Invitation of Public Comments

Total Page:16

File Type:pdf, Size:1020Kb

Invitation of Public Comments REGIONAL OFFICE – Guwahati National Highways & Infrastructure Development Corp.Ltd. (Ministry of Road Transport & Highways, Government of India) 2nd Floor, Agnishanti Business Park, Opp. AGP Office, GNB Road, Ambari, Guwahati, PIN -781001, Tel : +91-361-2730546, Email:- [email protected] or [email protected] A GOVT. OF INDIA ENTERPRISE RO-NE/W/A/Ghy-Dim/OFC/189-D/6968 Date:10.06.2021 Invitation of Public Comments Sub: Rehabilitation and Augmentation of For Laning of Numaligarh to Jorhat Section from Km 402.50 to Km 453.00 of NH-37 except construction of Dergaon Bypass from Km 426.800 to Km 437.420 in the State of Assam under SARDP-NE on EPC Basis– Permission for laying of undergound Natural Gas Pipeline alongwith OFC of 24” Dia @ Km 408+950 and 12” Dia @ Km 439+700 across NH-37 (New NH-715)-Reg. The GM(P), PMU Jorhat vide letter No: JRT/NHIDCL/GM/OFC/Pt-1/61/2017/1362 dated 19.05.2021 has submitted a proposal alongwith recommendation for according permission for laying of undergound Natural Gas Pipeline alongwith OFC of 24” Dia @ Km 408+950 and 12” Dia @ Km 439+700 across NH-37 (New NH-715). The applicant, M/s Indradhanush Gas Grid Limited (IGGL) had submitted their proposal to the PMU vide their letter no.: IGGL/GHY/Pl/PH-I/SKP/NH/2020/27 & 28 dated 07.05.2021. The GM(P), PMU Jorhat has certified the proposals, checklist and drawings as per the extant practice. 2. The subject cited NH Section is presently under construction and is being developed to a 4-Lane facility. 3. As per Ministry’s circular no. RW/NH-33044/29/2015/S&R(R) dated 22.11.2016 and subsequent modification dated 15/01/2021, the Highway administrator will make available the subject proposal on the portal for 30 days seeking for public comments on ground of public interest. 4. In view of above, the comments of the public are invited on the captioned proposal and the same should reach the below mentioned address till 30 (thirty) days from the date of uploading, beyond which no comments will be considered. The Executive Director (Projects) cum Highway Administrator National Highways & Infrastructure Development Corporation Limited (NHIDCL) (Ministry of Road Transport & Highways, Government of India) Regional Office, Guwahati Ist &2nd Floor, Agnishanti Business Park, Opp. AGP Office, GNB Road, Ambari, Guwahati, PIN -781001, Tel: +91-361-2730546, 2736404 Email: [email protected] 5. This issues with the approval of the Competent Authority Yours faithfully Binayak Kumar Dy. General Manager (P) Copy to: 1. The Senior Technical Director, NIC, Ministry of Road Transport & Highways, Transport Bhawan, New Delhi-110001: with a request for uploading on the Ministry’s website. 2. The GM(P), PMU Jorhat: for information. Head Office: - 3RD Floor, PTI Building 4- Parliament Street, New Delhi-110001 .
Recommended publications
  • Holiday Listed Vendor Details of Numaligarh Refinery Limited
    Holiday Listed Vendor Details of Numaligarh Refinery Limited Sl Holiday Listing Period Vendor Name Address PAN No GSTN No From Date To Date 1 Debashish Gautam (303072) 12-08-2021 11-08-2022 Sarupathar Town, Dist: Golaghat ASIPG9706F 18ASIPG9706F3ZK 2 M/s D D Enterprise 08-07-2021 07-07-2022 Majarigaon, Azara, Ghy NA NA 3 Maa Construction 21-04-2021 20-04-2022 Bishnupur, Dist: Golaghat NA NA LAXMI NARAYAN 4 PACKEGING 02-02-2021 01-02-2022 VILL-NAWKUCHI, NH-41, RANGIA, AADFL0516B 18AADFL0516B2ZX INDUSTRIES(204278) 5 Chandrajit Hazarika 14-12-2020 13-12-2021 Kuruwabahi Satra, Bokakhat NA NA 6 Sanjay Bora (203650) 28-10-2020 27-10-2021 P.O-KACHARIHAT, GOLAGHAT AWKPB1638F 18AWKPB1638F2ZP Blueladder EPC Solutions NA NA 7 08.10.2020 07.10.2021 M-1, Saraf Court, Dhantoli, Nagpur Pvt. Ltd. 1404 Fairfield B Lodha Luxuria, Eastern 8 Farhan Heavy Electricals 13.08.2020 12.08.2023 Express Highway, Majiwada, Thane West- AFLPM2267F NA 400606 M/s S. M. ISLAM & SON 4th Floor, Flat No. 4C, 5, Dr. Biresh Guha 9 06-03-2020 05-03-2023 AAMFS1067K 19AAMFS1067K2ZO (303701) Street, Kolkata - 700017 M/s Integrated Fire 38, Pandit Madan Mohan Malabya Sarani, 10 Protection Pvt. Ltd., 29.02.2020 28.02.2021 AAACI5559B 19AAACI5559B1ZN Chakraberia Road (North), Kolkata- 700020 (200593) 11 M/s Bijoy Sankar Borah 12-02-2020 11-02-2021 Old Amulapatty, Sivasagar- 785640 NA NA HOUSE NO. 11, 12, SUNDARPUR, BYE PREMIER SOLUTIONS 12 22-01-2020 21-01-2021 LANE 2, R.G. BARUAH ROAD, ABGFM8346L 18ABGFM8346L1ZN (203588) GUWAHATI-5 DALMIA CEMENT 13 (BHARAT) LIMITED 22-01-2020 21-01-2021 Rajgangpur, Dist: Sundargarh, Odisha -770017 AADCA9414C 21AADCA9414C3Z9 (203822) Arihant Security Services 97,Homeopathic College 14 31-12-2019 30-12-2020 ACTPB6881B NA (302108) road,Bagharbari,Panjabari, Guwahat-781037 M/s Nagman Calibration 168/7, Chennai-Bangalore National Highway, 15 05-12-2019 12/4/2022.
    [Show full text]
  • Brahmaputra and the Socio-Economic Life of People of Assam
    Brahmaputra and the Socio-Economic Life of People of Assam Authors Dr. Purusottam Nayak Professor of Economics North-Eastern Hill University Shillong, Meghalaya, PIN – 793 022 Email: [email protected] Phone: +91-9436111308 & Dr. Bhagirathi Panda Professor of Economics North-Eastern Hill University Shillong, Meghalaya, PIN – 793 022 Email: [email protected] Phone: +91-9436117613 CONTENTS 1. Introduction and the Need for the Study 1.1 Objectives of the Study 1.2 Methodology and Data Sources 2. Assam and Its Economy 2.1 Socio-Demographic Features 2.2 Economic Features 3. The River Brahmaputra 4. Literature Review 5. Findings Based on Secondary Data 5.1 Positive Impact on Livelihood 5.2 Positive Impact on Infrastructure 5.2.1 Water Transport 5.2.2 Power 5.3 Tourism 5.4 Fishery 5.5 Negative Impact on Livelihood and Infrastructure 5.6 The Economy of Char Areas 5.6.1 Demographic Profile of Char Areas 5.6.2 Vicious Circle of Poverty in Char Areas 6. Micro Situation through Case Studies of Regions and Individuals 6.1 Majuli 6.1.1 A Case Study of Majuli River Island 6.1.2 Individual Case Studies in Majuli 6.1.3 Lessons from the Cases from Majuli 6.1.4 Economics of Ferry Business in Majuli Ghats 6.2 Dhubri 6.2.1 A Case Study of Dhubri 6.2.2 Individual Case Studies in Dhubri 6.2.3 Lessons from the Cases in Dhubri 6.3 Guwahati 6.3.1 A Case of Rani Chapari Island 6.3.2 Individual Case Study in Bhattapara 7.
    [Show full text]
  • Advertisement No.: 02/2021 122A, G.S.Road, Christianbasti, Guwahati-781005 (Assam) CIN - U11202AS1993GOI003893
    NUMALIGARH REFINERY LIMITED Registered Office: Advertisement No.: 02/2021 122A, G.S.Road, Christianbasti, Guwahati-781005 (Assam) CIN - U11202AS1993GOI003893 ABOUT NUMALIGARH REFINERY LIMITED Numaligarh Refinery Limited (NRL), a subsidiary of M/s Oil India Limited (OIL), is a Miniratna Public Sector Undertaking (PSU) under Ministry of Petroleum & Natural Gas. It has a 3.0 MMTPA Oil Refinery at Numaligarh in the district of Golaghat, Assam and Marketing Terminals at Numaligarh, Assam and Siliguri, West Bengal. Numaligarh Refinery was conceived in the historic ‘Assam Accord’ of 1985. NRL has displayed creditable performance since commencement of commercial production of its refinery in October, 2000. Since then the Company has diversified into Petrochemicals, Natural Gas transportation etc. NRL is also the largest producer of Paraffin Wax in the country. With its concern, commitment and contribution to socio-economic development of the state combined with a track record of continuous growth, Govt. of India has approved its prestigious project for capacity expansion from 3.0 MMTPA to 9.0 MMTPA. The project also includes setting up of a crude oil pipeline from Paradip Port, Odisha to Numaligarh, Assam and a product pipeline from Numaligarh to Siliguri. The Company is also laying a Trans National Indo-Bangladesh Petroleum Pipeline from Siliguri to Parbatipur. The Company, by way of a Joint Venture, is also setting up a 2G Ethanol Plant at Numaligarh which will be using bamboo bio mass as feedstock. The Company is looking for dynamic and committed professionals, who are ready to take challenges head on. Here is the opportunity to fulfill your potential and script yet another growth story of NRL while contributing towards the strong energy future of the country.
    [Show full text]
  • 1 Numaligarh Refinery Limited Brochure Selection Of
    NUMALIGARH REFINERY LIMITED BROCHURE SELECTION OF PETROL/DIESEL RETAIL OUTLET DEALERS 9th December, 2010 1 INDEX Clause No. Clause Heading Page Number From To 1 Identification of locations 3 3 2 Mode of selection of Dealers 3 3 3 Reservation for Retail Outlet (RO) Dealerships 3 4 4 Eligibility Criteria 4 6 5 Disqualification 6 6 6 Applicability of Multiple dealership norms (Relationship 6 7 clause) 7 Personal supervision by dealer 7 7 8 Scheme of financial assistance to SC/ST category 7 7 dealerships under 'Corpus Fund' scheme 9 Licence Fee 8 8 10 Application form 8 9 11 Person applying for different locations 9 9 12 Eligibility to Apply 9 9 13 Evaluation of Applicants 9 9 14 Details of the Parameters for evaluating the applicants 10 16 and Personal Interview 15 Inters-se-priority for "DEF" and "PMP" categories 16 17 16 Results of the interview 17 18 17 Provision of basic facilities at the retail outlets 18 18 18 Security deposit 18 18 19 Grievance / Complaint redressal system 18 19 20 Tenure of dealership 19 19 21 Furnishing of false information / concealing information 19 19 22 Amendment / Modification 19 19 2 Numaligarh Refinery Limited For appointing dealers for its Retail Outlets (ROs), the oil company follows the following transparent procedure: 1. Identification of locations Locations for setting up Petrol/Diesel Retail Outlets are identified by the Oil Company after carrying out required feasibility study and based on commercial considerations. 2. Mode of selection of Dealers (a) The locations identified as above are advertised under applicable category in two newspapers - one English and one Regional vernacular newspaper having wide circulation in the area where the location falls in case of Regular ROs and in case of Rural ROs in one local/vernacular newspaper (with maximum circulation in the area) and in one state level newspaper having maximum circulation in the state.
    [Show full text]
  • NUMALIGARH REFINERY LIMITED GENERAL CONDITIONS of CONTRACT for Implementation of Numaligarh Refinery Project
    Page 1 NUMALIGARH REFINERY LIMITED GENERAL CONDITIONS OF CONTRACT For implementation of Numaligarh Refinery Project. Page 1 of 128 Page 2 TABLE OF CONTENTS FOR GENERAL CONDITIONS OF CONTRACT SL.NO. DESCRIPTION PAGE NO. (I) TABLE OF CONTENT (I) to (iv) (II) SUBMISSION OF TENDER 1 SECTION-I (GENERAL CONDITION OF CONTRACT) 2 to 5 1.0 DEFINITION OF TERMS 2 to 5 SECTION-II (GENERAL INFORMATION) 6 to 9 2.0 GENERAL INFORMATION 6 2.1 (a) LOCATION OF SITE 6 (b) ACCESS BY ROAD 6 2.2 SCOPE OF WORK 6 2.3 WATER SUPPLY 6 2.4 POWER SUPPLY 7 & 8 2.5 LAND FOR CONTRACTOR’S FIELD OFFICE , GODOWN & WORKSHOP 8 & 9 2.6 LAND FORSIDENTAL ACCOMMODATION 9 SECTION-III (GENERAL INSTRUCTION TO TENDERERS) 10 to 17 3.0 SUBMISSION OF TENDER 10 4.0 DOCUMENTS 10 4.1 GENERAL 10 & 11 4.2 ALL PAGES TO BE INTIALLED 1 4.3 RATES TO BE IN FIGURES AND WORDS 11 & 12 4.4 CORRECTION AND ERASURES 12 4.5 SIGNATURE OF TENDERER 12 4.6 WITNESS 12 4.7 DETAILS OF EXPERIENCE 12 5.0 TRANSFER OF TENDER DOCUMENTS 12 6.0 EARNEST MONEY 12 & 13 7.0 VALIDITY 13 8.0 ADDENDA/CORRIGENDA 13 Page 2 of 128 Page 3 9.0 RIGHT OF OWNER TO ACCEPT OR REJECT TENDER 13 10.0 SECURITY DEPOSIT 14 11.0 TIME SCHEDULE 14 12.0 COLLECTION OF DATA TENDERER’S RESPONSIBILITY 14 13.0 RETIRED GOVERNMENT OR COMPANY OFFICERS 14 14.0 SIGNING OF CONTRACT AGREEMENT 15 15.0 FIELD MANAGEMENT BY ENGINEER-IN-CHARGE 15 16.0 NOTE TO SCHDULE OF RATES 15 17.0 POLICY FOR TENDERERS UNDER CONSIDERATION 15 & 16 18.0 AWARD OF CONTRACT 16 19.0 CLARIFICATION OF TENDER DOCUMENT 16 20.0 LOCAL CONDITION 16 & 17 21.0 ABNORMAL RATES 17 SECTION-IV
    [Show full text]
  • KAZIRANGA- KARBI ANGLONG LANDSCAPE Consistent Usage of Environmental Principles in Wildlife Conservation
    CASE BRIEF Supreme Court on Wildlife Conservation KAZIRANGA- KARBI ANGLONG LANDSCAPE Consistent Usage of Environmental Principles in Wildlife Conservation Shyama Kuriakose The author would like to thank Rohit Choudhury for providing us valuable information on the background and history of the Kaziranga landscape as well as the various judgements that have impacted this landscape in a positive manner. We would especially like to thank P. Sivakumar, Field Director of Kaziranga National Park and all the forest rangers for facilitating our visits to the Kaziranga National Park and its surrounding areas which helped us understand the ground realities. We are also grateful to Dr Anup Nayak, Former Member Secretary, National Tiger Conservation Authority for providing us insights into the nuances of wildlife conservation in India. Without all of their insights, and without the patient editing by Dr Dhvani Mehta and Debadityo Sinha, this case-brief could not have materialized. The author is also thankful to her colleagues Yogini Oke and Esha Rana for their inputs and help. Photographs used in this report were clicked by Debadityo Sinha and were captured during our field visit in and around Kaziranga National Park between 29th November-3rd December 2019. Vidhi would like to thank Tata Education and Development Trusts and Universal Comfort Products Limited for supporting this work. 1 he Supreme Court of India has a and toxic air and landfills in Delhi. They also stellar track record on span different environmental issues- T environmental protection. It is ecological threats posed by dams, efficacy of credited with taking important steps to effluent treatment plants, wildlife clean Delhi’s air, protecting the Taj Mahal conservation, air pollution, and waste from industrial pollution, preserving forests management.
    [Show full text]
  • By Video Conferencing)
    Item No. 09 Court No. 1 BEFORE THE NATIONAL GREEN TRIBUNAL PRINCIPAL BENCH, NEW DELHI (By Video Conferencing) Appeal No. 11/2018 Rohit Choudhary Appellant(s) Versus Union of India & Ors. Respondent(s) Date of hearing: 14.08.2020 Date of uploading of order on Website: 18.08.2020 CORAM: HON’BLE MR. JUSTICE ADARSH KUMAR GOEL, CHAIRPERSON HON’BLE MR. JUSTICE S. P. WANGDI, JUDICIAL MEMBER HON’BLE DR. NAGIN NANDA, EXPERT MEMBER ORDER 1. This appeal has been preferred against grant of Environmental Clearance (EC) for setting up Bamboo based Ethanol Project at village Owguri Chapori Gaon, Mouza Morong, Tehsil & District Golaghat (Assam) by M/s. Numaligarh Refinery Ltd. 2. The matter was earlier taken up by a different Bench. Vide order dated 02.08.2018, the appeal was dismissed as barred by limitation. It was found that the EC was granted on 08.11.2017 while the appeal was filed on 05.02.2018 which was not only beyond period of 30 days but also beyond further 60 days upto which Tribunal could extend the limitation. However, the Hon’ble Supreme Court in Civil Appeal No. 11941/2018 observed that delay beyond 30 days was 59 days which the Tribunal could condone. The matter was remanded to the Tribunal. Accordingly, the matter was taken up for consideration on merits, after 1 condoning the delay. The parties were required to file their respective pleadings, which have been filed. After retirement of the Presiding Judge in the other Bench, matter has been listed for hearing before this Bench. 3.
    [Show full text]
  • UBERIZATION – Route List (Modified)
    UBERIZATION – Route list (Modified) A) City bus service at Guwahati (SCR service) Total Route Number Base station Route details number No. of buses of bus 1 Khanapara Khanapara to Jalukbari via Paltanbazar 25 2 Basistha Basistha Mandir to Jalukbari via Paltanbazar 15 3 Paltanbazar Kahilipara to Jalukbari via Dispur, Paltanbazar 12 4 Forest Gate Forest Gate to Jalukbari via Chandmari, Church field 25 5 Khanapara Khanapara to Jalukbari via ISBT, NH 37 25 ISBT to Jalukbari via Basistha Chariali, Beltola tiniali, Last Gate, Ganeshguri, 6 ISBT 20 Zoo Road, Chandmari, Kachari 7 Forest Gate Chandrapur to Jalukbari via Forest Gate, Chandmari, Kachari 15 8 ISBT ISBT to Kachari via Saukuchi, Serab bhati, Paltanbazar 15 9 ISBT ISBT to Kachari via Garchuk, Ganeshpara, Dhirenpara, Ambari, Bharalumukh 15 Khanapara to Amingaon via ISBT, Jalukbari 10 Khanapara 15 233 (May be extended up to Changsari, if possible) 11 Paltanbazar Lalmati to Jalukbari via Hatigaon, Ganeshguri, Paltanbazar 7 Khanapara to Khanapara via Sixmile, Ganeshguri, Zoo Road, Hatigaon, 12 Khanapara 7 Narikolbasti, Geeta Mandir, Pathar Kuwari Forest Gate to Amingaon via Chandmari, Kachari 13 Forest Gate 7 (May be extended up to Changsari, if possible) 14 ISBT (Ghy) ISBT (Ghy) to Hajo via Adabari 7 15 ISBT (Ghy) ISBT (Ghy) to Soalkuchi via Adabari 5 16 Soygaon Soygaon to Adabari 5 17 Khanapara Byrnihat to Jalukbari via Basistha Chariali, Lakhara, Khanapara 5 18 Forest Gate Forest Gate to Khanapara via Noonmati, Chandmari, Zoo Road, Ganeshguri 8 B) Short distance service Total Number
    [Show full text]
  • Kaziranga Under Threat
    ISSN (Online) - 2349-8846 Kaziranga Under Threat Biodiversity Loss and Encroachment of Forest Land MAYURI GOGOI Vol. 50, Issue No. 28, 11 Jul, 2015 Mayuri Gogoi ([email protected]) teaches at the Department of Social Work, University of Delhi. Several highly polluting industries—stone quarries, oil refinery, parasitic rubber plantations—as well as encroachment from locals, are adversely affecting the biodiversity of the Kaziranga National Park in Assam. This article looks at how decisions taken in the past to establish regionalist claims over resources and industry have proved detrimental to the conservation efforts of Kaziranga. Introduction The Kaziranga National Park (KNP) is a world renowned protected area in Assam nestled on the banks of the river Brahmaputra in the foothills of the Karbi Anglong (KA) Hills. It is a UNESCO World Heritage site and famous as one of the few remaining places with a substantial population of the Asiatic one-horned rhinoceros. The park is spread over two districts—Golaghat and Nagaon—with majority of the area falling within the administrative boundaries of Golaghat. The forests surrounding KNP form a contiguous landmass spreading across the neighbouring KA district and offer prime habitat for wild animals in the Kaziranga-Karbi Anglong Landscape (KKAL). In recent years, KNP is battling a host of problems such as rhino poaching, erosion and flood. As against this, forest areas outside the park’s jurisdiction are getting increasingly exposed to onslaughts of unplanned and unmindful anthropogenic activities. There have been massive changes in land use in the KKAL, significantly altering the topography of the region and disrupting the well-being of animals and humans alike.
    [Show full text]
  • Regions of Assam
    REGIONS OF ASSAM Geographically Assam is situated in the north-eastern region of the Indian sub- continent. It covers an area of 78,523 sq. kilometres (approximate). Assam – the gateway to north-east India is a land of blue hills, valleys and rivers. Assam has lavishly bestowed upon unique natural beauty and abundant natural wealth. The natural beauty of Assam is one of the most fascinating in the country with evergreen forests, majestic rivers, rich landscape, lofty green hills, bushy grassy plains, rarest flora and fauna, beautiful islands and what not. The capital of Assam is Dispur and the state emblem is one-hoed rhino. Assam is bounded by Manipur, Nagaland and Myanmar in the east and in the rest by West Bengal in the north by Bhutan and Arunachal Pradesh and in the route by Mizoram, Tripura, Bangladesh and Meghalaya. Literacy rate in Assam has seen upward trend and is 72.19 percent as per 2011 population census. Of that, male literacy stands at 77.85 percent while female literacy is at 66.27 percent. As per details from Census 2011, Assam has population of 3.12 Crores, an increase from figure of 2.67 Crore in 2001 census. Total population of Assam as per 2011 census is 31,205,576 of which male and female are 15,939,443 and 15,266,133 respectively. In 2001, total population was 26,655,528 in which males were 13,777,037 while females were 12,878,491. The total population growth in this decade was 17.07 percent while in previous decade it was 18.85 percent.
    [Show full text]
  • Available Online at 1
    Social Science Researcher, Aug 2013- Jan 2014, 3.1:1-17 Gogoi Atanu Social Science Researcher Vol. 3 No. 1 Social Science Researcher North Lakhimpur College ISSN: 2319 – 8362 HISTORICAL TOURISM IN UPPER ASSAM: BACKGROUND AND POTENTIALITY Atanu Gogoi Dept of History, North Lakhimpur College (Autonomous) [email protected] Abstract Tourism is presently one of the largest, fastest growing and highly organized industries in the world. It is a highly complex phenomenon and important human activity of great significance. Historical tourism is one of the branches of tourism which has immense potentiality in Assam in general and Upper Assam in particular. Upper Assam, presently comprising seven districts, is endowed with rich heritage and glorious history stretching from the ancient to modern period which provide a wide background and great prospect for historical tourism. Ancient relics of the Doyang and Dhansiri valley, medieval historical sites, temples and monuments, modern legacies of the British rule and elements of heritage and cultural practices in different parts of the region can attract both domestic and international tourists. The promotion of the tourism industry can bring a tremendous change to the society and economy of this underdeveloped region. However, tourism fails to flourish here in spite of great potentiality and resources for a variety of reasons such as poor publicity, lack of proper preservation, weak infrastructure, failure of the govt. and private sector to promote the industry etc. This study aims at focusing on the historical assets of upper Assam and to find out the ways to overcome the impediments hampering the growth of tourism.
    [Show full text]
  • ASSAM ACCESSIBLE the Gateway to the North East, Assam Has Seen Rapid Progress in Road Infrastructure Development Since 2014
    MAKING ASSAM ACCESSIBLE The Gateway to the North East, Assam has seen rapid progress in road infrastructure development since 2014. The length of National Highways in the State has reached 3,909 km in 2018. India’s longest bridge, the 9.15 km long Bhupen Hazarika Setu worth Rs. 876 Cr across River Brahmaputra, connecting the Dhola and Sadiya ghats of Assam and Arunachal Pradesh was dedicated to the nation by Prime Minister Narendra Modi in May 2017. Over 300 km of National Highways are being upgraded to 4 lanes, at a cost of over Rs. 10,000 Cr. With engineering marvel projects like Dhubri-Phulbari Bridge & Gohpur-Tumligarh over Brahmaputra being built, the State’s economy is destined to fast track in coming years. “When a network of good roads is created, the economy of the country also picks up pace. Roads are veins and arteries of the nation, which help to transform the pace of development and ensure that prosperity reaches the farthest corners of our nation.” NARENDRA MODI Prime Minister “In the past four years, we have expanded the length of Indian National Highways network to 1,26,350 km. The highway sector in the country has seen a 20% growth between 2014 and 2018. Tourist destinations have come closer. Border, tribal and backward areas are being connected seamlessly. Multimodal integration through road, rail and port connectivity is creating socio economic growth and new opportunities for the people. In the coming years, we have planned projects with investments worth over Rs 6 lakh crore, to further expand the world’s second largest road network.” NITIN GADKARI Union Minister, Ministry of Road Transport & Highways, Shipping and Water Resources, River Development & Ganga Rejuvenation Fast tracking National Highway development in Assam NH + IN PRINCIPLE NH LENGTH UPTO YEAR 2018 3,909 km NH LENGTH UPTO YEAR 2014 3,634 km Adding new National Highways in Assam 1,945 km 798 km Yr 2014 - 2018 Yr 2010 - 2014 New NH New NH & In principle NH length 6 Road Projects awarded in Assam Yr 2010 - 2014 Yr 2014 - 2018 681 km 1,139.77 km Total Cost Total Cost Rs.
    [Show full text]