/"N / \ ! / \Q RADIO!.OGICAl, EtlERGENCY l'I.AN

Hevision Date: !!'-6 (PORC 5/25/84) TTsAE1 gg j p, g,g ) This nog nheet must be retaincel as the last page of the Brownn I'erry Niiclear I'lant Implementing Proceduren Document.

Reason for revision: nee covernheet

:s --

._

Innerteil by: __ ___ Date Innertcel:

- ---- _ . - _ _ . _ . . . _ _ _ . _ _ _ . . . Pagra t o be Hemovcel New Pagen to be innerteil

_. . . - - Part Page Number Neviufon Pa r t l' age Number Revin1on 1, Int of Effective 1 of 9 05/24/84 f. int of Effective 1 of 9 Pagen 2 of 9 06/06/f14 (A)LJ 05/24/84 Pagen 2 of 9 06/06/84 IP-6 Covernheet 05/15/84 11'- 6 Covernheet Attachment 2 1 of 2 05/25/114 04/17/f14 Attachment 2 1 of 2 05/25/fl4 Attachment 3 1 of 2 03/Oll/fl4 Attnehment 'l I of 2 2 of 2 05/25/fl4 04/17/84 2 of 2 05/25/114

,- [ i ; i ' ' - - - 0407090270 040702 FI!DR ADOCK 05000259 PDR , - , . '' , , * - *[,....w'v,. , ,

* , , , , ., , o --

.

' BFN-IPD } List of Effective Pages ' Page 1 of 9 06/06/84

TENNESSEE VALLEY AUTIIORITY

BROWNS FERRY NUCLEAR PLANT IMPLEMENTING PROCEDURES ~ DOCUMENT

LIST OF EFFECTIVE PAGES

This List of Effective Pages must be retained with the Browns Ferry Nuclear i Plant Implementing Procedures Documents.

Procedure Page Part Number Subdivision Number Date/Rev. No.

BFN List of Effective Pages 1 of 9 06/06/84 2 of 9 06/06/84 3 of 9 05/14/84 4 of 9 05/22/84 5 of 9 05/24/84 6 of 9 05/24/84 7 of 9 05/14/84 8 of 9 05/14/84 9 of 9 05/14/84 Table of Contents 1 of 1 05/04/84 O IP-1 Coversheet 04/06/86 Preface 1 of 1 10/12/83 1 of 11 03/14/84 2 of 11 03/14/84 3 of 11 10/19/82 4 of 11 04/06/84 5 of 11 .10/19/82 6.of 11 04/06/84 7 of 11 10/19/82 8 of 11 10/19/82 9 of 11 03/14/84 10 of 11 10/12/83 11 of 11 03/14/84 IP-2 Coversheet 04/17/84 1 of 3 04/17/84 2 of 3 04/17/84 3 of 3 02/04/83

IP-3 Coversheet 04/17/84 1 of 3 04/17/84 2 of 3 04/17/84 3 of 3 04/17/84 0 .

_ - _ - - _ _ - _ _ _ _ - _ _ _ - _ _ _ _ _ fi !

' i - , . * -BFN-IPD I List of Effective Pages , Page 2 of 9 f.; 06/06/84 ? !; LIST OF EFFECTIVE PAGES (Con't) $ 1 |: Procedure P~a ge Part Number Subdivision Number Date/Rev No.

BFN- IP-3. Table 1 1 of 1 10/12/83 (Cont'd) Table 2 1 of I 10/12/83

IP-4- Coversheet 04/17/84 1 of 3 01/19/84 2 of 3 04/17/84 3 of 3 03/20/84

Table 1 1 of 1 10/12/83 Table 2 1 of 1 10/12/83 IP-5 Coversheet 04/17/84- 1 of 3 03/12/84 2 of 3 04/17/84 3 of_3 03/20/84

Table 1 1 of 1 10/12/83 Table 2 1 of I_ 10/12/83. Figure 1 1 of 1 03/12/84- IP-6 Coversheet 05/25/84 1 of 1- 03/08/84

-Attachment 1 1 of.2 04/17/84 , 2 of 2 .04/17/84 ' Attachment 2 1 of 2 05/25/84

~ 2 of 2 05/15/84 Attachment 3 1 of 2 05/25/84 2 of 2 " IP-7- * Coversheet 04/17/84' 1 of 1 12/21/81

Attachment 1: 1 of 2_ 02/15/84 2 of.2 04/17/84- IP-8 Coversheet 04/17/84 ' -1 of 4 04/17/84- 4 2 o f ',4 103/14/84 . , . 3 of 03/14/84- 4 ofc4 L01/12/84 Attachment 1 (deleted) 1 'o f I 03/14/84.

.IP-9 (deleted). Coversheet 03/14/84-

,

. - . . _ , , ...... m mm ,,u.,, . .. . BF 11.1 ' FEB 151384 ; 6 PERMANENT INSTilUCTION CilANGE INFORMATION

,y . )i w,, ' 6 Instruction Number rag II: story of Revisions (For DCU Unit No. J. 2. n Use Only) Title Ae rmx ,,,a , , w, neo ,,g, Approval Date/Affected Pages i .r vie m e c ,u r,4 5/25/84 /1 (Att. 2) _ 5/25/84 / 1.2 (ALL M

______5/15/84 / 2 (Att__2) /1 7 (,n u_ . 4/ LZ/84

L - Reasgn For Reviqion p,m uas, _cas+Mez_j 4/17/84 / i? (At. . 2) - #As, eu bei ch cu c 2 __4n7/a4 / 2 (Att. n / " - / L / / / ( Pages Affected Ame,w,wr s ,%s i / nrr,,cu m r s. A.ar i n / /

t L Is this change in response to an I.ER, IE Bulletin, N!tC Inspection Report, - * Management / Supervisor inspection, OQAB audit, etc.? Yes. No V (If yes, specify document under reason for revision.) Change in procedural detail of FSAR or other licensing document? # 8. Yes No ; New instruction? Yes No (if yes to either question, a USQD is required. )

> ) (,/; !s this a work plan initiated change? Yes (Work Plan No. ) / No n. Fire Protection System involved? Yes No / (If yes, review and signature of fire protection engineer is required. ) 4/ 4 Fire Protection Engineer

== Was this change made to meet a NHC commitment? Yes No V (if yes, refer to BF 2.3 for proper identification of the change.)

| . Security System involved? Yes No (If yes, review and l signature of Public Safety Services Supervisor is required.)

W o4 '' Public Safety Services SuperGsor

' WJ _ r/ma - / ar- - 2-34 - hY0tsit>N) /GbLfff Prep (fedi7'') Date PORC Chairman Date

- ' $ / Wz W ||, f, - / W (sf , Submitted By Date/ lant perintendent "Date Retention: Period - Lifetime; Responsibility - Document Control Supervisor [^'N (Note:. If this is a new instruction or instruction deletion, document control ( b will update the source document matrix.) * Revision *

...... ;.. . W' - _ . , , a . .u . _ _ a. k . . - - . _ . . . .. - .. -. - -. . , . .

'

- .f(~- (3v HMEhT0 2 - TEAM 2 O(S

INSTRUCTIONS *

Contact members from this list if unable to reach TEAM 1 members. Attachment'3 If unable to reach TEAM 2 member to to ALTERNATE li

. Message: "This is Browr.s Ferry. We have activated the REP. Please report to the Technical -Support Center immediately as the (POSITION)."

Time Contacted Position last IR D21 M M Site Emergency Director Jim Swindell 221/212 701 355-7277 103 Operations Manager Tommy Jordan 205/214 793 383-5868 129 . Technical Assessment Manager- Dwight Mims 208/215 785 355-9659 272 * Maintenance Manager John Nebrig 762 734 350-0790 268

4 REP Communicator Bill Roberts 100/106 623 232-7027 142 ' Secretary Glenda Harrison 178 810 729-6573 NOTE: Secretary Call all Jacque Garner 221/212 701 233-0576 three Secretary. Peggy Gilbert 414 895 729-6273 TSC Communicator M. W. (Tink) Haney 206/241 790 233-0834 241 NRC Communicator E. G. Thornton 446 875 232-5952 Operations Specialist Roy Smallwood 429/430 861 757-3992 Health Physicist NOTE: Herman Crowsen 335/334 hCall both 876 764-1381 334 HealthPhysicistj Wayne Simpkins 457/458 759 232-7973

# Revision g > to en m g {E E{ $g5 ~ _ & "=, a a ~a A N . _ - - - - __ --. _ _ .--_.-_ _ _ _.- . _ __ _ _. __ _ .__ _ .___ . .. . _ . ,

* .

ATTACHMENT 3 - ALTERNATES , .. e 1][3TRUCTIONS

. Use this list only if unable to reach TEAM-1 or TEAM 2 member.

Message: "This'is Browns' Ferry. We have activated the REP. Please report to the ; 2 Technical Support Center immediately as the (POSITION)." Time Contacted Position Name IAI FlH HOME fAGE

I Site Emergency Director John Pittman 221/212 701 355-0230 221

Site Emergency Director Ray Hunkapiller 205/214 794 355-5667 204

Operations Manager- A. L. -(Smiley) Burnette 429/430 .861 766-1929 130

Technical Assessment Manager Jim Swindell 221/212 -701 355-7277 103

-Maintenance Manager Tom.Cosby 207/235 797 232-8779 235 *

- REP C-micator ' Jimmy Walker 405/406 865 232-9216 146

| -TSC Communicator ' John Nebrig 701 712 350-0790 268 e , NRC Communicator Vacant

4 Operations Specialist R. G. Jones 446 874 232-3596

Operations Specialist E. G. Thornton 446 875 232-5952 ,

Health Physicist John Corey 209 744-7239 .

' Radiochemical Engineer Jim Shaw . 436 621 381-6314

Reactor Engineer Harold Stiles 454/455 893 232-6389

00 -

. R ET**W

, ' Revision ** Deletion y g" _. 3m@Q $"u w to _ _ , _ _ __. _ . . . . . __. . . _. . _ . _ ._ . . _ . _ _ _ . . .

- , -

ATTACHMENT 3 - ALTERNATES (Continued) ...:

Time . - Contacted Position' laat .P.AI ~M EGiE PAGE ,'

~ . Electrical Engineer. ~ . Walt Christopher 207 .889 355-1810 - '. . ! Instrument Engineer No alternate

. PS0 Engineer. . - Elmer Todd~ 394/395 820 232-7978 258

>0 i Systems and Test Engineer. . No alternate

4 iMechanical' Engineer Pat Ebersole 206/241 791 543-6189 205

. Quality Engineer Larry Parvin 309/409 801 2343-9570 107

-Quality Engineer Russell Perry 100/106 623 -729-8823 -109/112 i ' PSS Supervisor Glen Lard 266/246 4 L 822 766-8557

Computer Engineer Wayne; Lynch - ; 264 856 233-0998 ;

; Secretary Darlene Rains 701 714 233-3715

4 ' 4 0 Secretary Arnette Johnson 212/221 701. 729-8389 !

' . ,

..

4

I

,

t . >

>

e

,

1 * Revision g > to to m 2> - EEEE . * 1 R',* to :r s n, | " g geen$75o h

taa i -

- . _ - , - . . ------

*' , , . b. . TV A ee (09-9 998 UNITED STATES COVERNMENT g Memorandum TENNESSEE VALLEY AUTHORITY

TO - Holders of Browns Ferry Nuclear Plant Implementing Procedures Document

FROM - ger E.. - .K. . Sli,a- . n , Supervisor, Radiological Emergency Preparedness Section, 1640 CST 2-C-

DATE : JUN 151984 -

SUBJECT: BROWNS FERRY NUCLEAR PLANT IMPLEMENTING PROCEDURES DOCUMENT

The attached revision is for inclusion in your copy of the subject manual. ' Section 10.1.5.3 of the Radiological Emergency Plan requires manual holders to acknowledge receipt of revisions. Please sign the receipt on the back of the distribution list and return to the Records / Manual Control Unit, 1570 CST 2-C, within 2 weeks of transmittal date. If you have any questions, call Linda Condra, 6796-C. If responsibility for this manual is transferred to another individual, please note this'on your acknowledgment receipt.

,

p - O, f) $$it 'm rc'R. Slig

BJS:LEC Attachments

.

/ i

+

4

4 t .

'

*

...... n....tr o ca..: . e n ,~ I. Ron, la,1,. n,, ol.s pa,.enti ca,.i no P!n - '

__ _ - _ _. _ , . _ _ _ , , -.

<.

._

-

'v' | _ RADIOLOGICAL EMERGENCY PLAN

Revision Date: IP-1. IP-14. IP-26 (P_0RC 5/30/84) (Issued JW 15 W ) This log sheet must be retained as the last page of the Browns Ferry Implementing Procedures Document. Reason for revision: see coversheets ,

-- - - _ . - _ _ .

.-- - . .- .- _. . . _

. . _ . _ . . . _ _ _ _ . . _ . ______. . ______. _ . . , _ _ . _ _ _ , Inserted by: Date Inserted: . _ _ , _ __

Pages to be Removed New Pages to be Inserted

Part Page Number Revision Part Page Number Revision List of Effective 1 of 9 06/06/84 List of Effective 1 of 9 ' 06/13/84 - ) Pages 4 of 9 05/22/84 Pages 4 of 9 06/13/84 V 8 of 9 05/14/84 8 of 9 06/13/84 1 : - IP-1~ Covernheet 04/06/84 IP-1 Coversheet 05/30/84 9 of 11 03/14/84 9 of 11 05/30/84 10 of 11 10/12/83 10 of 1i 05/30/84 IP-14~ Coversheet 01/19/84 IP-14 Coversheet 05/30/84 1 of 5 -10/12/83 1 of 5 10/12/83 2 of 5 10/12/83 2 of 5 05/30/84 3 of 5 10/12/83 3 of 5 05/30/84 4_of 5 01/19/84 4 of 5 01/19/84 5 of 5 04/07/83 5 of 5 '05/30/84 IP-26 Coversheet- .04/17/84 IP-26- Coversheet' 05/30/84 1 of 4. 07/06/83 -1'of~4 -05/30/84 2 of 4 10/12/83 -2 of 4 05/30/84' 3 of 4 04/17/84 3 of 4 05/30/84 4.of 4 .07/06/83 4 of 4 05/30/84

m \u i h

e ._ ,. .. .._. _ ___ . . _ . - . __. . _ . _ . _

*

- ._ 1; /;i: . , , | '; .,_ -T- . '

, , :,:

- W .'. ' . g'(' '$ BFN-IPD 7 List of Effective Pages I, . Page 1 of 9 ' 06/13/84

, TENNESSEE VALLEY AUTHORITY

s , BROWNS FERRY NUCLEAR PLANT IMPLEMENTING PROCEDURES DOCUMENT

, 7 LIST OF EFFECTIVE PAGES

. , qI. . . ; This List of Effective Pages must be retained with the Browns Ferry Nuclear > Plant Implementing Procedures Documents.

- Procedure Page Part Number , Subdivision Number Date/Rev. No.

' ,

; BFN List of Effective Pages 1 of 9 06/13/84 2 of 9 06/06/84 1 3 of 9 05/14/84 4 of 9 06/13/84 5 of 9 05/24/84 : 6 of 9 05/24/84 ' ' '- ' 7 of 9 05/14/84 '7 8 of 9 06/13/84 it 9 of 9 05/14/84 i

4 Table of Contents I of 1 05/04/84 IP-1 Coversheet 05/30/84 i Preface 1 of 1 10/12/83 E 1 of 11 03/14/84 < 2 of 11 03/14/84 3 of 11 10/19/82 .' ' 4 of 11 04/06/84 4 5 of 11- 10/19/82 6 of 11 04/06/84 ; 7 of 11- 10/19/82 " .8 of 11 10/19/82

, 3 9 of 11 05/30/84 . s, 10 of 11 05/30/84 % 11 of 11- 03/14/84 ; . o . ; ! , IP-2 Coversheet- 04/17/84 ' 'i 4 1 of 3 '04/17/84 , n 2 of 3 04/17/84 ~ .; 3 of 3 02/04/83

, \

, .' y' ,IP-3 | Coversheet- '04/17/84 b . 1 ' , , , 1 of.3 04/17/84

, , 2 of 3 04/17/84' .p/,fi ,J (_, g , 3 'of 3 04/17/84 I sj. . T>[ f d,f. .,-Q ' ~ ': < b. : / , Jy

+ Vpbj , ?j.L!|- ' ' * ?. , _7 ,9 - ;u t , . _ _ . ______- _ _ - _ _ _

.- ' .*, , | 1

- ... BFN-IPD | ~ f~} List of Effective Pages \ r ' ' ' Page 4 of 9

, 06/13/84 ,

LIST OF EFFECTIVE PAGES_(Con't)

Procedure Page

Part . Number Subdivision Number Date/Rev. No.

BFN IP-14 ' Coversheet 05/30/84 I of 5 10/12/83 2 of 5 05/30/84 3 of 5 05/30/84 . 4 of 5 01/19/84 ) 5 of 5 05/30/84 Attachment i 1 of 1 01/19/84

Attachment 2 1 of 1 01/19/84 ! Attachment 3 I o t* I Rev. O

Attachment 4 1 of 1 Rev. O

Attachment 5 1 of 1 Rev. O

IP-15 Coversheet 06/15/82 1 of 4 Rev. 0 ' 4 2 of 4 Rev. 0 ' 3 of 4 Rev. 0 4 of 4 , 03/30/82 IP-16 Coversheet 06/15/82 1 of 2 04/22/82 2 of 2 Rev. O

IP-17 Coversheet 05/08/84 1 of 15 05/08/84 ' 2 of 15 03/16/82' 3 of 15 04/07/83 4 of 15 ' ~ 03/16/82 5 of 15 01/26/82 6 of 15 03/16/84 7 'o f 15 01/26/82 8 of 15 10/12/83 9 of 15 05/08/84 10 of 15 04/22/82 11 of 15 04/06/82 12 of 15 01/26/82 13 of 15 01/26/82 14 of 15 04/17/84 75 15 of 15 10/12/83

C) , *

*

b

' ..

. ______. ______. . _ _ _ . . . ______. _ _ _ _ _ . ______. . _ _ _ . _ _ . _ _ _ . _ _ _ - - . - . = - .. -...... - .- . - - -

=. . , ,. 4, - . u

' , BFN-IPD

, CT, - List of Effective Pages ,,j - < Page 8 of 9 ' ' , 06/13/84

: LIST OF EFFECTIVE PAGES (Con't)

- . | Procedure Page Part Number Subdivision Number Date/Rev. No. ,

i 'BFN IP-24- Attachment A 18 of 31 11/04/83 -

_ , (Cent'd)- (Cont'd) 19 of 31 11/04/83 - . 20 of 31 11/04/83 $ ; 21 of 31 11/04/83 - .;- 22 of 31 11/04/83 . 23 of 31 ~ 11/04/83 ' : , 24 of 31 11/04/83 | 25 of 31 11/04/83 ' 26 of 31 11/04/83 | 27 of 31 ' 11/04/83 28 of 31 11/04/83

, , 29 of 31 -11/04/83 i- .s- 30 of 31 11/04/83 * 31 of 31 11/04/83 1 ! BFR IP-25' Coversheet 01/12/84 ; 1 -of. 2 04/07/83 i - 2 of 2 .01/12/84- l BFN ' IP-26 . Coversheet- 05/30/84 E ' i of 4 05/30/84 ; , 2 of 4- 05/30/84 3 of 4 05/30/84 4 of 4 ., '05/30/84 .BFN- . IP-27-. 'Coversheet 05/04/84 4 1 of 6' 05/04/84 2 of 6 .05/04/84

: . ': 3 of 6 : 05/04/84-~ ! 4 of 6 05/04/84 2 5 of'6'- 105/04/84 ; 6.of'6~ 05/04/84.- F' Attachment-1. 1:of'1 :05/04/84.

' -Attachment 2 .I of-3 ' 05/04/84. -. - . ' 2 of 3 - * -.05/04/84' . :3 of 3 :05/04/84 :' ' .At:tachment. 3.- - 1:: of /1. -05/04/84 , -

, ' ~ _ . . Attachment:4- ~ 1 of 1.- v 05/04/84 ..

~ (gg . Attachment 5; , 1 'o f L 1 '- '05/04/84'

- . .& Attachment:6'' I?of 1 305/04/_841 ' . x

' ~ ' , 7 - - Y ' 7~.s - - 4 ,

- n. . -x w ~-: ,7,g . ,, e , m. 1, 3 , T. u _ , .#; , , ., . . - _ ._ -- . --

. Tcnn:ssu Vall;y Authority BF 2.3 '" Browns Ferry Nucl:ar Plant BF 11.1 FEB 151984 | 7

, '" ) Q PERMANENT INSTRUCTION CilANGE INFORMATION

l llistory of Revisions (For DCU ' Instruction Number I Use Only) Unit No. / 2, 5 ' ca do,~ Approval Date/ Affected Pages Title Ge rce co [/e# ' / s/30/R4 / 9 in ! 2 0e4 /43 / 4/06/84 3/14/84 / i M o it

/ .6.10 " A' u.

C's Change in procedural detail of FSAR or other licensing document? Y; New instruction? Yes No V k) .6 Yes No b (If yes to either question, a USQD is required. )

, Is this a work plan initiated change? Yes (Work Plan No. ) V No Fire Protection System involved? Yes No Y (If yes, review and signature of fire protection engineer is required.)

- A _ Fire Protection Engineer

* Was this change made to meet a NRC commitment? Yes No Y' (If yes, refer to DF 2.3 for proper identification of the change.) : (If yes, review and l,, Security System involved? Yes No I signature of Public Safety Services Supervisor is required.)

e AY | Pub c Safety Services Supervisor ,

* .e / . f , _m /$f39ht' . 2/h ' %. ' Date N Dat'e PORC Chairman - Pr hl / ke /Y f | f Date * Date . Submitted By / [' Plant Superintendent l 4 I Retention: Period - Lifetime; Responsibility - Document Control Supervisor ', , I (Note: If this is a new instruction or instruction deletion, document control b will update the source document matrix.)

~- . * Revision ~ . ; !..h,b...$.Lj$.- - n _s,s :.:|v . w .=.. . -. _. . . - _ _ - ______- ______. _ . . . _- O O U2-q . ~ .

, .

. _8 ANY MEDICAL EMERGENCY Refer to IP-10

,,,,, INJURIES

_ CONTAMINATED INDIVIDUAL TRANSPORTED IP-1 NOTIFICATION OF TO OFFSITE HOSPITAL AN UNUSUAL EVENT Refer to IP-10

.

. _ NEAR OR ONSITE IP-2 NOTIFICATION OF ' MEDICAL AN UNUSUAL EVENT Refer to IP-10 if injury involved. .

,,__ TOIIC GASES WITHIN PLANT BUILDINGS IP-3 ALERT Refer to IP-10 if injury involved '

IP 11 SITE AREA EMERGENCY WITHIN VITAL AREAS Refer to IP-10 if injury involved

t

s .- - , , u m i,

' O %H

' G bEk T ' Revision :

,

k

4 - .-

* ' * _ i'~ % . . x) J J .

' TRIAXIAL OPERATION > 0.01g IP-2 NOTIFICATION OF AN UNUSUAL

. , EARTHQUAKE- EVENT (Refer also to IP-24)

' 'BIAIIAL OPERATION > 0.1g(2) IP-3 ALERT (Refer also to IP-24)

RESERVOIR LEVEL 2 561' IP-2 NOTIFICATION OF AN UNUSUAL EVENT

,,, RESERVOIR LEVEL 2 563 5' IP-3 ALERT

RESERVOIR LEVEL 2 565' IP-4 SITE AREA EMERGENCY

,,,,, WARNING RECEIVED NATURAL BY SHIFT ENGINEER FROM IP-2 NOTIFICATION OF AN UNUSUAL PHENOMENA- WILSON DISPATCHER OR EVENT (Refer also to IP-26) TORNADO TORNADO SIGHTING REPORTED TO SHIFT ENGINEER BY PLANT EMPLOYEE

L _ * REFER TO IP-26 ONLY

_ STRIKING PLANT IP-3 ALERT

,..HIGH WINDS SUSTAINED WINDS > 90 MPH IP-4 SITE AREA EMERGENCY

LOW RESERVOIR LEVEL BREACH OF WHEELER DAM IP-4 SITE AREA EMERGENCY

Before initiatinS IP-2, confirm by noticeable building movement and/or call National Earthquake Information Center at (303) 234-3994. See FSAR Figure 2.5-7. Modified Mercalli Intensity IV. , ( } Before initiating IP-3, confirm by building movement, some damage to nonseismic structures. Call National Earthquake Information Center at (303) 234-3994. See FSAR Figure 2.5-7, Modified Mercalli Intensity VII. |[ s : * C) d * *, 2 :

* Revision

______- _ _ _ - . . - - - ______.

~ _...... '' . Tennessee Valley Authority I; rm IW a !trJwns Ferry Nuclear Plant ItF 2.:t 11F 11.1 , , [[[3 3 ig.y 7, 7, - [ s.J - . ' PEltMANENT-INSTRUCTION CllANGE INFOftMATION

' Instruction Number llistory of Hevisions (For DUl: Unit No. Use Only) Title //e/,2,3l22-rN [#VT/e5 A'veEbv4F5 Approval Date/Affected Pagg 5/30/84 / 2,3,5 ' 4, 1 of Att-~ 1, __ _ L19/84 / _ _ _ _ . . _ _ _ _ . ._1/19L84 / 1 of Att. 2 g f) _ }_0],12 / 83 / 1,2,3,T _ or {tevision Nj_e.'s cv Ikh-t.. ison -F p;b ht' M O~L~ / ~~ v 5 J/rW{/L20 _ / _ -/ c _L /' 'Z ~7 cinrify the use of NRC / ~ hal th Phy=f r a Network f orMige_,y.h_one) / ._

. , Pages Affected - 2. 3. 5 / , , - . . . . . ,

' ._ / _ ~_

l . this change in response to an LER, IE Ilulletin. NitC Inspection Iteport. *%nagement/. Supervisor Inspection, OQAll audit, etc.? Yes No g' em iIf yes, specify document under reason for revision.) ('hange in procedural detail of FSAR or other licensing document? Yes No K; New instruction? Yes No ~ ~~ V- (If yes to either question-, a USQD is required.Y~ ~~'

' Is~ ibis a work plan initiated change? Yes (Work Plan No. ) _,(. N > Fire _ Protection System involved? Yes No Y (if yes, review and signature of- fire. protection engineer is required. ) A!k Fire Protection Engineer

Was this change made to meet a NRC commitment? Yes No V. .(If yes, refer to BF-2.3 for prol eri identification of the change.) ,

Security System involved? Yes ~ No V (if yes, review and signature of .Public Safety Services Supervisor is required.)

. I *%' A)k , . ,f . P lic Safety Services Supervisor ' t- Frepared- /SEfr / 39 ( ^/ < Ja t'e ' _ht.ftCPO ChairmanDate '

^ ./ $ / _.IL ; '/ 3 ,s.. ;) _ ilmutted Ity - - he -. f~ f4 ate. 'lant Tiuperintendent . D.it e , . ,/' . . . | 1:.. t en tion : . l'oriod .l.ifetime: llesponsibilit.f . Document . Contr..I' Supervhmr. t N..te: . it thi:. is a .iiew-inntrac:iva vr instruction deletion, document control! - w.ill . update the source document matrix.):

,- , y : W. - . E _. _

.

.-

*Page 1 of 5 BFN - IPD BPN, IP-14 '" OCT 12M HEAIMI PHYSICS PROCEDURES

1.0 PLRPOSE This procedure outlines the actions to be followed by Health Physics personnel during a radiological energency. Natural phenomena, security threats, or other events not involving radiation could be the cause for the energency. This procedure describes those HP actions required during an emergency involving radiological problens.

M7PC: Shift Engineer's clerk will initiate IP-14 by calling the Health Physics Shift Supervisor.

2.0 forIFICATION OF UNUSUAL EM 2.1 No offsite radiological problens are postulated during a N7FIFICATION OF UNUSUAL EVENP. This situation should not have any najor impact on the health physics unit. 2.2 Although Health Physics will not automatically be called, should L- assistance be needed Health Physics will. follow standard practices and procedures during any response work.

( 3.0 ALERT A limited release is possible during an ALERT situation. Significant loss of fuel cladding, small line breaks, fuel handling _ accidents, or

, high radiation levels are examples. INITIALS

3.1 All HP technicians report to the HP lab.

_ ~3.2 HP will take 1 ion chamber survey instrument to the TSC and to ' OSC. b 3.3 . HP personnel will periodically survey the TSC and OSC. !$ * , - 3.4 A HP technician will accompany any personnel dispatched into i _ areas of potential hazard. 3.5 An ALERT may require the evacuation of a certain plant area and/or building. HP will post these areas and have public safety restrict all unauthorized access, f 3.6 Health Physics personnel will assist in the development of all recovery plans as necessary. Recomendations will be made to

-keep exposure as low as reasonably achievable and to recomend' I and approve any cleanup activities.-

.

h '* Revision | x / I

I

- , .

. Paga 2 of 5 BFN - IPD BFN, IP-14 MAY 3 01984 g 4.0 SITE AREA EMERGENCY

A SITE AREA EMERGENCY may require extensive HP response. A LOCA major fuel handling accident are examples. INITIALS

4.1 HP technicals report to the lab.

4.2 HP will take 1 ion chamber survey instrument to the TSC and to the OSC.

4.3 Health Physics personnel will periodically survey the TSC NRC/C and OSC. 4.4 A health physics technician will accompany any personnel

__ dispatched into areas of potential hazard.

__ 4.5 Initial offsite environmental assessment will be conducted NRC/C e per IP-27. Report findings to the Site Emergency Director. [[[ 4.6 Dispatch HP technician to the site access control point established by PSS personnel. Survey vehicles and personnel leaving the site using RM-14 frishers and smear techniques. NRC/C

_ 4.7 If requested by Site Erergency Director, perform site boundary survey, using the emergency van. Equipment listed

__. in Attachment 1 should be transported to the van.

a. *dhen instructed to do so, travel to the site boundary in the downwind direction and measure the dose rate with an ionization chamber or similar survey instrument. If possible, air sampling should also be performed at the same time.

b. Precautions must be taken to prevent overexposure if there are high concentrations of racioactive particulate or radiciodine being released,

c. Record all survey results. All findings shall be reported to the TSC. If results indicate offsite contamination, the survey may need to be extended. Obtain further instructions and perform required surveillance,

d. Arrangements can be made for manpower support and offsite surveys from Muscle Shoals.

4.8 - If a site evacuation is ordered, see section 6.0. 4.9 If HP lab must be evacuated,' see Section 7.0. O

'Revisien

L m _ - - . _. . . _ _ . _ _ . _ . . _ . _ . . .. _._. ._ _. __ k

= ...

. . . j Page 3 of 5

, BFN - IPD BFN, IP-14 Os MAY 3 01984 5.0 GENERAL EMERGENCY

During a GENERAL~ EMERGENCY, there will probably be radiatior. releases to the environment requiring health physics response. INITIALS

' -

__ 5.1 HP technicians report to lab. .

. 5.2 HP will take 1-ion chamber survey instrument to the TSC and * OSC. NRC/C 5.3 Health Physica personnel will periodically survey the TSC , and OSC.

* 5.4 A-health physics technician will accompany any personnel dispatched into areas of potential hazard.

NRC/C 5.5 Initial offsite environmental assessment will be conducted

_ # per IP-27. Report findings to the Site Emergency Director.

, 5.6 Dispatch a HP Technician to the site access control point

; - NRC/C: established by PSS personnel. Survey vehicles and personnel _- leaving the site using RM-14 frishers and smear techniques, , i- ' 5.7 If requested by Site Emergency Director, perform site j boundary survey, using the emergency van. Equipment listed in Attachment 1 should be transported to the van.

a. When instructed to do so, travel to the site boundary in the downwind direction and measure the dose rate with an ionization chamber or similar. survey instrument. If- possible, air sampling should'also be-performed at the same. , L ; b. Precautions must be' taken to prevent overexposure =if there are-high concentrations of radioactive or radiodine being released. I c. Record all survey results. All findings'shall' be . reported to the TSC. .If results indicate offsite < oontamination, the survey may need to be extended.

~ : ' Obtain further. instructions and perform required 4 surveillance. t ) d. - Arrangements can be made Lfor manpower suprort and , equipment for offsite surveys from Muscle Shoals'. 5.8 If.a site evacuation is ordered, see.Section 6.0. ' |5.91If HP' lab aust :be evacuated,- see Section17.0. . .

. , 6.0 SITE EVAC UATION ,- , ). 4 s.Jf. - ' 6.1 . HP tvunnicians- proceed ' to lab, if habitable; If uninhabitable, , see Section L 7.0.

~ , = . . s # Revision' * " T- m . s, _ . -

' - - - . .. . - .a - - . .- -. _ .. :: . : . . _ . = ______

p:g2 4 of 5 * * - . DFN - IPD BFN - IP-14 JAN 101984

INITIALS 6.2 Report accountability by name and badge number to Health Physicist in TSC.

6.3 If any plant personnel are missing, PSS will form search parties, each having at least one HP technician. - NRC/C 6.4 HP will survey personnel and vehicles leaving the site at the PSS access control point. Contaminated individuals will be evacuated to the Power Service Shops utility C building at Wilson Hydro Plant. Notify Health Physicist in TSC of any such individuals. <- 7.0 HP LAB UNINHABITABLE - 7.1 HP technicians will secure equipment listed in Attachment 2, and proceed with equipment to mechanical equipment NRC/C room, control bay, unit 3, elevation 617. 7.2 Report to t{ealth physicist in TSC.

8.0 ISSUANCE OF POTASSIUM IODINE (KI)

8.1 If s responsible health physicist has reason to b.ilieve that a person's project 'd cumulative done to the thyroid from inhalation of radioactive iodine might exceed 10 rems (See Attachment 3) the exposed person should be started immediately on a dose regimen of potassium iodine (KI). Anyone authorized to initiate KI shall be familiar with the Food and Drug Administration approved package insert and be sure that each proposed recipient is similarly informed. The initial dose of KI should not be delayed and those who begin therapy dose is determined not to have exceeded 10 ccm. An adequate supply of KI is stored in the medical station to supply any personnel exposed to radioactive iodine. It is supplied in bottles which contain a full 10-day dose regime. Follow dosage scheduled as outlined on the package insert accompanying each bottle of KI.

8.2 The potassium iodine is stored in the plant medical station. KI has an approved shelf-life with the expiration date listed on each bottle. To ensure that the KI supply is valid, these dates will be inspected during the emergency medical supply inventory and the bottles replaced as necessary.

3.3 A copy of the Food and Drug Administration approved package insert shall accompany each bottle of KI issued. Dosage scheduled and other pertinent information are outlined on the package and should be followed closely (Attachment 4). 8.4 The issaing agent shall complete the Potassium Iodine Issuo' Report (Attachment 5) for each bottle of KI issued. A copy of this report will be routed to the Plant health physicist in a timely manner.

; < - __ _

..

*- . Paga 5 cf 5 BFN - IPD BFN, IP-14 MAY 3 01984

e9.0 USE OF NRC HEALTH PHYSICS NETWORK

e 9.1 This line is located in the health physics plant laboratory (on dimension) and the NRC Resident Inspector's office (orange phone).

* 9.2 The line is to be used by TVA personnel only under the following circumstances:

a. Incoming call from NRC.

b. Incoming call from another reactor site, if call is made at request of NRC at that site. Individual answering phone should verify the incoming call is made at NRC request.

o. Outgoing call to another reactor site at request of NRC at * Browns Ferry. [ Dial 21 + two digit number required * (22 - Bethesda, 23 - Atlanta.)]

d. Outgoing call to the two numbers (NRC) listed on the phone. * This is to be used in the event of an emergency, or can be used as a backup to the ENS (red phone) and Bell system during an emergency. O

,

' Revision O

'-

__

. . . . _ _ _ _ . _ _ _ . _ . _ _ _ _ . ______. ______. ______. ______. Tcnn ssa Vriley Authority . . . - . . . " BF 2.3 Browns Ferry Nuclear Plant BF 11.1

' FEB 151984 ,

77 , * ' ) % PERMANENT INSTRUCTION CIIANGE INFORMATION

IIistory of Revisions (For DCU * [ ~ Instruction Number I Use only) Unit No. /,2, 3 : Title dor,sa no Ehr//WLd9 rrebu,v4' Approval Date/Affected Pages j 5/30/84 / All 4/17/84 / 3 10/12/83 / 2 8/03/83 / 3 " Reason , Eor Revision M/#A&cfAML2) 7/06/83 / All o/J J N'a L S Au D /hrv.A L GVe :G / _Qtfim af f/ _ / Q , , * / / Pages Affected O[,1 / ( / /

m Is this change in response to an LER, IE Bulletin, NRC Inspection Report, - * Management / Supervisor Inspection, OQAB audit, etc.? Yes No Y (If yes, specify document under reason for revision.) , ,o Change in procedural detail of FSAR or other licensing docun ent? ( ) Yes No M ; New instruction? Yes No '"' W (If yes to either question, a USQD is required. ) ) M No 1 Is this a work plan initiated change? Yes (Work Plan No. h Fire Protection System involved? Yes No Y (If yes, review and signature of fire protection engineer is required.)

~ /Y Fire Protection Engineer i hs Was this change made to meet a NltC commitment? Yes No I (If yes, refer to BF 2.3 for proper identification of the change.) (If yes, review and m Security System involved? Yes No signature of Public Safety Services Supervisor is required.) f }}k' * Public Sately Services Supervisor

k' N 'u / - ks / $@ Y - P By / Date POftC Chairman Date N L / $. 'I;hh ate / (YYDate , Submitted By P ant Superintendent /^ Retention: Period - Lifetime; Responsibility I Document Control Supervisoi- , O l '(Note: If this is a new instruction or instruction deletion, document control W will update the source document matrix.) * Revision N on . d.f'ltt 4:. t- .c.s, s,.u.- w. . .5- g_ng - * ~ ~ - us n-tr - ?. :. * . .. M ~ ' ~ . _ .. - ...... - . _ - - .. _. ~_

- 1. ; -e : . Page 1 of 4 ' ' > . BFN - IPD

TORNADO EMERGENCY PROCEDURE

1.0 PURPOSE

; 1.1 To prescribe the actions to be- taken during a tornado watch and .

| 2.0 PROCEDURE

2.1 Notification '

2 Notification may be by any of the following:

I (a) _ Wilson Dispatcher.

(b) Plant personnel (verify by TV/ ).

(c) National Weather. Service (weather radio).

|. (d) 0ther sources (verify by TV/ weather radio) DATE: NOTE: Possible " Wind Speed High" at 45 mph (panel 9-20).

2.2 Tornado Watch i ~ INITIATED CANCELLED ' Tnit. Tina Tnit. Tina NOTE: . A tornado watch is a precautionary condition indicating a tornado is a possibility. , i. 2.2.1 Shift ' engineer notifies public safety service shift i . lieutenant (PAX 273) of tornado watch (refer him to IP- ' 26) and makes every effort to have an additional shift . engineer on-site whose duties will be to help coordinate electrical switching and other-plant activities.

2.2.2 Shift engineer reviews appropriate abnormal operating - instructions (OI-57) for implementation in case of build-

ing or electrical distribution system damage. . Particular , attention is to be given to possible loss of off-site - ' . power. f- "2.2.3 - Shift engineer will have. reactor building . crane, _ bridge,- and trolley secured against bumpers using tie-downs. :

~ , -2.2.4: Shift. engineer to notify refuel floor' personnel to suspend fuel handling operations. ,

3 - 2.2.5 Public safety service to be alert for conditions to become worse.and be prepared 'to' implement tornado warning . actions. |-

'

' ; . f('''i | < 2 s_ / : . , )

p

- - , m

.,...... -. _ . .- . - . . .- ._. . -- .

. Page 2 of 4 * BFN - IPD BFN IP-26 MAY 3 01984 $

2.3 Tornado warninz NOTE: A tornado warning condition indicates that a tornado has been sighted in the area (within approximately 35 mile radAus of BFNP), through notification as specified in 2.1 above.

2 3.1 Shift engineer immediate actions: NOTE: The duty shift engineer has primary responsibility for implementation and coordination of this pro- cedure and may exercise the authority to request needed assistance from other sections, as deemed INITIATED CANCELLED necessary, in the initiation and implementation of Init. Time Init. Time this procedure.

Initiate IP-2. NOTE: Hardhat provisions are suspended during a tornado warninz. as the primary concern is safety from the tornado. Notify public safety service shift lieutenant (PAX 273) of tornado warning. Request they activate their portion of this procedure.

Notify plant superintendent's office to clear office and service building personnel into elevation 565 turbine building. Request senior management personnel keep buildings clear.

Evacuate all personnel from refuel floor operations except personnel required to perform tie-down of reactor building crane, bridge, and trolley. Tie-down crew to evacuate refuel floor when crane is secured.

Dispatch AUO to evacuate elevation 621 turbine building.

Notify water treatment plant personnel of tornado warning. Request they stay inside until further notice.

, Notify Hypochlorite (Operations Training) Building personnel of tornado warning. Request they seek shelter in turbine or diesel generator building until further notice. Notify personnel in plant by public address of tornado warning. Request they go to reactor building, turbine building elevation 565 or 586, diesel generator building, or radwaste building. O

|

_ ._ .. .

. .*

, Page 3 of 4 BFN - IPD BFN, IP-26

O 2.3 Tornado warning (continued): 0 G84 INITIATED CANCELLED Init. Time Init. Time 2.3.1 (Continued): Close outside doors on radwaste building and reactor ____ building, if open.

Notify all control room operating personnel of the tornado warning.

__ - Position personnel for emergency switching on electrical distribution system.

2.3.2 Public safety service immediate actions.

Notify motor patrol of tornado warning. They should direct all workers in the yard, cooling tower area, and outside the protected area back inside the fence and then to elevation 565 turbine building.

Notify PSS field personnel of specific actions to be taken per PSSSIL 17.33

Evacuate all personnel from the following list of external buildings by dispatching officers, and direct them to one of the following: Reactor building, turbine O building elevation 565 or 586, radwaste area, diesel generator building, intake pumping building, or biothermal tuilding.

. Trailers on west side of powerhouse.

. Plant shop building 3 (north side of office building)

. Firing range (contact by radio if available).

Notify the following by telephone to evacuate to tornado shelter areas :

Public safety chief in administrative 266 822 office bulding outside security fence (when building is occupied).

OMMMM Supervisor or assistants. 701/715 714

Biotherm research facility supervisor 341 729-8574 or personnel (direct them to remain in facility).

O . *.

Page 4 of 4 BFN - IPD BFN, IP-26 MAY 3 01984

2.3 Tornado warning (continued): INITIATED CANCELLED Init. Time Init. Time Personnel in Warehouse 12 (east side 793/794/ of powerhouse). 789 748 Personncl in greenhouse (direct them to Biotherm) 729-6102

Low level radwaste facility 449

2.4 ALL CLEAR - Following Tornado Watch

Shift engineer notify public safety and all other personnel notified in step 2.2 when, in his judgment, it is safe to issue ALL CLEAR.

ALL CLEAR - Following Tornado Warning 2.5 | | 2.5.1 Shift engineer to announce "ALL CLEAR" on public address i system. Cancel IP-2 when, in his judgment, it is safe | to issue an " ALL CLE AR . "

2.5.2 Shift engineer to notify public safety by phone. 2.5.3 Public safety service shall notify all personnel notified in step 2.3.2 and those gathered in tornado shelter areas of the "ALL CLEAR" condition.

2.6 Ooerator Action Following Tornado or High Wind

2.6.1 Inspections by shift engineer / site emergency director.

Make inspection of switchyard ar.d transformer yard for damage.

Make inspaction of site area for any damage.

2.6.2 Based on results of damage inspections, the shift engineer / site emergency director will initiate maintenance and restoration actions. When conditions permit, resume normal activities. Log events and actions in daily journal.

. O