Key Centre – Shifnal
Total Page:16
File Type:pdf, Size:1020Kb

Load more
Recommended publications
-
Land North West of Stableford Hall Stableford Bridgnorth Shropshire
Committee and date South Planning Committee 13 January 2015 Development Management Report Responsible Officer: Tim Rogers email: [email protected] Tel: 01743 258773 Fax: 01743 252619 Summary of Application Application Number: 14/04387/FUL Parish: Worfield Proposal : Application under Section 73a of the Town and Country Planning Act 1990 for the erection of an agricultural building and formation of an agricultural access track (part retrospective) Site Address : Land North West Of Stableford Hall Stableford Bridgnorth Shropshire Applicant : Mr B Higginson Case Officer : Thomas Cannaby email : [email protected] Grid Ref: 375735 - 298714 Land North West of Stableford Hall, South Planning Committee – 13 January 2015 Bridgnorth © Crown Copyright. All rights reserved. Shropshire Council 100049049. 2011 For reference purposes only. No further copies may be made. Contact: Tim Rogers (01743) 258773 Land North West of Stableford Hall, South Planning Committee – 13 January 2015 Bridgnorth Recommendation:- Grant Permission,subject to confirmation that the building would be sited outside of flood zones 2 and 3, and to the conditions set out in Appendix 1. REPORT 1.0 THE PROPOSAL 1.1 The application is for the erection of an agricultural building and the formation of an access track on land adjacent to the River Worfe, near Stableford. The application is in part retrospective, with the access track already under construction and this application resulting from an investigation of an enforcement complaint against the works. 1.2 The proposed building would be of steel portal framed construction, with part block walls and part timber weather board cladding, and with a fibre cement sheet roof. -
Advisory Visit River Worfe March 2011
Advisory Visit River Worfe March 2011 1.0 Introduction This report is the output of a site visit undertaken by Tim Jacklin of the Wild Trout Trust to the River Worfe, Shropshire on 7th March, 2011. Comments in this report are based on observations on the day of the site visit and discussions with Tony Bostock of Severn Rivers Trust and Simon Cumming of the Environment Agency. Normal convention is applied throughout the report with respect to bank identification, i.e. the banks are designated left hand bank (LHB) or right hand bank (RHB) whilst looking downstream. 2.0 Catchment / Fishery Overview The River Worfe rises to the east of Telford and flows south near Ryton, Badger and Worfield where it turns west to join the River Severn just north of Bridgnorth. The river flows off the mid-Severn sandstone plateau and the underlying geology is largely Triassic sandstone, with superficial deposits of till or river terrace material. The three areas of the river inspected during this visit were to the south of Davenport House (SO752950), upstream of Worfield (SO759961) and downstream of Broad Bridge (SO761981) near Stableford. The lower section of the river from Rindleford down to the Severn was seen from a car. The river is fished by Salopian Fly Fishers (www.salopianflyfishers.co.uk) although some beats have recently been relinquished. Tony Bostock has fished the River Worfe for 37 years and reports a decline in the trout fishery in recent years based on personal experience and historic records. A full- time river keeper was employed by the Apley Estate in the 1930s and he kept written records regarding the river. -
The Shropshire Landscape Typology
The Shropshire Landscape Typology September 2006 Contents Part I – Setting the Scene 1 Introduction 2 The Shropshire Character Framework 5 Assessing Landscape Character 6 Part II – The Typology 11 Defining landscape types 12 High Open Moorland 14 High Enclosed Plateau 16 High Volcanic Hills and Slopes 18 Upland Smallholdings 20 Upstanding Enclosed Commons 22 Pasture Hills 24 Principal Wooded Hills 26 Wooded River Gorge 28 Wooded Hills and Farmlands 30 Wooded Hills and Estatelands 32 Sandstone Hills 34 Sandstone Estatelands 36 Incised Sandstone Valleys 38 Wooded Forest 40 Forest Smallholdings 42 Timbered Plateau Farmlands 44 Principal Timbered Farmlands 46 Timbered Pastures 48 Wooded Estatelands 50 Estate Farmlands 52 Settled Pastoral Farmlands 54 Principal Settled Farmlands 56 i Contents Part II – The Typology continued Enclosed Lowland Heaths 58 Lowland Moors 60 Riverside Meadows 62 Lowland Moss 64 Coalfields 66 Glossary 68 Further Information 73 ii Part I Setting the Scene “For the personality of a man reacting upon the spirit of a place produces something which is neither man nor the place, but fiercer and more beautiful than either” Mary Webb. The Golden Arrow © Gordon Dickens 1 Introduction Shropshire possesses one of the richest and most varied landscapes of any of the English counties. It offers a diverse range of scenery: from the lakes and rolling pasturelands around Ellesmere in the north, to the gaunt moorlands of the Clee Hills, with their stark industrial ruins, in the south; the densely wooded scarps of Wenlock Edge; or the straight, sandy lanes of the north-eastern heathlands, with their large arable fields and ‘big skys’. -
Global-Report-2 Sided 1 Column
Telford & Wrekin Council Scoping Water Cycle Study Final Report Hyder Consulting (UK) Limited 2212959 5th Floor The Pithay All Saints Street Bristol BS1 2NL United Kingdom Tel: +44 (0)117 372 1200 Fax: +44 (0)117 37 www.hyderconsulting.com Telford & Wrekin Council Scoping Water Cycle Study Final Report Author Heather Taylor Checker Liam Foster / Aimee Hart Approver Heather Taylor Report No 1 Date 5th September 2012 This report has been prepared for Telford & Wrekin Council in accordance with the terms and conditions of appointment for Final Report dated 3rd March 2012. Hyder Consulting (UK) Limited (2212959) cannot accept any responsibility for any use of or reliance on the contents of this report by any third party. Scoping Water Cycle Study—Final Report Hyder Consulting (UK) Limited-2212959 k:\uaprojects\ua004156 telford & wrekin\i- issued\5001-ua004156-telford wrekin scoping wcs-r-bm-final issue september 2012.docx CONTENTS 1 Executive Summary .............................................................................. 1 2 Introduction ........................................................................................... 3 2.1 Background to Study ............................................................................ 3 2.2 What is a Water Cycle Study (WCS)? .................................................. 4 2.3 Study area ............................................................................................ 6 2.4 The Water Cycle .................................................................................. -
Regulation 19: Pre-Submission Draft of the Shropshire Local Plan 2016 to 2038
Shropshire Council Regulation 19: Pre-Submission Draft of the Shropshire Local Plan 2016 to 2038 December 2020 Regulation 19: Pre-Submission Draft of the Shropshire Local Plan Page 0 1. Contents 2. Introduction ...................................................................................... 6 Shropshire’s Character ................................................................................... 6 National Planning Policy Framework (NPPF) ................................................ 8 The Shropshire Local Plan 2016 to 2038 ....................................................... 8 Cross Boundary Issues and the Duty to Cooperate ................................... 10 Infrastructure ................................................................................................. 10 Neighbourhood Plans and Community Led Plans ...................................... 10 3. Strategic Policies ........................................................................... 12 SP1. The Shropshire Test ......................................................................... 12 SP2. Strategic Approach ........................................................................... 13 SP3. Climate Change ................................................................................. 22 SP4. Sustainable Development................................................................. 25 SP5. High-Quality Design .......................................................................... 26 SP6. Health and Wellbeing ....................................................................... -
Water Resources Modelling of the Worfe River Catchment and Perak State Using Remote Sensing and GIS
HydroGIS 96: Application of Geographic Information Systems in Hydrology and Water Resources Management (Proceedings of the Vienna Conference, April 1996). IAHS Publ. no. 235, 1996. 605 Water resources modelling of the Worfe River catchment and Perak State using remote sensing and GIS MD AZLIN MD SAID School of Civil Engineering, University Sains Malaysia, Perak Branch Campus, Seri Iskandar, 31750 Tronoh, Perak, Malaysia Abstract Water resources modelling using spatial data inputs is capable of giving good representation of the hydrological processes involved. Two case studies are presented in this paper, one in which an established model was utilized and the other a model being developed. In both case studies, satellite images were used to provide land use/cover information. In the first case study, the model for the Worfe River catchment was used. Landsat MSS data, GIS techniques and Digital Terrain models were utilized to provide the necessary spatial information, such as land cover/use, rainfall and permeable soil distribution to estimate the recharge estimates. Several modelling cases were run which produced mixed groundwater and river flow results. The second case study is to evaluate the water resources availability for the State of Perak in Malaysia. A water resources model is currently being developed to integrate various spatial data inputs. Several problems were encountered in developing this model will be discussed in this paper. INTRODUCTION The use of mathematical models for the simulation of hydrological processes with water resources has become a common approach. In most cases, field data measurements from known locations in the study area are obtained and applied as input to the models. -
Bridgnorth and Surrounding Area Place Plan This Version Published 2019/20
Bridgnorth and Surrounding Area Place Plan This version published 2019/20 1 Contents Context What is a Place Plan? 3 Section 1 List of Projects 5 1.1 Data and information review 1.2 Prioritisation of projects 1.3 Projects for Bridgnorth and Surrounding Area Place Plan 1.4 Potential Projects Section 2 Planning in Shropshire 26 2.1 County-wide planning processes 2.2 This Place Plan area in the county-wide plan Section 3 More about this area 29 3.1 Place Plan boundaries 3.2 Pen picture of the area 3.3 List of Parishes and Elected Members 3.4 Other local plans Section 4 Reviewing the Place Plan 33 4.1 Previous reviews 4.2 Future reviews Annexe 1 Supporting information 35 2 Context: what is a Place Plan? Shropshire Council is working to make Shropshire a great place to live, learn, work, and visit – we want to innovate to thrive. To make that ambition a reality, we need to understand what our towns and communities need in order to make them better places for all. Our Place Plans – of which there are 18 across the county – paint a picture of each local area and help all of us to shape and improve our communities. Place Plans are documents which bring together information about a defined area. The information that they contain is focussed on infrastructure needs, such as roads, transport facilities, flood defences, schools and educational facilities, medical facilities, sporting and recreational facilities, and open spaces. They also include other information which can help us to understand local needs and to make decisions. -
Document-0.Pdf
109.67 acres Shifnal 4 miles, Bridgnorth 8 miles, Newport 10 miles A rare opportunity to purchase a block of 109 acres of land being 62.48 acres of high quality productive arable land, plus 32.33 acres of grassland and 14 acres of woodland in an attractive convenient location. The soil is a deep fertile sandy loam with good natural drainage. The area is surrounded by Grade 2 land. Richard Solari Farms Ltd has owned the majority of the land for 60 years. Potatoes have been grown on the land using irrigation from the River Worfe. The gently sloping topography and wooded escarpment add significant privacy and amenity vale. A family run clay pigeon shoot- ing syndicate operated based around the natural slopes in the grassland. The valley, slope and woodland provide opportunity for leisure uses, subject to planning. The land is well served by a very good lane from the northern end. Description Arable Land The arable land in four adjoining parcels is generally level deep fertile easy working loamy soils and will grow a range of arable crops. Potatoes have been grown on approximately 65 acres of the block over time. Grassland The grassland in 3 main fields has recently been fenced and has three watering points from the River Worfe. Two of the fields are generally level with a central valley providing amenity interest and shelter for livestock. Woodland A strip of coniferous woodland (planted in the 1960’s) straddles a steep slope on the eastern boundary. A separate block of coniferous woodland straddles the valley sides leading down to the River Worfe, where water is abstracted. -
Shropshire Outline Water Cycle Study Final Report
Sustaining & Improving the Quality of People’s Lives Shropshire Outline Water Cycle Study Final report Halcrow Group Limited Burderop Park Swindon SN4 0QD June 2010 01793 812479 http://www.halcrow.com/html/our_markets/watercycleplanning.htm Halcrow Group Limited has prepared this report in accordance with the instructions of their client, Shropshire Council, for their sole and specific use. Any other persons who use any information contained herein do so at their own risk. © Halcrow Group Limited 2010 iii Sustaining & Improving the Quality of People’s Lives iv Sustaining & Improving the Quality of People’s Lives Shropshire Outline Water Cycle Study Final report Halcrow Group Limited Burderop Park Swindon SN4 0QD March 2009 01793 812479 http://www.halcrow.com/html/our_markets/watercycleplanning.htm Halcrow Group Limited has prepared this report in accordance with the instructions of their client, Shropshire Council, for their sole and specific use. Any other persons who use any information contained herein do so at their own risk. © Halcrow Group Limited 2010 iii Sustaining & Improving the Quality of People’s Lives Shropshire Outline Water Cycle Study Final report Revision schedule Date Document reference Stage Author Approver 30/11/2009 WUSHWC Draft Ali Cotton Andy McConkey 14/05/2010 WUSHWC Draft Final Ali Cotton Andy McConkey 23/06/2010 WUSHWC Final Ali Cotton / Ali Cotton Emma Smith iv Sustaining & Improving the Quality of People’s Lives TABLE OF CONTENTS 1 Introduction 1 1.1 Background to the water cycle study 1 1.2 Water cycle processes -
Local Environment Agency Plan
I LeTVf^ - &OX 4 local environment agency plan MIDDLE SEVERN Second Annual Review January 2000 Marke) Draytoo OSWE Wem Ruyton xRlbwns ewport; SHREWSBi TELFORD BRIDONORTH Church Stretton KIDDERMINSTER Bewdl( Dtoitwich WORCESTER Middle Severn Local Environment Agency Plan (LEAP) Previous LEAP Documents Middle Severn LEAP Consultation Report April 1997 (now out o f stock) Middle Severn LEAP Consultation Report Summary April 1997 Middle Severn LEAP Action Plan November 1997 Middle Severn LEAP First Annual Review January 1999 This document should be read in conjunction with the Middle Severn LEAP Action Plan. If you or your organisation need further information or copies of any of the above documents, please contact: Jo Langfield Acting LEAPs Team Leader Environment Agency Hafren House Welshpool Road Shelton Shrewsbury Shropshire SY3 8BB Telephone: (01743) 272828 Fax: (01743) 272138 E-mai 1: jo. [email protected]. uk MI - 01/00 - 400 - C - BEXN FOREWORD The Environment Agency was established to protect, monitor and improve the environment in its broadest sense - ultimately contributing to the worldwide goal of sustainable development. One way of achieving this aim is through the production of Local Environment Agency Plans (LEAPs), which provide a framework for protecting and improving our local environment. This is the second Annual Review of the Middle Severn LEAP. Its purpose is to highlight the progress that has been made by the Agency and others during the past year, in tackling the issues and problems identified in the Action Plan. The progress that has been made over the last twelve months reflects the commitment of all those involved in the plan, and highlights the importance of the partnership approach developed through the LEAP process. -
Canoeists Guide to the River Severn
Canoeists Guide to the River Severn RUMMOND E n v ir o n m e n t A g e n c y K AND CANOE CENTRE E n v ir o n m e n t A g e n c y NATIONAL LIBRARY & INFORMATION SERVICE HEAD OFFICE Rio House. Waterside Drive, Aztec West, Almondsbury, Bristol BS32 4UD ENVIRONMENT AGENCY 006559 Contents Introduction______________________________________________________ 2 The River Severn 2 Severn Bore______________________________________________________ 2 Fish Weirs 3 Navigation_______________________________________________________ 3 Access____________________________________________________________4 Safety On The River 4 Health & Hygiene___________________________________________ 5 Leptospirosis - Weil's Disease 5 Code of Conduct 7 Use of Locks______________________________________________________ 8 Weirs 9 Launching & Landing 9 Itinerary__________________________________________________________9 Poole Quay (Abbey Weir) - Montford Bridge 10 _________ Montford Bridge - Shrewsbury Weir____________________ T2 Shrewsbury Weir - Ironbridge 14 Ironbridge to Bridgnorth 16 _________ Bridgnorth - Stourport_________________________________ 18 _________ Stourport - Worcester__________________________________20 Worcester - Tewkesbury 22 _________ Tewkesbury - Gloucester_______________________________ 24 The British Canoe Union 26 Useful Information 26 Canoe Hire & Instruction 27 Maps___________________________________________________________ 27 Fishing Seasons_________________________________________________ 27 Useful Addresses & Publications / ___________________________ -
Appendix 1. Pre-Submission Draft Local Plan
Shropshire Pre-Submission Draft Local Plan 2016 to 2038 July 2020 1. Contents 2. Introduction ..................................................................................... 6 Shropshire’s Character ................................................................................... 6 National Planning Policy Framework (NPPF) ................................................ 8 The Shropshire Local Plan 2016 to 2038 ....................................................... 8 Cross Boundary Issues and the Duty to Cooperate ..................................... 9 Infrastructure ................................................................................................. 10 Neighbourhood Plans and Community Led Plans ...................................... 10 3. Strategic Policies .......................................................................... 11 SP1. The Shropshire Test ......................................................................... 11 SP2. Strategic Approach ........................................................................... 12 SP3. Climate Change ................................................................................. 20 SP4. Sustainable Development................................................................. 22 SP5. High-Quality Design .......................................................................... 23 SP6. Managing Housing Development ..................................................... 25 SP7. Managing Development in Community Hubs ................................. 27 SP8. Managing