CANCELLED WIND POWER PROJECTS IN As on 31.07.2021 Sl No Companies Government Order Capacity in Location District Cancelled MW Government order 1 Smart Buy Inc DE 26 NCE 1999 dated 13.5.1999 5 Kanavahatti EN 493 NCE 2008 dated 8.5.2009

2 Valdel Power (P) Limited DE 246 NCE 2003 dated 12.6.2003 10 Malenahalli Tumkur EN 497 NCE 2008 dated 8.5.2009

3 J.N.Investments and trading company (P) DE 245 NCE 2002 dated 26.10.2002 13.7 Chickkabyaladakere, Tumkur EN 451 NCE 2008 Limited Dasagudi, Gollarahalli, dated 8.5.2009 Somanahalli and Timmapanahalli

4 Bellary Wind Power Private Limited DE 243 NCE 2002 dated 5.3.2003 24 Gurusiddapur (10 MW, Bellary EN 465 NCE 2008 Golarahatti and dated 8.5.2009 Jaramalai (6.00 MW), Munirabad (8.00 MW)

5 Sunil Agro Foods Limited DE 39 NCE 1997 (7) dated 2 Chikkodi EN 494 NCE 2008 dt 23.10.1997 8.5.2009 6 Renewable Energy Systems Limited DE 39 NCE 1997 (1) dated 6.5 Chikkodi Belgaum EN 455 NCE 2008 dt 23.10.1997 8.5.2009 7 Malagatti Wind Power Private Limited DE 248 NCE 2002 dated 5.3.2003 40 Tumkur Tumkur EN 466 NCE 2008 dated 8.5.2009

8 Indo Wind Energy Private Limited DE 26 NCE 1999 dated 13.5.1999 5 Kabadigerehatti Gadag EN 456 NCE 2008 dated 19.6.2009

9 Enercon (I) Ltd DE 98 NCE 2000 dtd 10/07/2000 15.000 Belgaum EN 471 NCE 2008 dated 11.08.2009

10 Weizmann Ltd DE 133 NCE 97(5) dated 20.04.1998 4.8 Arasinagundi EN 450 NCE 2008 dated 27.11.2009

11 Nuziveedu Seeds Limited EN 58 NCE 2004 dT 20.2.2004 45.00 , Tarehalli, Kolar and EN 207 NCE 2010 dt Kelagettu Davangere 14.12.2010

12 Baledh Energy Projects Limited EN 60 NCE 2004 dt 4.3.2004 35.00 Chikkamagalur Chikkamagalur EN 212 NCE 2010 dt 14.12.2010 13 Fiza Developer and Inter-trade (P) Limited EN 319 NCE 2004 dt 21.12.2004 15.00 Yeradahamkallu Chikkamagalur EN 208 NCE 2010 dt 2.2.2011 14 Vestas Wind Technology () Private EN 210 NCE 2005 dt 20.08.2005 & 102.75 Sugur, Biranhalli, Gulburga, Bidar, EN 441 NCE 2011 dt Limited EN 124 NCE 2002 dt 5.3.2003 Chimmangodu, Bagalkot, 11.01.2012 Muthangi, Chitradurga and Kusarmpalli,Badami, Gadag Yakkalara, Jogimatti and Kappatagudda

15 Vestas Wind Technology (India) Private EN 283 NCE 2005 dt 14.10.2005 36.30 Nysargi, Swanhalli, and Uttarkannada EN 441 NCE 2011 dt Limited and EN 284 NCE 2005 dt Yalapura and Belgaum 28.5.2012 14.10.2005 16 Sarjan Realities Limited EN 60 NCE 2005 dt 22.03.2005, EN 16.8 Rangayanadurga Davangere EN 167 NCE 2012 dt 560 NCE 2009 dt 12.11.2010 3.7.2012

17 Suzlon Energy Limited DE 98 NCE 2000 dtd 10/07/2000 14.75 Hanumanahatti Belgaum EN 172 NCE 2011 dt 17.07.2012

18 Doddanavar Global Energy (P) Limited EN 93 NCE 2009 dt 4.2.2010, EN 1.20 Thoranahalli Belgaum EN 230 NCE 2012 dt 218 NCE 2011 DT 10.8.2011 14.08.2012 19 Enercon India Limited and its group DE 133 NCE 1997 (1) Dt 20.4.1998, 603.61 Bharmpura, Jogimatti, Chitradurga, EN 207 NCE 2011 companies DE 364 NCE 2004 Dt 12.11.2004, Thimmapur, Belgaum, dated 16.8.2012 DE 26 NCE 1999 dt 13.5.1999 and Gangadikoppa, Chikka Davangere, DE 46 NCE 2000 dt 17.7.2000 - Handigola, Hirekoppa, Gadag, 1.72 MW, DE 98 NCE 2000 dt Adavisomapura, Belhatti, , 17.7.2000 and EN 76 NCE 2005 Alginvad, , Bangalore rural, dt 18.3.2005 - 26.4 MW, DE 241 Kerehalli, Chakanhalli, Shimoga, NCE 2001 dt 19.6.2002 and EN 320 Kendanahalli, Tumkur and NCE 2005 dt 25.10.2005 -5.4 MW, Mattanahalli, Kolar DE 268 NCE 2002 dt 22.11.2002 & Nambiganahalli, EN 319 NCE 2005 dt 25.10.2005 - Ayinahlli, 72 MW, EN 201 NCE 2005 dt Gaudagondanahlli, 18.8.2005 and EN 200 NCE 2006 dt Alpanahalli, 19.5.2006 - 12 MW, EN 398 NCE Marigdikapalu, Kadaga, 2005 dt 20.4.2006, EN 209 NCE Jmanur & Dodvadi 2006 dt 26.5.2006 and EN 146 NCE 2007 dt 17.5.2007 -24.8 MW, DE 245 NCE 2002 dt 26.10.2002 - 13.7 MW, EN 41 NCE 2006 dt 20.4.2006, EN 400 NCE 2010 (1) dt 27.9.2010, EN 148 NCE 2011 dt 23.3.2011 and EN 148 NCE 2011 dt 4.7.2011 (8.58 MW), DE 181 NCE 2002 dt 26.10.2002 and EN 77 NCE 2005 dt 18.3.2005 (68 MW) and EN 302 NCE 2006 dt 16.10.2006 (371.01 MW)

20 Bhoruka Power Corporation Limited EN 136 NCE 2006 dt 23.3.2006 and 54.35 Nargund, Gadag and Chitradurga & EN 191 NCE 2012 EN 18 NCE 2006 dt 21.4.2006 Doddasiddavanahalli, Gadag dated 21.8.2012 Chitradurga 21 GVR Infra Projects Limited EN 327 NCE 2006 dt 16.10.2006 35 Goddatimanahalli, Kolar EN 233 NCE 2012 dt Nagalapura 27.8.2012 22 Vestas Wind Technology (India) Private EN 247 NCE 2002 dt 5.3.2002, EN 147.28 Yermale, Hanumapura, Belgaum, EN 441 NCE 2011 dt Limited 285 NCE 2005 dt 14.10.2005 and Hatarwar, Vemalaiguda Chamrajnagar, 08.11.2012 EN 319 NCE 2006 dt 16.10.2006 and Heddur Dharwad, Chikkamagalur and Shimoga

23 Mysore Mercantile Company Limited EN 108 NCE 2005 dt 02.09.2005 18.00 Nabhapura and Belgaum EN 56 NCE 2012 dt and EN 204 NCE 2005 dt Kutharnahatti 02.04.2013 02.09.2005 24 Enercon India Limited EN 198 NCE 2005 dt 18.08.2005 108.80 , Yekkundi, Belgaum EN 158 NCE 2013 dt and EN 60 NCE 2006 dt 10.02.2006 Sirsangi, Kollur, Halgatti 06.07.2013 and 25 Chiranjeevi Wind Energy Limited EN 206 NCE 2005 dt 02.09.2005 132.25 Honnashettihalli, Shimoga, EN 47 NCE 2012 dt Baragehalli and Gangur Bellary, 5.8.2013 (6 MW)- Tumkur, Belgaum, Narasettihalli, Hassan and Honnanayakanahalli, Tumkur Anumanahalli, Kammaranahalli, Harmghatt, Mallapura (70.5 MW)-Shimoga, Hambalghatt (3.75 MW)- Bellary, Gangur, Chittanahalli, Handdralu, Kasturkoppalu, Madenahalli, Hiriyur, Kodihali,Bandur, Mallenhalli, Gollarahatti, Rampur (45 MW)-Hassan and Halki, Malgali - (7 MW)-Belgaum 26 Four EF Wind Power (P) Limited EN 291 NCE 2005 dt 14.10.2005 26.75 Venkatapura, Belgaum and EN 43 NCE 2012 dt Bedarahatti and Madikeri 5.8.2013 Talakaveri, Kuttagipillu Motted, Thungapare Motte, Mavala Motted

27 Suzlon Energy Limited DE 98 NCE 2000 dtd 10/07/2000 31.50 Chikkodi Belgaum EN 52 NCE 2012 dt and EN 484 NCE 2010 dt 13.08.2013 28.12.2010 28 Suzlon Infrastrcture Limited EN 192 NCE 2005 dt 19.8.20005 215.60 Bommanakatte, Chitradurga, EN 10 NCE 2012 dt (41 MW), EN 193 NCE 2005 dt Bhadrapura, Kalapura, Dharwad, 20.8.2013 19.8.2005 (6 MW & 8.4 MW), EN Nerlakar, Antharagange Hassan, 194 NCE 2005 dt 19.8.2005 (17.4 and Bisalamane, Tumkur, Bellary, MW, 2.4 MW & 12.6 MW), EN 195 Malappanahatti, Sirigere Belgaum and NCE 2005 dt 23.08.2005 (10.2 and Halaghatta - (55.4 Madikere MW), EN 267 NCE 2005 dt MW) - Chitradurga, 14.10.2005 (13.2 MW & 8.4 MW), Jalligere, Majjur, EN 268 NCE 2005 dt 14.10.2005 Kodkolm , (4.8 MW), EN 269 NCE 2005 dt Machinahalli, 14.10.2005 (15 MW), EN 270 NCE Beldasnditanda (32.4 2005 dt 14.10.2005 (3.6 MW & 1.8 MW)- Dharwad , Koppalu MW), EN 271 NCE 2005 dt (10.2 MW)-Hassan, 14.10.2005 (16.8 MW & 3.6 MW) Havinamudugu, and EN 292 NCE 2005 dt Viranahalli, Boragunte, 14.10.2005 (50.4 MW) Gidadagalahalli and Kunigalthimmanahalli, , Kabigere, Kenchenahalli and Tippadasarhalli - 21. 6 MW- Tumkur, Lakalhalli, Agrahara and Survanahalli (4.8 MW)- Bellary, Tirumalapura, Santhanahalli, Vishwanathanahalli, and Gollarahalli (15 MW)- Shimoga Maddur, Jallikatti, Magnur and Rampura (5.4 MW)- Belgaum, Maligenahalli, Kenchanahalli, Nandibail, Siddarahalli, Kokkanahalli, Morgonahalli, Saraswathipuram and Rampura- (20.4 MW) - Chikkamagalur and 29 Cape Infrastructure Private Limited EN 231 NCE 2005 dt 19.8.2005 and 33.50 Gandhal, Wanagatti, Raichur (18.5 EN 57 NCE 2012 dt EN 289 NCE 2005 dt 14.10.2005 Advibhavi, Hire Wadarkal MW) and 22.08.2013 (8 MW), Yerdoddi, Chikkamagalur Bagalgudda, Medkanhal & Hassan (15 (4 MW), Wasur, MW) Adavibhavi, Malur (3.5 MW) and Wirapur, Nandihalli, Kakkargol (3 MW) in Raichur District and Nilanahalli, Biranahalli, Gollarahatti, Siddapura, Bidare, Nayakarahatti (Chikkamagalur District - 7.5 MW), Basavanahalli, Bidare PTO, Kanchagal, , Kundur, Sidramanahalli, Madapura, Rangapura (Chikkamagalur and Hassan District-7.5 MW)

30 Arul Marimman Textiles Limited EN 43 NCE 2006 dt 21.4.2006 6.50 Bommanahalli, Chitradurga and EN 353 NCE 2012 dt Hosagudda, Maidur, Haveri 27.09.2013 Kamalapur and Hallur 31 Kondibari Energy Private Limited EN 19 NCE 2006 dt 21.4.2006 25.50 Biranahalli, Chikkamagalur EN 355 NCE 2012 dt Kabbigarahalli, 30.11.2013 Devagondanahalli, Sindigere and Kattetimmanahalli

32 Marudhavel Industries Limited EN 48 NCE 2006 dt 21.4.2006 5.25 Nandi, Lingadahalli and Chikkamagalur EN 358 NCE 2012 dt Sayadripura 30.11.2013 33 Enercon India Limited EN 268 NCE 2002 dt 22.11.2002, 30.00 Shendr, Dondikoppi, Belgaum EN 256 NCE 2013 dt EN 319 NCE 2005 dt 25.10.2005 Shipur, Taundi and 14.5.2014 Hatlarwal 34 Coorg Wind Energy EN 315 NCE 2006 dt 16.10.2006 12.00 Torimale Nidhimale and Madikere EN 357 NCE 2012 dt Bhagamandala 27.5.2014 35 Pioneer Asia Wind Turbines EN 147 NCE 2006 dt 20.4.2006 10.00 Guddehosur, Madikere & EN 356 NCE 2012 dt Kambibana, Kallur, Mysore 27.5.2014 Motur, Madapatna, Kushalnagar

36 Ajitkumar R Shah EN 107 NCE 2006 dt 20.4.2006 2 Channadaddi Belgaum EN 373 NCE 2012 dt 27.5.2014 37 Maruthi Power Infra Bangalore Private EN 50 NCE 2006 dt 21.4.2006 20.00 Kasturirangappanahhali, Chitradurga and EN 382 NCE 2012 dt Limited Dyagerahalli, Tumkur 16.8.2014 Madenahalli, Lambadihatti

38 Vajrapada Energy Private Limited EN 297 NCE 2005 dt 14.10.2005 25.00 Thimmarajapur, Mysore EN 54 NCE 2012 dt Madhavanahalli 16.08.2014 39 Enercon India Limited (CLP Wind Farms EN 198 NCE 2005 dt 18.08.2005 10.40 , Katmali Belgaum EN 257 NCE 2013 dt (India) Private Limited and EN 60 NCE 2006 dt 10.02.2006 & Huli, Mallapura, 16.8.2014 (Out of 82.4 MW, 72 MW commissioned and balance 10.4 MW cancelled ). 40 Suzlon Infrastrcture Limited EN 36 NCE 2006 dt 20.4.2006 (13.2 293.5 Melukote, Madhugiri RF Mandya EN 259 NCE 2013 (1) MW), EN 35 NCE 2006 dt 20.4.2006 & Kolikal SF, Tumkur, Bijapur dt 2.1.2015 (11.4 MW), EN 37 NCE 2006 dt Thipagondanahalli and Bangalore 20.4.2006 (15 MW), EN 14 NCE Shibanahalli, Kolar 2006 dt 20.4.2006 (44.4 MW),EN 40 Chikkabalapura, Shimoga & NCE 2006 dt 20.4.2006 (17.4 Sakaleshpura SF, Chikkamagalore, MW),EN 38 NCE 2006 dt 20.4.2006 Kurubarahalli, Hassan Coorg (6 MW),EN 11 NCE 2006 dt Thimasandra, Chitradurga, 20.4.2006 (19.8 MW),EN 39 NCE Shibanahalli, Mysore 2006 dt 20.4.2006 (27 MW),EN 12 Gotegahalli, Belekeri, & Bellary NCE 2006 dt 20.4.2006 (55.2 Siralvadi, Guddagapalya, MW),EN 10 NCE 2006 dt 20.4.2006 Bajatadripura, (1.8 MW),EN 99 NCE 2006 dt Vajrapura, 20.4.2006 (13.75 MW),EN 34 NCE Chikkaramapura, 2006 dt 20.4.2006 (3 MW),EN 298 Garudapaura, NCE 2006 dt 16.10.2006 (3.6 Madenahalli, Maligere, MW),EN 296 NCE 2006 dt Arenahalli, 16.10.2006 (30.45 MW) and EN 299 Ragibasavanahalli, NCE 2006 dt 16.10.2006 (31.5 MW) Hosahalli, Durugire, Balekatte, Siegegudda SF, Bachenahalli, Masavatur, Hondravali, Sanivarasanthe, Kargodu, Gonnahalli, Konehosuru, Gilalgundi, Kambaduru, Kyadikoppa, Kathigehalli, Ramanamatti, Suragondanakoppa, Honnavalli, Parasikoppa, Guttanahalli, Muthatbailu, Kotekoppa, Hunsekatte, Shyadagalale, Janurmane, Narasipura, , Gummanahalli, Tolalu, Gobbe, Gindehalli, Mavinakere, 41 Suzlon Energy Limited and its group EN 38 NCE 2006 dt 20.4.2006 (22.2 414.4 Kondali, Uvanramukhli, Hassan, Surrenderred vide companies MW), EN 36 NCE 2006 dt 20.4.2006 Rudragiri, Mulaina Giri, Tumkur, letter No Nil dated (3 MW), EN 40 NCE 2006 dt Gollarahatti, Ranibennur Chikmagalur, 28.01.2009 and 20.4.2006 (17.4 MW), EN 39 NCE RF, Malukote, Bellary, Mandya, Cancelled vide 2006 dt 20.4.2006 (5.4 MW), EN 59 Madhukeri SF, Bangalore, Kolar, Government Order NCE 04 dt 8.3.04 (30 MW), EN 56 Thipagondanahalli, Chitradurga, No EN 259 NCE 2013 NCE 04 dt 12.3.2004 (12 MW), EN Chikkabalapura, Shimoga,Chikka (2) dt 2.1.2015 37 NCE 2006 dt 20.4.2006 (10.8 Sakaleshpura SF, magalur and MW), EN 34 NCE 2006 dt Thimsandra, Gotegahalli, Dharwad 20.04.2006 (7.4 MW), EN 100 NCE Belekeri and Siralvadi, 05 dt 19.8.2005 (12.4 MW), DE 56 Guddadapalya, NCE 2004 dt 12.03.2004 (36 MW), Vajrapura, Garudapura, EN 193 NCE 2005 dt 19.8.2005 (12 Malligere, MW), EN 195 NCE 05 dt 23.8.2005 Ragibasavanahalli, (10.2 MW), EN 192 NCE 05 dt Sigeeguda SF, 19.8.2005 (85 MW), EN 292 NCE Bichenahalli, Masvatur, 2005 dt 14.10.2005 (9 MW), EN 271 Konehosuru, Gilalgundi, NCE 2005 dt 14.10.2005 (94.2 Honnavalli, Kotekoppa, MW), EN 269 NCE 2005 dt Arehalli,Karakalaghatta, 14.10.2005 (15.6 MW), EN 293 NCE Dasiripalli, Marangere, 2005 dt 14.10.2005 (27 MW), EN Bommanagaudenapalya, 60 NCE 2005 dt 22.03.2005 (3.6 Kondihalli, MW) and EN 98 NCE 2000 dt Kasappanahatti, 10.7.2000 (1.4 MW) Jogihalli, Devappapura, Vaddarahalli, Sakshihalli,, Badagollarahatti, Chikka Byaladakere

42 Kirloskar Electric Company Limited DE 16 NCE 1997 dt 14.5.1997 2 Hargapur and Solapur Belgaum EN 312 NCE 2012 dt (Commissioned proejct, but compay 8.1.2015 not renewed the lease agreement and not paid the lease amount to Revenue Department 43 Prakruthi Wind Energy EN 329 NCE 2006 dt 16.10.2006 14 Nagenahalli, Chitradurga, EN 370 NCE 2012 dt Kabadigarahalli, Davangere and 13.01.2015 Halimallapur, Kasipur, Kolar Kerebilichi, Upparpet

44 Vestas Wind Technology (India) Private EN 281 NCE 2005 dt 14.10.2005 14.85 Mudalhundi, Mysore and EN 170 NCE 2014 dt Limited (8.25 MW) & EN 287 NCE 2005 dt Puttegundanahalli, Dharwad 3.3.2015 14.10.2005 (6.6 MW) Hunaganagalli and Mandihal, and Varanagowli

45 Mangalam Wind Energy Private Limited DE 48 NCE 2002 dt 20.06.2002 36 Lingadahalli Chikkamagalur EN 177 NCE 2014 dt and DE 117 NCE 2006 dt 3.3.2015 21.05.2003 46 KSK Wind Power Aminabhavi Chikkodi EN 400 NCE 2004 dt 5.1.2005 & 15 Chikkodi Belgaum EN 181 NCE 2014 dt Private Limited EN 328 NCE 2011 dt 15.9.2011 25.7.2015

47 Shah Agency EN 127 NCE 2006 dt 20.4.2006, EN 9 Jaladihalli, Hire Chikkamagalur EN 354 NCE 2012 dt 108 NCE 2006 dt 20.4.2006, EN Kanavangala, Hosahalli, and Shimoga 25.7.2015 125 NCE 2006 dt 20.4.2006, EN Chikkakanavangala 126 NCE 2006 dt 20.4.2006 (Chikkamagalur-3 MW), Niralagundi, Bevinahalli, Singatagere (Shimoga - 2 MW), Chikkalakatte,Shivapur,S akunagir, Koracharahatti, Halsinamaradahalli (Chikkamagalur - 2 MW) & Maravanji,Madagondanah alli,Bidaganahalli, Gangodahalli, Pandavamatti (Shimoga- 2 MW) 48 Vestas Wind Technology (India) Private EN 247 NCE 2002 dt 5.3.2003, EN 30 Bagalkot - 8 MW, Bagalkot, Gadag EN 173 NCE 2014 dt Limited 463 NCE 2006 dt 21.12.2006 and -Gadag-7MW & and Belgaum 25.7.2015 EN 441 NCE 2011 dt 11.01.2012 Belgaum -15MW

49 J.H.Patel Power Proejcts Private Limited EN 23 NCE 2006 dt 8.5.2006, EN 30 Shivanagar, Kerabilichi, Davangere and EN 371 NCE 2012 dt 331 NCE 2008 dt 21.3.2009 Arasinaghatt & Shimoga 25.7.2015 Shanthisagar, Chennagiri (Davangere- 5 MW) & Hunasanaghatte, Guddanaghatta, Melanayakanakatte and Lingadahalli (Shimoga-25 MW)

50 Geenfive power Private Limited EN 46 NCE 2007 dt 02.01.2008 11.55 , Huloli, Belgaum EN 73 NCE 2014 dt , Mardi and 25.7.2015 51 Kalpesh Kumar R Shah EN 100 NCE 2006 dt 20.4.2006 and 2 Chinchiny Belagum EN 184 NCE 2014 dt EN 361 NCE 2012 dt 30.11.2013 25.7.2015

52 Poorva Power Gen EN 6 NCE 2006 dt 10.2.2006 and 27 Kasavanahalli and Chitradurga EN 72 NCE 2014 dt EN 117 NCE 2007 dt 26.3.2007 Jogimatti 25.7.2015

53 KSK Wind Energy Shigoan Haveri Private EN 291 NCE 2005 dt 14.10.2005 5.25 & Halahalli Bijapur and EN 80 NCE 2014 dt Limited Belgaum 30.7.2015 54 Chitradurga Wind Power Private Limited DE 124 NCE 2002 dt 31.5.2002, DE 9.5 Kappatagudda Gadag EN 165 NCE 2015 dt 124 NCE 2002 dt 5.3.2003, EN 31 30.7.2015 NCE 2004 dt 17.12.2004, EN 369 NCE 2007 dt 15.10.2007 & EN 422 NCE 2010 dt 7.12.2010

55 MSPL Gases Limited EN 500 NCE 2006 dated 17-03- 30 Tanda, Sitimani Bagalkot EN 179 NCE 2014 dt 2007 Tanada, Hire gulbal 5.8.2015 Tanda, Manihalli, Rampur 56 J.N.Investments and trading company (P) EN 41 NCE 2006 dt 20.4.2006 63.39 , Aminbhavi & Dharwad and EN 182 NCE 2014 dt Limited Uppina Betgeri Gadag 5.8.2015 Gangadikoppa, Nrupatungabetta Hebli (Dharwad-29.7 MW) Chikka Handigola, Hulkoti Hirekoppa, Belhatti, Konchigeri, Bijjur and Nararamaduvu Alginvad, , Belgatti & , Parsapur, Haripur, Sortur, Kerehalli, Mundawada (Gadag-33.69 MW)

57 Malgaon Energy Projects (P) Limited EN 499 NCE 2007 dt 31.12.2007 26.25 Madappanaguddi, Chamrajanagar EN 74 NCE 2014 dt Mastibetta, 5.8.2015 Chippalkalludoddi, Toreyanurinata & Kulaganadoddi

58 Renewable Energy Consultany EN 49 NCE 2006 dt 20.4.2006 & 4 Shirounj Gadag EN 245 NCE 2014 dt EN 249 NCE 2008 dt 20.12.2008 7.8.2015 59 Lanco Wind Power Private Limited EN 408 NCE 2007(1) dt 19.11.2007, 42.5 Kunchenahalli, Shimoga, EN 71 NCE 2014 dt EN 408 NCE 2007(2) dt 19.11.2007, Komanahal, Chikkamagalur, 10.8.2015 EN 408 NCE 2007(3) dt Bannikere,Musinahal Kolar and 19.11.2007,EN 408 NCE 2007(4) dt (Shimoga -15 MW), Chitradurga 19.11.2007, EN 408 NCE 2007(5) dt Kanchagaranahalli, 19.11.2007 and EN 408 NCE Nelagalli,Chennanahalli, 2007(6) dt 19.11.2007 Kyasanakere and Bairanahalli (Shimoga-6 MW),Maginahlli, Alampur, HuliyarhalliHampapur and Ramanhalli (Chikkamagalur-4 MW), Marvali, Kaginalli and Gogga (Shimoga-6 MW) Kotapalli, Kadirampalli, Hesaramalai, Mudhimdurga and Rayalpad (Kolar-6.5 MW) & Arasinaghatta, Mekkenahatti and Keshwapura (Chitradurga-5 MW)

60 RRB Energy Limited EN 148 NCE 2006 dt 21.4.2006 15 Ammangi, Yalimunnoli, Belgaum EN 363 NCE 2012 dt (Earlier Vestas RRB India Limited) Hanjanahatti and Belvi 10.8.2015 61 RRB Energy Limited EN 341 NCE 2006 dt 16.10.2006 67 Sirur,Jhalaki Gulburga, EN 363 NCE 2012 dt (Earlier Vestas RRB India Limited) Buzurg,Hadalagi,Arjunagi Chitradurga, 10.8.2015 tanda, Gulbarga-15, Belgaum and Kasavanahalli,Nerenahalli Bijapur ,Sajjanakere,Pallavagere, Jadipura,Sondekere,Lam badihatti, Chitradurga- 15, Kanal, , Kakmari -Belgaum-3MW & Bijjaragi,Babanagari,Kana madi,Honwad,Gothe,Koty al- Tikota Malkandevanahatti,Sidda pur,Ratnapur, Dhanargi, Atlahatti,Khadijapur,Lona gaon-Bijapur-34

62 Four EF Wind Power (P) Limited EN 318 NCE 2006 dt 16.10.2006 20 Gonagi, Mukramba, Gulburga EN 381 NCE 2012 dt Halsagund 10.8.2015 63 Chikkamagalur Energy Projects Private EN 92 NCE 2001 dt 19.11.2001, DE 50 Lingananahalli Chikkamagalur EN 83 NCE 2014 dt Limited 09 NCE 2004 dt 21.6.2004 & DE 18.8.2015 249 NCE 2012 dt 20.9.2012 64 Vish Wind Infrastrture LLP EN 42 NCE 2006 dt 20.4.2006, EN 81.03 Haveri and EN 180 NCE 2014 dt 462 NCE 2006 dt 19.12.2006 Kongapura, Sisvinahal, Dharwad 19.8.2015 Shalipur, Huvinsigli, Sigli, & Ramgeri (Haveri-17.82 MW) Chandapura, Malikankatti, Shiggaon Bevinahalli, Sirbadgi, Tallihalli, Hatti mttur Gudusalkoppa, Kerikoppa, Bhairadevaragudda Kalledevar, Basappagudda, Hanumanmatti,Kakol,Hul ihalli (Haveri and Dharwad) 63.61 MW

65 KSK Wind Power Yadahalli Benchi Private EN 456 NCE 2006 dt 22.5.2007, EN 2 Tandishihalu and Bijapur EN 81 NCE 2014 dt Limited 444 NCE 2011 dt 20.12.2010 and Chikkokigere 18.8.2015 EN 345 NCE 2011 dt 09.09.2011

66 KSK Wind Energy Mothalli Haveri (P) EN 456 NCE 2006 dt 22.5.2007, EN 2 Megur, Kandgal, Bijapur EN 79 NCE 2014 dt Limited 444 NCE 2011 dt 20.12.2010 and Kamalapura, Marthgere 19.8.2015 EN 360 NCE 2011 dt 15.09.2011 and Bilihal 67 Four EF Wind Power Private Limited EN 456 NCE 2006 dt 22.5.2007, EN 33.275 Maikodlu, Aranimule, North Canara, EN 171 NCE 2014 dt 444 NCE 2010 dt 20.12.2010 & EN Gaurargadde, Halebadi Bijapur Dharwad 27.8.2015 444 NCE 2010 dt 2.7.2011 (North Canara - 4 MW), and Belgaum Doni River Rakkadkatti, Rampur Tanda Oblapur, Batkurki, Salapur, Timmapur Tanda, Hanmapur,Umtar Bableshwar, Hokkundi, Halagani Madagunki, Kambagi, Hanumasagar,Kengalgutti Nidoni, Sangapura, Sarwad, Dignibeldo, Savanahalli, HonganahalliTandsihal Kandgal , Barahalla, Kagdhal, Haralkatti, Achmatti, Kanakikop, Gurlakatti (Belgaum, Bijapur & Dharwad-40 MW) Athani, Sankanahati, Raddeatti, Ghattanatti, , Dodahatti, , Desayarahatti (Belgaum- 7.275 MW) 68 Fiza Developer and Inter-trade (P) Limited EN 208 NCE 2005 dt 19.8.2015 36.35 Athni, Nandgon, Banhatti Belgaum & EN 60 NCE 2012 dt ,Mahalingapura, Katabal, Chamrajnagar 14.09.2015 Uttak, Suthakatte, Islampur, Basapura, Dasanahatti, Benchinahalli,Gudihalli, Mavanuru, Hogarehalli, Yeradahankallu, Godchinmaiki

69 GVR Infra Projects Limited EN 327 NCE 2006 dt 16.10.2006 15 Sogenahalli, Shettihalli, Tumkur & EN 72 NCE 2015 dt Madaganahatti (Tumkur- Hassan 20.11.2015 05 MW) and Rayapura, Yelagunda, nitturu, Basavapur, Aladahalli (Hassan -10 MW)

70 KSK Wind Energy Halagali Benchi Private EN 456 NCE 2006 dt 22.5.2007, EN 5 Kanmuhal, Sangapura, Bijapur EN 78 NCE 2014 dt Limited 444 NCE 2011 dt 20.12.2010 and Jumnal, Honganahalli 20.11.2015 EN 346 NCE 2011 dt 09.09.2011 and Savanahalli

71 Bhoruka Power Corporation Ltd EN 89 NCE 2009 100.000 Danaikapor, Javur, Chikamagalur EN 157 NCE 2015 dt Gajjegondanahalli, 27.11.2015 Kanabagahatte, Shivani, Sadihalli, Narayanapura, Hebburu, Katiganeru, Tamatadahalli, Chikamalluru, Gaduganahalli, Mudukere, Asandi, Anataragatti

72 Gadag Co-operative Industrial Estate DE 39 NCE 1995 dt 7.2.1997 5 Kappatagudda Gadag EN 22 NCE 2015 dt Limited 3.12.2015 73 Sarjan Realities Limited EN 59 NCE 2004 dt 8.3.2004, EN 105.65 Horogoppa (34 MW), Shimoga, EN 241 NCE 2014 dt 393 NCE 2014 dt 28.12.2005, EN Bukkapatna (18 MW), Tumkur, 5.12.2015 180 NCE 2007 dt 15.5.2007, EN Kudre Kanive SF (35.4 Chitradurga, 386 NCE 2005 dt 28.12.2005, EN MW), Horagondona (46.5 Bellary 555 NCE 2009 dt 25.11.2009, EN MW) & Aiyanahalli (0.75 33 NCE 2006 dt 7.2.2006, EN 342 MW) NCE 2005 dt 18.11.2005, EN 125 NCE 2007 dt 16.4.2007, EN 64 NCE 2006 dt 8.2.2006, EN 130 NCE 2007 dt 16.4.2007 & EN 81 NCE 2005 dt 18.3.2005

74 Farmenrs Wind Power Resources Private EN 281 NCE 2014 dt 9.01.2015 3.5 Kurkoti Gadag Government vide Limited order No EN 217 NCE 2015 dt 29.10.2015 has been withdrawn the capacity. 75 Lanco Wind Power Private Limited EN 204 NCE 2007 dt 27.12.2007 156 Rotti Kallu, Gali Gudda, Hassan, EN 70 NCE 2015 dt Bentakallu Gudda, Chikkamagalur 20.11.2015 Karadi betta, & Dakshina Adahanchalu, Kokke, Kallu, Sandikalleri, Guttihalli,Devaramane & Bommaragudda, Guuti (46.8 MW) & Malleshwara, Gangrikal, Gangamula, Kanambal Gudda, Anekattu Salu, Anekal Gudda, Belkarmittada Gudda, Kurubarakote, Budapare Betta, Subramanya Devastanda Betta, Boral Betta and Heggantota (109.20 MW)

76 Sun Photo Voltaic Energy India Private EN 228 NCE 2013 dt 9.10.2013 2 Kanamadi Government vide Limited Corrigendum order No EN 241 NCE 2015 dt 21.11.2015 instructed to read as capacity 78 MW instead of 80 MW allotted. 77 RSR Power Private Limited (Group EN 337 NCE 2006 dt 16.10.2006, 177.05 Nelaganti, Suldalal Belgaum, Bellary EN 369 NCE 2012 dt company of Gamesa Wind Turbines EN 432 NCE 2010 dt 16.12.2010 Shirgoan, Naghral, and Shimoga 07.01.2016 Private Limited) Umarani, Jadkurli, , Mekhali (Belagum-151.05 MW) Lingadahalli, Kodalu, Banihatti, Sulthanpur (Bellary -15 MW) Goppanahalli, Herehalli, Malligere, mvinaholle and Padavamatte (Shimoga -11 MW)

78 Bhoruka Power Corporation Limited EN 402 NCE 2008 dt 11.9.2009, EN 8.6 Yelisuru Gadag EN 21 NCE 2016 dt 288 NCE 2011 dt 5.7.2011, EN 341 29.01.2016 NCE 2011 dt 12.9.2011 and EN 211 NCE 2014 dt 3.11.2014

79 Vestas Wind Technology India (P) Limited EN 210 NCE 2005 dt 20.8.2005, EN 26.4 Amargaripate, Gollapalli, Kolar EN 75 NCE 2014 dt 463 NCE 2006 dt 22.12.2006 & EN Jadimakalapalli and 12.2.2016 389 NCE 2011 dt 19.03.2012 Sathanurapalli

80 Bellary Wind Power Private Limited EN 243 NCE 2002 dt 5.3.2003, EN 66.6 Benkanahalli, Nelagahalli Davangere EN 178 NCE 2014 dt 169 NCE 2008 dt 24.12.2008, EN and Yelavadahalli 1.3.2016 397 NCE 2010 dt 8.10.2010 and EN 465 NCE 2008 dt 8.5.2009

81 KSK Wind Power Athani (P) EN 318 NCE 2006 dated 16-10- 82.5 , Gundevadi Belgaum EN 186 NCE 2014 (2) Limited 2006, EN 225 NCE 2011 dated 10- and Chamkeri dt 23.3.2016 05-2011 and EN 301 NCE 2012 dated 02-08-2012

82 Vestas Wind Technology India (P) Limited EN 210 NCE 2005 dt 20.8.2005, EN 12.6 Uttanal, Bijapur EN 76 NCE 2014 dt 463 NCE 2006 dt 22.12.2006 & EN Heggadehaltanda & 22.3.2016 398 NCE 2010 dt 20.10.2010 Mangoli 83 Vestas Wind Technology India (P) Limited EN 210 NCE 2005 dt 20.8.2005, EN 21.6 Masbinal, Bijapur EN 76 NCE 2014 dt 463 NCE 2006 dt 22.12.2006 & EN Ingaleshwartanda 22.3.2016 399 NCE 2010 dt 20.10.2010

84 Four EF Power Projects (P) Ltd EN 318 NCE 2006 dt 16.10.2006 12.500 Hiregudda, Arakeritanda, Bagalkot EN 186 NCE 2014 (1) Jamattitanda dt 23.3.2016

85 Fiza Developer and Inter-trade (P) Limited EN 269 NCE 2006 dt 7.7.2006 24.150 Cheluru, Mudipinna and Dakshina EN 352 NCE 2012 dt (15.4 mw) and EN 314 NCE 2006 dt Padau (15.4 MW) and Kannada & 24.3.2016 16.10.2006 (8.75 MW) Hanumapura, Masandra, Bangalore Rural Kalari, Hujagallu, Vajarahalli, Dubbikotte, Solur, Madagondanahalli and Hajjahalli (8.75 MW)

86 Gamesa Wind Turbines Private Limited EN 226 NCE 2013 dt 9.10.2013 40 Belagavi Government reduced the Capacity from 100 MW to 60 MW vide G.O.No EN 247 NCE 2016 (1) dt 24.09.2016

87 NTPC Limited EN 570 NCE 2009 dt 25.11.2009 100 Sirur, Ramthal, Bagalkot, Koppal EN 208 NCE 2016 dt Amingarh, Guledagudda, and Gadag 7.3.2017 Gudur, Hullikeri, Kelur, Katapura, Kasur, Belihal, Sentigeri, Malgatti, Nagenragarh, Lakkalalatti, Venkatapura, Perumanahatti, Ganahal, & Muradu 88 Vish Wind Infrastructure LLP EN 302 NCE 2006 dt 16.10.2006, 218.4 Jogihalli Davangere and EN 147 NCE 2017 dt EN 128 NCE 2013 dt 30.5.2013 and Bellary 3.4.2017 EN 32 NCE 2014 dt 21.2.2014

89 Gem Laboratories private limited EN 266 NCE 2007 dt 25.06.2009 10 Kadlegudda, Chitradurga EN 183 NCE 2017 dt Bommanahalli 05.05.2017

90 Future energy EN 80 NCE 2009 dt 8.02.2010 5 Kalagurki Vijayapura EN 174 NCE 2017 dt 05.05.2017

91 Vajharpada Energy pvt ltd EN 76 NCE 2009 dt 01.02.2010 8.25 Belattur Chamarajanagara EN 181NCE 2017 dt 05.05.2017 92 Indo Wind Energy Limited EN 190 NCE 2006 dt 25.07.2006 9 Palavanahalli and Chitradurga EN 176 NCE 2017 dt and EN 325 NCE 2011 dt 9.04.2012 Jogimatti 05.05.2017

93 Shriram Leitwind Limited EN 405 NCE 2008 dt 16.09.2009 65 Sudi, Kalkapur, Gadag, Belagavi EN 177 NCE 2017 dt and EN 87 NCE 2009 dt 08.02.2010 Sankapur, Mirapurhatti, and 05.05.2017 Lakshmisagar, Narsipura Chickmagalur and Mirapurhatti

94 Sree Sairam Windtech Private limited EN 406 NCE 2008 dt 17.09.2006 10 Sambapura, Hatalageri, Gadag EN 180 NCE 2017 dt Betigeri, Kanginal and 05.05.2017

95 IKP constructions EN 4 NCE 2008 dt 15.07.2009 8.5 Kadigere Chikkamagalur EN 182 NCE 2017 dt 05.05.2017

96 Regen Powertech Private limited EN 401 NCE 2008 dt 08.02.2010 27 Channakal Mysuru EN 171 NCE 2017 dt 05.05.2017

97 Ghoverchand Jain EN 26 NCE 1999 dt 13.08.1999 2 Banjagondanahalli Chitraduraga EN 170 NCE 2017 dt 05.05.2017 98 Chauhan Wind energy EN 402 NCE 2008 dt 11.9.2009 and 63 Byapanahalli, Mysuru,Chitradu EN 172 NCE 2017 dt EN 77 NCE 2009 dt 08.02.2010 Hosadurga, rga and Gadag 05.05.2017 Devaragollarahatti, Kurtkoti, Annigere, Kalgowdanahundi, Puttanbetta, Karadibetta and Madumalai

99 Hutti Gold Mines Company limited EN 55 NCE 2005 dt 05.05.2005 20 Midkanahalli Belagavi EN 184 NCE 2017 dt 05.05.2017

100 Renew Wind Energy (MP One) Private EN 155 NCE 2015 dt 30.06.2015 46.8 Mydurdakki, Julkunte, Koppal EN 173 NCE 2017 dt limited Konnapur and 05.05.2017 Aryabhogapur 101 Green Infra Wind Power Solutions Limited EN 235 NCE 2012 dt 08.05.2013 28.5 Shivanakere, Kalahalu, Chitradurga EN 169 NCE 2017 and EN 157 NCE 2013 dt and (5), dt 05.05.2017 18.07.2013 chikkabennur 102 Sree Kandiamman Industries EN 88 NCE 2009 dt 08.02.2010 13 and Sigli Dharwad EN 179 NCE 2017 dt and EN 08 NCE 2015 dt 13.08.2015 05.05.2017

103 Green Infra Wind energy Efficiency limited EN 244 NCE 2012 dt 08.05.2013 46.5 Aralikatte, Belgavi EN 169 NCE 2017 and EN 154 NCE 2013 dt Vanthamuri,Jarkihalli, (2), dt 05.05.2017 18.07.2013 Rustumpura and Shilabhavi

104 Green Infra Wind Energy Creation Limited EN 245 NCE 2012 dt 08.05.2013 15 Timmalapura, Chitardurga EN 169 NCE 2017 and EN 156 NCE 2013 dt Thodranahalu, (4), dt 05.05.2017 18.07.2013 Halasinakerehatti and Matukarahatti

105 ARC Power generation Limited DE 39 NCE 1997 (4),dt 3 Ganjikatte Chitradurga EN 175 NCE 2017 dt 21.10.1997,DE 124 NCE 1997, dt 05.05.2017 23.07.1999, and EN 42 NCE 2007, dt 15.02.2007 106 Lanco Wind Power Private Limited EN 426 NCE 2007 dt 04.02.2010 144.9 Chandramapali, Udbal, Kalburgi, EN 178 NCE 2017 dt Bannahalli, Honnikere, Bidar,Mysuru, 05.05.2017 Malasapur, Hankuni, Shimoga and Pandaragera, Chenagata Darwad Tanda, Gangayikoppa, Bare Gudde, Chikkalattur, Kanchikallu Betta and Kainala Gudda

107 Green Infra Wind Energy Development EN 258 NCE 2012 dt 08.05.2013 52.5 Mylakabbe, Bhorana Tumkur EN 169 NCE 2017 (1) limited and EN 155 NCE 2013 dt kanive and Timmapura dt 05.05.2017 18.07.2013 108 Green Infra Wind Techno Solutions limited EN 234 NCE 2012 dt 08.05.2013 64.5 Dibbadahatti, Chitradurga EN 169 NCE 2017 (3) and EN 153 NCE 2013 dt , Bidarakere, dt 05.05.2017 18.07.2013 Hullehala nellekatte and Ajjappanahalli

109 Fiza Developer and Inter-trade (P) Limited DE 400 NCE 2004 dated 05-01- 32.8 Lambangihatti, Chitradurga EN 175 NCE 2014 2005, EN 238 NCE 2006 dated 15- Gollarahatti & (24.80 MW) & dated 29-05-2017 06-2006, EN 460 NCE 2006 dated Mysarahalli - 24.80 MW, Vijayapura (8 07-12-2006 and EN 443 NCE 2010 Auttagi, , MW) dated 15-09-2011 - 2 MW, Nidgundi & Jiralbhavi - 2 MW, Chiraldinni, Angadgeri, Sikalvadi & Hanumpur - 2 MW & Chikkop, and Bhairanahatti - 2 MW

110 Suzlon Gujrat Wind Park Limited EN 204 NCE 2009 dt 20.5.2010 37.8 Hulagbal, Mavinbhavi, Bijapur and EN 398 NCE 2017 dt Nagarbetta, Kodekai, Koppal 26.5.2018 , Uppaldinni, Hanchnal, Kadarhal, Dyamonal, Mahur, Bandeppanahalli. Kolihal, Gundaknal, Talikota 111 Auromira Energy & Infrastructure India EN 3 NCE 2008 dt 15.7.2009 100 Ajjampura, , Chikkamagalur EN 296 NCE 2018 dt Private Limited Kurubarahalli, Hosour, 2.6.2018 Yarehalli & Inglaranahalli

112 Four EF Wind Power Private Limited EN 444 NCE 2010 dt 20.12.2010 16 Dasarahalli Dharwad EN 298 NCE 2018 dt 2.6.2018 113 Karnataka Power Corporation Limited EN 569 NCE 2009 dt 26.11.2009 52.25 Kappatagudda Gadag EN 352 NCE 2017 dt 2.6.2018 114 Suzlon Infrastrcture Limited EN 101 NCE 2005 dt 13.4.2005, EN 169 Chanapura, Mandya, EN 9 NCE 2015 dt 124 NCE 2007 dt 16.4.2007, EN Chinakurli,HandlkupaSu Tumkur, 2.6.2018 131 NCE 2007 dt 16.4.2007, EN genahalli,Sidadevara Bangaluru, 134 NCE 2007 (1) dt 17.4.2007 & Betta SF, Hassan & EN 134 NCE 2007 (2) dt 17.04.2007 Gopalpura,Mayanahalli, Mysuru Mandya, Dodakoppa,Elehosahalli, Narikalgudda SF, Gotegahalli, Chikkyalur RF

115 KSK Wind Energy Nandagaon Athni EN 302 NCE 2011 dt 15.09.2011 137.5 Athani and Nandgoan Belgaum EN 297 NCE 2018 dt Private Limited 2.6.2018 116 Suzlon Infrastrcture Limited EN 297 NCE 2006 dt 16.10.2016 149.1 Kankal, Basarkad, Vijayapura EN 302 NCE 2018 dt and EN 168 NCE 2011 dt Jalapur and Muddebihal 7.6.2018 19.04.2011 117 Vish Wind Infrastrcture LLP EN 42 NCE 2006 dt 20.4.2006, EN 81.03 Chandapura, Dharwad & EN 305 NCE 2018 dt 462 NCE 2006 dt 19.12.2006, EN Malikankatti, Shiggaon Haveri 7.6.2018 322 NCE 2011 dt 28.10.2011, EN Bevinahalli, Sirbadgi, 250 NCE 2012 dt 11.10.2012, EN Tallihalli, Hatti mttur 107 NCE 2012 dt 16.05.2013 & EN Gudusalkoppa, 117 NCE 2014 dt 8.8.2014 Kerikoppa, Bhairadevaragudda Kalledevar, Basappagudda, Hanumanmatti,Kakol,Hul ihalli 118 MSPL Gases Limited EN 400 NCE 2008 dt 22.9.2009 43 Avgharnath, Nandgad, Bagalkot EN 295 NCE 2018 dt Padalvadi, (25 MW), 7.6.2018 Chennevadi,Hadalgi, Allihol, Chapgaon, Belgaum Karalgi, Hattarvad, (18 MW) Halga, Hoshatti, , Sagri, Bidi,Surpur kervad, Siragupur, hosur, , Gundanhatti,Chimmanak atti, Chiralkop &

119 Ravi Urja Energy India Private Limited EN 207 NCE 2013 dt 26.08.2013 31 Kakmari Belagavi (Government reduced the Capacity from 160 MW to 129 MW vide G.O.No EN 308 NCE 2018 dt 12.06.2018)

120 G.M.Navarra Wind Energy Private Limited EN 447 NCE 2007 dt 25.6.2009 and 151.4 Savalsung (5.1 MW), Bijapur (15.1 EN 293 NCE 2018 dt EN 108 NCE 2013 dt 4.7.2013 Sankanur (100.3 MW), MW), Gulburga 13.6.2018 (21 MW), (100.3 MW), Basavanabagewadi (10 Belgaum (21 MW), Pelurahatti (15 MW) MW) and Chitradurga (15 MW)

121 Chitradurga Wind Power Private Limited EN 124 NCE 2002 dt 31.5.2002, EN 160.65 Jogimatti- II-57 MW, Chitradurga (114 EN 294 NCE 2018 dt 124 NCE 2002 dt 5.3.2003, EN 31 Jogimatti-III-57 MW, MW) & 19.6.2018 NCE 2004 dt 17.12.2004, EN 369 Harapanahalli west-45 Davangere (45 NCE 2007 dt 15.10.2007, EN 422 MW, Thuppadahalli-1.65 MW) & Shimoga NCE 2010 dt 7.12.2010, EN 215 MW. (1.65 MW) NCE 2010 dt 21.10.2010, EN 441 NCE 2011 dt 11.01.2012 and EN 165 NCE 2015 dt 30.7.2015 122 Suzlon Infrastrcture Limited DE 56 NCE 2004 dt 12.03.2004, EN 208.45 Gopalpura, Nirlkalgudda, Hassan, EN 442 NCE 2018 dt 101 NCE 2005 dt 13.04.2005, EN Basapura, Klamange, Bangaluru, 07.08.2018 124 NCE 2007 dt 16.04.2007 (7.5), Kurgod, Sindgere, Shimoga, DE 56 NCE 2004 dt 12.03.2004 (3 Subranhalli, Raichur, Bellary, MW), EN 195 NCE 2005 dt Devgerehalli, Nemkalu, Davangere and 23.08.2005 (11.4 MW) & EN 195 Virapura, Gummnahalli, Chitradurga NCE 2005 dt 23.08.2005 (10.2), EN Rangankopallu, 191 NCE 2005 dt 19.08.2005 & EN Bettamalanagudda & 178 NCE 2008 dt 24.12.2008 (6 Jogimatti MW), EN 191 NCE 2005 dt 19.08.2005, EN 177 NCE 2008 dt 24.12.2008, EN 397 NCE 2011 dt 22.01.2011 (31.5 MW) , EN 191 NCE 2005 dt 19.08.2005 (43.8 MW), EN 191 NCE 2005 dt 19.08.2005, EN 179 NCE 2008 dt 24.12.2008 (27 MW), EN 271 NCE 2005 dt 14.10.2005, EN 315 NCE 2011 dt 05.09.2011 (15 MW), EN 271 NCE 2005 dt 14.10.2005, EN 259 NCE 2013 (2) dt 02.01.2015 (10 MW), en 271 NCE 2005 dt 14.10.2005 (1.8 MW), EN 13 NCE 2006 dt 20.04.2006 (11.25 MW) & EN 315 NCE 2005 dt 19.10.2005, EN 6 NCE 2006 dt 10.02.2006 (30 MW) 123 Suzlon Energy Limited DE 98 NCE 200 dt 10.07.200, EN 193.5 Maddurgudda, Hassan, EN 403 NCE 2018 dt 102 NCE 2005 dt 21.04.2005, EN Bellenahalli, Belgaum, 07.08.2018 126 NCE 2007 dt 16.04.2007 (15 Hanumanhatti, Kundur, Davangere, MW, 1.5 MW, 4.75 MW, DE 98 NCE Banjagondanahalli, Chitradurga, 2000 dt 10.07.200,EN 172 NCE Dasarahalli, Jogimatti, Chikkamagalur 2011 dt 17.7.2012 (1.25 MW), DE Bagli, Hnaumanahalli and Bellary 46 NCE 2000 dt 17.07.200, EN 556 NCE 2010 dt 05.05.2010 (7.5 MW), DE 26 NCE 1999 dt 13.08.1999, EN 344 NCE 2005 dt 18.11.2005 (1.5 MW), DE 137 NCE 2001 dt 19.09.2001 (20 MW), DE 98 NCE 2000 dt 10.07.2000, EN 325 NCE 2002 dt 21.12.2002, EN 346 NCE 2004 dt 09.11.2004, EN 346 NCE 2004 dt 09.11.2004 (1.5 MW), DE 98 NCE 2000 DT 10.07.2000, DE 325 NCE 2002 dt 21.12.2002, DE 346 NCE 2004 dt 09.11.2004,DE 414 NCE 2004 dt 20.12.2004 (2.5 MW) & DE 230 NCE 2004 dt 13.09.2004, DE 230 NCE 2004 dt 13.09.2004, EN 343 NCE 2005 dt 18.11.2005 & EN 123 NCE 2007 dt 16.04.2007 (72 MW) 124 Suzlon Gujrat Wind Park Limited (Earlier EN 204 NCE 2009 dt 20.05.2010, 158.1 Guddadur, Raichur, Bellary EN 441 NCE 2018 dt Suzlon Infrastrcture Services Limited) EN 101 NCE 2011 dt 06.04.2011 Chikkamakki, and Bijapur 7.8.2018 (37.8 MW), EN 204 NCE 209 dt Nishanigudda, 20.05.2010 (22.8 MW), EN 204 NCE Gonthakvalla, Sidlabhavi 2009 dt 20.05.2010, EN 102 NCE 2011 dt 06.04.2011 (19.5 MW), EN 204 NCE 2009 dt 20.05.2010 (28.2 MW), EN 204 NCE 2009 dt 20.05.2009 (15.6 MW) & EN 204 NCE 2009 dt 20.05.2010 (34.2 MW)

125 B.B.Hils Wind Farms Development (P) EN 188 NCE 2004 dt 22.06.2004 93.00 B.B.Hills Chikkamagalur EN 418 NCE 2018 dt Limited 16.8.2018 126 Renew Wind Energy (Karnataka 5) (P) EN 210 NCE 2005 dt 20.08.2005, 25.2 Basapura Raichur EN 426 NCE 2018 dt Limited EN 463 NCE 2006 dt EN 274 NCE 16.8.2018 2015 dt 21.12.2015

127 Renew Wind Energy (Karnataka 5) (P) EN 210 NCE 2005 dt 20.08.2005, 12.6 Gajalagatta Raichur EN 425 NCE 2018 dt Limited EN 463 NCE 2006 dt EN 275 NCE 16.8.2018 2015 dt 21.12.2015

128 Sri Swarna Green Power ME 216 NCE 2001 dt 19.07.2002, 8 Mavinhunda Belgaum EN 406 NCE 2018 dt EN 80 NCE 2008 dt 22.2.2008 and 16.08.2018 EN 438 NCE 2009 dt 28.2.2011

129 Clean Wind Energy Private Limited EN 114 NCE 2010 dt 16.09.2010 15 Neralakere, Medihalli Chikkamagalur EN 431 NCE 2018 dt 16.8.2018 130 Vijayalakshmi Hydro Power (P) Limited EN 120 NCE 2011 dt 13.03.2012 15 Donnehalli, Akkanur, Davangere EN428 NCE 2018 dt Honnamardi and 16.8.2018 Torangatti

131 RRB Energy Limited EN 92 NCE 2008 dt 29.01.2010 (5 20.3 Chikkappanahalli Belgaum (5 MW) EN 416 NCE 2018 dt (Earlier Vestas RRB India Limited) MW), DE 26 NCE 99 dt 13.05.1999, Madakaripura, & Davangere 16.08.2018 DE 57 NCE 2001 dt 24.4.2002, ME Nuganhatti, Hulikere, (15.3 MW) 32 NCE 2004 dt 3.3.2004 & EN 104 Murgod, Subapur NCE 2006 dt 18.03.2006 (15.3 MW) 132 Deepak.M.Patil EN 306 NCE 2004 dt 21.12.2004, 5.25 Kappataguda Gadag EN 422 NCE 2018 dt EN 213 NCE 2010 dt 14.12.2010, 16.08.2018 EN 421 NCE 2011 dt 15.03.2012 & EN 26 NCE 2014 dt 20.06.2014

133 Mytrah Energy India Limited EN 116 NCE 2011 dt 5.3.2012, EN 45 Bagewadi, Sarapura and Gadag (15 MW), EN 407 NCE 2018 dt 117 NCE 2011 dt 5.3.2012, EN 118 Sadapur,, Belgaum (15 16.08.2018 NCE 2011 dt 24.01.2012 , Nipnal and MW) & 15 MW Devarpurahatti, Hosahalli, and Mugli

134 Sun Power Inida EN 22 NCE 2006 dt 20.4.2006 8 Chikkodi Belgaum EN 419 NCE 2018 dt 16.08.2018

135 Mysore Mercantile Company Limited ME 46 NCE 2006 dt 20.04.2006, 13.8 Kutaranahallti Davangere (4 EN 412 NCE 2018 dt EN 204 NCE 2005 dt 2.9.2005, EN Kubaldinni, Gonur, MW), Belgaum 16.08.2018 199 NCE 2006 dt 15.11.2006, EN , Kenchanahalli, (9.5 MW) & 151 NCE 2013 dt 25.10.2013, EN Bullapura-2 MW Gadag (0.3 MW) 14 NCE 2014 dt 15.7.2014 & EN Kunchuru, Arasanahalu, 160 NCE 2015 dt 14.7.2015 Ittigudi-2 MW,

136 Tata Power Company Limited EN 45 NCE 2006 dt 20.4.2006, EN 60 Mavinitagi, Bilgi and Koppal EN 417 NCE 2018 dt 167 NCE 2008 dt 6.10.2008, EN Chandragiri, 16.8.2018 255 NCE 2011 dt 10.06.2011, EN 144 NCE 2012 dt 12.02.2013, EN 197 NCE 2014 dt 30.01.2016 137 Dishaa Power Corporation (P) Limited EN 407 NCE 2008 dt 19.5.2009, EN 15 5 MW: Area (1):Bavapur, Haveri EN 423 NCE 2018 dt 396 NCE 2011 dt 30.12.2011 Chikka Budihal, 16.08.2018 Shankaranhalli, Hire Budihal, Area (2): Guddada Hosahalli, Guddada Bevinahallii, Aladgeri

15 MW: Kalkeri, Kelvarkop, Matapur, Chikka Basur,, Kasambi, , Hirelingadahalli

138 Air Concept EN 94 NCE 2009 dt 29.01.2010 10 Kurtkoti, Hulkoti Gadag EN 434 NCE 2018 dt 16.08.2018

139 Ramgad Minerals and Mining (P) Limited EN 32 NCE 2003 dt 12.02.2004, EN 6.5 Jambunathahalli Ballari EN 430 NCE 2018 dt 459 NCE 2006 dt 17.03.2017 16.08.2018

140 Abletech Electro Engineers (P) Limited EN 458 NCE 2006 dt 27.12.2007 32.7 Shivagange, Chitradurga EN 420 NCE 2018 dt Nagaraghatta, Nelikatte, (18.4 MW), 16.08.2018 Malasinganahalli, Haveri (14.3 MW) Madderu & Kervadi, Vadenpur, Yogikop,chinna Mulgund Tanda, Hire Budihal, Aladgeri, Bisalhalli, Guddada Hosahalli, Sanakalbidri, Salagudda

141 Pioneer Wincon Private Limited DE 26 NCE 1999 dated 13.5.1999, 6.76 Kurumaridekere, Chitradurga EN 414 NCE 2018 dt ME 26 NCE 1999 (Part) dt 6.1.2000, Palavanahalli, 16.08.2018 EN 312 NCE 2005 dt 11.10.2005 Chikkasiddanahalli. 142 Vijayalakshmi Hydro Power (P) Limited EN 121 NCE 2011 dt 13.3.2012 15 Aiyanahalli, Koduru, Chitradurga EN 424 NCE 2018 dt Kalgatta, 16.08.2018 Vishwanathanahalli and Nandihalli

143 Copse Energy (P) Limited EN 304 NCE 2010 dt 02.05.2011 6 Kanginhal, Niralgi, Kot Gadag EN 421 NCE 2018 dt Umachigi 16.08.2018

144 Celebrity Power Company (P) Limited EN 78 NCE 2009 dt 19.03.2010 30 Chikkakabbigere, Chitradurga EN 427 NCE 2018 dt Yalagodu, Chippinakere, 16.08.2018 Sultanipura and Vaddanahalli

145 Vijayanagar Industries Credits Limited ME 31 NCE 2003 dt 12.02.2004 4 Vysanakerigunda Ballari EN 415 NCE 2018 dt 16.08.2018

146 Gadag Wind Farm Society EN 414 NCE 2008 dt 12.06.2009 10 , Gojnur, Gadag EN 435 NCE 2018 dt Haldapur, , 16.08.2018 Basapura, Holapura, Sitalahari

147 Dabripada Energy Private Limited EN 21 NCE 2006 dt 21.04.2006 21 Kadalematti, Kotiganuru, Bellary EN 413 NCE 2018 dt Dhrmasagara 16.08.2018

148 MSPL Limited EN 51 NCE 2007 dt 05.10.2007 15 , Belgaum EN 408 NCE 2018 dt Arbhavimath, 16.08.2018 Singanapur-7.5MW Benchinmardi, Gokak town-7.5MW

149 Jambhora Energy Projects (P) Limited EN 280 NCE 2005 dt 14.10.2005, 25 Maralagudda, Aladanal Mysuru EN 405 NCE 2018 dt EN 107 NCE 2007 dt 21.02.2007 Betta, Santanavara 16.08.2018 and Corrigendum G.O.dated Betta, Basavanaoddu, - 30.05.2007 19MW Budapare Betta, Subtamanya Devastanada Betta, Boral Betta-6MW 150 Regen Powertech Private limited EN 113 NCE 2011 dt 05.12.2011, 27 Channakal betta, Chikkabalapura EN 409 NCE 2018 dt EN 115 NCE 2011 dt 24.01.2012, Niluvadi, Sulingi betta, (10.5 MW), 16.08.02018 EN 112 NCE 2011 dt 24.01.2012 Chikka betta, Tumkur (10.5 Doddegauenna & MW) & Bettadpur betta Chitradurga (6 MW)

151 Suzlon Realities Limited EN 228 NCE 2007 dt 5.10.2007, EN 132.2 Kalaviranganagudda , Shimoga (35), EN 404 NCE 2018 dt 60 NCE 2005 dt 22.03.2005, EN Gangavanasara, Dharwad (28.8), 16.08.2018 132 NCE 2007 dt 16.4.2007 EN 59 Kattinahalli, Herada & Ballari (42) NCE 2004 dt 8.3.2004, EN 393 NCE Hiregudda Chikkamagalur(1 2005 dt 28.12.2005, EN 180 NCE 0.8) & (4.2) 2007 dt 15.5.2007, EN 64 NCE 2006 dt 8.2.2006, EN 130 NCE 2007 dt 16.4.2007

152 MSPL Gases Limited ME 30 NCE 2003 dt 12.02.2004, 8.8 Amaravathihalli Bellary EN 429 NCE 2018 dt EN 172 NCE 2006 dt 18.05.2006, 18.08.2018 EN 173 NCE 2008 dt 24.12.2008

153 Guttaseema Wind Energy Company (P) EN 83 NCE 2009 dt 29.11.2011, EN 99.5 Nalvadi, Chekalabi, Chitradurga EN 411 NCE 2018 dt Limited 86 NCE 2009 dt 01.02.2010 Yerabuppi, Chikkanarti (49.5 MW) & 18.08.2018 & Turvanur Dharwad (50 MW)

154 Vaayu Shakthi Wind Power Limited EN 65 NCE 2006 dt 21.04.2016 0.25 Hanumasagar Koppal EN 410 NCE 2017 dt 18.08.2018

155 Fortune Five Minerlas Exports Private EN 317 NCE 2006 dt 16.10.2006, 99 Nagendragarh, Gadag EN 433 NCE 2018 dt Limited EN 212 2011 dt 29.02.2012, EN Amarghatti, Lakkalakatti 16.08.2018 272 NCE 2012 dt 3.10.2013 and Kalkaleshwar

156 Farmenrs Wind Power Resources Private EN 228 NCE 2008 dt 19.05.2009, 12 Hulkoti, Kurtkoti, Gadag EN 432 NCE 2018 dt Limited EN 200 NCE 2014 dt 23.09.2014, Benturu 16.08.2018 EN 281 NCE 2014 dt 9.01.2015, EN 139 NCE 2015 dt 19.6.2015, EN 217 NCE 2016 dt 2.8.2016 157 Gamesa Wind Turbines Private Limited EN 227 NCE 2013 dt 9.10.2013 50 Agasanal, Domnhal, Vijayapura EN 507 NCE 2018 dt Rajan Tanda, Ramthirth 03.10.2018 Tanda and Gundana Tanda

158 Tejasri Develoeprs (P) Limited EN 493 NCE 2006 dt 15.5.2007 and 40.4 Belathaditanda & Gadag EN 506 NCE 2018 dt EN 117 NCE 2008 dt 28.3.2008 Nabhapura 04.10.2018

159 Atria Wind Power (Basavanabagewadi) EN 79 NCE 2012 dt 27.09.2012, en 0.8 Nandihal, Vijayapura EN 572 NCE 2018 dt Private Limited - (0.4 ) & Atria Wind Power 137 nce 2017 (1) dt 3.4.2017, EN 16.11.2018 (Chitradurga) Private Limited - (0.4) 137 NCE 2017 (3) dt 03.04.2017

160 Vish Wind Infrastructure LLP (Earlier EN 302 NCE 2006 dt 16.10.2006, 47 Jamnur, Turkara, Dharwad EN 532 NCE 2018 dt Logaer Machines) EN 462 NCE 2006 dt 19.12.2006, Singihal, Tadkol, 16.11.2018 EN 207 NCE 2011 dt 16.08.2012, Bijargadi (35.97) and EN 128 NCE 2013 dt 30.5.2013, EN Dodwadi, Guddikatti and 207 NCE 2011 dt 16.08.2012, EN Govinakoppa (10.23) and 42 NCE 2006 DT 20.04.2006 AND Tadas (0.8) EN 117 NCE 2014 dt 08.08.2014

161 Suzlon Gujarat Wind Park Limited EN 204 NCE 2009 dt 20.5.2010 29.4 Nalatvad, Bijjur, Talikota, Raichur EN 620 NCE 2018 dt Anehosur, Gonwatal, 11.12.2018 Bhupur, Purnpet, Mudgal, Upperpet, Nagarhal, Nandawadgi, Hirelakkihal

162 Suzlon Gujarat Wind Park Limited EN 204 NCE 2009 dt 20.5.2010 20.4 Hire Mannapur, Raichur EN 619 NCE 2018 dt Bennihatti, Mudenur, 11.12.2018 Jumlapur, Garjanhal, Wirapur, HireBhergi, Tawargeri, Nandapur

163 Shree Krishna Minerals EN 510 NCE 2006 dt 22.05.2007 10 and Bestur Belgaum EN 92 NCE 2019 dt 20.03.2019 164 Fortune 5 Wind Energy (Karnataka) EN 8 NCE 2015 dt 13.08.2015 30 Hirehanchinal, Gadag EN 115 NCE 2019 dt Private Limited Thimmapura, Haralapura 10.04.2019 and Kaginal 165 Fotune Five Mineral Exports Private EN 317 NCE 2006 dt 16.10.2006 19 {Machagondanahalli,Hega Hassan and Energy 176 NCE Limited dihalli,Hulikal,Kallur-5- Kodagu 2014 dt 18.6.2019 Hassan & Belur,Basavanahalli,Niru galale,Kaniveramapura,H osakote,Siddalingapura- 14-Kodagu

166 SS Renewable Energy Ventures Private EN 250 NCE 2016 dt 29.11.2017 19.5 Jagalur Davangere Energy 93 NCE 2019 Limited dt 01.07.2019

167 Sarjan Realities Limited ME 60 NCE 2005 dt 23.03.2005, 173.1 Basavankotte, Daavngere and Energy 94 NCE 2019 EN 246 NCE 2010 dt 25.07.2011, Kallenahalli, Bellari dt 01.07.2019 EN 246 NCE 2010 dt 15.02.2011 & Advimallapur, EN 212 NCE 2016 dt 11.08.2016 , Khanderayanahalli, Barenahalli, Kambatarhalli

168 Kaldar Energy Project Private Limited EN 20 NCE 2006 dt 21.04.2006 15 Nagaboranahalli, Chikkamagalur Energy 195 NCE Masanikere, 2019 dt 11.11.2019 Bukkambudi, Chiranahalli,

169 Welspun Renewable Energy Limited EN 161 NCE 2013 dt 15.06.2013 100 Malghangere, Kalgharki Vijayapura Energy 196 NCE and Masooti 2019 dt 27.11.2019

170 Suzlon Gujarat Wind Park Limited EN 204 NCE 2009 DT 20.05.2010, 16.8 Kustagi Raichur and Energy 16 NCE 2020 EN 261 NCE 2016 dt 25.10.2016 Bagalkot dt 27.01.2020

171 Suyush Renewables Limited EN 204 NCE 2009 DT 20.05.2010, 52.5 Jailihal, Balgunti Koppal and Energy 15 NCE 2020 EN 261 NCE 2016 dt 25.10.2016, Bagalkot dt 3.2.2020 EN 199 NCE 2017 dt 9.5.2017 & EN 207 NCE 2017 dt 9.5.2017

172 Matrix Wind Energy Private Limited EN 316 NCE 2006 dt 16.10.2006, 26 Golsangi, Hebbal, Bidnal Vijayapura Energy 29 NCE 2020 EN 161 NCE 2015 dt 25.7.2015 and Hangaragi dt 17.02.2020

173 Mithuna Constructions Private Limited EN 210 NCE 2015 dt 23.09.2015 10.2 Gondiguppi Energy 83 NCE 2020 dt 30.06.2020 174 Vestas Wind Technology India (P) Limited EN 210 NCE 2005 dt 20.08.2005EN 8.25 Ratnapur Raichur Energy 76 NCE 2020 463 NCE 2005 dt 22.12.2006 dt 22.09.2020

175 Gamesa Wind Turbines Private Limited EN 227 NCE 2013 dt 9.10.2013 & 100 Kannur, Vijayapura Energy 30 NCE 2020 EN 507 NCE 2018 dt 3.10.2018 Markhanpura,tanda, dt 22.09.2020 Mandsalnal, Lamanatanda and Manappa doddi

176 Manipal Helath Systems Private Limited DE 26 NCE 1999 (Part) dt 6.1.2000 7.45 Palavanahalli and Chitradurga Energy 25 NCE 2020 and EN 106 NCE 2005 dt Kurumardikere dt 21.09.2020 15.04.2005 177 Mimesis Wind Energy Private Limited EN 204 NCE 2008 dt 12.06.2009, 12 Velhatti, Magadi, Gadag Energy 23 NCE 2020 EN 227 NCE 2014 dt 5.12.2014, EN Hetthihalli, Hiregunjan, dt 21.09.2020 166 NCE 2015 dt 25.5.2015 & EN Chikgunjal 291 NCE 2017 dt 16.03.2018

178 Shah Agency EN 47 NCE 2006 dt 20.04.2006, EN 1.6 Gajendragagh Gadag Energy 87 NCE 2020 245 NCE (1) 2006 dt 22.06.2006, dt 21.09.2020 EN 245 NCE (2) 2006 dt 22.06.2006, EN 245 NCE (3) 2006 dt 22.06.2006, EN 5 NCE 2007 dt 09.01.2007, EN 531 NCE 2009 dt 29.10.2009 and EN 348 NCE 2007 dt 21.09.2007

179 Green Infra Wind Power Generation EN 247 NCE 2012 dt 14.05.2013, 4 Ananthanahalli Davangere Energy 26 NCE 2020 Limited EN 175 NCE 2013 dt 14.8.2013, EN dt 30.09.2020 92 NCE 2015 dt 2.7.2015 and EN 40 NCE 2015 dt 4.3.2016

180 United Green Power Belgaum (P) Limited EN 229 NCE 2007 dt 02.01.2008 49.3 TelaginhattiGhar and Belagavi Energy 84 NCE 2020 Hoskotti dt 30.09.2020

181 Mytrah Energy India Limited EN 119 NCE 2011 dt 05.03.2012 10 Tokgatti Belagavi Energy 88 NCE 2020 dt 30.09.2020 182 Enercon India Limited DE 98 NCE 2000 dt 10.07.2000, EN 9 Jogimatti Chitradurga Energy 133 NCE 76 NCE 2005 dt 18.03.2005, EN 2020 dt 30.09.2020 471 NCE 2008 dt 11.08.2009 and EN 207 NCE 2011 dt 16.08.2012

183 Chitradurga Wind Power Private Limited DE 244 NCE 2002 dt 5.3.2003, EN 7.65 Bharmasagar (1.65 MW) Chitradurga Energy 134 NCE 373 NCE 2006 dt 01.09.2006 & Holalkere (6 MW) 2020 dt 30.09.2020

184 Poonawalla Investments & Industries EN 212 NCE 2016 dt 11.08.2016 2.1 Kambrathahalli Daavngere and Energy 85 NCE 2020 Private Limited and EN 98 NCE 2017 dt 06.03.2017 Bellari dt 30.09.2020

185 Atria Wind Power (Bijapur-2) Private EN 137 NCE 2012 dt 20.12.2013 & 0.7 Arasinagundi Chitradurga Energy 78 NCE 2020 Limited EN 259 NCE 2016 dt 13.10.2016 dt 30.09.2020

186 Atria Wind Power (Bijapur-1) Private EN 79 NCE 2012 dt 27.09.2012, EN 0.4 Basavabagewadi Vijayapura Energy 77 NCE 2020 Limited 137 NCE 2017 (2) dt 3.4.2017 dt 6.10.2020

187 Bhoruka Power Corporation Limited EN 69 NCE 2012 dt 25.09.2012, EN 0.3 Belagavi Energy 75 NCE 2020 347 NCE 2012 dt 28.06.2013 dt 6.10.2020

188 Fortune Five Hydel Projects Private Limited EN 316 NCE 2006 dt 16.10.2006, 59.8 Inlgleshwar (44.8 & 3 Vijayapura Energy 24 NCE 2020 EN 253 NCE 2011 dt 02.01.2012, MW), Kalgharki, Talewad, dt 02.01.2021 EN 278 NCE 2014 dt 24.02.2015 & Yarnal and Mangoli -10 EN 161 NCE 2015 dt 25.07.2015 MW, Chiraldinni (2 MW), 189 Four EF Wind Power Private Limited EN 318 NCE 2006 dt 06.10.2006, 38.975 Malligere, Yadahalli, Bagalkot, Energy 111 NCE EN 381 NCE 2012 dt 10.08.2015, Manthur and Belagavi and 2020 dt 02.01.2021 EN 186 NCE 2014 (1) dt Hanchibenchi-12.5 MW, Dharwad 23.03.2016, EN 225 NCE 2011 dt Guddanahalli - 2 MW, 10.05.2011, EN 301 NCE 2011 dt Kundgol, Kamdoli and 02.08.2012, EN 186 NCE 2014 (2) Shirur (9.225 MW) and dt 23.03.2016, EN 145 NCE 2005 Jamkhandi (15.25 MW) dt 16.10.2006, EN 238 NCE 2012 dt 08.05.2013, EN 169 NCE 2017 (5) dt 5.5.2017, EN 234 NCE 2012 dt 08.05.2013, EN 169 NCE 2017 (3) dt 5.5.2017, EN 244 NCE 2012 dt 08.05.2013, EN 169 NCE 2017 (2) dt 5.5.2017, EN 456 NCE 2006 dt 22.05.2007, EN 456 NCE 2006 dt 22.5.2007, EN 456 NCE 2006 dt 22.05.2007, EN 444 NCE 2010 dt 20.12.2010 and 02.07.2011, EN 43 NCE 2012 dt 5.8.2013, EN 329 NCE 2011 dt 09.09.2011 and EN 80 NCE 2014 dt 30.07.2015

190 Renew Wind Energy (Karnataka) (P) EN 114 NCE 2015 dt 18.05.2015, 38.4 Kudligi Ballari Energy 127 NCE Limited EN 117 NCE 2015, 18.05.2015, EN 2020 dt 06.01.2021 116 NCE 2015 dt 18.05.2015, EN 134 NCE 2015 dt 28.03.2017, EN 115 NCE 2015 dt 18.05.2015, EN 203 NCE 2016 dt 27.07.2016 & EN 133 NCE 2017 dt 28.03.2017

191 Jindal Aluminium Limited EN 25 NCE 2015 dt 27.02.2015 11.2 Bhailtumbharguddi, Davanger & Energy 06 NCE 2021 Ranganathanahalli, Kudligi dt 21.01.2021 Hirekumbalkunta, and Hunmavanagathihalli 192 Shri Krishna Minerals EN 152 NCE 2006 dt 21.04.2006 & 0.75 Hanumasagar Koppal Energy 09 NCE 2021 EN 108 NCE 2008 dt 20.03.2008 dt 21.01.2021

193 Y.Mahabaleahrappa & Sons EN 348 NCE 2007 dt 21.09.2007 2.4 Rajur Gadag Energy 04 NCE 2021 dt 21.01.2021

194 Cape Infrastructure Private Limited EN 165 NCE 2011 dt 07.04.2011 4 Naregal Gadag Energy 08 NCE 2021 dt 21.01.2021

195 Fiza‍ Developers and Inter -trade (P) Limited EN 165 NCE 2002 dt 05.03.2003, 85.6 Different village Chitradurga (25 Energy 93 NCE 2020 EN 174 NCE 2005 dt 13.07.2005, MW) & Dakshina dt 29.03.2021 DE 4 NCE 2002 dt 31.05.2002, ME Kannada (60.6 4 NCE 2002 dt 11.12.2002, EN 239 MW) NCE 2006 dt 15.06.2006, EN 269 NCE 2006 dt 07.07.2006, EN 194 NCE 2007 dt 02.07.2007, EN 352 NCE 2012 dt 24.03.2016

196 Vestas Wind Technology India (P) Limited EN 409 NCE 2006, Dated: 18-10- 1.65 Belagavi Belagavi Energy 05 NCE 2021, 2006 (9.9-8.25=1.65) Dated: 16-04-2021 197 Enercon India Limited EN 398 NCE 2005, Dated: 20-04- 228.01 Hosur, Linganahatti, Belagavi and Energy 89 NCE 2020, 2005, EN 209 NCE 2006, Dated: 26- Naragund - 4.8 MW, Gadag Dated: 25-05-2021 05-2006, EN 146 NCE 2007, Harnakola, , Dated: 17-05-2007 Ankalagi - 28.8 MW, Badhurwadi, , Mohaewadi - 3.2 MW, Kakti, Budranur, Siddanahalli, Rampur, Kencenahatti-64 MW, , Sigihatti, Harlikatte - 9.6 MW, Nelaganti, Benakanabhavi Halla, Hosakote - 2.4 MW, Bhoganur, Shelwadi, Adanur, , Sasivahalli - 26.4 MW, Anthur, Benthur, Nilagund, Kallur, Yalavatti - 32.01 MW, Kurthakoti, Horti Kanavi, Mulagund - 21.6 MW, Adaralli, Deviyal, Nadigatti, Hosur, Narayanapura, Sugganahalli - 35.2 MW

9120.01 As on 31.07.2021

15

26.75

15 5.25

20 2

2 33.275 36.35

5

11.5 12.5

24.15

2

5

3.6 40

8

32.8 16

5

99 30 19