VIJAY NIRMAN COMPANY PVT LTD

ENGINEERS CONSTRUCTORS AN ISO CERTIFIED COMPANY

04 DECADES OF ENGINEERING EXCELLENCE Our VISION

• A RESPECTED INFRASTRUCTURE ORGANIZATION WITH ETHICAL STANDARDS, COMMITTED TO QUALITY, RELIABILITY AND CONTINUOUS TECHNOLOGY UP GRADATION.

• CUSTOMER CENTRIC BY BUILDING BEST RELATIONSHIPS WITH OUR CLIENTS IN TERMS OF PERFORMANCE, TRUST AND CUSTOMER SATISFACTION.

• AN ENTERPRISE PROVIDING OUR EMPLOYEES A POSITIVE ENVIRONMENT FOR CONTINUOUS LEARNING, MOTIVATION, CHALLENGE IN WORK PLACE AND REWARDING THEM SUITABLY.

• RECOGNIZED FOR TREATING ALL OUR STAKEHOLDERS WITH GRATITUDE, DIGNITY AND OPTIMIZING THEIR INVESTMENT WITH US.

• A RESPONSIBLE CORPORATE IMPROVING THE QUALITY OF LIFE WITHIN AND OUTSIDE THE ORGANIZATION. VNC VALUES Company Overview

. Vijay Nirman Company Private Limited (‘VNC’) was promoted by Dr.S.Vijaya Kumar, in 1982 . Engaged in civil construction works such as  Urban Infrastructure –Residential, Commercial, Institutional  Roads & Associated Structures like Flyovers, Bridges, ROB’s, Viaducts, Metro Works  Industrial structures, Ports, Power plants, Steel plants, and other Marine works.  Foundation works like Piling, Diaphragm wall etc. . Corporate Office is in Visakhapatnam and has operating offices at Bangalore, Nagpur, Hyderabad, , Delhi. . Has over 1,700 employees and has executed over 450 projects. . Infrastructure and deliverance confirming to international standards in terms of quality and Safety . ISO 9001:2015 & OHSAS 18001 : 2007 certified company. We Only Look Forward VNC is a multi-faceted organization with the power to craft everything from concept to commissioning efficiently. Our adherence to quality, in-time delivery and cost-effectiveness has made us a name to reckon with the engineering industry. We deliver projects that are engineering marvels, with our construction and engineering excellence that keeps getting better by the day. What started as the Chairman Dr.S.Vijaya Kumar’s dream is today an extremely powerful reality and that has only been possible because of his perceptive vision and progressive thinking.

We have been successful in building a solid platform for a more aggressive industrial and infrastructural growth in and eventually the world. No matter what stands against us, what we stand for gives us the strength to keep marching ahead.

The strength of the company has always been the core values, which have enabled us to build long time relationship with all the clients. KEY PERSONNEL A.V.V.V.Prasad (Vishnu), M.Sc. Vice Chairman

Mr. Vishnu has over 35 years of experience in execution of several projects encompassing Pile Foundations, Bridges, Marine Works and Industrial Structures, housing projects and multi-stored buildings.

V. Ajay Kumar, B.Tech, MS Managing Director

Mr. Ajay Kumar has done his Masters in Technical Management from Eastern Michigan University, USA Dr. S.Vijaya Kumar, ME (Structure),Ph.D and has over 15 years (National and International ) Chairman experience in Corporate Business Management and Strategic Planning. Dr. Vijaya Kumar established Vijay Nirman Company in the year 1982 and leads the Company from the front. He has nurtured the company on the tenets of professionalism, Y.V. Ramana, M.Tech(Geo Engg) excellence and quality. He empowers the core Chief Executive Officer (CEO) team as well as employees with the twin mantras of freedom and trust Mr. Ramana has over 33 Years of experience in executing number of projects involving Marine works, Industrial Infrastructure and Buildings Projects. Business development is his forte. KEY PERSONNEL

A.S. MAHALLE, B.E. COO -Projects Mr. Mahalle has over 30 years of experience in executing projects in the fields of Marine Works, Power Plants, Cement & Steel Plants, Residential Buildings, Water Supply Projects etc.

M. Vamsidhar, MBA Dy COO-Projects Mr. Vamsidhar has over 20 years of experience in construction industry involving industrial and urban infrastructure such as Buildings & Housing, transportation structures including grade separation units, industrial buildings, intricate foundations etc.

Cmde(Retd). N. Krishna Rao, M.Tech (Mech) Director-Projects He has more than 32 years of experience in Indian Navy and had executed various industrial projects . As DDG-DGNP, he had handled Marine Infrastructure and Equipments. He is a recipient of Nausena Medal from the President of India. TOTAL MANPOWER WITH THE COMPANY a) Management - 06 Nos b) Business Development - 03 Nos c) Civil/Technical - 579 Nos d) Design Department - 02 Nos e) Finance and Accounts - 72 Nos f) Form Work Department - 14 Nos g) HR, Admin and IT - 113 Nos h) MEP - 150 Nos i) Plant & Machinery - 110 Nos j) Quality Assurance & Control - 51 Nos k) QS, Planning & Contracts - 32 Nos l) Stores & Procurement - 106 Nos m) Safety Department - 61 Nos n) Technical Consultants - 01 Nos o) VNC Academy - 02 Nos TOTAL - 1302 Nos MAJOR PLANT AND EQUIPMENT Sl.N Equipment Capacity No Sl.N Equipment Capacit Nos o s o y 1 Hydraulic Piling Rig 600-1800 dia 12 17 SAW/MIG Welding 8 Machine 2 Conventional Piling 33 Rigs 18 Crusher 200 TPH 1 3 Vibro Hammer 4 Tons 2 19 Motor Grader 2

4 Crawler Cranes 18T to 70 T 10 20 WMM Plant 1

5 Hydraulic Cranes 10T-12T 18 21 Vibratory Soil 3 Compactors 6 Batching Plant 20-30 Cum 20 22 Asphalt Hot Mix Plant 1 7 Mini Batching Plant 12 Cum 15 23 Road Paver 2 8 Concrete Mixer 28 24 Kerb Placing 2 9 Transit Mixer 6 Cum 66 Machine 25 Pneumatic Tyre Roller 3 10 Concrete Pump 350 CC 20 26 Tower Cranes 1-6 Tons 12 11 Boom Placer 36 m reach 4 27 Tower Hoist with 9 12 Hydraulic 1-2 Cum 3 Winch Excavator 28 Diesel Generators (5-250 50 13 Front End Loader & 0.5 Cum 15 kVA) Wheel Loader 29 Electrical Pump Sets 36 14 Earth Rammer 17

15 Dumpers/Tippers/Tr 9-14 Cum 27 30 Survey Equipment 15 ucks (Total Station) 16 Welding Rectifiers 100-400 212 31 Weigh batchers 16 Amps 32 Trailers 9 Financial Strength 1200

1045.64 1000

871.48

800 691.57 659.92 637.2 600

400

212.22 196.96 208.01 200 145.31 145.93

0 2014-15 2015-16 2016-17 2017-18 2018-19 Turnover Net worth VNC CONSTRUCTION ACADEMY

We Empower the leaders of tomorrow

The construction Industry is one of the fastest growing industries in India. To compliment this growth, we started the VNC Construction Academy, an in-house training institute that aims at producing Site Engineers and Supervisors who are prepared for the challenges of tomorrow.

Training is imparted to select individuals in the fields of Formwork, Bar Bending, Steel Fixing, Masonry Works, Scaffolding, Laboratory Testing of Materials, Surveying etc. 80% of our trainees are from economically weaker sections of the society. The academy has successfully produced 85 site engineers and 530 site supervisors who now have a firm grip on quality standards.

VNC’s belief in the motto ‘Healthy body makes a healthy mind’ has led to the introduction of Yoga Regime, Physical Training, Safety Drills and First Aid Training to the students. We transform learners into competitive individuals and empower them to lead the future. CORPORATE SOCIAL RESPONSIBILITY Social : Established the ‘GokulChandra and Rahul Chandra Memorial Charitable Trust”, which benefits the underprivileged strata of the society. Supporting SOS village and Rotary Club.

Health : • Financial Assistance for Cancer Patients • Providing Hearing aids to the deaf • Securing Insurance for HIV patients.

Education and Sports : • Awarding scholarships to intermediate and graduate students. • Distribution of books, Uniforms and Mid-day meals to primary school children. • Renovation of old school and college buildings • Providing sports gear to the deserving and the needy in the fields of skating and archery • Sponsoring boxing gear. AWARDS ISO CERTIFICATES

CMD receiving Vishwakarma Award from Chairman of the Prime Minister’s Economic Advisory Council, Dr. C.Rangarajan

Indian Achievers Award for business excellence on the occasion of 29th Indian International achievements award ion INDO- THAI business Relations. Every Project Is A Mark Of Quality And Performance On Time Every project we build is a mark of quality and performance, meets global standards and exceeds the customer’s expectations. To us, every project is a new challenge, an opportunity to showcase our versatility and technological innovation. We believe and practice ‘Nothing is impossible’. Our core competence is structured project management, acquired over years of working towards building outstanding projects that are the pride of our nation. Creating New Opportunities Our specialized services come with trust and value, and we are synonymous with diversity. VNC is where expertise and experience converge and effectively diverge as smart solutions for all construction and infrastructure activities. With our enterprising spirit, we have established a bold presence in the following areas:-

Roads, Bridges & Metro • National and State Highways • Bridges, Interchanges, Flyovers and Viaducts • Viaducts, Metro Rail Transport works including Ballast-less Tracks

Urban Infrastructure • Residential/Commercial Buildings • Water Treatment Plants and Distribution • Sewage Treatment Plants and Network • Desalination Plants Industrial Infrastructure • Material Handling Systems • Industrial Buildings • Power Plants • Integrated Steel Plants and other Metallurgical Units • Electrical substations, H.T & E.H.T. Transmission Lines • Cement Plants Ports & Terminals • Piling Works • Marine Structures • Diaphragm Walls ROADS AND BRIDGES ROADS AND BRIDGES

Ongoing Projects • WIDENING OF EXISTING ROAD TO 2 LANE NH STANDARDS ALONG WITH IMPROVEMENT AND RE-ALIGNMENT FROM KM 0+000 TO KM 57+250 IN THE STATE OF ARUNACHAL PRADESH ON NH NO.229 - PACKAGE – I FOR SUSHEE INFRA.

• CONTRACT KC-17R: (1) CONSTRUCTION OF ELEVATED VIADUCT, THREE STATIONS VIA: ERNAKULUM SOUTH, THAIKOODAM AND PETTA INCLUDING ARCHITECTURAL FINISHING, PLUMBING AND ELECTRICAL WORKS ON ALWAYE- PATTA LINE OF KOCHI METRO RAIL PROJECT.

• CONSTRUCTION OF FOUR LANE APPROACH RAMP AT RAJIV GANDHI INTERNATIONAL AIRPORT HYDERABAD FOR GMR.

• VUDA - CONSTRUCTION OF A COMPOSITE LEVEL GRADE SEPARATOR WITH ARCHITECTURAL FINISHING, AESTHETICS, SERVICE ROADS ETC, AT NAVAL ARMAMENT DEPOT (NAD) JN. IN VISAKHAPATNAM.

• DESIGN AND CONSTRUCTION OF CIVIL, STRUCTURES AND TRACK WORKS FOR DOUBLE LINE RAILWAY INVOLVING FORMATION IN EMBANKMENT/CUTTING, BALLAST ON FORMATION, TRACT WORKS, BRIDGES, STRUCTURES, BUILDINGS, YARDS, INTEGRATION WITH IR EXISTING RAILWAY SYSTEM AND TESTING AND COMMISSIONING ON DESIGN-BUILD LUMP SUM BASIS FOR NEW KARCHANA STATION . -202 D IN KANPUR. ROADS AND BRIDGES Ongoing Projects

• CONSTRUCTION OF SIX LANE EASTERN PERIPHERAL EXPRESSWAY (NH NO.11) PACKAGE I THE STATE OF HARYANA AT SONIPAT FOR SADHBAV.

• 4 LANING OF JHANSI - KHAJURAHO SECTION -I OF NH - 75/76 IN THE STATE OF UP & MP (SECTION-1 JHANSI JN. WITH NH 25 TO NH-75 ALLAHABAD JUNCTION FOR PNC

• CONSTRUCTION OF SIX LANE EASTERN PERIPHERAL EXPRESSWAY (NH NO.11) PACKAGE II FROM KM 22.000 TO KM46.55 - LOI FOR STRUCTURE WORKS FROM KM33.880 TO KM 46.55 IN THE STATE OF UP AT GHAZIABAD FOR SADHBAV

• CONTRACT CC-47 : PART DESIGN & CONSTRUCTION OF ELEVATED VIADUCT FROM MUNDKA TO TIKRI BORDER, SIDING AT TIKRI BORDER AND FOUR ELEVATED STATIONS FOR SADHBAV

• CONSTRUCTION OF ROAD BRIDGE WORKS IN BHAVNAGAR-TALAJA SECTION OF NH-8E IN THE STATE OF GUJARAT TO BE EXECUTED ON HYBRID ANNUITY MODE UNDER NHDP PHASE IV PROJECT. ROADS AND BRIDGES Ongoing Projects

• DESIGN AND CONSTRUCTION OF CIVIL, STRUCTURES AND TRACK WORKS FOR DOUBLE LINE RAILWAY INVOLVING FORMATION IN EMBANKMENT/CUTTING, BALLAST ON FORMATION, TRACT WORKS, BRIDGES, STRUCTURES, BUILDINGS, YARDS, INTEGRATION WITH IR EXISTING RAILWAY SYSTEM AND TESTING AND COMMISSIONING ON DESIGN-BUILD LUMP SUM BASIS FOR MUGHAL SARAI TO NEW KARCHANA STATION-201 B IN MIRZAPUR.

• CONSTRUCTION OF SRCPL PHASE – IIB (CH. 54 TO 70 KM) ON ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) BASIS. (SARGUJA RAIL CORRIDOR) FOR ADANI.

• ROADS AND BUILDING WORKS FOR RAJURA CHECK POST, KHARPI CHECK POST AND BILIOLI CHECK POST - MOBILISATION AND COMPUTERISATION OF INTEGRATED BORDER CHECK POSTS AT 22 LOCATIONS IN THE STATE OF MAHARASHTRA FOR SADBHAV ENGINEERING LIMITED.

• REHABILITATION AND UP-GRADATION TO FOUR LANING OF CHHAPRA- HAJIPUR SECTION OF INCLUDING MAJOR RIVER BRIDGE ACROSS GANDAK RIVER

• CONSTRUCTION OF APRON STANDS BETWEEN TAXIWAY M1-L1 AND ASSOCIATED WORKS AT IGI AIRPORT ,NEW DELHI(PHASE-3A)

• CONSTRUCTION OF APRON STANDS BETWEEN TAXIWAY L1-L2 AND ASSOCIATED WORKS AT IGI AIRPORT ,NEW DELHI(PHASE-3A)

• CONSTRUCTION OF FBO/MRO FACILITIES AT IGI AIRPORT ,NEW DELHI SARGUJA RAIL CORRIDOR ROADS AND BRIDGES

4 LANE APPROACH RAMP WORK AT RGIA- HYDERABAD ROADS AND BRIDGES

4 LANE APPROACH RAMP WORK AT RGIA- HYDERABAD ROADS AND BRIDGES

APRON STANDS – M1 L1 , DELHI INTERNATIONAL AIRPORT ROADS AND BRIDGES Major Completed Projects • CONSTRUCTION OF VIADUCT INTERCHANGE, BRIDGES AND VEHICULAR UNDERPASS, WHICH INCLUDES PILING WITH HYDRAULIC RIGS, SUBSTRUCTURE WITH RCC, SUPERSTRUCTURE WITH PRECAST PRE-STRESSED PRECAST CONCRETE GIRDER, TRANSPORTATION & LAUNCHING AT REQUIRED SPANS OF STRUCTURES.

• CONSTRUCTION OF OUTER RING ROAD (ORR) ON DESIGN, BUILD, FINANCE, OPERATE AND TRANSFER (DBFOT) - CONSTRUCTION OF MAJOR STRUCTURES FROM KM 0.00 TO KM 12.00 (PKG-2).

• CONSTRUCTION OF STRUCTURE WORK FROM KM.0.000 TO KM.57.000 OF THE CHHINDWARA RING ROAD EXCLUDING THE PORTION FROM KM. 23.553 TO KM 29.275 , KM 167.700 IMLIKHERA JUNCTION AND ERR.

• CONSTRUCTION OF STRUCTURE WORK FROM KM.193.000 TO KM.222.000 ON THE PROJECT HIGHWAY - FOUR LANING OF GOMTI CHAURAHA - UDAIPUR SECTION OF NH-8 (FROM KM.177/000 TO KM 260/100) IN THE STATE OF RAJASTHAN UNDER NHDP PHASE IV ON DESIGN, BUILD, FINANCE, OPERATE AND TRANSFER (TOLL) BASIS.

• MRTS - PHASE - II - EXTENSION FROM TO ST. THOMAS MOUNT - PROPOSED ELEVATED SUPERSTRUCTURE CONSISTING OF PSC BOX GIRDERS, "U" TYPE PSC DECK SLABS AND OTHER RCC WORKS, PROTECTIVE COATING TO PSC GIRDERS ETC. OVER ALREADY COSTRUCTED SUB STRUCTURE BETWEEN CHAINAGE 19750 AND 23350. ROADS AND BRIDGES Major Completed Projects

• CONSTRUCTION OF BRIDGE ACROSS CREEK TO ENNORE EXPRESSWAY .

• LC-3 – CONSTRUCTION OF ROAD OVER BRIDGE IN LIEU OF EXISTING LC-3 BETWEEN THONDIARPET AND RAILWAY STATION NEAR TIRUVOTTIYUR MATTUMANDHAI.

• FOUR LANING OF BETWEEN KM 00.00 TO KM 80.858 OF ROHTAK TO PANIPAT SECTION OF NH-71 IN THE SATE OF HARYANA.

• CONSTRUCTION OF ROB IN , BETWEEN ENNORE -ATHIPATTU STRETCH IN RAILWAY PORTION AT 2/610 OF NORTH CHENNAI THERMAL POWER STATION (NCTPS) ROAD, CHENNAI, TAMILNADU.

• CONSTRUCTION OF THREE LANE BRIDGE ADJACENT TO THE EXISTING THIRU- VI-KA BRIDGE ACROSS CHENNAI.

• WIDENING OF 4 LANING AND STRENGTHENING OF EXISTING TWO LANE CARRIAGE FROM KM 0+313 TO 27+280 ON SALEM ULUNDERPET SECTION OF NH-68 IN TAMIL NADU.

• CONSTRUCTION OF PROPOSED MAJOR BRIDGES PSC BOX / I-GIRDER WITH PILE FOUNDATIONS FOR COAL CONVEYOR SYSTEM AND FOR CARRYING PIPE LINE PASSING ACROSS RAILWAY LINES BETWEEN ATTIPATTU PUDUNAGAR - ENNORE STATIONS AND , DULY CONNECTING VALLUR THERMAL POWER PLANT OF M/S.NTECL AND NORTH CHENNAI THERMINAL POWER STATION AT VALLUR FOR RITES. ROADS AND BRIDGES Major Completed Projects

• BRIDGES, UNDERPASSES AND ROBS FOR FOUR LANING & STRENGTHENING OF EXISTING 2 LANE OF TINDIVANAM – ULUNDURPET SECTION OF NH-45 IN TAMILNADU FOR GMR PROJECTS PVT. LTD.

• MAJOR AND MINOR BRIDGES INCLUDING RE WALLS, WELL FOUNDATIONS, KERBS AND REHABILITATION WORKS OF WESTERN TRANSPORT CORRIDOR TUMKUR - HAVERI NH-4 PROJECT OF NHAI FOR UE DEVELOPMENT INDIA PVT LTD.

• CONSTRUCTION OF ROAD OVER BRIDGE NEAR PAKUR STATION IN JHARKHAND FOR KONKAN RAILWAY CORPORATION. “ The affected (Kadalundi) bridge has been rebuilt in less • CONSTRUCTION OF RAIL BRIDGE ACROSS LAKSHMANTEERTHA RIVER IN MYSORE- HASSAN SECTION FOR SOUTHERN RAILWAYS. than 45 days. Considering that this was done during the • MAIN CARRIAGEWAY CONSTRUCTION OF ELEVATED HIGHWAY OF HOSUR monsoon across one of the ROAD, BANGALORE FOR MAYTAS. backwaters of Kerala, it is not less than a miracle. M/s Vijay • CONSTRUCTION OF SUBSTRUCTURE AND SUPER STRUCTURE FOR Nirman Company adopted METROPOLITAN TRANSPORT PROJECT (RAILWAYS), CHENNAI OF MRTS PHASE- II IN TIRUMALAI- VELACHERY SECTION. the unique concept using the railway track for doing the • RECONSTRUCTION OF SUBSTRUCTURE OF 275M LONG RAILWAY BRIDGE OVER work of bored piles..” RIVER KADALUNDI FOR SOUTHERN RAILWAYS, KERALA CONSISTING OF 44 NOS M.Ravindra, Former Chairman, PILES OF 1000MM DIA. AND ASSOCIATED CIVIL WORKS OF THE BRIDGE – THIS Railway Board PROJECT HAS BEEN COMPLETED WITHIN A RECORD TIME OF 43 DAYS AND WON THE COMPANY A LETTER OF APPRECIATION FROM THE CLIENT. ROADS AND BRIDGES

Tambaram-Tindivanam Road Project, Road Udaipur works at Acharapakkam &Melmaruvathur.

GMR Outer Ring Road (ORR), Chennai ROADS AND BRIDGES

Bridge across Lakshmanteertha river

Metropolitan Transport Project, Chennai ROADS AND BRIDGES

MTP, Chennai ROADS AND BRIDGES

YAMUNA EXPRESS WAY-DELHI ROADS AND BRIDGES

Tapi River Bridge URBAN INFRASTRUCTURE URBAN INFRASTRUCTURE

Sea Valley Resorts – Varun Beach Novotel Hotel, Visakhapatnam Urban Infrastructure - Residential/Commercial Buildings Major Ongoing Projects

• CONSTRUCTION OF HOUSING TOWNSHIP USING SHEAR WALL TECHNOLOGY FOR APITDCO AT VIZIANAGARAM, SRIKAKULAM, VIZAG DISTRICT – PHASE 1 OF 5440 UNITS WITH AREA OF 18.79 LAKHS SFT. VALUED AT RS.321 CRORES.

• CONSTRUCTION OF HOUSING TOWNSHIP USING SHEAR WALL TECHNOLOGY FOR APITDCO AT VIZIANAGARAM DISTRICT OF 7677 UNITS WITH AREA OF 26.51 LAKHS SFT. VALUED AT RS.418.44 CRORES.

• CONSTRUCTION OF HOUSING TOWNSHIP USING SHEAR WALL TECHNOLOGY FOR APITDCO AT SRIKAKULAM DISTRICT OF 4773 UNITS WITH AREA OF 16.48 LAKHS SFT. VALUED AT RS.261 CRORES

• CONSTRUCTION OF ACADEMIC BLOCK (NORTH WEST), HOSTEL 02 BLOCK (INCLUDING INTERNAL, PLUMBING, ELECTRICAL WORKS FIREFIGHTING, VENTILATION AND IBMS FOR BOTH BLOCKS) AND INFRASTRUCTURE & ALLIED WORKS IIT CHITTOR, SRICITY ANDHRA PRADESH APTIDCO Housing Project APTIDCO Housing Project Urban Infrastructure - Residential/Commercial Buildings

Ongoing Projects Hiranandani – Project Details

Area per Floor Area over all project Sl. Description of No tower Qty Qty Qty Qty (Sqm) (Sft) (Sqm) (Sft) A AMALFI TOWER

Typical floor (36 floors) 1,048 11,281 37,728 406,104

Basement (3 Floors) 5,504 59,246 16,512 177,738

Total 6,552 70,527 54,240 583,842

B TIANA TOWER

Typical floor (34 floors) 1,019 10,965 34,635 372,816

Basement (3 Floors) 6,505 70,024 19,516 210,072

Total 7,524 80,989 54,152 582,888

C ANCHORAGE TOWER

Typical floor (46 floors) 1,107 11,911 50,904 547,926

Basement (2 Floors) 5,806 62,492 11,611 124,983

Total 6,912 74,403 62,515 672,910

A+B +C Total Area 170,907 1,839,640 URBAN INFRASTRUCTURE Ongoing Projects

• CONSTRUCTION OF HIGH RISE RESIDENTIAL APARTMENTS WITH A BUILT-UP AREA OF 7M25M000 SFT AT VIJAYAWADA FOR VNC-GEV HOUSING.

• CONSTRUCTION OF HIRANANDANI COTTAGES AND APARTMENTS FOR HIRANANDANI UPSCALE PROJECT AT DEVANAHALLI, BANGALORE.

• CONSTRUCTION OF 36 FLOORS OF RESIDENTIAL DEVELOPMENT FOR “HIRANANDANI AMALFI” FOR HIRANANDANI DEVELOPERS AT CHENNAI.

• VIT-AP AMARAVATHY CAMPUS - PROPOSED CONSTRUCTION OF BOYS HOSTEL & GIRLS HOSTEL –HB2 (G+14 FLOORS) AT INNAVOLU VILLAGE.

• CONSTRUCTION OF CIVIL WORKS FOR ANCHORAGE BASEMENT AND BUILDING WORK FOR HIRANANDANI DEVELOPERS AT CHENNAI. (45 FLOOR TOWER WHICH IS TALLEST BUILDING IN SOUTH INDIA)

• CONSTRUCTION OF TOWNSHIP FOR TATA PROJECTS AT THEIR POWER PLANT IN NELLORE, ANDHRA PRADESH URBAN INFRASTRUCTURE Ongoing Projects URBAN INFRASTRUCTURE

Convention Centre at RGIA, Hyderabad Urban Infrastructure - Residential/Commercial Buildings Completed Projects • CONSTRUCTION OF ESIC MEDICAL COLLEGE AT SANATHANAGAR, HYDERABAD .

• CONSTRUCTION OF CLIENTS PROJECT OFFICE & ITS FACILITIES, PROJECT CONSTRUCTION PACKAGES – 6,7,8,9,IT, HT, WWT, ANNEXURE BUILDINGS, GATES & CATTLE GRIDS & MISCELLANEOUS WORKS. FOR FORD INDIA PVT LTD .

• CONSTRUCTION OF TWIN TOWERS “LANSUM ESI Medical Collage Building OXYGEN TOWERS” OF G+35 FLOORS AT VISAKHAPATNAM.

Ford India Plant, Ahmedabad Hotel & Multiplex complex, Visakhapatnam URBAN INFRASTRUCTURE RESIDENTIAL/COMMERCIAL BUILDINGS Completed Projects

• CIVIL WORKS OF SEA VALLEY RESORTS WITH A BUILT UP AREA OF 6,00,000 SFT, A MULTIPLEX AND HOTEL IN VISAKHAPATNAM.

• CONSTRUCTION OF 125 INDEPENDENT VILLAS AT CLOUD-9, INCLUDING ALL CIVIL WORKS, INTERNAL ELECTRICAL AND SANITARY WORKS IN BENGALURU FOR NU- TECH PRASIDDHI PROPERTIES.

• CHALUKYA HOLIDAY RESORTS (2 BASEMENTS + 14 Cloud 9, Bangalore FLOORS) AT BENGALURU WITH A BUILT UP AREA OF 3,30,000 SQFT.

• CIVIL AND ARCHITECTURAL WORKS FOR ‘ROYAL LEGEND’ HIGH RISE BUILDINGS OF 11 BLOCKS OF 7 STORIED BUILDINGS WITH A BUILT UP AREA OF 6,00,000 SFT AT BOMMANAHALLI, BENGALURU.

• HIGH QUALITY LUXURY APARTMENTS CALLED ‘ATRIA TOWERS’ WITH A BUILT UP AREA OF 3,00,000 SFT IN BENGALURU, DESIGNED BY SAA-SINGAPORE, CONSISTING OF THREE BLOCKS, 16 FLOORS WITH Royal Legend, Bangalore SWIMMING POOL, CLUB HOUSE ETC. URBAN INFRASTRUCTURE RESIDENTIAL/COMMERCIAL BUILDINGS Completed Projects

• RESIDENTIAL APARTMENTS ‘HM TROPICAL TREE’ WITH BUILT UP AREA OF 1,50,000 SFT IN BENGALURU FOR HM INFRATECH PVT LTD.

• CONSTRUCTION OF DIAPHRAGM WALL AND PILING WORKS FOR A COMMERCIAL COMPLEX IN BANGALORE USING TOP DOWN CONSTRUCTION.

• CONSTRUCTION OF RESIDENTIAL GOLF VIEW Golfview Apartments, Lucknow APARTMENTS FOR TULSIANI DEVELOPERS AT LUCKNOW.

• CIVIL WORKS FOR CONSTRUCTION OF APARTMENT FOR HIRANANDANI CYPRESS AT DEVANAHALLI, BENGALURU

• CIVIL WORKS FOR CONSTRUCTION OF HIGH RAISED APARTMENT FOR VGN PRAGNYA ,CHENNAI.

• CONSTRUCTION OF RELIANCE HYPER MALL, TIRUNELVELI.

• PART DESIGN AND CONSTRUCTION OF KAUSHAMBI Hiranandani Apartments, Bangalore METRO STATION AT DELHI FOR DMRC INDUSTRIAL INFRASTRUCTURE INDUSTRIAL BUILDINGS Major Ongoing Projects • CIVIL WORKS FOR BOP FOR 1X800MW SDSTPS, STAGE - II UNIT - NO. 3, KRISHNAPATNAM PROJECT IN NELLORE DISTRICT, ANAHDRA PRADESH FOR TATA.

• MAIN CIVIL WORKS (ISBL & OSBL) – HURL (6378- HGCI & 6382 – HGCO) PROJECT AT HURL, GORAKHPUR, UTTAR PRADESH FOR TOYO.

• CIVIL WORKS FOR CONSTRUCTION OF POKARNA ENGINEERED STONE LIMITED – UNIT II PLANT AT MEKAGUDA. INDUSTRIAL BUILDINGS Major Completed Projects

• CONSTRUCTION OF ‘MAINTENANCE, REPAIR AND OVERHAUL FACILITY BUILDING’ AT RAJIV GANDHI INTERNATIONAL AIRPORT AT SHAMSHABAD, HYDERABAD INCLUDING CIVIL WORKS, FINISHES, APRON AND DRAIN WORKS FOR GMR AEROSPACE ENGINEERING.

• CIVIL, FABRICATION AND ERECTION (2500 T) OF STEEL STRUCTURES AND EQUIPMENT) WORK OF GAS SUSPENSION CALCINER AT NALCO – DAMANJODI AND ANGUL, ORISSA FOR FFE MINERALS INDIA PVT. LTD.

• CIVIL WORKS FOR WET GRAVITY PLANT AND DRY GARNET Pharmazell, Visakhapatnam PLANT AT SRIKAKULAM, ANDHRA PRADESH FOR TRANSWORLD GARNET INDIA (P) LTD.

• NEW STAGE PREPARATION BUILDING AT PSLV COMPLEX - SHAR FOR DEPT OF SPACE, AT SRIHARIKOTA .

• WORKSHOP BUILDINGS 5 & 6 INVOLVING 6000 T OF STRUCTURAL STEEL FABRICATION & ERECTION AND TECHNICAL BUILDINGS 9, 10, 11 & 12 WITH ALLIED CIVIL WORKS FOR DIRECTOR GENERAL OF NAVAL PROJECTS.

• DM & PT PLANT PACKAGE FOR SOLAPUR SUPER THERMAL POWER PROJECT (2 X 660 MW) AT PHATATEWADI, NTPC SOLAPUR

Wet Gravity and Dry Garnet Plant, Srikakulam INDUSTRIAL BUILDINGS Major Completed Projects

• CIVIL AND STRUCTURAL WORKS FOR ALUMINIUM ALLOY WHEEL PLANT AT VISAKHAPATNAM FOR SYNERGIES- DOORAY AUTOMOTIVE LTD.

• CONSTRUCTION OF INDUSTRIAL BUILDINGS, CONTROL ROOMS, CONVEYORS, HEAD WORKS , INTAKE WELL, FILTRATION GALLERY, JACKWELL, QUARTERS FOR SPONGE IRON PLANT AT CHANDRAPUR, MAHARASHTRA FOR LLOYDS METALS & ENGINEERS LTD.

• CIVIL WORK FOR THE MAIN PLANT INCLUDING MACHINE FOUNDATIONS, COMPOUND WALL , DG ROOM, SCCESSORY BUILDINGS AROUND THE MAIN PLANT INCLUDING WATER RE- Steam Turbine Hall, Godavari Gas CIRCULATING PLANT FOR POKARNA ENGINEERED STONE Power Project, Kakinada LIMITED, AT APSEZ , VISAKHAPATNAM.

• CIVIL WORKS INCLUDING SITE GRADING, CONSTRUCTION OF BUILDINGS, RCC WATER TANKS, RCC EFFLUENT STORAGE TANKS, ROADS AND DRAINSFOR PHARMAZELL (VIZAG) PVT LTD. AT VISAKHAPATNAM.

• CIVIL WORKS FOR LAMINATED GLASS WINDSCREEN MANUFACTURING FACILITY FOR PILKINGTON AUTOMOTIVE INDIA PVT. LTD. AT VISAKHAPATNAM.

• CIVIL WORKS FOR BP-18 AIR SEPARATION PLANT FOR PRAXAIR INDIA PVT LTD. AT BELLARY. 3x33 MW STG Project, Bina INDUSTRIAL STRUCTURES Hanger for MASGMR at Hyderabad Airport INDUSTRIAL STRUCTURES

Granite Stone Plant for Glass Factory for Pilkington Pokarna Ltd Automotive Pvt Ltd. INDUSTRIAL STRUCTURES

Reliance Hyper Market-Andhra Pradesh INDUSTRIALSTRUCTURES

INTERIM INTERNATIONAL DEPARTURE TERMINAL BUILDING, RGIA- HYDERABAD INDUSTRIALSTRUCTURES

INTERIM INTERNATIONAL DEPARTURE TERMINAL BUILDING, RGIA- HYDERABAD

POWER PLANTS 208 MW Godavari Gas Power Major Ongoing Projects Project, Kakinada

• CIVIL WORKS FOR BOP FOR 1X800 MW SDSTPS, STAGE – II UNIT NO 3 KRISHNAPATNAM PROJECT IN NELLORE DISTRICT, AP. Major Completed Projects

• 1X30 MW CAPTIVE POWER PLANT FOR ARYAN COAL BENEFICATIONS PVT. LTD. CONSISTING OF TURBINE HOUSE, BOILER HOUSE, ESP FOUNDATION, CONTROL ROOM, SILOS, MATERIAL HANDLING SYSTEM, CRUSHER HOUSE, WATER TREATMENT PLANT, COOLING TOWER ETC.

• 208 MW COMBINED CYCLE POWER PLANT AT KAKINADA FOR ROLLS ROYCE INDUSTRIAL POWER (INDIA) LTD., INVOLVING 5- Vijay Nirman's quality and CELL RCC COOLING TOWER, WATER TREATMENT FACILITY, adherence to time schedules are STRUCTURAL STEEL FABRICATION & ERECTION FOR THE GAS TURBINE CANOPY & STEAM TURBINE HALL, RESERVOIR LINER notable and they are very PROTECTION ETC. responsive to the client's needs. By adopting the approach that simple • CIVIL & STRUCTURAL WORKS INCLUDING PILE FOUNDATIONS, PILE solutions to engineering CAPS, DG FOUNDATION, DG BUILDING, TRANSFORMER HOUSE, RAW complexities are possible, they WATER TANK, WATER TREATMENT PLANT, COOLING TOWER displayed a capacity to innovative. FOUNDATIONS, CHIMNEY FOUNDATIONS ETC FOR 3 X 10 MW CAPTIVE POWER PLANT AT BHADRAK, RANDIA (DIST) FOR FERRO They never showed any tendency to ALLOY CORPORATION LTD, BALASORE. dispute or involve in litigation.” • CIVIL WORKS FOR POWER BLOCK PACKAGE FOR 2X300MW-TRN V.P.Hodge, Project Director, ENERGY THERMAL POWER PROJECT AT RAIGARH CHHATTISGARH. Rolls – Royce Industrial Power Limited, England ELECRICAL WORKS Major Completed Projects

• 11KV SUBSTATION, OVERHEAD LINES, SWITCHYARD, TRANSFORMERS, DG SETS, HT / LT PANELS INSTRUMENTATION & PLC SYSTEMS, INTERNAL ELECTRIFICATION WORKS OF WET GRAVITY PLANT AND DRY GARNET PLANT FOR TRANSWORLD GARNET INDIA (P) LTD. AT SRIKAKULAM.

• 33 KV SUBSTATION, SWITCHGEAR, POWER WIRING AND DISTRIBUTION NETWORK AT ALUMINIUM ALLOY WHEEL PLANT AT VISAKHAPATNAM FOR SYNERGIES-DOORAY AUTOMOTIVE LIMITED.

• CONSTRUCTION POWER SUPPLY SYSTEM WITH TRANSFORMER, SUBSTATION AT VISAKHAPATNAM STEEL PLANT EXPANSION TO 6.30 MILLION TONNE FOR RASHTRIYA ISPAT NIGAM LIMITED.

• PROVISION VIB AND POWER HOUSE AT OUTER WHEELER ISLAND FOR CCE (R&D), NEW DELHI . MATERIAL HANDLING SYSTEMS Major Completed Projects

• OPERATION AND MAINTENANCE OF BULK MATERIAL HANDLING SYSTEM FOR VIZAG SEAPORTS AT VISAKHAPATNAM.

• CIVIL, STRUCTURAL AND ARCHITECTURAL WORKS RELATED TO SOLID MATERIALS HANDLING SYSTEM INCLUDING BUNKERS, CONVEYER GALLERIES, TRANSFER TOWERS, CRUSHER HOUSES, STACKER RECLAIMER COMPLEX, HOPPERS, WAGON TIPPLER STRUCTURES ETC. FOR 3X33 MW STG PROJECT, BHARAT OMAN REFINARY LTD., BINA FOR BHEL .

• CONSTRUCTION OF WAGON TIPPLER, FABRICATION AND Gangavarm port, Visakhapatnam ERECTION OF CONVEYOR STRUCTURES AND ASSOCIATED ELECTRO-MECHANICAL WORKS RELATED TO BULK MATERIAL HANDLING SYSTEM INCLUDING DUST SUPPRESSION SYSTEM AT GANGAVARAM PORT, VISAKHAPATNAM FOR GANGAVARAM PORT LTD.

• EXPANSION OF ALUMINA HANDLING FACILITIES AT NALCO’S PORT FACILITY AT VISAKHAPATNAM.

• CONSTRUCTION OF AMMONIA STORAGE TANK & HANDLING FACILITIES AT KAKINADA FOR GODAVARI FERTILISERS & CHEMICALS LTD.

• CIVIL & STRUCTURAL WORKS FOR AMMONIA TANK FOUNDATION & RELATED FACILITIES FOR COROMANDEL FERTILISERS LTD., VISAKHAPATNAM PILING WORKS Major Completed Projects PILING WORKS :

• PILING AND RCC WORKS IN BACK UP AREA FOR EQ9 BERTH AT VSPL. IN VISAKHAPATNAM.

• GROUND IMPROVEMENT AND EARTH WORKS IN CONNECTIOIN WITH CONTAINER FREIGHT STATION PROJECT SITUATED AT EXIM PARK AREA – VISAKHAPATNAM

• CIVIL AND FOUNDATION WORKS RELATED TO BULK MATERIAL HANDLING SYSTEMS - PACKAGE 4F FOR GANGAVARAM PORT LIMITED VISKHAPATNAM

DIAPHRAGM WALLS :

• CONSTRUCTION OF DIAPHRAGM WALL AND GUIDE WALL FOR LAUNCHING SHAFT AND STATION BUILDING OF DMRC AT JANPATH, DELHI FOR PRATIBHA-CRFG JV.

• CONSTRUCTION OF DIAPHRAGM WALL FOR MFAR COMMERCIAL DEVELOPMENT AT BANGALORE. SPECIALIZED WORKS – BALLAST-LESS TRACK Major Projects

• TRACK WORK BETWEEN TIRUMALAI – TARAMANI STATIONS FOR MRTS PHASE II, CHENNAI.

• TRACK OVER THE VIADUCT FOR VARIOUS STRETCHES OF LINE-3 (ON DWARAKA SIDE) OF DMRC, DELHI.

• TRACK OVER THE VIADUCT FOR VARIOUS STRETCHES IN EXTENSION OF LINE 3 OF DMRC (ON DWARKA SIDE) AT DELHI FOR CONTRACT 3T-06 OF DMRC

• PHASE – II, PART - 2 CORRIDOR OF DMRC (CENTRAL SECRETARIAT - GREEN PARK - QUTUB MINAR - SUSHANT LOK) OF DMRC, DELHI.

• UDHAMPUR-KATRA SECTION OF UDHAMPUR- SRINAGAR-BARAMULLA SECTION FOR IRCON INTERNATIONAL LTD. SPECIALIZED WORKS – BALLAST-LESS TRACK Major Projects

• SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF TRACK WORK INCLUDING INSTALLATION OF THIRD RAIL SYSTEM IN UNDERGROUND AND REACH-3B SECTIONS OF BANGALORE METRO RAIL PROJECT - PHASE-1.

• TRACK OVER THE VIADUCT AND UNDERGROUND FOR PART-2 CORRIDOR OF SECTIONS OF JANAKPURI WEST – KALINDI KUNJ (LINE 8) AND CENTRAL SECRETARIAT – KASHMERE GATE (LINE 6 EXTN) OF DMRC PHASE – III.

• CONSTRUCTION OF BALLASTED AND BALLASTLESS TRACK WORK FOR MUMBAI METRO, MUMBAI

• TRACK IN THE UNDERGROUND IN DELHI FROM JANPATH TO MANDI HOUSE INCLUDING 2 STATIONS OF JANPATH & MANDI HOUSE FOR DMRC BT-01 CONTRACT IN DELHI

• TRACK OVER THE VIADUCT IN CONNECTION WITH THE EXTENSION OF METRO RAILWAY, KOLKATA FROM TOLLYGUNGE TO GARIA WATER AND SEWAGE TREATMENT SYSTEMS

MAJOR COMPLETED PROJECTS:

• PRODUCTION BUILDING, UTILITY BLDG, PUMP HOUSE, SUBSTATION BLDG, SUMPS, TREATMENT PLANTS, STORAGE SHEDS, WARE HOUSE, WORK SHOP, ADMINISTRATION BLDG, COMPOUND WALLS, DRAINS.

• CIVIL AND STRUCTURAL WORKS FOR 100 MLD DE-SALINATION PLANT AT NEMMELI IN TAMILNADU FOR CMWSSB FOR VA TECH WABAG LTD.

• REGIONAL RURAL WATER SUPPLY SCHEME OF MAHARASHTRA JEEVAN PRADHIKARAN AT GONDPIPRI .

• REGIONAL RURAL WATER SUPPLY SCHEME OF MAHARASHTRA JEEVAN PRADHIKARAN AT WARDHA, MUMBAI.

• CONSTRUCTION OF AQUEDUCT ON BEMBLA RIVER MAIN CANAL IN YEOTMAL DISTRICT FOR VIDARBHA IRRIGATION DEVELOPMENT CORPORATION.

• CIVIL WORK FOR GRANITE STONE PLANT AT APSEZ LTD OUR CLIENTS CONTINUOUS CLIENT RELATIONSHIPS

FY 2013-18 FY 2012 FY 2012 FY 2012 Calgary Apartment, Phase III, Phase Phase II Cypress Amalfi, Tiana, IV Cottage Cottage Apartment Anchorage Towers

FY 2009 FY 2015 FY 2010 1) Fy 2011 Fy 2012 1) Structure work Four laning of Construction Structure workNH- NH-8 Rajasthan. Structure Rohtak to of Tapi 71 2) Roads 2) Structure work Bridge and building MP work MP NH-13 (MH) Hissar section

FY 2016 Fy 2016 Fy 2016 Fy 2016 Fy 2016 Contract CC-47 Development Elevated Viaduct Twin tunnel works Twin tunnel works Development 6 lane works from Mundka to at Bhanpura at Bhanpura 6 lane works at Tikri Canal Project Canal Project at Harayana Ghaziabad

FY 2012 FY 2012 FY 2013 FY 2013 Civil work MEPF Main substation Machine Boundary –FIPL-Admin / FIPL-II building Wall fencing Canteen

2018 2019 2018 Purvachal Samruddhi Jhansi – Khajurao Expressway Expressway Structures Structures Structures CONTINUOUS CLIENT RELATIONSHIPS

FY 2007 FY 2010 FY 2011 FY 2012 Civil FY 2016 works at DFCC Bridge Awarded Chennai Hangar Works Airport works at Tindivanam ORR HYD-Airport Hyderabad Kanpur

FY 2017 FY 2017 FY 2017 FY 2016 Earthworks of Construction of FY 2017 DFCC Bridge Four lane Apron Expansion Taxiway PAPA-1 Terminal Building works at Mirzapur approach at HYD Airport at Delhi Airport at Hyd Airport ramp

FY 2009 Fy 2011 Awarded FY 2010 Fy 2012 Structures on Awarded Flyover Toll Plaza Toll Plaza Noida-Agra ` @ Noida for ` 601m Agra Noida 1,638m project

FY 2008 FY 2010 FY 2012 FY 2012 Awarded Awarded Salem - Hyper Mall Tirunelveli Karur Bypass Ullunderpet ` Guntur Hyper Mall ` 1,851m 1,966m SITE PHOTOGRAPHS WE BUILD PROJECTS THAT MAKE INDIA PROUD

Interchange at 0.00km, Taj Expressway. Lakshmanatheertha Bridge near Mysore.

Superstructure Work at MRTS, Chennai Construction of Tapi Bridge at Ballastless Track Work, Dhule for Sadhbav Engineering Mumbai Metro Rail Construction of Diaphragm Desalination Plant for Wall for Mfar at Manyatha Watech Vabag at Nemmelli, Tech park, Bangalore Chennai Largest Concrete Truss Span at Kakinada LANSUM OXYGEN TOWERS Premium Villas “ Cloud 09 ” Royal Legend Apartments at at Bengaluru Bengaluru ESI – HOSPITAL - HYDERABAD Gangavaram Port - Tippler House – ESIC –Electrical Panel Room Ore Conveyor Belt

Sea Gold - Jetty Reliance Hyper Mall Contact us

Registered & Branch Office – Branch Office – Corporate Office – Hyderabad Delhi Visakhapatnam Address: 8-3-833/118, AddressFlat No. 2A, Pocket 7, Kamalapuri Phase – 1, Address: #11-09-16, Rihayasi Apartment, Dasapalla Hills, Srinagar Colony, Hyderabad – Visakhapatnam – 530003, 500 073 Sector – 12,

Andhra Pradesh, India Phone: +91 40 42015019 Near Dwaraka Sector 12 Metro Station, Phone: +91 891 2575755 Fax: +91 40 23733890 NEW DELHI – 110078 Fax: +91 891 2754046 Email: [email protected] Email: Email: [email protected] [email protected]

Branch Office – Branch Office – Bangalore Nagpur Address: Plot No. 29, Sobha Address: #105, 7th Main, 4th Heights, Cross, S.E Railway Co.op. Housing MLA Layout, RMV 2nd Stage, Society,

Bengaluru – 560 094 Somalwar High School Road, Near Pratap Nagar Police Phone: +91 80 67433355 Chowki, Pratap Nagar, Nagpur, Fax: +91 80 67433356 Maharashtra-440022