M/S. Anandram Developers Pvt Ltd., Form-1
Total Page:16
File Type:pdf, Size:1020Kb
M/s. Anandram Developers Pvt Ltd., Form-1 FORM – I I. BASIC INFORMATION S. No. Item Details 1 Name of the project Proposed Hyper Mall/ Food court/ Multiplex/ Hotel/ Restaurants/ Shops / Commercial Units“Matrix Mall” by M/s. Anandram Developers Pvt Ltd 2 S. no. in the schedule 8 (a) 3 Proposed area Area Details: Total land area: 18149.26 m2 Proposed FSI : 45354.21 m2 Total built-up area: 88779.42 m2. 4 New/Expansion/Modernization Expansion of existing Environmental Clearance; Ref : Lr. No. SEIAA/ TN/ EC/ 8(a)/ 0013/ F-31/ 2008/ Dt: 03.10.2008 5 Existing capacity/Area etc Nil 6 Category of project i.e. „A‟ or „B‟ B 7 Does it attract the general No condition? If yes, please specify 8 Does it attract the specific No condition? If yes, please specify 9 Plot/Survey/Khasra No T.S. Nos: 8/1 (Part), 8/2 to 8/30, 8/33, 13, 14, 15 in Block No.44 Village Saligramam village Tehsil Mambalam Taluk District Chennai District State Tamilnadu 10 Nearest railway station/airport Railway station: Vadapalani Metro Railway Station along with distance in kms (1.0 km, NE) Airport: Chennai International airport (7.10 km, SW) (Source of information:- Google Earth Image) 11 Nearest town, city, district Town : Vadapalani (1.3 km, North-East direction) headquarters along with distance City : Chennai (8.3 km, North-East direction) in kms District headquarters : Chennai Corporation 12 Village panchayats, Zilla parishad, This proposed Commercial project comes under municipal corporation, local body CMDA (Complete postal addresses with Thalamuthu Natarajan Building, No. 1, Gandhi Irwin telephone nos. to be given) Road, Egmore, Chennai, Tamil Nadu 600008. 13 Name of the applicant M/s. Anandram Developers Pvt Ltd 14 Registered address M/s. Anandram Developers Pvt Ltd 1/460,Mount Poonamallee Road, Iyyapanthangal, Chennai-600056. 15 Address for correspondence: M/s.Anandram Developers Pvt Ltd Name Mukund Vijayan Designation Director Address Door No. 45 & 47, N.S.K Salai ( Arcot Road), Saligramam, Chennai. M/s. Eco Tech Labs Pvt Ltd., Chennai. Page 17 M/s. Anandram Developers Pvt Ltd., Form-1 S. No. Item Details Pin code 600026. E-mail [email protected] Telephone No. / Fax No. Tel: 9791939664 16 Details of alternative sites No alternative site is considered. examined, if any, Location of these sites should be shown on a topo sheet 17 Interlinked projects No interlinked projects 18 Whether separate application of No interlinked project has been submitted? 19 If yes, date of submission NA 20 If no, reason NA 21 Whether the proposal involves No approval/clearance under: if yes, details of the same and their status to be given. (a) The forest (conservation) Act, 1980? (b) The wild life (Protection) Act, 1972? (c) The CRZ Notification 1991 22 Whether there is any government No order/policy relevant/relating to the site 23 Forest land involved (hectares) No 24 Whether there is any litigation No pending against the project and/or land in which the project is propose to be set up? a) Name of the Court b) Case No c) Orders/directions of the court, if any and its relevance with the proposed project II. ACTIVITY 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies etc.) S. No. Information/Checklist Yes/No Details thereof (with approximate quantities /rates, confirmation wherever possible) with sources of information data 1.1 Permanent or temporary Yes Project site comes under Commercial Zone. Copy of change in land use, land land use certificate is enclosed as Annexure IV. cover or topography including increase in intensity of land use (with respect to local land use plan) M/s. Eco Tech Labs Pvt Ltd., Chennai. Page 18 M/s. Anandram Developers Pvt Ltd., Form-1 S. No. Information/Checklist Yes/No Details thereof (with approximate quantities /rates, confirmation wherever possible) with sources of information data 1.2 Clearance of existing No The construction of Mall/ Hotel/ Theatre Complex has land, vegetation and been 95% completed. It does not require any clearance buildings? of existing Land, Vegetation & Building. 1.3 Creation of new land Yes The vacant land has been transformed into a Mall/ uses? Hotel/ Theatre Complex. 1.4 Pre-construction Yes Geo-technical investigations have been carried out and investigations e.g. bore the copy of the report is enclosed as holes, soil testing ? Annexure VI. 1.5 Construction works? Yes Construction of Mall/ Hotel/ Theatre Complex has been completed up to 95%. It could be completed in a span of about 6 months. 1.6 Démolition Works? No The proposed site does not require demolition. 1.7 Temporary sites used for No All the construction activities including stacking of raw construction works or materials will be confined within the project site only. housing of construction No temporary labor hutments are proposed. Local workers? laborers from nearby areas will be hired for the work. Proper sanitation facilities for them will be provided at site. 1.8 Above ground buildings, Yes Details No. of levels Total Built up structures or earthworks of floors Area (Sq.m) including linear Block : A Basement+ structures, cut and fill or (Mall) Ground floor+ 57,140.35 excavations 12 Floors Block : B Ground level+ 28,974.79 (MLCP) 16 Levels Block : C Basement + 2664.06 (Sub- Station) Ground + 2 floors Total 88779.2 1.9 Underground works No No underground works including mining/ tunneling is including mining or required except excavation of earth for foundation & tunneling? basement as proposed within project site. 1.10 Reclamation Works? No No reclamation work required. 1.11 Dredging? No No dredging required. 1.12 Offshore structures? No No offshore structures required. 1.13 Production and No No production/manufacturing process involved. The manufacturing processes? proposed project is a residential development. 1.14 Facilities for storage of Yes Separate raw material handling yard will be located goods or materials? within the project site and separated by enclosures/barricades. Cement will be separately stored under cover in bales. Sand will be stacked under tarpaulin cover. 1.15 Facilities for treatment or Yes Solid Waste: Wastes generated will be collected from disposal of solid waste or the designated locations and segregated into Bio liquid effluents? degradable waste and non - bio degradable waste. The bio degradable waste will be collected, segregated and composted in the site, non biodegradable will be handed M/s. Eco Tech Labs Pvt Ltd., Chennai. Page 19 M/s. Anandram Developers Pvt Ltd., Form-1 S. No. Information/Checklist Yes/No Details thereof (with approximate quantities /rates, confirmation wherever possible) with sources of information data over to the recyclers. Liquid Effluent: During the construction phase, sewage generated from the project will be disposed by Septic tank and soak pit arrangements. During operational phase also, sewage generated from the project will be treated in the proposed STP. 1.16 Facilities for long term No None housing of operational workers? 1.17 New road, rail or sea No None traffic during construction or operation? 1.18 New road, rail, air No Project site is accessible and is well connected via waterborne or other network of rail & road. No new road, rail, air transport infrastructure waterborne or other transport infrastructure will be including new or altered developed. Only internal roads will be constructed for routes and stations, ports, facilitating movement of vehicles and connecting the airports etc? site to the existing roads. 1.19 Closure or diversion of No None existing transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted No There will not be any new/diverted transmission lines or transmission lines or pipelines around the proposed project. pipelines? 1.21 Impoundment, damming, No No impoundment, damming, culverting, realignment or culverting, realignment or other changes to the hydrology of surface watercourses other changes to the is proposed. hydrology of watercourses or aquifers? 1.22 Stream crossings? No There are no streams running across the site 1.23 Abstraction or transfers No None of water from ground or surface waters? 1.24 Changes in water bodies No None or the land surface affecting drainage or run- off? 1.25 Transport of personnel or Yes Transportation of personnel and material by road will be materials for necessary for the contractors during the construction construction, operation or phase. decommissioning? 1.26 Long-term dismantling or No None decommissioning which could have an impact on the environment? 1.27 Ongoing activity during No None M/s. Eco Tech Labs Pvt Ltd., Chennai. Page 20 M/s. Anandram Developers Pvt Ltd., Form-1 S. No. Information/Checklist Yes/No Details thereof (with approximate quantities /rates, confirmation wherever possible) with sources of information data decommissioning which could have an impact on the environment? 1.28 Influx of people to an Yes There will be a permanent influx of people after the area in either temporarily construction phase. or permanently? 1.29 Introduction of alien No None species? 1.30 Loss of native species or No None genetic diversity? 1.31 Any other actions? No None 2. Use of Natural resources for construction or operation of the Project (Such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): S. No. Information/Checklist Yes/ Details thereof (with approximate quantities / confirmation No rates, wherever possible) with sources of information data 2.1 Land especially undeveloped Yes Land is earmarked for commercial development or agricultural land (ha) as per master development plan of the area. 2.2 Water (expected source & Yes Construction Stage: competing users) Unit: KLD About 10 KLD of water will be required during the peak construction phase and it will be sourced through private tankers groundwater.