1 Summary of the Mineral Block PART-A-General Information About
Total Page:16
File Type:pdf, Size:1020Kb
Summary of the Mineral Block PART-A-General Information about Bhangaon Iron Ore Block Features Details 1. Location Mineral Block Bhangaon Iron Ore Block 1) N 220 01’37.20720”, E 850 15’07.48400” 2) N 220 01’58.60999”, E 850 15’01.82002” 3) N 220 01’58.03000”, E 850 14’49.26998” 4) N 220 02’04.73640”, E 850 14’48.42600” Corner Points (Latitude, Longitude) 5) N 220 02’38.28422”, E 850 14’22.14298” 6) N 220 02’37.79642”, E 850 15’03.03952” 7) N 220 02’18.32827”, E 850 14’56.21305” 8) N 220 02’10.53600”, E 850 15’21.0240” Village Bhangaon Tehsil/ Taluka/ Mandal/ Block Noamundi Block District West Singhbhum State Jharkhand 2. Area (hectares/Square Kilometers) 118 Hects 3. Exploration Status (G2/G3/G4 etc.) G2 Exploration Agency Directorate of Geology, Jharkhand Total Number of Bore holes with 14 Bore holes, 991.90 Meters meterage Bore hole Spacing (Density) 200 meter X 200 meter grid 4. Quantity of Minerals (Grade-Wise) Average Fe Tonnage Sl. No Mineral : Iron Ore Range/ (%) Million tones 1 58.3% 40.29 Total Geological Resources 40.29 Million tones (Reserves) 5. Mineralized Zones Trend (Strike and Dip) NNW- SSE with south westerly dipping at 65- 75º Total Thickness Variable 1 6. Accessibility Karampada in the Kiriburu-Bimalgarh branch of Nearest Rail Head south eastern railway which is about 8 km from the area The area is well connected from Chaibasa upto Kiriburu by Chaibasa-Barajamda-Kiriburu State Highway. It is about 8 km from Kiriburu and can be Road approached by a motorable Kacha Forest road. The total distance from Chaibasa to the area is about 110 km. Airport - 7. Hydrography No major source of perennial water in the area. Local Surface Drainage Pattern However, a number of Nalas pass through the (Channels) area. Sufficient quantity of water is present to support mining. Rivers/ Streams - 8. Climate Mean Annual Rainfall 1800 to 2000 mm Temperatures (Minimum) 40 c Temperatures (Maximum) 420 c 9. Topography Topo Sheet Number F45H4 & F45H8 2 PART B PARTICULARS OF STATUTORY LICENSES, PERMITS, PERMISSIONS, CONCESSIONS, APPROVALS AND CONSENTS RELATED TO MINING OPERATIONS Particulars Details/ Status 1. Forest clearance To be obtained by successful bidder Wild life clearance (Sanctuary, reservoir 2. To be obtained by successful bidder special zone clearances) 3. Environmental clearance* To be obtained by successful bidder 4. Consent to establish To be obtained by successful bidder 5. Explosive license To be obtained by successful bidder 6. Permission for mine opening To be obtained by successful bidder Permission of installation/trial operation of 7. To be obtained by successful bidder equipment 8. Ground water clearance (Centre/ State) To be obtained by successful bidder 9. Railway siding approval To be obtained by successful bidder 10. Approval for diesel storage To be obtained by successful bidder 11. Power line from State Discom To be obtained by successful bidder Clearances relating to work under an 12. existing transmission line or shifting of the To be obtained by successful bidder transmission line 13. Grama Sabha Consent To be obtained by successful bidder * Also includes all applicable statutory clearances w.r.t. mining near interstate boundaries. PART C - PARTICULARS OF LAND Particulars Details/ Status 1. Total Concession Area 118 Hects. 2. Forest Land with Status 118 Hects. 3. GM with Status - 4. Raiyati with Status - 5 Unclassified with status - 5. Revenue survey details are - 3 .