Calvert Area Liaison Meeting 12th February 2021

Chris James EKFB Simon Griffiths Fusion Thaina Sa’id EWR Agenda

1. Welcome / Introductions

2. Main works Update – 20 minutes – Chris James

3. Enabling Works Update – 20 minutes – Simon Griffiths

4. EWR Update – 20 minutes – Thaina Sa’id

5. AOB & Next meeting - All Health & Safety Health & Safety

Covid Measures

1. Testing continues to 10% of workforce.

2. Innovative Social Distancing technology being implemented. Traffic Update Traffic – HGV’s January

Actual (Approx Average) Utilisation Permitted 10/1 17/01 24/01

Gawcott 55 18 19 19 30% 5 0 0 0 0 %

Twyford 0 0 0 0

Calvert 32 22 25 25 75%

Edgcott 55 41 44 44 75%

1MC07-CEK-IN-PRE-CS07_CL13-000001 February 12

EKFB HGV Traffic Daily Deliveries

1. From South through from 0 to 22.

3 2. From the North through daily deliveries of between 40 and 50. 3. , five deliveries over last two weeks so averaging one delivery every other day.

1 Daily HGV movements average around 60 = 60% of capacity

1MC07-CEK-IN-PRE-CS07_CL13-000001 Gawcott

Traffic Lights on Road

1. Traffic Signals to control a tight section of Radclive road

1MC07-CEK-IN-PRE-CS07_CL13-000001 February 12

EKFB HGV Traffic Daily Deliveries

1. Two daily rail deliveries. Equivalent to 160 HGV’s every 3 day.

1 4

1MC07-CEK-IN-PRE-CS07_CL13-000001 Overall Picture Daily HGV delivery equivalents Increase in rail delivery, two to the Calvert Area trains running now. 12

Around 75% of material deliveries 45 coming in by train. 0.5 3rd delivery by train planed for late 0 0 February 160

Edgcott Gawcott Twyford Steeple Claydon Rail

1MC07-CEK-IN-PRE-CS07_CL13-000001 Road Closures

1MC07-CEK-IN-PRE-CS07_CL13-000001 Road Closure Strategy

1MC07-CEK-IN-PRE-CS07_CL13-000001 Road Closure Strategy

1MC07-CEK-IN-PRE-CS07_CL13-000001 Road Closure Strategy

• West Street, long term to build bridge.

• Gawcott road. Traffic lights, crossing, short term closures for tie in work.

1MC07-CEK-IN-PRE-CS07_CL13-000001 Road Crossing

1MC07-CEK-IN-PRE-CS07_CL13-000001 Road Closure Strategy

• School Hill, long term to build bridge.

• Addison road. Traffic lights, short term closures for tie in work.

1MC07-CEK-IN-PRE-CS07_CL13-000001 EKFB Main Works Update Operational Overview 4 EKFB 1 1. Compound & Infrastructure 7 3 4 2. Aggregate delivery by Rail 2 3. Ground investigation & underground services 6 Fusion 7 3 5 4. Archaeology 5. Woodland translocation & planting 6. Works Compound 7. Underground Services EWR 8. Road Closures

1MC07-CEK-IN-PRE-CS07_CL13-000001 Upcoming Work 4 EKFB 1 • Piling to structures 7 3 4 • Batching Plant installation 2

6 Fusion 7 3 5 • Brackley lane • Addison road short term closure

1MC07-CEK-IN-PRE-CS07_CL13-000001 Weekend Work (13th/14th Feb) 4 EKFB 1 7 3 • Saturday Morning working is normal 4 2 hours. • Ground Investigation Works Saturday & 6 7 Sunday 3 5

1MC07-CEK-IN-PRE-CS07_CL13-000001 1MC07-CEK-IN-PRE-CS07_CL13-000001 British Horse Society

1MC07-CEK-IN-PRE-CS07_CL13-000001 Bridle Crossings

Mix of concrete Structures & Steel Structures.

• Parapet • Surface • Mounting blocks

1MC07-CEK-IN-PRE-CS07_CL13-000001 Bridleways

1. QUA 28 4 2. QUA 36 3 3. GUN 28 4. GUN 25 2 5. Restricted Byway 1 PB1/5A/3

1MC07-CEK-IN-PRE-CS07_CL13-000001 Bridleways

5 1. QUA 28 2. QUA 36 3. GUN 28 4. GUN 25 5. Restricted Byway PB1/5A/3

1MC07-CEK-IN-PRE-CS07_CL13-000001 Bridleways GUN/25

1. Bridleway is along the route of the new railway. 2. New route provided in advance of cloing the bridleway. 3. Discussions held with BCC. 4. BHS review of these plans requested

1MC07-CEK-IN-PRE-CS07_CL13-000001 Bridleways GUN/25

1. Closure during construction when not vicinity is not safe due to construction activity. 2. Discussions with BCC to clarify timescales. 3. Permanent design provides new bridleway access over the new railway.

1MC07-CEK-IN-PRE-CS07_CL13-000001 Bridleways GUN/25

1. Closure during construction when not vicinity is not safe due to construction activity. 2. Discussions with BCC to clarify timescales. 3. Permanent design provides new bridleway access over the new railway.

1MC07-CEK-IN-PRE-CS07_CL13-000001 EKFB HS2 Enquiries Update

1MC07-CEK-IN-PRE-CS07_CL13-000001 Since our last meeting we received… 6 complaints Average response time for Calvert 2 enquiries 4 working days

4 of these did not related to EKFB works (50%) Most common themes: 2 of these were closed by EKFB, 2 remain open. HGV drivers speeding and not driving safely Complaints and enquiries received (by category): HGVs through Edgcott on

Community weekend of 30 January Lighting, 1 Relations, 1 General site (not HS2) requirements, 1 Noise concerns after 7pm near Calvert Traffic and Transport, 5

1MC07-CEK-IN-PRE-CS07_CL13-000001 All Calvert area complaints/enquiries – since last meeting 29 Jan

Current Nature of Detailed Complaint Description Complaint Construction Complaint Complaint Sub Date complaint complaint status contact Location/addres Area Category 1 Category Raised s of problem Open Programme Traffic and Various issues re HGVs in Steeple Delivery Transport Complaint Claydon area - multiple contractors Steeple Claydon C (construction) 30-Jan Closed Resident emailed to complain about Programme Traffic and HGV drivers speeding through Delivery Transport Complaint puddles and splashing pedestrians Edgcott C (construction) 02-Feb Open Resident emailed directly to raise Programme Lighting concerns regarding site lighting on Delivery Complaint properties Calvert C (construction) 03-Feb Open Concerns about COVID response Programme Community and the HS2 complaints procedure Delivery Relations General process in relation to a resident's (construction) information complaint. Calvert C Diverted to HS2/ another contractor Drone was 'shot down' by Complaint contractors Calvert C Diverted to HS2/ Programme Traffic and another RE truck drving through Calvert Delivery Transport contractor Complaint Green (Fusion) Calvert Green C (construction) 06-Feb Diverted to HS2/ Call recevied from local resident Programme Traffic and another complaining about the behaviour of Delivery Transport contractor Complaint HGV drivers on 30 Jan Edgcott C (construction) 30-Jan Diverted to HS2/ Programme Traffic and another Stakeholder has contacted the HS2 Delivery Transport contractor helpdesk in regards to the way the (construction) General lorry drivers have been driving information around the Edgcott Road area. Edgcott C 03-Feb

Grey shading: Queries that were investigated and found to be non-EKFB related. 1MC07-CEK-IN-PRE-CS07_CL13-000001 And Finally…

• Newsletter

• Webinar

• 1:1 Surgeries..

1MC07-CEK-IN-PRE-CS07_CL13-000001 Fusion Early Works Update

1MC07-CEK-IN-PRE-CS07_CL13-000001 Calvert area update Calvert area

• Archaeological works are continuing off Addison Road completion by the end February 2021(subject to weather conditions)

• Brackley Lane utility diversion works due to start Q2 2021 (subject to consents)

• Calvert Road & Gawcott Road compounds works handover to EKFB achieved in December 2020

• Ancient woodland translocation works started in October 2020 and will continue until March 2021

• Tree planting works started November 2020 and will continue until March 2021

• Utility diversion works at Addison Road by Shepherds Furze Farm November 2020 until Spring 2021

• Vegetation removal completion end of March 2021

1MC07-CEK-IN-PRE-CS07_CL13-000001 Calvert area update

1MC07-CEK-IN-PRE-CS07_CL13-000001 Calvert area update School Hill satellite compound

Completing laying base/ binder course and road surfacing

1MC07-CEK-IN-PRE-CS07_CL13-000001 Calvert area update School Hill satellite compound

1MC07-CEK-IN-PRE-CS07_CL13-000001 Calvert area update Community works Steeple Claydon

1MC07-CEK-IN-PRE-CS07_CL13-000001 Calvert Area Liaison Meeting 12th February 2021

Chris James EKFB Simon Griffiths Fusion Thaina Sa’id EWR

1MC07-CEK-IN-PRE-CS07_CL13-000001