WELCOME
The purpose of this meeting is to provide a final update on Roosevelt Station design and gather public comment.
6 p.m. – Meeting opens
6:30 p.m. – Presentation begins
How to comment:
• Fill out a comment card provided at the comment table
• Speak with our staff at this meeting
• Send an email to [email protected]
• Call 206-398-5300 to speak to the outreach team NORTHGATE LINK EXTENSION ROUTE AND STATIONS
NE Northgate Way
NORTHGATE MALL MAP KEY 5 Sample Tunnel Route Travel Times Northgate Station Retained Cut-fill Route NE 103rd St Elevated Route NORTHGATE TRANSIT CENTER NE 100th St Station NORTH SEATTLE P Park-and-Ride Lot Downtown COMMUNITY 4th Ave NE 3rd Ave NE COLLEGE 8th Ave NE TC Transit Center Seattle to NE 95th St MAPLE LEAF Northgate TUNNEL PORTAL NE 92nd St 14 minutes NE 91st St NE 90th St
Meridian Ave N NE 88th St
N 85th St 5th Ave NE NE 85th St
NE 82nd St Northgate to
Bagley Ave N Banner Way NE Husky Stadium NE 80th St
N
e 7 minutes v NE 78th St Lake City Way NE
A Latona Ave NE NE 77th St
s
s
i
l
r
o
C Roosevelt Way NE NE 75th St
NE 73rd St
E
GREEN LAKE N
PARK NE 70th St e
v
A
h
t
NE 68th St 2 U District
1 NE 67th St ROOSEVELT HIGH SCHOOL to Downtown NE 66th St NE 65th St Roosevelt Station Bellevue NE 64th St 32 minutes NE 62nd St RAVENNA PARK
NE 59th St NE R aven na Blvd
NE 55th St
5 E
N
NE 53rd St E E
E e E
v
N N
N N Roosevelt to
A
e e
e e
v a v
v v
n
A
25th Ave NE A
A A
n
h h
h
h Sea-Tac Airport e
t t
t t
v
6 7
8 NE 50th St 0 a
1 1
1 2
E R
N
E
N
y
a 44 minutes
e e
v
E
W
E E
A N
N N
y
N
NE 47th St
t
e
n
i
e
e e
s v
y
v v
l
v r A
A
k
e
A
A
t
o
v
i
h
s
h h
o
t t
n t
r 1
5
7 8 Roosevelt Way NE Roosevelt Way B
U
11th Ave NE 2
1 NE 45th St
NE 43rd St U District Station
NE 42nd St
NE 41st St Safeco & NE 40th St CenturyLink fields UNIVERSITY OF WASHINGTON Montlake Blvd NE to Northgate
y NE Boat St a N Pacific St E W 20 minutes Stevens
University of HUSKY STADIUM Eastlake Ave NE Washington Station
2 /15 ROOSEVELT STATION SCHEDULE
2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021
Station final design ...... 30% design open house ...... 60% design open house ...... 90% design open house ......
Demolition & environmental clean-up ......
Early utility relocation ......
Station excavation ...... Tunneling (Maple Leaf tunnel portal to University of Washington Station)......
Station construction ......
Systems installation / testing ......
Link light rail service begins ......
2 /15 Duration of noise variance and nighttime work CONSTRUCTION PHOTOS ROOSEVELT STATION
Excavation pit – Excavation crews used a conveyor belt to lift dirt out of the site and onto trucks waiting next to 12th Avenue NE.
Ring stockpile – The first of two tunnel boring machines is expected to reach the Roosevelt Station excavation site in early March. Crews are stockpiling the concrete segments that will form the walls of the tunnels.
65th restoration – Crews are restoring the pavement at the intersection of NE 65th Street and 12th Avenue NE. This work is expected to be complete in late spring/early summer. STATION ENTRANCES ROOSEVELT STATION 90% DESIGN
SOUTH ENTRANCE
NORTH ENTRANCE
2/15 VIEW FROM NE 66TH STREET & 12TH AVENUE NE ROOSEVELT STATION 90% DESIGN
LOOKING NORTH
LOOKING SOUTH
2/15 STATION INTERIOR ROOSEVELT STATION 90% DESIGN
NORTH LOBBY
PLATFORM
2/15 STATION INTERIOR ROOSEVELT STATION 90% DESIGN
SOUTH LOBBY
SOUTH LOBBY ESCALATORS/STAIRS
2/15 SITE PLAN AND BIRDSEYE VIEW ROOSEVELT STATION 90% DESIGN
SITE PLAN
2/15
BIRDSEYE VIEW