Complete Mth 1-12 2012-13 Post Adjustments.Xlsx

Total Page:16

File Type:pdf, Size:1020Kb

Complete Mth 1-12 2012-13 Post Adjustments.Xlsx NHS AYRSHIRE & ARRAN SUPPLIER PAYMENTS OVER £25K - PERIOD 1st April 2012 to 31st March 2013 (as required under the Public Services Reform (Scotland) Act 2010 Analysed Gross Supplier Name Analysis of Expenditure Date Paid Detail Aah Pharmaceuticals Ltd Raw Materials/Consumables 02/04/2012 38,353.86 Aah Pharmaceuticals Ltd Raw Materials/Consumables 10/04/2012 35,882.16 Aah Pharmaceuticals Ltd Raw Materials/Consumables 20/04/2012 42,407.42 Aah Pharmaceuticals Ltd Raw Materials/Consumables 30/04/2012 55,941.60 Aah Pharmaceuticals Ltd Raw Materials/Consumables 04/05/2012 29,504.17 Aah Pharmaceuticals Ltd Raw Materials/Consumables 11/05/2012 44,313.89 Aah Pharmaceuticals Ltd Raw Materials/Consumables 18/05/2012 41,168.32 Aah Pharmaceuticals Ltd Raw Materials/Consumables 25/05/2012 56,783.45 Aah Pharmaceuticals Ltd Raw Materials/Consumables 01/06/2012 34,737.55 Aah Pharmaceuticals Ltd Raw Materials/Consumables 13/06/2012 30,482.98 Aah Pharmaceuticals Ltd 22/06/2012 38,276.49 Aah Pharmaceuticals Ltd Raw Materials/Consumables 29/06/2012 40,121.18 Aah Pharmaceuticals Ltd Raw Materials/Consumables 13/07/2012 30,093.28 Aah Pharmaceuticals Ltd Raw Materials/Consumables 18/07/2012 27,057.67 Aah Pharmaceuticals Ltd Raw Materials/Consumables 27/07/2012 28,930.92 Aah Pharmaceuticals Ltd Raw Materials/Consumables 03/08/2012 31,132.00 Aah Pharmaceuticals Ltd Raw Materials/Consumables 10/08/2012 38,758.21 Aah Pharmaceuticals Ltd Raw Materials/Consumables 17/08/2012 27,265.99 Aah Pharmaceuticals Ltd Raw Materials/Consumables 24/08/2012 40,596.89 Aah Pharmaceuticals Ltd Raw Materials/Consumables 31/08/2012 42,240.51 Aah Pharmaceuticals Ltd Raw Materials/Consumables 07/09/2012 34,333.61 Aah Pharmaceuticals Ltd Raw Materials/Consumables 14/09/2012 27,293.03 Aah Pharmaceuticals Ltd Raw Materials/Consumables 01/10/2012 38,296.30 Aah Pharmaceuticals Ltd Raw Materials/Consumables 05/10/2012 47,852.08 Aah Pharmaceuticals Ltd Raw Materials/Consumables 19/10/2012 25,589.61 Aah Pharmaceuticals Ltd Raw Materials/Consumables 24/10/2012 27,223.28 Aah Pharmaceuticals Ltd Raw Materials/Consumables 26/10/2012 47,767.84 Aah Pharmaceuticals Ltd Stock: General Stores 14/11/2012 73,559.59 Aah Pharmaceuticals Ltd Stock: General Stores 19/11/2012 27,603.71 Aah Pharmaceuticals Ltd Stock: General Stores 29/11/2012 31,636.42 Aah Pharmaceuticals Ltd Stock: General Stores 30/11/2012 26,664.62 Aah Pharmaceuticals Ltd Stock: General Stores 07/12/2012 48,285.45 Aah Pharmaceuticals Ltd Stock: General Stores 13/12/2012 33,238.28 Aah Pharmaceuticals Ltd Stock: General Stores 21/12/2012 68,709.18 Aah Pharmaceuticals Ltd Stock: General Stores 10/01/2013 66,059.89 Aah Pharmaceuticals Ltd Stock: General Stores 11/01/2013 43,031.90 Aah Pharmaceuticals Ltd Stock: General Stores 14/01/2013 35,639.75 Aah Pharmaceuticals Ltd Stock: General Stores 07/02/2013 40,219.78 Aah Pharmaceuticals Ltd Stock: General Stores 11/03/2013 53,242.63 Aah Pharmaceuticals Ltd Stock: General Stores 14/03/2013 27,947.55 Aah Pharmaceuticals Ltd Stock: General Stores 21/03/2013 33,331.85 Aah Pharmaceuticals Ltd Stock: General Stores 22/03/2013 26,787.45 Aah Pharmaceuticals Ltd Total 1,638,362.34 Abbott Laboratories Ltd* Raw Materials/Consumables 02/04/2012 25,521.48 Abbott Laboratories Ltd* Raw Materials/Consumables 13/04/2012 30,613.36 Abbott Laboratories Ltd* Raw Materials/Consumables 30/04/2012 33,949.67 Analysed Gross Supplier Name Analysis of Expenditure Date Paid Detail Abbott Laboratories Ltd* Raw Materials/Consumables 04/05/2012 38,835.05 Abbott Laboratories Ltd* Raw Materials/Consumables 01/06/2012 25,984.44 Abbott Laboratories Ltd* Raw Materials/Consumables 06/07/2012 34,750.30 Abbott Laboratories Ltd* Raw Materials/Consumables 13/07/2012 29,051.89 Abbott Laboratories Ltd* Chemicals 17/10/2012 32,265.36 Abbott Laboratories Ltd* Total 250,971.55 Abbvie Limited Raw Materials/Consumables 06/08/2012 57,727.62 Abbvie Limited Raw Materials/Consumables 24/08/2012 43,437.93 Abbvie Limited Raw Materials/Consumables 14/09/2012 32,071.78 Abbvie Limited Raw Materials/Consumables 20/09/2012 25,498.92 Abbvie Limited Raw Materials/Consumables 24/09/2012 28,958.58 Abbvie Limited Raw Materials/Consumables 12/10/2012 43,851.56 Abbvie Limited Raw Materials/Consumables 19/10/2012 42,632.80 Abbvie Limited Raw Materials/Consumables 30/10/2012 28,958.58 Abbvie Limited Stock: General Stores 23/11/2012 29,595.06 Abbvie Limited Stock: General Stores 07/12/2012 28,271.68 Abbvie Limited Stock: General Stores 08/01/2013 67,553.10 Abbvie Limited Stock: General Stores 09/01/2013 36,405.07 Abbvie Limited Stock: General Stores 15/02/2013 26,174.38 Abbvie Limited Stock: General Stores 28/02/2013 32,268.13 Abbvie Limited Stock: General Stores 11/03/2013 55,435.00 Abbvie Limited Total 578,840.19 Abena Uk Ltd Incontinence Pads 18/04/2012 109,655.46 Abena Uk Ltd Flat Bed Pads 25/05/2012 104,692.04 Abena Uk Ltd Flat Bed Pads 15/06/2012 129,613.60 Abena Uk Ltd Flat Bed Pads 20/07/2012 124,312.37 Abena Uk Ltd Flat Bed Pads 29/08/2012 117,894.86 Abena Uk Ltd Total 586,168.33 Adt Fire And Security* Repairs Fire Fighting Equip 04/05/2012 59,169.11 Adt Fire And Security* Total 59,169.11 Advanced Bionics Uk Ltd Med/Surg Equip Purchase 13/06/2012 25,500.00 Advanced Bionics Uk Ltd Med/Surg Equip Purchase 10/09/2012 31,440.00 Advanced Bionics Uk Ltd Total 56,940.00 Advanced Health And Care Limited Serv Contract Computers 04/05/2012 27,946.98 Advanced Health And Care Limited Serv Contract Computers 15/08/2012 27,946.98 Advanced Health And Care Limited Total 55,893.96 Advanced Health And Care Ltd Serv Contract Computers 12/12/2012 27,946.98 Advanced Health And Care Ltd Serv Contract Computers 11/02/2013 27,946.98 Advanced Health And Care Ltd Total 55,893.96 Aedas Architects Ltd Architect / Surveyor Fees 18/04/2012 36,000.00 Aedas Architects Ltd Total 36,000.00 Alliance Healthcare (Distribution) Ltd Raw Materials/Consumables 02/04/2012 75,364.38 Alliance Healthcare (Distribution) Ltd Raw Materials/Consumables 10/04/2012 52,866.76 Alliance Healthcare (Distribution) Ltd Raw Materials/Consumables 20/04/2012 80,891.57 Analysed Gross Supplier Name Analysis of Expenditure Date Paid Detail Alliance Healthcare (Distribution) Ltd Raw Materials/Consumables 30/04/2012 68,218.93 Alliance Healthcare (Distribution) Ltd Raw Materials/Consumables 04/05/2012 25,819.45 Alliance Healthcare (Distribution) Ltd Raw Materials/Consumables 11/05/2012 53,718.03 Alliance Healthcare (Distribution) Ltd Raw Materials/Consumables 18/05/2012 64,526.91 Alliance Healthcare (Distribution) Ltd Raw Materials/Consumables 25/05/2012 51,987.51 Alliance Healthcare (Distribution) Ltd Raw Materials/Consumables 01/06/2012 26,954.58 Alliance Healthcare (Distribution) Ltd Raw Materials/Consumables 08/06/2012 40,378.56 Alliance Healthcare (Distribution) Ltd Raw Materials/Consumables 15/06/2012 68,919.29 Alliance Healthcare (Distribution) Ltd Raw Materials/Consumables 22/06/2012 49,994.87 Alliance Healthcare (Distribution) Ltd Raw Materials/Consumables 29/06/2012 47,163.34 Alliance Healthcare (Distribution) Ltd Raw Materials/Consumables 06/07/2012 32,257.46 Alliance Healthcare (Distribution) Ltd Raw Materials/Consumables 13/07/2012 60,940.78 Alliance Healthcare (Distribution) Ltd Raw Materials/Consumables 18/07/2012 36,439.89 Alliance Healthcare (Distribution) Ltd Raw Materials/Consumables 20/07/2012 37,559.46 Alliance Healthcare (Distribution) Ltd Raw Materials/Consumables 27/07/2012 49,352.63 Alliance Healthcare (Distribution) Ltd Raw Materials/Consumables 03/08/2012 62,356.90 Alliance Healthcare (Distribution) Ltd Raw Materials/Consumables 10/08/2012 68,457.42 Alliance Healthcare (Distribution) Ltd Raw Materials/Consumables 17/08/2012 41,415.79 Alliance Healthcare (Distribution) Ltd Raw Materials/Consumables 24/08/2012 59,166.29 Alliance Healthcare (Distribution) Ltd Raw Materials/Consumables 31/08/2012 40,997.01 Alliance Healthcare (Distribution) Ltd Raw Materials/Consumables 07/09/2012 55,762.77 Alliance Healthcare (Distribution) Ltd Raw Materials/Consumables 14/09/2012 36,969.53 Alliance Healthcare (Distribution) Ltd Raw Materials/Consumables 20/09/2012 42,169.45 Alliance Healthcare (Distribution) Ltd Raw Materials/Consumables 01/10/2012 63,962.10 Alliance Healthcare (Distribution) Ltd Raw Materials/Consumables 05/10/2012 34,759.84 Alliance Healthcare (Distribution) Ltd Raw Materials/Consumables 12/10/2012 57,275.50 Alliance Healthcare (Distribution) Ltd Raw Materials/Consumables 19/10/2012 43,407.97 Alliance Healthcare (Distribution) Ltd Raw Materials/Consumables 26/10/2012 63,428.98 Alliance Healthcare (Distribution) Ltd Total 1,593,483.95 Alliance Healthcare (Practice Ac) Stock: General Stores 14/11/2012 135,877.46 Alliance Healthcare (Practice Ac) Stock: General Stores 16/11/2012 28,949.77 Alliance Healthcare (Practice Ac) Stock: General Stores 19/11/2012 45,799.13 Alliance Healthcare (Practice Ac) Stock: General Stores 28/11/2012 35,000.44 Alliance Healthcare (Practice Ac) Stock: General Stores 29/11/2012 60,403.22 Alliance Healthcare (Practice Ac) Stock: General Stores 30/11/2012 29,117.97 Alliance Healthcare (Practice Ac) Stock: General Stores 07/12/2012 72,464.18 Alliance Healthcare (Practice Ac) Stock: General Stores 21/12/2012 111,668.60 Alliance Healthcare (Practice Ac) Stock: General Stores 08/01/2013 26,588.20 Alliance Healthcare (Practice Ac) Stock: General Stores 10/01/2013 53,860.86 Alliance Healthcare (Practice Ac) Stock: General Stores 11/01/2013 37,176.41 Alliance Healthcare (Practice Ac) Stock: General Stores 14/01/2013 37,997.62 Alliance Healthcare (Practice Ac) Stock:
Recommended publications
  • North Ayrshire Council to Be Held in the Council Chambers, Cunninghame House, Irvine on MONDAY 23 MAY 2016 at 10.00 A.M
    Cunninghame House, Irvine. 19 May 2016 Audit Committee You are requested to attend a Meeting of the above mentioned Committee of North Ayrshire Council to be held in the Council Chambers, Cunninghame House, Irvine on MONDAY 23 MAY 2016 at 10.00 a.m. to consider the undernoted business. Yours faithfully Elma Murray Chief Executive 1. Declarations of Interest Members are requested to give notice of any declarations of interest in respect of items of business on the Agenda. 2. Minutes (Page 7) The accuracy of the Minutes of the meeting of the Committee held on 15 February 2016 will be confirmed and the Minutes signed in accordance with Paragraph 7 (1) of Schedule 7 of the Local Government (Scotland) Act 1973 (copy enclosed). 3. School Funds (Page 11) Submit report by the Executive Director (Education & Youth Employment) on the actions following the recent School Fund Internal Audit investigation (copy enclosed). North Ayrshire Council, Cunninghame House, Irvine KA12 8EE Reports for Approval 4. Internal Audit Reports issued (Page 15) Submit report by the Executive Director (Finance and Corporate Support) on the findings of Internal Audit work completed between 1 February and 30 April 2016 (copy enclosed). 5. Internal Audit and Corporate Fraud Action Plans: Quarter 4 update (Page 29) Submit report by the Executive Director (Finance and Corporate Support) on progress made by Council services in implementing the agreed actions from Internal Audit and Corporate Fraud reports as at 31 March 2016 (copy enclosed). 6. Annual Governance Statement 2015/16 (Page 39) Submit report by the Executive Director (Finance and Corporate Support) on the Council's Annual Governance Statement for 2015/16 which will be included within the Annual Accounts (copy enclosed).
    [Show full text]
  • Chapter 6 Landscape and Visual
    Chapter 6 Landscape and Visual www.scottishpowerrenewables.com Clauchrie Windfarm December, 2019 Environmental Impact Assessment Report Table of contents 6.4.5.2 Visualisations 18 6.5 Baseline Conditions 18 6.5.1 Introduction 18 6.1 Introduction 6 6.5.2 Landscape Baseline - Overview 18 6.1.1 Background 6 6.5.2.1 Site Context 18 6.1.2 The proposed Development 6 6.5.2.2 Landscape Character 18 6.1.3 Study Area 6 6.5.2.3 Landscape Designations 19 6.5.2.4 Merrick Wild Land Area (WLA) 19 6.2 Legislation, Policy and Guidelines 7 6.5.3 Visual Baseline Overview 19 6.2.1 Legislation 7 6.5.3.1 Blade Tip ZTV 19 6.2.2 Policy 7 6.5.3.2 Blade Tip ZTV with Potential Forestry Screening 20 6.2.2.1 European Landscape Convention (ELC) 7 6.5.3.3 Hub Height ZTV 20 6.2.2.2 National Planning Framework 3 (NPF3) 7 6.5.3.4 Horizontal Angle ZTV 20 6.2.2.3 National Planning Framework 4 (NPF4) 7 6.5.3.5 Overview of Principal Visual Receptors 20 6.2.2.4 Scottish Planning Policy (SPP) 7 6.5.3.5.1 Settlement 20 6.2.2.5 SNH Spatial Planning for Onshore Wind Turbines 7 6.5.3.5.2 Roads 21 6.2.2.5.1 National Scenic Areas 7 6.5.3.5.3 Rail Routes 21 6.2.2.5.2 Gardens and Designed Landscapes 8 6.5.3.5.4 Ferry Routes 21 6.2.2.5.3 Wild Land 8 6.5.3.5.5 Recreational Routes 21 6.2.2.6 South Ayrshire Local Development Plan Policy 8 6.5.3.5.5.1 Southern Upland Way (SUW) 21 6.2.2.6.1 LDP Policy: Landscape Quality 8 6.5.3.5.5.2 Other Long-Distance Footpaths 21 6.2.2.6.2 LDP Policy: Protecting the Landscape 8 6.5.3.5.5.3 Local Paths Network 21 6.2.2.6.3 LDP Policy: Dark Skies 8 6.5.3.5.5.4
    [Show full text]
  • Abbreviated Dental List As at 1St March 2020
    Ayrshire and Arran Health Board Abbreviated Dental List as at 1st March 2020 Dental Practitioners Providing General Dental Services Name of Address of Practice Contact Numbers ARDROSSAN – NORTH AYRSHIRE Brian A. Collins B A Collins Dental Surgery Angela Reid 1 Eglinton Road 01294 464431 Lynsey Curran KA22 8LL Stephen Reid Sergiusz Przygoda Ardrossan Dental Care 01294 603468 31 Glasgow Street KA22 8EP AUCHINLECK – EAST AYRSHIRE Iain Gillan Sorn Road Dental Practice 01290 421043 29 Sorn Road KA18 2HR AYR – SOUTH AYRSHIRE Kirsteen Henderson K Ayr Dental Surgery 01292 266554 Cristina Rodriguez-Vico 34 New Road fax: 01292 619877 KA8 8EX James McCall Alloway Place Dental Care 01292 263103 Jennifer McCall 1 Alloway Place Anjuli Hunter KA7 2AA Ainsley Coats Edward Coote David Shields Barns Street Dental Practice 01292 263550 Fiona Piper 19 Barns Street fax: 01292 880824 John-Paul Flanigan KA7 1XB Lorna Johnston Sadagathi Mangalampalli Gurveer Basi 1 AYR – SOUTH AYRSHIRE Name of Dentists Address of Practice Contact Numbers Donald Morrison Quadrant Dental Practice 01292 268880 Peter Byrne 3 Barns Street fax: 01292 268323 Kirsty Dukes KA7 1XB Conor Morgan Elliot Braddock Michael Lewis Sukhada Bal Ayr Dental Studio 01292 280323 Boswell House Arthur Street KA7 1QU Mark Fitzpatrick Sandgate Dentistry 01292 266587 Robert Carter 59/61 Sandgate Fiona Stanbridge KA7 1DA Aparna Subhedar Per Andersson Andersson Dental Care 01292 283644 Lindsay Andersson 14B Fullarton Street fax: 01292 619708 KA7 1UB Greg Thorburn Fullarton Dental Care 01292 264558 Claudia
    [Show full text]
  • Scottish Sustainable Communities Initiative 2 Years On
    Edinburgh Research Explorer Speirs Lock Masterplan Citation for published version: Rankin, C & Fraser, K, Speirs Lock Masterplan: Regeneration Masterplan , 2008, Design. <http://www.scotland.gov.uk/Topics/Built-Environment/AandP/Projects/SSCI> Link: Link to publication record in Edinburgh Research Explorer Document Version: Early version, also known as pre-print General rights Copyright for the publications made accessible via the Edinburgh Research Explorer is retained by the author(s) and / or other copyright owners and it is a condition of accessing these publications that users recognise and abide by the legal requirements associated with these rights. Take down policy The University of Edinburgh has made every reasonable effort to ensure that Edinburgh Research Explorer content complies with UK legislation. If you believe that the public display of this file breaches copyright please contact [email protected] providing details, and we will remove access to the work immediately and investigate your claim. Download date: 08. Oct. 2021 two years on two years on © Crown copyright 2011 ISBN: 978-0-7559-9906-4 The Scottish Government St Andrew’s House Edinburgh EH1 3DG Produced for the Scottish Government by APS Group Scotland DPPAS11112 (03/11) Published by the Scottish Government, March/2011 This document is also available on the Scottish Government website : www.scotland.gov.uk Scottish Sustainable Communities Initiative: Two years on 03 Preface The factors which contribute to the creation of successful communities involve a complex interplay of environmental, social and economic issues at all scales. The Scottish Sustainable Communities Initiative (SSCI), launched in 2008, sets out to encourage and support approaches to planning in Scotland that consider these many interconnections and take an holistic approach to the creation of high quality places where communities can flourish.
    [Show full text]
  • Cameron Duncan-Cox 120007535
    An Evaluation of Tornagrain A Scottish New Urbanist Town Property Development Processes UP51005 2020/21 Cameron Duncan-Cox 120007535 F0.1 - Front Cover Graphic Personally edited from Early Tornagrain Concept Illustration[ F0.2 - Early Tornagrain Concept Illustration [https://i.pinimg.com/originals/8c/fc/3b/8cfc3b8b39cd18008fd5acff762a2791.jpg] Page Intentionally Left Blank Executive Summary Contents This report aims to evaluate the growing New Urbanist settlement 01 - Megaprojects & Contexual Framework 7 of Tornagrain, which is located in the Scottish Highlands, and 1.1 - Tornagrain as a megaproject 8 communicate an understanding of how this project was informed by 1.2 -Socioeconomic Context 10 Poundbury and in turn informs Chapelton. 1.3 - Planning Policy Context 12 Tornagrain qualifi es as a megaproject by virtue of its brief which shares characteristics of other projects with comparable scale and 02 - Critical Evaluation Framework 15 cost and through contextual framework it describes the premise for 2.1 -Evaluation Framework 16 Tornagrain’s conception. 2.2 - Front End Planning 16 2.3 - Land Ownership 17 To evaluate the development, a critical evaluation framework was 2.4 - Securing Funding 18 devised. It analyses the key components of Moray Estates Development 2.5 - Establishing Design Team 19 Company’s (MEDCO) front end planning which sought to understand 2.6 - Establishing Principles 20 it’s established counterpart in England. It utilised a charrette workshop 2.7 - Project Feasibility 21 to provide opportunity for early community engagement. From both of which a design was formulated to ensure the New Urbanist 2.8 - Project Governance 23 fundamentals within its Scottish context. 2.9 - Stakeholders 24 2.10- Design Code 26 However, the phased project is signifi cantly behind schedule.
    [Show full text]
  • C17 Land Disposal Notice- Coal Road, Auchinleck, East Ayrhsire 22 July 2020
    Les Waters Senior Manager, Licensing Email: [email protected] 22 July 2020 Company Secretary Network Rail Infrastructure Limited 1 Eversholt Street London NW1 2DN Network licence Condition 17 (land disposal): Coal Road, Auchinleck, East Ayrshire Decision 1. On 23 June 2020, Network Rail gave notice of its intention to dispose of land at Coal Road, Auchinleck, East Ayrshire (“the land”), in accordance with Condition 17 of its network licence. The land is described in more detail in the notice (copy attached). 2. We have considered the information supplied by Network Rail including the responses received from third parties consulted. For the purposes of Condition 17 of Network Rail’s network licence, ORR consents to the disposal of the land in accordance with the particulars set out in its notice. Reasons for decision 3. We are satisfied that Network Rail has consulted relevant stakeholders with current information and no objections were received. 4. In considering the proposed disposal, we note that: there is no evidence that railway operations would be affected adversely; Network Rail completed the process to remove the land from the strategic freight site list in 2018; and no other reasonably foreseeable railway use for the land was identified. 5. Based on all the evidence we have received and taking into account all the material facts and views relevant to our consideration under Condition 17, we are satisfied that there are no issues for us to address. 6. We have had regard to our decision criteria in Land disposal by Network Rail: The regulatory arrangements, October 2019,1 and balanced our section 4 duties given to us under the Railways Act 1993.
    [Show full text]
  • CSGN Business Case Study
    Case Study 07 Hope Homes: Knockroon The Knockroon vision combines residential, retail, business and community use buildings with sustainability at the heart of the development. This is not only evident in the design of the buildings and public realm, but also through the high level of local engagement which takes place with neighbouring communities. Business Benefi ts Wider Benefi ts • Sustainability attracts interest - footfall to the • The local economy was boosted by an increase site is high and it is hoped this will convert into in jobs during the construction phase. house sales. • Local residents and school children have • Hope Homes is generating additional work by benefi ted from on-site training and opportunities developing a reputation for sustainable housing. to engage in the development. • Working with the local community has enabled • A wide variety of habitats have been created for the business to create green garden products local birds and mammals, trees and hedgerows which are sold to schools and visitors. have also been planted. Recognition Scottish Sustainable Communities Initiative : Exemplar Project Context “Creating sustainable and green The Prince’s Charitable Foundation purchased Dumfries neighbourhoods is all about fi nding solutions House and the surrounding estate including Knockroon Farm in 2007, with the ambition to create a new model for that will stand the test of time – not about economic, social and ecological renewal in East Ayrshire. gimmicks or quick fi xes.” Following an extensive Enquiry by Design workshop in Hank Dittmar, Chief Executive, The Prince’s 2008, a masterplan for Knockroon was developed and Foundation. approved. The idea was to create a showcase community estate with a distinctive design, taking into account local architectural traditions, whilst incorporating the latest in Selling homes using Green Infrastructure sustainability measures.
    [Show full text]
  • New Series, Volume 19, 2018
    NEW SERIES, VOLUME 19, 2018 DISCOVERY AND EXCAVATION IN SCOTLAND A’ LORG AGUS A’ CLADHACH AN ALBAINN NEW SERIES, VOLUME 19 2018 Editor Paula Milburn Archaeology Scotland Archaeology Scotland is a voluntary membership organisation, which works to secure the archaeological heritage of Scotland for its people through education, promotion and support: • education, both formal and informal, concerning Scotland’s archaeological heritage • promotion of the conservation, management, understanding and enjoyment of, and access to, Scotland’s archaeological heritage • support through the provision of advice, guidance, resources and information related to archaeology in Scotland Our vision Archaeology Scotland is the leading independent charity working to inspire people to discover, explore, care for and enjoy Scotland’s archaeological heritage. Our mission …to inspire the discovery, exploration, stewardship and enjoyment of Scotland’s past. Membership of Archaeology Scotland Membership is open to all individuals, local societies and organisations with an interest in Scottish archaeology. Membership benefits and services include access to a network of archaeological information on Scotland and the UK, three newsletters a year, the annual edition of the journal Discovery and excavation in Scotland, and the opportunity to attend Archaeology Scotland’s annual Summer School and the Archaeological Research in Progress conference. Further information and an application form may be obtained from Archaeology Scotland Email [email protected] Website www.archaeologyscotland.org.uk A’ lorg agus a’ cladhach an Albainn The Gaelic translation of Discovery and excavation in Scotland was supplied by Margaret MacIver, Lecturer in Gaelic and Education, and Professor Colm O’Boyle, Emeritus Professor, both at the Celtic, School of Language and Literature, University of Aberdeen.
    [Show full text]
  • Scottish Sustainable Communities Initiative 2 Years On
    Edinburgh Research Explorer Speirs Lock Masterplan Citation for published version: Rankin, C & Fraser, K, Speirs Lock Masterplan: Regeneration Masterplan , 2008, Design. <http://www.scotland.gov.uk/Topics/Built-Environment/AandP/Projects/SSCI> Link: Link to publication record in Edinburgh Research Explorer Document Version: Early version, also known as pre-print General rights Copyright for the publications made accessible via the Edinburgh Research Explorer is retained by the author(s) and / or other copyright owners and it is a condition of accessing these publications that users recognise and abide by the legal requirements associated with these rights. Take down policy The University of Edinburgh has made every reasonable effort to ensure that Edinburgh Research Explorer content complies with UK legislation. If you believe that the public display of this file breaches copyright please contact [email protected] providing details, and we will remove access to the work immediately and investigate your claim. Download date: 09. Oct. 2021 two years on two years on © Crown copyright 2011 ISBN: 978-0-7559-9906-4 The Scottish Government St Andrew’s House Edinburgh EH1 3DG Produced for the Scottish Government by APS Group Scotland DPPAS11112 (03/11) Published by the Scottish Government, March/2011 This document is also available on the Scottish Government website : www.scotland.gov.uk Scottish Sustainable Communities Initiative: Two years on 03 Preface The factors which contribute to the creation of successful communities involve a complex interplay of environmental, social and economic issues at all scales. The Scottish Sustainable Communities Initiative (SSCI), launched in 2008, sets out to encourage and support approaches to planning in Scotland that consider these many interconnections and take an holistic approach to the creation of high quality places where communities can flourish.
    [Show full text]
  • Malcolm Logistics Voted 3PL of the Year
    GROUP 24 THE MALCOLM GROUP magazine issue eleven Malcolm Logistics voted 3PL of the year In this issue: Q&A with the Group’s own Robert Deans Page 08 Malcolm Memories Page 18 IVECO Handover Page 28 Barony Campus Page 32 practical solutions, successful partnerships Eleventh Issue December 2018 2 24 3 Welcome to the eleventh edition of 24 seven! Remembering… This has been an exceptional year for the Malcolm Group with high points across all of the divisions. Sadly this year we have lost 3 Malcolm I’ve known George since I was a boy but I really got to Directors who were instrumental in making know him after in 1983 deciding that a career in chartered In this edition of 24 Seven we have our usual mix of news the business what it is today. accounting wasn’t for me and joining WH Malcolm stories, a Q&A with Logistics Fleet Engineer Robert Deans with George as my boss. If I had to describe George’s and details of our prestigious awards and accreditations management training style it was definitely more stick than received throughout the year, a new exciting project for George Walker carrot. Looking back it was definitely the best management Malcolm Construction and updates on some of the charities training I could have had. Thereafter, we became good and events we have contributed to in the past year. George was born in Bellshill in 1945. Dux at school, friends and trusted colleagues and rarely made an important he went on to study maths and pure science at decision without discussing it with each other first.
    [Show full text]
  • Knockroon Learning & Enterprise Campus
    East Ayrshire Council: Knockroon Learning & Enterprise Campus Strategic Brief : Main Document Rev A: Final edits 18/02/16 Directors Maggie Barlow T 07771 926507 E [email protected] Kirstine Robinson T 07853 322820 E [email protected] 1.0 Introduction 05 4.0 Key constructs 29 1.1 The strategic brief & this 06 4.1 Introducing the SPACE budget 31 4.7 Secondary 50 document 4.1.1 Uplifts 4.7.1 Organisational principles 51 1.2 The existing facilities 07 4.1.2 Area Caps 4.7.2 Generic teaching spaces 52 1.3 The engagement process 09 4.1.3 Potential variations to area 4.7.3 Specialist teaching spaces 54 1.4 Managing change 11 4.2 Critical Constructs 32 4.7.4 Student support 62 4.2.1 Measuring GIA 4.7.5 Learning plazas 63 2.0 Vision & Aspiration 13 4.2.2 Circulation & NEA 4.8 Secondary SLC 64 4.2.3 The SPACE planning grid 4.8.1 Organisational principles 64 4.3 ASN (Hillside) 33 4.8.2 Class bases 65 4.3.1 Organisational principles 35 4.8.3 Retreat 65 2.1 Seamless transitions 14 4.3.2 Class bases & retreat spaces 35 4.8.4 Support 65 2.2 Community at the heart 14 4.3.3 Storage 37 4.9 Whole campus spaces 66 2.3 Nurture & support 15 4.3.4 Flexible use space 38 4.9.1 Project spaces 67 2.4 Learning spaces not teaching spaces 16 4.3.5 Specialist learning spaces 39 4.9.2 Library (LRC) 67 2.5 Embedded digital approaches 16 4.3.6 Hydrotherapy pool 39 4.9.3 Flexible learning space 68 2.6 Health & Wellbeing 17 4.4 Early Childhood Centre 40 4.9.4 Assembly / Performance 68 2.7 Entrepreneurship & employability 17 4.4.1 Key principles (current
    [Show full text]
  • KNOCKROON: a SUSTAINABLE DEVELOPMENT in EAST AYRSHIRE Anne and Ian Hope Gave Arran Civic Trust an Insight Into
    KNOCKROON: A SUSTAINABLE DEVELOPMENT IN EAST AYRSHIRE www.knockroon.com Anne and Ian Hope gave Arran Civic Trust an insight into the Master Plan and development of Knockroon, supported by the Prince’s Foundation, which in partnership with other bodies bought Dumfries House and estate for £45M. The house was built by the Adam Brothers and with superb furniture designed for the house by Chippendale and Scottish furniture makers. Knockroon is being built on the outskirts of Cumnock. The Master Plan was drawn up following a weeklong consultation with many different stakeholders. Zero C involved in designs, as they were in the Poundbury buildings in Dorset and the Olympic Village in Weymouth. The designs of houses are typical of Ayrshire houses of the late 17th century to the mid 19th century. The aim is to have a real sense of place. A register of typologies has been drawn up to include such things as gateposts, doors and external fittings, all of traditional designs. 770 dwellings will be built over 15-25 years and the pace of sales will determine the pace of build. Some clear criteria are in the Master Plan. 1. Walkable neighbourhood, building a sense of community. 2. Mix of sizes and types of dwellings. For all ages and backgrounds. 1, 2, 3, 4 and 5 bedrooms, flats and houses. 3. Workshops and workspaces within the development. 4. Demand important 5. Good connections to public transport. Auchinleck railway station is 1 mile away. 6. Slow down traffic especially cars so development pedestrian led. Minimisation of road signage, Roads that encourage slow speed; narrow and with bends.
    [Show full text]