Glebe Society Bulletin 2009 Issue 10

Total Page:16

File Type:pdf, Size:1020Kb

Glebe Society Bulletin 2009 Issue 10 A metro for Glebe? Well, maybe Many members will probably groan, and mutter ‘Not another pie-in-the-sky railway project!’ Believe it or not, it’s a fact that planning of Stage 2 of the Syd- ney Metro Network - a 24 km underground line from Central to Westmead - has begun. While it’s also a fact that funding has not been found for this ambitious project (the only funded metro project at present is the line from the CBD to Rozelle), members should be aware that a consulta- tive process is underway, and take the chance A modern metro train in the French city of to inform themselves on what is planned. Lyon. Photo: Bruce Davis The public consultation is part of the process modest ‘shop front’ building. of drawing up a draft environmental impact The construction phase will also have signifi- statement for the project. Already meetings cant local impact as it will require major ex- have been held in a number of centres, and an cavation in the park, and may also require a information session will be held at Leichhardt works depot on the northern side of Par- Town Hall on Saturday, 28 November (see ramatta Road between Derwent Street and p.2 for more information). Derwent Lane. Another aspect which will 10/2009 November/December 10/2009 November/December This was planned as the last of the current require careful management is the design and series of community briefings, but representa- positioning of several exhaust stacks servic- tives of Sydney Metro’s consultants who ing the underground station. briefed CoGG last week undertook to arrange A consultant working with the environmental a briefing for residents of Glebe and nearby assessment process tells us that a second areas. round of community information sessions is The Metro, should it be built, will have a sig- planned to take place in February, before the nificant impact on Glebe as a station is Environmental Assessment is lodged with the planned under Victoria Park adjacent to the Department of Planning towards the end of main entrance to Sydney University, and it is March. expected that this station will be connected to The full project assessment will then be the Broadway shopping centre. The main placed on public exhibition for a minimum of entrance to the station is proposed for the four weeks, and members of the public will southern side of Parramatta Road, opposite be invited to make submissions that will be Derwent Street, and is planned as a relatively taken into account in the formulation of the final plan. What’s coming soon? There is no need to make an appointment for the Leichhardt information session – just drop Saturday 28 November, 10am-2pm - Syd- in at Leichhardt Town Hall any time between ney Metro Community Information Session, 10am and 2pm. Leichhardt Town Hall. The Leichhardt session represents the start of Tuesday 1 December, 7pm - Musica Viva the consultation process in the local area, with concert, Gleebooks, 49 Glebe Point Road. the session for residents affected by the Vic- Wednesday 2 December, 6.30-7.30pm - toria Park station expected in coming weeks. Harold Park community update meeting at As this session will take place before the pub- St Scholastica’s College. lication of our first Bulletin for 2010, the Sunday 6 December, 3pm - Coro Innomi- Glebe Society will do its best to inform mem- nata at St Scholastica’s Chapel. bers through email and our website, Friday 11 December, 7pm - midnight – www.glebesociety.org.au. Glebe Society Christmas Party Dinner, Wen- - Bruce Davis tworth Park. Glebe Society Bulletin ISSN 1836-599X More Metro information on next page ... A publication of THE GLEBE SOCIETY INC PO Box 100 GLEBE 2037 www.glebesociety.org.au A metro for Glebe? Fencing off the Lord Mayor seeks to protect open space foreshore The Blackwattle campus of the Sydney The following is an extract from Chippendale and Darlington residents Secondary College has notified residents Clover’s e-news dated 20 November: already have low levels of open green that it plans to build a fence along its space and the CBD metro extension Ferry Road boundary near the rowing Stage 2 of the Sydney Metro includes must not result in a loss of vital open clubs. The fence will close off public a Broadway-University of Sydney green space. Sydney Metro must access through the school grounds to the station that would service the foreshore between Ferry Road and Pyr- examine alternative sites. Broadway Shopping Centre, mont Bridge Road. Chippendale, Darlington, Glebe and The City submission to the CBD This section of foreshore is the location the University of Sydney. Metro project recommended that of the final stage of the Glebe Foreshore Stage 1 of the Metro system be Maps show that station platforms will Walk and Cycleway, and originally was extended to the intersection of City scheduled by the City Council for com- be beneath Victoria Park and open Road and Broadway to serve the pletion soon after the section to Ferry space in the University of Sydney University of Sydney, Glebe Point Road. Unfortunately this did not occur, adjacent to Parramatta Road, with Road, Broadway Shopping Centre and partly due to complicated negotiations station entrances on existing green the Ultimo, Glebe and Chippendale between the City and the Education De- open space. neighbourhoods. partment, and partly because the City deferred funding for the project. I have asked the Minister for - Cr Clover Moore, MP, Lord Transport to work with the University The Blackwattle Cove Coalition (BCC) Mayor of Sydney of Sydney, the City and local residents raised this matter with the City’s chief to review suitable locations for this executive, Monica Barone, at a recent meeting and was assured that design metro station and protect green open work on the uncompleted section is pro- space. Community Information Session ceeding, but at this stage funding has not Victoria Park provides essential Sydney Metro been allocated – ‘maybe next year’. parkland in this precinct. While it is understandable that the school Network Stage 2 wishes to control access to its grounds (Central – Westmead) pending completion of the foreshore Why a station at walk, the Society sought an assurance Broadway-Sydney Stage 2 (Central – Westmead) is a that the fence will not impair completion University? 24km underground metro with of the project. stations at Westmead, Parramatta, The school Principal, Jill Collier, told the The proposed Broadway-Sydney Camellia, Silverwater, Sydney Bulletin that some members of the gen- University metro station will Olympic Park, Strathfield, eral public currently use the school as a provide: Burwood, Five Dock, Leichhardt, thoroughfare, and the temporary fence on Camperdown and Broadway- Improved access to Sydney Ferry Road was intended to prevent Sydney University, University, Victoria Park and the this. She said local residents would still Broadway Shopping Centre. There is a Community Information be able to use the steps and gate on Tay- Session on Saturday 28 November, lor Street to walk in the school grounds Access for Glebe, Darlington and 10am – 2pm at Leichhardt Town and to exercise their dogs, but they would Chippendale residents to Hall. There is no need to make an have to leave by the same gate. employment opportunities in the appointment – just drop in at any When the foreshore walk was extended Sydney CBD and to the west. time. past the school, this gate would be Reduced bus congestion on For further information about the moved further into the school grounds, Parramatta Road. project, please call 1800 636 910 or she said. Overhead or underground access visit www.sydneymetro.nsw.gov.au. BCC is also seeking information about across Parramatta Road, allowing - Sydney Metro invitation plans for the Blackwattle Bay wharves. easy access between suburbs to the Members may recall that an artist’s im- north and to the south. pression of the preferred plan was re- leased earlier in the year, but no further The preferred location for a station details have emerged. Public access at Broadway-Sydney University is in The other Abbey sold through the wharves is a vital part of the Victoria Park on the southern side of The Abbey in Johnson Street Annan- plan to extend the foreshore walk through Parramatta Road, west of City Road. dale, which the Glebe Society visited to Pyrmont and the city, and is included A worksite for station construction is in July, was sold at auction recently in the master plan for the wharves. The City is also interested in this section of also proposed in this location. for $4,800,000. I believe the buyers Pyrmont Bridge Road as part of its cycle were a family from Balmain. - Sydney Metro Community way strategy. Information display panel - David Mander Jones - Bruce Davis 2 Glebe Society Bulletin The Bays Precinct Saga – the last episode! John Brooks (Chair of the Blackwattle It had been our expectation that we process has been the strengthening of Cove Coalition) and I have put a lot of would be able to work until the end of linkages across community groups in effort into convening a sub-group of February to develop options for the Glebe, Balmain, Rozelle and Pyr- the Bays Precinct Community Refer- whole of the Precinct – as long as we mont/Ultimo. ence Group (CRG) to see how far we met the Government’s timeline on the To be fair, I would like to note that could go in developing a set of strate- Passenger Terminal. Our work sched- Verity Firth and her office have, at gic principles for the Bays Precinct ule has been premised on this.
Recommended publications
  • Heritage Tree List
    1 HERITAGE TREE LIST A Development Application must be lodged with Council if you are seeking permission to remove a tree from any property listed below which Council have deemed as important and require development consent in accordance with Clause 5.10(2) of the Sydney Local Environmental Plan 2012. The following Heritage Items are listed and described in accordance with Schedule 5 of the Sydney Local Environmental Plan 2012. Suburb Address Item Name Property Description Sig. Item No. Camperdown Alexandria Drive Former Alexandria Hospital palm trees lot 24, DP 270241 Local I40 Camperdown Missenden Road Royal Prince Alfred Hospital group including Lot 101, DP 819559, Lot 1, DP State I68 buildings and their interiors, trees and ground 860610 Camperdown Parramatta Road Site landscaping, University of Sydney Land in MS 5912.300; Land in Local I72 perimeter fencing and gates MS 635.650 Camperdown 20 Pyrmont Bridge Road, Former Royal Alexandra Hospital for Children Lots 16, 17, 23, 26 and 27, DP Local I91 30 Pyrmont Bridge Road, boundary landscaping 270241 (SP 69440, SP 71747 2-4 Sterling Circuit Camperdown 15 Carillon Avenue Women's College group, University of Sydney Land in MS 2878.3000; Lot 761, State I45 including building interiors and grounds DP 752049 Camperdown 19 Carillon Avenue St Andrew's College, University of Sydney Lot 1, DP 137172 Local I46 including main building and interior, quadrangle and grounds Camperdown City Road St Paul's College group, University of Sydney Lot 1966, DP 1117595 Local I52 buildings and their interiors, quadrangles, oval and scoreboard, cricket pavilion and grounds Camperdown 8A Missenden Road St John's College, University of Sydney Lot 2, DP 1124852 Local I67 including main building and interior, quadrangle, gate lodge and interior, fence and gate and grounds Centennial Park 70A Cook Road House " Sandringham" including interior, front Lot 1002, DP 1013499 Local I100 fence and grounds 2 Suburb Address Item Name Property Description Sig.
    [Show full text]
  • Sydney Fish Markets Redevelopment Aboriginal Heritage Interpretation Plan: Rev 1
    Sydney Fish Markets Redevelopment Aboriginal Heritage Interpretation Plan: Rev 1 Sydney Fish Markets Redevelopment Aboriginal Heritage Interpretation Plan REV 1 Report to Multiplex 12 February 2021 Page i Sydney Fish Markets Redevelopment Aboriginal Heritage Interpretation Plan: Rev 1 Document history and status Date Review type Revision Date issued Reviewed by Approved by approved Internal 5 Feb 2021 Sandra Wallace, Sandra 5 Feb 2021 Internal review Artefact Wallace, Artefact Client 5 Feb 2021 Mitch Pellling, Mitch Pellling, 8 Feb 2021, Client review Multiplex Multiplex with minor amendments Rev 1 12 Feb 2021 Rev 2 Final Printed: Last saved: 5 March 2021 File name: Sydney Fish Markets Aboriginal HIP Author: Darrienne Wyndham and Carolyn MacLulich Project manager: Carolyn MacLulich Name of organisation: Artefact Heritage Services Pty Ltd Name of project: Sydney Fish Markets Redevelopment Stage 2 Sydney Fish Markets Redevelopment Stage 2 Aboriginal Heritage Name of document: Interpretation Plan Document version: REV 1 © Artefact Heritage Services, 2021 This document is and shall remain the property of Artefact Heritage Services. This document may only be used for the purposes for which it was commissioned and in accordance with the Terms of the Engagement for the commission. Unauthorised use of this document in any form whatsoever is prohibited. Disclaimer: Artefact Heritage Services has completed this document in accordance with the relevant federal, state and local legislation and current industry best practice. The company accepts no liability for any damages or loss incurred as a result of reliance placed upon the document content or for any purpose other than that for which it was intended.
    [Show full text]
  • Glebe Society Bulletin 2017 Issue 06
    Sunday 20 August 2017 11am-1pm Glebe Town Hall Nomination forms must be signed by two members of the Society and accompanied by the written consent of the candidate. I invite you to get in touch with me ([email protected]) to discuss your interest in joining the Management Committee and to learn more about what is involved. We will All members of the Society, and especially new be happy to provide information about the members, are cordially invited to attend the Management Committee and our very active Annual General Meeting of the Society at Glebe subcommittees, which are open to any member Town Hall, St Johns Rd Glebe on Sunday 20 to join. August at 11am. Allan Hogan In addition to the usual business activities of the President AGM, we will be addressed by guest speakers Senior Constable Renee Fortuna, Youth Liaison Agenda for the AGM Officer, and Detective Inspector Gavin Beck, Welcome and acknowledgement of country Crime Manager, of the Leichhardt Local Area (Allan Hogan) Command. They will speak about the work they Apologies do with youth programs in the Glebe area. Minutes of 2016 Annual General Meeting Renee is a talented amateur boxer and works for confirmation closely with Indigenous youth in the Glebe area. Members might remember hearing her speak at Treasurer’s report for 2016-2017 (Jane the Centipede fundraiser last year. Gatwood) Office bearers of the Society and other members Subcommittee reports (including questions on reports already published) of the Management Committee will be elected at the AGM and members are warmly encouraged President’s report (Allan Hogan) to consider the benefits of active involvement in Election of Management Committee for your Society.
    [Show full text]
  • Autumn 2016 Edition (Pdf)
    ADVERTORIAL Autumn 2016 www.twentieth.org.au ISSN 1440-639X The Protected Tax Status of the Home – A Misguided Concession? Introduction A review of the Explanatory Memorandum to the 1986 bill introduc- as these costs tended to be related to the capital value of the property. ing, with effect from 20 September 1985, capital gains tax on most things, devotes little more than a page out of 160 pages to the exemp- So, aside from any political difficulty in implementing a comprehen- tion of the home from such a tax and says nothing as to why the exemp- sive taxation solution, it seems that the present quality of data relating tion exists1. to property values, income and costs is not sufficiently accurate and/or reliable to base a taxation regime on it. A review of different capital gains tax regimes around the world reveals that most exempt the family home, but usually with demanding resi- Perhaps an effort should be made to improve the quality of such data. It is interesting to note that the UK is conducting research into imputed M ODERN AND dence requirements and/or repurchase requirements. Commonwealth 8 countries such as the U.K., Canada and Australia have the most gener- rent , and that South Africa has effectively implemented a capital gains tax regime along the lines of what the Australia Institute advocated ous exemptions, although notably New Zealand has no capital gain tax 9 at all2. The largest economy in the world, the United States, provides earlier this year . SU M PTUOUS no family home capital gains tax exemption3.
    [Show full text]
  • Post Exhibition - Planning Proposal - 225-279 Broadway, Glebe - Sydney Local Environmental Plan 2012 and Sydney Development Control Plan 2012 Amendment
    Transport, Heritage and Planning Committee 12 August 2019 Post Exhibition - Planning Proposal - 225-279 Broadway, Glebe - Sydney Local Environmental Plan 2012 and Sydney Development Control Plan 2012 Amendment File No: X001999 Summary This City-led planning proposal will facilitate the renewal of a strategically important site on Broadway, located adjacent to the University of Sydney and acting as a gateway to Central Sydney. The innovative new planning controls will encourage future development to support the nearby health, education and research cluster of the Camperdown-Ultimo health and education precinct, create a lively and interesting ground floor presence along Broadway and Grose Street, and deliver improved energy efficiency performance. The planning proposal protects the long standing and important heritage significance of the site by listing the Former International Harvester Company of America building, and placing sympathetic new development within a street wall punctuated by three landmark heritage items. A planning proposal for 225-279 Broadway, Glebe was endorsed by Council and the Central Sydney Planning Committee to go on public exhibition in March 2018. This report includes the outcomes of exhibition, and details changes made to the planning proposal in response to submissions and further internal consideration. It recommends approval of the finalised controls which incorporate post-exhibition amendments, comprising of a planning proposal to amend Sydney Local Environmental Plan 2012 (LEP) at Attachments A1-A4, and an amendment to Sydney Development Control Plan 2012 (DCP), at Attachment B. The changes to the LEP include: Changing the Height of Buildings control from a relative height limit above ground to fixed heights measured in reduced levels (RL) based on the Australian Height Datum (AHD).
    [Show full text]
  • Attachment A
    Attachment A Accommodation Grant Program – Annual Performance Review Ratings 9 Accommodation Grant Recipient List ORGANISATION PROPERTY ADDRESS RATING 2018 Assessment: Grant Recipients rated A (meeting performance criteria) 107 Projects Inc 107 Redfern Street, Redfern A 107 Projects Inc Level 1, 107 Redfern Street, Redfern A Asian Australian Artists Corporation Building, 181-187 Hay Street A Association Haymarket Australian Design Centre 113-115 William Street, Darlinghurst A Australian Screen Editors Rex Centre, 50-58 Macleay Street, Elizabeth A Inc Bay Beehive Industries Co-op 137 Palmer Street, Darlinghurst A Big Fag Press Inc Jubilee - Viaducts, 6 Chapman Road, A Annandale Brand X East Sydney Community and Arts Centre, 225- A 245 Palmer Street, Darlinghurst Counterpoint Community Alexandria Town Hall, 73 Garden Street, A Services Inc Alexandria Darlinghurst Theatre Eternity Playhouse, 249 Palmer Street, A Company Darlinghurst Feminist Legal Clinic Inc Suite 2, Benledi House, 186 Glebe Point Road, A Glebe First Draft Inc Depot - Riley Street, 13-17 Riley Street, A Woolloomooloo Gay & Lesbian Rights Glebe Community Centre - Benledi House, A Lobby 186-194 Glebe Point Road, Glebe Geoff Holmes T/as Glebe Jubilee - Viaducts, 6 Chapman Road, A Music Project Annandale Glebe District Hockey Club Jubilee - Viaducts, 6 Chapman Road, A Inc Annandale Goodstart Early Learning The Crescent Early Learning Centre, 7 A Ltd Chapman Rd, Annandale Goodstart Early Learning East Sydney Early Learning Centre, 277 A Ltd Bourke St, Darlinghurst Goodstart Early
    [Show full text]
  • List of Members
    x X I". LIST OF MEMBERS. SEPTE.\1BER 30, 1907. 1886 AD AMS , W. J. ... 163 C]a.rence-street, Sydney, 1901 ADAM SO NJ H. Adelaid e S.S. Co., Ltd., Syuney. 1888 AHRBECKER, H. V. Mort's Dock & Engineerin g Co. , L td:, Balmain. 1905 ALLEN, M. " Dundee," Burlington-st., North- Sydney. 1906 ApPLETON, T. Woo .. 63 Booth-street, Balmain. 1903 ARNOT , A. J. 427 Sussex-street, Sydney. 1907 BALFOUR, J. W .... Borough E lec tric Lighting E ngineer, Redfern. 1907 BOGENRIEDER, 0 .... 9 Castlel'eagh-st l- eet, Sydney. 1902 BOH LER, G. Mort's Dock & Engineering Co " Ltd., Balmain. 1897 BOOTH, W. Messrs. J ohn Danks' Lead Works, Blackfriars, Sydney. 1903 BOR'fHW ICK, D. 24 F itzroy-avenue, Balmain. 1904 BOltLAND, R. Government Dockyard, Biloela. 1886 BOULTON. G. Mort's Dock & Engineeriug Co., L td., Balmain. 1899 BOWDEN , T . ClJde E ngineering Works, Granvil le. 1903 BRAGG, J. W. '" 7 Bent-street , Sydney. 1888 BROWN. T . Sydney Ferries, Ltd., Sydney. 1884 B USH, T .•T. 163 K ent-street, Sydney. 1887 CHRISTIE, A. 93 P itt-street, Sydney. 1892 CHRISTIE, P . N . Sydney Harbour Trust, Sydney. 1900 CLAYTON, R. Colonial Sugar Refining Co, Sydney. 1901 COGGER, G. P . Pyrmont Refinery, Pyrmont. 1903 CONNI F., P . _. Co lonial Sugar Hefining Co., Sydney. 1870 CRUICKSHANK,W .D. Cameron's-avenue, Balmain. 1907 CULLE N, A. ... Power S tation, Ultimo. 1891 CUTLER , A. E. .., Government Dockyard, Biloela_ 1900 DAVIS, C. H. .._ 25 Broad-st., New York, U.S. America. 1906 ED WARDS, J08. 85 PORt Office Chambers, P itt-street, Sydney.
    [Show full text]
  • The Story of Conybeare Morrison
    THE STORY OF CONYBEARE MORRISON F ew designers have made such an indelible mark on Sydney’s urban spaces, infrastructure and architecture as Darrel Conybeare and Bill Morrison. Together, these two have produced innovations so pervasive through Sydney that they have become part of the ‘furniture’ – yet their significance has largely gone unrecognised. Outdoor Design Source takes a closer look at Conybeare and Morrison’s contribution to the design of the Harbour City and seeks to discover the secret to their extraordinary partnership. 66 LUMINARY I www.outdoordesign.com.au LUMINARY 67 "Their work has subtly and skilfully become part of the fabric of Sydney's metropolitan landscape." Previous page: Bill Morrison n 1962 Darrel Conybeare graduated from the Sydney Park and Parramatta Park. Through this and Darrel Conybeare on their University of Sydney with First Class Honours period he sought to raise consciousness towards SFA classic, The Plaza Seat Iin Architecture winning the prestigious a redesign for Circular Quay. Top left: Mixed-use residential University Medal. He attained a Masters in William Morrison graduated in architecture and commercial towers, Architecture and City Planning at the University at the University of Sydney in 1965. His early Figtree Drive, Homebush of Pennsylvania and went on to work in various years were spent with the Commonwealth Bottom left: Conybeare American architectural practices, including the Department of Works and at the National Morrison’s recent residential esteemed office of Ray & Charles Eames as the Capital Development Commission, Canberra, I was extensive, and given the innovative nature Street Furniture Australia. Founded in 1986 Darling Harbour; George Street North, work, Epping Road, Lane Cove Project Design Director of the National Fisheries which introduced him to a broader vision.
    [Show full text]
  • The Living Daylights 2(9) Richard Neville Editor
    University of Wollongong Research Online The Living Daylights Historical & Cultural Collections 3-1974 The Living Daylights 2(9) Richard Neville Editor Follow this and additional works at: http://ro.uow.edu.au/livingdaylights Recommended Citation Neville, Richard, (1974), The Living Daylights 2(9), Incorporated Newsagencies Company, Melbourne, vol.2 no.9, March 5- 11, 28p. http://ro.uow.edu.au/livingdaylights/19 Research Online is the open access institutional repository for the University of Wollongong. For further information contact the UOW Library: [email protected] The Living Daylights 2(9) Publisher Incorporated Newsagencies Company, Melbourne, vol.2 no.9, March 5- 11, 28p This serial is available at Research Online: http://ro.uow.edu.au/livingdaylights/19 30c Vol.2No.9 March 5-11 1974 INTERNATIONAL WOMENS DAY march 8&9 Stomping the violent male Brazil’s decade of murder Grovelling in Canberra What’s on in your town Liife & Death HIS week The living daylights looks i cakT AD/); Tat dying. When Allison Gillmore visit­ w f cArir h w i f ' ed the offices with plans for exploring the b E U \E Fk, Australian way o f death, we said sure, FOP-TMM a n d mason smilingly, and expected never again to see Richard Beckett CANT C0N\peT£ Wl7b her. Ideas are cheap around newspaper OVfK P R IC E S ' offices, with the talkers outnumbering the beats up &JT 7 7 /f5 executors, and while much is cast upon the - s /f o p waters, less is washed up by the tide. But the w eek’s news Allison returned, with a thick folio on HAT’LL TEACH US TO ACT AS death styles — including a guide on how to TAN INDEPENDENT NATION: bury your own — which begins eccentrical­ : Still totally unable to get used to the ly on page 9.
    [Show full text]
  • Second Report on the Inquiry Into Children in Institutional Or Out-Of-Home Care
    The Senate Community Affairs References Committee Protecting vulnerable children: A national challenge Second report on the inquiry into children in institutional or out-of-home care March 2005 © Commonwealth of Australia 2005 ISBN 0 642 71493 2 Senate Community Affairs References Committee Secretariat Mr Elton Humphery (Secretary) Ms Christine McDonald (Principal Research Officer) Ms Geraldine Badham (Principal Research Officer) Mr Peter Short (Senior Research Officer) Ms Leonie Peake (Research Officer) Ms Ingrid Zappe (Executive Assistant) The Senate Parliament House Canberra ACT 2600 Phone: 02 6277 3515 Fax: 02 6277 5829 E-mail: [email protected] Internet: http://www.aph.gov.au/senate_ca This document was produced by the Senate Community Affairs References Committee Secretariat and printed by the Senate Printing Unit, Parliament House, Canberra. Any nation that does not care for and protect all of its children does not deserve to be called a nation Nelson Mandela v MEMBERSHIP OF THE COMMITTEE 40TH PARLIAMENT Members Senator Jan McLucas, Chair (from 29.3.04) ALP, Queensland Senator Steve Hutchins, Chairman (until 29.3.04) ALP, New South Wales Senator Sue Knowles, Deputy Chairman LP, Western Australia Senator Gary Humphries LP, Australian Capital Territory Senator Claire Moore ALP, Queensland Senator Andrew Murray AD, Western Australia (to replace Senator Meg Lees for this inquiry) Participating Members Senator the Hon Eric Abetz LP, Tasmania Senator Lyn Allison AD, Victoria Senator Guy Barnett LP, Tasmania Senator Andrew
    [Show full text]
  • Peter Forsyth Auditorium Access Information
    Peter Forsyth Auditorium access information Contents About Peter Forsyth Auditorium ................................................................................ 1 Getting to PFA .......................................................................................................... 1 Public transport ..................................................................................................... 1 Driving or parking .................................................................................................. 2 Taxis and private vehicles ..................................................................................... 2 Entrance ................................................................................................................... 3 Toilets ....................................................................................................................... 3 Change and shower facilities .................................................................................... 4 Spectator areas ......................................................................................................... 4 Audio communication ................................................................................................ 5 Kitchenette ................................................................................................................ 5 Find out more ............................................................................................................ 5 About Peter Forsyth Auditorium Peter Forsyth Auditorium
    [Show full text]
  • Sydney Local Environmental Plan 2012 Under the Environmental Planning and Assessment Act 1979
    2012 No 628 New South Wales Sydney Local Environmental Plan 2012 under the Environmental Planning and Assessment Act 1979 I, the Minister for Planning and Infrastructure, pursuant to section 33A of the Environmental Planning and Assessment Act 1979, adopt the mandatory provisions of the Standard Instrument (Local Environmental Plans) Order 2006 and prescribe matters required or permitted by that Order so as to make a local environmental plan as follows. (S07/01049) SAM HADDAD As delegate for the Minister for Planning and Infrastructure Published LW 14 December 2012 Page 1 2012 No 628 Sydney Local Environmental Plan 2012 Contents Page Part 1 Preliminary 1.1 Name of Plan 6 1.1AA Commencement 6 1.2 Aims of Plan 6 1.3 Land to which Plan applies 7 1.4 Definitions 7 1.5 Notes 7 1.6 Consent authority 7 1.7 Maps 7 1.8 Repeal of planning instruments applying to land 8 1.8A Savings provision relating to development applications 8 1.9 Application of SEPPs 9 1.9A Suspension of covenants, agreements and instruments 9 Part 2 Permitted or prohibited development 2.1 Land use zones 11 2.2 Zoning of land to which Plan applies 11 2.3 Zone objectives and Land Use Table 11 2.4 Unzoned land 12 2.5 Additional permitted uses for particular land 13 2.6 Subdivision—consent requirements 13 2.7 Demolition requires development consent 13 2.8 Temporary use of land 13 Land Use Table 14 Part 3 Exempt and complying development 3.1 Exempt development 27 3.2 Complying development 28 3.3 Environmentally sensitive areas excluded 29 Part 4 Principal development standards
    [Show full text]