App,Caron for MTNTNG of Mrnor *J:#R'.Xor* Caregory'82'for Less Rhan and EQUAL to FIVE HECTARE
Total Page:16
File Type:pdf, Size:1020Kb
APPENDIX VIII App,cAroN FoR MTNTNG oF MrNoR *J:#r'.Xor* cArEGoRy'82'FoR LEss rHAN AND EQUAL TO FIVE HECTARE Basic lnformation Name of the Mining Lease site: - Kiroli River Bed Sand Mining Tehsil : Koregaon, District: Satara, Maharashtra Location / site (GPS Co-ordinates):- Pillar No. Latitude Longitude BP-1 l_7"31"'45.4" N 74"08'55.1" E BP -2 17"31'47.7" N 74"08'55.4" E Size of the Mining Lease (Hectare):- 0.234Ha Capacity of Mining Lease (TPA):- Quantity of sand 826 Brass Period of Mining Lease:- Period of Mine Lease will be One Year (2018- 2019) or up t o 30.09.2019 Expected cost ofthe Project: - Contact lnformation of consultant: Mantras Green Resources Ltd. Tel-+9L253-2355665 E-mail : info@ m antrasresources.com, uksharma @ mantrasresou rces.com Accredited by NABET: No: - NABET/EtA/161.9/RA0060/ June 29, 2OLt) Environmental Sensitivity:- sl. Areas Distance in No. kilometer / oetails 1 Distance of project site from nearest rail or road None,0 Km bridge over the concerned River, Rivulet, Nallah etc. 2 Distance from infrastructural facilities Railway line Targaon Railway Station near about 1.82 km in South East Direction National Highway National Highway No. NH-4 Near about 8.10 km West State Hlghway Direction None, 0 km Major District Road Rahimatpur, Satara Wai are Any Other Road , the nearby by towns to Wathar- [kiroli] having road connectivity to Wathar- [kircli] None, 0 km Electric transmission line pole or tor,rrer None, 0 km Canal or check dam or reservoirs or lake or ponds Dug Well & Bore Well ln-take for drinking uvater pump house None, 0 km lntake for lrrigation canal puntps 3 Areas protected under international conventions, There are any no intenrational national or local legislation for conventions, national or local their ecological, landscape, cultural or other related legislation for their ecological, value landscape, cultural or" other related value. --l 4 Areas which are important or sensitive for ecological Koyna Wildlife Sanctuary at i l reasons - Wetlands, 128.8 km I watercourses or other water bodies, coastal zone, biospheres, mountains, forests 5 Areas used by protected, important or sensitive There is no any sensitive species of flora or fauna for species of flora or fauna for I breeding, nesting, foraging, resting, ovei" wintering, breed ing, nesting, foraging, I migration resting, over wintering, migration I 6 lnland, coastal, marine or underground waters T[. l"r* ** ilp"r *r*v ir l- a River Bed of Krushna River. i Coastal, marine water are not present. The sand mining of l river bed may encounter I underground water, but I precautions will be taken I 7 State, National boundaries None, 0 km 8 Routes or facilities used by the public for access to Datta Mandir at 0.5 recreation or other tourist, pilgrim areas 9 Defense installations None -1 10 Densely populated or built-up area, distance from Takale ( 3 KM ), Mohitewadi nearest human habitation (3KM) 1,1 Areas occupied by sensitive man-made land uses Medical Facility is available in (hospitals, schools, places of worship, community village Kiroli near about 2.10 Km.NE Direction. fa cilities ) School is at village Kiroli near about 2.10 Km.NE Direction 1,2 Areas containing important, high quality or scarce Areas containing important, resources (ground water resources, surface resources, high quality or scarce resource forestry, agriculture, fisheries, tourism, minerals) are not present t3 Areas already subjected to pollution or environmental None damage. (those where existing legal environmental standards are exceeded) T4 Areas susceptible to natural hazard which could cause None the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) 15 ls proposed mining site located over or near fissure / None fracture for ground water recharge 1,6 Whether the proposal involves approval or clearance No clearance is required under under the following Regulations or Acts, namely:- the mentioned Acts/rules. (a) The Forest (Conservation) Act, 19g0; (b) The Wildlife (Protection) Act,1,972; (c)The Coastal Regulation Zone Notification, 201"1,. lf yes, details of the same and their status to be given. t7 Forest land involved (hectares) No forest land is involved 1B Whether there is any litigation pending against the None project and/or land in which the project is propose to be set up? (a) Name of the Court (b) Case No. (c) Orders or directions of the Court, if any, and its relevance with the proposed project Along with name and address).