Jbimdland GOVERNMENT OF AND LABRADOR Labrador Department of Transportation and Works

REPORT AFTER PUBLIC TENDER CALL

TENDER#: 12186 DOCKET#: MA 12186 TENDER CLOSING DATE & TIME: 2020/03/06 2:00:00PM TENDER DESCRIPTION: MA 12186 - Water & Sewer Upgrading, Newtown Road, Town of PROJECT #: Grand Le Pierre, NL

NUMBER OF TENDERS RECEIVED: 15 NUMBER OF ADDENDUM ISSUED: CHAIRMAN: Stephen Slaney SECRETARY: Deanne Adams CONSULTANT: Harris & Associates

SCHEDULE OF TENDERS

NAME AND ADDRESS Base Bid HST Tender Total Security

PROFESSIONAL GRADING & CONTRACTING , P.O. 'if Box 581. Gander, NL, A1V1W8 . M\\.

PRECISION EXCAVATION LTD(TB), 3 Ivy Dale PI, CBS, NL, A1L0E9 \ AS MALLAY'S INDUSTRIAL SERVICES LTD , PO Box 1386, , NL, A0E2M0 AS- L.')S BENNETT'S CONSTRUCTION & SUPPLIES (2011) \S, o-i, c-b LIMITED ,40 Main Street, P.O. Box 7, , NL, AOEIWO

STELLAR STORM INDUSTRIES INC(TB), 31 Main iAf Street, Site 2E, P. O. Box 177, Little Bay, NL, A0E2H0

SOUTHERN CONSTRUCTION 1981 LTD ,P.O. Box 40, Trepassey, NL, A0A4B0 ■s, 7 OI . "71J . If

WALLY DRAKE'S TRUCKING LTD , 2 Cyril Drakes Road, Box 166, Marystown,, NL, A0E2M0 fc m, \ .tA

GERGAR ENTERPRISES LIMITED , P.O. Box 13091, Shoal Harbour, NL, A5A4R2 ^VT7, Ob7 J-o

SWEETLAND'S AGGREGATE LTD , P. O. Box 718, Bonavista, NL, AOCIBO >'lfo

STORM EXTERIORS LTD (TB), 16 Blueview Ave, CBS, NL, A1W5W7 \ u 0

BAY BY BAY RECYCLING LTD , 116 Main Road, P.O. Box 97, Chance Cove, NL, AOBl KO $ 107, , 4b '\-ib

COUGAR ENGINEERING & CONSTRUCTION , P.O. Box 8274, St. John's, NL, AIB3N4 ^ 1 '-I 1 u dO . u 0

BLACK DIAMOND CONSTRUCTION LTD. (TB), 1 Centennial Street, Suite 105, Mount Pearl, NL, AIN0C9 , 7M"7 fo

PLATINUM CONSTRUCTION CO LTD , Station Foxtrap, P. 0. Box 16008, Conception Bay South, NL, A1X2E2 ) .3 0 . 5' 0 B & R ENTERPRISES LTD , 8 Burnt Berry Road, P.O. Box 297, Springdale, NL, AOJITO \-rA-0-

TRANSPORTATION TENDERS (Only)

PRE-TENDER ESTIMATE OF COST: POST-TENDER ESTIMATE OF COST:

Base Bid Base Bid

Materials Materials

Other Charges Other Charges

Engineering Engineering

TOTAL COST: TOTAL COST:

Report Number: (X)I4 Date Printed: 2020/03/06