14. Draft Habitat Creation and Management Plan for The
CH2M HILL Hong Kong Ltd. 14. DRAFT HABITAT CREATION AND MANAGEMENT PLAN FOR THE WETLAND NATURE RESERVE 14.1 Study background and objectives 14.1.1 This draft Habitat Creation and Management Plan (HCMP) presents the details for the design and management of the on-site Wetland Nature Reserve (WNR) that was identified as appropriate mitigation and compensation for the construction of the residential development as detailed in Section 13. This is a draft document and key details presented here, including, for example, stocking densities and monitoring requirements are to be finalised subject to the endorsement of AFCD or other appropriate authority. If changes are required in light of the changing environment/baseline, such changes would need to be agreed with AFCD or the relevant authorities. 14.1.2 The proposed WNR has been designed to achieve sufficient functional enhancement to compensate for long-term operational phase disturbance. Section 3.5.6.4 xiv and xv of the Study Brief also specifically states that the Ecological Impact Assessment should: A. Identify any constraints associated with the finalized mitigation measures. B. Propose a management package for the proposed on-site WNR with particular attention to: i. The habitat management plan and specification of resources requirement for its implementation. ii. The long-term foundation management system with management guidelines. iii. The financial arrangements to sustain the management of the wetland. iv. The management agents and their responsibility. v. A contingency plan for the management of the WNR before the establishment of the foundation management. C. Formulate an ecological monitoring and audit programme for the periods of construction and subsequent site operation, including the development and operation of the WNR.
[Show full text]