Proposed Project: Clearwater West Project
BC AB SK
Fort McMurray
Grande Prairie Mainline Loop Grande No. 2 (Huallen Section) Prairie
Grande Prairie Mainline Loop No. 3 (Elmworth Section 1)
Edmonton
Wolf Lake Compressor Station Unit Addition
Clearwater Compressor Station Unit Addition
Calgary
Medicine Hat Clearwater West Project
The Project NOVA Gas Transmission Ltd. (NGTL) System, a wholly owned subsidiary of TransCanada PipeLines Limited (TransCanada), is proposing to construct and operate new facility additions to its natural gas pipeline system in northern Alberta as the Clearwater West Project (the Project). The Project is required to accommodate the transportation of growing natural gas production from the Peace River area, which includes a shift of production from other areas on the NGTL System to the northwest portion of the NGTL System. The Project will support many Canadian natural gas producers, allowing TransCanada’s NGTL System to continue to meet aggregate system needs and provide safe, reliable access to North American markets. We anticipate submitting an application to the National Energy Board (NEB) under Section 58 of the National Energy Board Act in Q2 2018 with an anticipated in-service date in Q2 2020 for all Project components.
Project Schedule • Q3 2017 – Initial stakeholder notification and consultation • Q2 2018 – Anticipated Section 58 Project application to the NEB • Q1 2019 – Anticipated regulatory approval to construct • Q1 2019 – Begin construction of Compressor Station and pipeline additions • Q2 2020 – Anticipated in-service dates for all Project components
Clearwater West Project – December 2017 Clearwater West Project
ALBRIGHT POPLAR HILL
N WEMBLEY NO. 2 SALES WEMBLEY Henderson Lake t e Anderson LakeAnderson Lake WEMLoweBLEY S ALakeLES 73 - 11 - W6M B 73 - 10 - W6M 73 - 9 - W6M NIOBE k 73 - 8 - W6M e ee WEMBLEY SOUTH SALES a r r C Lowe Lake il R ta HYTHE Bear River Grande Prairie Mainline Loop No. 2 r i ve v ea e B r (Huallen Section) Mcneill
k Lake e The proposed pipeline section would be located e Mcneill Lake Wilkin r Wilkin Lake C Bear Lake n u HOMMYPROVINCIAL Lake o parallel to an existing pipeline corridor where h y k u PARK q Bisbing Lake a e l H e o Cutbank Lake l r t r feasible in the County of Grande Prairie in ALBRIGHT C C Hay Creek Bisbing Lake Cutbank Lake Colquhoun Creek Alberta. The installation of approximately 72 - 11 - W6M Deep Lake 72 - 10 - W6M 72 - 9 - W6M 72 - 8 - W6M 13 kilometres (km) of 48-inch diameter pipeline ra e Pra r e a l e oo o SASKATOON LAKE SASKATOON would start approximately eight km southeast MOUNTAINNAT alle URAL ect o Yoke Lake AREA of Beaverlodge, Alberta at SE-12-71-10 W6 and BEAVERLODGE Harold Saskatoon Lake Saskatoon Lake Burgess Lake ea erlo e Creek SASKATOON ending at SW-17-72-9-W6. k ISLANDPROVINCIAL e e k Little Lake Fowel LaLkoewen Lake r e PARK e C r d Uswell Lake Funell Lake l C ro e Hackmatach Lake Beaverlodge River a c WAPITI NORTH SALES WAPITI NORTH u H r HAYFIELD B B ea S ve WEMBLEY pring 71 - 11 - W6M rl 71 - 10 - W6M od Bruce71 - 9 - WCreek6M Cree ge 71 - 8 - W6M k R iv er We le
LEIGHMORE alco rtHALCOURT PIPESTONE CREEK CS P