STATUS OF IRRIGATION SUPPLIED DURING KHARIFF AS ON SEPTEMBER 2015 IN DISTRICT

Length of canal system in Km Ayacut in Ha. Reason for less/ excess of ayacut Sl Ayacut Name of District Name of Block Name of MIP Actual length in Actual irrigated/ Reason No. Design Designed irrigated which water Potential for not reaching tail length Ayacut upto 15th supplied Created end Sept' 2015 1 2 3 4 5 6 7 8 9 10 Structures are badly damaged, requires 1 Dhenkanal Badabandha 13.30 5.80 364.00 250.00 150.00 re-construction & repair 2 Dhenkanal Bhuban Balibo NCS 42.00 75.00 42.00 Full Ayacut 3 Dhenkanal Bhuban Baunskana 0.36 0.36 61.00 61.00 61.00 Full Ayacut Structures are badly damaged, requires 4 Dhenkanal Bhuban Damasal 64.35 6.00 2,000.00 2552.00 1900.00 re-construction & repair

Structures are badly damaged, requires 5 Dhenkanal Bhuban Khurusia NCS 81.00 50.00 25.00 re-construction & repair 6 Dhenkanal Bhuban Mathakargolla 0.31 0.31 41.00 41.00 41.00 Full Ayacut 7 Dhenkanal Bhuban Solapokhari NCS 81.00 51.00 0.00 Structures are badly damaged, requires 8 Dhenkanal Bhuban Tananali (Anal) 1.74 1.30 162.00 122.00 122.00 re-construction & repair 9 Dhenkanal Bhuban Tangarpada 0.60 0.60 49.00 77.00 49.00 Full Ayacut 10 Dhenkanal Bhuban Tipilai NCS 81.00 70.00 51.00 Less rainfall Length of canal system in Km Ayacut in Ha. Reason for less/ excess of ayacut Sl Ayacut Name of District Name of Block Name of MIP Actual length in Actual irrigated/ Reason No. Design Designed irrigated which water Potential for not reaching tail length Ayacut upto 15th supplied Created end Sept' 2015 1 2 3 4 5 6 7 8 9 10 Structures are badly Badajore damaged, requires 11 Dhenkanal Dhenkanal NCS 150.00 50.00 30.00 (Durgaprasad) re-construction & repair

Structures are badly damaged, requires 12 Dhenkanal Dhenkanal Biradia 1.55 0.90 162.00 280.00 100.00 re-construction & repair On-going Project 13 Dhenkanal Dhenkanal Chaulia 810.00 0.00 under RIDF Due to damage of 14 Dhenkanal Dhenkanal Dalibandha NCS 56.00 25.00 25.00 H/R Canal requires 15 Dhenkanal Dhenkanal Gahamkhunti 1.00 0.60 81.00 75.00 75.00 improvement work 16 Dhenkanal Dhenkanal Gohirakhal NCS 41.00 32.00 25.00 Less rainfall Canal desilting is 17 Dhenkanal Dhenkanal Jhumpudia 0.90 0.60 61.00 30.00 30.00 required 18 Dhenkanal Dhenkanal Kaintaliabandha NCS 41.00 30.00 30.00 Less rainfall 19 Dhenkanal Dhenkanal Khalibandha 0.30 0.30 41.00 40.00 40.00 Less rainfall Structures are badly damaged, requires 20 Dhenkanal Dhenkanal Khinda NCS 121.00 0.00 re-construction & repair 21 Dhenkanal Dhenkanal Mahulapada 0.80 0.80 41.00 41.00 41.00 Full Ayacut Structures are badly damaged, requires 22 Dhenkanal Dhenkanal Mankira NCS 520.00 0.00 re-construction & repair Length of canal system in Km Ayacut in Ha. Reason for less/ excess of ayacut Sl Ayacut Name of District Name of Block Name of MIP Actual length in Actual irrigated/ Reason No. Design Designed irrigated which water Potential for not reaching tail length Ayacut upto 15th supplied Created end Sept' 2015 1 2 3 4 5 6 7 8 9 10 23 Dhenkanal Dhenkanal Namichira NCS 41.00 41.00 41.00 Full Ayacut Renovation to H/W 24 Dhenkanal Dhenkanal Parbatia 1.50 0.80 162.00 130.00 120.00 is required Structures are badly damaged, requires 25 Dhenkanal Dhenkanal Patrabhaga 3.00 1.80 211.00 180.00 180.00 re-construction & repair. 26 Dhenkanal Dhenkanal Siariakata NCS 80.00 40.00 40.00 Less rainfall 27 Dhenkanal Dhenkanal Similibandha NCS 41.00 25.00 25.00 Less rainfall On-going Project 28 Dhenkanal Dhenkanal Sunajhari 90.00 0.00 under RIDF Structures are badly damaged, requires 29 Dhenkanal Dhenkanal Talbarkote 0.20 162.00 62.00 62.00 re-construction & repair 30 Dhenkanal Gondia Alhachua NCS 81.00 0.00 31 Dhenkanal Gondia Aliapada 0.90 0.50 81.00 81.00 81.00 Full Ayacut Canal desilting is 32 Dhenkanal Gondia Archua NCS 121.00 0.00 required. Structures are badly damaged, requires 33 Dhenkanal Gondia Badapokhari NCS 81.00 0.00 re-construction & repair Renovation to H/W 34 Dhenkanal Gondia Baidakateni 0.60 72.00 0.00 is required. 35 Dhenkanal Gondia Balusua NCS 41.00 0.00 36 Dhenkanal Gondia Bankianala NCS 81.00 0.00 Renovation to H/W 37 Dhenkanal Gondia Bhuasunibandha 0.70 89.00 0.00 is required. 38 Dhenkanal Gondia Binjarinalla NCS 900.00 0.00 Length of canal system in Km Ayacut in Ha. Reason for less/ excess of ayacut Sl Ayacut Name of District Name of Block Name of MIP Actual length in Actual irrigated/ Reason No. Design Designed irrigated which water Potential for not reaching tail length Ayacut upto 15th supplied Created end Sept' 2015 1 2 3 4 5 6 7 8 9 10 39 Dhenkanal Gondia Bunglow 0.40 0.40 113.00 113.00 113.00 Full Ayacut Structures are badly damaged, requires 40 Dhenkanal Gondia Dadhisinga NCS 81.00 0.00 re-construction & repair

Canal requires 41 Dhenkanal Gondia Daluasuni 1.65 1.00 73.00 74.00 40.00 improvement work On-going Project 42 Dhenkanal Gondia Darh 1.50 216.00 0.00 under RIDF 43 Dhenkanal Gondia Deogaon NCS 41.00 41.00 20.00 Less rainfall Renovation to H/W 44 Dhenkanal Gondia Dhaneibandha 0.70 0.90 100.00 80.00 80.00 is required Structures are badly damaged, requires 45 Dhenkanal Gondia Dhanianali 7.11 4.00 243.00 362.00 100.00 re-construction & repair.

Structures are badly damaged, requires 46 Dhenkanal Gondia Dhehuritotajharan NCS 41.00 0.00 re-construction & repair.

Structures are badly damaged, requires 47 Dhenkanal Gondia Durgabandha 0.97 0.70 202.00 150.00 90.00 re-construction & repair. Length of canal system in Km Ayacut in Ha. Reason for less/ excess of ayacut Sl Ayacut Name of District Name of Block Name of MIP Actual length in Actual irrigated/ Reason No. Design Designed irrigated which water Potential for not reaching tail length Ayacut upto 15th supplied Created end Sept' 2015 1 2 3 4 5 6 7 8 9 10 Structures are badly damaged, requires 48 Dhenkanal Gondia Gundurapasi 12.81 10.00 1,012.00 1042.00 800.00 re-construction & repair. Gunduribandha 49 Dhenkanal Gondia NCS 41.00 20.00 20.00 Less rainfall (Badhipokhari) 50 Dhenkanal Gondia Jaribandha NCS 81.00 54.00 20.00 Less rainfall 51 Dhenkanal Gondia Jharanabandha-I NCS 41.00 30.00 20.00 Scanty rainfall Renovation to H/W 52 Dhenkanal Gondia Jharanabandha-II 1.15 0.50 50.00 40.00 30.00 is required Structures are badly damaged, requires 53 Dhenkanal Gondia Jhumpan 1.57 1.10 145.00 130.00 110.00 re-construction & repair.

Canal requires 54 Dhenkanal Gondia Khandiabandha 1.60 1.20 53.00 54.00 50.00 improvement work..

Structures are badly damaged, requires 55 Dhenkanal Gondia Kolibandha NCS 81.00 0.00 re-construction & repair.

Structures are badly damaged, requires 56 Dhenkanal Gondia Kurangia NCS 81.00 0.00 re-construction & repair. Length of canal system in Km Ayacut in Ha. Reason for less/ excess of ayacut Sl Ayacut Name of District Name of Block Name of MIP Actual length in Actual irrigated/ Reason No. Design Designed irrigated which water Potential for not reaching tail length Ayacut upto 15th supplied Created end Sept' 2015 1 2 3 4 5 6 7 8 9 10 Structures are badly damaged, requires 57 Dhenkanal Gondia Lahada(Ankul) NCS 41.00 0.00 re-construction & repair.

Canal requires 58 Dhenkanal Gondia Madhapur 1.75 1.20 81.00 81.00 70.00 improvement work..

Structures are badly damaged, requires 59 Dhenkanal Gondia Nuabandha NCS 81.00 0.00 re-construction & repair.

Structures are badly damaged, requires 60 Dhenkanal Gondia Panaslikata NCS 41.00 0.00 re-construction & repair. Renovation to H/W 61 Dhenkanal Gondia Pinguabhusabandha 1.50 0.40 81.00 83.00 20.00 is required. Canal desilting is 62 Dhenkanal Gondia Ramei (Archua) 2.20 2.20 42.00 80.00 42.00 required. Structures are badly damaged, requires 63 Dhenkanal Gondia Saharpokhari NCS 41.00 0.00 re-construction & repair.

Structures are badly damaged, requires 64 Dhenkanal Gondia Sankeibandha NCS 60.00 0.00 re-construction & repair. Length of canal system in Km Ayacut in Ha. Reason for less/ excess of ayacut Sl Ayacut Name of District Name of Block Name of MIP Actual length in Actual irrigated/ Reason No. Design Designed irrigated which water Potential for not reaching tail length Ayacut upto 15th supplied Created end Sept' 2015 1 2 3 4 5 6 7 8 9 10 Structures are badly damaged, requires 65 Dhenkanal Gondia Saupajhar 4.00 3.50 350.00 0.00 350.00 re-construction & repair. 66 Dhenkanal Gondia Sibasagar NCS 41.00 35.00 20.00 Scanty rainfall Canal desilting is 67 Dhenkanal Gondia Sorisiapada 2.61 1.80 108.00 100.00 80.00 required. Talibandha 68 Dhenkanal Gondia NCS 41.00 0.00 (Bhalugadia) 69 Dhenkanal Gondia Worinalla NCS 41.00 0.00 Canal requires 70 Dhenkanal Hindol Badibahal 0.10 0.15 41.00 41.00 41.00 improvement work. 71 Dhenkanal Hindol Bankidibandha NCS 0.20 81.00 50.00 50.00 Less rainfall 72 Dhenkanal Hindol Baradapal 8.20 8.20 715.00 715.00 715.00 Full Ayacut Baradapal Canal desilting is 73 Dhenkanal Hindol 0.48 0.32 42.00 55.00 35.00 (Badabandha) required Structures are badly damaged, requires 74 Dhenkanal Hindol Baunsapokhari 4.63 4.10 271.00 273.00 205.00 re-construction & repair.

Structures are badly damaged, requires 75 Dhenkanal Hindol Bedapada 7.32 5.50 386.00 320.00 320.00 re-construction & repair.

Structures are badly damaged, requires 76 Dhenkanal Hindol Beruanpal 4.02 2.70 248.00 248.00 210.00 re-construction & repair. Length of canal system in Km Ayacut in Ha. Reason for less/ excess of ayacut Sl Ayacut Name of District Name of Block Name of MIP Actual length in Actual irrigated/ Reason No. Design Designed irrigated which water Potential for not reaching tail length Ayacut upto 15th supplied Created end Sept' 2015 1 2 3 4 5 6 7 8 9 10 77 Dhenkanal Hindol Brahmanipal NCS 0.20 43.00 35.00 35.00 Scanty rainfall Canal requires 78 Dhenkanal Hindol Champamunda 0.88 0.50 41.00 43.00 35.00 improvement work 79 Dhenkanal Hindol Diarpasi NCS 0.24 81.00 65.00 65.00 Scanty rainfall Canal requires 80 Dhenkanal Hindol Dudurkote 0.25 0.20 41.00 43.00 30.00 improvement work

Structures are badly damaged, requires 81 Dhenkanal Hindol Ektali 5.85 4.50 206.00 206.00 190.00 re-construction & repair

Structures are badly damaged, requires 82 Dhenkanal Hindol Gadabandha NCS 364.00 0.00 re-construction & repair 83 Dhenkanal Hindol Gandanali 0.42 0.42 41.00 41.00 41.00 Full Ayacut Structures are badly damaged, requires 84 Dhenkanal Hindol Gulei 1.07 0.70 405.00 120.00 120.00 re-construction & repair. 85 Dhenkanal Hindol Jharanabandha NCS 0.50 81.00 60.00 60.00 Scanty rainfall 86 Dhenkanal Hindol Kalanda NCS 0.55 81.00 65.00 65.00 Scanty rainfall Renovation to H/W 87 Dhenkanal Hindol Kalangabandha NCS 41.00 0.00 is required. 88 Dhenkanal Hindol Kalijodi 5.88 5.88 405.00 405.00 405.00 Full Ayacut Due to damage of 89 Dhenkanal Hindol Kamarbeda NCS 89.00 40.00 40.00 H/R Canal desilting is 90 Dhenkanal Hindol Kansara 3.54 3.00 81.00 81.00 70.00 required. Length of canal system in Km Ayacut in Ha. Reason for less/ excess of ayacut Sl Ayacut Name of District Name of Block Name of MIP Actual length in Actual irrigated/ Reason No. Design Designed irrigated which water Potential for not reaching tail length Ayacut upto 15th supplied Created end Sept' 2015 1 2 3 4 5 6 7 8 9 10 Structures are badly damaged, requires 91 Dhenkanal Hindol Kantamila 0.24 0.20 243.00 180.00 180.00 re-construction & repair. On-going Project 92 Dhenkanal Hindol Kapasia NCS 380.00 0.00 under RIDF. 93 Dhenkanal Hindol Khajuriakata NCS 81.00 40.00 40.00 Less rainfall Canal desilting is 94 Dhenkanal Hindol Kharidali 0.88 0.50 121.00 144.00 95.00 required. Canal requires 95 Dhenkanal Hindol Kukupangi 3.32 2.50 134.00 137.00 90.00 improvement work. 96 Dhenkanal Hindol Kurumitha 0.90 0.90 81.00 81.00 81.00 Full Ayacut Structures are badly damaged, requires 97 Dhenkanal Hindol Kusumbandha NCS 324.00 0.00 re-construction & repair.

Structures are badly damaged, requires 98 Dhenkanal Hindol Madhusagar NCS 0.20 41.00 20.00 20.00 re-construction & repair.

Structures are badly damaged, requires 99 Dhenkanal Hindol Nuabandha NCS 81.00 40.00 re-construction & repair.

Canal requires 100 Dhenkanal Hindol Nuaghai 2.21 1.50 101.00 101.00 80.00 improvement work. 101 Dhenkanal Hindol Paikpali NCS 0.05 41.00 15.00 15.00 Less rainfall Length of canal system in Km Ayacut in Ha. Reason for less/ excess of ayacut Sl Ayacut Name of District Name of Block Name of MIP Actual length in Actual irrigated/ Reason No. Design Designed irrigated which water Potential for not reaching tail length Ayacut upto 15th supplied Created end Sept' 2015 1 2 3 4 5 6 7 8 9 10 Structures are badly damaged, requires 102 Dhenkanal Hindol Panaspal 9.30 7.50 486.00 400.00 400.00 re-construction & repair.

Canal requires 103 Dhenkanal Hindol Rampal 0.46 0.40 81.00 70.00 70.00 improvement work.

Canal requires 104 Dhenkanal Hindol Sanjapada 0.30 0.15 41.00 38.00 20.00 improvement work.

Structures are badly damaged, requires 105 Dhenkanal Hindol Sarpa 15.76 15.76 810.00 810.00 810.00 re-construction & repair.

Structures are badly damaged, requires 106 Dhenkanal Hindol Thengamunda 0.60 0.35 162.00 100.00 100.00 re-construction & repair.

Canal requires 107 Dhenkanal Anlaberini 1.80 0.40 81.00 100.00 20.00 improvement work. 108 Dhenkanal Kamakhyanagar Baligorada NCS 41.00 41.00 35.00 Less rainfall Canal desilting is 109 Dhenkanal Kamakhyanagar Bankual 1.05 1.00 41.00 44.00 40.00 required. 110 Dhenkanal Kamakhyanagar Bhagirathipur NCS 41.00 41.00 41.00 Full Ayacut Canal requires 111 Dhenkanal Kamakhyanagar Bhairapur 2.70 2.20 101.00 101.00 90.00 improvement work. Length of canal system in Km Ayacut in Ha. Reason for less/ excess of ayacut Sl Ayacut Name of District Name of Block Name of MIP Actual length in Actual irrigated/ Reason No. Design Designed irrigated which water Potential for not reaching tail length Ayacut upto 15th supplied Created end Sept' 2015 1 2 3 4 5 6 7 8 9 10 Canal requires 112 Dhenkanal Kamakhyanagar Galukateni 4.50 1.00 41.00 81.00 30.00 improvement work. 113 Dhenkanal Kamakhyanagar Hadgudi 1.17 1.17 41.00 41.00 41.00 Full Ayacut Structures are badly damaged, requires 114 Dhenkanal Kamakhyanagar Indrajitnalla 11.94 6.35 486.00 250.00 250.00 re-construction & repair. 115 Dhenkanal Kamakhyanagar Jantakhola NCS 81.00 0.00 Structures are badly damaged, requires 116 Dhenkanal Kamakhyanagar Jhamujhar 3.82 0.30 190.00 20.00 20.00 re-construction & repair.

Structures are badly damaged, requires 117 Dhenkanal Kamakhyanagar Jodabadia 8.07 3.50 445.00 400.00 180.00 re-construction & repair. 118 Dhenkanal Kamakhyanagar Kakudia 2.80 2.80 41.00 41.00 41.00 Full Ayacut Structures are badly damaged, requires 119 Dhenkanal Kamakhyanagar Kankadajhar 13.68 2.20 263.00 200.00 75.00 re-construction & repair. 120 Dhenkanal Kamakhyanagar Kantajharia 4.60 4.60 41.00 48.00 41.00 Full Ayacut 121 Dhenkanal Kamakhyanagar Kantapal 1.30 1.30 81.00 146.00 81.00 Full Ayacut Canal requires 122 Dhenkanal Kamakhyanagar Kantiokateni 2.20 1.50 42.00 122.00 30.00 improvement work. 123 Dhenkanal Kamakhyanagar Khatakhura 0.95 0.95 41.00 41.00 41.00 Full Ayacut Length of canal system in Km Ayacut in Ha. Reason for less/ excess of ayacut Sl Ayacut Name of District Name of Block Name of MIP Actual length in Actual irrigated/ Reason No. Design Designed irrigated which water Potential for not reaching tail length Ayacut upto 15th supplied Created end Sept' 2015 1 2 3 4 5 6 7 8 9 10 On-going Project 124 Dhenkanal Kamakhyanagar Kusumjodi NCS 80.00 0.00 under RIDF. Canal desilting is 125 Dhenkanal Kamakhyanagar Lokanathpur 0.51 0.50 73.00 73.00 30.00 required. Canal desilting is 126 Dhenkanal Kamakhyanagar Machhia 1.27 1.00 65.00 41.00 20.00 required. 127 Dhenkanal Kamakhyanagar Motta 1.20 1.20 41.00 41.00 41.00 Full Ayacut Canal desilting is 128 Dhenkanal Kamakhyanagar Nahakani 0.30 0.30 41.00 60.00 41.00 required. 129 Dhenkanal Kamakhyanagar Rajakulkateni NCS 41.00 0.00 41.00 Full Ayacut Canal desilting is 130 Dhenkanal Kamakhyanagar Rankia 3.80 3.00 81.00 103.00 70.00 required. 131 Dhenkanal Kamakhyanagar Saradhapur NCS 41.00 0.00 Canal desilting is 132 Dhenkanal Kankadahad Bandania 1.20 0.70 65.00 65.00 45.00 required. Structures are badly damaged, requires 133 Dhenkanal Kankadahad Birasal (Combined) 7.20 5.80 408.00 370.00 320.00 re-construction & repair.

Structures are badly damaged, requires 134 Dhenkanal Kankadahad Damsal 14.62 11.00 1,215.00 1215.00 1000.00 re-construction & repair.

Canal requires 135 Dhenkanal Kankadahad Gurujanguli 4.04 2.80 41.00 48.00 25.00 improvement work. On-going Project 136 Dhenkanal Kankadahad Khandahata 352.00 0.00 under RIDF. 137 Dhenkanal Kankadahad Pangatira 0.45 0.45 73.00 73.00 73.00 Full Ayacut Length of canal system in Km Ayacut in Ha. Reason for less/ excess of ayacut Sl Ayacut Name of District Name of Block Name of MIP Actual length in Actual irrigated/ Reason No. Design Designed irrigated which water Potential for not reaching tail length Ayacut upto 15th supplied Created end Sept' 2015 1 2 3 4 5 6 7 8 9 10 Canal requires 138 Dhenkanal Odapada Barabahalia 1.50 0.95 61.00 61.00 50.00 improvement work. 139 Dhenkanal Odapada Bhagirathisagar NCS 1.00 80.00 60.00 50.00 Less rainfall 140 Dhenkanal Odapada Jadabandha NCS 41.00 35.00 35.00 Less rainfall Canal desilting is 141 Dhenkanal Odapada Kalika Prasad 2.75 1.45 60.00 60.00 45.00 required. Structures are badly damaged, requires 142 Dhenkanal Odapada Khandiabandha-I NCS 162.00 25.00 25.00 re-construction & repair.

Structures are badly damaged, requires 143 Dhenkanal Odapada Lowerbaga 10.07 3.50 364.00 300.00 200.00 re-construction & repair. On-going Project 144 Dhenkanal Odapada Nuabandha 1.50 0.60 90.00 90.00 70.00 under RIDF. 145 Dhenkanal Odapada Panchagochhia NCS 41.00 41.00 41.00 Full Ayacut Canal desilting is 146 Dhenkanal Odapada Ranipal 0.30 0.25 121.00 145.00 110.00 required. Structures are badly damaged, requires 147 Dhenkanal Odapada Tinimuhani 9.00 6.90 393.00 380.00 330.00 re-construction & repair.

Structures are badly damaged, requires 148 Dhenkanal Odapada Upperbega 2.60 0.50 162.00 100.00 70.00 re-construction & repair. 149 Dhenkanal Parjang Anladihikata NCS 41.00 20.00 20.00 Less rainfall Length of canal system in Km Ayacut in Ha. Reason for less/ excess of ayacut Sl Ayacut Name of District Name of Block Name of MIP Actual length in Actual irrigated/ Reason No. Design Designed irrigated which water Potential for not reaching tail length Ayacut upto 15th supplied Created end Sept' 2015 1 2 3 4 5 6 7 8 9 10 Canal desilting is 150 Dhenkanal Parjang Badajhara 0.65 0.50 41.00 41.00 35.00 required. 151 Dhenkanal Parjang Badakata NCS 41.00 20.00 20.00 Less rainfall 152 Dhenkanal Parjang Bahalabandha NCS 41.00 0.00 Canal requires 153 Dhenkanal Parjang Baigania 0.80 0.60 41.00 41.00 30.00 improvement work. 154 Dhenkanal Parjang Barabank 1.70 1.70 81.00 81.00 61.00 Less rainfall 155 Dhenkanal Parjang Chandandeipur NCS 162.00 0.00 156 Dhenkanal Parjang Jayapura NCS 41.00 0.00 Canal requires 157 Dhenkanal Parjang Kamarda 2.20 1.50 41.00 30.00 30.00 improvement work. 158 Dhenkanal Parjang Kantur NCS 162.00 0.00 Canal requires 159 Dhenkanal Parjang Kumusikata 1.07 0.50 41.00 44.00 25.00 improvement work. 160 Dhenkanal Parjang Muktaposi NCS 81.00 0.00 161 Dhenkanal Parjang Panigengutia NCS 162.00 0.00 On-going Project 162 Dhenkanal Parjang Patuapalli NCS 75.00 0.00 under RIDF. 163 Dhenkanal Parjang Saranga NCS 41.00 10.00 10.00 Less rainfall 164 Dhenkanal Parjang Siarimalia NCS 41.00 0.00 Similibahal Canal requires 165 Dhenkanal Parjang 2.25 1.50 110.00 100.00 90.00 (Kankadasoda) improvement work. 166 Dhenkanal Parjang Vereniakata 0.90 0.90 41.00 41.00 41.00 Full Ayacut Total: 342.68 195.81 25,731.00 17,693.00 14,344.00