Management of Tailings Storage Facilities June 2019

Total Page:16

File Type:pdf, Size:1020Kb

Management of Tailings Storage Facilities June 2019 Management of Tailings Storage Facilities June 2019 1 The failure of the tailings facility at circumstances or regulations – the Córrego do Feijão iron ore as well as regular inspections mine in Brumadinho, Brazil, in and formal annual Engineer of January was a tragedy that left Record reviews. close to 300 people dead and impacted many families and their After the Brumadinho tragedy, communities. Our hearts go out to Gold Fields' operations carried those affected and we have out additional safety inspections offered our deepest condolences at our facilities and concluded and support. that Gold Fields-managed TSFs were not at risk. To further But we also recognise that, as improve operational safety of miners, our responsibilities go our TSFs, we are, where beyond offering just words. We practical, evaluating the have to ensure that we manage potential to move away from the our tailings facilities with the construction of upstream utmost care to avoid a repeat of facilities to centre-line or the Brumadinho tragedy as well downstream designs, as other mine tailings dam failures considering filtered and dry before then. stacked tailings, as well as in-pit tailings disposal. In the wake of the tragedies, Gold Fields is pursuing two broad We will continue to review and, strategies to further strengthen where applicable and practical, the technical management and consider the adoption of leading governance of the 34 tailings practices in the design, facilities at our operations and construction, operation and joint ventures. closure (including post-closure) of tailings dams in the company. At industry level, CEOs of the Gold Fields fully supports International Council on Mining & greater transparency in the Opening Metals (ICMM), including Gold mining sector and as such we Fields, have committed to are today providing a written remarks creating a step change for the response to a request from the by industry in the safety of tailings Church of England Pensions facilities. The ICMM, UN Board and the Swedish Council Gold Fields Environment and the UN on Ethics for the AP Funds to a Principles for Responsible number of listed mining CEO Investment are developing a companies. recognised international standard Nick Holland for member companies, based on At Gold Fields the safety and best practices to ensure that health of our workforce has tailings facility risks are managed always been management’s top appropriately, consistently, and priority. The recent industry transparently. An independent tragedies around the panel of experts is overseeing the catastrophic failures of tailings work. facilities has highlighted once again that the safety of our At company level, Gold Fields has surrounding communities is aligned its tailings management equally critical. practices to the ICMM position statements on water and tailings Sincerely management. All Gold Fields’ TSFs, as well as associated pipeline and pumping Nick Holland infrastructure, are subject to an CEO, Gold Fields Ltd independent, external audit every three years – or more frequently where required by local 2 CHURCH OF ENGLAND PENSIONS BOARD / SWEDISH NATIONAL PENSION FUNDS COUNCIL ON ETHICS REQUEST FOR INFORMATION CONCERNING TAILINGS MANAGEMENT PREAMBLE a) Provide an overview of your tailings management system, and how you manage risk The most significant waste materials produced by our operations are tailings, waste rock, chemical waste and hydrocarbon waste. By managing these wastes responsibly, we minimise the environmental and potential social impact, so as to maintain our licence to operate. In total, as at 7 June 2019, our ten operations (including three joint venture sites) contain 34 tailings dams, of which 14 are active or are being rehabilitated and one will be commissioned imminently. With regards to active tailing storage facilities (TSFs), Gold Fields currently has two in-pit tailings dams operating at Agnew (Australia) and St Ives (Australia), five downstream/centreline tailings dams and seven upstream tailings dams. Gold Fields operations with active downstream/centreline tailings dams are Cerro Corona (Peru), Damang (Ghana) and Tarkwa (Ghana). Gold Fields has only three operations where upstream tailings are being used, being South Deep (South Africa), Tarkwa and Granny Smith (Australia). The factor of safety (FOS) of each existing upstream TSF is regularly reviewed, and when required, modification options (e.g. embankment buttressing) are considered to ensure Gold Fields’ target minimum FOSs are at least sustained. Maintaining our TSFs, which includes identifying, assessing and managing the risks associated with them (including operational, structural and environmental risks) is part of our ordinary course of business. That notwithstanding, Gold Fields, like many other mining companies faces inherent risks in our operation of TSFs. Most critically, tailings must be disposed of in an appropriate manner so as not to impact the safety of the workforce and communities or cause environmental damage. The use of TSFs exposes Gold Fields to certain risks, among them seepage of decanted tailings water or acid mine drainage and the failure of a dam at a tailings storage facility. TSFs designed with upstream constructed embankments typically present greater risk, particularly where the facility is located in a high seasonal rainfall area and where the embankments are constructed using reclaimed tailings materials. The occurrence of a dam failure at one of Gold Fields’ TSFs could also lead to the loss of human life and/or extensive property, environmental damage and result in significant financial exposure and the approach we take to prevent such a failure is described on the following pages. Gold Fields’ Group, regional and mine management regularly assess the risks facing the business. The assessments of the risks and their mitigating actions are a critical internal management tool, which seek to mitigate the identified risks. Risk mitigations are included in the annual Group Performance Scorecard and cascaded down to the performance scorecard of management employees at regional and operational levels. The formal risk review process starts during management’s annual strategic planning sessions where strategic risks and macro-trends are analysed in developing Gold Fields’ risk registers and mitigating actions. These are updated quarterly, and presented to the Board’s Risk Sub-Committee twice a year for verification. Gold Fields maintains measures to manage its TSFs’ safety, including compliance with the International Council on Mining & Metals’ (ICMM) Tailings Governance Position Statement and undertakes routine reviews by independent international consulting companies. All of our operations have tailings management plans in place, including closure and post-closure management plans. Gold Fields has implemented a multi-layered approach to TSF management that includes: 1. TSFs are designed by external, experienced and qualified engineers 2. TSF designs are required to be peer-reviewed 3. Construction is supervised or monitored by the design engineer and includes appropriate quality assurance/control 4. “As-built” facilities are required to be signed-off by the design engineer 5. TSFs are managed by assigned personnel 6. TSFs have an engineer of record appointed who undertakes regular reviews of the TSFs 3 7. Independent audits are undertaken at least on a triannual basis (more often in some cases) 8. Gold Fields’ corporate technical services team review and check TSF management processes employed at the operations 9. Key variances identified by TSF reviews are noted and communicated to the Gold Fields Executive Committee and the Board of Directors quarterly 10. Gold Fields has developed a formal Group TSF Management Guideline, and full compliance to this is expected 11. Risk is identified formally through risk assessments undertaken at various stages of the design and operational process 12. A strategic risk register is maintained at corporate level, which includes risks linked to the TSFs Gold Fields is moving away from installing new upstream TSFs with the most recent new TSFs constructed being in-pit TSFs (Agnew and St Ives), and downstream TSFs (Gruyere (Australia), Tarkwa and Damang). As two of our sites - South Deep and Granny Smith - are located in relatively dry regions, limited amounts of water need to be stored on the facilities, significantly reducing the risk of saturation of the dams. Tarkwa’s upstream tailings dams in Ghana have been constructed from imported fill materials, and are designed assuming worst-case scenario conditions, to ensure the embankments remain stable throughout both the wet and dry seasons, as well as for the life of the facility. All Gold Fields’ TSFs, as well as associated pipeline and pumping infrastructure, are subject to an independent, external audit every three years – or more frequently where required by local circumstances or regulations – as well as regular inspections and formal annual or quarterly Engineer of Record reviews. Risk tables and heat maps have been published in the Integrated Annual Report (IAR) for the last nine years. See https://www.goldfields.com/reports/annual-report-2018/risks-and-materiality.php for more details. Information about how Gold Fields discloses risks associated with its TSFs may be found in its most recent Form 20-F filing with the US Securities and Exchange Commission. See https://www.goldfields.com/form-20- f.php for more details. b) Confirm whether your approach to tailings management has
Recommended publications
  • A Wild Ride Foundations of a Company Coming of Age
    What still stands is what we created. The dams, the roads, the bridges, the schemes, The idea of forming consortiums always struck me as a good one, as problems The more difficult projects in which I was involved required detailed attention by me. That wasn’t My boss asked if I would be interested in working in Africa and got me a job interview with A valley failed where a company was building a mining tailings dam in Papua New Guinea called Ok When I joined Klohn Leonoff, I brought a capability in rock mechanics and a background in tunnelling. The variety of clients and market sectors is a driver as to why I came back into consulting We realized in the early 2000s that we had to fundamentally change the culture of the company to survive. That meant teaching professional engineers and I have found KCB to be a company that values the “why.” Our focus is on understanding the problems and KCB is a purpose-driven enterprise. Our purpose is the application of engineering and science for the betterment of our world. We and all the construction did not disappear with the company. These structures show FOUNDATIONS OF A COMPANY could be ironed out around the Board table. When there were problems on site dictated by me—it was dictated by the projects. The concentration that was required on these projects METAMORPHOSES COMING OF AGE PROJECTS AND PROGRESS ONE CHAPTER CLOSES A NEW MILLENNIUM A WILD RIDE C.B.A. Engineering. Don Bazett hired me and sent me to be the dam engineer on the Hadejia Tedi.
    [Show full text]
  • BHP “Extreme” Consequence Tailings Dams with Potential to Cause Fatality of 100 Employees
    BHP “Extreme” consequence tailings dams with potential to cause fatality of 100 employees: Briefing Paper by David Noonan, Independent Environment Campaigner - 22 May 2020 BHP has Questions to answer on Worker Safety, Transparency and Accountability at Olympic Dam BHP took over Olympic Dam copper-uranium mine in 2005, operating the mine for a decade before a GHD “TSF Dam Break Safety Report”1 to BHP in August 2016 concluded all existing Tailings Storage Facilities (TSFs) are “Extreme” consequence tailings dams with a failure potential to cause the death of 100 BHP employees: “BHP OD has assessed the consequence category of the TSFs according to ANCOLD (2012a,b). A dam break study, which considered 16 breach scenarios of TSFs 1 to 5, was completed by GHD (2016) and indicated a potential for tailings and water flow into the mine’s backfill quarry and underground portal. The following conclusions were drawn: • The population at risk (PAR) for a TSF embankment breach is greater than 100 to less than 1000 mine personnel primarily as a result of the potential flow of tailings into the adjacent backfill quarry and entrance to the underground mine. • The financial cost to BHP OD for a tailings dam failure was assessed by BHP OD to be greater than US$1B, a “catastrophic” loss according to ANCOLD guidelines (2012a,b). Based on these criteria, the TSFs at Olympic Dam have been given a consequence category of “Extreme” to guide future assessments and designs. Note that this is an increase compared to the assessment prior to the FY16 Annual Safety Inspection and Review (Golder Associates, 2016a) which classified TSF 1-4 and TSF 5 as “High A” and “High B”, respectively.
    [Show full text]
  • Tailings Facilities Disclosure: Response to the Church of England Pensions Board and the Council on Ethics Swedish National Pension Funds
    BHP Tailings Facilities Disclosure Tailings Facilities Disclosure: Response to the Church of England Pensions Board and the Council on Ethics Swedish National Pension Funds 7 June 2019 In April 2019, the Church of England Pensions Board and the Council on Ethics Swedish National Pension Funds wrote to approximately 700 mining firms to request specific disclosures of their tailings facilities. This document contains the response of BHP and that of our Non-operated joint ventures to this request. This disclosure has been certified by BHP’s Chief Executive Officer, in line with this request. BHP Tailings Facilities Disclosure DISCLAIMER Forward-looking statements This document contains forward-looking statements, which may include statements regarding: trends in commodity prices and currency exchange rates; demand for commodities; plans, strategies and objectives of management; closure or divestment of certain operations or facilities (including associated costs); anticipated production or construction commencement dates; capital costs and scheduling; operating costs and shortages of materials and skilled employees; anticipated productive lives of projects, mines and facilities; provisions and contingent liabilities; tax and regulatory developments. Forward-looking statements can be identified by the use of terminology including, but not limited to, ‘intend’, ‘aim’, ‘project’, ‘anticipate’, ‘estimate’, ‘plan’, ‘believe’, ‘expect’, ‘may’, ‘should’, ‘will’, ‘continue’, ‘annualised’ or similar words. These statements discuss future expectations concerning the results of operations or financial condition, or provide other forward- looking statements. These forward-looking statements are not guarantees or predictions of future performance, and involve known and unknown risks, uncertainties and other factors, many of which are beyond our control, and which may cause actual results to differ materially from those expressed in the statements contained in this presentation.
    [Show full text]
  • Deep Into the Mud: Ecological and Socio-Economic Impacts of the Dam
    n a t u r e z a & c o n s e r v a ç ã o 1 4 (2 0 1 6) 35–45 Natureza & Conservação Brazilian Journal of Nature Conservation Supported by Boticário Group Foundation for Nature Protection http:/ /www.naturezaeconservacao.com.br Essays and Perspectives Deep into the mud: ecological and socio-economic impacts of the dam breach in Mariana, Brazil a,b,∗ c d Geraldo Wilson Fernandes , Fernando F. Goulart , Bernardo D. Ranieri , a,e f g h Marcel S. Coelho , Kirsten Dales , Nina Boesche , Mercedes Bustamante , a i b j Felipe A. Carvalho , Daniel C. Carvalho , Rodolfo Dirzo , Stephannie Fernandes , b,k g g k Pedro M. Galetti Jr. , Virginia E. Garcia Millan , Christian Mielke , Jorge L. Ramirez , a g l m c Ana Neves , Christian Rogass , Sérvio P. Ribeiro , Aldicir Scariot , Britaldo Soares-Filho a Evolutionary Ecology & Biodiversity, Department of General Biology, Universidade Federal de Minas Gerais (UFMG), Belo Horizonte, MG, Brazil b Department of Biology, Stanford University, Stanford, United States c Master in Modeling and Analysis of Environmental Systems, Center for Remote Sensing, Department of Cartography, Universidade Federal de Minas Gerais (UFMG), Belo Horizonte, MG, Brazil d Norman B. Keevil Institute of Mining Engineering, University of British Columbia, Vancouver, Canada e Laboratory of Phenology, Department of Botany, Instituto de Biociências (IB), Universidade Estadual Paulista (UNESP), Rio Claro, SP, Brazil f Canadian International Resources & Development Institute, University of British Columbia, Vancouver, Canada g Helmholtz
    [Show full text]
  • Tailings Dam Failures: a Review of the Last One Hundred Years
    Tailings Dam Failures: A Review of the Last One Hundred Years Shahid Azam Qiren Li Introduction one hundred years is estimated to be information when reported. This has Tailings dams are some of the largest 1.2%. This is more than two orders of seriously hindered the development of earth structures geotechnical engineers magnitude higher than the failure rate safety regulations in such areas. De- construct. These embankments are often of conventional water retention dams spite insufficient data, a generalized built with steep slopes using the coarse that is reported to be 0.01% (ICOLD, statistical analysis is exigently needed fraction of the tailings thereby saving 2001). to help minimize tailings dam failure on cost. To keep such impoundments The mining industry has experi- events. standing is one of the most challenging enced several significant dam failures tasks in mine waste management. in recent history: Merriespruit (South Scope of this Study Generally, these containment facilities Africa), 1994; Omai (Guyana), 1994; A comprehensive worldwide database are vulnerable to failure because of the Los Frailes (Spain), 1998; Baia Mare for all historical failure events is following reasons: (i) dyke construction (Romania), 2000; and Aitik (Sweden), virtually inexistent. Still, a number of with residual materials from the mining 2000. An acute societal concern over databases can be used in conjunction. operations; (ii) sequential dam raise such events has resulted in enforc- The primary databases are given along with an increase in effluents; (iii) ing stringent safety criteria at mining as follows: (i) United Nations lack of regulations on design criteria, operations in some parts of the globe.
    [Show full text]
  • Designing Safe and Stable Tailings Dam Structures with Centrifuge Modelling
    Risk Analysis VII PI-615 Designing safe and stable tailings dam structures with centrifuge modelling E. De Souza The Robert M. Buchan Department of Mining, Queen’s University, Canada Abstract The failure of a number of waste dumps and tailings dams over the last decade has directed public attention to the potential hazard and severe environmental and safety impact created by mine tailings disposal, and has brought concerns on the need for more appropriate design, construction and management of tailings impoundments. Although past engineering research efforts carried out within the mining industry have developed unique strategies that normally result in stable tailings dam conditions, the effective and economic design, construction and maintenance of safe mine tailings dams still constitute a major technical challenge to industry. As a manifested contribution to this continuing effort, this paper introduces the centrifuge as a modern and unique design and verification tool which provide viable solutions to the continuing effort towards the construction of safe mine tailings dams. Keywords: tailings dams, waste dumps, centrifuge modelling, stability design. 1 Introduction Tailings dam failures generally result in catastrophic ecological disasters. Failure of an embankment generally results in liquefaction of the unconsolidated tailings mass, which can flow many miles in the surroundings. Because of the potential hazard and severe environmental and safety impact created by mine tailings disposal, industry has taken leadership in developing extensive research towards improved tailings dam design and management techniques that address both the safety and the environmental issues of tailings disposal. The mining industry is more and more expected to achieve high environmental performance in their operations, and high design standards are WIT Transactions on Information and Communication Technologies, Vol 43, ©2010 WIT Press www.witpress.com, ISSN 1743-3517 (on-line) doi:10.2495/RISK100511 PI-616 Risk Analysis VII required by government and regulators.
    [Show full text]
  • Tailings Dam Spills at Mount Polley & Mariana Summary
    BY JUDITH MARSHALL August 2018 Tailings dam spills at Download the Mount Polley & Mariana full report at: corporatemapping.ca/ CHRONICLES OF DISASTERS FORETOLD tailings-disasters Summary THIS PAPER EXPLORES THE MANY PARALLELS between the tailings dam spills at the Mount Polley mine in British Columbia (BC), Canada, and the Samarco mine in Mariana, Minas Gerais, Brazil. The Mount Polley disaster took place in August 2014, when the dam holding toxic waste from the copper and gold mine collapsed, creating the largest environ- mental disaster in Canada’s mining history. It was not long after — in November of the following year — that the largest mine disaster in Latin American history took place in Mariana, Brazil, when an even larger reservoir of waste collapsed at the Samarco iron mine. TOP: AERIAL VIEW OF MOUNT POLLEY MINE SITE, JULY 24, 2014 PRIOR TO THE DAM BREACH. BOTTOM: AFTER THE AUGUST 4, 2014 DAM BREACH. BY JESSE ALLEN, USING LANDSAT DATA FROM THE U.S. GEOLOGICAL SURVEY. — VISIBLE EARTH, NASA The enormity of tailings ponds Despite their name, tailings ponds are often more like lakes — many square kilometres in size, held in by dams that may be from 40 to more than 100 metres high. “Tailings” refers to the chemical-laden waste rock left behind from the processing of ore: in milling and separating ore from marketable minerals, a huge quantity of waste rock is ground to the consistency of sand and ends up mixed with a tremendous amount of water into a “slurry,” which is then piped into a tailings pond. The solids settle to the bottom of the pond and also form “tail- ings beaches” that become an important buffer between a pond’s embankment (waste rock set 2 SUMMARY — TAILINGS DAM SPILLS AT MOUNT POLLEY AND MARIANA up to hold in solids) and the water.
    [Show full text]
  • Surface(Placed,Cemented(Paste,Tailings
    ! Surface(Placed,Cemented(Paste,Tailings, Prepared,by, ,,Enviromin,,Inc.1, Introduction! Surface( placement( of( cemented0paste( tailings( is( an( innovative( and( logical( application( of( two( proven( technologies:(cemented0paste(tailings(backfill(and(surface(placement(of(paste(tailings.(This(approach( reduces( the( long0term( risks( associated( with( tailings( dams( (subaqueous( tailings( impoundments),( and( lessens(potentially(unfavorable(environmental(conditions(observed(in(traditional(tailings(facilities,(such( as(dust(and(water(quality(impacts.(((Although(this(technology(has(not(yet(been(implemented(at(the(facility( scale,(studies(of(surface(placement(of(cemented0paste(tailings(began(in(the(early(2000s.((Critics(within( the(mining(industry(claim(that(adding(cement(to(paste(tailings(in(a(surface(facility(creates(unnecessary( expense,(yet(the(benefits(of(this(tailings(management(strategy(are(increasingly(clear.(The(United(Nations( recently(published(a(rapid(response(assessment(to(mine(tailings(storage(and(recommends(that(tailings( facility( design(objectives( be( raised(to(the( level(of( “zero0failure”( (“Mine( Tailings( Storage:( Safety( is( No( Accident.”(Roche(et(al.,(2017).(( The(utilization(of(cemented0paste(tailings(in(a(surface(facility,(while(acknowledged(as(a(very(expensive( approach,(is(the(highest(level(of(tailings(safety(management(and(goes(well(beyond(the(recommendations( of(the(2017(United(Nations(report.(This(adaptation(of(proven(best(management(practices(culminates(in( an(industry0led(approach(to(responsible(resource(development.(
    [Show full text]
  • Tailings Dam Questions and Answers
    Tailings Dam Questions and Answers 1. What is a tailings dam? A tailings dam is a structure built for the purposes of storing mine waste and water from the milling process. Where water retention dams are constructed to full height before any discharge to the impoundment, tailings dams increase in size as storage requirements increase1. 2. Why do we need tailings dams? Tailings dams, or tailings management facilities (TMF), are required for the long term deposition of mine waste such as tailings and waste rock. Tailings are generated from the mined ore that has been ground during mine processing, and must be kept behind a dam to prevent them from flowing into waterways. 3. Why can’t you use another technology like dry stack tailings to manage the tailings? Mine waste that has a high sulphide content and low neutralization potential (called Potentially Acid Generating or PAG material) such as at Casino, has the potential to react with oxygen in the air and, if not stored under water which prevents it from coming in contact with air, will leach acid and metals into the environment. Dry stack tailing technology is appropriate for waste that has low sulphide content and high neutralization potential, as the waste is continuously exposed to air. Conservative approaches and current best practices dictate that, for Casino’s waste, co-disposal of the PAG waste rock and tailings under a constant water cover is the best technology to prevent the formation of acidic drainage. 4. What is contained in the tailings dam? What is the water quality like? The Casino tailings dam will store non-PAG tailings adjacent to the dam and PAG tailings further upstream.
    [Show full text]
  • Modelling the Brumadinho Tailings Dam Failure, the Subsequent Loss Of
    https://doi.org/10.5194/nhess-2020-159 Preprint. Discussion started: 4 June 2020 c Author(s) 2020. CC BY 4.0 License. Modelling the Brumadinho tailings dam failure, the subsequent loss of life and how it could have been reduced Darren Lumbroso1, Mark Davison1, Richard Body1, Gregor Petkovšek1 1HR Wallingford, Howbery Park, Wallingford, Oxfordshire OX10 8BA, UK 5 Correspondence to: Darren Lumbroso ([email protected]) Abstract. In recent years the number of tailings dams failures has increased. On 25 January 2019, the Brumadinho tailings dam in Brazil suddenly failed releasing a mudflow over 10 m deep comprising some 10 million m3 of mining waste which killed between 270 and 320 people. This paper details the use of an agent-based model, known as the Life Safety Model (LSM), to estimate the risk to people downstream of the Brumadinho tailings dam and to assess if the number of fatalities 10 could have been reduced if a warning had been received prior to or at time the dam failed. The LSM modelling indicates that even if a warning had been issued as the dam failed the number of fatalities could have been reduced. Agent-based modelling tools such as the LSM can help to inform and improve emergency plans for tailings dams, which will help to reduce the risk posed by them in the future. 1 Introduction 15 Tailings dams are earth embankments used to store waste materials, known as tailings, from mining operations. They can be more than 100 m high and in some cases several kilometres long (Kossoff et al., 2014).
    [Show full text]
  • Impacts of the Fundão Dam Failure
    Impacts of the Fundão Dam failure A pathway to sustainable and resilient mitigation L.E. Sánchez, K. Alger, L. Alonso, F.A.R. Barbosa, M.C.W. Brito, F.V. Laureano, P. May, H. Roeser, Y. Kakabadse RIO DOCE PANEL THEMATIC REPORT NO. 1 About IUCN IUCN is a membership Union uniquely composed of both government and civil society organisations. It provides public, private and non-governmental organisations with the knowledge and tools that enable human progress, economic development and nature conservation to take place together. Created in 1948, IUCN is now the world’s largest and most diverse environmental network, harnessing the knowledge, resources and reach of more than 1,300 Member organisations and some 10,000 experts. It is a leading provider of conservation data, assessments and analysis. Its broad membership enables IUCN to fill the role of incubator and trusted repository of best practices, tools and international standards. IUCN provides a neutral space in which diverse stakeholders including governments, NGOs, scientists, businesses, local communities, indigenous peoples organisations and others can work together to forge and implement solutions to environmental challenges and achieve sustainable development. www.iucn.org https://twitter.com/IUCN/ B | Impacts of the Fundão Dam failure A pathway to sustainable and resilient mitigation L.E. Sánchez, K. Alger, L. Alonso, F.A.R. Barbosa, M.C.W. Brito, F.V. Laureano, P. May, H. Roeser, Y. Kakabadse | i The designation of geographical entities in this book, and the presentation of the material, do not imply the expression of any opinion whatsoever on the part of IUCN concerning the legal status of any country, territory, or area, or of its authorities, or concerning the delimitation of its frontiers or boundaries.
    [Show full text]
  • Deformations Prior to the Brumadinho Dam Collapse Revealed by Sentinel-1 Insar Data Using SBAS and PSI Techniques
    remote sensing Article Deformations Prior to the Brumadinho Dam Collapse Revealed by Sentinel-1 InSAR Data Using SBAS and PSI Techniques Fábio F. Gama 1,* , José C. Mura 1, Waldir R. Paradella 1 and Cleber G. de Oliveira 2 1 National Institute for Space Research (INPE), São José dos Campos, 12227-010 São Paulo, Brazil; [email protected] (J.C.M.); [email protected] (W.R.P.) 2 VISIONA Tecnologia Espacial, São José dos Campos, 12247-016 São Paulo, Brazil; [email protected] * Correspondence: [email protected]; Tel.: +55-12-32086517 Received: 17 August 2020; Accepted: 18 September 2020; Published: 9 November 2020 Abstract: Differential Interferometric SAR (DInSAR) has been used to monitor surface deformations in open pit mines and tailings dams. In this paper, ground deformations have been detected on the area of tailings Dam-I at the Córrego do Feijão Mine (Brumadinho, Brazil) before its catastrophic failure occurred on 25 January 2019. Two techniques optimized for different scattering models, SBAS (Small BAseline Subset) and PSI (Persistent Scatterer Interferometry), were used to perform the analysis based on 26 Sentinel-1B images in Interferometric Wide Swath (IW) mode, which were acquired on descending orbits from 03 March 2018 to 22 January 2019. A WorldDEM Digital Surface Model (DSM) product was used to remove the topographic phase component. The results provided by both techniques showed a synoptic and informative view of the deformation process affecting the study area, with the detection of persistent trends of deformation on the crest, middle, and bottom sectors of the dam face until its collapse, as well as the settlements on the tailings.
    [Show full text]