Inter Island Ferry Services Summer 2019 Timetables

Total Page:16

File Type:pdf, Size:1020Kb

Inter Island Ferry Services Summer 2019 Timetables Item: 11 Development and Infrastructure Committee: 13 November 2018. Inter-Island Ferry Services – Proposed Summer 2019 Timetables. Report by Executive Director of Development and Infrastructure. 1. Purpose of Report To consider the proposed inter-island ferry services timetables for summer 2019. 2. Recommendations The Committee is invited to note: 2.1. That the inter-island ferry services timetables for summer 2019 are scheduled to operate from 5 May to 30 September 2019. 2.2. That draft timetables in respect of ferry services to be operated by Orkney Ferries Limited during summer 2019 were presented to the Ferry Services Consultative Forum for consideration on 22 August 2018, with main comments and representations from transport representatives outlined in section 4 of this report. 2.3. That, on 20 September 2018, the proposed timetables, together with feedback from the Ferry Services Consultative Forum, were considered by the Board of Orkney Ferries Limited and recommended to the Council for implementation. 2.4. That the proposed timetables, attached as Appendix 1 to this report, remain consistent with those operated during summer 2018, including the option of including the Tuesday and Thursday return link from Eday to Sanday for education purposes, which is currently being trialled. 2.5. That, in the event the trial referred to above does not continue, the timetable in respect of the Outer North Isles would revert to the level of service operated during summer 2017, attached as Appendix 2 to this report. Page 1. 2.6. That, in advance of the Council’s budget setting process for 2019 to 2020 being concluded, any decision on the proposed Orkney Ferries summer timetable for 2019 will be subject to an adequate service revenue budget being established for financial year 2019 to 2020. It is recommended: 2.7. That, subject to an adequate service revenue budget being established for financial year 2019 to 2020 and subject to the trial of a Tuesday and Thursday return link from Eday to Sanday continuing, the timetables in respect of ferry services to be operated by Orkney Ferries Limited during summer 2019, attached as Appendix 1 to this report, be approved. 2.8. That, should the trial referred to at paragraph 2.7 above not continue, the timetable in respect of ferry services to be operated to the Outer North Isles during summer 2019, attached as Appendix 2 to this report, be approved. 3. Background 3.1. In accordance with the Service Level Agreements entered into by Orkney Ferries Limited and the Council, a recommendation from the Board of Orkney Ferries must be made via the Head of Marine Services, Engineering and Transportation in order for the winter and summer timetable periods to be approved by this Committee. 3.2. The draft timetables for summer 2019 were considered by the Ferry Services Consultative Forum on 22 August 2018. The key issues discussed at the Forum are outlined in section 4 below. The draft timetables are also circulated to Community Councils for consideration and comment in advance of the Consultative Forum meeting. 3.3. The draft timetables and feedback from the Forum were considered by the Board of Orkney Ferries Limited on 20 September 2018. 4. Ferry Services Consultative Forum 4.1. The Graemsay, Hoy and Walls, Rousay, Egilsay, Wyre and Gairsay, Shapinsay, Papa Westray and Flotta Community Councils had no comments on the proposed timetables for summer 2019. Page 2. 4.2. North Ronaldsay Community Council had no comment on the proposed timetable however, the representative requested that some resilience is given in order to get goods, particularly fresh food, to the island as quickly as possible if a ferry has to be cancelled. It was agreed that this would be considered further by Orkney Ferries Limited. 4.3. The Outer North Isles timetables were considered by the Forum, noting that the request from Education Services to provide an all year-round link from Eday to Sanday return had been incorporated. At the request of parents, a Tuesday and Thursday return link has been incorporated in the timetable, thereby enabling Eday S1 pupils to attend Sanday Junior High School two days per week. This was introduced on a trial basis from August 2018 and will be reviewed by Education Services in 2019. 4.4. The Eday Transport Representative referred to the Sunday timetable change, whereby Eday and Stronsay have been combined since 2017 due to high vehicle demand on the Sanday sailing. It was further noted that the timetable change had also affected Sunday excursions, and therefore, a request was made to link Eday and Sanday and Eday and Westray for a number of excursion dates if possible. 4.5. The Stronsay Transport Representative made a request to revert back to a direct sailing to Stronsay on a Sunday, consistent with the request made from the Eday Transport Representative. 4.6. Reflecting the requests made above, the Sanday Transport Representative requested a link to allow Eday residents to come to Sanday to attend church on Sunday. 4.7. In considering the requests to revise the routing of Sunday sailings, consideration has been given to the usage of these services in prior years, notably vehicle carryings. The data supplied by Orkney Ferries Limited for the 21 Sundays of operation in summer 2018 show that on average the first and return sailings have much higher carryings of vehicles to Sanday than to Stronsay and Eday combined – on the afternoon return sailing for example, 30 per cent of the deck space remains available from Sanday, compared to 60 per cent of the deck space available on the Stronsay and Eday combined sailing. Furthermore, nearly 20 per cent of the Sanday return sailings to Kirkwall in the afternoon were running full, and a further 19 per cent had only up to 24 per cent of the deck space available. This is notably higher utilisation of the deck space than is the case for the combined Stronsay and Eday sailings on a Sunday, which, more often than not, sailed with more than half of the Page 3. deck space remaining available. The data for the 2018 summer Sundays is shown below. 1st Sailing from Kirkwall Return sailing from isles Outward sailing to isles in morning to isles in evening in evening Stronsay Stronsay Eday and Sanday Sanday Stronsay and Eday and Eday Sanday AVERAGE deck space 62% 71% 30% 60% 64% 88% remaining available 75-100% of deck space 33% 57% 5% 33% 29% 95% remained available 50 - 74% 43% 33% 19% 52% 57% 5% 25 - 49% 19% 5% 38% 0% 10% 0% 1 - 24% 5% 0% 19% 14% 5% 0% Deck full 0% 5% 19% 0% 0% 0% 4.8. The Stronsay Transport Representative further requested amendments to the timetable for the Sanday Show and the Stronsay Massive Weekend to allow inter island travel. A change to the excursion from Westray to North Ronaldsay was also requested, to allow residents to attend the fun weekend on Stronsay. 4.9. The Ferry Services Manager agreed to consider these further requests regarding Sunday excursions and to report back via the Liaison Office as to whether these requests could be incorporated within the programme for summer 2019. 4.10. The Westray Transport Representative was unable to attend, however it had been requested, by email, that the Sunday Excursions are reconsidered. The North Ronaldsay Transport Representative advised that Sunday Excursions are a huge benefit to North Ronaldsay. With the exception of North Ronaldsay excursions, it is felt that consideration should be given to amending excursions in the future. 4.11. The discounted book of tickets was raised by Rousay, Egilsay, Wyre and Gairsay Community Council via memorandum and whether the vehicle books could be changed so that any family/household vehicle could be used rather than books issued per vehicle. It was noted that a Road Equivalent Tariff type tariff is being considered for the inter-island ferry service network, which would in effect remove the existing books of tickets and unfairness associated with only obtaining a discount if bulk purchasing. It was agreed that the matter would be considered further by Page 4. Orkney Ferries Limited. Subsequently, the company has now implemented a change to vehicle books of tickets, such that households are now able to list two household vehicles per book of tickets. 4.12. As no further comments were made, it is recommended that the draft summer 2019 timetables, attached at Appendix 1 to this report, are approved, which includes retaining the Sunday link of Eday with Stronsay on the first sailing out from Kirkwall and subsequent afternoon return. Should the Eday education trial not continue, it is recommended that the timetable for the Outer North Isles, attached as Appendix 2 to this report, be operated. 5. Links to Council Plan 5.1. The proposals outlined in this report relate to improved outcomes for communities as outlined in the Council Plan strategic priority theme of Connected Communities. 5.2. The proposals in this report relate directly to Priority 1.9 Work with Scottish Government and other partners to progress the outcomes of the Inter Isles STAG (Strategic Transport Appraisal Guidelines) Strategic Business Cases in order to develop and then deliver the Outline and final Business Cases for improved inter isles transport services and the associated ferry, air and infrastructure improvements of the Council Delivery Plan. 6. Links to Local Outcomes Improvement Plan The proposals in this report support and contribute to improved outcomes for communities as outlined in the Local Outcomes Improvement Plan priority of Strong Communities. 7. Financial Implications 7.1. The timetables proposed in this report, attached as Appendix 1, represent a continuation of the existing level of service provision, with the exception of the option to accommodate and continue a link between Eday and Sanday on a Tuesday and Thursday which is currently being trialled for Education purposes.
Recommended publications
  • Results of the Seabird 2000 Census – Great Skua
    July 2011 THE DATA AND MAPS PRESENTED IN THESE PAGES WAS INITIALLY PUBLISHED IN SEABIRD POPULATIONS OF BRITAIN AND IRELAND: RESULTS OF THE SEABIRD 2000 CENSUS (1998-2002). The full citation for the above publication is:- P. Ian Mitchell, Stephen F. Newton, Norman Ratcliffe and Timothy E. Dunn (Eds.). 2004. Seabird Populations of Britain and Ireland: results of the Seabird 2000 census (1998-2002). Published by T and A.D. Poyser, London. More information on the seabirds of Britain and Ireland can be accessed via http://www.jncc.defra.gov.uk/page-1530. To find out more about JNCC visit http://www.jncc.defra.gov.uk/page-1729. Table 1a Numbers of breeding Great Skuas (AOT) in Scotland and Ireland 1969–2002. Administrative area Operation Seafarer SCR Census Seabird 2000 Percentage Percentage or country (1969–70) (1985–88) (1998–2002) change since change since Seafarer SCR Shetland 2,968 5,447 6,846 131% 26% Orkney 88 2,0001 2,209 2410% 10% Western Isles– 19 113 345 1716% 205% Comhairle nan eilean Caithness 0 2 5 150% Sutherland 4 82 216 5300% 163% Ross & Cromarty 0 1 8 700% Lochaber 0 0 2 Argyll & Bute 0 0 3 Scotland Total 3,079 7,645 9,634 213% 26% Co. Mayo 0 0 1 Ireland Total 0 0 1 Britain and Ireland Total 3,079 7,645 9,635 213% 26% Note 1 Extrapolated from a count of 1,652 AOT in 1982 (Meek et al., 1985) using previous trend data (Furness, 1986) to estimate numbers in 1986 (see Lloyd et al., 1991).
    [Show full text]
  • Cruising the ISLANDS of ORKNEY
    Cruising THE ISLANDS OF ORKNEY his brief guide has been produced to help the cruising visitor create an enjoyable visit to TTour islands, it is by no means exhaustive and only mentions the main and generally obvious anchorages that can be found on charts. Some of the welcoming pubs, hotels and other attractions close to the harbour or mooring are suggested for your entertainment, however much more awaits to be explored afloat and many other delights can be discovered ashore. Each individual island that makes up the archipelago offers a different experience ashore and you should consult “Visit Orkney” and other local guides for information. Orkney waters, if treated with respect, should offer no worries for the experienced sailor and will present no greater problem than cruising elsewhere in the UK. Tides, although strong in some parts, are predictable and can be used to great advantage; passage making is a delight with the current in your favour but can present a challenge when against. The old cruising guides for Orkney waters preached doom for the seafarer who entered where “Dragons and Sea Serpents lie”. This hails from the days of little or no engine power aboard the average sailing vessel and the frequent lack of wind amongst tidal islands; admittedly a worrying combination when you’ve nothing but a scrap of canvas for power and a small anchor for brakes! Consult the charts, tidal guides and sailing directions and don’t be afraid to ask! You will find red “Visitor Mooring” buoys in various locations, these are removed annually over the winter and are well maintained and can cope with boats up to 20 tons (or more in settled weather).
    [Show full text]
  • Ferry Timetables
    1768 Appendix 1. www.orkneyferries.co.uk GRAEMSAY AND HOY (MOANESS) EFFECTIVE FROM 24 SEPTEMBER 2018 UNTIL 4 MAY 2019 Our service from Stromness to Hoy/Graemsay is a PASSENGER ONLY service. Vehicles can be carried by prior arrangement to Graemsay on the advertised cargo sailings. Monday Tuesday Wednesday Thursday Friday Saturday Sunday Stromness dep 0745 0745 0745 0745 0745 0930 0930 Hoy (Moaness) dep 0810 0810 0810 0810 0810 1000 1000 Graemsay dep 0825 0825 0825 0825 0825 1015 1015 Stromness dep 1000 1000 1000 1000 1000 Hoy (Moaness) dep 1030 1030 1030 1030 1030 Graemsay dep 1045 1045 1045 1045 1045 Stromness dep 1200A 1200A 1200A Graemsay dep 1230A 1230A 1230A Hoy (Moaness) dep 1240A 1240A 1240A Stromness dep 1600 1600 1600 1600 1600 1600 1600 Graemsay dep 1615 1615 1615 1615 1615 1615 1615 Hoy (Moaness) dep 1630 1630 1630 1630 1630 1630 1630 Stromness dep 1745 1745 1745 1745 1745 Graemsay dep 1800 1800 1800 1800 1800 Hoy (Moaness) dep 1815 1815 1815 1815 1815 Stromness dep 2130 Graemsay dep 2145 Hoy (Moaness) dep 2200 A Cargo Sailings will have limitations on passenger numbers therefore booking is advisable. These sailings may be delayed due to cargo operations. Notes: 1. All enquires must be made through the Kirkwall Office. Telephone: 01856 872044. 2. Passengers are requested to be available for boarding 5 minutes before departure. 3. Monday cargo to be booked by 1600hrs on previous Friday otherwise all cargo must be booked before 1600hrs the day before sailing. Cargo must be delivered to Stromness Pier no later than 1100hrs on the day of sailing.
    [Show full text]
  • Of Orkn Y 2015 Information and Travel Guide to the Smaller Islands of Orkney
    The Islands of ORKN Y 2015 information and travel guide to the smaller islands of Orkney For up to date Orkney information visit www.visitorkney.com • www.orkney.com • www.discover-orkney.com The Islands of ORKN Y Approximate driving times From Kirkwall and Stromness to Ferry Terminals at: • Tingwall 30 mins • Houton 20 mins From Stromness to Kirkwall Airport • 40 mins From Kirkwall to Airport • 10 mins The Islands of looking towards evie and eynhallow from the knowe of yarso on rousay - drew kennedy 1 Contents Contents Out among the isles . 2-5 will be happy to assist you find the most At catching fish I am so speedy economic travel arrangements: A big black scarfie fromEDAY . 6-9 www.visitscotland.com/orkney If you want something with real good looks You can’t go wrong with FLOTTA fleuks . 10-13 There’s not quite such a wondrous thing as a beautiful young GRAEMSAY gosling . 14-17 To take the head off all their big talk Just pay attention to the wise HOY hawk . 14-17 The Countryside Code All stand to the side and reveal Please • close all gates you open. Use From far NORTH RONALDSAY a seal . 18-21 stiles when possible • do not light fires When feeling low or down in the dumps • keep to paths and tracks Just bake some EGILSAY burstin lumps . 22-25 • do not let your dog worry grazing animals You can say what you like, I don’t care • keep mountain bikes on the For I’m a beautiful ROUSAY mare .
    [Show full text]
  • Orkney Greylag Goose Survey Report 2015
    The abundance and distribution of British Greylag Geese in Orkney, August 2015 A report by the Wildfowl & Wetlands Trust to Scottish Natural Heritage Carl Mitchell 1, Alan Leitch 2, & Eric Meek 3 November 2015 1 The Wildfowl & Wetlands Trust, Slimbridge, Gloucester, GL2 7BT 2 The Willows, Finstown, Orkney, KY17, 2EJ 3 Dashwood, 66 Main Street, Alford, Aberdeenshire, AB33 8AA 1 © The Wildfowl & Wetlands Trust All rights reserved. No part of this document may be reproduced, stored in a retrieval system or transmitted, in any form or by any means, electronic, mechanical, photocopying, recording or otherwise without the prior permission of the copyright holder. This publication should be cited as: Mitchell, C., A.J. Leitch & E. Meek. 2015. The abundance and distribution of British Greylag Geese in Orkney, August 2015. Wildfowl & Wetlands Trust Report, Slimbridge. 16pp. Wildfowl & Wetlands Trust Slimbridge Gloucester GL2 7BT T 01453 891900 F 01453 890827 E [email protected] Reg. Charity no. 1030884 England & Wales, SC039410 Scotland 2 Contents Summary ............................................................................................................................................... 1 Introduction ............................................................................................................................................ 2 Methods ................................................................................................................................................. 3 Field counts ......................................................................................................................................
    [Show full text]
  • Kirkwall to Westray
    Sailing notes downloaded from the Orkney Marinas website. www.orkneymarinas.co.uk Kirkwall to Westray We hope you find these notes helpful and of interest to you while planning your sailing trip to Orkney. Please note they are not intended to be used for navigation The quickest journey time from Kirkwall to Pierowall is on the ebb, leaving Kirkwall to cross the Westray Firth on the last of the ebb as by the time the tide is running N.E through Fersness and Weatherness sounds. It makes little difference to the journey times when leaving Kirkwall whether one goes out through Vasa or the Bouyed channel nearer Gairsay, Vasa probably best on the ebb, Bouyed best on the flood. When crossing the Westray Firth if there is any westerly type weather it is advisable to keep well over to the Green Holmes and across to Seal Skerry on the west side of Eday. In westerly conditions, the further west one goes the worse the conditions are with a very rough edge of tide running from Seal Skerry to the SW corner of Rusk Holm and NW to Rull Noost off Wart Holm especially during the last 2 hours of the ebb. Best avoided. If conditions are not adverse let the tide carry you to the west of Rusk Holm and NE to Weatherness, this is the quickest route. Fersness or Weatherness sounds can be used with the deeper water in Fersness. The tide in both places tends to run east for 4 hours and west for 8 hours. If sailing from Kirkwall during flood tide your journey time will be somewhat longer.
    [Show full text]
  • History of Medicine
    HISTORY OF MEDICINE The air-ambulance: Orkney's experience R. A. COLLACOTT, MA, DM, PH.D, MRCGP RCGP History of General Practice Research Fellow; formerly General Practitioner, Isle of Westray, Orkney Islands SUMMARY. The paramount problem for the de- isolated medical service. Patients could be transferred livery of the medical services in the Orkneys has between islands and from the islands to mainland been that of effective transport. The develop- Scotland. It became easier for general practitioners to ment of an efficient air-ambulance service has obtain the assistance of colleagues in other islands, had a major impact on medical care. The service which led to more effective specialist services in the started in 1934, but was abolished at the outset of main island townships of Kirkwall in the Orkney Isles, the Second World War and did not recommence Stornoway in the Hebrides and Lerwick in the Shetland until 1967. This paper examines the evolution of Isles. The air-ambulance made attending regional cen- the air-ambulance service in the Orkney Islands, tres such as Aberdeen easier and more comfortable for and describes alternative proposals for the use of patients than the conventional, slower journey by boat: aircraft in this region. for example, the St Ola steamer took four to five hours to sail between Kirkwall and Wick via Thurso whereas the plane took only 35 minutes; furthermore, patients Introduction often became more ill as a result of the sea journey alone, the Pentland Firth being notorious for its stormy UNLIKE the other groups of Scottish islands, the I Orkney archipelago a of seas.
    [Show full text]
  • The North Orkney Population History Project
    Historical Demography, Oral History, Settlement Archaeology, and Landscape Ecology: The North Orkney Population History Project Please Do Not Cite or Reference – Email [email protected] for a final version of the paper to be presented on July 10, 2008 Tim Murtha, Pat Johnson, Jim Wood, Stephen Matthews, and Julia Jennings Pennsylvania State University University Park, PA 16802 Corey Sparks University of Texas, San Antonio European Population Conference Barcelona, Spain July 9‐12, 2008 Presentation Date: July 10, 2008 (4:30‐6:00pm) Draft Date: June 23, 2008 (tm) July 1, 2008 Abstract: Between 1750 and 2000, the northern islands of Orkney (Scotland) underwent a major cycle of population growth and decline. The modern demographic transition, which contributed significantly to population decline over the past century, was atypical in several respects: it was late, the decline in fertility preceded that in mortality, and the transition involved massive net out‐migration, resulting in progressive depopulation. The North Orkney Population History Project is investigating these demographic changes within the context of the transition from near‐subsistence farming to modern, commercialized livestock rearing. Unusual for historical demography, we are linking parish records, census data, and vital registers to historical archaeological information on houses, farmsteads, and the past environment, and ethnographic/oral history material on local people’s perceptions of change over the past 80 years. Using data from the islands of Westray and Sanday, we compare the spatial distribution of households using multi‐scale point pattern analysis to ascertain the extent to which surviving archaeological remains can capture the historically documented settlement pattern of the pre‐modern demographic regime.
    [Show full text]
  • Nistigar, Westray, Orkney. KW17 2DP
    Farm & Lands – Nistigar, Westray, Orkney. KW17 2DP (Offers over £350,000) Situated on the beautiful island of Westray, In the archipelago of Orkney The farmhouse and steading of Nistigar. The farm and lands of Nistigar extend to a total of 48.34 hectares (119.4 acres). 42.83ha (105.8 acres) is arable and grazing land which is Region 1, and 5.51ha (13.6 acres) which is made up of some meadowland and is Region 3 classed land. This well maintained farm could easily carry 40 Breeding cows and followers, and in the past housed 100 store cattle for finishing and a flock of 60 Breeding ewes before turning to Breeding Cattle. Nistigar is located to the west side of the island of Westray, approximately 5 miles from the main harbour, used by the daily ferry which services the island. Nistigar is only a few minutes’ drive from the village of Pierowall, where the school, shops, hotel and doctor’s surgery are situated. THE STEADING The steading at Nistigar consists of:- 60’ x 40’ Steel frame shed used as general purpose shed/barley store This shed also has 38’ x 10’ slats inside that can be used for extra winter accommodation. 75’ x 32’ Slatted Byre 75’ x 40’ Inside Silo Also contains 45’ x 8’ slats down one side for extra winter accommodation. 45’ x 24’ Workshop (containing a toilet) FARM OVERVIEW This is a unique opportunity to purchase a working farm in idyllic surroundings. All aspects of the farm are in excellent condition. The house and steading are in very good state of repair.
    [Show full text]
  • Rousay, Egilsay, Wyre and Gairsay Community Council General Meeting
    MINUTE of the MEETING of ROUSAY, EGILSAY, WYRE AND GAIRSAY COMMUNITY COUNCIL, held in the ROUSAY CHURCH CENTRE HALL on SATURDAY, 15 FEBRUARY 2014 at 10.15 a.m. Present: Mr A Firth, Ms C Cox, Mr R Koster, Mr Eric Shortland and Mr R Tipper In Attendance: Councillor G Sinclair Mrs M Spence, Democratic Services Manager Miss K Rendall, Community Council Liaison Officer Mrs M Spence, Democratic Services Manager Mrs D Compton, Clerk 1 Member of the Public 1. APOLOGIES RESOLVED to note that there were no apologies. 2. ADOPTION OF MINUTES (a) General Meeting of 10 September 2013 RESOLVED that the Minute of the Meeting held on 10 September 2013 was approved, being proposed by Mr Tipper and seconded by Mr Koster. (b) Informal Meeting of 30 November 2013 RESOLVED that the Note of the Informal Meeting held on 30 November 2013 was approved, being proposed by Mr Firth and seconded by Mr Shortland. 3. MATTERS ARISING (a) Rousay Community Association – Purchase of Fireworks (30.11.13, para 8 (a)) Members heard that following agreement at the Meeting of 30 November 2013 to grant financial assistance of £350 to Rousay Community Association towards the purchase of fireworks for the display in Rousay, the Clerk had contacted members and received a majority decision in favour of this and had made an application to Community Council Grant Scheme (CCGS) accordingly, and it was:- RESOLVED to note the contents of the report. (b) Rousay Primary School – Christmas Presents 2013 (30.11.13. para 8 (c)) Members heard that following agreement at the Meeting of 30 November 2013 to make a donation of £250 to Rousay Primary School towards the purchase of Christmas presents, the Clerk had contacted members and received a majority decision in favour of this and had processed the payment from the General Fund, and it was:- RESOLVED to note the contents of the report.
    [Show full text]
  • Westray and Sanday – Eday Cable Replacements
    SHEPD Eday – Westray and Sanday – Eday Cable Replacements Marine Construction Environmental Management Plan Scottish and Southern Energy plc Assignment Number: A303128-S00 Document Number: A-303128-S00-TECH-004 Xodus Group Xodus House, 50 Huntly Street Aberdeen, UK, AB10 1RS T +44 (0)1224 628300 E [email protected] www.xodusgroup.com CONTENTS 1 INTRODUCTION 1 2 SCOPE 1 3 REVIEW AND UPDATE PROCEDURE 2 4 DOCUMENT STRUCTURE 2 5 MITIGATION REQUIREMENTS 3 Eday – Westray and Sanday – Eday Cable Replacement – Marine Construction Environmental Management Plan Assignment Number A303128-S00 Document Number A-303128-S00-TECH-004 iii 1 INTRODUCTION Scottish Hydro Electric Power Distribution plc (SHEPD) holds a licence under the Electricity Act 1989 for the distribution of electricity in the North of Scotland including the islands. It has a statutory duty to provide an economic and efficient system for the distribution of electricity, and to ensure that its assets are maintained to ensure a safe, secure and reliable supply to customers. Faults have been identified on the existing submarine power cables between Eday – Westray and Sanday – Eday in the Orkney Islands. The 33kV Eday – Westray cable faulted on 7th August 2020 affecting supplies to 977 customers on Eday, Sanday, Stronsay and Shapinsay. On 2nd November 2020 the Eday to Sanday 33kV submarine electricity cable faulted affecting 853 customers on Sanday, Stronsay and Shapinsay. SHEPD have identified that both cables need to be replaced. Hereafter, the Eday – Westray and Sanday – Eday cable replacement installation corridors will be collectively referred to as the ’installation corridors’. A Marine Environmental Appraisal (MEA) was developed by Xodus Group Ltd, to support SHEPD’s Marine Licence Applications to conduct emergency cable replacements within the installation corridors.
    [Show full text]
  • Download the Orkney Sailing Guide
    Sailing notes downloaded from the Orkney Marinas website. www.orkneymarinas.co.uk Westray to Kirkwall We hope you find these notes helpful and of interest to you while planning your sailing trip to Orkney. Please note they are not intended to be used for navigation The quickest journey is to leave Westray so that the last of the flood takes you into Kirkwall Bay. If the weather is okay and you do not go to early the tide should be going west through Weatherness and Fersness. Unless the wind is strong there should be no problem crossing the Westray Firth on the flood. There can be a bit if a roost during strong SE wind and flood tide running SE from Kili Holm. If the weather is suitable and you go west of Rusk Holm give Rusk Holm a good berth and let the flood help you down the middle towards the Galt Buoy. Do not go too near the Egilsay shore as there will be a strong eddy running north (very handy if you are going out against the flood). If you come down the west side of Pharay or out through Fersness hold up for the SW corner of Rusk Holm before standing out across the firth. When going from Westray to Kirkwall during ebbing water after passing through either Weatherness or Fersness keep down along the west side of Eday to Seal Skerry here you will meet a strong ebb tide. If you can crab across to the Muckle Green Holm you will get some benefit from an eddy until you again come into a strong tide at the SW corner of the little Green Holm this one will help a bit as you hold up toward the Galt buoy.
    [Show full text]