M.I.Division Dhenkanal.Xlsx
Total Page:16
File Type:pdf, Size:1020Kb
STATUS OF IRRIGATION SUPPLIED DURING KHARIFF AS ON SEPTEMBER 2015 IN DHENKANAL DISTRICT Length of canal system in Km Ayacut in Ha. Reason for less/ excess of ayacut Sl Ayacut Name of District Name of Block Name of MIP Actual length in Actual irrigated/ Reason No. Design Designed irrigated which water Potential for not reaching tail length Ayacut upto 15th supplied Created end Sept' 2015 1 2 3 4 5 6 7 8 9 10 Structures are badly damaged, requires 1 Dhenkanal Bhuban Badabandha 13.30 5.80 364.00 250.00 150.00 re-construction & repair 2 Dhenkanal Bhuban Balibo NCS 42.00 75.00 42.00 Full Ayacut 3 Dhenkanal Bhuban Baunskana 0.36 0.36 61.00 61.00 61.00 Full Ayacut Structures are badly damaged, requires 4 Dhenkanal Bhuban Damasal 64.35 6.00 2,000.00 2552.00 1900.00 re-construction & repair Structures are badly damaged, requires 5 Dhenkanal Bhuban Khurusia NCS 81.00 50.00 25.00 re-construction & repair 6 Dhenkanal Bhuban Mathakargolla 0.31 0.31 41.00 41.00 41.00 Full Ayacut 7 Dhenkanal Bhuban Solapokhari NCS 81.00 51.00 0.00 Structures are badly damaged, requires 8 Dhenkanal Bhuban Tananali (Anal) 1.74 1.30 162.00 122.00 122.00 re-construction & repair 9 Dhenkanal Bhuban Tangarpada 0.60 0.60 49.00 77.00 49.00 Full Ayacut 10 Dhenkanal Bhuban Tipilai NCS 81.00 70.00 51.00 Less rainfall Length of canal system in Km Ayacut in Ha. Reason for less/ excess of ayacut Sl Ayacut Name of District Name of Block Name of MIP Actual length in Actual irrigated/ Reason No. Design Designed irrigated which water Potential for not reaching tail length Ayacut upto 15th supplied Created end Sept' 2015 1 2 3 4 5 6 7 8 9 10 Structures are badly Badajore damaged, requires 11 Dhenkanal Dhenkanal NCS 150.00 50.00 30.00 (Durgaprasad) re-construction & repair Structures are badly damaged, requires 12 Dhenkanal Dhenkanal Biradia 1.55 0.90 162.00 280.00 100.00 re-construction & repair On-going Project 13 Dhenkanal Dhenkanal Chaulia 810.00 0.00 under RIDF Due to damage of 14 Dhenkanal Dhenkanal Dalibandha NCS 56.00 25.00 25.00 H/R Canal requires 15 Dhenkanal Dhenkanal Gahamkhunti 1.00 0.60 81.00 75.00 75.00 improvement work 16 Dhenkanal Dhenkanal Gohirakhal NCS 41.00 32.00 25.00 Less rainfall Canal desilting is 17 Dhenkanal Dhenkanal Jhumpudia 0.90 0.60 61.00 30.00 30.00 required 18 Dhenkanal Dhenkanal Kaintaliabandha NCS 41.00 30.00 30.00 Less rainfall 19 Dhenkanal Dhenkanal Khalibandha 0.30 0.30 41.00 40.00 40.00 Less rainfall Structures are badly damaged, requires 20 Dhenkanal Dhenkanal Khinda NCS 121.00 0.00 re-construction & repair 21 Dhenkanal Dhenkanal Mahulapada 0.80 0.80 41.00 41.00 41.00 Full Ayacut Structures are badly damaged, requires 22 Dhenkanal Dhenkanal Mankira NCS 520.00 0.00 re-construction & repair Length of canal system in Km Ayacut in Ha. Reason for less/ excess of ayacut Sl Ayacut Name of District Name of Block Name of MIP Actual length in Actual irrigated/ Reason No. Design Designed irrigated which water Potential for not reaching tail length Ayacut upto 15th supplied Created end Sept' 2015 1 2 3 4 5 6 7 8 9 10 23 Dhenkanal Dhenkanal Namichira NCS 41.00 41.00 41.00 Full Ayacut Renovation to H/W 24 Dhenkanal Dhenkanal Parbatia 1.50 0.80 162.00 130.00 120.00 is required Structures are badly damaged, requires 25 Dhenkanal Dhenkanal Patrabhaga 3.00 1.80 211.00 180.00 180.00 re-construction & repair. 26 Dhenkanal Dhenkanal Siariakata NCS 80.00 40.00 40.00 Less rainfall 27 Dhenkanal Dhenkanal Similibandha NCS 41.00 25.00 25.00 Less rainfall On-going Project 28 Dhenkanal Dhenkanal Sunajhari 90.00 0.00 under RIDF Structures are badly damaged, requires 29 Dhenkanal Dhenkanal Talbarkote 0.20 162.00 62.00 62.00 re-construction & repair 30 Dhenkanal Gondia Alhachua NCS 81.00 0.00 31 Dhenkanal Gondia Aliapada 0.90 0.50 81.00 81.00 81.00 Full Ayacut Canal desilting is 32 Dhenkanal Gondia Archua NCS 121.00 0.00 required. Structures are badly damaged, requires 33 Dhenkanal Gondia Badapokhari NCS 81.00 0.00 re-construction & repair Renovation to H/W 34 Dhenkanal Gondia Baidakateni 0.60 72.00 0.00 is required. 35 Dhenkanal Gondia Balusua NCS 41.00 0.00 36 Dhenkanal Gondia Bankianala NCS 81.00 0.00 Renovation to H/W 37 Dhenkanal Gondia Bhuasunibandha 0.70 89.00 0.00 is required. 38 Dhenkanal Gondia Binjarinalla NCS 900.00 0.00 Length of canal system in Km Ayacut in Ha. Reason for less/ excess of ayacut Sl Ayacut Name of District Name of Block Name of MIP Actual length in Actual irrigated/ Reason No. Design Designed irrigated which water Potential for not reaching tail length Ayacut upto 15th supplied Created end Sept' 2015 1 2 3 4 5 6 7 8 9 10 39 Dhenkanal Gondia Bunglow 0.40 0.40 113.00 113.00 113.00 Full Ayacut Structures are badly damaged, requires 40 Dhenkanal Gondia Dadhisinga NCS 81.00 0.00 re-construction & repair Canal requires 41 Dhenkanal Gondia Daluasuni 1.65 1.00 73.00 74.00 40.00 improvement work On-going Project 42 Dhenkanal Gondia Darh 1.50 216.00 0.00 under RIDF 43 Dhenkanal Gondia Deogaon NCS 41.00 41.00 20.00 Less rainfall Renovation to H/W 44 Dhenkanal Gondia Dhaneibandha 0.70 0.90 100.00 80.00 80.00 is required Structures are badly damaged, requires 45 Dhenkanal Gondia Dhanianali 7.11 4.00 243.00 362.00 100.00 re-construction & repair. Structures are badly damaged, requires 46 Dhenkanal Gondia Dhehuritotajharan NCS 41.00 0.00 re-construction & repair. Structures are badly damaged, requires 47 Dhenkanal Gondia Durgabandha 0.97 0.70 202.00 150.00 90.00 re-construction & repair. Length of canal system in Km Ayacut in Ha. Reason for less/ excess of ayacut Sl Ayacut Name of District Name of Block Name of MIP Actual length in Actual irrigated/ Reason No. Design Designed irrigated which water Potential for not reaching tail length Ayacut upto 15th supplied Created end Sept' 2015 1 2 3 4 5 6 7 8 9 10 Structures are badly damaged, requires 48 Dhenkanal Gondia Gundurapasi 12.81 10.00 1,012.00 1042.00 800.00 re-construction & repair. Gunduribandha 49 Dhenkanal Gondia NCS 41.00 20.00 20.00 Less rainfall (Badhipokhari) 50 Dhenkanal Gondia Jaribandha NCS 81.00 54.00 20.00 Less rainfall 51 Dhenkanal Gondia Jharanabandha-I NCS 41.00 30.00 20.00 Scanty rainfall Renovation to H/W 52 Dhenkanal Gondia Jharanabandha-II 1.15 0.50 50.00 40.00 30.00 is required Structures are badly damaged, requires 53 Dhenkanal Gondia Jhumpan 1.57 1.10 145.00 130.00 110.00 re-construction & repair. Canal requires 54 Dhenkanal Gondia Khandiabandha 1.60 1.20 53.00 54.00 50.00 improvement work.. Structures are badly damaged, requires 55 Dhenkanal Gondia Kolibandha NCS 81.00 0.00 re-construction & repair. Structures are badly damaged, requires 56 Dhenkanal Gondia Kurangia NCS 81.00 0.00 re-construction & repair. Length of canal system in Km Ayacut in Ha. Reason for less/ excess of ayacut Sl Ayacut Name of District Name of Block Name of MIP Actual length in Actual irrigated/ Reason No. Design Designed irrigated which water Potential for not reaching tail length Ayacut upto 15th supplied Created end Sept' 2015 1 2 3 4 5 6 7 8 9 10 Structures are badly damaged, requires 57 Dhenkanal Gondia Lahada(Ankul) NCS 41.00 0.00 re-construction & repair. Canal requires 58 Dhenkanal Gondia Madhapur 1.75 1.20 81.00 81.00 70.00 improvement work.. Structures are badly damaged, requires 59 Dhenkanal Gondia Nuabandha NCS 81.00 0.00 re-construction & repair. Structures are badly damaged, requires 60 Dhenkanal Gondia Panaslikata NCS 41.00 0.00 re-construction & repair. Renovation to H/W 61 Dhenkanal Gondia Pinguabhusabandha 1.50 0.40 81.00 83.00 20.00 is required. Canal desilting is 62 Dhenkanal Gondia Ramei (Archua) 2.20 2.20 42.00 80.00 42.00 required. Structures are badly damaged, requires 63 Dhenkanal Gondia Saharpokhari NCS 41.00 0.00 re-construction & repair. Structures are badly damaged, requires 64 Dhenkanal Gondia Sankeibandha NCS 60.00 0.00 re-construction & repair. Length of canal system in Km Ayacut in Ha. Reason for less/ excess of ayacut Sl Ayacut Name of District Name of Block Name of MIP Actual length in Actual irrigated/ Reason No. Design Designed irrigated which water Potential for not reaching tail length Ayacut upto 15th supplied Created end Sept' 2015 1 2 3 4 5 6 7 8 9 10 Structures are badly damaged, requires 65 Dhenkanal Gondia Saupajhar 4.00 3.50 350.00 0.00 350.00 re-construction & repair. 66 Dhenkanal Gondia Sibasagar NCS 41.00 35.00 20.00 Scanty rainfall Canal desilting is 67 Dhenkanal Gondia Sorisiapada 2.61 1.80 108.00 100.00 80.00 required. Talibandha 68 Dhenkanal Gondia NCS 41.00 0.00 (Bhalugadia) 69 Dhenkanal Gondia Worinalla NCS 41.00 0.00 Canal requires 70 Dhenkanal Hindol Badibahal 0.10 0.15 41.00 41.00 41.00 improvement work. 71 Dhenkanal Hindol Bankidibandha NCS 0.20 81.00 50.00 50.00 Less rainfall 72 Dhenkanal Hindol Baradapal 8.20 8.20 715.00 715.00 715.00 Full Ayacut Baradapal Canal desilting is 73 Dhenkanal Hindol 0.48 0.32 42.00 55.00 35.00 (Badabandha) required Structures are badly damaged, requires 74 Dhenkanal Hindol Baunsapokhari 4.63 4.10 271.00 273.00 205.00 re-construction & repair.