WELCOME

The purpose of this meeting is to provide a final update on Roosevelt Station design and gather public comment.

6 p.m. – Meeting opens

6:30 p.m. – Presentation begins

How to comment:

• Fill out a comment card provided at the comment table

• Speak with our staff at this meeting

• Send an email to [email protected]

• Call 206-398-5300 to speak to the outreach team ROUTE AND STATIONS

NE Northgate Way

NORTHGATE MALL MAP KEY 5 Sample Tunnel Route Travel Times Northgate Station Retained Cut-fill Route NE 103rd St Elevated Route NE 100th St Station NORTH P Park-and-Ride Lot Downtown COMMUNITY 4th Ave NE 3rd Ave NE COLLEGE 8th Ave NE TC Transit Center Seattle to NE 95th St MAPLE LEAF Northgate TUNNEL PORTAL NE 92nd St 14 minutes NE 91st St NE 90th St

Meridian Ave N NE 88th St

N 85th St 5th Ave NE NE 85th St

NE 82nd St Northgate to

Bagley Ave N Banner Way NE NE 80th St

N

e 7 minutes v NE 78th St Lake City Way NE

A Latona Ave NE NE 77th St

s

s

i

l

r

o

C Roosevelt Way NE NE 75th St

NE 73rd St

E

GREEN LAKE N

PARK NE 70th St e

v

A

h

t

NE 68th St 2 U District

1 NE 67th St ROOSEVELT HIGH SCHOOL to Downtown NE 66th St NE 65th St Roosevelt Station Bellevue NE 64th St 32 minutes NE 62nd St RAVENNA PARK

NE 59th St NE R aven na Blvd

NE 55th St

5 E

N

NE 53rd St E E

E e E

v

N N

N N Roosevelt to

A

e e

e e

v a v

v v

n

A

25th Ave NE A

A A

n

h h

h

h Sea-Tac Airport e

t t

t t

v

6 7

8 NE 50th St 0 a

1 1

1 2

E R

N

E

N

y

a 44 minutes

e e

v

E

W

E E

A N

N N

y

N

NE 47th St

t

e

n

i

e

e e

s v

y

v v

l

v r A

A

k

e

A

A

t

o

v

i

h

s

h h

o

t t

n t

r 1

5

7 8 Roosevelt Way NE Roosevelt Way B

U

11th Ave NE 2

1 NE 45th St

NE 43rd St U District Station

NE 42nd St

NE 41st St & NE 40th St CenturyLink fields Montlake Blvd NE to Northgate

y NE Boat St a N Pacific St E W 20 minutes Stevens

University of HUSKY STADIUM Eastlake Ave NE Washington Station

2 /15 ROOSEVELT STATION SCHEDULE

2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021

Station final design ...... 30% design open house ...... 60% design open house ...... 90% design open house ......

Demolition & environmental clean-up ......

Early utility relocation ......

Station excavation ...... Tunneling (Maple Leaf tunnel portal to University of Washington Station)......

Station construction ......

Systems installation / testing ......

Link light rail service begins ......

2 /15 Duration of noise variance and nighttime work CONSTRUCTION PHOTOS ROOSEVELT STATION

Excavation pit – Excavation crews used a conveyor belt to lift dirt out of the site and onto trucks waiting next to 12th Avenue NE.

Ring stockpile – The first of two tunnel boring machines is expected to reach the Roosevelt Station excavation site in early March. Crews are stockpiling the concrete segments that will form the walls of the tunnels.

65th restoration – Crews are restoring the pavement at the intersection of NE 65th Street and 12th Avenue NE. This work is expected to be complete in late spring/early summer. STATION ENTRANCES ROOSEVELT STATION 90% DESIGN

SOUTH ENTRANCE

NORTH ENTRANCE

2/15 VIEW FROM NE 66TH STREET & 12TH AVENUE NE ROOSEVELT STATION 90% DESIGN

LOOKING NORTH

LOOKING SOUTH

2/15 STATION INTERIOR ROOSEVELT STATION 90% DESIGN

NORTH LOBBY

PLATFORM

2/15 STATION INTERIOR ROOSEVELT STATION 90% DESIGN

SOUTH LOBBY

SOUTH LOBBY ESCALATORS/STAIRS

2/15 SITE PLAN AND BIRDSEYE VIEW ROOSEVELT STATION 90% DESIGN

SITE PLAN

2/15

BIRDSEYE VIEW