INDIAN BUREAU of MINES Nagpur Regional Office
Total Page:16
File Type:pdf, Size:1020Kb
INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR INSPECTION REPORT Nagpur regional office Mine file No : MAH/BHD/MN-131/NGP Mine code : 40MSH05004 (i) Name of the Inspecting : K02( ) Kalmata.M.K. Officer and ID No. (ii) Designation : Regional Mining Geologist (iii) Accompaning mine : Shri.Hemant Hinge, Geologist Official with Designation (iv) Date of Inspection : 28/02/2020 (v) Prev.inspection date : 21/08/2011 PART-I : GENERAL INFORMATION 1. (a) Mine Name : NAVEGAON (15.90 HECT) (b) Registration NO. : IBM/560/2011 (c) Category : A Other than Fully Mech. (d) Type of Working : Opencast (e) Postal address State : MAHARASHTRA District : BHANDARA Village : NAWEGAON Taluka : MOHADI Post office : KANDRI Pin Code : FAX No. : 0712-2520360 E-mail : [email protected] Phone : 0712-2532901 (f) Police Station : Mohadi (g) First opening date : 17/01/2011 (h) Weekly day of rest : 2. Address for : 33, Mount Road, Sadar correspondance Nagpur-440001 3. (a) Lease Number : MSH0373 (b) Lease area : 15.9 (c) Period of lease : 50 (d) Date of Expiry : 21/03/2060 4. Mineral worked : MANGANESE ORE Main PAGE : 2 5. Name and Address of the Lessee : M/S SUNFLAG IRON & STEEL CO. LTD. 33, MOUNT ROAD, SADAR, NAGPUR- 440001 BHANDARA MAHARASHTRA Phone: FAX : 6. Date of approval of Mining : Fresh under rule 22 MCR1960 30/09/2009 Plan/Scheme of Mining MP modif under MCR 1960 09/09/2016 PAGE : 3 PART - II : OBSERVATION/COMMENTS OF INSPECTING OFFICERS Exploration : Sl.No. Item Proposals Actual work Remarks 1a Backlog of There was a The exploration has been Violation is previous year proposal to not carried out by the pointed out for drill two lessee. the same, under boreholes in Rule 11(1) of the year MCDR-2017. 2017-18, and three boreholes in the year 2018-19. 1b Exploration over Proposal was Exploration was not Violation is lease area for given to carried out as per the pointed out for geological axis 1 explore proposal. the same, under or 2 entire Rule 11(1) of mineralized MCDR-2017. area under G- 2 level. 1c Exploration Not proposed. Nil No exploration has Agencies and been carried out, Expenditure in in the present lakh rupees plan period. during the year 1d Balance area to 3.00 Ha Nil Exploration is not be explored to carried out as per bring Geological the proposal, and axis in 1 or 2 Violation is pointed out for the same under Rule 11(1) of MCDR-2017. 1e Balance reserve Reserves as Reserves as on No insitu mining as on 01/04/20 on 01.04.2015 01.04.2019. was done in the (as per Probable Mineral present plan approved Reserves (122) - 31185 period, so insitu document) tonnes reserves/resources Probable Pre-feasibility M remains unchanged. Mineral resources (222)- 16335 Reserves tonnes. (122) - 31185 tonnes Pre- feasibility M resources (222)- 16335 tonnes. PAGE : 4 1f General remarks GSI has carriedout of inspecting exploration, in the officers on Navegaon area,covering geology, all the mines in the exploration etc area over strike length of 1.05km from eastern end of R.B.Lanjewar mines to D costa mines in west. As per the GSI report three boreholes are drilled near the lease area, out of three, location of two boreholes falls within the lease area. Reserves are estimated by taking the influence of GSI drilled boreholes. Development : Sl.No. Item Propasals Actual work Remarks 2a Location of Development is The mine is not worked The mine is not development proposed in in the year 2018-19. working, due to w.r.t.lease area the existing lack of space for old pit only. extension of the The proposed pit. The lease co-ordinates area is surrounded are N-2367600 by P.L. area's of to N-232367660 the same company, & E-343850 to which are under E-343975 saved case (Section 10 (a) 2(c) of MMDR, Amendment Act, 2015) and proposal is pending with Government. 2b Separate benches Yes, proposed. Nil The mine is not in topsoil, working due to overburden and area restrictions. minerals (Rule 15) 2c Stripping ratio 1:11.30, in Nil The mine is not or ore to OB the year 2018- working. ratio 19. 2d Quantity of 120 CUM Nil topsoil generation in m3 2e Quantity of 50954 CUM. Nil overburden generation in m3 PAGE : 5 2f General remarks The mine is not working, of inspecting due to lack of space for officers on extension of the pit. development of The lease area is pit w.r.t. type surrounded by P.L. of deposit etc area's of the same company, which are yet to be decided by the Government. Exploitation: Sl.No. Item Propasals Actual work Remarks 3a Number of pit One working has been not proposed for carried out in the year production 2018-19. 3b Quantity of ROM 5686 tonnes, Nil Mine is not mineral in the year working. production 2018-19. proposed 3c Recovery of 80% Nil The mine is not sailable/usable working. mineral from ROM production 3d Quantity of 1139 tonnes in Nil Mine is not mineral reject the year 2018- working. generation 19. 3e Grade of mineral Below 20% Mn. Not applicable. The company has rejects kept the cut-off generation and grade, above 20% threshold value Mn. and manganese declared. ore containined below 20% Mn was proposed to stock separately. The mine is not working and no mineral rejecet is generated in the year 2018-19. 3f Quantity of sub Not proposed Nil grade mineral generation. 3g Grade of sub Not Not applicable. grade mineral applicable. generation 3h Manual / Manual Nil Mine is not Mechanised working, and no method adopted production was for segregating done in the year from ROM 2018-19. PAGE : 6 3i Any analysis or Not Proposed. Nil Lessee has not beneficiation proposed, any study proposed beneficiation and carried out study, and only for sub grade manual sorting of mineral and different grades rejects. is proposed. 3j Provision of Jack-hammer Nil The mine is not drilling and and wagon working. No blasting in drilling was drilling and mineral benches proposed. For blasting is blasting carried out in the contract given year 2018-19. to Government recognized agency. 3k Provision of Yes, Nil. Mine is not mining combination of working. machineries in Excavator and mineral benches Trucks is proposed. 3l Whether height Bench height Yes, the proposed bench The mine is not of benches in is proposed 5 height is suitable for working and no new overburden and mtrs for both proposed method of benches were mineral suitable ore and OB. mining. developed in the for method of year 2018-19. mining proposed in MP/SOM 3m Total area 0.073Ha, in Nil One old pit is covered under the year 2018- exist within the excavation/pits 19. lease area and total area coverd under old excavation is 1.210Ha. 3n Ore to OB ratio 1:11.30, in Nil Mine is not for the pit/mine the year 2018- working. during the year. 19. 3o Total area put The proposed The total area put in The mine is not in use under under use under different working, so area different heads different heads at the end of 218- put under at the end of heads, up to 19 is as follows. different heads is year the present Area under excavation- less than the plan period is 1.210Ha, Waste dump- proposal. as follows. 1.6080Ha, Mineral stock- Area under 0.027Ha, Infrastructure- excavation- 0.02Ha. 2.32Ha, Waste dump-4.55Ha, Mineral stock- 0.099, Infrastructure -0.04 PAGE : 7 3p Production of 2018-19 2018-19 ROM mineral 5686 tonnes Nil. during the last 2017-18 2017-18 five year period 5686 Tonnes 14 tonnes as applicable 2016-17 2016-17 5686 Tonnes. Nil 2015-16 2015-16 Nil. Nil 2014-15 2014-15 12692(Dump re- NIL handling) 3q General remarks Only dump mining is of inspecting carried out in the officers on present plan period. method of mining Presently the mine is etc. not working, due to lack of space for extension of the pit. The lease area is surrounded by P.L. area's of the same company, which are yet to be decided by the Government. Solid Waste Management - Dumping: Sl.No. Item Propasals Actual work Remarks 4a Separate dumping Yes, separate Nil The mine is not of topsoil, OB duming was working. and mineral proposed for rejects (Rule OB and Mineral 32,33) Reject. 4b Location of Proposed The mine is not working No insitu mining topsoil, OB and location of OB and no dumping was made was caried out in mineral reject dump in the in the year 2018-19. the present plan dumps plan period is period, so no N-2367320 to fresh dump is N-2367390 and formed. However E-344210 to E- the waste 344370. generated during Mineral dump mining was reject-N- levelled there 2367390 to N- only. 2367440 & E- 343930 to E- 343970. 4c Number of dumps Two, one for Nil, No fresh dump was Two old dumps are within lease overburden and made in the present plan existing within area and outside other for period up to 2018-19. the lease area. of lease area mineral (Adjacent to reject. existing old pit) PAGE : 8 4d Location of Outside the No new dump was made in Two old dumps are dumps w.r.t. UPL. the present plan period. existing within ultimate pit the UPL. limit (Rule 16) 4e Number of active Two, proposed No new dump was made in Two old dumps are and alive dumps.