Management of Storage Facilities June 2019

1

The failure of the tailings facility at circumstances or regulations – the Córrego do Feijão iron as well as regular inspections mine in , , in and formal annual Engineer of January was a tragedy that left Record reviews. close to 300 people dead and impacted many families and their After the Brumadinho tragedy, communities. Our hearts go out to Fields' operations carried those affected and we have out additional safety inspections offered our deepest condolences at our facilities and concluded and support. that Gold Fields-managed TSFs were not at risk. To further But we also recognise that, as improve operational safety of miners, our responsibilities go our TSFs, we are, where beyond offering just words. We practical, evaluating the have to ensure that we manage potential to move away from the our tailings facilities with the construction of upstream utmost care to avoid a repeat of facilities to centre-line or the Brumadinho tragedy as well downstream designs, as other mine tailings failures considering filtered and dry before then. stacked tailings, as well as in-pit tailings disposal. In the wake of the tragedies, Gold Fields is pursuing two broad We will continue to review and, strategies to further strengthen where applicable and practical, the technical management and consider the adoption of leading governance of the 34 tailings practices in the design, facilities at our operations and construction, operation and joint ventures. closure (including post-closure) of tailings in the company. At industry level, CEOs of the Gold Fields fully supports International Council on & greater transparency in the Opening Metals (ICMM), including Gold mining sector and as such we Fields, have committed to are today providing a written remarks creating a step change for the response to a request from the by industry in the safety of tailings Church of England Pensions facilities. The ICMM, UN Board and the Swedish Council Gold Fields Environment and the UN on Ethics for the AP Funds to a Principles for Responsible number of listed mining CEO Investment are developing a companies. recognised international standard Nick Holland for member companies, based on At Gold Fields the safety and best practices to ensure that health of our workforce has tailings facility risks are managed always been management’s top appropriately, consistently, and priority. The recent industry transparently. An independent tragedies around the panel of experts is overseeing the catastrophic failures of tailings work. facilities has highlighted once again that the safety of our At company level, Gold Fields has surrounding communities is aligned its tailings management equally critical. practices to the ICMM position statements on water and tailings Sincerely management.

All Gold Fields’ TSFs, as well as associated pipeline and pumping Nick Holland infrastructure, are subject to an CEO, Gold Fields Ltd independent, external audit every three years – or more frequently where required by local

2

CHURCH OF ENGLAND PENSIONS BOARD / SWEDISH NATIONAL PENSION FUNDS COUNCIL ON ETHICS REQUEST FOR INFORMATION CONCERNING TAILINGS MANAGEMENT

PREAMBLE

a) Provide an overview of your tailings management system, and how you manage risk

The most significant waste materials produced by our operations are tailings, waste rock, chemical waste and hydrocarbon waste. By managing these wastes responsibly, we minimise the environmental and potential social impact, so as to maintain our licence to operate.

In total, as at 7 June 2019, our ten operations (including three joint venture sites) contain 34 tailings dams, of which 14 are active or are being rehabilitated and one will be commissioned imminently. With regards to active tailing storage facilities (TSFs), Gold Fields currently has two in-pit tailings dams operating at Agnew (Australia) and St Ives (Australia), five downstream/centreline tailings dams and seven upstream tailings dams. Gold Fields operations with active downstream/centreline tailings dams are Cerro Corona (Peru), Damang (Ghana) and Tarkwa (Ghana). Gold Fields has only three operations where upstream tailings are being used, being South Deep (South Africa), Tarkwa and Granny Smith (Australia). The factor of safety (FOS) of each existing upstream TSF is regularly reviewed, and when required, modification options (e.g. embankment buttressing) are considered to ensure Gold Fields’ target minimum FOSs are at least sustained.

Maintaining our TSFs, which includes identifying, assessing and managing the risks associated with them (including operational, structural and environmental risks) is part of our ordinary course of business. That notwithstanding, Gold Fields, like many other mining companies faces inherent risks in our operation of TSFs. Most critically, tailings must be disposed of in an appropriate manner so as not to impact the safety of the workforce and communities or cause environmental damage. The use of TSFs exposes Gold Fields to certain risks, among them seepage of decanted tailings water or and the failure of a dam at a tailings storage facility.

TSFs designed with upstream constructed embankments typically present greater risk, particularly where the facility is located in a high seasonal rainfall area and where the embankments are constructed using reclaimed tailings materials. The occurrence of a at one of Gold Fields’ TSFs could also lead to the loss of human life and/or extensive property, environmental damage and result in significant financial exposure and the approach we take to prevent such a failure is described on the following pages.

Gold Fields’ Group, regional and mine management regularly assess the risks facing the business. The assessments of the risks and their mitigating actions are a critical internal management tool, which seek to mitigate the identified risks. Risk mitigations are included in the annual Group Performance Scorecard and cascaded down to the performance scorecard of management employees at regional and operational levels. The formal risk review process starts during management’s annual strategic planning sessions where strategic risks and macro-trends are analysed in developing Gold Fields’ risk registers and mitigating actions. These are updated quarterly, and presented to the Board’s Risk Sub-Committee twice a year for verification.

Gold Fields maintains measures to manage its TSFs’ safety, including compliance with the International Council on Mining & Metals’ (ICMM) Tailings Governance Position Statement and undertakes routine reviews by independent international consulting companies.

All of our operations have tailings management plans in place, including closure and post-closure management plans. Gold Fields has implemented a multi-layered approach to TSF management that includes:

1. TSFs are designed by external, experienced and qualified engineers 2. TSF designs are required to be peer-reviewed 3. Construction is supervised or monitored by the design engineer and includes appropriate quality assurance/control 4. “As-built” facilities are required to be signed-off by the design engineer 5. TSFs are managed by assigned personnel 6. TSFs have an engineer of record appointed who undertakes regular reviews of the TSFs 3

7. Independent audits are undertaken at least on a triannual basis (more often in some cases) 8. Gold Fields’ corporate technical services team review and check TSF management processes employed at the operations 9. Key variances identified by TSF reviews are noted and communicated to the Gold Fields Executive Committee and the Board of Directors quarterly 10. Gold Fields has developed a formal Group TSF Management Guideline, and full compliance to this is expected 11. Risk is identified formally through risk assessments undertaken at various stages of the design and operational process 12. A strategic risk register is maintained at corporate level, which includes risks linked to the TSFs

Gold Fields is moving away from installing new upstream TSFs with the most recent new TSFs constructed being in-pit TSFs (Agnew and St Ives), and downstream TSFs (Gruyere (Australia), Tarkwa and Damang).

As two of our sites - South Deep and Granny Smith - are located in relatively dry regions, limited amounts of water need to be stored on the facilities, significantly reducing the risk of saturation of the dams. Tarkwa’s upstream tailings dams in Ghana have been constructed from imported fill materials, and are designed assuming worst-case scenario conditions, to ensure the embankments remain stable throughout both the wet and dry seasons, as well as for the life of the facility.

All Gold Fields’ TSFs, as well as associated pipeline and pumping infrastructure, are subject to an independent, external audit every three years – or more frequently where required by local circumstances or regulations – as well as regular inspections and formal annual or quarterly Engineer of Record reviews.

Risk tables and heat maps have been published in the Integrated Annual Report (IAR) for the last nine years. See https://www.goldfields.com/reports/annual-report-2018/risks-and-materiality.php for more details. Information about how Gold Fields discloses risks associated with its TSFs may be found in its most recent Form 20-F filing with the US Securities and Exchange Commission. See https://www.goldfields.com/form-20- f.php for more details. b) Confirm whether your approach to tailings management has changed or will change in light of the recent tailings disasters at Brumadinho, Mariana, Mt Polley and others. Have you, for example, reviewed all tailings storage facilities with upstream dam construction, and taken steps necessary to protect local communities and the environment e.g. buttressing, evacuation?

After the Samarco accident, ICMM members developed a Tailings Position Statement in 2016 and approved a tailings aspirational goals roadmap in late 2018. Following a company-wide programme of internal and external reviews of the Gold Fields TSFs undertaken in 2017, a number of improvement areas were recommended, including:  Seismicity design considerations  Appointment of an Engineer of Record for each TSF  Dam break assessments  Update of emergency response plans  TSF seepage management and control

Gold Fields’ Group Tailings Management Guidelines are aligned to the ICMM Tailings Position Statement. The guidelines were strengthened during 2017 with the inclusion of additional performance guidance and minimum assessment criteria.

Subsequent to the Brumadinho tragedy, the ICMM agreed to establish an independent panel of experts to develop an international standard for tailings facilities for its member companies. The panel has since been established.

In addition to closing out the above identified gaps during 2018, Gold Fields also embarked on a programme to further improve operational safety of its TSFs, including moving away from the construction of upstream facilities to centre-line or downstream designs, consideration of filtered and dry stacked tailings, as well as in-pit tailings disposal.

These are in line with the main areas of work under the ICMM’s aspirational goals: improving critical controls and reducing tailings water content.

4

The following actions have been implemented or are currently in process at our operations: • The recent construction of a new downstream TSF for the Damang Reinvestment project • The adoption of filtered, dry stacked and lined tailings storage for the planned Salares Norte () mine • The increased use of in-pit tailings disposal in Australia (new TSFs for Agnew and St Ives installed are in- pit TSFs) • Increased use of tailings for underground backfill at the South Deep, Granny Smith and St Ives Invincible mines • Improved governance over seepage control at TSFs through the installation of liners. All new TSFs at Tarkwa, Damang and Gruyere are fully or partially lined

In February 2019, the Gold Fields Board also requested strengthened governance of the Group’s TSFs through, among others, quarterly TSF update reports, continuous environmental monitoring, satellite monitoring scans, and increased external and independent verification. These programmes and initiatives are currently being investigated by management with a view to rapid implementation.

Gold Fields is also working with Lepanto Mining, its majority partner in the Far Southeast project in the Philippines, on enhancing risk mitigating measures for the TSF used by Lepanto for tailings disposal from its nearby gold mine. Gold Fields and Lepanto have commissioned external consultants to undertake detailed hydrological, seismic and geotechnical reviews and make recommendations on strengthening the TSF. The TSF is located in a region with high seismic activity and frequent typhoons.

Our technical teams are also working with Asanko Gold to further strengthen risk assessment and governance of the lined and downstream designed TSF at the Asanko gold mine joint venture in Ghana. Asanko Gold has management control of the operation.

During 2018, two new downstream TSFs were commissioned at our West African operations: the FETSF at the Damang mine and TSF 5 at Tarkwa. c) General note

ICMM agreed a position statement on the materiality of member submissions, which it relayed to the Church of England and the Swedish Council of Ethics. Gold Fields has applied the same interpretation to our response.

To fulfil our understanding of the spirit of the questionnaire (i.e. any potential latent life-safety concerns at an existing facility that have been previously flagged but remain unaddressed), the following interpretation has been used:  Not being certified/confirmed as stable is assumed to be where a noted deficiency is deemed sufficiently significant to trigger a catastrophic failure – the term deficiency is used in that context herein;  For operating facilities, this refers to any identified sufficiently significant deficiency for the current life/stage. For a previous life/stage, any deficiency that was not addressed as vetted by an independent review  For closed/legacy facilities, this refers to any identified sufficiently significant deficiency that reflects the current state of the facility versus a previous issue that has been addressed through a confirmed changed condition via the closure process

We have applied the above interpretation because we believe the disclosure effort is aimed at identifying tailings facilities that could potentially lead to a life-safety concerns, while avoiding falsely identifying issues for facilities that are decades old and no longer resemble the facility referred to in a former noted deficiency (i.e. the formerly noted deficiency is of a nature that materially no longer exists).

5

Responses to request for information on Gold Fields’ 34 TSFs

6

Agnew TSF 1

1. "Tailings Dam" Name/identifier Agnew TSF 1

2. Location 28°00'28.70"S, 120°30'2.18"E

3. Ownership Owned/Operated

4. Status Closed & rehabilitated

5. Date of initial operation 1986

6. Is the dam currently operated or closed as per currently Yes approved design?

7. Raising method Upstream

8. Current Maximum Height (m) 9

9. Current Tailings Storage Impoundment Volume (m3) 245 000

10. Planned Tailings Storage Impoundment Volume in 5 years’ 245 000 time (m3)

11. Most recent Independent Expert Review 29 Oct 18

12. Do you have full and complete relevant engineering records Internal technical working document (2000) including design, construction, operation, maintenance – stability assessment and slope design and/or closure

13. What is your hazard categorisation of this facility, based on Low consequence of failure?

14. What guideline do you follow for the classification system? ANCOLD 2012

15. Has this facility, at any point in its history, failed to be confirmed or certified as stable, or experienced notable stability concerns, as identified by an independent engineer No (even if later certified as stable by the same or a different firm)

16. Do you have internal/in house engineering specialist oversight of this facility? Or do you have external engineering External support for this purpose?

17. Has a formal analysis of the downstream impact on communities, ecosystems and critical infrastructure in the a) No. See Q4 event of catastrophic failure been undertaken and to reflect final conditions? If so, when did this assessment take place?

18. Is there a) a closure plan in place for this dam, and b) does it a) Yes include long term monitoring? b) Yes

19. Have you, or do you plan to assess your tailings facilities against the impact of more regular extreme weather events Yes as a result of climate change, e.g. over the next two years?

7

20. Any other relevant information and supporting documentation. Please state if you have omitted any other - exposure to tailings facilities through any joint ventures you may have

Agnew TSF 2

1. "Tailings Dam" Name/identifier Agnew TSF 2

2. Location 28°00'45.5"S, 120°29'46.9"E

3. Ownership Owned/Operated

4. Status Re-mining

5. Date of initial operation 1991

6. Is the dam currently operated or closed as per currently Yes approved design?

7. Raising method Upstream

8. Current Maximum Height (m) 25

9. Current Tailings Storage Impoundment Volume (m3) 14 200 000

10. Planned Tailings Storage Impoundment Volume in 5 years’ 10 000 000 time (m3)

11. Most recent Independent Expert Review 29 Oct 18

Internal technical working documents (2001, 2002) – master plan – stability analysis 12. Do you have full and complete relevant engineering records External expert engineering reports (1995, including design, construction, operation, maintenance 2000, 2003, 2010) and/or closure – certificate of compliance – closure concept report – construction specification – design reports – operation works approval application

13. What is your hazard categorisation of this facility, based on Low consequence of failure?

14. What guideline do you follow for the classification system? ANCOLD 2012

15. Has this facility, at any point in its history, failed to be confirmed or certified as stable, or experienced notable stability concerns, as identified by an independent engineer No (even if later certified as stable by the same or a different firm)

16. Do you have internal/in house engineering specialist oversight of this facility? Or do you have external engineering External support for this purpose?

8

17. Has a formal analysis of the downstream impact on communities, ecosystems and critical infrastructure in the a) No. See Q20 event of catastrophic failure been undertaken and to reflect final conditions? If so, when did this assessment take place?

18. Is there a) a closure plan in place for this dam, and b) does it a) Yes include long term monitoring? b) Yes

19. Have you, or do you plan to assess your tailings facilities against the impact of more regular extreme weather events Yes as a result of climate change, e.g. over the next two years?

20. Any other relevant information and supporting TSF 2 is currently being re-mined using documentation. Please state if you have omitted any other excavator, loader and trucks, for use as exposure to tailings facilities through any joint ventures you underground backfill may have

9

Agnew Redeemer

1. "Tailings Dam" Name/identifier Agnew Redeemer

2. Location 28°03'45.7"S, 120°29'02.1"E

3. Ownership Owned/Operated

4. Status Partially active for rehabilitation only

5. Date of initial operation 2004

6. Is the dam currently operated or closed as per currently Yes approved design?

7. Raising method In-pit

8. Current Maximum Height (m) 0

9. Current Tailings Storage Impoundment Volume (m3) 10 500 000

10. Planned Tailings Storage Impoundment Volume in 5 years’ 10 500 000 time (m3)

11. Most recent Independent Expert Review 29 Oct 18

Internal technical working documents (2001, 2002, 2018) – master plan External expert engineering reports (2002, 12. Do you have full and complete relevant engineering records 2010, 2012) including design, construction, operation, maintenance – design report and/or closure – geotechnical assessment – hydrogeological assessment – operations manual – underdrainage system construction specification

13. What is your hazard categorisation of this facility, based on Low consequence of failure?

14. What guideline do you follow for the classification system? ANCOLD 2012

15. Has this facility, at any point in its history, failed to be confirmed or certified as stable, or experienced notable stability concerns, as identified by an independent engineer No (even if later certified as stable by the same or a different firm)

16. Do you have internal/in house engineering specialist oversight of this facility? Or do you have external engineering External support for this purpose?

17. Has a formal analysis of the downstream impact on communities, ecosystems and critical infrastructure in the a) No. See Q20 event of catastrophic failure been undertaken and to reflect final conditions? If so, when did this assessment take place?

10

18. Is there a) a closure plan in place for this dam, and b) does it a) Yes include long term monitoring? b) Yes

19. Have you, or do you plan to assess your tailings facilities against the impact of more regular extreme weather events Yes as a result of climate change, e.g. over the next two years?

20. Any other relevant information and supporting In-pit TSF, with no embankments, that is documentation. Please state if you have omitted any other periodically being topped-up to optimise exposure to tailings facilities through any joint ventures you rehabilitation landform may have

11

Agnew Songvang

1. "Tailings Dam" Name/identifier Agnew Songvang

2. Location 28°08'28.3"S, 120°27'40.9"E

3. Ownership Owned/Operated

4. Status Active

5. Date of initial operation 2017/12/01

6. Is the dam currently operated or closed as per currently Yes approved design?

7. Raising method In-pit

8. Current Maximum Height (m) 0

9. Current Tailings Storage Impoundment Volume (m3) 750 000

10. Planned Tailings Storage Impoundment Volume in 5 years’ 4 350 000 time (m3)

11. Most recent Independent Expert Review 29 Oct 18

Internal technical working document (2018) – operations manual External expert engineering reports (2004, 2005, 2015, 2016, 2018) – basis of design 12. Do you have full and complete relevant engineering records including design, construction, operation, maintenance – design reports and/or closure – dewatering investigation and upgrade – geophysical and hydrogeological baseline investigations – geotechnical study – stability review

13. What is your hazard categorisation of this facility, based on Low consequence of failure?

14. What guideline do you follow for the classification system? ANCOLD 2012

15. Has this facility, at any point in its history, failed to be confirmed or certified as stable, or experienced notable stability concerns, as identified by an independent engineer No (even if later certified as stable by the same or a different firm)

16. Do you have internal/in house engineering specialist oversight of this facility? Or do you have external engineering External support for this purpose?

17. Has a formal analysis of the downstream impact on communities, ecosystems and critical infrastructure in the a) No. See Q20 event of catastrophic failure been undertaken and to reflect final conditions? If so, when did this assessment take place?

12

18. Is there a) a closure plan in place for this dam, and b) does it a) Yes include long term monitoring? b) Yes

19. Have you, or do you plan to assess your tailings facilities Yes against the impact of more regular extreme weather events

as a result of climate change, e.g. over the next two years?

20. Any other relevant information and supporting documentation. Please state if you have omitted any other Active in-pit TSF with no above-ground exposure to tailings facilities through any joint ventures you embankments may have

13

Asanko TSF

1. "Tailings Dam" Name/identifier Asanko TSF

2. Location 6°21'27.78"N, 1°59'16.96"E

3. Ownership Non-operated JV

4. Status Active

5. Date of initial operation 2016/01/26

6. Is the dam currently operated or closed as per currently Yes approved design?

7. Raising method Downstream

8. Current Maximum Height (m) 26

9. Current Tailings Storage Impoundment Volume (m3) 8 273 400

10. Planned Tailings Storage Impoundment Volume in 5 years’ 28 776 980 time (m3)

11. Most recent Independent Expert Review 11 Dec 18

External expert engineering reports (2012, 2013, 2015, 2016) – feasibility study update 12. Do you have full and complete relevant engineering records – geotechnical investigation including design, construction, operation, maintenance – operating and monitoring manual and/or closure – permitting design – stage 1 construction report – tailings physical and geochemistry properties testing

13. What is your hazard categorisation of this facility, based on Class A consequence of failure?

14. What guideline do you follow for the classification system? Ghana (LI 2182)

15. Has this facility, at any point in its history, failed to be confirmed or certified as stable, or experienced notable stability concerns, as identified by an independent engineer No (even if later certified as stable by the same or a different firm)

16. Do you have internal/in house engineering specialist oversight of this facility? Or do you have external engineering External support for this purpose?

17. Has a formal analysis of the downstream impact on communities, ecosystems and critical infrastructure in the a) Yes event of catastrophic failure been undertaken and to reflect b) Nov 2018 final conditions? If so, when did this assessment take place?

18. Is there a) a closure plan in place for this dam, and b) does it a) Yes include long term monitoring? b) Yes

14

19. Have you, or do you plan to assess your tailings facilities against the impact of more regular extreme weather events Yes as a result of climate change, e.g. over the next two years?

20. Any other relevant information and supporting documentation. Please state if you have omitted any other - exposure to tailings facilities through any joint ventures you may have

15

Cerro Corona TSF

1. "Tailings Dam" Name/identifier Cerro Corona TSF

2. Location 6°45'55.65"S, 78°38'28.06"W

3. Ownership Owned/Operated

4. Status Active

5. Date of initial operation 2008/09/01

6. Is the dam currently operated or closed as per currently Yes approved design?

7. Raising method Centreline

8. Current Maximum Height (m) 137

9. Current Tailings Storage Impoundment Volume (m3) 47 213 503

10. Planned Tailings Storage Impoundment Volume in 5 years’ 71 540 000 time (m3)

11. Most recent Independent Expert Review 31 Jan 19

External expert engineering reports (2005, 2007, 2008, 2009, 2010, 2012, 2014, 2015, 2016, 2017) - as-built plans - compactors and clay specifications - construction quality assurance - construction report - dam breach analysis - design report - failure modes and effects analysis - final design 12. Do you have full and complete relevant engineering records - flood inundation and hazard assessment including design, construction, operation, maintenance - geochemical modelling and/or closure - geotechnical investigation - hydrogeological study - integrated management system - operation, maintenance and surveillance manual - physical properties of beach tailings soils - seismic hazard assessment report - tailings pipeline system general design basis - upstream containment blanket design plans and reports

13. What is your hazard categorisation of this facility, based on Extreme consequence of failure?

14. What guideline do you follow for the classification system? ANCOLD 2012

16

15. Has this facility, at any point in its history, failed to be confirmed or certified as stable, or experienced notable stability concerns, as identified by an independent engineer No (even if later certified as stable by the same or a different firm)

16. Do you have internal/in house engineering specialist oversight of this facility? Or do you have external engineering Internal & External support for this purpose?

17. Has a formal analysis of the downstream impact on communities, ecosystems and critical infrastructure in the a) Yes event of catastrophic failure been undertaken and to reflect b) Jun 2017 final conditions? If so, when did this assessment take place?

18. Is there a) a closure plan in place for this dam, and b) does it a) Yes include long term monitoring? b) Yes

19. Have you, or do you plan to assess your tailings facilities against the impact of more regular extreme weather events Yes as a result of climate change, e.g. over the next two years?

Tailings/decant discharge event on 16 Dec 2018 through failed water diversion pipeline 20. Any other relevant information and supporting underneath the facility. The incident did not documentation. Please state if you have omitted any other compromise the dam’s integrity or physical exposure to tailings facilities through any joint ventures you stability. See may have https://www.goldfields.com/reports/annual- report-2018/environmental-stewardship.php for more details.

17

Damang FETSF

1. "Tailings Dam" Name/identifier Damang FETSF

2. Location 5°30'14.56"N, 1°50'6.08"W

3. Ownership Owned/Operated

4. Status Active

5. Date of initial operation 2018/01/01

6. Is the dam currently operated or closed as per currently Yes approved design?

7. Raising method Downstream

8. Current Maximum Height (m) 18

9. Current Tailings Storage Impoundment Volume (m3) 3 804 281

10. Planned Tailings Storage Impoundment Volume in 5 years’ 17 687 500 time (m3)

11. Most recent Independent Expert Review 29 Apr 19

External expert engineering reports (2009, 2011, 2012, 2013, 2015, 2017, 2018, 2019) - concept design report - conceptual closure plan - construction as-built report - dam break assessment - design optimization report - detailed design report 12. Do you have full and complete relevant engineering records - emergency response plan including design, construction, operation, maintenance - environmental compliance monitoring plan and/or closure - health and safety plan - life cycle management plan - management plan - monitoring (surveillance) plan - preliminary seismic hazard assessment - shear key review over alluvium zone - social responsibility plan - water balance review report

13. What is your hazard categorisation of this facility, based on Moderate consequence of failure?

14. What guideline do you follow for the classification system? Ghana (LI 2182)

15. Has this facility, at any point in its history, failed to be confirmed or certified as stable, or experienced notable stability concerns, as identified by an independent engineer No (even if later certified as stable by the same or a different firm)

16. Do you have internal/in house engineering specialist oversight of this facility? Or do you have external engineering Internal & External support for this purpose?

18

17. Has a formal analysis of the downstream impact on communities, ecosystems and critical infrastructure in the a) Yes event of catastrophic failure been undertaken and to reflect b) Dec 2015 final conditions? If so, when did this assessment take place?

18. Is there a) a closure plan in place for this dam, and b) does it a) Yes include long term monitoring? b) Yes

19. Have you, or do you plan to assess your tailings facilities against the impact of more regular extreme weather events Yes as a result of climate change, e.g. over the next two years?

Minor piping event caused discharge of 20. Any other relevant information and supporting decant water during TSF commissioning on 5 documentation. Please state if you have omitted any other Apr 2018. See exposure to tailings facilities through any joint ventures you https://www.goldfields.com/reports/annual- may have report-2018/environmental-stewardship.php for more details.

19

Damang ETSF

1. "Tailings Dam" Name/identifier Damang ETSF

2. Location 5°30'47.98"N, 1°49'54.83"W

3. Ownership Owned/Operated

4. Status Closed & still rehabilitating

5. Date of initial operation 2000/12/01

6. Is the dam currently operated or closed as per currently Yes approved design?

7. Raising method Downstream and mod. Centreline

8. Current Maximum Height (m) 43

9. Current Tailings Storage Impoundment Volume (m3) 56 570 686

10. Planned Tailings Storage Impoundment Volume in 5 years’ 56 570 686 time (m3)

11. Most recent Independent Expert Review 29 Apr 19

External expert engineering reports (2000, 2004, 2005, 2008, 2009, 2010, 2011, 2012, 2014, 2015, 2016, 2017) - conceptual design report - construction report - dam break assessment - deposition and closure plan 12. Do you have full and complete relevant engineering records - design report including design, construction, operation, maintenance - detailed design report and/or closure - final design report - operations manual - overflow outlet works - preliminary seismic hazard assessment - raise as-built construction report - raise construction report - updated conceptual design

13. What is your hazard categorisation of this facility, based on Serious consequence of failure?

14. What guideline do you follow for the classification system? Ghana (LI 2182)

15. Has this facility, at any point in its history, failed to be confirmed or certified as stable, or experienced notable stability concerns, as identified by an independent engineer No (even if later certified as stable by the same or a different firm)

16. Do you have internal/in house engineering specialist oversight of this facility? Or do you have external engineering Internal & External support for this purpose?

20

17. Has a formal analysis of the downstream impact on communities, ecosystems and critical infrastructure in the a) Yes event of catastrophic failure been undertaken and to reflect b) Dec 2015 final conditions? If so, when did this assessment take place?

18. Is there a) a closure plan in place for this dam, and b) does it a) Yes include long term monitoring? b) Yes

19. Have you, or do you plan to assess your tailings facilities against the impact of more regular extreme weather events Yes as a result of climate change, e.g. over the next two years?

20. Any other relevant information and supporting A buttress has been installed to enhance documentation. Please state if you have omitted any other long term post-seismic stability of the exposure to tailings facilities through any joint ventures you Southern Causeway embankment. This TSF may have is currently inactive.

21

Damang STSF

1. "Tailings Dam" Name/identifier Damang STSF

2. Location 5°29'40.91"N, 1°50'33.46"W

3. Ownership Owned/Operated

4. Status Closed & rehabilitated

5. Date of initial operation 1997/11/01

6. Is the dam currently operated or closed as per currently Yes approved design?

7. Raising method Downstream

8. Current Maximum Height (m) 19

9. Current Tailings Storage Impoundment Volume (m3) 9 107 143

10. Planned Tailings Storage Impoundment Volume in 5 years’ 9 107 143 time (m3)

11. Most recent Independent Expert Review 29 Apr 19

External expert engineering reports (1995, 1996, 1997, 1998, 2000) - construction report 12. Do you have full and complete relevant engineering records - detailed design including design, construction, operation, maintenance - operations manual and/or closure - preliminary seismic hazard assessment - proposed design modifications - rehabilitation and closure

13. What is your hazard categorisation of this facility, based on NA consequence of failure? Ghana Minerals and Mining Law 1986 and 14. What guideline do you follow for the classification system? Guidelines on Ghana's Mining Environmental Regulations, Final Draft 1994

15. Has this facility, at any point in its history, failed to be confirmed or certified as stable, or experienced notable stability concerns, as identified by an independent engineer No (even if later certified as stable by the same or a different firm)

16. Do you have internal/in house engineering specialist oversight of this facility? Or do you have external engineering Internal & External support for this purpose?

17. Has a formal analysis of the downstream impact on communities, ecosystems and critical infrastructure in the a) No. See Q4 event of catastrophic failure been undertaken and to reflect final conditions? If so, when did this assessment take place?

18. Is there a) a closure plan in place for this dam, and b) does it a) Yes include long term monitoring? b) Yes

22

19. Have you, or do you plan to assess your tailings facilities against the impact of more regular extreme weather events Yes as a result of climate change, e.g. over the next two years?

20. Any other relevant information and supporting documentation. Please state if you have omitted any other

exposure to tailings facilities through any joint ventures you may have

23

Granny Smith Cell 1

1. "Tailings Dam" Name/identifier Granny Smith Cell 1

2. Location 28°49'22.48"S, 122°24'35.94"E

3. Ownership Owned/Operated

4. Status Inactive/Stand-by

5. Date of initial operation 1987/08/04

6. Is the dam currently operated or closed as per currently Yes approved design?

7. Raising method Upstream

8. Current Maximum Height (m) 33

9. Current Tailings Storage Impoundment Volume (m3) 24 769 000

10. Planned Tailings Storage Impoundment Volume in 5 years’ 25 500 000 time (m3)

11. Most recent Independent Expert Review 01 Nov 17

Internal technical working documents (2013) - monitoring protocol - tailings characterization External expert engineering reports (1993, 1994, 2000, 2001, 2003, 2005, 2006, 2007, 2009, 2010, 2011, 2012, 2013, 2014, 2015, 2016, 2017, 2018, 2019) - cone penetration testing program - construction compliance report - construction inspection - CPT data analysis techniques - cracking on the decant causeway - critical phreatic levels - dam break assessment - deposition and construction schedule 12. Do you have full and complete relevant engineering records - embankment inspection including design, construction, operation, maintenance - embankment stability analysis and/or closure - environmental geochemical characteristics - final design report - geochemical characterisation - geotechnical investigation of embankment and stability analysis - groundwater flow and solute transport modelling - groundwater risk assessment. - hydrogeological assessment - monitoring bore hydrogeological investigation - operating manual - paste backfill recovery - performance review 24

- permitted height increase - proposed re-permitted crest elevations - raise – technical specification - review of feasibility design - review of tailings disposal operations - seepage assessment - seepage characterisation and embankment stability - seepage interception trench - slope stability analysis - solids breach assessment - stability report - static and dynamic stability analysis - static and dynamic stability assessment - supplementary stability assessment - technical specification - technical audit reports - vibrating wire piezometer installation programme 13. What is your hazard categorisation of this facility, based on High B consequence of failure?

14. What guideline do you follow for the classification system? ANCOLD 2012

15. Has this facility, at any point in its history, failed to be confirmed or certified as stable, or notable stability concerns, No as identified by an independent engineer (even if later certified as stable by the same or a different firm)

16. Do you have internal/in house engineering specialist oversight of this facility? Or do you have external engineering External support for this purpose?

17. Has a formal analysis of the downstream impact on communities, ecosystems and critical infrastructure in the a) Yes event of catastrophic failure been undertaken and to reflect b) Nov 2018 final conditions? If so, when did this assessment take place?

18. Is there a) a closure plan in place for this dam, and b) does it a) Yes include long term monitoring? b) Yes

19. Have you, or do you plan to assess your tailings facilities against the impact of more regular extreme weather events Yes as a result of climate change, e.g. over the next two years?

Routine third party peer review of stability modelling in Q1 2019 indicated a reduction in the estimated factor of safety. Extensive inspections found no sign of any form of 20. Any other relevant information and supporting embankment instability. Tailings deposition documentation. Please state if you have omitted any other ceased immediately, and enhanced survey exposure to tailings facilities through any joint ventures you and monitoring regime implemented as may have precautionary measures. Buttress construction works to maintain long term stability of this TSF cell to commence on completion of necessary laboratory testing, analysis and design works.

25

26

Granny Smith Cell 2

1. "Tailings Dam" Name/identifier Granny Smith Cell 2

2. Location 28°49'5.87"S, 122°24'54.80"E

3. Ownership Owned/Operated

4. Status Re-mining

5. Date of initial operation 1987/12/05

6. Is the dam currently operated or closed as per currently Yes approved design?

7. Raising method Upstream

8. Current Maximum Height (m) 35

9. Current Tailings Storage Impoundment Volume (m3) 24 290 000

10. Planned Tailings Storage Impoundment Volume in 5 years’ 24 290 000 time (m3)

11. Most recent Independent Expert Review 01 Nov 17

Internal technical working documents (2013) - monitoring protocol - tailings characterization External expert engineering reports (1993, 1994, 2000, 2001, 2003, 2005, 2006, 2007, 2009, 2010, 2011, 2012, 2013, 2014, 2015, 2016, 2017, 2018, 2019) - cone penetration testing program - construction compliance report - construction inspection - CPT data analysis techniques - cracking on the decant causeway - critical phreatic levels - dam break assessment - deposition and construction schedule 12. Do you have full and complete relevant engineering records - embankment inspection including design, construction, operation, maintenance - embankment stability analysis and/or closure - environmental geochemical characteristics - final design report - geochemical characterisation - geotechnical investigation of embankment and stability analysis - groundwater flow and solute transport modelling - groundwater risk assessment. - hydrogeological assessment - monitoring bore hydrogeological investigation - operating manual - paste backfill recovery - performance review 27

- permitted height increase - proposed re-permitted crest elevations - raise – technical specification - review of feasibility design - review of tailings disposal operations - seepage assessment - seepage characterisation and embankment stability - seepage interception trench - slope stability analysis - solids breach assessment - stability report - static and dynamic stability analysis - static and dynamic stability assessment - supplementary stability assessment - technical specification - technical audit reports - vibrating wire piezometer installation programme 13. What is your hazard categorisation of this facility, based on High B consequence of failure?

14. What guideline do you follow for the classification system? ANCOLD 2012

15. Has this facility, at any point in its history, failed to be confirmed or certified as stable, or experienced notable stability concerns, as identified by an independent engineer No (even if later certified as stable by the same or a different firm)

16. Do you have internal/in house engineering specialist oversight of this facility? Or do you have external engineering External support for this purpose?

17. Has a formal analysis of the downstream impact on communities, ecosystems and critical infrastructure in the a) Yes event of catastrophic failure been undertaken and to reflect b) Nov 2018 final conditions? If so, when did this assessment take place?

18. Is there a) a closure plan in place for this dam, and b) does it a) Yes include long term monitoring? b) Yes

19. Have you, or do you plan to assess your tailings facilities against the impact of more regular extreme weather events Yes as a result of climate change, e.g. over the next two years?

20. Any other relevant information and supporting documentation. Please state if you have omitted any other Currently being re-mined using excavator & exposure to tailings facilities through any joint ventures you trucks for use as underground backfill may have

28

Granny Smith Cell 3

1. "Tailings Dam" Name/identifier Granny Smith Cell 3

2. Location 28°49'38.58"S, 122°24'9.42"E

3. Ownership Owned/Operated

4. Status Active

5. Date of initial operation 2000/01/10

6. Is the dam currently operated or closed as per currently Yes approved design?

7. Raising method Upstream

8. Current Maximum Height (m) 21

9. Current Tailings Storage Impoundment Volume (m3) 9 872 000

10. Planned Tailings Storage Impoundment Volume in 5 years’ 17 000 000 time (m3)

11. Most recent Independent Expert Review 01 Nov 17

Internal technical working documents (2013) - monitoring protocol - tailings characterization External expert engineering reports (1993, 1994, 2000, 2001, 2003, 2005, 2006, 2007, 2009, 2010, 2011, 2012, 2013, 2014, 2015, 2016, 2017, 2018, 2019) - cone penetration testing program - construction compliance report - construction inspection - CPT data analysis techniques - cracking on the decant causeway - critical phreatic levels - dam break assessment - deposition and construction schedule 12. Do you have full and complete relevant engineering records - embankment inspection including design, construction, operation, maintenance - embankment stability analysis and/or closure - environmental geochemical characteristics - final design report - geochemical characterisation - geotechnical investigation of embankment and stability analysis - groundwater flow and solute transport modelling - groundwater risk assessment. - hydrogeological assessment - monitoring bore hydrogeological investigation - operating manual - paste backfill recovery - performance review 29

- permitted height increase - proposed re-permitted crest elevations - raise – technical specification - review of feasibility design - review of tailings disposal operations - seepage assessment - seepage characterisation and embankment stability - seepage interception trench - slope stability analysis - solids breach assessment - stability report - static and dynamic stability analysis - static and dynamic stability assessment - supplementary stability assessment - technical specification - technical audit reports - vibrating wire piezometer installation programme 13. What is your hazard categorisation of this facility, based on High C consequence of failure?

14. What guideline do you follow for the classification system? ANCOLD 2012

15. Has this facility, at any point in its history, failed to be confirmed or certified as stable, or experienced notable stability concerns, as identified by an independent engineer No (even if later certified as stable by the same or a different firm)

16. Do you have internal/in house engineering specialist oversight of this facility? Or do you have external engineering External support for this purpose?

17. Has a formal analysis of the downstream impact on communities, ecosystems and critical infrastructure in the a) Yes event of catastrophic failure been undertaken and to reflect b) Nov 2018 final conditions? If so, when did this assessment take place?

18. Is there a) a closure plan in place for this dam, and b) does it a) Yes include long term monitoring? b) Yes

19. Have you, or do you plan to assess your tailings facilities against the impact of more regular extreme weather events Yes as a result of climate change, e.g. over the next two years?

20. Any other relevant information and supporting documentation. Please state if you have omitted any other - exposure to tailings facilities through any joint ventures you may have

30

Gruyere IWL TSF

1. "Tailings Dam" Name/identifier Gruyere IWL TSF

2. Location 27°58'56.58"S, 123°52'8.66"E

3. Ownership Operated JV

4. Status Under construction

5. Date of initial operation Not Commissioned

6. Is the dam currently operated or closed as per currently Yes approved design?

7. Raising method Downstream

8. Current Maximum Height (m) 13

9. Current Tailings Storage Impoundment Volume (m3) 0

10. Planned Tailings Storage Impoundment Volume in 5 years’ 22 000 000 time (m3)

11. Most recent Independent Expert Review 03 Apr 17

External expert engineering reports (2015, 2016, 2017, 2018, 2019) - construction report - construction scope of works and technical specification 12. Do you have full and complete relevant engineering records - design reports including design, construction, operation, maintenance - detailed design and/or closure - geochemical characterisation - materials assessment - operations manual - options study - rehabilitation soil requirements

13. What is your hazard categorisation of this facility, based on High C consequence of failure?

14. What guideline do you follow for the classification system? ANCOLD 2012

15. Has this facility, at any point in its history, failed to be confirmed or certified as stable, or experienced notable stability concerns, as identified by an independent engineer No (even if later certified as stable by the same or a different firm)

16. Do you have internal/in house engineering specialist oversight of this facility? Or do you have external engineering External support for this purpose?

17. Has a formal analysis of the downstream impact on communities, ecosystems and critical infrastructure in the a) Yes event of catastrophic failure been undertaken and to reflect b) Sep 2017 final conditions? If so, when did this assessment take place?

31

18. Is there a) a closure plan in place for this dam, and b) does it a) Yes include long term monitoring? b) Yes

19. Have you, or do you plan to assess your tailings facilities against the impact of more regular extreme weather events Yes as a result of climate change, e.g. over the next two years?

20. Any other relevant information and supporting documentation. Please state if you have omitted any other TSF constructed but not yet commissioned exposure to tailings facilities through any joint ventures you as at end-Mar, 2019 may have

32

Lawlers TSF 1

1. "Tailings Dam" Name/identifier Lawlers TSF 1

2. Location 28°04'34.51"S, 120°32'26.01"E

3. Ownership Owned/Operated

4. Status Closed & rehabilitated

5. Date of initial operation 1985

6. Is the dam currently operated or closed as per currently Yes approved design?

7. Raising method Downstream

8. Current Maximum Height (m) 10

9. Current Tailings Storage Impoundment Volume (m3) 511 066

10. Planned Tailings Storage Impoundment Volume in 5 years’ 511 066 time (m3)

11. Most recent Independent Expert Review 23 Apr 19

12. Do you have full and complete relevant engineering records External expert engineering reports (2007, including design, construction, operation, maintenance 2019) and/or closure - audit and assessment reports

13. What is your hazard categorisation of this facility, based on Low consequence of failure?

14. What guideline do you follow for the classification system? ANCOLD 2012

15. Has this facility, at any point in its history, failed to be confirmed or certified as stable, or experienced notable stability concerns, as identified by an independent engineer No (even if later certified as stable by the same or a different firm)

16. Do you have internal/in house engineering specialist oversight of this facility? Or do you have external engineering External support for this purpose?

17. Has a formal analysis of the downstream impact on communities, ecosystems and critical infrastructure in the a) No. See Q4 event of catastrophic failure been undertaken and to reflect final conditions? If so, when did this assessment take place?

18. Is there a) a closure plan in place for this dam, and b) does it a) Yes include long term monitoring? b) Yes

19. Have you, or do you plan to assess your tailings facilities against the impact of more regular extreme weather events No as a result of climate change, e.g. over the next two years?

33

20. Any other relevant information and supporting documentation. Please state if you have omitted any other

exposure to tailings facilities through any joint ventures you may have

Lawlers TSF 2

1. "Tailings Dam" Name/identifier Lawlers TSF 2

2. Location 28°04'59.55"S, 120°32'10.96"E

3. Ownership Owned/Operated

4. Status Closed & rehabilitated

5. Date of initial operation 1988

6. Is the dam currently operated or closed as per currently Yes approved design?

7. Raising method Upstream

8. Current Maximum Height (m) 22

9. Current Tailings Storage Impoundment Volume (m3) 4 800 000

10. Planned Tailings Storage Impoundment Volume in 5 years’ 4 800 000 time (m3)

11. Most recent Independent Expert Review 23 Apr 19

External expert engineering reports (1993, 2001, 2002, 2003, 2007, 2010, 2011, 2013, 2019) - arsenic-solubility behaviour - audit and assessment reports - capping project 12. Do you have full and complete relevant engineering records - geochemical characterisation including design, construction, operation, maintenance - geotechnical assessment report and/or closure - materials characterisation assessment - performance review - rehabilitation - suppression of arsenic-solubility by gypsum - works approval application

13. What is your hazard categorisation of this facility, based on Low consequence of failure?

14. What guideline do you follow for the classification system? ANCOLD 2012

15. Has this facility, at any point in its history, failed to be confirmed or certified as stable, or experienced notable stability concerns, as identified by an independent engineer No (even if later certified as stable by the same or a different firm)

34

16. Do you have internal/in house engineering specialist oversight of this facility? Or do you have external engineering External support for this purpose?

17. Has a formal analysis of the downstream impact on communities, ecosystems and critical infrastructure in the a) No. See Q4 event of catastrophic failure been undertaken and to reflect final conditions? If so, when did this assessment take place?

18. Is there a) a closure plan in place for this dam, and b) does it a) Yes include long term monitoring? b) Yes

19. Have you, or do you plan to assess your tailings facilities against the impact of more regular extreme weather events No as a result of climate change, e.g. over the next two years?

20. Any other relevant information and supporting documentation. Please state if you have omitted any other

exposure to tailings facilities through any joint ventures you may have

35

Lawlers GEP TSF

1. "Tailings Dam" Name/identifier Lawlers GEP TSF

2. Location 28°04'44.2"S, 120°32'18.0"E

3. Ownership Owned/Operated

4. Status Closed & rehabilitated

5. Date of initial operation 2004/04/01

6. Is the dam currently operated or closed as per currently Yes approved design?

7. Raising method In-pit

8. Current Maximum Height (m) 0

9. Current Tailings Storage Impoundment Volume (m3) 1 281 409

10. Planned Tailings Storage Impoundment Volume in 5 years’ 1 281 409 time (m3)

11. Most recent Independent Expert Review 23 Apr 19

Internal technical working documents (2012) - operations manual External expert engineering reports (2003, 2004, 2005, 2006, 2007, 2008, 2009, 2010, 12. Do you have full and complete relevant engineering records 2011) including design, construction, operation, maintenance - audit reports and/or closure - construction report - monitor bore drilling program - operations manual - strategy

13. What is your hazard categorisation of this facility, based on NA consequence of failure?

14. What guideline do you follow for the classification system? NA

15. Has this facility, at any point in its history, failed to be confirmed or certified as stable, or experienced notable stability concerns, as identified by an independent engineer No (even if later certified as stable by the same or a different firm)

16. Do you have internal/in house engineering specialist oversight of this facility? Or do you have external engineering External support for this purpose?

17. Has a formal analysis of the downstream impact on communities, ecosystems and critical infrastructure in the a) No. See Q4 event of catastrophic failure been undertaken and to reflect final conditions? If so, when did this assessment take place?

18. Is there a) a closure plan in place for this dam, and b) does it a) Yes include long term monitoring? b) Yes

36

19. Have you, or do you plan to assess your tailings facilities against the impact of more regular extreme weather events No as a result of climate change, e.g. over the next two years?

20. Any other relevant information and supporting documentation. Please state if you have omitted any other In-pit TSF located underneath TSF 3 exposure to tailings facilities through any joint ventures you may have

37

Lawlers LEP TSF

1. "Tailings Dam" Name/identifier Lawlers LEP TSF

2. Location 28°04'43.8"S, 120°32'35.6"E

3. Ownership Owned/Operated

4. Status Closed & rehabilitated

5. Date of initial operation 2006/01/01

6. Is the dam currently operated or closed as per currently Yes approved design?

7. Raising method In-pit

8. Current Maximum Height (m) 0

9. Current Tailings Storage Impoundment Volume (m3) 1 216 794

10. Planned Tailings Storage Impoundment Volume in 5 years’ 1 216 794 time (m3)

11. Most recent Independent Expert Review 23 Apr 19

Internal technical working documents (2012) - operations manual External expert engineering reports (2003, 2004, 2005, 2006, 2007, 2008, 2009, 2010, 12. Do you have full and complete relevant engineering records 2011) including design, construction, operation, maintenance - audit reports and/or closure - construction report - monitor bore drilling program - operations manual - strategy

13. What is your hazard categorisation of this facility, based on NA consequence of failure?

14. What guideline do you follow for the classification system? NA

15. Has this facility, at any point in its history, failed to be confirmed or certified as stable, or experienced notable stability concerns, as identified by an independent engineer No (even if later certified as stable by the same or a different firm)

16. Do you have internal/in house engineering specialist oversight of this facility? Or do you have external engineering External support for this purpose?

17. Has a formal analysis of the downstream impact on communities, ecosystems and critical infrastructure in the a) No. See Q4 event of catastrophic failure been undertaken and to reflect final conditions? If so, when did this assessment take place?

18. Is there a) a closure plan in place for this dam, and b) does it a) Yes include long term monitoring? b) Yes

38

19. Have you, or do you plan to assess your tailings facilities against the impact of more regular extreme weather events No as a result of climate change, e.g. over the next two years?

20. Any other relevant information and supporting documentation. Please state if you have omitted any other In-pit TSF located underneath TSF 3 exposure to tailings facilities through any joint ventures you may have

39

Lawlers CI TSF

1. "Tailings Dam" Name/identifier Lawlers CI TSF

2. Location 28°05'00.64"S, 120°33'08.23"E

3. Ownership Owned/Operated

4. Status Closed & rehabilitated

5. Date of initial operation 2000/08/01

6. Is the dam currently operated or closed as per currently Yes approved design?

7. Raising method In-pit

8. Current Maximum Height (m) 0

9. Current Tailings Storage Impoundment Volume (m3) 670 000

10. Planned Tailings Storage Impoundment Volume in 5 years’ 670 000 time (m3)

11. Most recent Independent Expert Review 23 Apr 19

Internal technical working documents (2012) - operations manual External expert engineering reports (1999, 2000, 2001, 2002, 2003, 2004, 2011, 2012, 2013, 2019) 12. Do you have full and complete relevant engineering records - arsenic-solubility behaviour including design, construction, operation, maintenance - audit reports and/or closure - construction report - decommissioning report & closure plan - geochemical characterisation - materials characterisation assessment - performance review

13. What is your hazard categorisation of this facility, based on Low consequence of failure?

14. What guideline do you follow for the classification system? ANCOLD 2012

15. Has this facility, at any point in its history, failed to be confirmed or certified as stable, or experienced notable stability concerns, as identified by an independent engineer No (even if later certified as stable by the same or a different firm)

16. Do you have internal/in house engineering specialist oversight of this facility? Or do you have external engineering External support for this purpose?

17. Has a formal analysis of the downstream impact on communities, ecosystems and critical infrastructure in the a) No. See Q4 event of catastrophic failure been undertaken and to reflect final conditions? If so, when did this assessment take place?

40

18. Is there a) a closure plan in place for this dam, and b) does it a) Yes include long term monitoring? b) Yes

19. Have you, or do you plan to assess your tailings facilities against the impact of more regular extreme weather events No as a result of climate change, e.g. over the next two years?

20. Any other relevant information and supporting documentation. Please state if you have omitted any other In-pit TSF that is closed and rehabilitated exposure to tailings facilities through any joint ventures you may have

41

Lawlers HPI TSF

1. "Tailings Dam" Name/identifier Lawlers HPI TSF

2. Location 28°05'03.98"S, 120°33'31.20"E

3. Ownership Owned/Operated

4. Status Closed & rehabilitated

5. Date of initial operation 2001/12/01

6. Is the dam currently operated or closed as per currently Yes approved design?

7. Raising method In-pit

8. Current Maximum Height (m) 0

9. Current Tailings Storage Impoundment Volume (m3) 971 951

10. Planned Tailings Storage Impoundment Volume in 5 years’ 971 951 time (m3)

11. Most recent Independent Expert Review 23 Apr 19

Internal technical working documents (2012) - operations manual External expert engineering reports (1999, 2001, 2002, 2003, 2004, 2011, 2012, 2013, 2019) 12. Do you have full and complete relevant engineering records - arsenic-solubility behaviour including design, construction, operation, maintenance - audit reports and/or closure - construction report - decommissioning report & closure plan - geochemical characterisation - materials characterisation assessment - performance review

13. What is your hazard categorisation of this facility, based on Low consequence of failure?

14. What guideline do you follow for the classification system? ANCOLD 2012

15. Has this facility, at any point in its history, failed to be confirmed or certified as stable, or experienced notable stability concerns, as identified by an independent engineer No (even if later certified as stable by the same or a different firm)

16. Do you have internal/in house engineering specialist oversight of this facility? Or do you have external engineering External support for this purpose?

17. Has a formal analysis of the downstream impact on communities, ecosystems and critical infrastructure in the a) No. See Q4 event of catastrophic failure been undertaken and to reflect final conditions? If so, when did this assessment take place?

42

18. Is there a) a closure plan in place for this dam, and b) does it a) Yes include long term monitoring? b) Yes

19. Have you, or do you plan to assess your tailings facilities against the impact of more regular extreme weather events No as a result of climate change, e.g. over the next two years?

20. Any other relevant information and supporting documentation. Please state if you have omitted any other In-pit TSF that is closed and rehabilitated exposure to tailings facilities through any joint ventures you may have

43

Lawlers TSF 3

1. "Tailings Dam" Name/identifier Lawlers TSF 3

2. Location 28°04'51.46"S, 120°32'37.12"E

3. Ownership Owned/Operated

4. Status Closed & rehabilitated

5. Date of initial operation 2008/12/01

6. Is the dam currently operated or closed as per currently Yes approved design?

7. Raising method Upstream

8. Current Maximum Height (m) 11

9. Current Tailings Storage Impoundment Volume (m3) 2 500 000

10. Planned Tailings Storage Impoundment Volume in 5 years’ 2 500 000 time (m3)

11. Most recent Independent Expert Review 23 Apr 19

Internal technical working documents (2012) - flood repairs and mitigation - operations manual External expert engineering reports (2007, 2008, 2010, 2011, 2012, 2013, 2014, 2019) - audit reports - construction monitoring - construction reports 12. Do you have full and complete relevant engineering records - decommissioning review including design, construction, operation, maintenance - geotechnical assessment and and/or closure investigation - hydrogeological investigations - materials characterisation assessment - operations manual - options study - risk assessment - strategy - works approval application

13. What is your hazard categorisation of this facility, based on Low consequence of failure?

14. What guideline do you follow for the classification system? ANCOLD 2012

15. Has this facility, at any point in its history, failed to be confirmed or certified as stable, or experienced notable stability concerns, as identified by an independent engineer No (even if later certified as stable by the same or a different firm)

16. Do you have internal/in house engineering specialist oversight of this facility? Or do you have external engineering External support for this purpose?

44

17. Has a formal analysis of the downstream impact on communities, ecosystems and critical infrastructure in the a) No. See Q4 event of catastrophic failure been undertaken and to reflect final conditions? If so, when did this assessment take place?

18. Is there a) a closure plan in place for this dam, and b) does it a) Yes include long term monitoring? b) Yes

19. Have you, or do you plan to assess your tailings facilities against the impact of more regular extreme weather events No as a result of climate change, e.g. over the next two years?

20. Any other relevant information and supporting documentation. Please state if you have omitted any other

exposure to tailings facilities through any joint ventures you may have

45

Lepanto TD5A

1. "Tailings Dam" Name/identifier Lepanto TD5A

2. Location 16°53'56.11"N, 120°46'1.97"E

3. Ownership Non-operated JV

4. Status Active

5. Date of initial operation 1993

6. Is the dam currently operated or closed as per currently Yes approved design?

7. Raising method Downstream

8. Current Maximum Height (m) 95

9. Current Tailings Storage Impoundment Volume (m3) 12 800 000

10. Planned Tailings Storage Impoundment Volume in 5 years’ 14 300 000 time (m3)

11. Most recent Independent Expert Review 07 Mar 19

Internal technical working documents (1995, 2012, 2013, 2014, 2016, 2017, 2018, 2019) - audit report - compliance action plan - construction summary - environmental compliance monitoring report - field density test-calibration - longitudinal & cross sections - monitoring protocol - operating manual - seismicity monitoring survey status report - sieve analysis for sand filter material - water quality baseline data-analysis and 12. Do you have full and complete relevant engineering records interpretation including design, construction, operation, maintenance External expert engineering reports (1991, and/or closure 1995, 1998, 2000, 2010, 2011, 2012, 2013, 2014, 2015, 2016, 2017, 2018, 2019) - audit reports - concept strengthening options - construction staging - dam wall drilling method statement - decant structure strengthening - decants -diversion tunnel outlet portal - design basis and information - design-detailed engineering - detailed seismicity assessment - dynamic analysis - environmental tailings and groundwater review - geotechnical borehole and test pit locations 46

- geotechnical investigation - landslide stabilization measures - operational review - options study - revised TSF siting study - risk assessment - stability review 13. What is your hazard categorisation of this facility, based on Extreme consequence of failure?

14. What guideline do you follow for the classification system? ANCOLD 2012

15. Has this facility, at any point in its history, failed to be confirmed or certified as stable, or experienced notable stability concerns, as identified by an independent engineer No (even if later certified as stable by the same or a different firm)

16. Do you have internal/in house engineering specialist oversight of this facility? Or do you have external engineering Internal & External support for this purpose?

17. Has a formal analysis of the downstream impact on communities, ecosystems and critical infrastructure in the a) No. See Q3 event of catastrophic failure been undertaken and to reflect final conditions? If so, when did this assessment take place?

18. Is there a) a closure plan in place for this dam, and b) does it a) Yes include long term monitoring? b) Unknown

19. Have you, or do you plan to assess your tailings facilities against the impact of more regular extreme weather events No as a result of climate change, e.g. over the next two years?

20. Any other relevant information and supporting This TSF is located in a high seismicity documentation. Please state if you have omitted any other location. Studies are ongoing to characterise exposure to tailings facilities through any joint ventures you the seismic response of the embankment to may have large-scale earthquakes.

47

St Ives TSF 1

1. "Tailings Dam" Name/identifier St. Ives TSF 1

2. Location 31°22'43"S, 121°47'37"E

3. Ownership Owned/Operated

4. Status Re-mining

5. Date of initial operation 1987/01/01

6. Is the dam currently operated or closed as per currently Yes approved design?

7. Raising method Upstream

8. Current Maximum Height (m) 30

9. Current Tailings Storage Impoundment Volume (m3) 12 000 000

10. Planned Tailings Storage Impoundment Volume in 5 years’ 8 000 000 time (m3)

11. Most recent Independent Expert Review 23 Nov 17

Internal technical working documents (2012) - monitoring protocol 12. Do you have full and complete relevant engineering records External expert engineering reports (2011, including design, construction, operation, maintenance 2012, 2013, 2014, 2015, 2016, 2018) and/or closure - audit and management reviews - mine closure plan

13. What is your hazard categorisation of this facility, based on Low consequence of failure?

14. What guideline do you follow for the classification system? ANCOLD 1999

15. Has this facility, at any point in its history, failed to be confirmed or certified as stable, or experienced notable stability concerns, as identified by an independent engineer No (even if later certified as stable by the same or a different firm)

16. Do you have internal/in house engineering specialist oversight of this facility? Or do you have external engineering External support for this purpose?

17. Has a formal analysis of the downstream impact on communities, ecosystems and critical infrastructure in the a) No. See Q20 event of catastrophic failure been undertaken and to reflect final conditions? If so, when did this assessment take place?

18. Is there a) a closure plan in place for this dam, and b) does it a) Yes include long term monitoring? b) Yes

19. Have you, or do you plan to assess your tailings facilities against the impact of more regular extreme weather events Yes as a result of climate change, e.g. over the next two years?

48

20. Any other relevant information and supporting documentation. Please state if you have omitted any other Currently being re-mined using excavator & exposure to tailings facilities through any joint ventures you trucks for use as underground backfill. may have

49

St Ives TSF 2

1. "Tailings Dam" Name/identifier St. Ives TSF 2

2. Location 31°23'10"S, 121°47'50"E

3. Ownership Owned/Operated

4. Status Inactive/Care & Maintenance

5. Date of initial operation 1994/10/01

6. Is the dam currently operated or closed as per currently Yes approved design?

7. Raising method Upstream

8. Current Maximum Height (m) 36

9. Current Tailings Storage Impoundment Volume (m3) 8 800 000

10. Planned Tailings Storage Impoundment Volume in 5 years’ 8 800 000 time (m3)

11. Most recent Independent Expert Review 23 Nov 17

Internal technical working documents (2012) - monitoring protocol External expert engineering reports (1998, 2001, 2005, 2009, 2010, 2011, 2012, 2013, 12. Do you have full and complete relevant engineering records 2015, 2016, 2018) including design, construction, operation, maintenance - audit and management reviews and/or closure - geotechnical assessments - mine closure plan - operating manual - piezometer installation and geotechnical investigation

13. What is your hazard categorisation of this facility, based on Low consequence of failure?

14. What guideline do you follow for the classification system? ANCOLD 1999

15. Has this facility, at any point in its history, failed to be confirmed or certified as stable, or experienced notable stability concerns, as identified by an independent engineer No (even if later certified as stable by the same or a different firm)

16. Do you have internal/in house engineering specialist oversight of this facility? Or do you have external engineering External support for this purpose?

17. Has a formal analysis of the downstream impact on communities, ecosystems and critical infrastructure in the a) No. See Q20 event of catastrophic failure been undertaken and to reflect final conditions? If so, when did this assessment take place?

50

18. Is there a) a closure plan in place for this dam, and b) does it a) Yes include long term monitoring? b) Yes

19. Have you, or do you plan to assess your tailings facilities against the impact of more regular extreme weather events Yes as a result of climate change, e.g. over the next two years?

20. Any other relevant information and supporting documentation. Please state if you have omitted any other Remote location - no downstream exposure to tailings facilities through any joint ventures you communities may have

51

St Ives TSF 3

1. "Tailings Dam" Name/identifier St. Ives TSF 3

2. Location 31°22'49"S, 121°47'03"E

3. Ownership Owned/Operated

4. Status Inactive/Care & Maintenance

5. Date of initial operation 2003/02/01

6. Is the dam currently operated or closed as per currently Yes approved design?

7. Raising method Upstream

8. Current Maximum Height (m) 25

9. Current Tailings Storage Impoundment Volume (m3) 17 400 000

10. Planned Tailings Storage Impoundment Volume in 5 years’ 17 400 000 time (m3)

11. Most recent Independent Expert Review 23 Nov 17

Internal technical working documents (2012) - monitoring protocol External expert engineering reports (1998, 2005, 2010, 2011, 2012, 2013, 2014, 2015, 2016, 2018) - audit and management reviews 12. Do you have full and complete relevant engineering records including design, construction, operation, maintenance - closure implementation plan and/or closure - construction report - design report - mine closure plan - operating manual - piezometer installation and geotechnical investigation

13. What is your hazard categorisation of this facility, based on Low consequence of failure?

14. What guideline do you follow for the classification system? ANCOLD 2012

15. Has this facility, at any point in its history, failed to be confirmed or certified as stable, or experienced notable stability concerns, as identified by an independent engineer No (even if later certified as stable by the same or a different firm)

16. Do you have internal/in house engineering specialist oversight of this facility? Or do you have external engineering External support for this purpose?

17. Has a formal analysis of the downstream impact on communities, ecosystems and critical infrastructure in the a) No. See Q20 event of catastrophic failure been undertaken and to reflect final conditions? If so, when did this assessment take place?

52

18. Is there a) a closure plan in place for this dam, and b) does it a) Yes include long term monitoring? b) Yes

19. Have you, or do you plan to assess your tailings facilities against the impact of more regular extreme weather events Yes as a result of climate change, e.g. over the next two years?

20. Any other relevant information and supporting documentation. Please state if you have omitted any other Remote location - no downstream exposure to tailings facilities through any joint ventures you communities may have

53

St Ives TSF 4

1. "Tailings Dam" Name/identifier St. Ives TSF 4

2. Location 31°19'59"S, 121°43'47"E

3. Ownership Owned/Operated

4. Status Inactive/Stand-by

5. Date of initial operation 2012/09/01

6. Is the dam currently operated or closed as per currently Yes approved design?

7. Raising method Upstream

8. Current Maximum Height (m) 15

9. Current Tailings Storage Impoundment Volume (m3) 8 130 000

10. Planned Tailings Storage Impoundment Volume in 5 years’ 8 130 000 time (m3)

11. Most recent Independent Expert Review 23 Nov 17

Internal technical working documents (2009, 2019) - mining proposal - tailings management plan External expert engineering reports (2006, 12. Do you have full and complete relevant engineering records 2009, 2012, 2013, 2014, 2015, 2016, 2018) including design, construction, operation, maintenance - audit and management reviews and/or closure - construction reports - design reports - detail design report - preliminary geotechnical assessment - safety in design report

13. What is your hazard categorisation of this facility, based on Low consequence of failure?

14. What guideline do you follow for the classification system? ANCOLD 2012

15. Has this facility, at any point in its history, failed to be confirmed or certified as stable, or experienced notable stability concerns, as identified by an independent engineer No (even if later certified as stable by the same or a different firm)

16. Do you have internal/in house engineering specialist oversight of this facility? Or do you have external engineering External support for this purpose?

17. Has a formal analysis of the downstream impact on communities, ecosystems and critical infrastructure in the a) No. See Q20 event of catastrophic failure been undertaken and to reflect final conditions? If so, when did this assessment take place?

54

18. Is there a) a closure plan in place for this dam, and b) does it a) Yes include long term monitoring? b) Yes

19. Have you, or do you plan to assess your tailings facilities against the impact of more regular extreme weather events Yes as a result of climate change, e.g. over the next two years?

20. Any other relevant information and supporting documentation. Please state if you have omitted any other Remote location - no downstream exposure to tailings facilities through any joint ventures you communities may have

55

St Ives North Orchin

1. "Tailings Dam" Name/identifier St. Ives North Orchin

2. Location 31°19'03"S, 121°45'30"E

3. Ownership Owned/Operated

4. Status Inactive/Care & Maintenance

5. Date of initial operation 2010/07/01

6. Is the dam currently operated or closed as per currently Yes approved design?

7. Raising method In-pit

8. Current Maximum Height (m) 0

9. Current Tailings Storage Impoundment Volume (m3) 6 900 000

10. Planned Tailings Storage Impoundment Volume in 5 years’ 6 900 000 time (m3)

11. Most recent Independent Expert Review 23 Nov 17

Internal technical working documents (2012, 2019) - monitoring protocol 12. Do you have full and complete relevant engineering records - tailings management plan including design, construction, operation, maintenance External expert engineering reports (2005, and/or closure 2011, 2012, 2013, 2015, 2016, 2018) - audit and management reviews - hydrogeological investigation

13. What is your hazard categorisation of this facility, based on Low consequence of failure?

14. What guideline do you follow for the classification system? ANCOLD 2012

15. Has this facility, at any point in its history, failed to be confirmed or certified as stable, or experienced notable stability concerns, as identified by an independent engineer No (even if later certified as stable by the same or a different firm)

16. Do you have internal/in house engineering specialist oversight of this facility? Or do you have external engineering External support for this purpose?

17. Has a formal analysis of the downstream impact on communities, ecosystems and critical infrastructure in the a) No. See Q20 event of catastrophic failure been undertaken and to reflect final conditions? If so, when did this assessment take place?

18. Is there a) a closure plan in place for this dam, and b) does it a) Yes include long term monitoring? b) Yes

56

19. Have you, or do you plan to assess your tailings facilities against the impact of more regular extreme weather events Yes as a result of climate change, e.g. over the next two years?

20. Any other relevant information and supporting documentation. Please state if you have omitted any other In-pit TSF - no embankments exposure to tailings facilities through any joint ventures you may have

57

St Ives Leviathan

1. "Tailings Dam" Name/identifier St. Ives Leviathan

2. Location 31°19'38"S, 121°46'19"E

3. Ownership Owned/Operated

4. Status Active

5. Date of initial operation 2016/11/01

6. Is the dam currently operated or closed as per currently Yes approved design?

7. Raising method In-pit

8. Current Maximum Height (m) 0

9. Current Tailings Storage Impoundment Volume (m3) 6 810 000

10. Planned Tailings Storage Impoundment Volume in 5 years’ 21 476 667 time (m3)

11. Most recent Independent Expert Review 23 Nov 17

Internal technical working document (2019) - tailings management plan External expert engineering reports (2014, 12. Do you have full and complete relevant engineering records 2016, 2018) including design, construction, operation, maintenance - audit and management review and/or closure - construction compliance report - deposition modelling - groundwater aspects

13. What is your hazard categorisation of this facility, based on Low consequence of failure?

14. What guideline do you follow for the classification system? ANCOLD 2012

15. Has this facility, at any point in its history, failed to be confirmed or certified as stable, or experienced notable stability concerns, as identified by an independent engineer No (even if later certified as stable by the same or a different firm)

16. Do you have internal/in house engineering specialist oversight of this facility? Or do you have external engineering External support for this purpose?

17. Has a formal analysis of the downstream impact on communities, ecosystems and critical infrastructure in the a) No. See Q20 event of catastrophic failure been undertaken and to reflect final conditions? If so, when did this assessment take place?

18. Is there a) a closure plan in place for this dam, and b) does it a) Yes include long term monitoring? b) Yes

58

19. Have you, or do you plan to assess your tailings facilities against the impact of more regular extreme weather events Yes as a result of climate change, e.g. over the next two years?

20. Any other relevant information and supporting documentation. Please state if you have omitted any other In-pit TSF - no embankments exposure to tailings facilities through any joint ventures you may have

59

South Deep South Shaft

1. "Tailings Dam" Name/identifier South Deep South Shaft

2. Location 26°24'52.77"S, 27°40'36.43"E

3. Ownership Owned/Operated

4. Status Inactive/Care & Maintenance

5. Date of initial operation 1968

6. Is the dam currently operated or closed as per currently Yes approved design?

7. Raising method Upstream

8. Current Maximum Height (m) 45

9. Current Tailings Storage Impoundment Volume (m3) 15 105 408

10. Planned Tailings Storage Impoundment Volume in 5 years’ 15 105 408 time (m3)

11. Most recent Independent Expert Review 01 Sep 17

External expert engineering reports (2012, 2015, 2017, 2018) 12. Do you have full and complete relevant engineering records - audit reports including design, construction, operation, maintenance - closure plan and/or closure - rehabilitation plan - stability review

13. What is your hazard categorisation of this facility, based on High B consequence of failure?

14. What guideline do you follow for the classification system? ANCOLD 2012

15. Has this facility, at any point in its history, failed to be confirmed or certified as stable, or experienced notable stability concerns, as identified by an independent engineer No (even if later certified as stable by the same or a different firm)

16. Do you have internal/in house engineering specialist oversight of this facility? Or do you have external engineering External support for this purpose?

17. Has a formal analysis of the downstream impact on communities, ecosystems and critical infrastructure in the a) No event of catastrophic failure been undertaken and to reflect final conditions? If so, when did this assessment take place?

18. Is there a) a closure plan in place for this dam, and b) does it a) Yes include long term monitoring? b) Yes

19. Have you, or do you plan to assess your tailings facilities against the impact of more regular extreme weather events No as a result of climate change, e.g. over the next two years?

60

20. Any other relevant information and supporting TSF decommissioned in 2011. Future re- documentation. Please state if you have omitted any other mining is planned. Reassessment of current exposure to tailings facilities through any joint ventures you TSF stability is in progress. may have

61

South Deep Twin Shaft

1. "Tailings Dam" Name/identifier South Deep Twin Shaft

2. Location 26°25'6.26"S, 27°40'13.87"E

3. Ownership Owned/Operated

4. Status Re-mining

5. Date of initial operation 1982

6. Is the dam currently operated or closed as per currently Yes approved design?

7. Raising method Upstream

8. Current Maximum Height (m) 39

9. Current Tailings Storage Impoundment Volume (m3) 23 807 642

10. Planned Tailings Storage Impoundment Volume in 5 years’ 21 896 454 time (m3)

11. Most recent Independent Expert Review 01 Sep 17

External expert engineering reports (2012, 2015, 2017, 2018) 12. Do you have full and complete relevant engineering records - audit reports including design, construction, operation, maintenance - closure plan and/or closure - rehabilitation plan - stability review

13. What is your hazard categorisation of this facility, based on High B consequence of failure?

14. What guideline do you follow for the classification system? ANCOLD 2012

15. Has this facility, at any point in its history, failed to be confirmed or certified as stable, or experienced notable stability concerns, as identified by an independent engineer No (even if later certified as stable by the same or a different firm)

16. Do you have internal/in house engineering specialist oversight of this facility? Or do you have external engineering External support for this purpose?

17. Has a formal analysis of the downstream impact on communities, ecosystems and critical infrastructure in the a) Yes event of catastrophic failure been undertaken and to reflect b) Unknown final conditions? If so, when did this assessment take place?

18. Is there a) a closure plan in place for this dam, and b) does it a) Yes include long term monitoring? b) Yes

19. Have you, or do you plan to assess your tailings facilities against the impact of more regular extreme weather events No as a result of climate change, e.g. over the next two years?

62

20. Any other relevant information and supporting TSF decommissioned in 2011 and currently documentation. Please state if you have omitted any other being re-mined and reprocessed. exposure to tailings facilities through any joint ventures you Reassessment of current TSF stability is in- may have progress.

63

South Deep Doornpoort

1. "Tailings Dam" Name/identifier South Deep Doornpoort

2. Location 26°27'45.38"S, 27°38'54.11"E

3. Ownership Owned/Operated

4. Status Active

5. Date of initial operation 2011/04/01

6. Is the dam currently operated or closed as per currently Yes approved design?

7. Raising method Upstream

8. Current Maximum Height (m) 19

9. Current Tailings Storage Impoundment Volume (m3) 7 219 509

10. Planned Tailings Storage Impoundment Volume in 5 years’ 14 473 304 time (m3)

11. Most recent Independent Expert Review 01 Sep 17

Internal technical working documents (2014) - mandatory code of practice External expert engineering reports (1998, 2003, 2005, 2007, 2008, 2009, 2010, 2012, 2014, 2015, 2017, 2018, 2019) - audit report - closure framework - dam break assessment - design of pipe encasing and temporary penstocks - detailed design - detailed design of the return water dam - environmental impact 12. Do you have full and complete relevant engineering records including design, construction, operation, maintenance assessment/environmental management and/or closure programme - geotechnical investigation and side slope stability assessment - hydrogeological investigation and impact assessment - operating manual - rehabilitation plan - risk assessment - seepage analysis - site selection - site selection review and capital cost estimate - slope stability analysis

13. What is your hazard categorisation of this facility, based on High B consequence of failure?

14. What guideline do you follow for the classification system? ANCOLD 2012

64

15. Has this facility, at any point in its history, failed to be confirmed or certified as stable, or experienced notable stability concerns, as identified by an independent engineer No (even if later certified as stable by the same or a different firm)

16. Do you have internal/in house engineering specialist oversight of this facility? Or do you have external engineering External support for this purpose?

17. Has a formal analysis of the downstream impact on communities, ecosystems and critical infrastructure in the a) Yes event of catastrophic failure been undertaken and to reflect b) 2008 final conditions? If so, when did this assessment take place?

18. Is there a) a closure plan in place for this dam, and b) does it a) Yes include long term monitoring? b) Yes

19. Have you, or do you plan to assess your tailings facilities against the impact of more regular extreme weather events No as a result of climate change, e.g. over the next two years?

20. Any other relevant information and supporting documentation. Please state if you have omitted any other

exposure to tailings facilities through any joint ventures you may have

65

Tarkwa TSF 1

1. "Tailings Dam" Name/identifier Tarkwa TSF1

2. Location 5°20'21.57"N, 2° 1'31.73"W

3. Ownership Owned/Operated

4. Status Active

5. Date of initial operation 2004/09/01

6. Is the dam currently operated or closed as per currently Yes approved design?

7. Raising method Upstream

8. Current Maximum Height (m) 39

9. Current Tailings Storage Impoundment Volume (m3) 44 153 846

10. Planned Tailings Storage Impoundment Volume in 5 years’ 53 615 385 time (m3)

11. Most recent Independent Expert Review 06 Feb 19

External expert engineering reports (2014, 2016, 2018) - construction reports - costed mine reclamation plan - dam breach assessment - dam break risk assessment and zone of influence - design report 12. Do you have full and complete relevant engineering records - design review including design, construction, operation, maintenance - detailed design report and/or closure - drilling and cone penetration test report - environmental impact statement - expansion design - final design report - geotechnical parameter gap analysis - raise designs - review of stability - soil investigation - tailings test report

13. What is your hazard categorisation of this facility, based on Class C consequence of failure?

14. What guideline do you follow for the classification system? Ghana (LI 2182)

15. Has this facility, at any point in its history, failed to be confirmed or certified as stable, or experienced notable stability concerns, as identified by an independent engineer No (even if later certified as stable by the same or a different firm)

66

16. Do you have internal/in house engineering specialist oversight of this facility? Or do you have external engineering Internal & External support for this purpose?

17. Has a formal analysis of the downstream impact on communities, ecosystems and critical infrastructure in the a) Yes event of catastrophic failure been undertaken and to reflect b) 2013 final conditions? If so, when did this assessment take place?

18. Is there a) a closure plan in place for this dam, and b) does it a) Yes include long term monitoring? b) Yes

19. Have you, or do you plan to assess your tailings facilities against the impact of more regular extreme weather events Yes as a result of climate change, e.g. over the next two years?

20. Any other relevant information and supporting documentation. Please state if you have omitted any other - exposure to tailings facilities through any joint ventures you may have

67

Tarkwa TSF 2

1. "Tailings Dam" Name/identifier Tarkwa TSF2

2. Location 5°21'5.35"N, 2° 1'54.79"W

3. Ownership Owned/Operated

4. Status Active

5. Date of initial operation 2008/08/01

6. Is the dam currently operated or closed as per currently Yes approved design?

7. Raising method Upstream

8. Current Maximum Height (m) 37

9. Current Tailings Storage Impoundment Volume (m3) 41 538 462

10. Planned Tailings Storage Impoundment Volume in 5 years’ 58 461 538 time (m3)

11. Most recent Independent Expert Review 06 Feb 19 External expert engineering reports (2008, 2010, 2013, 2014, 2015, 2018) - dam break risk assessment and zone of 12. Do you have full and complete relevant engineering records influence including design, construction, operation, maintenance - design reports and/or closure - detailed design report and operating requirements - seepage and slope stability analysis - side slope stability report 13. What is your hazard categorisation of this facility, based on Class B consequence of failure?

14. What guideline do you follow for the classification system? Ghana (LI 2182)

15. Has this facility, at any point in its history, failed to be confirmed or certified as stable, or experienced notable stability concerns, as identified by an independent engineer No (even if later certified as stable by the same or a different firm)

16. Do you have internal/in house engineering specialist oversight of this facility? Or do you have external engineering Internal & External support for this purpose?

17. Has a formal analysis of the downstream impact on communities, ecosystems and critical infrastructure in the a) Yes event of catastrophic failure been undertaken and to reflect b) 2014 final conditions? If so, when did this assessment take place?

18. Is there a) a closure plan in place for this dam, and b) does it a) Yes include long term monitoring? b) Yes

68

19. Have you, or do you plan to assess your tailings facilities against the impact of more regular extreme weather events Yes as a result of climate change, e.g. over the next two years?

20. Any other relevant information and supporting documentation. Please state if you have omitted any other - exposure to tailings facilities through any joint ventures you may have

69

Tarkwa TSF 3

1. "Tailings Dam" Name/identifier Tarkwa TSF3

2. Location 5°21'53.61"N, 2° 1'46.36"W

3. Ownership Owned/Operated

4. Status Active

5. Date of initial operation 2011/11/01

6. Is the dam currently operated or closed as per currently Yes approved design?

7. Raising method Upstream

8. Current Maximum Height (m) 30

9. Current Tailings Storage Impoundment Volume (m3) 25 333 333

10. Planned Tailings Storage Impoundment Volume in 5 years’ 25 333 333 time (m3)

11. Most recent Independent Expert Review 06 Feb 19

External expert engineering reports (2011, 2014, 2015) - dam break risk assessment and zone of 12. Do you have full and complete relevant engineering records influence including design, construction, operation, maintenance - design reports and/or closure - detailed design report and operating requirements - side slope stability report

13. What is your hazard categorisation of this facility, based on Class B consequence of failure?

14. What guideline do you follow for the classification system? Ghana (LI 2182)

15. Has this facility, at any point in its history, failed to be confirmed or certified as stable, or experienced notable stability concerns, as identified by an independent engineer No (even if later certified as stable by the same or a different firm)

16. Do you have internal/in house engineering specialist oversight of this facility? Or do you have external engineering Internal & External support for this purpose?

17. Has a formal analysis of the downstream impact on communities, ecosystems and critical infrastructure in the a) Yes event of catastrophic failure been undertaken and to reflect b) 2014 final conditions? If so, when did this assessment take place?

18. Is there a) a closure plan in place for this dam, and b) does it a) Yes include long term monitoring? b) Yes

70

19. Have you, or do you plan to assess your tailings facilities against the impact of more regular extreme weather events Yes as a result of climate change, e.g. over the next two years?

20. Any other relevant information and supporting documentation. Please state if you have omitted any other - exposure to tailings facilities through any joint ventures you may have

71

Tarkwa TSF 5

1. "Tailings Dam" Name/identifier Tarkwa TSF5

2. Location 5°20'45.48"N, 2° 1'7.05"W

3. Ownership Owned/Operated

4. Status Active

5. Date of initial operation Q2 2018

6. Is the dam currently operated or closed as per currently Yes approved design?

7. Raising method Downstream

8. Current Maximum Height (m) 12

9. Current Tailings Storage Impoundment Volume (m3) 1 500 000

10. Planned Tailings Storage Impoundment Volume in 5 years’ 16 100 000 time (m3)

11. Most recent Independent Expert Review 06 Feb 19

External expert engineering reports (2015, 2018) 12. Do you have full and complete relevant engineering records - construction evaluation including design, construction, operation, maintenance - dam breach assessment report and/or closure - final construction report - final design report

13. What is your hazard categorisation of this facility, based on Medium consequence of failure?

14. What guideline do you follow for the classification system? ANCOLD 2012

15. Has this facility, at any point in its history, failed to be confirmed or certified as stable, or experienced notable stability concerns, as identified by an independent engineer No (even if later certified as stable by the same or a different firm)

16. Do you have internal/in house engineering specialist oversight of this facility? Or do you have external engineering Internal & External support for this purpose?

17. Has a formal analysis of the downstream impact on communities, ecosystems and critical infrastructure in the a) Yes event of catastrophic failure been undertaken and to reflect b) Oct 2015 final conditions? If so, when did this assessment take place?

18. Is there a) a closure plan in place for this dam, and b) does it a) Yes include long term monitoring? b) Yes

19. Have you, or do you plan to assess your tailings facilities against the impact of more regular extreme weather events Yes as a result of climate change, e.g. over the next two years?

72

20. Any other relevant information and supporting documentation. Please state if you have omitted any other - exposure to tailings facilities through any joint ventures you may have

Forward looking statements disclaimer

This document contains forward-looking statements within the meaning of Section 27A of the U.S. Securities Act of 1933, as amended, or the Securities Act, and Section 21E of the U.S. Securities Exchange Act of 1934, as amended, or the Exchange Act, with respect to Gold Fields' tailing storage facilities, management of such facilities and certain other operational matters. These forward-looking statements, wherever they may occur in this document represent the current expectations of Gold Fields, reflecting the best judgment of the senior management of Gold Fields and involve a number of risks and uncertainties that could cause actual results to differ materially from those suggested by the forward-looking statements. As a consequence, these forward-looking statements should be considered in light of various important factors, including those set forth in this document. Important factors that could cause actual results to differ materially from such statements are set out more fully in Gold Fields most recent annual report on Form 20-F filed with the US Securities and Exchange Commission, which can be found free of charge on EDGAR at www.sec.gov.