REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region February 2018

No. Company Name and Address Project Name Date Approved Mr. Francis S. Medina Proposed 7-Eleven Foodstore-Fitout 1 2/12/2018 7F Columbia Tower, Ortigs Ave., City Emerald Ave., , City Mr. Alfonso O. Purugganan Renovation of Easy Tiger (SM PODIUM) 2 2/12/2018 #14 Montemayor St., San Francisco, Del Monte, ADB Ave. cor J. Vargas Ave., Pasig City Ma. Cecilia Formoso Proposed Warehouse Located at F. Pasco Ave. Santolan, Pasig 3 2/21/2018 25 Jose A. Santos St., Ayala Heights Village, Quezon City 45 F. Pasco Ave., Santolan, Pasig City Mr. Edwin S.P. Manahan 2-Storey Residential 4 2/5/2018 112 Gen. Luna ST., Guitnang Bayan I, San Mateo, Rizal Block 1 Lot 1 Brazil St., LGV, Brgy. , City Construction of Concrete Fence Ms. Erlinda S. Morales Firewall For Morales Residence 5 L27 B2 Ephesians St., Oro Vista Subd., Concepcion Uno, 2/8/2018 L27 B2 Ephesians St., Oro Vista Subd., Concepcion Uno, Marikina City Marikina City Proposed Two Unit 2-Storey Residential Apartment Mr. Robert N. De Guzman 6 Lot 15-B, Pres. Marcos St., Industrial Valley Complex, Marikina 2/12/2018 33-B Pres. Marcos St., Industrial Valley Complex, Marikina City City Ms. Jinkeyleen D. Lim Proposed Renovation and Additional 2nd Floor Duplex 7 2/13/2018 #2 Opal St., Concepcion Subd., Concepcion I, Marikina City Lot 10-B-2-B Garnet St., Concepcion I, Marikina City Proposed Renovation and Additional Structure on 2 Storey Mr. & Mrs. Arnel Laurente 8 Residential Unit 2/14/2018 Fernando St., , Marikina City Fernando St., Barangka, Marikina City Ms. Robina Sakurai Proposed One Storey Residence 9 2/14/2018 Lot 45, Lot 6, M. Gonzales St.,Barangka, Marikina City Lot 45, Lot 6, M. Gonzales St.,Barangka, Marikina City Mr. Jose Rhonel Eusebio Proposed Daniel's Coffee Shop 10 2/28/2018 Champaca St., , Marikina Ccity Champaca St., Marikina Heights, Marikina City Mr. Jose Mijares, Jr. Two (2) Storey Units with Roofdeck Residential Bldg. 11 2/28/2018 # 24 Apitong St., Marikina Heights, Marikina City # 24 Apitong St., Marikina Heights, Marikina City Ms. Lotus Mae R. Dulla Proposed Softlink Trading and Construction Office 12 12 Del carmen St., Sta. Teresita Village, Malanday, Marikina 2/19/2018 Dela Paz Street, Centro Buenviaje, Sto. Niño, Marikina City City Mr. Cipriano P Balbuena Giligan's Restaurant 13 2/26/2018 Unit 4108-4111 E COM Bldg., River Bank Center, A. Bonifacio Unit 4108-4111 E COM Bldg., River Bank Center, A. Bonifacio

Page 1 of 80

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region February 2018

No. Company Name and Address Project Name Date Approved Ave., Marikina City Ave., Marikina City

Proposed Installation of Trusses, Weiding and Roofing of Ms. Lina M. Laguisma / 14 Carwash 2/26/2018 530 Gen. Ordoñez St., Marikina Heights, Marikina City 530 Gen. Ordoñez St., Marikina Heights, Marikina City Ms. Dolores Q. Santiago / Proposed Tempura King Interior Fit-Out 15 2/28/2018 Marikina City Unit 30-A SF SM City Marikina Ms. Christine Charmie / Construction of Barenaked Body Sugaring Salon 16 2/28/2018 Liwasang Kalayaan, Marikina Heights, Marikina City Liwasang Kalayaan, Marikina Heights, Marikina City Ms. Sylvette G. Marcelo / Proposed Additional Terrace Residential / 17 # 23 Mohawk St., cor Jerusalem St., St. Claire 1 Subd., # 23 Mohawk St., cor Jerusalem St., St. Claire 1 Subd., 2/28/2018 Marikina City Marikina City Ms. Regina T. Galang / Renovation of One (1) Studio Type Unit 18 2/8/2018 278 Pineda Building, Boni Avenue, Plainview, Mandaluyong City 278 Pineda Building, Boni Avenue, Plainview, Mandaluyong City Mr. Pablo B. Del Rosario / Proposed Renovation of One Storey Existing House 19 344 A. Bonifacio St. cor. Pinagtipunan St., Brgy. Hagdan Bato 344 A. Bonifacio St. cor. Pinagtipunan St., Brgy. Hagdan Bato 2/8/2018 Libis, Mandaluyong City Libis, Mandaluyong City Ms. Erlinda A. Morales Proposed Construction of Two Storey Residence 20 2/9/2018 126 Private Road, Hulo, Mandaluyong City 126 Private Road, Hulo, Mandaluyong City Mr. Daryl Kong / Proposed Renovation of Jollibee SM Light 21 SM Light Mall, EDSA cor. Madison St., Barangka Ilaya, SM Light Mall, EDSA cor. Madison St., Barangka Ilaya, 2/9/2018 Mandaluyong City Mandaluyong City Mr. Cesar C. Guillermo Proposed Renovation of Fatfook Restaurant 22 2/9/2018 3/F Unit 3356-A Sm Mega Mall, Mandaluyong City 3/F Unit 3356-A Sm Mega Mall, Mandaluyong City Mr. Kelvn Lester Ngo Proposed Renovation of SUNDAYS 23 2/9/2018 Unit C, # 41, 11th St., Brgy. Damayang Lagi, Quezon City 2F cor. Market Food Hall, Podium Mall, Mandaluyong City Mr. Francis S. Medina Proposed 7-Eleven Foodstore-Fitout 24 2/12/2018 7F Columbia Tower, Ortigs Ave., Mandaluyong City G/F Sun Plaza, Shaw Blvd cor Princeton St., Mandaluyong City Ms. Marivic Aguibiador Proposed Renovation of David Salon Royal Plaza 25 Unit 104, Royal Plaza Bldg., M. Guevarra St.,Brgy. Highwayhills, Unit 104, Royal Plaza Bldg., M. Guevarra St.,Brgy. Highwayhills, 2/14/2018 Mandaluyong City Mandaluyong City

Page 2 of 80

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region February 2018

No. Company Name and Address Project Name Date Approved Mr. Mark Christopher Lena Renovation of Char Express Store 26 2/15/2018 7A, 2nd Street, Bgry. Kapitolyo, Pasig City 2F The Podium, Wack-Wack, Mandaluyong City Renovation of MI Authorized Reseller Store Ms. Irene Garcia 27 4F Cyberzone, SM Megamall, Brgy. Wack-Wack, Mandaluyong 2/15/2018 14Joy St., Grace Village, Brgy. Apolonio Samson, Quezon City City Mr. Mark Anthony Caguioa Proposed Extension Penthouse 28 2/15/2018 394 P. Lopez St., Mandaluyong City 394 P. Lopez St., Mandaluyong City Proposed Renovation/ Building Care Realty Corp. Mr. Edwin M. Villasin 29 215 J. Cardinal Sin St. cor De La Paz St., Brgy. Pleasant Hills, 2/28/2018 Mandaluyong Mandaluyong City Mr. Jose Coronel Proposed Renovation of Esprit 30 2/28/2018 Mandaluyong 2nd Level Bldg. A, SM Megamall Mandaluyong City Ms. Erlinda Padua Two Storey Residence w/ Roofdeck 31 2/19/2018 16A W Road 11, 1st West, San Juan City 16W Road 11, 1st West, San Juan City Ms. Emma Aristorenas Renovation of Extension of Second Floor Residential 32 2/21/2018 7 Van Buren, North Greenhills Subd., San Juan City 7 Van Buren, North Greenhills Subd., San Juan City Mr. Richard Ong. Demolition of 1 Storey Residential with Basement 33 2/28/2018 #50 Buchanan St., North Greenhills, San Juan City #50 Buchanan St., North Greenhills, San Juan City ANNA LYNE S. PONFERRADO Hyundai CV Renovation 34 2/19/2018 43 Commonwealth Ave. Brgy. Holy Spirit, Quezon City 43 Commonwealth Ave., Brgy. Holy Spirit, Quezon City HILARIO O. AÑEDEZ PROPOSED 2 STOREY RESIDENTIAL BUILDING 35 BLK. 49 G. ST. LOT 14 E2, ALUPIHANG DAGAT-DAGATAN, BLK. 49 G. ST. LOT 14 E2, ALUPIHANG DAGAT-DAGATAN, 2/13/2018 LONGOS, CITY LONGOS, MALABON CITY LERMA P. PATRICIO 2-STOREY RESIDENTIAL HOUSE 36 2/19/2018 BLK. 11 LOT 120 HASA-HASA ST. LONGOS, MALABON CITY LK. 11 LOT 120 HASA-HASA ST. LONGOS, MALABON CITY CARMELITA PEREZ 2 STOREY RESIDENTIAL HOUSE 37 2/19/2018 2 HONRADEZ ST. BARANGAY , MALABON CITY 2 HONRADEZ ST. BARANGAY TUGATOG, MALABON CITY MARISSA S. SANTOS PROPOSED 1-STOREY WITH ATTIC RESIDENTIAL HOUSE 38 2/21/2018 112 HERNANDEZ ST. CATMON, MALABON CITY 112 HERNANDEZ ST. CATMON, MALABON CITY CRISTINA G. FLORORITA PROPOSED 2-STOREY RESIDENTIAL 39 2/21/2018 89 MH DEL PILAR ST. TUGATOG, MALABON CITY 89 MH DEL PILAR ST. TUGATOG, MALABON CITY

Page 3 of 80

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region February 2018

No. Company Name and Address Project Name Date Approved PROPOSED RENOVATION 2-STOREY RESIDENTIAL AGERICO DEL ROSARIO 40 BUILDING 2/21/2018 NAVAL ST. BRGY. FLORES, MALABON CITY NAVAL ST. BRGY. FLORES, MALABON CITY PROPOSED ONE-STOREY 3-UNITS COMMERCIAL SALVADOR FLORES BUILDING 41 47 BASILLIO ST. BAUTISTA BLVD., HULONG DUHAT, 2/21/2018 47 BASILLIO ST., BAUTISTA BLVD., HULONG DUHAT, MALABON CITY MALABON CITY PATERNO R. ROQUE PROPOSED 2-STOREY RESIDENTIAL BUILDING 42 2/21/2018 36 NAVAL ST. BRGY. FLORES, MALABON CITY 36 NAVAL ST. BRGY. FLORES, MALABON CITY CORAZON B. DE JESUS PROPOSED 2-STOREY RESIDENTIAL BUILDING 43 180 INTERIOR, GEN. LUNA ST. BRGY. IBABA, MALABON 180 INTERIOR, GENERAL LUNA ST. BRGY. IBABA, 2/21/2018 CITY MALABON CITY PROPOSED ONE-STOREY VETERINARY/COMMERCIAL ALBERTO I. BERNABE/ 44 BUILDING 2/21/2018 NAVAL ST., BRGY. FLORES, MALABON CITY NAVAL ST. BRGY. FLORES, MALABON CITY PROPOSED ONE-STOREY OFFICE WITH MEZZANINE KYNAR DANEL PHILS. CORP. / BUILDING 45 7B PLATINUM ST. GOLDEN DALE SUBD. TUGATOG, 2/23/2018 92 MH DEL PILAR ST. CORNER LT. ROQUE ST. TUGATOG, MALABON CITY MALABON CITY DIOMEDES M. QUINTO/ PROPOSED 2-STOREY RESIDENTIAL BUILDING 46 2/26/2018 BRGY. SAN AGUSTIN, MALABON CITY BRGY. SAN AGUSTIN, MALABON CITY ERIKA HAZEL TSAY TY PROPOSED TWO STOREY RESIDENTIAL BUILDING 47 LOT 25-B-2-C-4-G-1-3 ARANETA VILLAGE POTRERO LOT 25-B-2-C-4-G-1-3 ARANETA VILLAGE POTRERO 2/27/2018 MALABON CITY MALABON CITY PROPOSED RENOVATION 2-STOREY RESIDENTIAL AQUILINO IGNACIO JR. 48 BUILDING 2/28/2018 # 2 KATIPUNAN ST. BAYAN BAYANAN, MALABON CITY # 2 KATIPUNAN ST. BAYAN BAYANAN, MALABON CITY PROPOSED 3 UNITS TWO STOREY W/ DECK RESIDENTIAL MR. & MRS. MAURO REYES/ 49 BLDG. 2/27/2018 BAGUMBAYAN, CITY BAGUMBAYAN, NAVOTAS CITY PRIME KITCHEN INTERIOR FIT-OUT WORKS OF RAMEN TERU JAPANESE 50 2-Feb-2018 2345 OSMENA ST., BRGY. VALENZUELA, CITY RESTAURANT

Page 4 of 80

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region February 2018

No. Company Name and Address Project Name Date Approved GROUND FLOOR UNIT 131-132 SEA RESIDENCE, SUNSET DRIVE MOA COMPLEX CITY, THE COFFEE BEAN AND TEA LEAF-DOUBLE DRAGON SAVE DESIGNBUILD ENTERPRISE INC. 51 24 DIOSDADO MACAPAGAL BLVD. PASAY DOUBLE 12-feb-2018 615-B HOUSE OF L. BLDG. GAMBAN ST. PASAY DRAGON MALL, PASAY CITY CRISTOPHER SALES PROPOSED TWO STOREY RESIDENCE WITH DECK 52 22-Feb-2018 12th - 15th ST., VILLAMOR AIR BASE, PASAY CITY 12th - 15th ST., VILLAMOR AIR BASE, PASAY CITY SPS. FELIMON & SYLVIA BRIONES PROPOSED TWO STOREY RESIDENCE 53 BLK. 38 LOT 9-A PHASE 2, VILLAMOR AIR BASE, PASAY BLK. 38 LOT 9-A PHASE 2, VILLAMOR AIR BASE, PASAY 22-Feb-2018 CITY CITY GRACE COMMUNITY CHRISTIAN SCHOOL TWO STOREY SCHOOL BUILDING 54 23-Feb-2018 VETALES ST. MALIBAY , PASAY CITY VETALES ST. MALIBAY , PASAY CITY TIMOTHY PAUL T. PICHAY RENOVATION OF STORE OUTLET 55 17 FOREST HILL, ROLLING HILLS SUBD., NEW , 2170 (MM) MALL OF ASIA, DIOKNO BLVD., BRGY. 76, PASAY 27-Feb-2018 QUEZON CITY CITY PROPOSED RENOVATION OF LACOSTE STORE-MOA ROSARIO HIPOLITO 56 MM 271 B 272 MALL OF ASIA JW DIOKNO BLVD., MOA 28-Feb-2018 403 4/F MIDLAND BLDG., BUENDIA SEN GIL PUYAT, MAKATI COMPLEX, PASAY CITY CONSTRUCTION OF TWO(2) STOREY WITH ROOF DECK HERMINIO E. ABARICO 57 RESIDENTIAL BUILDING 5-Feb-2018 LOT 1 BLOCK 154, BRGY. RIZAL, MAKATI CITY LOT 1 BLOCK 154, BRGY. RIZAL, MAKATI CITY PROPOSED CONSTRUCTION OF "A BITE OF HUNAN AMADOR TORRES BARRAMEDA / NO.06 BILBAO ST., RESTAURANT" 58 INTERCITY HOMES SUBDIVISION, CUPANG GOLDEN MANGO TECHNOLOGY INNOVATION INC. UPPER 28-Feb-2018 CITY GROUND LEVEL, CIRCUIT LANE, BRGY. OLYMPIA, MAKATI CITY TOSHIYA TANIGUCHI/NIPPON PREMIUM BAKERY, INC. PROPOSED OFFICE RENOVATION 59 UNIT 304-307 3/F LA FUERZA PLAZA 2, 2241 DON CHINO UNIT 304-307 3/F LA FUERZA PLAZA 2, 2241 DON CHINO 26-Feb-2018 ROCESS AVE., BANGKAL, MAKATI ROCESS AVE., BANGKAL, MAKATI LONGINES R. HERNANDEZ OFFICE FIT-OUT OF ESTERLY SERVICE INC. 60 29TH FLOOR PBCOM TOWER, AYALA AVE. COR. V.A. 29TH FLOOR PBCOM TOWER, AYALA AVE. COR. V.A. 23-Feb-2018 RUFINO ST. BEL-AIR, MAKATI CITY RUFINO ST., BEL-AIR, MAKATI CITY

Page 5 of 80

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region February 2018

No. Company Name and Address Project Name Date Approved PROPOSED EXTENSIION FOR TWO STOREY RESIDENCE ROLANDO M. AUDIJE 61 WITH ROOF DECK 27-Feb-2018 BLOCK 89 LOT 17 PASCUA ST., BRGY. RIZAL, MAKATI CITY BLOCK 89 LOT 17 PASCUA ST., BRGY. RIZAL, MAKATI CITY MARY SUSAN V. CATAQUIZ PROPOSED TWO(2) STOREY WITH DECK 62 19-Feb-2018 #30 BAYABAS ST. COMEMBO, MAKATI CITY #30 BAYABAS ST. COMEMBO, MAKATI CITY DEMOLITION OF TWO (2) STOREY RESIDENTIAL BUILDING /H.I.S. CONSTRUCTION, INC. U/G CITYLAND CONDOMINIUM 8, BUENDIA, PIO DEL PILAR, H.I.S. CONSTRUCTION, INC. MAKATI CITY 33050 / JUL-01-17 5 DEMOLITION 63 U/G CITYLAND CONDOMINIUM 8, BUENDIA, PIO DEL PILAR, 20-Feb-2018 DEMOLITION OF TWO (2) STOREY RESIDENTIAL BUILDING MAKATI CITY / #38 ZODIAC STREET, NRGY. BEL-AIR, MAKATI CITY 20- Feb-2018 20-Feb-2018 0 #38 ZODIAC STREET, NRGY. BEL-AIR, MAKATI CITY MACKINTOSH CORPORATION RE-WATERPROOFING OF ROOF DECK 64 700 ROAD-1, TANDANG SORA AVE., OLD BALARA, 20-Feb-2018 93 CAMBRIDGE CIRCLE, NORTH FORBES, MAKATI CITY QUEZON CITY TWO STOREY RESIDENCE ANDREA MONICA I. GONZALES 65 Lot 4 Blk 11, Aragona St., Cittadella Executive Village, Pulang 2/19/2018 34 Doña Aurora St., Tahanan Village, Parañaque City Lupa Dos, Las Piñas City RODRIGO G. CASTILLO PROPOSED TWO STOREY RESIDENTIAL BUILDING 66 2/21/2018 Block 4 Lot 16 St., Luningning Subd., Talon 5, Las Piñas City Block 4 Lot 16 St., Luningning Subd., Talon 5, Las Piñas City LIBERATO R. LAPIÑA PROPOSED 2 STOREY RESIDENTIAL BUILDING 67 2/21/2018 C. Raymond St., BF Resort Village, Las Piñas City C. Raymond St., BF Resort Village, Las Piñas City JOHN LOUIGI C. ABELARDO PROPOSED 2 STOREY RESIDENTIAL BUILDING 68 2/21/2018 Block 3 Lot 7 Remarville Subd., Pamplona, Las Piñas City Block 3 Lot 7 Remarville Subd., Pamplona, Las Piñas City CONCHITA L. REYES TWO-STOREY RESIDENTIAL HOUSE 69 2/21/2018 B-6 L-5, Sta. Monica St., PH 2-C Gatchalian, Parañaque City 812-D S. Marquez St., Gatchalian Subd., Las Piñas City CONCHITA L REYES TWO STOREY RESIDENTIAL HOUSE 70 B-6 L5 Sta. Monica St. PH 2-C, Gatchalian Subdivision, 2/21/2018 812-D S. Marquez St. Gatchalian Subdivision, Las Piñas City Parañaque City

Page 6 of 80

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region February 2018

No. Company Name and Address Project Name Date Approved CONSTRUCTION OF ONE STOREY RESIDENTIAL BONGALO EDWIN CHRISTIAN B. ILANO 71 Lot 16 Blk 41 Mt. Carmel St., Christianville, Talon Singko, Las 2/21/2018 B6 L18, 22 St. Golden Gate Subd. Talon 3, Las Piñas City Piñas City KEVIN CHRISTIAN CARREON PROPOSED TWO (2) RESIDENTIAL BLDG. 72 2/21/2018 1901 Richville Tower, , Muntinlupa City L 13, B 8, Portofino Heights, Almanza Dos, Las Piñas City JENVIT D. SISON PROPOSED ADDITIONAL SECOND FLOOR 73 Blk 4, Lot 2-A Calle Segovia, BF Resort Village, Talon 2, Las Blk 4, Lot 2-A Calle Segovia, BF Resort Village, Talon 2, Las 2/22/2018 Piñas City Piñas City JOSELITA NONNATA G. BAGAIN PROPOSED ONE STOREY OFFICE 74 RM. 510 Malate Crown Plaza, Adriatico corner San Andres St., Blk 8 Lot 3 Dahlia St., TS Cruz Subdivision, Almanza Dos, Las 2/22/2018 Malate, Manila Piñas City MICHAEL SAN PEDRO ALEJANDRO PROPOSED TWO STOREY RESIDENTIAL BUILDING 75 2/22/2018 Lazo St. Alejandro Compound, Almanza Uno, Las Piñas City Lazo St. Alejandro Compound, Almanza Uno, Las Piñas City PROSERPINA TADEO PROPOSED TWO (2) STOREY RESIDENTIAL 76 2/23/2018 Blk 35 Lot 10-A G. D. Sekiat BF Resort Village, Las Piñas City Blk 35 Lot 10-A G. D. Sekiat BF Resort Village, Las Piñas City MYUN SOO JANG PROPOSED TWO (2) STOREY RESIDENTIAL BUILDING 77 2/23/2018 BGU Almanza, Las Piñas City BGU Almanza, Las Piñas City LUGENE ENRILE V. AMPARO PROPESED 16 UNIT 2 STOREY STUDIO TYPE RESIDENCE 78 Lot 15A Block 2, Villanueva Compound, J. Aguilar, Pamplona, Lot 15A Block 2, Villanueva Compound, J. Aguilar, Pamplona, 2/26/2018 Las Piñas City Las Piñas City PROPOSED 2 STOREY RESIDENTIAL APARTMENT NESTOR RAMOS 79 B20 L27 Josefa Ave., Dona Josefa Subd. Almanza 1, Las Pinas 2/26/2018 B9 L7, Dona Josefa Subd. Almanza 1, Las Piñas City City ROY JANAYON RENOVATION OF OFFICE 80 2/26/2018 #56 Aguirre Road, Pilar Village, Las Piñas City Starmall, Las Piñas City BEATRIZ R. MENDOZA PROPOSED TWO (2) STOREY RESIDENTIAL BLDG. 81 2/26/2018 Blk. 16 Lot 2, Villamer St., Soldiers II, Almanza 1, Las Piñas City Blk. 16 Lot 2, Villamer St., Soldiers II, Almanza 1, Las Piñas City GEM ZEÑAROSA DEMOLITION OF TWO(2) STOREY RESIDENTIAL 82 2/26/2018 15 Mercury Ave. Maries Village, Quezon City F. Ocampo Ave., Manuela Subd. Las Piñas City GERALD A. AREVALO PROPOSED 2 STOREY 3 DOOR RESIDENTIAL BLDG. 83 2/26/2018 Lot 6 Blk 4 B1 Naga Road, Pulang Lupa Dos, Las Piñas City 903 San Jose St. Brgy. Ilaya, Las Piñas City

Page 7 of 80

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region February 2018

No. Company Name and Address Project Name Date Approved MICHELLE V. JUAN TWO (2) STOREY RESIDENTIAL BUILDING 84 2/26/2018 B13 L5 Royal South Village, Talon 5, Las Piñas City B13 L5 Royal South Village, Talon 5, Las Piñas City PROPOSED TWO (2) STOREY COMMERCIAL BLDG. WITH ARTHUR FILOTEO EVANGELISTA 85 ROOF DECK 2/27/2018 32 Topland Ave., Golden Gate Subd., Talon 3, Las Piñas City 32 Topland Ave., Golden Gate Subd., Talon 3, Las Piñas City ANNA DENISE A. BALDOS PROPOSED TWO (2) STOREY 3 RESIDENTIAL UNITS 86 Lot 20 Blk 2 E. Cojuanco St. BF Resort Village, Talon Dos, Las Blk. 4 Lot 42 Charlemagne St. Talia 500, BF Resort Village, 2/28/2018 Piñas City Talon Dos, Las Piñas City JOSELITA NONNATA G. BAGAIN PROPOSED ONE STOREY STAFF HOUSE 87 Blk 8 Lot 3 Dahlia St., TS Cruz Subdivision, Almanza Dos, Las Blk 8 Lot 3 Dahlia St., TS Cruz Subdivision, Almanza Dos, Las 2/28/2018 Piñas City Piñas City NARITO T. BATALLER TWO STOREY RESIDENCE 88 2/28/2018 300 DBP Comp. Rosal St., Pulanglupa Dos, Las Piñas City Lot 3A 1 Hunter St., Greenview, Las Piñas City DEBORAH N. WANIA WANIA RESIDENCES PROJECT 89 2/12/2018 Camella 2E, Putatan, Muntinlupa City B8 L31, Maya St., Camella 2E, Putatan Muntinlupa City JUNE ANTOINETTE DACANAY JAMES COOPER SALON INTERIOR RENOVATION 90 2/14/2018 Unit 07-08 Avida Tower, Alabang, Muntinlupa City Unit 07-08 Avida Tower, Alabang, Muntinlupa City JAIME B. GOSTILLO PROPOSED RENOVATION CBC INTEGRATED SCHOOL 91 #1560 Estanilao St., Lakeview Homes, Brgy. Putatan, #1560 Estanilao St., Lakeview Homes, Brgy. Putatan, 2/14/2018 Muntinlupa City Muntinlupa City STORE RENOVATION OF 1 UNIT RENTED SPACE @ NOELLE CATHERINE SIDAYON 92 (MUMUSO) 2/19/2018 #12 Jose Q. Ver, Brgy BF Homes, BF Classic, Parañaque City 1109 Alabang Center Entertainment Complex, Muntinlupa City BARNABY L. CHONG WORLD BALANCE - FIT OUT 93 2/21/2018 19 V. Mapa St., City Unit 114 Ground Floor SM Munitnlupa City MARIVIC AGUIBIADO UNION JACK TAVERN INTERIOR RENOVATION 94 2/21/2018 Unit 1127 Festival Mall, Alabang Muntinlupa City Unit 1127 Festival Mall, Alabang Muntinlupa City ALBERT R. PUJOL HOUSE RENOVATION 95 2/21/2018 228 Makiling St., , Muntilupa City 228 Makiling St., Ayala Alabang, Muntilupa City KRISTINE TOBILLO PROPOSED THE BROW STUDIO 96 2/21/2018 2F Festival Mall, Albang, Muntinlupa City 2F Festival Mall, Albang, Muntinlupa City

Page 8 of 80

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region February 2018

No. Company Name and Address Project Name Date Approved WILSON CHU GUU INC. - FESTIVAL MALL BRANCH 97 6/F Bonifacio Tech Center, 31st corner 2nd Ave., Bonifacio 2/21/2018 1st Lavel Festival Supermall, Filinvest Alabang, Muntinlupa City Global City MICHAEL DA POWER SWITCH 98 2/21/2018 Blk 11 Lot 7 Ph 3, Mabuhay City, Mamatid Cabuyao, DGI-1.2 Level 3, Festival Mall, Alabang, Muntinlupa City ALABANG HILLS 2 STOREY RESIDENCE ANTHONY R. QUIJANO 99 L 36 B22 Phase 2, Don Manalo Blvd., Alabang Hills Village, 2/21/2018 Paco, Manila Alabang, Muntinlupa City FRANCIS MEDINA RENOVATION 7/11 FOOD STORE 100 2/22/2018 G/F Civic Pime Filinvest Corporation, Alabang, Muntinlupa City G/F Civic Pime Filinvest Corporation, Alabang, Muntinlupa City GEN. MELENDRINO DULIG PROPOSED THREE DOORS TWO (2) STOREY APARTMENT 101 2/22/2018 Lot 12 Block 15, Soldiers Hills Village, Putatan, Muntinlupa City Lot 12 Block 15, Soldiers Hills Village, Putatan, Muntinlupa City FRANCIS MEDINA RENOVATION 7/11 FOOD STORE 102 Unit 4, CTP Alpha Investment Drive, Macapagal Businesss Unit 4, CTP Alpha Investment Drive, Macapagal Businesss 2/22/2018 Park, Alabang-Zapote Road, Alabang, Muntinlupa City Park, Alabang-Zapote Road, Alabang, Muntinlupa City YHK F&B INC. SAMGYUPSALAMAT 103 Unit 1005 & 1006 South Park, Alabang, Muntinlupa Unit 1005 & 1006 Ayala Malls South Park, Alabang, Muntinlupa 2/22/2018 City City PROPOSED CONSTRUCTION OF ADVANCED DENTISTRY DR. JAMES M. DELA CRUZ 104 2nd Floor, Festival Mall Alabang Expansion, Alabang, 2/22/2018 B 14 Lot 7, Jubilation, Brgy. Platero, Biñan, Laguna Muntinlupa City RYAN LABRADOR PROPOSED 2 STOREY RESIDENCE 105 2/23/2018 Vermillion St. Agro Homes, Muntinlupa City Vermillion St. Agro Homes, Muntinlupa City MICHELLE GO RENOVATION OF BNY CLOTHING APAREL 106 2/26/2018 SM Muntinlupa, National Road, , Muntinlupa City SM Muntinlupa, National Road, Tunasan, Muntinlupa City TWO STOREY 3 DOORS APARTMENT DR. SILVERIO SALILENG 107 Blk. 96 Lot 26, Jaramilla St., Katarungan Village Polacion, 2/26/2018 457 Villa Sarmiento Cupang, Muntinlupa City Muntinlupa City G.A. Corvera Construction Corp. ASICS (FIT-OUT) 108 RM. 201-202 Capitol Masonic Bldg. II, # 37 Matalino St., Central Space 2241 Upper Ground Floor Level Expansion Bldg., 2/26/2018 Diliman, Quezon City Alabang Town Center, Muntinlupa City

Page 9 of 80

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region February 2018

No. Company Name and Address Project Name Date Approved REAGAN MCWILSON L. TAN GRINGO - RENOVATION OF RESTAURANT 109 2/28/2018 Unit 3339 Festival Supermall, Alabang, Muntinlupa City Unit 3339 Festival Supermall, Alabang, Muntinlupa City DEMOLITION OF EXISTING ONE STOREY HOUSE AND ANNA ROSE CABRERA CONSTRUCTION OF TWO STOREY RESIDENCE (4-UNITS) 110 Unit 14-42 Fountain Breeze Condo, Lombo St.,Brgy. San Isidro, WITH DECK 2/8/2018 Parañaque City L-2 152 Lamberto St., Dela Cruz Compound, San Isidro, Parañaque City HENEDINA F. PECANA PROPOSED 2 STOREY RESIDENCE 111 L3 B24, Dapo St., Tahanan Village Brgy. BF Homes, Parañaque L3 B24, Dapo St., Tahanan Village, Brgy. BF Homes, 2/14/2018 City Parañaque City JEANETTE CHENG PROPOSED DEMOLITION OF BUNGALOW 112 2/14/2018 L4550 East Service Rd., SMDP, Parañaque City L4550 East Service Rd., SMDP, Parañaque City Amalia Reyes TWO STOREY RESIDENCE 113 #12 Pamona St., Mahogany Place, 2 Acacia Estate, Bambang Lot 14 Blk. 2 Montevideo St., Merville Park Subdivision, 2/15/2018 City Parañaque City FLORIFE L. JOSE JOSE'S RESIDENCE 114 B6 L15 Tantona St., IWA Executive Homes, SAV-1, Sucat, B6 L15 Tantona St., IWA Executive Homes, SAV-1, Sucat, 2/19/2018 Parañaque City Parañaque City MICHAEL R. GONZALES TWO STOREY RESIDENCE 115 2/19/2018 34 Doña Aurora St., Tahanan Village, Parañaque City Lot 29, Blk 10 Lily St., Tahanan Village, Parañaque City GISELLE P. LEPITEN RESIDETIAL TWO STOREY BUILDING 116 2/21/2018 9810 ilang-ilang St., Viitalez Compound, Baltao, Parañaque City 9810 ilang-ilang St., Vitalez Compound, Baltao, Parañaque City ELADIO C. FERMIN PROPOSED TWO STOREY RESIDENTIAL 117 Lot 18 B4 Sampaguita Circle Salvador Estate, Brgy. San Isidro, Lot 18 B4 Sampaguita Circle Salvador Estate, Brgy. San Isidro, 2/21/2018 Parañaque City Parañaque City TWO (2) STOREY RESIDENTIAL WINSTON MARTIN A. TONGOL 118 LOT 6, BLK 14, MABOLO ST. DOÑA JOSEFA VILLAGE , 2/28/2018 22 Herbs St. Purok 16 Zone 6B South Signal Taguig City ALMANZA UNO LAS PIÑAS CITY JIANBING CHEN MACARTHY BAKERY - PASTRY SHOP 119 U-215 Monach Park Suites, Aseana Business Park, Bradco U-215 Monach Park Suites, Aseana Business Park, Bradco 2/28/2018 Ave., Parañaque City Ave., Parañaque City

Page 10 of 80

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region February 2018

No. Company Name and Address Project Name Date Approved JIANBING CHEN NEW CONCEPT BARBERSHOP 120 U-215 Monach Park Suites, Aseana Business Park, Bradco U-215 Monach Park Suites, Aseana Business Park, Bradco 2/28/2018 Ave., Parañaque City Ave., Parañaque City JIANBING CHEN ELLIS (PHIL) FURNITURE STORE LTD. 121 Unit 216-217 Monach Park Suites, Aseana Business Park, Unit 216-217 Monach Park Suites, Aseana Business Park, 2/28/2018 Bradco Ave., Parañaque City Bradco Ave., Parañaque City JAYSON T. ARELLANO ILAHUI STORE RENOVATION 122 4th Floor, PCCI Bldg., 118 LP Leviste St., Salcedo Village, 2/14/2018 B25 2F Upotown Mall, , Taguig City Makati City ROSARIO B. HIPOLITO HOUSE OF SAMSONITE 123 403 4th Floor Midland Bldg. Buendia Sen. Gil Puyat Ave., Makati Space No NW-UG Upperground Floor, Central Square 2/27/2018 City Bonifacio, High Street Central, Brgy. Fort Bonifacio, Taguig City Inchoi Development, Inc. / Cai Yao Huang Demolition of Two (2) Storey Old House 124 692 6th Flr., Pines Tower Numancia St., San Nicolas, , 2/7/2018 Arianan cor. Camba St., Binondo, Manila Manila Nordin B. Macapa, Jr. Proposed One (1) Storey Residential Building 125 2/9/2018 2534 J. Posadas St., Punta, Sta. Ana, Manila 2534 J. Posadas St., Punta, Sta. Ana, Manila Photoline Enterprise Corp. / Kristoferson Dany L. Ting Proposed Renovation of Photoline Enterprises Corp. 126 2/9/2018 Level 2, Adriatico Wing, Space No. 190 Robinson's, Manila Level 2, Adriatico Wing, Space No. 190 Robinson's, Manila Josefine B. Sunga Proposed Repair of Two (2) Storey Old House 127 2/9/2018 3575 Buenos Aires St., Sta. Mesa, Manila 3575 Buenos Aires St., Sta. Mesa, Manila Robertino M. Ramos Proposed Demolition of Two (2) Storey Residence 128 2/12/2018 1337 Burgos St., Paco, Manila 1337 Burgos St., Paco, Manila Erlinda B. Reyes Repair of 3rd Floor Ceiling, Roofing, Truss and CHB 129 2/12/2018 651 A. H. Lacson Ave., Sampaloc, Manila 651 A. H. Lacson Ave., Sampaloc, Manila Beyond Concepts, Inc. / Howard N. Paw EYB - Eat Yourself Bankrupt Renovation 130 Level 1 Space No. 092-094 Orosa Wing, Robinsons Place, Level 1 Space No. 092-094 Orosa Wing, Robinsons Place, 2/13/2018 , Manila Ermita, Manila Ester S. Del Rosario Proposed Two (2) Storey Residential Building 131 2/13/2018 639 Interior 3-A, Geronimo St., Sampaloc, Manila 639 Interior 3-A, Geronimo St., Sampaloc, Manila

Page 11 of 80

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region February 2018

No. Company Name and Address Project Name Date Approved Anna Loren Riguera Boutique Store Renovation 132 2/13/2018 Unit 310, SM City Manila Unit 310, SM City Manila Security Bank Corporation/Leslie Yu Chan Proposed Renovation of Security Bank Corporation 133 2/15/2018 6776 Security Bank Center, Ayala Ave., Makati City Adriatico cor. San Andres St., Malate, Manila Jeanybel Mc Carthy / Joblane International Manpower Services, 6th Floor Office Renovation/ 134 Inc. 2/15/2018 6F BDO Bldg., 707 Churruca St. cor. TM Kalaw, Ermita, Manila 6F BDO Bldg., 707 Churruca St. cor. TM Kalaw, Ermita, Manila Felmar Junifer T. Picar Proposed Construction of Two (2) Storey Building 135 1958 Angel Linao St., Brgy. 743 Zone 80 District 5, Malate, 1958 Angel Linao St., Brgy. 743 Zone 80 District 5, Malate, 2/15/2018 Manila Manila Dominic Construction, Inc. Proposed PLDT Sta. Mesa Exchange Improvement 136 2/16/2018 229-A Basilan Corner Talayan Streets, Mandaluyong City #3510 Ramon Magsaysay Blvd., Brgy. 593, Sta. Mesa, Manila Leonora M. Tumbaga Repair of Two (2) Storey with Deck Building 137 2/20/2018 1225 Trece de Agosto cor. Estero de Paco Sts., Paco, Manila 1225 Trece de Agosto cor. Estero de Paco Sts., Paco, Manila Ricardo Banzon Proposed Second Floor Addition 138 2/22/2018 2139 Rd. 7, NDC Compound, Sta. Mesa, Manila 2139 Rd. 7, NDC Compound, Sta. Mesa, Manila Norma C. Bornilla Proposed Demolition of Existing Old House 139 2/22/2018 Matagbac, Tabaco City corner A. Roxas St., 2646 Arellano Ave., Malate, Manila Mervin Banta Proposed construction of Perimeter Fence 140 2/22/2018 274 P. Faura St., cor. Guerrero St., Ermita, Manila 274 P. Faura St., cor. Guerrero St., Ermita, Manila Marilou S. Yu Lit Proposed Renovation of Anding's Toys and Flower Inc. 141 2/22/2018 415 Gen. Vicente Lim St., San Rafael Village, Navotas City Tutuban Mall, Prime Block, C. M. Recto, Tondo, Manila Shelley N. Reyes Demolition of Two (2) Storey Old House 142 2/22/2018 3426 G. Santiago St., Bo. Obrero, Tondo, Manila 3426 G. Santiago St., Bo. Obrero, Tondo, Manila Ronualdo Aguilar Proposed Construction of Two (2) Storey Residential Bldg. 143 2/22/2018 2323 Antenor St., , Manila 2323 Antenor St., Pandacan, Manila Daisy B. Sotelo Proposed Construction of Two (2) Storey Residential Bldg. 144 2/22/2018 5120 Charlemagne St., Italia 500, BF Resort, Las Pinas 2657 Old Panaderos St., Sta. Ana, Manila Christine C. Tano Demolition of Two (2) Storey Bldg. with Deck 145 2/22/2018 727 Interior 2, T. Alonzo St., Sta. Cruz, Manila 727 Interior 2, T. Alonzo St., Sta. Cruz, Manila

Page 12 of 80

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region February 2018

No. Company Name and Address Project Name Date Approved Proposed Construction of Two (2) Storey Residence with Roof Rolando L. Hombrebueno 146 Deck 2/26/2018 1825-C M. Hizon St., Sta. Cruz, Manila 1825-B Felix Huertas St., Sta. Cruz, Manila Minor Construction Works at The Generics Pharmacy Louie Anthony Tan 147 Kiosk #3 & 4 Puregold Bldg., Tayuman cor. Juan Luna St., 2/26/2018 88 Rev. Aglipay St., Mandaluyong City Tondo, Manila Minor Construction Works at The Generics Pharmacy Louie Anthony Tan 148 3E - 03A 3rd Floor 999 Shopping Mall Bldg., Soler St., Binondo, 2/26/2018 88 Rev. Aglipay St., Mandaluyong City Manila JPM Cavat Construction Demolition of Concrete Pavement 149 2/27/2018 406 Sta. Teresita St., Sampaloc, Manila Petron Pandacan Terminal, Jesus St., Pandacan, Manila LBP Resources and Development Corporation Landbank Harrison Plaza Branch Renovation Project 150 24th Floor, LBP Plaza 1598 MH Del Pilar St. corner Dr. J. 2/27/2018 , Harrison Plaza, Manila, Philippines Quintos St., Malate, Manila 1004 LBP Resources and Development Corporation Overseas Filipino Bank Main Building Repainting and Minor 151 24th Floor, LBP Plaza 1598 MH Del Pilar St. corner Dr. J. Repairs 2/27/2018 Quintos St., Malate, Manila 1004 Postal Bank Center, Liwasang Bonifacio, Manila

No. Company Name/Project Owner and Address Project Name Date Approved Remarks Cesar O. Sison & Teresita P. Sison Proposed Three (3) Storey Residential with Deck 152 1-Feb-2018 2355 Marconi St., Brgy. Palanan, Makati City 2355 Marconi St., Brgy. Palanan, Makati City Improvement of Roads and Drainage along Bambi St., Department of TM Abad Construction 153 Brgy. Gen. T. De Leon 1-Feb-2018 Public Works and No. 34 Mt. Fuji ST., Filinvest 1, Subd., Valenzuela City Highways Improvement of Roads and Drainage along Victoria Department of TM Abad Construction 154 Homes, Brgy. Gen. T. De Leon 1-Feb-2018 Public Works and No. 34 Mt. Fuji ST., Filinvest 1, Subd., Batasan Hills Valenzuela City Highways

Page 13 of 80

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region February 2018

Improvement of Roads and Drainage along Bahay Pari- Department of TM Abad Construction Rosario-San Miguel and Delos Reyes Compound, Brgy. 155 1-Feb-2018 Public Works and No. 34 Mt. Fuji ST., Filinvest 1, Subd., Batasan Hills Gen. T. De Leon Highways Valenzuela City Improvement of Roads and Drainage along Ricky Department of TM Abad Construction 156 Street, Brgy. Gen. T. De Leon, Valenzuela City 1-Feb-2018 Public Works and No. 34 Mt. Fuji ST., Filinvest 1, Subd., Batasan Hills Valenzuela City Highways Improvement of Roads and Drainage along Karen Department of TM Abad Construction 157 Street., Brgy. T. De Leon 1-Feb-2018 Public Works and No. 34 Mt. Fuji ST., Filinvest 1, Subd., Batasan Hills Valenzuela City Highways Construction of Four (4) Storey, 16-Classroom School Metrics Const. & Trading DPWH-Quezon Building Aguinaldo Elementary School, Quezon City 3rd 158 766 Tandang Sora Ave., Tandang Sora, Quezon 1-Feb-2018 City 2nd Eng'g. LD City District Brgy. San Roque, Quezon City JC Albason Builders & Supply Rehabilitation of FSIS Building at CAAP Compound 159 1-Feb-2018 Diversion Road, Dungon A., Jaro, Ilo-ilo City Old MIA Road, cor. Ninoy Aquino Ave., Pasay City N2017-01-Proposed Demolition of Four (4) Storey and V.S. Cerdon Iron Works & Construction Two (2) Storey Structural Concrete Buildings, at Lupang 160 Lot 8 Blk. 26 Katipunan St., Kingspoint Subd., Brgy. 1-Feb-2018 Pangako, Brgy. , Quezon city Bagbag, Novaliches, Quezon City Brgy. Payatas, Quezon City Construction of Academic Building (Mandaluyong City C.B. Garay Philwide Builders College) Including Completion of Facilities and Ground DPWH-National 161 GBG Building, #16 Yakal West St., Santolan, Pasig 2-Feb-2018 Improvement Capital Region City Mandaluyong City, C.B. Garay Philwide Builders Constract ID: 17E00103 Extension of Planning Design DPWH, Region 162 16 Yakal West St., Marcos Highway, Santolan, Division, Maintenance Division and Procurement Office 2-Feb-2018 IV-B, EDSA, Pasig City DPWH, Region IV-B, EDSA, Quezon City Quezon City C.B. Garay Philwide Builders Constract ID: 17E00104 Construction of DPWH 4B DPWH, Region 163 16 Yakal West St., Marcos Highway, Santolan, Covered Court with Stage, Comfort Rooms and Office 2-Feb-2018 IV-B, EDSA, Pasig City DPWH, Region IV-B, EDSA, Quezon City Quezon City Constract ID: 17E00102 Extension of Equipment C.B. Garay Philwide Builders DPWH, Region Management Division for DPWH 4B Regional Director 164 16 Yakal West St., Marcos Highway, Santolan, 2-Feb-2018 IV-B, EDSA, and Assistant Regional Director's Quarters Pasig City Quezon City DPWH, Region IV-B, EDSA, Quezon City

Page 14 of 80

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region February 2018

Proposed Four (4) Storey Residential with Covered Danilo C. Manalo, Jr. 165 Court 2-Feb-2018 Lot 12 Blk. 7, Amatiista, Sta. Ana, Manila Lot 12 Blk. 7, Amatiista, Sta. Ana, Manila Flood Control Project based on Master Plan for Metro Ciriaco Corporation Manila and Surrounding areas, Upper DPWH-Central 166 15th Floor Victoria Bldg., 429 U.N. Ave., Ermita, Improvement (Upstream of Procurement/Contract ID 2-Feb-2018 Office, Port Area, Manila 16Z00018 Manila Marikina City Jethrock Construction Corporation Facade Facelift 167 Suite 703, Atlanta Centre, #31 Annapolis St., Chinese General- 286 Blumentritt St., Sta. Cruz, Manila 2-Feb-2018 Greenhills, San Juan City Hospital- Three (3) Storey with Roofdeck Residential & Nila I. Alarcon 168 Commercial 2-Feb-2018 #23 14 Roxas St., San Roque, Marikina City #23 14 Roxas St., San Roque, Marikina City Improvement of Satop and Social Hygiene Office at 5th Hilarch Builders Corp. 169 Floor Health Department, Pasig City Hall 2-Feb-2018 15 A. Luna St. Brgy. Malinao Paig City Pasig City Hall, Pasig City Construction of R.E.D. Storage with Connector at Pasig Hilarch Builders Corp. 170 Motorpool 2-Feb-2018 15 A. Luna St. Brgy. Malinao Paig City C. Raymundo Ave., Brgy. Caniogan, Pasig City Construction of New Pasig City Central Fire Station & Hilarch Builders Corp. Batas ng Ciudad Enforcement Office (B.C.E.O.) 171 2-Feb-2018 15 A. Luna St. Brgy. Malinao Paig City (Structural Works-Phase 1) Brgy. Sto. Tomas, Pasig City Proposed Additional Loads for Sta. Lucia Senior High Hilarch Builders Corp. School (Electrical Works) at GSIS Road, Sta. Lucia High 172 2-Feb-2018 15 A. Luna St. Brgy. Malinao Paig City School Compound Brgy. Sta. Lucia, Pasig City CKI Builders & Engineering Services Rolex Store (Interior Fit-out Works) 173 2-Feb-2018 #7 Maginhawa St., UP Vill., Diliman, Quezon City SM Mall of Asia, Pasay City 18OD0059-Construction of Flood Control River Wall Metro Manila Flordes Construction and Trading Corp. along Lingahan Creek, Sta. 0+000 to Sta. 0+300, Brgy. Third Engineering 174 3401 Magistrado Arellano St., Bacood, Sta.Mesa, 2-Feb-2018 Coloong, Valenzuela City District Marulas, Manila Coloong, Valenzuela City Valenzuela City

Page 15 of 80

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region February 2018

Metro Manila Flordes Construction and Trading Corp. 18OD0063-Rehabilitation of Roads and Drainage along Third Engineering 175 3401 Magistrado Arellano St., Bacood, Sta.Mesa, Capt. Cruz Stret, Brgy. Malinta, Valenzuela City 2-Feb-2018 District Marulas, Manila Malinta, Valenzuela City Valenzuela City 18OD0045-Construction/Rehabilitation of Riverwall Metro Manila Flordes Construction and Trading Corp. along Tullahan River, Sta. 6+024-Sta.6+128, Brgy. Third Engineering 176 3401 Magistrado Arellano St., Bacood, Sta.Mesa, 2-Feb-2018 Marulas, Valenzuela City District Marulas, Manila Marulas, Valenzuela City Valenzuela City Santos M. Laguinta Additional 3rd Floor 177 56 Cherry Gail St., Gabriel Subd. II, H-Duhat, 56 Cherry Gail St., Gabriel Subd. II, H-Duhat, Malabon 2-Feb-2018 Malabon City City Richard Ngui Proposed Warehouse Two (2) Storey 178 2-Feb-2018 265 N. Domnigo, san Juna City 265 N. Domnigo, San Juan City Proposed 2017 Partial Pipe Replacement due to Drainage Improvement Project in H.S. D. Tuazon at 19- F.G. Guintu Construction & Trading, Inc. 179 RSV01M. Along D. Tuazon St., Brgy. Lourdes, Quezon 2-Feb-2018 35 Fema Road, Project 8, Quezon City City under Quirino Roosevelt B.A. along D. Tuazon, Brgy. Lourdes, Quezon City Isagani Dominguez Proposed Additional Floors 6th to 9th Floors 180 2-Feb-2018 L29 B1 Biyaya St., Bacood Sta. Mesa, Manila L29 B1 Biyaya St., Bacood Sta. Mesa, Manila 17OB0458 Construction of Four (4) Storey Six (6) Redcar Trading & Construction DPWH-Metro Classroom National High School, Taguig 181 16 Ilang-ilang Road, San Antonio Valley, Las Piñas 2-Feb-2018 Manila 1st District City City Engineering Taguig City Jeffrey Mangaliag Proposed Three (3) Storey Residential Building 182 14-B Francisco Lane, Villa San Juan, Sto. Tomas, 14-B Francisco Lane, Villa San Juan, Sto. Tomas, Pasig 2-Feb-2018 Pasig City City Fastrack Home Developers, Inc. 17-19025B Improvement of Road & Drainage of 183 No. 33 Collantes St., Xaviersville Subd., Brgy. Sampaguita Street 2-Feb-2018 Loyola Heights, Quezon City Sampaguita St., Brgy. Talipapa, Quezon City 18OD0010-Rehabilitation of Roads and Drainage in C.L. Morales Construction and Trading DPWH MM 3rd Catleya and Dama De Noche Street, Brgy. Tagalag, 184 #35 Tatco Compound, Jacinto St., Brgy. Malinao, 2-Feb-2018 DEO , Marulas, Valenzuela City Pasig City Valenzuela City Tagalag, Valenzuela City

Page 16 of 80

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region February 2018

St. Timothy Construction Corp. 18OD0035-Construction of Flood Control Wall along F. DPWH MM 3rd 185 #35 Tatco Compound, Jacinto St., Brgy. Malinao, Dela Cruz Creek, Brgy. Paso De Blas, Valenzuela City 2-Feb-2018 DEO , Marulas, Pasig City Paseo De Blas, Valenzuela City Valenzuela City C.L. Morales Construction and Trading 18OD0037-Improvement of Roads and Drainage along DPWH MM 3rd 186 #35 Tatco Compound, Jacinto St., Brgy. Malinao, Guava St., Brgy. Gen. T. De Leon, Valenzuela City 2-Feb-2018 DEO , Marulas, Pasig City Gen. T. De Leon, Valenzuela City Valenzuela City St. Timothy Construction Corp. 18OD0053-Construction of Flood Control Wall along DPWH MM 3rd 187 #35 Tatco Compound, Jacinto St., Brgy. Malinao, Parada Creek, Brgy. Parada, Valenzuela City 2-Feb-2018 DEO , Marulas, Pasig City Parada, Valenzuela City Valenzuela City 18OD0064-Improvement of Roads and Drainage along C.L. Morales Construction and Trading DPWH MM 3rd Fruit Salad,Grapes and Star Apple Street, Brgy. Gen. T. 188 #35 Tatco Compound, Jacinto St., Brgy. Malinao, 2-Feb-2018 DEO , Marulas, De Leon, Valenzuela City Pasig City Valenzuela City Gen. T. De Leon, Valenzuela City 18OD0068-Improvement of Roads and Drainage along C.L. Morales Construction and Trading DPWH MM 3rd Molave Street and Derupa Street, Brgy. Maysan, 189 #35 Tatco Compound, Jacinto St., Brgy. Malinao, 2-Feb-2018 DEO , Marulas, Valenzuela City Pasig City Valenzuela City Maysan, Valenzuela City C.L. Morales Construction and Trading 18OD0070-Improvement of Roads and Drainage along DPWH MM 3rd 190 #35 Tatco Compound, Jacinto St., Brgy. Malinao, Del Mundo Street, Brgy. Ugong, Valenzuela City 2-Feb-2018 DEO , Marulas, Pasig City Ugong, Valenzuela City Valenzuela City C.L. Morales Construction and Trading 18OD0073-Improvement of Roads and Drainage along DPWH MM 3rd 191 #35 Tatco Compound, Jacinto St., Brgy. Malinao, Bandino Street, Brgy. Parada, Valenzuela City 2-Feb-2018 DEO , Marulas, Pasig City Parada, Valenzuela City Valenzuela City C.L. Morales Construction and Trading 18OD0075-Rehabilitation of Roads and Drainage in DPWH MM 3rd 192 #35 Tatco Compound, Jacinto St., Brgy. Malinao, Cuadra Street, Brgy. Coloong, Valenzuela City 2-Feb-2018 DEO , Marulas, Pasig City Brgy. Coloong, Valenzuela City Valenzuela City 18OD0074-Construction of Flood Control Wall and C.L. Morales Construction and Trading DPWH MM 3rd Bridge along Metro Village, Brgy. Mapulang Lupa, 193 #35 Tatco Compound, Jacinto St., Brgy. Malinao, 2-Feb-2018 DEO , Marulas, Valenzuela City Pasig City Valenzuela City , Valenzuela City C.L. Morales Construction and Trading 18OD0077-Rehabilitation of Flood Control Wall along DPWH MM 3rd 194 #35 Tatco Compound, Jacinto St., Brgy. Malinao, Parada creek, Brgy. Gen. T. de Leon, Valenzuela City 2-Feb-2018 DEO , Marulas, Pasig City Brgy. Gen. T. De Leon, Valenzuela City Valenzuela City

Page 17 of 80

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region February 2018

C.L. Morales Construction and Trading 18OD0091-Improvement of Roads and Drainage along DPWH MM 3rd 195 #35 Tatco Compound, Jacinto St., Brgy. Malinao, Miguelo Homes, Brgy. Gen. T. De Leon, Valenzuela City 2-Feb-2018 DEO , Marulas, Pasig City Gen. T. De Leon, Valenzuela City Valenzuela City 18OD0087-Improvement of Roads and Drainage along C.L. Morales Construction and Trading DPWH MM 3rd Fruit Salad Street, Brgy. Gen. T. De Leon, Valenzuela 196 #35 Tatco Compound, Jacinto St., Brgy. Malinao, 2-Feb-2018 DEO , Marulas, City Pasig City Valenzuela City Gen. T. De Leon, Valenzuela City C.L. Morales Construction and Trading 18OD0088-Improvement of Roads and Drainage along DPWH MM 3rd 197 #35 Tatco Compound, Jacinto St., Brgy. Malinao, Tata Indo Street, Brgy. Karuhatan, Valenzuela City 2-Feb-2018 DEO , Marulas, Pasig City Karuhatan, Valenzuela City Valenzuela City St. Timothy Construction Corp. 18OD0079-Rehabilitation of Roads and Drainage in DPWH MM 3rd 198 #35 Tatco Compound, Jacinto St., Brgy. Malinao, Cabesang IMO Street, Brgy. Balangkas, Valenzuela City 2-Feb-2018 DEO , Marulas, Pasig City Balangkas, Valenzuela City Valenzuela City Proposed Additional 2nd to 5th Floor Resiudential Jeorge P. De Vera 199 Building 2-Feb-2018 #501 F. Cruz St., Malibay, Pasay city #501 F. Cruz St., Malibay, Pasay city DPWH-Metro TM Abad Construction Construction of Road, Brgy. 171 Manila III District 200 2-Feb-2018 No. 34 Mt. Fuji ST., Filinvest 1, Subd., Batasan Hills Caloocan City Engineering Office DPWH-Metro Improvement of Roads and Drainage along Gregorio TM Abad Construction Manila III District 201 Street, Brgy. Gen. T. De Leon 2-Feb-2018 No. 34 Mt. Fuji ST., Filinvest 1, Subd., Batasan Hills Engineering Valenzuela City Office DPWH-Metro TM Abad Construction Construction of Road, Phase 7, Brgy. 176 Manila III District 202 2-Feb-2018 No. 34 Mt. Fuji ST., Filinvest 1, Subd., Batasan Hills Caloocan City Engineering Office DPWH-Metro TM Abad Construction Construction of Road, Phase 8, Brgy. 176 Manila III District 203 2-Feb-2018 No. 34 Mt. Fuji ST., Filinvest 1, Subd., Batasan Hills Caloocan City Engineering Office

Page 18 of 80

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region February 2018

Improvement of Drainage along Angeles Extension DPWH-Metro TM Abad Construction Compound, Peacock Street and Santolan Street, Brgy. Manila III District 204 2-Feb-2018 No. 34 Mt. Fuji ST., Filinvest 1, Subd., Batasan Hills Gen. T. De Leon Engineering Valenzuela City Office DPWH-Metro Construction/Rehabilitation of Riverwall along Tullahan TM Abad Construction Manila III District 205 River Sta. 8+274-Sta. 8+354, Brgy. Marulas 2-Feb-2018 No. 34 Mt. Fuji ST., Filinvest 1, Subd., Batasan Hills Engineering Valenzuela City Office DPWH-Metro Construction of Flood Control Riverwall Lingahan Creek TM Abad Construction Manila III District 206 Sta. 0+300 to Sta. 0+450, Brgy. Coloong 2-Feb-2018 No. 34 Mt. Fuji ST., Filinvest 1, Subd., Batasan Hills Engineering Valenzuela City Office DPWH- Metro Improvement of Roads and Drainage along Gumamela Manila Third Carry On Construction 207 Street, Brgy. Gen. T. De Leon 2-Feb-2018 District 2030 Gen. T. De Leon Road, Valenzuela City Valenzuela City Engineering Office DPWH- Metro Carry On Construction Improvement of Roads and Drainage along Lanzones Manila Third 208 Unit 4 ERN Commercial Complex, Lot 1125 Street and Ubas Street, Brgy. Gen. T. De Leon 2-Feb-2018 District Tandang Sora Ave., Tandang Sora, Quezon City Valenzuela City Engineering Office Mostrales & Luzviminda M. Espiritu Proposed Additional 3rd Floor Residential 209 Blk. 188 Lot 5 Tambuli St., Zone 8, Brgy. Pembo, Blk. 188 Lot 5 Tambuli St., Zone 8, Brgy. Pembo, Makati 5-Feb-2018 Makati City City Lina F. Hizon Proposed Four (4) Storey Apartment 210 5-Feb-2018 Lot 11 Blk. 43 Mola St., Brgy. La Paz, Makati city Lot 11 Blk. 43 Mola St., Brgy. La Paz, Makati City Ernesto Galura Proosed Two (2) Storey 6-Door Apartment 211 5-Feb-2018 3870 Pasong Makipo t, Putatan, Muntinlupa City 3870 Pasong Makipo t, Putatan, Muntinlupa City Octovino Q. Esguerra Proposed Extension of Three (30 Storey Residence 212 Lot 23 Blk. 8 St. Anne St., Provident Vill., Marikina 5-Feb-2018 Lot 23 Blk. 8 St. Anne St., Provident Vill., Marikina City City

Page 19 of 80

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region February 2018

Contract ID 18OD0026 Rehabilitation of Flood Control DPWH MM 3rd JASA Builders Wall Along Orbe Creek, Barangay Bagbaguin, 213 5-Feb-2018 DEO, Marulas, La Perla St., Bolinao, Pangasinan Valenzuela City Valenzuela City Valenzuela City Contract ID 18OD0047 Construction/Rehabilitation of Riverwall Along Tullahan River, Sta. 8+217 - Sta. 8+217 DPWH MM 3rd JASA Builders 214 and Sta. 8+255 - Sta. 8+274, Barangay Marulas, 5-Feb-2018 DEO, Marulas, La Perla St., Bolinao, Pangasinan Valenzuela City Valenzuela City Valenzuela City Contract ID 18OD0049 Construction/Rehabilitation of DPWH MM 3rd JASA Builders Riverwall Along Tullahan River, Sta. 5+816 - Sta. 215 5-Feb-2018 DEO, Marulas, La Perla St., Bolinao, Pangasinan 5+920, Barangay Marulas, Valenzuela City Valenzuela City Valenzuela City Contract ID 18OD0050 Construction/Rehabilitation of DPWH MM 3rd JASA Builders Riverwall Along Tullahan River, Sta. 4+896 - Sta. 216 5-Feb-2018 DEO, Marulas, La Perla St., Bolinao, Pangasinan 4+989, Right Bank Barangay Marulas, Valenzuela City Valenzuela City Valenzuela City Contract ID 18OD0056 Construction of Road Dike Along DPWH MM 3rd JASA Builders 217 Meycauayan River Polo Area, Valenzuela City 5-Feb-2018 DEO, Marulas, La Perla St., Bolinao, Pangasinan Valenzuela City Valenzuela City Victoria Development and Construction Supply Contract ID 18OD0057 Flood Control Project and Dike DPWH MM 3rd 218 Corp. Improvement Along Polo River, Valenzuela City 5-Feb-2018 DEO, Marulas, 103 Lopez Jaena St., Tacloban City Valenzuela City Valenzuela City Contract ID 18OD0080 Dredging of Meycauayan River, Victoria Development and Construction Supply DPWH MM 3rd Wawang Polo Side Sta. 1+260 to Sta. 1+810, Caloocan 219 Corp./J. Simeon Construction, JV 5-Feb-2018 DEO, Marulas, City La Perla St., Bolinao, Pangasinan Valenzuela City Caloocan City Contract ID 18OD0081 Construction of Flood Control DPWH MM 3rd JASA Builders Wall/Riprapping Along Banks of Creeks, Barangay 172, 220 5-Feb-2018 DEO, Marulas, La Perla St., Bolinao, Pangasinan Caloocan City Valenzuela City Caloocan City Contract ID 17 OOD0187 Construction of Four (4) J. Simeon Construction/Solenko Construction, JV DPWH MM 3rd Storey Twelve (12) Classroom School Building Gen. t. 221 2038-A Santos Subd., Brgy. Gen. T. De Leon, 5-Feb-2018 DEO, Marulas, de leon National High School, Valenzuela City Valenzuela City Valenzuela City Valenzuela City

Page 20 of 80

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region February 2018

Upgrading of Service Entrance (Revolving Tower and Interbuild Construction tanghalang Pasigeño) and Installation of 950KVA, 222 5-Feb-2018 Brgy. Maybunga, Pasig City Generator Set (Existing from PCGH) Carucho Ave., Brgy. San Nicolas, Pasig City Greenheat Corporation Renovation of Goniophotometer Building 223 MTC Bldg. A. Soriano St. cor. Arzobispo St., Rizal Drive, Bonifacio Global City, Taguig City, Metro 5-Feb-2018 , Manila Manila Erection and Construction of the Relocation Works for EEI Corporation the Affected Transmission Facilities by the Metro Manila 224 5-Feb-2018 12 Manggahan St., Bagumbayan, Quezon City Skyway Stage 3 Project 878 G. Araneta Ave., Brgy. Tatalon, Quezon City 17OB0421 Construction of Four (4) Storey Workshop DPWH-Metro Alpha & Omega Gen. Contractor & Dev't. Corp. Building (7x18) at Rizal Exp. Sta. and Pilot Sci. Manila 1st District 225 6-Feb-2018 #35 Tatco Cmpd. E. Jacinto St. Malinao, Pasig City (RESPCI), Pasig City Engineering Rizal Exp. Sta. and Pilot Sci. (RESPCI), Pasig City Office DPWH-Metro 17OB0388 Construction of Four (4) Storey, Nine (9) Alpha & Omega Gen. Contractor & Dev't. Corp. Manila 1st District 226 Classroom 6-Feb-2018 #35 Tatco Cmpd. E. Jacinto St. Malinao, Pasig City Engineering Buting Elementary School, Pasig City Office Contract ID: 17OB0441 Maintenance, Repair and DPWH-Metro MSB Vitug Construction Rehabilitation of Flood Control Structures along Pasig- Manila 1st District 227 6-Feb-2018 13 San Antonio, Lubao, Marikina River Channel, Sta. 0+575-Sta. 1+500 Engineering Pasig-Marikina River Channel, Sta. 0+575-Sta. 1+500 Office Contract ID: 17OB0442 Maintenance, Repair and DPWH-Metro MSB Vitug Construction Rehabilitation of Flood Control Structures along Pasig- Manila 1st District 228 6-Feb-2018 6 Bangkal St., Amparo Village, Caloocan City Marikina River Channel, Sta. 0+000-Sta. 0+525 Engineering Pasig-Marikina River Channel, Sta. 0+000-Sta. 0+525 Office Contract ID: 17OB0443 Maintenance, Repair and DPWH-Metro MSB Vitug Construction Rehabilitation of Flood Control Structures within Pasig- Manila 1st District 229 6-Feb-2018 6 Bangkal St., Amparo Village, Caloocan City Marikina River Basin, Mandaluyong City Engineering Pasig-Marikina River Basin, Mandaluyong City Office DPWH-Metro 17OB0433 Construction of Four (4) Storey Twelve (12) GR Fevidal Construction Developers Corporation Manila 1st District 230 Classroom, Malanday Elementary School, Marikina City 6-Feb-2018 Unit 603 Jovan Bldg. Shaw Blvd., Mandaluyong City Engineering Malanday Elementary School, Marikina City Office

Page 21 of 80

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region February 2018

Construction of Four (4) Storey, Thirty Six (36) Edison Development & Construction Classroom, Industrial Valley Complex (IVC) National 231 #121 Le Mariche Subdivision, E. Roriguez, Sr. High School, Marikina City 6-Feb-2018 DPWH-1st Metro Avenue, Quezon City Industrial Valley Complex (IVC) National High School, Marikina City Asset Preservation Program: Preventive Maintenance, DPWH-Quezon Dimaguila Construction & Supply, Inc. Slab Replacement-EDSA, K0018 + 869 - K0017 + 493, City Second 232 6-Feb-2018 107 Mabilis St., , Diliman, Quezon City Quezon City (Contract ID 17-OG-0125) Engineering EDSA, Quezon City District Asset Preservation Program: Preventive Maintenance, DPWH-Quezon Slab Replacement-EDSA, K0016 + 654 - K0017 + 294, New Arcond Builders, Inc. City Second 233 K0018 +569 - K0019 + 185, Quezon City (Contract ID 6-Feb-2018 107 Mabilis St., Piñyahan, Diliman, Quezon City Engineering 17-OG-0111) District EDSA, Quezon City International Committee of the Red Cross (ICRC)/ Addplus Solutions Group, Inc. Renovation 234 6/F The Valero Tower, 122 Valero St., Salcedo Vill., 6-Feb-2018 27th Floor, Petron Mega Plaza, 358 Sen Gil. Puyat Ave., Makati City Makati City Landscape Development of Pasig Housing Village 1 ay C.S.L. Construction Corporation Jenny's Avenue, Brgy. Maybunga, Pasig City 235 6-Feb-2018 510 Sandoval Avenue, Palatiw, Pasig City Pasig Housing Village 1 ay Jenny's Avenue, Brgy. Maybunga, Pasig City LBP Resources & Development Corporation LBP Owwa Extension Office Relayout/Renovation 236 24/F LBP Plaza Building 1598 M.H. Del Pilar cor. Ground Floor, OWWa Building, F.B. Harrison St. cor. 6-Feb-2018 Quintos Sts., Manila 7th St., Pasay City Proposed Five (5) Storey Residential Building with Sps. Norman & Joana Lourdes L. Deogracias 237 Basement 7-Feb-2018 6071 R. Palma St. St., Poblacion, Makati City 6071 R. Palma St. St., Poblacion, Makati City William Tan Chua & Susan Tan Chua Demolition of Four (4) Storey Building 238 7-Feb-2018 354,358Clavel St., Binondo, Manila 354,358Clavel St., Binondo, Manila Sps. Abelardo/Ruby Fugen Proposed Three (3) Storey Residential Building 239 Blk. 5 Lot 6 Trevi Subd., J.P. Rizal Concepcion Uno, Blk. 5 Lot 6 Trevi Subd., J.P. Rizal Concepcion Uno, 7-Feb-2018 Marikina City Marikina City

Page 22 of 80

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region February 2018

Francisco S. Tan, Jr. Et. Al. Proposed Four (4) Storey Residential Building Only 240 7-Feb-2018 Blumentritt St., Sampaloc, Manila Blumentritt St., Sampaloc, Manila Jared S. Guiang Proposed Four (4) Storey Studio Type Apartment 241 923-G San Jose St., Brgy. Mauaway, Mandaluyong 7-Feb-2018 923-G San Jose St., Brgy. Mauaway, Mandaluyong City City Vhoug International Construction Group, Inc. Proposed Level 32 ILCC Fit-out 242 507 OMM-CITRA Bldg., San Miguel Ave., Ortigas Level 32 Insular Life Corporate Center, Insular Drive, 7-Feb-2018 Center, San Antonio, Pasig City , Alabang, Muntinlupa City KP Gonzales Construction Supply And Trading Contract ID 18OH0016- Repair/Rehabilitation of Multi- 243 Blk 3D L19 Phi Tierra Nevada San Francisco Gen. purpose Building 24, Pasay City 7-Feb-2018 DPWH- SMDEO Trias Pasay City KP Gonzales Construction Supply And Trading Contract ID 18OH0011- Rehabilitation of Drainage 244 Blk 3D L19 Phi Tierra Nevada San Francisco Gen. System Augustine Street, Barrio Filipino, Pasay City 7-Feb-2018 DPWH- SMDEO Trias Cavite Pasay City Contract ID#: 17OI0142-Const. of Four (4) Storey, LMG Construction Twenty (20) Classrooms School Building at Muntinlupa 245 7-Feb-2018 DPWH-LPMDEO Malasin Sto. Domingo, Nueva Ecija National High School Building 2 Muntinlupa City Muntinlupa City R.C. Geronimo Builders, Inc. CBG Renovation 246 7-Feb-2018 967 Estrada St., Malate, Manila G/F UCPB Office, 7907 Makati Ave., Makati City DPWH-Metro J Simeon Construction/Solenko Construction-JV Construction of Four (4) Storey 12-Classroom School Manila 3rd District 247 2038-a Santis Subdivision Brgy. Gen T. De Leon, Building Gen,. T. De Leon National High School 7-Feb-2018 Engineering Valenzuela City Valenzuela City Office Proposed Twenty One (21) Storey -^Towers with Roof Asia Structural Developer Corporation 248 Deck and Basement 7-Feb-2018 L17 -G NCIC, Brgy. Manggahan, Gen. Trias, Cavite Marina Seaview, Parañaque City DPWH-South Ironforge Construction and Supply 17OH0151-Proposed Rainwater Collection Sytem Manila District 249 28 A. Barrion St., BF Homes, Brgy. Holy Spirit, 7-Feb-2018 Manila City Engineering Quezon City Office Ironforge Construction and Supply 17OO0031-Repair of Flagpole/Parking Area at DPWH- DPWH-NCR 250 28 A. Barrion St., BF Homes, Brgy. Holy Spirit, NCR Compound, 2nd St., Port Area 7-Feb-2018 Regional Office Quezon City Manila City

Page 23 of 80

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region February 2018

Proposed Three (3) Storey Residential Building with Jumar Cirillo T. Merina 251 Roofdeck 7-Feb-2018 187.1 27th Ave., Brgy. East Rembo, Makati City 187.1 27th Ave., Brgy. East Rembo, Makati City Ragojos Heritage Construction Corporation Wells Fargo Building D Office Fit-out 252 51 Vicente Ave. North Susana Exec. Village, Old Wells Fargo Center 1180 Wells Fargo Drive, Mckinley 7-Feb-2018 Balara Diliman, Quezon City Hill, Cyberpark, Taguig City CBTL Holdings @ Menarco Tower, Philippines Office Ragojos Heritage Construction Corporation Fit-out 253 51 Vicente Ave. North Susana Exec. Village, Old 7-Feb-2018 30th Floor Menarco Tower, Lot 8 Blk. 5 32nd St., Balara Diliman, Quezon City Bonifacio Global City, Taguig City 180E0040 Organizational Outcome 2: Protect Lives and Properties against Major Floods-Flood Management Sto. Cristo Construction and Trading Program-Construction/Maintenance of Flood Mitigation DPWH-North 254 7-Feb-2018 Sto. Cristo Hermosa, Bataan Structures and Drainage Systems-Bank Improvement Manila DEO (Steel Sheet Pile) Estero De Binondo, Sta. 0+202.76 Manila City 180E0023 Organizational Outcome 2: Protect Lives and Properties against Major Floods-Flood Management Sto. Cristo Construction and Trading Program-Construction/Maintenance of Flood Mitigation DPWH-North 255 7-Feb-2018 Sto. Cristo Hermosa, Bataan Structures and Drainage Systems-Bank Improvement Manila DEO (Steel Sheet Pile) Estero De San Lazaro, Sta. 0+047 Manila City C.T. Leoncio Construction & Trading 17OE0201 Deepening of Estero De Maypajo DPWH-North 256 7-Feb-2018 171 Guyong Sta. Maria, Bulacan Manila City Manila DEO 18OE0017 Organizational Outcome 2: Protect Lives and Properties against Major Floods-Flood Management C.T. Leoncio Construction & Trading Program-Construction/Maintenance of Flood Mitigation DPWH-North 257 7-Feb-2018 171 Guyong Sta. Maria, Bulacan Structures and Drainage Systems-Bank Improvement Manila DEO (Steel Sheet Pile) Estero De Maypajo, Sta. 0+372.36 Manila City

Page 24 of 80

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region February 2018

18OE0031 Organizational Outcome 2: Protect Lives and Properties against Major Floods-Flood Management C.T. Leoncio Construction & Trading Program-Construction/Maintenance of Flood Mitigation DPWH-North 258 7-Feb-2018 171 Guyong Sta. Maria, Bulacan Structures and Drainage Systems-Bank Improvement Manila DEO (Steel Sheet Pile) Estero De Vitas, Sta. 0+592.80 t Manila City 18OE0057 Organizational Outcome 2: Protect Lives and Properties against Major Floods-Flood Management C.T. Leoncio Construction & Trading/M.V. Caldo Program-Construction/Maintenance of Flood Mitigation DPWH-North 259 Engineering Construction & Supplies (J.V.) 7-Feb-2018 Structures and Drainage Systems-Bank Improvement Manila DEO 44 San Jose, Sto. Tomas, Batangas (Steel Sheet Pile) Estero Dela Reina, Sta. 0+172.80 Manila City 18OE0052 Organizational Outcome 2: Protect Lives and Properties against Major Floods-Flood Management C.T. Leoncio Construction & Trading/M.V. Caldo Program-Construction/Maintenance of Flood Mitigation DPWH-North 260 Engineering Construction & Supplies (J.V.) 7-Feb-2018 Structures and Drainage Systems-Bank Improvement Manila DEO 44 San Jose, Sto. Tomas, Batangas (Steel Sheet Pile) Estero Dela Reina, Sta. 0+103 to Manila City 17-OE0197 - Construction of Four (4) Storey Sixteen Aylan Construction and Trading/Ale-j Construction (16) Classroom Tondo High School, (Phase II), Tondo, DPWH-North 261 Trading Joint Venture 7-Feb-2018 Manila Manila DEO #16 NS Amoranto Avenue, La Loma, Quezon City Tondo, Manila 17OA0095 - Construction of Three (3) Storey, Nine (9) Department of ISH Construction, Inc. Classroom School Building, Catmon Integrated School, Public Works and 262 #38 Carmira's Drive South Green Park Village, 7-Feb-2018 Malabon City Highways Project 8, Quezon City Malabon City (DPWH) Proposed Construction of Six (6) Swtorey School Dominic Construction, Inc. Building (Structural Works Only) 263 7-Feb-2018 229 A. Basilan cor. Talayan Sts., Mandaluyong City Roosevelt College, 504 J.P. Rizal St., Malanday, Marikina City Eduardo Lopez Murillo Proposed Additional Third Floor Warehouse Building 264 7-Feb-2018 44 Jose P. Bautista St., Potrero, Malabon City 44 Jose P. Bautista St., Potrero, Malabon City Mr. & Mrs. Fernando Dela Paz Proposed Two (2) Storey Commercial Building 265 7-Feb-2018 222 Don Basilio Blvd., Dampalit, Malabon City 222 Don Basilio Blvd., Dampalit, Malabon City

Page 25 of 80

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region February 2018

Lizabeth Brotonel Proposed Three (3) Storey Residential Townhouse 266 7-Feb-2018 445 Vicencio St., Hulong Duhat, Malabon City 445 Vicencio St., Hulong Duhat, Malabon City Janel Ivana Dionisio/Jane Bianca Dionisio Two (2) Storey Three (3) Units Residential Building 267 7-Feb-2018 Dakila St., Tonsuya, Malabon city Dakila St., Tonsuya, Malabon City Ernilito Chan Four (4) Units Three (30 Storey Residential Building 268 7-Feb-2018 Daez St., Concepcion, Malabon city Daez St., Concepcion, Malabon city 18OE0064 Organizational Outcome 2: Protect Lives and Properties against Major Floods-Flood Management C.T. Leoncio Construction & Trading Program-Construction/Maintenance of Flood Mitigation DPWH-North 269 7-Feb-2018 171 Guyong Sta. Maria, Bulacan Structures and Drainage Systems-Bank Improvement Manila DEO (Steel Sheet Pile) Estero De Vitas, Sta. 0+659.20 t Manila City 17OE0162, MFO-1 National Road Network Service- Asset Preservation of National Roads Construction and G.F. Fabian Construction Maintenance of Bridges along National Roads, DPWH-North 270 7-Feb-2018 772 F. Halili Ave., Turo Bocaue, Bulacan Rehabilitationor Major Repair of Bridges-Claro M. Recto, Manila DEO Manila City Manila City J.C. Piñon Construction Inc. Construction of Tandang Sora Senior High School 271 212 Goc. F. Halili Avenue, Bagbaguin, Sta. Maria, (Project No. 17-16004) 8-Feb-2018 Bulacan Brgy. Tandang Sora, Quezon City ARCC Construction Improvement of Road & Drainage at Centerville St., 272 Unit 3 Monarch Square#77 Sct. Sikatuna St., Laging Brgy. Pasong tamo, Quezon City 8-Feb-2018 Handa, Quezon city Centerville St., Brgy. Pasong Tamo, Quezon City JRB and Associates Construction, inc. Elevated Food Recipe Inc. 273 Unit 811 Citiland 10 Tower II, H.V. Dela Costa St., 5F Podium, ADB Ave., Ortigas Center, Mandaluyong 8-Feb-2018 Makati Cityy City Rosand Builders Corporation 17-25003-Construction of Covered Pathwalk 274 94 Doña Rosario Ext., Brgy. Novaliches Proper, Bonifacio Memorial Elementary School, Brgy. Unang 8-Feb-2018 Quezon City Sigaw, Quezon City Rosand Builders Corporation 17-25007-Improvement of Imelda (Admin Building) 275 94 Doña Rosario Ext., Brgy. Novaliches Proper, Bonifacio Elementary School, Brgy. Unang Sigaw, 8-Feb-2018 Quezon City Quezon City

Page 26 of 80

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region February 2018

Repair of Pavement, Drainage System, Lighting Hi-Tone Construction & Dev't. Corp. Facilities and Concrete Fence at Collector Road inside 276 8-Feb-2018 Bogtong, Legaspi City PMO Compound, North Harbor, Tondo, Manila PMO Compound, North Harbor, Tondo, Manila Renovation of the Department of Finance Building E.M. Cuerpo Inc. Offices - Package 2 277 E.M. Cuerpo Inc. Bldg., No. 3 Metropoli Drive, 8-Feb-2018 Department of Finance, BSP Complex, Roxas Blvd., Metropoli Residenza, Bagumbayan, Quezon City Malate, Manila Organizational Outcome 1; Ensure Safe and Reliable RA Ignacio Construction Corporation National Ropad System-Asset Preservation Program- Department of 278 Unit 413 Cedar Executive Bldg. II, Timog Ave., cor. Preventive Maintenance-Tertiary Roads-Ma. Clara, 8-Feb-2018 Public Works & Sct. Tobias, Quezon City K0008+ (-354.00) To K008+ (-458.00) Manila City Highways Manila City Organizational Outcome 1; Ensure Safe and Reliable RA Ignacio Construction Corporation National Ropad System-Asset Preservation Program- Department of 279 Unit 413 Cedar Executive Bldg. II, Timog Ave., cor. Preventive Maintenance-Tertiary Roads-Manga St., 8-Feb-2018 Public Works & Sct. Tobias, Quezon City (SO2548LZ) Chainage O-Chainage 51.30, Manila City Highways Manila City Supply & Installation of Fire Prevention System at San Atlantica Fire Systems, Inc. Juan & Siruna Warehouses (Contract Number: 017- 3F Atlantica Fire Systems, Inc. 655 Severina Ave., 0123-01-SCOHMI-SOMO1) 280 8-Feb-2018 Km. 18 West Service Road, Brgy. Marcelo Green, Manila Water Logistic Hub San Juan 15 N. Domingo St., Parañaque City San Juan, Manila Water San Juan Logistic Hub & Siruna Logistic Hub #17-25009 Drainage Improvement and Concreting of Ann-gie Builders 281 Pathwalk at Sapalad HOA 9-Feb-2018 #9 Almaciga St., Old Balara, Quezon City Brgy. Commonwealth, Quezon City #17-25014 Improvement of Road and Drainage of Doña Ann-gie Builders 282 Filomena Street 9-Feb-2018 #9 Almaciga St., Old Balara, Quezon City Brgy. Matandang Balara, Quezon city Improvement of Administration Building (Exterior & Second Floor) at RESPSCI, Jenny's Extension, Brgy. Lucky Princejon Construction 283 Maybunga, Pasig City 9-Feb-2018 36 Earth St., Greenland Village, Rosario, Pasig City RESPSCI, Jenny's Extension, Brgy. Maybunga, Pasig City

Page 27 of 80

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region February 2018

Oscar S. Viola Proposed Two (2) Storey Multi-Family Dwelling 284 25 Aquarius St., LA Consolacion Village, Parang, 25 Aquarius St., La Consolacion Village, Parang, 9-Feb-2018 Marikina City Marikina City Mr. & Mrs. Angelo Salarza Proposed One (1) Storey Residential with Roof Slab 285 15 Old 113 New Tangerine St., Concepcion Dos, 15 Old 113 New Tangerine St., Concepcion Dos, 9-Feb-2018 Marikina City Marikina City R.B. Soriano Construction Renovation and Extension of Surgical Intensive Care 286 No. 11 Lauren St., Simeona Village, Concepcion, Unit (SICU) (Lot No. 69-Phividec-UOI-2017) 9-Feb-2018 Marikina City VMMC, North Ave., Diliman, Quezon City Pamantasan ng Lungsod ng Pasig - HRM/Multi-Purpose R.B. Soriano Construction Bldg. (HVAC Works and Vertical Transport) at Industria 287 No. 9 Lauren St., Simeona Village, Concepcion, 9-Feb-2018 St. Marikina City Barangay Kapasigan, Pasig City Iconstructors and Developers, Inc. AMPI Building 3 288 Block 18 Lot 27 Acacia St., Mahogany Village 1, 9-Feb-2018 Sampaguita Street, marimar Village, Parañaque City Brgy. Pulo, Cabuyao, Laguna 17OB0462 Construction of Four (4) Storey, Twenty Four St. Timothy Construction Corporation (24) Classroom, Leodegario Victorino Elementary 289 9-Feb-2018 35 Tatco Compound Jacinto St., Pasig City School, Marikina City Marikina City Aichu Therese Luy Proposed Three (3) Storey Residential with Penthouse 290 Manila Midtown Executive House UN Ave. Paco, 9-Feb-2018 Manila Midtown Executive House UN Ave. Paco, Manila Manila Daniel Cabildo, Jr. Proposed Four (4) Storey Residential 291 9-Feb-2018 843 Ibarra St., Sampaloc, Manila 843 Ibarra St., Sampaloc, Manila Proposed Construction of Two (2) Storey Residential Sps. Andrew & Mary Ann Garcia Structure 292 Lot 30, Block 7, Brazilia Heights, Brgy. Tunasan, 9-Feb-2018 Lot 30, Block 7, Brazilia Heights, Brgy. Tunasan, Muntinlupa City Muntinlupa City Ellen E. Topacio Four (4) Storey Residential Bldg. 293 9-Feb-2018 518 D. Santiago St., San Juan City 518 D. Santiago St., San Juan City Bong Macaranas Proposed Demolition of Existing Structure 294 9-Feb-2018 No. 5 Banada Circle South Forbes Park, Makati City No. 5 Banada Circle South Forbes Park, Makati City

Page 28 of 80

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region February 2018

Cindy Haw Proposed Duplex Two (2) Storey Residence 295 Lot 11 Blk. 12 Pacencia Park St., Teresa Park Lot 11 Blk. 12 Pacencia Park St., Teresa Park Subd., 9-Feb-2018 Subd., Pilar Village, Las Piñas City Pilar Village, Las Piñas City Danilo Ignacio, Jr. Proposed Six (6) Storey Commercial Building 296 9-Feb-2018 3691 Gabong St., Brgy. Pinagkaisahan, Makati City 3691 Gabong St., Brgy. Pinagkaisahan, Makati City Proposed Construction of Two (2) Storey Duplex Mary Joanne Castillo Structure 297 Araullo St., Katarungan village, brgy. Poblacion, 9-Feb-2018 Araullo St., Katarungan village, brgy. Poblacion, Muntinlupa City Muntinlupa City C.B. Garay Philwide Builders 16O00051 - Construction of Taguig General Hospital DPWH - National 298 CBG Building, #16 Yakal West St., Santolan, Pasig 9-Feb-2018 Taguig City, Metro Manila Capital Region City Philip Camiguing Proposed Two (2) Storey Four (4) Units Residence 299 9-Feb-2018 3 Agoho St., Concepcion Uno, Marikina City 3 Agoho St., Concepcion Uno, Marikina City Lovely Mangilit Aviso Proposed One (1) Storey Residence with Store 300 Lot 1-A Lavender St., Concepcion Dos, Marikina 9-Feb-2018 Lot 1-A Lavender St., Concepcion Dos, Marikina City City Jeanette Cheng Proposed One (1) Storey Warehouse 301 Lot 4450 A&B East Service Road, San Martin de Lot 4450 A&B East Service Road, San Martin de Porres, 9-Feb-2018 Porres, Parañaque City Parañaque City Christopher Chilip Proposed One (1) Storey Warehouse 302 9-Feb-2018 054 4th Ave., Bagumbayan, Taguig City 054 4th Ave., Bagumbayan, Taguig City Greenheat Corporation Supply, Delivery, Installation and Commissioning of 31 303 MTC Bldg. A. Soriano cor. Arzobispo Sts., KWp. Grid Tied Roof Mounted Solar PV Power Plant 9-Feb-2018 Intramuros, Manila Boni Avenue, Mandaluyong City Supply, Delivery, Installation and Commissioning of 99.2 Greenheat Corporation KWp. Grid Tied Roof Mounted Solar PV Power Plant 304 MTC Bldg. A. Soriano cor. Arzobispo Sts., 9-Feb-2018 Rizal Technological University, Eusebio Avenue San Intramuros, Manila Miguel, Pasig City Charifer Builders, Inc. Removal of Underground pipes & Excavation of Soil 305 Lot 15 Boundary Camachile St. Amparo Subd., 9-Feb-2018 Jesus St., Pandacan, Manila Caloocan City R.C. Ramos Construction Corporation BIR RR5 Revenue District Office Rdo 25A & 25B 306 9-Feb-2018 194 Quezon Road, San Roque, Mexico, Pampanga Brgy. Bagong Barrio, EDSA, Caloocan City

Page 29 of 80

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region February 2018

Asia Structural Developer Corporation Proposed Forty Six (46) Storey Condominium & Thirty 307 L17-G B3 NCIC, Brgy, Manggahan, Gen. Trias, nine (39) Storey Office-Warehouse, Two-Tower Building 9-Feb-2018 Cavite Alvarado Street, Binondo, Manila 18OE0027 - Organizational Outcome 2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/Maintenance of Hexamindz Corporation DPWH-North 308 Flood Mitigation Structures and Drainage Systems - 9-Feb-2018 Pearl St., Marifori Heights Subd., Davao City Manila DEO Bank Improvement (Steel Sheet Pile) Estero de Vitas, Sta. 0+ Manila City 18OE0059 - Organizational Outcome 2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/Maintenance of Hexamindz Corporation DPWH-North 309 Flood Mitigation Structures and Drainage Systems - 9-Feb-2018 Pearl St., Marifori Heights Subd., Davao City Manila DEO Bank Improvement (Steel Sheet Pile) Estero de Vitas, Sta. 0+ Manila City 18OE0020 - Organizational Outcome 2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/Maintenance of Hexamindz Corporation DPWH-North 310 Flood Mitigation Structures and Drainage Systems - 9-Feb-2018 Pearl St., Marifori Heights Subd., Davao City Manila DEO Bank Improvement (Steel Sheet Pile) Estero de Sampaloc, Sta. Manila City 18OE0015 - Organizational Outcome 2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/Maintenance of Hexamindz Corporation DPWH-North 311 Flood Mitigation Structures and Drainage Systems - 9-Feb-2018 Pearl St., Marifori Heights Subd., Davao City Manila DEO Bank Improvement (Steel Sheet Pile) Estero de Maypajo, Sta. Manila City

Page 30 of 80

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region February 2018

18OE0008 - Organizational Outcome 2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/Maintenance of Hexamindz Corporation DPWH-North 312 Flood Mitigation Structures and Drainage Systems 9-Feb-2018 Pearl St., Marifori Heights Subd., Davao City Manila DEO Improvement of Drainage System J. Posadas St., Punta Sta. Ana Manila City 18OE0048 - Organizational Outcome 2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/Maintenance of JASA Builders DPWH-North 313 Flood Mitigation Structures and Drainage Systems - 9-Feb-2018 123 La Perla St., Luciente 1st, Bolinao, Pangasinan Manila DEO Bank Improvement (Steel Sheet Pile) Estero de North Maypajo, Manila City 18OE0032 - Organizational Outcome 2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/Maintenance of JASA Builders DPWH-North 314 Flood Mitigation Structures and Drainage Systems - 9-Feb-2018 123 La Perla St., Luciente 1st, Bolinao, Pangasinan Manila DEO Bank Improvement (Steel Sheet Pile) Estero de Sunog Apog, St Manila City 18OE0026 - Organizational Outcome 2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/Maintenance of Orani Builders Supply DPWH-North 315 Flood Mitigation Structures and Drainage Systems - 9-Feb-2018 Arellano Ave., Mulawin, Orani, Bataan Manila DEO Bank Improvement (Steel Sheet Pile) Estero de la Reina, Sta. Manila City 18OE0019 - Organizational Outcome 2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/Maintenance of Alleyway Construction DPWH-North 316 Flood Mitigation Structures and Drainage Systems- 9-Feb-2018 #72 Bancal Meycauayan, Bulacan Manila DEO Construction/Riverwall at Estero de San Lazaro (Tayuman Sectio Manila City

Page 31 of 80

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region February 2018

17OE0194 Completion/Upgrading/Expansion/Repair/Rehabilitation Alleyway Construction DPWH-North 317 and/or Completion of Velasquez Health Center Manila 9-Feb-2018 #72 Bancal Meycauayan, Bulacan Manila DEO City Tondo, Manila A. Eslabon & Ma Proposed Three (3) Level Residence 318 Blk. 5B Lot 14A Rio Grande St., Brazilla Mts., Brgy. Blk. 5B Lot 14A Rio Grande St., Brazilla Mts., Brgy. 12-Feb-2018 Tunasan, Muntinlupa city Tunasan, Muntinlupa city Lot 7-A Uding Santiago Sr. Compound, Brgy. Alabang, Arnel S. Berganio & Jaycel R. Berganio Muntinlupa City 319 Lot 7-A Uding Santiago Sr. Compound, Brgy. 12-Feb-2018 Lot 7-A Uding Santiago Sr. Compound, Brgy. Alabang, Alabang, Muntinlupa City Muntinlupa City Construction of Four (4) Storey Sixteen (16) Classroom Departemnt of R.M. Mondares Construction 320 School Building Navotas Elementary School 12-Feb-2018 Public Works & Buhisan Road, Brgy. Buhisan. Cebu City Navotas City Highways BF Corporation Design and Build of the Proposed Construction of a New 321 Km. 17 Ortigas Ave. Ext. Brgy. Sto. Domingo, Dormitory Building 12-Feb-2018 Cainta, Rizal Roces St., U.P. Diliman, Quezon City Christopher Brian Co Yu Proposed 6-Storey with Roof Top 322 #35 Libertad St., cor. Esteban St., brgy. Highway #35 Libertad St., cor. Esteban St., brgy. Highway Hills, 12-Feb-2018 Hills, Mandaluyong City Mandaluyong City Sps. Judith H. De Villa/Valentina G. De Villa Proposed Three (3) Storey Residential Building 323 12-Feb-2018 626 Ventura St., Sampaloc, Manila 626 Ventura St., Sampaloc, Manila Ernesto B. Dinlasan Proposed Three (3) Storey Residential Building 324 12-Feb-2018 P. Villanueva St., Pasay City P. Villanueva St., Pasay City Sps. Melinda Joson & Raymundo Joson Proposed Three (3) Storey Residential Building 325 12-Feb-2018 Lot 5 Blk. 2 Rizal Village, Alabang, Muntinlupa city Lot 5 Blk. 2 Rizal Village, Alabang, Muntinlupa city Proposed Construction of Matsuda Japanese Cuisine Lolita Tiu Restaurant 326 GF Unit 12, The Beacon, Don Chino Roces Ave., 12-Feb-2018 GF Unit 12, The Beacon, Don Chino Roces Ave., cor. cor. Arnaiz Ave., Legaspi Village, Makati City Arnaiz Ave., Legaspi Village, Makati City Proposed Construction of Two (2) Storey Erlinda A. Morales 327 Commercial/Residential 12-Feb-2018 126 Private Road, Hulo, Mandaluyong City 126 Private Road, Hulo, Mandaluyong City

Page 32 of 80

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region February 2018

Gemma Cuntada Matsui Proposed Two (2) Storey 6-Units Apartment 328 Lot 1 Blk. 3 Sapphire Cor. Opal Sts., Manuela Lot 1 Blk. 3 Sapphire Cor. Opal Sts., Manuela Homes, 12-Feb-2018 Homes, Las Piñas City Las Piñas City Edward Hao Chua Proposed Two (20 Storey with Basement 329 12-Feb-2018 45 Kennedy cor. Roosevelt Sts., San Juan City 45 Kennedy cor. Roosevelt Sts., San Juan City 4 Doublers Trading & Contractor Improvement of School Managed Canteen at Camp 330 22 Caliraya St., Napocor Village, Tandang Sora, Gen. Aguinaldo High School 12-Feb-2018 Quezon City Brgy. Camp. Aguinaldo, Quezon City 4 Doublers Trading & Contractor Improvement/Replacement of Feeding Center at Camp 331 22 Caliraya St., Napocor Village, Tandang Sora, Gen. Aguinaldo High School (Cgeahs) 12-Feb-2018 Quezon City Brgy. , Quezon city CG General Construction and Development Repair/Renovation of Sambong Tennis Court at Malac Corporation 332 Street 12-Feb-2018 22 Caliraya St., Napocor Village, Tandang Sora, Brgy. Masambong, Quezon city Quezon City CG General Construction and Development Construction of Two (2) Storey Multi-purpose Building Corporation 333 along Greenville Drive, Greenville Subd. 12-Feb-2018 22 Caliraya St., Napocor Village, Tandang Sora, Brgy. Sauyo, Quezon City Quezon City Movable Handwashing Facilities in Various Day Care Centers CG General Construction and Development Brgy. Sauyo (5-Units), Talipapa (6-Units), Baesa (6- Corporation 334 Units) Sangandaan (2-Units), Balon Bato (1-Unit), 12-Feb-2018 22 Caliraya St., Napocor Village, Tandang Sora, Unang Sigaw (1-Unit), Apolonio Samson (4-Units), Quezon City Pasong Tamo (7-Units), Tandang Sora (3-Units), and Culiat (3-Units) Quezon City Contract ID 18OD0032 Rehabilitation of Roads and DPWH Metro IM Construction Corporation Drainage System along Mariano Ponce Road, Brgy. 135 Manila 3rd DEO, 335 No. 47 Kasay-kasay St., Mira-Nila Homes, Tandang 12-Feb-2018 Connectiong EDSA, Caloocan City Marulas, Sora, Quezon City Caloocan City Velenzuela City Contract ID 18OD0060 DPWH Metro IM Construction Corporation Construction/Rehabilitation/Improvement of Road and Manila 3rd DEO, 336 No. 47 Kasay-kasay St., Mira-Nila Homes, Tandang 12-Feb-2018 Drainage System (Phase 1), Barangay 2, Caloocan City Marulas, Sora, Quezon City Caloocan City Velenzuela City

Page 33 of 80

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region February 2018

Contract ID 18OD0082 ConstructionOF Flood Control DPWH Metro IM Construction Corporation Wall/Riprapping Along Banks of Creeks, Brgy. 174, King Manila 3rd DEO, 337 No. 47 Kasay-kasay St., Mira-Nila Homes, Tandang 12-Feb-2018 Solomon, Caloocan City Marulas, Sora, Quezon City Caloocan City Velenzuela City Contract ID 18OD0029 Rehabilitation of Road and DPWH Metro IM Construction Corporation Drainage System along Gen. Tinio Road Brgy. 134 from Manila 3rd DEO, 338 No. 47 Kasay-kasay St., Mira-Nila Homes, Tandang 12-Feb-2018 Tirad Pass Connecting EDSA, Caloocan City Marulas, Sora, Quezon City Caloocan City Velenzuela City DPWH Metro IM Construction Corporation Contract ID 18OD0078 Construction of Drainage Manila 3rd DEO, 339 No. 47 Kasay-kasay St., Mira-Nila Homes, Tandang System along Brgy. 170, Deparo 2, Caloocan city 12-Feb-2018 Marulas, Sora, Quezon City Caloocan City Velenzuela City BDO SM Megamall B Branch-Interior Renovation JBMG Builders, Co., Inc. 340 BDO Corporate Center Ortigas, 12 ADB Ave., Ortigas 12-Feb-2018 1888 Becerra St., Sta. Cruz, Manila Center, Mandaluyong city Vergilio Lopena Proposed Two (2) Storey Four (4) Units Apartment 341 330 Lope K. Santos St., Marikina Heights, Marikina 12-Feb-2018 330 Lope K. Santos St., Marikina Heights, Marikina City City Apolinario Marquez Proposed Two (2) Storey Residential Duplex Structure 342 B131 L3 Liway st., Katarungan Village, Poblacion, B131 L3 Liway st., Katarungan Village, Poblacion, 12-Feb-2018 Muntinlupa City Muntinlupa City Ernesto Nepomuceno Two (2) Storey Residential 343 12-Feb-2018 L4 B22 J.B Roxas Olympia, Makati City L4 B22 J.B Roxas Olympia, Makati City #17-25013- Asphalt Overlay of Summer Drive, ELPA Construction November Drive, Administration Street and Maria Elena 344 12-Feb-2018 92 Selecta Drive, Balintawak, Quezon City Street Brgy. Bahay Toro, Quezon city #17-25010- Improvement of Road and Drainage of ELPA Construction 345 Barcelona Street 12-Feb-2018 92 Selecta Drive, Balintawak, Quezon City Brgy. Bahay Toro, Quezon city Mattro Construction Construction of Stage at Culiat High School 346 6/F Victoria 1 Bldg., 1670 Quezon Ave., Quezon 12-Feb-2018 Brgy. Culiat, Quezon City City

Page 34 of 80

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region February 2018

Rehabilitation of 43-Units LRV Carbody, Flooring and Joratech Corporation Ceiling 347 RM-202 State Condo V, 452 EDSA Gaudalupe, 12-Feb-2018 LRT-1 Depot Airport Road cor. Andrews Ave., Pasay Makati City City, Philippines Organizational Outcome 2: Protect Lives and Properties Three W Builders, Inc./R.A. Ignacio Construction Against Major Floods - Flood Management Program - Department of Corporation Construction/Maintenance of Flood Mitigation Structures 348 12-Feb-2018 Public Works and Unit 415-416 Cedar Executive Building, Timog Ave., and Drainage Systems - Bank Improvement (Steel Highways Sct. Tobias, Quezon City Sheet Pile) Estero de Valencia (Phase 1) Sta.0+ Manila City Organizational Outcome 2: Protect Lives and Properties Three W Builders, Inc./R.A. Ignacio Construction Against Major Floods - Flood Management Program - Department of Corporation Construction/Maintenance of Flood Mitigation Structures 349 12-Feb-2018 Public Works and Unit 415-416 Cedar Executive Building, Timog Ave., and Drainage Systems - Bank Improvement (Steel Highways Sct. Tobias, Quezon City Sheet Pile) Estero de Valencia (Phase II) Sta . Manila City Construction of Multi-purpose Building, Panghulo Department of TM Abad Construction 350 NationalHigh School, Brgy. Panghulo 13-Feb-2018 Public Works and No. 34 Mt. Fuji ST., Filinvest 1, Subd., Batasan Hills Malabon City Highways Department of TM Abad Construction Rehabilitation of Road, Inocencia St., Brgy. Tugatog 351 13-Feb-2018 Public Works and No. 34 Mt. Fuji ST., Filinvest 1, Subd., Batasan Hills Malabon City Highways Rehabilitation of Road, San Marcos Street, Brgy. Department of TM Abad Construction 352 Bagumbayan South 13-Feb-2018 Public Works and No. 34 Mt. Fuji ST., Filinvest 1, Subd., Batasan Hills Navotas City Highways Department of TM Abad Construction Rehabilitation of Road, Javier Street, Brgy. Baritan 353 13-Feb-2018 Public Works and No. 34 Mt. Fuji ST., Filinvest 1, Subd., Batasan Hills Malabon City Highways IM Construction Corporation Rehabilitation/Construction of Dela Paz Elementary Department of 354 No. 47 Kasay-kasay St., Mira-Nila Homes, Tandang School, Brgy. San Agustin 13-Feb-2018 Public Works and Sora, Quezon City Malabon City Highways IM Construction Corporation Department of Rehabilitation of Road, Espiritu Street, Brgy. Panghulo 355 No. 47 Kasay-kasay St., Mira-Nila Homes, Tandang 13-Feb-2018 Public Works and Malabon City Sora, Quezon City Highways

Page 35 of 80

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region February 2018

IM Construction Corporation Rehabilitation of Victoneta Avenue (Phase 2), Brgy. Department of 356 No. 47 Kasay-kasay St., Mira-Nila Homes, Tandang Potrero 13-Feb-2018 Public Works and Sora, Quezon City Malabon City Highways Department of Big C Construction Rehabilitation of Road, Champaca Street, Brgy. Tanza 357 13-Feb-2018 Public Works and #2469 P. Zamora St., Pasay City Navotas City Highways Rehabilitation of Road, Dama De Noche Street, Brgy. Department of Big C Construction 358 Tanza 13-Feb-2018 Public Works and #2469 P. Zamora St., Pasay City Navotas City Highways Asset Preservation- C.B. Tampengco Construction and Supply Rehabilitation/Reconstruction/Upgrading of Damaged Department of 359 Block 3 Lot 15, Medallion Homes, Ibayo, Marilao, Paved Roads-Tertiary Roads R-10 Road-K0007+098 to 13-Feb-2018 Public Works and Bulacan K0007+351, K0007+412 to K0007+424 Highways Navotas City Department of Eight J'S Construction Services Rehabilitation of Road Commercio Street, Brgy. Tugatog 360 13-Feb-2018 Public Works and Brgy. Quintong, San Carlos City, Pangasinan Malabon City Highways Ayana Construction and Trading Department of Construction of Drainage System along Brgy. 149 361 # 15 D. Noriel St.,Brgy.Hulo Sto.Domingo,Nueva 13-Feb-2018 Public Works and Caloocan City Ecija Highways Asset Preservation-Preventive Maintenance-Tertiary Department of Road-P. Aquino (Letre)- K0012+377.20 to Globalcrete Builders, Inc. Public Works and 362 K0012+125.30 to Koo12+158, K0012+464.20 to 13-Feb-2018 620 Mandasig, Candaba, Pampanga Highways K0012+544.20 (DPWH) Malabon City Department of ISH Construction, Inc. Construction of Three (30 storey 9-Classroom School Public Works and 363 #38 Carmira's Drive South Green Park Village, 13-Feb-2018 Malabon City Highways Project 8, Quezon City (DPWH) Department of RCDG Construction Corp. Rehabilitation of Road, Rosas Street, Brgy. Tanza Public Works and 364 A. Ruste Drive, San Jose Road, Zamboagan City, 13-Feb-2018 Navotas City Highways Zamboanga Del Sur (DPWH)

Page 36 of 80

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region February 2018

Department of Studio 26 Construction, Inc. Rehabilitation of Roads, Basilio Street, Brgy. Acacia Public Works and 365 13-Feb-2018 59 West Capitol Drive, Kapitolyo, Pasig city Malabon City Highways (DPWH) Department of Construction of Four (4) Storey Twenty (20) Classroom St. Timothy Construction Corporation Public Works and 366 School Building Santiago Syjuco Memorial School 13-Feb-2018 35 Tatco Compound Jacinto St., Pasig City Highways Malabon City (DPWH) Vicenta Orodio Proposed Two (2) Storey Residential with Roof Deck 367 13-Feb-2018 Lot 2 Blk. 7 Barasoain St., Tejeros, Makati Lot 2 Blk. 7 Barasoain St., Tejeros, Makati Arvie Garcia/ Family Health Beauty Proposed Renovation of Watson 368 13-Feb-2018 GF Villa Bldg., Jupiter Brgy. Bel Air, Makati City GF Villa Bldg., Jupiter Brgy. Bel Air, Makati City Fernando Evalla Gallardo, Jr. Four (4) Storey Residence with Roof Deck 369 13-Feb-2018 A.I. Osmeña St., Brgy. Poblacion, Makati City A.I. Osmeña St., Brgy. Poblacion, Makati City Rehabilitation of Drainage System Including Curb & DPWH- Metro Star William Construction Gutter and Sidewalk along DR. Sixto Antonio Ave., Manila 1st District 370 128 Mabini St., Pinagbakahan, Malolos City, 13-Feb-2018 Pasig City Engineering Bulacan Pasig City Office Adora Herico Proposed Quality Sleep 371 13-Feb-2018 214 Shaw Blvd., cor. M. Yulo St., Mandaluyong City 214 Shaw Blvd., cor. M. Yulo St., Mandaluyong City Retrofitting/Strengthening of Mac Arthur Bridge along DPWH Central Wing-An Construction and Development Corp. 372 Lawton-Sta. Cruz, Manila City 13-Feb-2018 NCR, 2nd St., 410-412 A. Luna St., Cor. Asinas San Juan City Manila City Port Area, Manila R.E. Orlina Construction Corporation Improvement of Road and Drainage of Samat Street 373 13 Emerald St., Northview 1, Batasan Hills, Quezon 13-Feb-2018 Brgy. Holy Spirit, Quezon City City Jerico T. Serevo Proposed Three (3) Doors Two (2) Storey Residential 374 Lot 3 Blk. 4 Don Abdon Homes, Sto. Niño, Marikina House 13-Feb-2018 City Lot 3 Blk. 4 Don Abdon Homes, Sto. Niño, Marikina City Proposed Two (2) Storey Residence with Private Sps. Narciso & Aurora Cruz Swimming Pool 375 Lot 10 Blk. 42 East Drive, Marikina Heights, 13-Feb-2018 Lot 10 Blk. 42 East Drive, Marikina Heights, Marikina Marikina City City

Page 37 of 80

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region February 2018

Precision Foundry of the Philippines/Martin D. Proposed Heat Treatment Warehouse Building 376 Tuazon 13-Feb-2018 Armscor Ave., Brgy. Fortune, Marikina City Armscor Ave., Brgy. Fortune, Marikina City Ramona Serevilla Four (4) Storey Residential Building 377 13-Feb-2018 Talumpong St., Brgy. Malamig, Mandaluyong City Talumpong St., Brgy. Malamig, Mandaluyong City JPM Cavat Construction Demolition of One (1) Storey Building 378 13-Feb-2018 406 Sta. Teresita St., Sampaloc, Manila Dr. A. Santos Ave., Brgy. San Antonio, Parañaque City JPM Cavat Construction Proposed Shell Gasoline Station 379 13-Feb-2018 406 Sta. Teresita St., Sampaloc, Manila Dr. A. Santos Ave., Brgy. San Antonio, Parañaque City JPM Cavat Construction Proposed Shell Gasoline Station 380 13-Feb-2018 406 Sta. Teresita St., Sampaloc, Manila P. Sanchez St., Brgy. 607, Sta. Mesa, Manila Bonifacio Park, Pasig Bonifacio Linear Park Redevelopment (Phase II) Alcalde Jose St., and P. C.S.L. Construction Corporation 381 ConcepcionSt., Brgy. Kapasigan, Pasig City 13-Feb-2018 510 Sandoval Avenue, Palatiw, Pasig City Alcalde Jose St., and P. Concepcion St., Brgy. Kapasigan, Pasig City Ragojos Heritage Construction Corporation CNX EXXA Tower Fit-out Phase 1 382 51 Vicente Ave. North Susana Exec. Village, Old 4F, 7F-10F EXXA Tower, IT Park, C% 13-Feb-2018 Balara Diliman, Quezon City Road, Ugong Norte, Quezon City, Philippines Ragojos Heritage Construction Corporation British Council Manila Office Fit-out 383 51 Vicente Ave. North Susana Exec. Village, Old 13-Feb-2018 Level 7, The Curve Tower BGC, Taguig City Balara Diliman, Quezon City #16O000014 Construction of Administrative Building Tracsom Builders, Inc. (Mandaluyong City College) Including Completion of DPWH-NCR 2nd Unit 202 2nd Floor Skyway Twin Tower 384 Facilities and Ground Improvement 13-Feb-2018 St., Port Area, Condominium#351 Capt. Henry Javier St., Brgy. City College Welfare Compound, Acacia Lane Manila Oranbo, Pasig City Extension, Mandaluyong City Proposed Conversion of Vacant Lot into Parking Area Dastec Construction and Supply 385 Km. 20 East Service Road, South Superhiway, Alabang, 13-Feb-2018 #43 Bohol Mansions, Bohol Ave., Quezon City Muntinlupa City Filipinas Benzon Industrial & Development corp. Proposed Warehouse 386 MCL Cmpd., E. Rodriguez Ave., Tunasan, MCL Cmpd., E. Rodriguez Ave., Tunasan, Muntinlupa 13-Feb-2018 Muntinlupa City City

Page 38 of 80

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region February 2018

Elsie A. Ediong Proposed Four (4) Storey Residential Project 387 13-Feb-2018 Blk. 93 Lot 42 San Francisco St., Rizal, Makati City Blk. 93 Lot 42 San Francisco St., Rizal, Makati City Organizational Outcome 1: Ensure Safe and Reliable National Ropad System-Asset Preservation Program- Three W Builders, Inc. Department of Rehabilitation/Reconstruction/Upgrading of Damaged 388 Unit 415-416 Cedar Executive Building, Timog Ave., 13-Feb-2018 Public Works and PAved Roads-Secondary Roads-R. MAgsaysay Blvd.- Sct. Tobias, Quezon City Highways K0005+0589-189.1, K0005+237.9-K0005+688.0, Manila Manila City Organizational Outcome 2: Protect Lives and Properties Against Major Floods - Flood Management Program - Three W Builders, Inc. Department of Construction/Maintenance of Flood Mitigation Structures 389 Unit 415-416 Cedar Executive Building, Timog Ave., 13-Feb-2018 Public Works and and Drainage Systems - Bank Improvement (Steel Sct. Tobias, Quezon City Highways Sheet Pile) Estero de Sampaloc II, Sta. 0+180.0 Manila City 18OA0017 Construction/Sealing of Riverwall along DPWH-Malabon- M.G. Salazar Construction Corp. Navotas River from Estrella Bridge to City Hall, Navotas Navotas- 390 13-Feb-2018 371 Sto Tomas, Sta Maria, Bulacan City Engineering Navotas City District 17OI0114 Preventive Maintenance of Road: Asphalt R.V. Rieta Treding & Gen. Construction Overlay along Muntinlupa Railroad Station Road- DPWH -Las 391 Advincula Avenue, san Sebastian Kawit, Cavite K0028+269-K0028+890.4 (80mm, with Correction), 13-Feb-2018 Piñas Muntinlupa 4104 Muntinlupa City, Metro manila Muntinlupa City Pacific Summit Const. Group, Inc. DJFMH-Outpatient Department Building 392 2101 One Global Place Bldg. 5th Ave. cor. 25th St., 14-Feb-2018 DOH Compound, Sta. Cruz, Manila BGC Fort Bonifacio, Taguig City Ana Marie Sarmiento Construction of Top Sky Supreme Communication 393 18F Vector 3, Northgate Cyberzone, Filinvest, 18F Vector 3, Northgate Cyberzone, Filinvest, Alabang, 14-Feb-2018 Alabang, Muntinlupa City Muntinlupa City R.A. Nolido Construction Corporation Civil/Structural & Masonry Works Urban Loft Guevent 394 Unit B. Rama Building, 165 Roosevelt Ave., Quezon Project 14-Feb-2018 City J. Fabella St., Mandaluyong City

Page 39 of 80

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region February 2018

17OD0128 Construction,Upgrading, Expansion, Repair, Cardrian Builders Co. Department of Rehabilitation and Completion of Valenzuela City 395 Units 505-508 WEB JET Building, 88 E. Rodriguez 14-Feb-2018 Public Works and Emergency Hospital Jr. Ave., Bagumbayan, Quezon City Highways Valenzuela City Maricel Lopena Agustin Proposed Two (2) Storey residence with Commercial 396 14-Feb-2018 TM Road, Brgy. Buli, Muntinlupa City TM Road, Brgy. Buli, Muntinlupa City Sandra Garganta Uy Proposed Two (2) Storey Residential Four (4) Units 397 #12 Rita St., Sta. Teresita Village, Malanday, #12 Rita St., Sta. Teresita Village, Malanday, Marikina 14-Feb-2018 Marikina City City Cristina Tolentino Proposed Two (2) Storey Residential Apartment 398 Lot A-6 Victor St., Greenview Village, Pamplona 3, Lot A-6 Victor St., Greenview Village, Pamplona 3, Las 14-Feb-2018 Las Piñas City Piñas City Sps. Moshe Brenn M. Peñaverde & Jemellee V. Peñaverde Proposed Three (3) Storey Residential Building 399 14-Feb-2018 109 C. Nuestra Señora Subd., Panghulo, Malabon 109 C. Nuestra Señora Subd., Panghulo, Malabon City City Julieta Morales Proposd Two (2) Storey Residential Apartment with 400 #318 Anne St., Perpetual Pulang Lupa, Las Piñas Deck 14-Feb-2018 City #318 Anne St., Perpetual Pulang Lupa, Las Piñas City Roy Victor Lopez, Jr. Proposed Carwash & Detailing Shop 401 15-Feb-2018 #30 A. De Guzman St., Concepcion I, Marikina City #30 A. De Guzman St., Concepcion I, Marikina City John Mardy Rongavilla Construction of Two (2) Storeys Residential Building 402 Lot 31-B Blk. 48, Morning Glory St., SGH, Putatan, Lot 31-B Blk. 48, Morning Glory St., SGH, Putatan, 15-Feb-2018 Muntinlupa City Muntinlupa City Anastacio C. Jaen Proposed Additional Second Floor Residential 403 15-Feb-2018 Lot 4-B-1 Daang Bakal, Nangka, Marikina City Lot 4-B-1 Daang Bakal, Nangka, Marikina City Jose Marie Santos Three (3) Storey Residential Structure 404 15-Feb-2018 76 Sulu St., Ayala Alabang, Muntinlupa City 76 Sulu St., Ayala Alabang, Muntinlupa City Proposed Four (4) Storey Residential/Commercial with Kishore I. Chugani 405 Roofdeck 15-Feb-2018 9542 Akle St., Brgy. San Antonio, Makati City 9542 Akle St., Brgy. San Antonio, Makati City

Page 40 of 80

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region February 2018

Proposed Three (3) Storey Residential Building with Melinda M. David Roof Deck 406 No. 118 Bayabas St., Blk. 5 Sitio 1, West Rembo, 15-Feb-2018 No. 118 Bayabas St., Blk. 5 Sitio 1, West Rembo, Makati City Makati City Proposed Three (3) Storey Residential Building with Maxima S. Salvador 407 Roof Deck 15-Feb-2018 2998 Kakarong St., Brgy. Sta. Cruz, Makati City 2998 Kakarong St., Brgy. Sta. Cruz, Makati City Proposed Four (4) Storey Residential/Commercial Victor Felix 408 Building 15-Feb-2018 Lot 26 Blk. 68, Catleya St., Brgy. Rizal, Makati city Lot 26 Blk. 68, Catleya St., Brgy. Rizal, Makati City Sheryl B. Almario, Et. Al Proposed Three (3) Storey Residential Building 409 15-Feb-2018 Araro St., Brgy. Palanan, Makati City Araro St., Brgy. Palanan, Makati City Hawkinson Adrian Yao Lato Proposed Construction of Technopop 410 Molito 3 Ground Floor Unit 6, Madrigal Ave., Ayala Molito 3 Ground Floor Unit 6, Madrigal Ave., Ayala 15-Feb-2018 Alabang, Muntinlupa City Alabang, Muntinlupa City Proposed As-Built Plan of G/F and 2/F and Additional Imelda Baruela 411 3/F, 4F & 5F 15-Feb-2018 2962 Balacbac St., Brgy. Pinagkaisahan, Makati city 2962 Balacbac St., Brgy. Pinagkaisahan, Makati city Proposed Three (3) Storey Residential with Penthouse Conrado Sinchioco 412 with Commercial at Ground Floor 15-Feb-2018 Blk. 249 Lot 1, Venus St., Pembo, Makati City Blk. 249 Lot 1, Venus St., Pembo, Makati City Ma. Patricia F. Villareal Construction of Banco De Oro Unibank, Inc. 413 GF EBC Bldg., Paseo De Roxas cor. Gil Puyat Ave., GF EBC Bldg., Paseo De Roxas cor. Gil Puyat Ave., 15-Feb-2018 Brgy. Bel Air, Makati City Brgy. Bel Air, Makati City Proposed Construction of two (2) Storey Duplex Nieva M. Dela Residential 414 L ots 2 & 4 Blk. 35, Sampaguita St., Pilar Village, 15-Feb-2018 L ots 2 & 4 Blk. 35, Sampaguita St., Pilar Village, Las Las Piñas City Piñas City KB Holding Corporation Three (3) Storey Residential Building 415 15-Feb-2018 #2 Davila St., Brgy. La Paz, Makati City #2 Davila St., Brgy. La Paz, Makati City Raymond Tan Demolition of Old Residential House 416 15-Feb-2018 621 Gen. St., Malate, Manila 621 Gen. Malvar St., Malate, Manila Benjamin Dela Cuadra, Jr. Proposed Four (4) Storey Residential Building 417 15-Feb-2018 I. Delos Reyes St., cor. Eloisa St., Sampaloc, Manila I. Delos Reyes St., cor. Eloisa St., Sampaloc, Manila

Page 41 of 80

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region February 2018

Ma. Lourdes Senna Gavanzo Proposed Three (3) Storey Residential Building 418 Lot 38 Blk. 12, Topacio St., San Andres Bukid, Sta. Lot 38 Blk. 12, Topacio St., San Andres Bukid, Sta. Ana, 15-Feb-2018 Ana, Manila Manila Adrian Ang Proposed Three (3) Storey Building 419 15-Feb-2018 1445 Mahatma Gandhi St., Paco, Manila 1445 Mahatma Gandhi St., Paco, Manila Proposed One (1) Storey Residential with Three 93) Ala E. Dela Peña Bedrooms 420 Lot 17 Blk. 27 Soldiers Hills Village, Putatan, 15-Feb-2018 Lot 17 Blk. 27 Soldiers Hills Village, Putatan, Muntinlupa Muntinlupa city city Manuelita M. Castañeda Proposed Two (2) Storey Residence with Attic 421 Lot 5 Blk. 2 Paseo De Magallanes, Magallanes Lot 5 Blk. 2 Paseo De Magallanes, Magallanes Village, 15-Feb-2018 Village, Makati City Makati City Ruben Rafael Proposed Two (2) Storey Residence with Roof Deck 422 Lot 27 Blk. 59 Charlamagne St., BF Resort Village, Lot 27 Blk. 59 Charlamagne St., BF Resort Village, 15-Feb-2018 Talon 2, Las Piñas City Talon 2, Las Piñas City Franchesca Marie Escoto Proposed Additional 2nd & 3rd Floor Residence 423 45 Virginia St., Manotoc Subd., Sto. Niño, Marikina 15-Feb-2018 45 Virginia St., Manotoc Subd., Sto. Niño, Marikina city city Catherine Del Rosario Tablizo Proposed Two (2) Storey Residence with Deck 424 Lot 65 Blk. 3 Apitong St., Monte Vista Subd., I.V.C., Lot 65 Blk. 3 Apitong St., Monte Vista Subd., I.V.C., 15-Feb-2018 Marikina City Marikina City KB Konstrak Bilding Solusyons Proposed Nursery of Indigeneous and Endemic Plants 425 Lot 2A Blk. 3 Villa Gracia Homes, Litex Road, DOST-ASTI Complex, CP Garcia Ave., U.P. Diliman, 15-Feb-2018 Payatas B, Quezon City Quezon City Proposed Two (2) Unit Studio Type & Four 94) Jaime Del Rosario, Jr. Residential Room for Rent Three (3) Storey Building 426 15-Feb-2018 #124 Bantayog St., Concepcion Uno, Marikina City with Deck #124 Bantayog St., Concepcion Uno, Marikina City DPWH-Las Piñas Muntinlupa 17OI0140 Construction of Flood Control Structures RGDG Construction/AARCON Builders (J.V.) District 427 along Laguna De Bay, Brgy. Tunasan, Muntinlupa City 13-Feb-2018 #148 Diamond St., Bernabe Subd. I, Parañaque City Engineering Muntinlupa City Office 2nd St., Port Area, Manila

Page 42 of 80

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region February 2018

18OE0032 - Organizational Outcome 2: Protect Lives and Properties Against Major Floods - Flood DPWH-North Management Program - Construction/Maintenance of JASA Builders Manila District 428 Flood Mitigation Structures and Drainage Systems - 15-Feb-2018 123 La Perla St., Luciente 1st, Bolinao, Pangasinan Engineering Bank Improvement (Steel Sheet Pile) Estero de Sunog Office Apog Sta Brgy. 145, Manila City 18OA0014 - Construction/Sealing/Improvement of DPWH-Malabon- JASA Builders Riverwall along South Pinagkabalian River, Sta. 0+292 Navotas District 429 15-Feb-2018 123 La Perla St., Luciente 1st, Bolinao, Pangasinan to Sta. 0+584 (Phase II) Engineering Brgy. Panghulo, Malabon city Office 18OE0053 - Organizational Outcome 2: Protect Lives and Properties Against Major Floods - Flood DPWH-North Management Program - Construction/Maintenance of JASA Builders Manila District 430 Flood Mitigation Structures and Drainage Systems - 15-Feb-2018 123 La Perla St., Luciente 1st, Bolinao, Pangasinan Engineering Bank Improvement (Steel Sheet Pile) Estero de Sunog Office Apog, St Brgy. 137, Manila City 18OE0048 - Organizational Outcome 2: Protect Lives and Properties Against Major Floods - Flood DPWH-North Management Program - Construction/Maintenance of JASA Builders Manila District 431 Flood Mitigation Structures and Drainage Systems - 15-Feb-2018 123 La Perla St., Luciente 1st, Bolinao, Pangasinan Engineering Bank Improvement (Steel Sheet Pile) Estero de North Office Maypajo, Manila City Palmary Corp./Perry Weinne Lato Proposed Three (30 Storey Residence 432 Lot C Blk. 12-8 Savoy St., Mckinley West Fort Lot C Blk. 12-8 Savoy St., Mckinley West Fort Bonifacio, 15-Feb-2018 Bonifacio, Taguig City Taguig City E.M. Cuerpo Inc./G.G. Uy Construction/Coco Raising of Polder Dike including Slope Protection Works DPWH-Malabon- Technologies Corporation-Joint Venture (Phase 4: Sta. 2+030 to Sta. 2+530, Phase 5 Sta. Navotas District 433 15-Feb-2018 #102 Ligay St. (former Col. Asistio St.) 7th Ave., 5+720 to Sta. 5+200 Phase 6 Contract ID: 17Z00010 Engineering Brgy. 122, Grace Park East, Caloocan City Brgy. Dampalit, Malabon city Office

Page 43 of 80

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region February 2018

DPWH-Quezon 17-OF0093-Construction of DENR, Hostel Retaining Ale-J Construction and Trading City First District 434 Wall, DENR Compound, Visayas Ave., Quezon City 15-Feb-2018 M.H. Del Pilar St., San Rafael, Rodriguez, Rizal Engineering DENR Compound, Visayas Ave., Quezon City Office PHPC Co., Ltd. Inc. Petron New Lube Oil Blending Plant (Package 3) 435 15-Feb-2018 11/F 6788 Oledan Square Ayala Avenue Makati City Manila North Harbor, Tondo, Manila Improvement and Upgrading of Electrical System at Apolonio Samson Senior High School, Camp Emelio Grandeur Construction & Vibrant Realty, Inc. Aguinaldo High School, Fort Aguinaldo Elementary 436 15-Feb-2018 43 Road 7, Project 6, Quezon City School and Flora Ylagan Senior High School Brgy. Apolonio Samson, Camp Aguinaldo, & Pinyahan, Quezon City Contract ID#: 17OI0068 Repair/Maintenance along Philippine Chemsteel Industrial, Inc. Alabang-Zapote Road, K0023+ (-615)-K0023+(-420), 437 2309 Antel Global Corporate Center, Doñ Julia 15-Feb-2018 DPWH-LPMDEO Muntinlupa City Vargas Ave., Ortigas, Pasig City Metro Manila 17OI0135 Preventive Maintenance of Road: Asphalt AKN Construction Corporation Overlay along Daang Maharlika (LZ) K0026+ (-1036)- 438 15-Feb-2018 DPWH-LPMDEO 5085 Filmore St., Palanan, Makati City K0026+(-496) (100MM with Correction), Muntinlupa City Muntinlupa City Improvement of Open Spaces at DepEd Central Office Er Dela Cruz Construction and Supply 439 (Lot No. 2-Hardscape) 15-Feb-2018 Brgy. West Feria, San Felipe, Zambales Pasig City 18OE0009 Organizational Outcome 2: Protect Lives and Properties against Major Floods-Flood Management C.T. Leoncio Construction & Trading Program-Construction/Maintenance of Flood Mitigation DPWH-North 440 15-Feb-2018 171 Guyong Sta. Maria, Bulacan Structures and Drainage Systems-Bank Improvement Manila DEO (Steel Sheet Pile) Estero De Maypajo Sta. 0+239.56 Manila City 18OE0011 Organizational Outcome 2: Protect Lives and Properties against Major Floods-Flood Management Hexamindz Corporation Program-Construction/Maintenance of Flood Mitigation DPWH-North 441 15-Feb-2018 Pearl St., Marifori Heights Subd., Davao City Structures and Drainage Systems-Bank Improvement Manila DEO (Steel Sheet Pile) Estero De Maypajo Sta. 0+305.96 Manila City

Page 44 of 80

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region February 2018

Proposed Landscape Development of Pasig Housing A.M. Mauricio Construction & Builders, Inc. Village II (Westbank) at Westbank Road, Eusebio 442 15-Feb-2018 Parugan Block 3, Brgy. San Jose, Antipolo City Village Brgy. Maybunga, Pasig City A.M. Mauricio Construction & Builders, Inc. Renovation of Manggahan Annex Office 443 15-Feb-2018 Parugan Block 3, Brgy. San Jose, Antipolo City Brgy. Manggahan, Pasig City Asahi Asia Construction Inc. Kidzooona Indoor Playground 444 Unit 606 Prime Land Tower, Market St., Madrigal 4/F Level Waltermart Mall, Bay City, D. Macapagal 15-Feb-2018 Business Park, Alabang, Muntinlupa City Blvd., Reclamation Area, Pasay City Manna Builders, Inc. Jollibe Muntinlupa Bayan 445 #42 Betzaya St., Brgy. San Agustin, Novaliches, 15-Feb-2018 Katihan Road, Muntinlupa City Quezon City 2018 Pipelaying Project along Dubai Main Road, in Port Area, Manila City Under Jefermag Progress & Dev't., Inc. 446 South Manila, Pasay Makati Business Area 15-Feb-2018 113 Angeles Subd., Pasolo, Valenzuela City Dubai Main Road, Baseco Compound, Port Area, Manila City Will Decena and Associates, Inc. The Aster Project (6-Storey Office Building), Mandala 447 3F/4F #73 Rose Building, West Avenue, Quezon Park, Shaw Blvd., Mandaluyong City 15-Feb-2018 City Mandala Park, Shaw Blvd., Mandaluyong City Will Decena and Associates, Inc. Proposed Alabang West Retail (2-Storey) 448 3F/4F #73 Rose Building, West Avenue, Quezon 15-Feb-2018 Road-Alabang West, Las Piñas City City Proposed 30-Storey RC Building with 2 Storey Don Lee Builders, Inc. 449 Penthouse 15-Feb-2018 215 Juan Luna St., Binondo, Manila 354 Juan Luna St., Binondo, Manila Supply and Installation of the 34.5 kV Underground Link Energie Industries, Co., Inc. Power Distribution Line at LA Mesa Treatment Plant 2 450 15-Feb-2018 No. 2 Gen. Atienza St., San Antonio Vill., Pasig City and La Mesa Booster Pumping Station La Mesa Treatment Plant 2, Novaliches, Quezon City Vinnell-Belvoir Corporation Construction of Four (4) Storey Twelve (12) Classrooms Department of 451 2322 DPC Place Building Chino Roces Ave. Ext., Concepcion Integrated School 19-Feb-2018 Public Works and Magallanes, Makati City Concepcion, Marikina City Highways

Page 45 of 80

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region February 2018

Vinnell-Belvoir Corporation Construction of Four (4) Storey sixteen (16) Classrooms Department of 452 2322 DPC Place Building Chino Roces Ave. Ext., Parang High School 19-Feb-2018 Public Works and Magallanes, Makati City Parang, Marikina City Highways Vinnell-Belvoir Corporation Construction of Four (4) Storey Eight (8) Classrooms Department of 453 2322 DPC Place Building Chino Roces Ave. Ext., Parang High School 19-Feb-2018 Public Works and Magallanes, Makati City Parang, Marikina City Highways Dreamworx Builder & Trading, Inc. Rehabilitation of Local Road Gonio Street, Brgy. Department of 454 Room 312 Anita Building, 1300 Quezon Ave., Panghulo, Malabon City 19-Feb-2018 Public Works and Quezon City Gonio St., Brgy. Panghulo, Malabon City Highways Dreamworx Builder & Trading, Inc. Rehabilitation of Local Road Plata St., Brgy. Panghulo, Department of 455 Room 312 Anita Building, 1300 Quezon Ave., Malabon City 19-Feb-2018 Public Works and Quezon City Plata St., Brgy. Panghulo, Malabon City Highways Dreamworx Builder & Trading, Inc. Rehabilitation of Road Jasmin St., Brgy. Tanza, Navotas Department of 456 Room 312 Anita Building, 1300 Quezon Ave., City 19-Feb-2018 Public Works and Quezon City Jasmin St., Brgy. Tanza, Navotas City Highways Contract ID: 18OA0055-Upgrading of Road with Dreamworx Builder & Trading, Inc. Department of Improvement of Drainage Canal at Luna St., Bangkulasi, 457 Room 312 Anita Building, 1300 Quezon Ave., 19-Feb-2018 Public Works and Navotas City Quezon City Highways Luna St., Bangkulasi, Navotas City Department of Contract ID: 18OA0056-Rehabilitation of Road, Yangco- Globalcrete Builders, Inc. Public Works and 458 Verdadero St., Brgy. Navotas West, Navotas City 19-Feb-2018 620 Mandasig, Candaba, Pampanga Highways Brgy. Navotas West, Navotas City (DPWH) Department of Contract ID: 18OA0062-Construction of Multi-purpose Globalcrete Builders, Inc. Public Works and 459 Building, Brgy. Ibababa, Malabon City 19-Feb-2018 620 Mandasig, Candaba, Pampanga Highways Brgy. Ibaba, Malabon City (DPWH) Contract ID#: 18OA0053- Raising/Improvement of Department of Ayana Construction & Trading Drainage System along Jorge St., Brgy. San Rafael Public Works and 460 15 D. Noriel St., Brgy. Hulo, Sto. Domingo, Nueva 19-Feb-2018 Village, Navotas City Highways Ecija Jorge St., Brgy. San Rafael Village, Navotas City (DPWH) Department of Ayana Construction & Trading Contract ID#: 18OA0037- Rehabilitation of Road, Public Works and 461 15 D. Noriel St., Brgy. Hulo, Sto. Domingo, Nueva Benjamin St., Brgy. San Rafael Village, Navotas City 19-Feb-2018 Highways Ecija Brgy. San Rafael Village, Navotas City (DPWH)

Page 46 of 80

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region February 2018

C.L. Morales Construction and Trading Expansion/Construction of TB Dots Serrano Health Department of 462 #35 Tatco Compound, Jacinto St., Brgy. Malinao, Center 19-Feb-2018 Public Works and Pasig City Valenzuela City Highways Contract ID: 18OA0040-Construction of Roadincluding Department of TM Abad Construction Drainage within Tanza Socialized Housing (Phase 2) 463 19-Feb-2018 Public Works and No. 34 Mt. Fuji ST., Filinvest 1, Subd., Batasan Hills Brgy. Tanza, Navotas City Highways Brgy. Tanza, Navotas City Justbuilt Builders Rehabilitation of Local Road Pureza St., Brgy. Tugatog, Department of 464 Unit 19L One Adriatico Place Manila, Adriatico St., Malabon City 19-Feb-2018 Public Works and Manila Pureza St., Brgy. Tugatog, Malabon City Highways Contract ID: 18OA0012-Construction/ Sealing/Improvement of Riverwall Malabon Tullahan Department of Newbig Four J Construction Inc. 465 River (Sta. 1+841 to Sta.2+135), Brgy. Niugan, Mabon 19-Feb-2018 Public Works and # 21 Mustang St., Rancho Estate I, Marikina City City Highways Brgy. Niugan, Malabon City Proposed Teenzone (Two Rooms, Ground Floor R.G. Villanueva Construction 466 RCE School Building at Rizal High School Complex, 19-Feb-2018 36 San Bernardo St., Brgy. San Joaquin, Pasig City Brgy. Caniogan, Pasig City Repair of Dilapidated Comfort Rooms at BCE & SCE R.G. Villanueva Construction 467 Building 19-Feb-2018 36 San Bernardo St., Brgy. San Joaquin, Pasig City Nagpayong Elementary School, Pasig City DPWH-Metro Construction of Four (4) Storey, Twenty (20) Classroom, Henscah Philippines, Incorporated Manila 1st District 468 Bagong Ilog Elementary School, Pasig City 19-Feb-2018 107 Carmay West, Rosales, Pangasinan Engineering Bagong Ilog Elementary School, Pasig City Office DPWH-Metro Express Construction 017OB0451-Completion of Three (3) Storey, Nine (9) Manila 1st District 469 52 Scout Chuatoco Street, Roxas District, Quezon Classroom at Fortune Elementary School, Marikina City 19-Feb-2018 Engineering City Fortune Elementary School, Marikina City Office 017OB0452-Completion of Four (4) Storey, 18- DPWH-Metro Red Matrix Builders & Trading Classroom School Building, H. Bautista Elementary Manila 1st District 470 19-Feb-2018 Red Matrix Builders & Trading School, Marikina City Engineering H. Bautista Elementary School, Marikina City Office

Page 47 of 80

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region February 2018

Proposed Three (3) Storey Residential Building (with Roberto Aserios 471 Mezz.) 19-Feb-2018 107 F. Yuseco St., Tondo, Manila 107 F. Yuseco St., Tondo, Manila Proposed Four (4) Storey with Mezzanine and Roof Arnold Padilla 472 Deck 19-Feb-2018 Fraternal St., Quiapo, Manila Fraternal St., Quiapo, Manila Michael Eric D.S. Apelario Ong Proposed Three (3) Storey Parkintg- Yakult phils. 473 19-Feb-2018 1371 San Marcelino st., Ermita, Manila 1371 San Marcelino st., Ermita, Manila Rochelle K. Baringa Rochelle K. Baringa-Proposed Demolition 474 19-Feb-2018 18662 Dominga St., Pasay City 18662 Dominga St., Pasay City Contract ID No. 17E00105 Contract Name: Extension/Renovation/Improvement of Various Offices J-Marbela Construction and Supply/Jamvaz Builders in DPWH Region IV-B 1.1 Cashier, P.R.O. and DPWH Region and Supply (JV) Administrative Division. 1.2 Conference Room 1 and IV-B EDSA, 475 19-Feb-2018 D6 RBNI Building, Princeton St., Concepcion Chapel, 1.3 Construction Division, 1.4 Financial and Diliman, Quezon Pequeña, Naga City Management Divi City DPWH Region IV-B Compound/EDSA Diliman, Quezon City Improvement Works at Bagong Ilog Elementary School Mega Bricks Builders & Trading Phils., Inc. 476 Bagong Ilog Elementary School, Brgy. Bagong Ilog 19-Feb-2018 232 Dr. Pilapil St., San Miguel, Pasig City Elementary School 18OF0082-Preventive Maintenance of G. Araneta Ave., Newbig Four J Construction Inc. 477 K0011+-1236-K0011+871, K--11+891-K0011+1216 20-Feb-2018 DPWH-QCFIRST # 21 Mustang St., Rancho Estate I, Marikina City Quezon City 18OF0029-Rehab/Improvement of Tullahan River, Brgy. Newbig Four J Construction Inc. 478 Nagkaisang Nayon (Phase IV) Quezon City 20-Feb-2018 DPWH-QCFIRST # 21 Mustang St., Rancho Estate I, Marikina City Quezon City E.L. Torres Construction & Trading, Inc. 18OF0008 Road Improvement of Road 20 Q.C. Phase 479 Lot-15 Blk. 136 Mindanao Ave. Ext., Brgy. Greater V 20-Feb-2018 DPWH-QCFED Lagro, Quezon City Quezon City E.L. Torres Construction & Trading, Inc. 18OF0101 Construction of Slope Protection Tributaries, 480 Lot-15 Blk. 136 Mindanao Ave. Ext., Brgy. Greater Brgy. Nagkaisang Nayon, Quezon city 20-Feb-2018 DPWH-QCFED Lagro, Quezon City Quezon City

Page 48 of 80

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region February 2018

Contract ID# 18OH0008 Const./Maintenance of Flood Mitigation Structures & Drainage System- Construction St. Timothy Construction Corporation 481 of Drainage System (Box Culvert) along Calderon St., 13-Feb-2018 DPWH-SMDEO 35 Tatco Compound Jacinto St., Pasig City from LA Torre St., to Estero De Sta. Clara, Manila City Manila City Contract ID# 18OH0014 St. Timothy Construction Corporation Rehabilitation/Reconstruction/Upgrading of Damaged 482 13-Feb-2018 DPWH-SMDEO 35 Tatco Compound Jacinto St., Pasig City Paved Roads along Romualdez St., Manila City Manila City Contract ID# 18OH0012 St. Timothy Construction Corporation Rehabilitation/Reconstruction/Upgrading of Damaged 483 13-Feb-2018 DPWH-SMDEO 35 Tatco Compound Jacinto St., Pasig City Paved Roads along Road, Manila City Manila City Contract ID# 18OH0018 Proposed Construction of St. Timothy Construction Corporation Retaining Wall-Estero De Sto. Niño (Phase III), Pasay 484 13-Feb-2018 DPWH-SMDEO 35 Tatco Compound Jacinto St., Pasig City City Pasay City Contract ID# 18OH0003 Const./Maintenance of Flood Mitigation Structures & Drainage System-Construction St. Timothy Construction Corporation of Drainage System (Box Culvert) along Medel St., from 485 13-Feb-2018 DPWH-SMDEO 35 Tatco Compound Jacinto St., Pasig City Syquia St. to Estero De Sta. Clara, Manila anila Manila City Simeon Bacaoco Proposed Three (3) Storey Residence 486 Manlunas St., Airmens Village, Villamor Airbase, Manlunas St., Airmens Village, Villamor Airbase, Pasay 20-Feb-2018 Pasay City City Proposed Construction of Two (2) Storey, 8-Units Rochelle R. Floerich Residential Apartment 487 Lots 28 & 30, Blk. 15, San Clemente St., Metrocor- 20-Feb-2018 Lots 28 & 30, Blk. 15, San Clemente St., Metrocor-B, B, Talon 5, Las Piñas City Talon 5, Las Piñas City Cynthia Aguinaldo Four (4) Storey Commercial Residential with Deck 488 319 Jefferson St., Taylo St., Pio Del Pilar, Makati 20-Feb-2018 319 Jefferson St., Taylo St., Pio Del Pilar, Makati City City

Page 49 of 80

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region February 2018

Mia Sarah Casais Proposed Construction of Fyre Rooftop Lounge, Inc. 489 5060 P. Burgos St., cor. L.M. Guerrero St., 5060 P. Burgos St., cor. L.M. Guerrero St., Poblacion, 20-Feb-2018 Poblacion, Makati City Makati City Proposed Construction of Steak Room Concepts, Elbert P. Cuenca 490 Inc./Elbert's Upstairs Bar 20-Feb-2018 25th & 26th Fort Bonifacio Global, Taguig City 25th & 26th Fort Bonifacio Global, Taguig City Proposed Construction of Steak Room Concepts, Elbert P. Cuenca Inc./Elbert's Sandwiches 491 S248, R2, Level, , Rockwell 20-Feb-2018 S248, R2, Level, Power Plant Mall, Rockwell Cednter, Cednter, Makati City Makati City Hajjie B. Gonzales Construction of Cebuana Lhullier 492 2nd Floor Lionas Building, 252 Muntillano St., Brgy. 2nd Floor Lionas Building, 252 Muntillano St., Brgy. 20-Feb-2018 Alabang, Muntinlupa City Alabang, Muntinlupa City Proposed Additional Two (2) Storey and Renovation Dr. Rosela B. Fullante 493 Residential Building 20-Feb-2018 2519-C Tramo St., Brgy. 107, Zone 2, Pasay City 2519-C Tramo St., Brgy. 107, Zone 2, Pasay City Proposed Three (3) Storey Residential with Loft Cerlyn Rimando Aison Bedrooms 494 P. Vhora St., Brgy. Balagtas, Pamplona Uno, Las 20-Feb-2018 P. Vhora St., Brgy. Balagtas, Pamplona Uno, Las Piñas Piñas City City Roberto De Leon Project Chi (PHO 24) 495 20-Feb-2018 G/F/ D.D. Meridian Park Mall, Pasay City G/F/ D.D. Meridian Park Mall, Pasay City Hill Residences Visionproperties Development Corporation SMDC Vacant Lot #23 General Luis St., Sitio Kapre, 496 2nd Floor Lawyers Cooperative Building, 459 20-Feb-2018 Reliance St., Brgy. Nagkaisang Nayon Area 9 District 2, Quezon Ave., Sto. Domingo I, Quezon City Novaliches, Quezon City Contract ID: 018-OF-0028 Contruction of Slope L.R. Tiqui Builders, Inc. Protection of Marikina River Brgy. Batasan Hills, 000 to DPWH-Quezon 497 20-Feb-2018 147 Bagbaguin Sta.Maria, Bulacan Sta. 17+915-Sta. 18+058 City 1st DEO Brgy. Batasan Hills, Quezon City Contract ID: 018OF0054 Construction of Slope L.R. Tiqui Builders, Inc. Protection of Tullahan River, Brgy. Gulod, Quezon City, DPWH-Quezon 498 20-Feb-2018 147 Bagbaguin Sta.Maria, Bulacan Phase IV City 1st DEO Brgy. Gulod, Quezon City

Page 50 of 80

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region February 2018

Contract ID: 018OF0085 Construction of Slope L.R. Tiqui Builders, Inc. Protection in Marikina River Sta. 17+769 to Sta. 17+915, DPWH-Quezon 499 20-Feb-2018 147 Bagbaguin Sta.Maria, Bulacan Brgy. Batasan Hills, Quezon City City 1st DEO Brgy. Batasan Hills, Quezon City DPWH-Metro Contract ID: 018OB0213 Construction of RCBC along L.R. Tiqui Builders, Inc. Manila 1st District 500 Balanti Creek, Brgy. Sta. Elena, Marikina City 20-Feb-2018 147 Bagbaguin Sta.Maria, Bulacan Engineering Brgy. Sta. Elena, Marikina City Office DPWH-Metro Contract ID No.O18OB0003 Excavation/Desilting of Margarita Construction Manila 1st District 501 Nangka River, Brgy. Parang, Marikina City 20-Feb-2018 147 Bagbaguin, Sta. Maria, Bulacan Engineering Brgy. Parang, Marikina City Office DPWH-Metro Contract ID No.O18OB0004 Excavation/Desilting of Margarita Construction Manila 1st District 502 Nangka River, Brgy. Fortune, Marikina City 20-Feb-2018 147 Bagbaguin, Sta. Maria, Bulacan Engineering Brgy. Fortune, Marikina City Office DPWH-Metro Contract ID No.O18OB0002 Excavation/Desilting of Margarita Construction Manila 1st District 503 Nangka River, Brgy. Nangka, Marikina City 20-Feb-2018 147 Bagbaguin, Sta. Maria, Bulacan Engineering Brgy. Nangka, Marikina City Office PGM Construction & Plumbing Services Proposed MSEP Renovation Lot 1 Blk. 11 Greenlane cor. Green Valley St., 504 CSRC Building, National Science Complex, U.P. 20-Feb-2018 Greenview Ph. 3, Sauyo Road, West Fairview, Diliman, Quezon City Quezon City PGM Construction & Plumbing Services Proposed Power Supply of Air-Conditioning Units at Lot 1 Blk. 11 Greenlane cor. Green Valley St., CSWD 505 20-Feb-2018 Greenview Ph. 3, Sauyo Road, West Fairview, College of Social Work and Community Development, Quezon City Magsaysay St., U.P. Diliman, Quezon city Proposed Two (2) Storey, Six (6) Units Residential Helen M. Santos Apartment 506 Lot 6 Blk. 5 Paolo St., Golden Acres, Talon 5, Las 21-Feb-2018 Lot 6 Blk. 5 Paolo St., Golden Acres, Talon 5, Las Piñas Piñas City City Eliza May Santiago Caranto, Elynn Santiago Ampol, Proposed Four (4) Storey Residential Building with Deck 507 Elenita Santiago Villar, Ell-ey Ganol Santiago 21-Feb-2018 Lot 4-A-1 Valentina St., Paco, Manila Lot 4-A-1 Valentina St., Paco, Manila

Page 51 of 80

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region February 2018

Antonio Lim Ang Proposed Three (3) Storey Building 508 27 A. Mabini St., Brgy. Mabini, J.P. Rizal, 27 A. Mabini St., Brgy. Mabini, J.P. Rizal, Mandaluyong 21-Feb-2018 Mandaluyong City City Jasen Ngo Two (2) Storey Residential 509 Lot 15 Blk. 24, Manansala St., North Susana Lot 15 Blk. 24, Manansala St., North Susana Executive 21-Feb-2018 Executive Village, Quezon City Village, Quezon City Aaron Wong Two (2) Storey with Attic 510 Lot 37 Blk. 15, Manansala St., North Susana Lot 37 Blk. 15, Manansala St., North Susana Executive 21-Feb-2018 Executive Village, Quezon City Village, Quezon City 18OE0004 - Organizational Outcome 2: Protect Lives and Properties Against Major Floods - Flood Alpha & Omega Gen. Contractor & Dev't. Corp. Management Program - Construction/Maintenance of DPWH-North 511 F. Manalo St. cor. J. Pueblo St., Bambang, Pasig Flood Mitigation Structures and Drainage Systems - 21-Feb-2018 Manila DEO City Bank Improvement (Steel Sheet Pile) Estero De Cabulusan Sta. Manila City 18OE0003 - Organizational Outcome 2: Protect Lives and Properties Against Major Floods - Flood Alpha & Omega Gen. Contractor & Dev't. Corp. Management Program - Construction/Maintenance of DPWH-North 512 F. Manalo St. cor. J. Pueblo St., Bambang, Pasig Flood Mitigation Structures and Drainage Systems - 21-Feb-2018 Manila DEO City Bank Improvement (Steel Sheet Pile) Estero De Cabulusan Sta. Manila City 18OE0042 - Organizational Outcome 2: Protect Lives and Properties Against Major Floods - Flood Alpha & Omega Gen. Contractor & Dev't. Corp. Management Program - Construction/Maintenance of DPWH-North 513 F. Manalo St. cor. J. Pueblo St., Bambang, Pasig Flood Mitigation Structures and Drainage Systems - 21-Feb-2018 Manila DEO City Bank Improvement (Steel Sheet Pile) Estero De Quiapo, Sta. 0+ Manila City

Page 52 of 80

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region February 2018

18OE0016 Organizational Outcome 2: Protect Lives and Properties against Major Floods-Flood Management C.T. Leoncio Construction & Trading Program-Construction/Maintenance of Flood Mitigation DPWH-North 514 21-Feb-2018 171 Guyong Sta. Maria, Bulacan Structures and Drainage Systems-Bank Improvement Manila DEO (Steel Sheet Pile) Estero De Maypajo, Sta. 0+766.40 Manila City 18OE0001 Organizational Outcome 2: Protect Lives and Properties against Major Floods-Flood Management C.T. Leoncio Construction & Trading Program-Construction/Maintenance of Flood Mitigation DPWH-North 515 21-Feb-2018 171 Guyong Sta. Maria, Bulacan Structures and Drainage Systems-Bank Improvement Manila DEO (Steel Sheet Pile) Estero De Vitas Sta. 0+368.25 to Manila City 18OE0024 Organizational Outcome 2: Protect Lives and Properties against Major Floods-Flood Management C.T. Leoncio Construction & Trading/M.V. Caldo Program-Construction/Maintenance of Flood Mitigation DPWH-North 516 Engineering Construction and Supplies (JV) 21-Feb-2018 Structures and Drainage Systems-Bank Improvement Manila DEO 171 Guyong Sta. Maria, Bulacan (Steel Sheet Pile) Estero De Vitas Sta. 0+469.65 to Manila City 18OE0050 Organizational Outcome 2: Protect Lives and Properties against Major Floods-Flood Management DAHL Construction Corp. Program-Construction/Maintenance of Flood Mitigation DPWH-North 517 21-Feb-2018 #6 Uranus St., Brgy. Bahay Toro, Quezon City Structures and Drainage Systems-Bank Improvement Manila DEO (Steel Sheet Pile) Estero De North Maypajo, Sta. 0= Manila City El-Jake Construction 18-OG-0012, Improvement/Rehabilitation of Drainage DPWH-Quezon 518 Blk. 19 Lot 18 Hosea St, Exodus, Sta. Ana, Taytay, System, Brgy. Valencia, Quezon City 21-Feb-2018 City 2nd DEO Rizal Quezon City 18OE0014 - Organizational Outcome 2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/Maintenance of Hexamindz Corporation DPWH-North 519 Flood Mitigation Structures and Drainage Systems - 21-Feb-2018 Pearl St., Marifori Heights Subd., Davao City Manila DEO Bank Improvement (Steel Sheet Pile) Estero de Maypajo, Sta. Manila City

Page 53 of 80

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region February 2018

18OE0006 - Organizational Outcome 2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/Maintenance of St. Timothy Construction Corporation DPWH-North 520 Flood Mitigation Structures and Drainage Systems - 21-Feb-2018 35 Tatco Compound Jacinto St., Pasig City Manila DEO Bank Improvement (Steel Sheet Pile) Estero de San Miguel 0+5 Manila City 180E0060 Organizational Outcome 2: Protect Lives and Properties against Major Floods-Flood Management Sto. Cristo Construction and Trading Program-Construction/Maintenance of Flood Mitigation DPWH-North 521 21-Feb-2018 Sto. Cristo Hermosa, Bataan Structures and Drainage Systems-Bank Improvement Manila DEO (Steel Sheet Pile) Estero De San Miguel, Sta. 1+963 Manila City 17OE0196, Locally- - Funded Projects Local Conscore Corporation Infrastructure Program Buildings and Other Structures DPWH-North 522 786 J.P. Rizal Street, Concepcion Uno, Marikina Multi-Purpose/Facilities-Renovation of Day Care Center 21-Feb-2018 Manila DEO City District 4 Zone 41, Brgy. 401, Manila City Manila City D.R. Robles Construction/Triches Construction and 17-OG-0139, Improvement of Roads at Brgy. San Isidro Trading (J.V.) DPWH-Quezon 523 Galas, Quezon City 21-Feb-2018 124 Divine Mercy Village, c6 Road, Gb 1, San City 2nd Deo Quezon City Mateo, Rizal 180E0049 Organizational Outcome 2: Protect Lives and Properties against Major Floods-Flood Management FFJJ Construction Program-Construction/Maintenance of Flood Mitigation DPWH-North 524 #12 2nd Batch, Blk. XI, Notre Dame Village, 21-Feb-2018 Structures and Drainage Systems-Bank Improvement Manila DEO Cotabato City, Region 12 L21, Cotabato City (Steel Sheet Pile) Estero De Vitas, Sta. 0+460.00 t Manila City DPWH-District J.H. Pajara Construction Corporation Improvement/Clearing and Desilting of Zapo te River Engineer Office 525 #33 San Rafael cor. San Roque St., Brgy. Kapitolyo, (Phase II) Las Piñas City 21-Feb-2018 Las Piñas- Pasig City Las Piñas City Muntinlupa, NCR

Page 54 of 80

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region February 2018

Organizational Outcome 1: Ensure Safe and Reliable National Road System-Asset Preservation Program- BMDG Construction Department of Rehabilitation/Reconstruction/Upgrading of Damaged 526 Unit 1 Green Manor Townhouse 101 11th Street, 21-Feb-2018 Public Works & Paved Roads-Tertiary Roads-Paltok St., (SO2265LZ) Mariana, New Manila, Quezon city Highways Chainage 008.8-Chainage 258.8 Manila City Organizational Outcome 1: Ensure Safe and Reliable National Road System-Asset Preservation Program- BMDG Construction Department of Rehabilitation/Reconstruction/Upgrading of Damaged 527 Unit 1 Green Manor Townhouse 101 11th Street, 21-Feb-2018 Public Works & Paved Roads-Tertiary Roads-F. Cayco St. (SO2514LZ) Mariana, New Manila, Quezon city Highways Chainage 227.00-Chainage 430.00 Manila City ASEC Development & Const. Corp. San Antonio Residence 528 3rd Floor, Regalia Park Tower Building A, 150 21-Feb-2018 Malugay St., Makati City P.Tuazon Ave., Cubao, Quezon City Datem Incorporated Senior High School Building-UST 529 21-Feb-2018 99 Mindanao Ave., Quezon City España cor. Cayco St., Manila DPWH-Quezon New Arcond Builders, Inc. Construction of Slope Protection Tawid Sapa City First 530 22-Feb-2018 107 Mabilis St., Piñyahan, Diliman, Quezon City Brgy. Kaligayahan, Quezon city Engineering District DPWH-Quezon Dimaguila Construction & Supply, Inc. Improvement of Road, NBAnawe St., Quezon City City Second 531 22-Feb-2018 107 Mabilis St., Pinyahan, Diliman, Quezon City Banawe St., Quezon City Engineering District Astran Marketing & General Contractor, Inc. Construction of Bridge Steel Fence at Odelco 532 B3 L7 Royalle Parthenon Square, 685 Tandang Subdivision 22-Feb-2018 Sora Ave., Quezon City Brgy. Nagkaisang Nayon & San Bartolome, Quezon City DPWH-Quezon New Arcond Builders, Inc. Construction of Slope Protection Tributaries City First 533 22-Feb-2018 107 Mabilis St., Piñyahan, Diliman, Quezon City Brgy. Sta. Monica, Quezon city Engineering District

Page 55 of 80

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region February 2018

DPWH-Quezon Rehabilitation/Improvement of Drainage System of New Arcond Builders, Inc. City First 534 Calamba St., Phase II (Mariveles to Mayon sts.) 22-Feb-2018 107 Mabilis St., Piñyahan, Diliman, Quezon City Engineering Quezon City District DPWH-Quezon Rehabilitation/Improvement of Drainage System of New Arcond Builders, Inc. City First 535 Simoun St., Phase II (Baco to Mayon St.) 22-Feb-2018 107 Mabilis St., Piñyahan, Diliman, Quezon City Engineering Quezon City District CNC Construction & Development Corporation Proposed Six (6) Storey Office & Commercial Building 536 22-Feb-2018 62 D. Tuazon St., Lourdes, Quezon city 8860 Sampaloc St., Makati City Crisalle G. Domingo Proposed Three (3) Storey with Roof Deck 537 2614 Tirso Cruz St., Callejon II, Gagalangin, Tondo, 2614 Tirso Cruz St., Callejon II, Gagalangin, Tondo, 22-Feb-2018 Manila Manila Proposed Three (3) Storey with Deck Residential Romeo E. Dellomas 538 Building 22-Feb-2018 Blk. 13 Lot 20 Pampano St., Longos, Malabon City Blk. 13 Lot 20 Pampano St., Longos, Malabon City Proposed Three (3) Storey Duplex with deck Residential Jose Sandy Sevilla 539 Building 22-Feb-2018 35 Int. F. Nicolas St., Niugan, Malabon city 35 Int. F. Nicolas St., Niugan, Malabon city Cherrylyn Ingilla Proposed Three (3) Storey Residential with Deck 540 Mantunas St., Airmens Village, Villamor Airbase, Mantunas St., Airmens Village, Villamor Airbase, Pasay 22-Feb-2018 Pasay City City Proposed Three (3) Storey Residence with Penthouse Gemmaluz A. Hosana and Deck 541 Lot 5-7 B1 Banner Ave., 4th Estate Subd., San 22-Feb-2018 Lot 5-7 B1 Banner Ave., 4th Estate Subd., San Antonio, Antonio, Parañaque City Parañaque City Ferdinand Lansang Proposed Four (4) Storey Residential with Roof Deck 542 7108 M. Ocampo St., Brgy. Pio Del Pilar, Makati 22-Feb-2018 7108 M. Ocampo St., Brgy. Pio Del Pilar, Makati City City Veronica J. Betzing Proposed Four Storey Residential with Deck 543 22-Feb-2018 No. 4344 Montojo St., Brgy. Sta. Cruz, Makati City No. 4344 Montojo St., Brgy. Sta. Cruz, Makati City Proposed Renovation Circuit Corporadte Center II (9th - Liyi Yan/Huaxin Global Support, Inc.) 544 12th-14th-18th Floor) 22-Feb-2018 Circuit, Brgy. Carmona, Makati City Circuit, Brgy. Carmona, Makati City

Page 56 of 80

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region February 2018

Proposed Renovation of two (2) Storey Commercial Rosanto G. Misa 545 building 22-Feb-2018 Lot 14 Edison St., Makati city Lot 14 Edison St., Makati city Proposed One (1) Storey Six (6) Units with Deck Jaime Que 546 Commercial Stalls 22-Feb-2018 Rivera St., Tinajeros, Malabon City Rivera St., Tinajeros, Malabon city Two (2) Storey Residential Building with Lower Ground Wilcy Phua floor 547 B9 L21 Pine St., Lindenwood Residences, Susana 22-Feb-2018 B9 L21 Pine St., Lindenwood Residences, susana Heights, Putatan, Muntinlupa City Heights, Putatan, Muntinlupa City Ruby Francisco Proposed Two (2) storey with Deck 548 22-Feb-2018 Jacinto St., Brgy. Ibara, Malabon city Jacinto St., Brgy. Ibara, Malabon city Kathlyn Sebastian Two (2) Storey Residential 549 Blk. 61 Lot 8 G. Villazon St., Katarungan Village, Blk. 61 Lot 8 G. Villazon St., Katarungan Village, 22-Feb-2018 Poblacion, Muntinlupa City Poblacion, Muntinlupa City Charrisse Felipe Gallardo/ Edward Silverio Delfin Two (2) Storey Warehouse 550 Lot 4801-B A. Bonifacio St., san Dionisio, Lot 4801-B A. Bonifacio St., san Dionisio, Parañaque 22-Feb-2018 Parañaque City City Proposed Two (2) Storey, Three (3) Units Residential Catalina D. Yap 551 Apartment 22-Feb-2018 #10 Ruby Road, Pilar Village, Las Piñas City #10 Ruby Road, Pilar Village, Las Piñas City Jhanssen V. Castillo Proposed Two (2) Storey, Eight (8) Units Residential 552 22-Feb-2018 Lot 9 Blk. 4 cor. Ballad St., Sta. Cecilla Lot 9 Blk. 4 cor. Ballad St., Sta. Cecilla Maribel Comendador/Chiara's Gelateria Caffe Bar & Chiara's Gelateria 553 Ristorante Corp. 22-Feb-2018 2299.3 Festival Supermall, Alabang, Muntinlupa City 2299.3 Festival Supermall, Alabang, Muntinlupa City Mat P. Tee/Vulbrite Sunrise Bistro, Inc. Fiery Style Southwestern Flaming Grill 554 22-Feb-2018 2299.2 Festival Supermall, Alabang, Muntinlupa City 2299.2 Festival Supermall, Alabang, Muntinlupa City Rizhle Construction & Development Corp. Three (30 Storey Residence 555 22-Feb-2018 718 Garland Compound, Talon 3, Kawit, Kavite Tindig na Mangga, Las Piñas City, Metro manila Proposed Fifteen (15) Storey Mixed Used Building with Ironcon Builders & Development Corporation 556 Roofdeck 22-Feb-2018 471 Gen. Luna St., Intramuros, Manila C.M. Recto Ave., Brgy. 313 Zone 031, Sta. cruz, Manila

Page 57 of 80

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region February 2018

Ironcon Builders & Development Corporation Proposed Eight (8) Storey Office Building 557 22-Feb-2018 471 Gen. Luna St., Intramuros, Manila 900 D. Romualdez St., Paco, Manila Contract ID 18OD0025 Improvement of Flood Control DPWH MM 3rd Power K Construction Supply & Services Wall along Pugad Baboy Creek, Brgy. Gen. T. De Leon, 558 22-Feb-2018 DEO, Marulas, Brgy. San Antonio, Pila, Laguna Valenzuela City Valenzuela City Valenzuela City DPWH Malabon Contract ID 18OA0028 Raising/ Improvement of Navotas DEO, C$ St. Timothy Construction Corporation Drainage System along Escoda St., Brgy. San Rafael Road, 559 22-Feb-2018 35 Tatco Compound Jacinto St., Pasig City Village, navotas Cityy Bagumbayan Brgy. San Rafael, Navotas City North, Navotas City Contract ID 17OH0169 Proposed Alpha & Omega Gen. Contractor & Dev't. Corp. Repair/Renovation/Improvement of Central Office 560 F. Manalo St. cor. J. Pueblo St., Bambang, Pasig 22-Feb-2018 DPWH-SMDEO Motorpool BOE, Bonifacio Drive, Port Area, Manila City Manila City Contract ID 18OH0013 Rehabili tation of rafael Alpha & Omega Gen. Contractor & Dev't. Corp. PalmaElem. School Building/Facilities Pablo Ocampo 561 F. Manalo St. cor. J. Pueblo St., Bambang, Pasig 22-Feb-2018 DPWH-SMDEO St., cor. San Andres Bukid Manila City 5th LD City Manila City Contract ID#: 17OH0115, Local Infrastructure Program KP Gonzales Construction Supply And Trading Buildings and Other Structures Multi-Purpose/ Facilities- 562 Blk 3D L19 Phi Tierra Nevada San Francisco Gen. Construction of Multi-purpose Building (Center) Brgy. 22-Feb-2018 DPWH- LPMDEO Trias Cavite 857 Zone 93, Pandacan, Manila City Manila City Contract ID#: 17OH0117 Locally Funded Projects: Local Infrastructure Program Buildings and Other Structures KP Gonzales Construction Supply And Trading Multi-Purpose/ Facilities-Construction of Multi-purpose 563 Blk 3D L19 Phi Tierra Nevada San Francisco Gen. 22-Feb-2018 DPWH- LPMDEO Building (Center) Paraiso ng Batang Maynila, Manila Trias Cavite City Manila City KP Gonzales Construction Supply And Trading Contract ID#: 17OH0173 Construction (Completion) of 564 Blk 3D L19 Phi Tierra Nevada San Francisco Gen. Multi-purpose Building Sucat Muntinlupa City 22-Feb-2018 DPWH- LPMDEO Trias Cavite Muntinlupa City

Page 58 of 80

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region February 2018

Contract ID#: 17Oi0122-Routine Maintenance of KP Gonzales Construction Supply And Trading National Roads-Repair of Roads Brought Abaout by 565 Blk 3D L19 Phi Tierra Nevada San Francisco Gen. 22-Feb-2018 DPWH- LPMDEO Typhoon "Gorio", Muntinlupa City Trias Cavite Muntinlupa City Reference No. 18-OE0020 Organizational Outcome 2: North Manila Protect Lives and Properties against Major Floods-Flood Engineering Hexamindz Corporation Management Program-Construction/Maintenance of 566 22-Feb-2018 District, 10-A Pearl St. Heights, Davao city Flood Mitigation Structures and Drainage Systems-Bank Nagtahan, Manila Improvement (Steel Sheet Pile) Estero De Sampalo (NCR-DPWH) Tondo, Manila City Reference No. 18-OE0021 Organizational Outcome 2: North Manila Protect Lives and Properties against Major Floods-Flood Engineering Hexamindz Corporation Management Program-Construction/Maintenance of 567 22-Feb-2018 District, Pearl St., Marifori Heights Subd., Davao City Flood Mitigation Structures and Drainage Systems-Bank Nagtahan, Manila Improvement (Steel Sheet Pile) Estero De San Mig (NCR-DPWH) Manila City Specified Contractors & Development, Inc. Siena Showroom and Model Units 568 Suite 305 Xavierville Square Condo, Xavierville 22-Feb-2018 Sumulong Highway, Marikina City Ave., Loyola Heights, Quezon City A.M. Cañete Construction & Trading Contract ID: 18OA0018-Rehabilitation of Alleys in Brgy. Department of 569 St. Anthony Subd., Sto. Niño, San Fernando City, Longos, Malabon City 22-Feb-2018 Public Works & Pampanga Brgy. Longos, Malabon City Highways A.M. Cañete Construction & Trading Contract ID: 18OA0036-Construction of Multi-purpose Department of 570 St. Anthony Subd., Sto. Niño, San Fernando City, Building, Brgy. Longos, Malabon City 22-Feb-2018 Public Works & Pampanga Brgy. Longos, Malabon City Highways A.M. Cañete Construction & Trading Contract ID: 18OA0034-Rehabilitation of Road in Hito Department of 571 St. Anthony Subd., Sto. Niño, San Fernando City, St., Pampano St., Brgy. Longos, Malabon City 22-Feb-2018 Public Works & Pampanga Hito St.-Pampano St., Malabon City Highways A.M. Cañete Construction & Trading Contract ID: 18OA0002-Rehabilitation of Road in Department of 572 St. Anthony Subd., Sto. Niño, San Fernando City, General Lim St., Brgy. San Rafael Village, Navotas City 22-Feb-2018 Public Works & Pampanga Gen. Lim St., Brgy. San Rafael, Navotas City Highways Contract ID#: 17OC0119- Construction of Multi-purpose Arleen D. Beltran Ayana Construction & Trading Building UPS-V Area 7, Brgy. San Isidro, Parañaque District Engineer 573 15 D. Noriel St., Brgy. Hulo, Sto. Domingo, Nueva 22-Feb-2018 City, Metro Manila MMIIDEO- Ecija Parañaque City, Metro, Manila DPWH-NCR

Page 59 of 80

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region February 2018

Contract ID#: 18OC0033- Rehabilitation of South Super Arleen D. Beltran Ayana Construction & Trading Highway from Magallanes towards Gil Puyat Ave., District Engineer 574 15 D. Noriel St., Brgy. Hulo, Sto. Domingo, Nueva 22-Feb-2018 (Intermittent Section) Makati City, Metro Manila MMIIDEO- Ecija Makati City, Metro, Manila DPWH-NCR 18OC0026 Improvement/Sheet Piling along Parañaque Arleen D. Beltran Aarcon Builders River South Phase II, Brgy. san Dionisio, Parañaque District Engineer 575 Unit 206 FSS Bldg., #18 Scout Tuason Castor, 22-Feb-2018 City MMIIDEO- Quezon City Parañaque City, Metro Manila DPWH-NCR 18OC0016 Improvement/Sheet Piling of Parañaque Arleen D. Beltran Aarcon Builders River South East Section, Brgy. San Dionisio, District Engineer 576 Unit 206 FSS Bldg., #18 Scout Tuason Castor, 22-Feb-2018 Parañaque City, Metro Manila MMIIDEO- Quezon City Parañaque City, Metro Manila DPWH-NCR 18OC0022 Improvement/Sheet Piling of Parañaque Arleen D. Beltran Aarcon Builders River, South Phase I, Brgy. San Dionisio, Parañaque District Engineer 577 Unit 206 FSS Bldg., #18 Scout Tuason Castor, 22-Feb-2018 City, Metro Manila MMIIDEO- Quezon City Parañaque City, Metro Manila DPWH-NCR 18OC0025 Construction of Four (4) Storey Four (4) Arleen D. Beltran Grac-ta Builders Classroom School Building at Elementary District Engineer 578 Ilang Ilang St., Saint Mary Subd., Brgy. Mayamot, 22-Feb-2018 School, Parañaque City, Metro Manila MMIIDEO- Antipolo city, Rizal Parañaque City, Metro Manila DPWH-NCR 17OC0114 Construction of Four (4) Storey Twelve (12) Arleen D. Beltran Grac-ta Builders Classroom School Building at Parañaque National High District Engineer 579 Ilang Ilang St., Saint Mary Subd., Brgy. Mayamot, 22-Feb-2018 School Don Galo Annex, Parañaque City, Metro Manila MMIIDEO- Antipolo city, Rizal Parañaque City, Metro Manila DPWH-NCR 17OC0115 Completion of Four (4) Storey Sixteen (16) Arleen D. Beltran Grac-ta Builders Classroom School Building at Don Galo National High District Engineer 580 Ilang Ilang St., Saint Mary Subd., Brgy. Mayamot, 22-Feb-2018 School Annex, Parañaque City, Metro Manila MMIIDEO- Antipolo city, Rizal Parañaque City, Metro Manila DPWH-NCR 18OC0006 Drainage Improvementof Camia Street Arleen D. Beltran Rain Construction Corp. including Laterals, Brgy. Pembo, District II, makati City, District Engineer 581 22-Feb-2018 #5044 Filmore St., Palanan, Makti City Metro Manila MMIIDEO- Makati City, Metro Manila DPWH-NCR

Page 60 of 80

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region February 2018

18OC0005 Drainage Improvementof Dahlia Street Arleen D. Beltran Rain Construction Corp. including Laterals, Brgy. Pembo, District II, Makati City, District Engineer 582 22-Feb-2018 #5044 Filmore St., Palanan, Makti City Metro Manila MMIIDEO- Makati City, Metro Manila DPWH-NCR 18OC0014 Rehabilitation of Road and Drainage Arleen D. Beltran Rain Construction Corp. Improvement along Maya Creek, Brgy. Rizal District II, District Engineer 583 22-Feb-2018 #5044 Filmore St., Palanan, Makti City Makati City, Metro Manila MMIIDEO- Makati City, Metro Manila DPWH-NCR 17OC0062 Cleaning and Improvement of Ayala Creek, Arleen D. Beltran Rain Construction Corp. Ayala Avenue Extension to Makati Avenue, Makati City, District Engineer 584 22-Feb-2018 #5044 Filmore St., Palanan, Makti City Metro Manila MMIIDEO- Makati City, Metro Manila DPWH-NCR NMJ Builder Proposed Dyson Flagship Store 585 Unit 28 1552 Diamante St., cor. Zapiro St., Brgy. EX 221 & 222 2nd Level the Podium, ADB Ave., 22-Feb-2018 802, San Andres Bukid, Manila Ortigas, Mandaluyong City 18OC0004-Improvement/Sheet Piling of Kaybuboy Arleen D. Beltran AKN Construction Corporation Creek (South Side) Brgy. San Dionisio, Parañaque City, District Engineer 586 22-Feb-2018 5085 Filmore St., Palanan, Makati City Metro Manila MMIIDEO- Parañaque City, Metro Manila DPWH-NCR 18OC0032-Improvement of J.P. Rizal Street from Arleen D. Beltran R.E. Orlina Construction Corporation Makati Ave. to EDSA (Intermittent Section) Makati City, District Engineer 587 13 Emerald St., Northview 1, Batasan Hills, Quezon 22-Feb-2018 Metro Manila MMIIDEO- City Makati City, Metro Manila DPWH-NCR 18OC0008 Construction of Four (4) Storey Eight (8) Arleen D. Beltran MPJR Builders Company Classroom School Building at Parañaque Science High District Engineer 588 Unit 515, Cityland Shaw Tower cor. St. Francis St., 22-Feb-2018 School, Parañaque City, Metro Manila MMIIDEO- Mandaluyong City Parañaque City, Metro Manila DPWH-NCR 17OC0122 Construction of Four (4) Storey Twenty Eight (28) Classroom at Parañaque National High Schooll- Arleen D. Beltran Springstar Const. & Supply Main, Parañaque City, Metro Manila (12) Classroom District Engineer 589 22-Feb-2018 #143-C Balagtas St., Brgy. 719, Malate, Manila School Building at Parañaque National High School Don MMIIDEO- Galo Annex, Parañaque City, Metro Manila DPWH-NCR Parañaque City, Metro Manila

Page 61 of 80

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region February 2018

18OC0001-Improvement/Sheet Piling of Kaybuboy Arleen D. Beltran Precious Construction J.V. King Eight Builders & Creek (South Side) Brgy. San Dionisio, Parañaque City, District Engineer 590 Supply 22-Feb-2018 Metro Manila MMIIDEO- San Isidro, Magarao, Camarines Sur Parañaque City DPWH-NCR Metro Manila Flordes Construction and Trading Corp. 18OD0027-Rehabilitation/Reconstruction Mac Arthur Third Engineering 591 3401 Magistrado Arellano St., Bacood, Sta.Mesa, Highway, Valenzuela City 22-Feb-2018 District Marulas, Manila Mac Arthur Highway, Valenzuela City Valenzuela City 18OC0024 Repair & Rehabilitation of Health Center of Arleen D. Beltran- Sanper Ventures, Inc. La Paz Archimedes St. cor. Dumas St., Brgy. La Paz, District Engineer 592 Unit 211 Don Raul Building, Kamuning Road, 22-Feb-2018 Makati City, Metro Manila MMIIIDEO- Quezon City Makati City & Parañaque City DPWH NCR 18OC0009 Rehabilitation/Upgrading and Drainage Arleen D. Beltran- D.C.R. Construction Improvement of Kamagong Street and its Vicinity District Engineer 593 Christmas Day St., Holiday Village, Bayan Luma IV, (Phase II), Brgy. San Antonio, District, Makati City, 22-Feb-2018 MMIIIDEO- Imus City Cavite Metro Manila DPWH NCR Makati City 17OC0118 Completion of Four (4) Storey Sixteen (16) Arleen D. Beltran- RGDG CONSTRUCTION Classroom School Building at Parañaque National High District Engineer 594 22-Feb-2018 148 Diamond St. Bernabe Subd. I, Parañaque City School Baclaran, Parañaque City, Metro Manila MMIIIDEO- Parañaque City DPWH NCR 18OC0007 Rehabilitation/Upgrading and Drainage Arleen D. Beltran- Kyro Builders, Inc. Improvement of Camachile Street and its Vicinity, Brgy. District Engineer 595 14 Ongianco St., Sta. veronica, Guimba, Nueva 22-Feb-2018 San antonio, District I, Makati City, Metro Manila MMIIIDEO- Ecija Makati City, Metro Manila DPWH NCR Archipelago Builders Vista Recto Residences 596 22-Feb-2018 29 North Ave., Quezon City 1896 CM Recto Ave., Quiapo, Manila Rizal Medical Center (RMC) Procurement of New C.C. Barcelona Construction Corporation Infrastructure Projects Design and Build for the 597 22-Feb-2018 No. 2343 Yangfco St., Gagalangin, Tondo, Manila Proposed Cancer Center Facility Rizal Medical Center, Pasig Blvd., Pasig City Double Dragon Tower Megawide Construction Corporation 598 Double Dragon Meridian Park EDSA Extension cor. 22-Feb-2018 N. Domingo St., Brgy. Valencia, Quezon City Diosdado Macapagal Ave., Pasay City

Page 62 of 80

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region February 2018

Ascott Hotel Megawide Construction Corporation 599 Double Dragon Meridian Park Manila, EDSA Extension 22-Feb-2018 N. Domingo St., Brgy. Valencia, Quezon City cor. Diosdado Macapagal Ave., Pasay City Megawide Construction Corporation Golden Bay Tower 600 22-Feb-2018 N. Domingo St., Brgy. Valencia, Quezon City Macapagal Ave., CBP-1, Pasay City Hi Corporate Center (8-Storey Building with 2 EEI Corporation Basement) 601 22-Feb-2018 12 Manggahan St., Bagumbayan, Quezon City Pablo Ocampo Sr. Extension, Brgy. Sta. Cruz, Makati City Mr. Joseph & Mrs. Janna Santamarina Proposed Two (2) Storey Residence 602 Lot 15 Blk. 3 Brtazilla Heights, Tunasan, muntinlupa 23-Feb-2018 Lot 15 Blk. 3 Brtazilla Heights, Tunasan, Muntinlupa City City I.F. Clemente Construction Corporation Construction of Perimeter Rear Fence 603 Door 1 Villa Isabel Townhouse Compound P. Civil Aviation Training Center (CATC) Compound, 23-Feb-2018 Angeles, San Jose Baliuag, Bulacan Merville, Parañaque City Quezon City Second R.A. Pahati Const. & Supply, Inc. 18OG0021 Improvement of Road Samar Street 604 25-Jan-2018 Engineering 283 Payawal Subd., San Lorenzo, Gapan City Quezon City District Office- DPWH Quezon City 18OG0023 Widening of Road and Drainage Second Nueda builders Construction and Supply, Inc. 605 Improvement of Eugenio Lopez Drive 23-Feb-2018 Engineering P. Cruz Brgy. Mangino, Gapan City, Nueva Ecija Quezon City District Office- DPWH Quezon City 18OG0016 Improvement/Rehabilitation of Drainage Second Nueda builders Construction and Supply, Inc. 606 System at 11th Jamboree St. 23-Feb-2018 Engineering P. Cruz Brgy. Mangino, Gapan City, Nueva Ecija Quezon City District Office- DPWH DMCI- Project Developers, Inc. Mulberry Place 607 23-Feb-2018 1321 Apolinario St., Brgy. Bangkal, Makati City Brgy. Bangbang Acacia Estate, Taguig City DMCI- Project Developers, Inc. The Orabella 608 23-Feb-2018 1321 Apolinario St., Brgy. Bangkal, Makati City Lot 6 21st Ave., Brgy. Tagumpay, Cubao, Quezon City

Page 63 of 80

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region February 2018

Marilou Montes Four (4) Storey Apartment with Roofdeck 609 23-Feb-2018 13A Jasmine St., TS Cruz Subd., Las Piñas City 13a Jasmine St., TS Cruz Subd., Las Piñas City 18OE0012-Organizational Outcome 2: Protect Lives and North Manila Properties Against Major Floods - Flood Management St. Timothy Construction Corp. Engineering Program-Construction/Maintenance of Flood Mitigation 610 #35 Tatco Compound Jacinto St., Brgy. Malinao, 16-Jan-2018 District, Nagtahan Structures and Drainage Systems-Bank Improvement Pasig City Manila (NCR- Steel Sheet Pile, Estero de San Miguel Sta. 0+000 DPWH) Manila City 18OE005-Organizational Outcome 2: Protect Lives and North Manila Properties Against Major Floods, Flood Management St. Timothy Construction Corp. Engineering Program, Construction/Maintenance of Flood Mitigation 611 #35 Tatco Compound Jacinto St., Brgy. Malinao, 26-Feb-2018 District, Nagtahan Structures and Drainage Systems: Bank Improvement Pasig City Manila (NCR- (Steel Sheet Pile) Estero de Aviles, Sta. 0+200 t DPWH) Manila City Shamrock Development Corporation/Mr. Tommy K. Proposed Ten (10) Storey Office Building With Deck 612 Tan 26-Feb-2018 382 Shaw Blvd., Pleasant Hills, Mandaluyong City 382 Shaw Blvd., Pleasant Hills, Mandaluyong City Mundo Builders Inc. Megami Boutique 613 1477 Apolinari St. cor. Gen. Mascardo Bangkal, Okada Manila, New Seaside Drive, , 26-Feb-2018 Makati City Barangay Tambo, Parañaque City Antonio Lim Ang Proposed Three (3) Storey Building 614 27 A. Mabini St. Brgy. Mabini, J.p. Rizal, 27 A. Mabini St. Brgy. Mabini, J.p. Rizal, Mandaluyong 26-Feb-2018 Mandaluyong City City Jesus Noel & Maria Gina De Villa Two(2) Storey Residence 615 B5B L32 Plum St., Underwood Residence, Tunasan, B5B L32 Plum St., Underwood Residence, Tunasan, 27-Feb-2018 Muntinlupa City Muntinlupa City Mr. & Mrs. Teofista R. Presnedi Two(2) Storey Residential Building 616 L12 B2 Filinvest Palms Pointe Alabang, Muntinlupa 27-Feb-2018 L12 B2 Filinvest Palms Pointe Alabang, Muntinlupa City City Gilbert Palmero Interior Renovation of SSS Alabang Office 617 22 Norfil Bldg. national Road, Brgy. Putatan, 22 Norfil Bldg. national Road, Brgy. Putatan, Muntinlupa 27-Feb-2018 Muntinlupa City City

Page 64 of 80

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region February 2018

Quezon City 180G0019 Widening of road abd Drainage Improvement Second Nueda Builders Construction and Supply, Inc. 618 of 11th Jamboree St., Quezon City 27-Feb-2018 Engineering P. Cruz Brgy. Mangino, Gapan City, Nueva Ecija Quezon City District Office- DPWH Quezon City 180F0045 Const./Maint. Of Flood Control Structures, R.A. Pahati Const. & Supply, Inc./Nueda Builders Second Tributaries and Drainage System of Brgy. Bagong 619 Construction and Supply, Inc. (JV) 25-Jan-2018 Engineering Silangan (Phase 4) P. Cruz Brgy. Mangino Gapan City, Nueva Ecija District Office- Quezon City DPWH Myung Soo Jang Yan Proposed Two (2) Storey Residence 620 L20 B6 Intramuros St., The Enclave Alabang Brgy. L20 B6 Intramuros St., The Enclave Alabang Brgy. 27-Feb-2018 Almanza Dos, Las Piñas City Almanza Dos, Las Piñas City Sps. Andy/Leanie Paner Proposed Three (3) Storey Residence w/ Mezz. Only 621 27-Feb-2018 821 Cebu St., Sampaloc, Manila 821 Cebu St., Sampaloc, Manila Apolinario Marquez Three (3) Storey Residential Structure w/ Roofdeck 622 #8 G. Araneta and #25 mariano St. Katarungan #8 G. Araneta and #25 mariano St. Katarungan Village, 27-Feb-2018 Village, Brgy. Poblacion, Muntinlupa City Brgy. Poblacion, Muntinlupa City Michael Chua Fit-out PC Work 623 27-Feb-2018 Festival Mall, Brgy. Alabang, Muntinlupa City Festival Mall, Brgy. Alabang, Muntinlupa City I.M. Construction Corp. Contract ID:18-OF0100- Construction of Slope Department of 624 47 Kasay-Kasay St., Mira Nila Subd., Tandang Sora Protection Tributaries, Brgy. Fairview, Quezon City 27-Feb-2018 Public Works and District 2, Quezon City Brgy. Fairview, Quezon City Highways I.M. Construction Corp. Contract ID:18-OF0083- Road Improvement of Banawe Department of 625 47 Kasay-Kasay St., Mira Nila Subd., Tandang Sora St., Quezon City 27-Feb-2018 Public Works and District 2, Quezon City Banawe St., Quezon City Highways I.M. Construction Corp. Contract ID:18-OF0055- Rehab./Improvement of Department of 626 47 Kasay-Kasay St., Mira Nila Subd., Tandang Sora Tullahan River, Brgy. Nova Proper, Quezon City 27-Feb-2018 Public Works and District 2, Quezon City Banawe St., Quezon City Highways I.M. Construction Corp. Contract ID:18-OF0087- Opening of Katipunan Ave. Department of 627 47 Kasay-Kasay St., Mira Nila Subd., Tandang Sora Ext., Quezon City 27-Feb-2018 Public Works and District 2, Quezon City Quezon City Highways

Page 65 of 80

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region February 2018

Contract ID: 18OA0050- Rehabilitation of Road, Camia Department of Hexamindz Corporation 628 St., Brgy. Tanza, Navotas City 27-Feb-2018 Public Works and Pearl St., Marifori Heights Subd., Davao City Navotas City Highways Contract ID: 18OA0013- Construction/Sealing of River Department of Hexamindz Corporation 629 Wall Along Tanza Dike, Navotas City (Phase II) 27-Feb-2018 Public Works and Pearl St., Marifori Heights Subd., Davao City Navotas City Highways Ayana Construction & Trading Contract ID#: 18OA0067- Upgrading of Basketball Department of 630 15 D. Noriel St., Brgy. Hulo, Sto. Domingo, Nueva Court, Block 10 Phase 3, Brgy. Longos, Malabon City 27-Feb-2018 Public Works and Ecija Malabon City Highways Contract ID#: 18OA0068- Construction of Multi-Purpose Ayana Construction & Trading Department of Building, Santiago City Syjuco Elementary School, Brgy. 631 15 D. Noriel St., Brgy. Hulo, Sto. Domingo, Nueva 27-Feb-2018 Public Works and Ibaba, Malabon City Ecija Highways Malabon City Contract ID: 18OA0066- Raising/Improvement of Department of Jagonbuild Construction Corp. Drainage System Along Dalagang Bukid St., Brgy. 632 27-Feb-2018 Public Works and 141 Gov. F. Hall St., Bagbaguin, Sta.Maria, Bulacan NBBS, Navotas City Highways Navotas City Contract ID: 18-OF0109- Construction of Slope Department of Altius Trading and Construction 633 Protection Goodwill Creek, Brgy. Bagbag, Quezon City 27-Feb-2018 Public Works and #35 Alkalde Jose Street, Pasig City Quezon City Highways Upgrading of Earist Quadrangle including Construction Advance Tech Construction & Trading Corp. of Drainage System and Sewerage System thru Design 634 Unit 832 City & Land Mega Plaza Condominium, 27-Feb-2018 And Build ADB Avenue, Ortigas Center, Pasig City Nagtahan, Sampaloc, Manila Kenneth Pundanera Proposed Unioil Gas Station 635 L2A Dr. A. Santos Ave., Brgy. San Antonio, L2A Dr. A. Santos Ave., Brgy. San Antonio, Parañaque 27-Feb-2018 Parañaque City City Ma. Antonia C. Cuneta Four (4) Storey Residential Building 636 28-Feb-2018 2724 Fogueroa St., Pasay City 2724 Fogueroa St., Pasay City Brysar Builders Karangalan Sewer Rehabilitation Works 637 #60 Don Manuel cor. Cadig St., Brgy. Salvacion, 28-Feb-2018 Karangalan Village, Pasig City Quezon City

Page 66 of 80

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region February 2018

18OC0010- Rehabilitation/Upgrading and Drainage Arleen D. Beltran, The Steadfast Builders Improvement of Catmon St., Brgy. San Antonio, District District Engineer, 638 Lot3B B5 Villa Corinna Subdivision, Pasong Tamo, 28-Feb-2018 I, Makati City, Metro Manila NMIIDEO- Quezon City Makati City, Metro Manila DPWH,NCR 18OC0015- Rehabilitation/Upgrading and Drainage Arleen D. Beltran, The Steadfast Builders Improvement of Dita St., Brgy. San Antonio, District I, District Engineer, 639 Lot3B B5 Villa Corinna Subdivision, Pasong Tamo, 28-Feb-2018 Makati City, Metro Manila NMIIDEO- Quezon City Makati City, Metro Manila DPWH,NCR 18OC0048- Rehabilitation/Upgrading and Drainage Arleen D. Beltran, The Steadfast Builders Improvement of Santol St. and its Vicinity, Brgy. San District Engineer, 640 Lot3B B5 Villa Corinna Subdivision, Pasong Tamo, 28-Feb-2018 Antonio, District I, Makati City, Metro Manila NMIIDEO- Quezon City Makati City, Metro Manila DPWH,NCR Arleen D. Beltran 17OC0120- Construction of Flood Gates, Calatagan - District RNN Construction Corp. Creek cor. Chino Roces Avenue, Makati City, Metro 641 28-Feb-2018 Engineer, 5044 Filmore St., Barangay Palanan, Makati City Manila MMIIDEO- Makati City, Metro Manila DPWH-NCR Arleen D. Beltran 18OC0012- Rehabilitation/Upgrading and Drainage - District RNN Construction Corp. Improvement of Balimbing St. including Laterals, Brgy. 642 28-Feb-2018 Engineer, 5044 Filmore St., Barangay Palanan, Makati City Comembo, District II, Makati City, Metro Manila MMIIDEO- Makati City, Metro Manila DPWH-NCR Arleen D. Beltran 18OC0031- Retrofitting of Pasong Tamo Bridge - District ACJ Construction Resources (B01861LZ), Pasong Tamo Extension, Makati City, 643 28-Feb-2018 Engineer, Noter Dame Drive, Poblacion, Pikit, Cotabato Metro Manila MMIIDEO- Makati City, Metro Manila DPWH-NCR Arleen D. Beltran 018OC0029, Rehabilitation/Upgrading of Road including - District El Kapitan Construction Services Drainage of Davilla St., and its Vicinity (Phase 2) District 644 28-Feb-2018 Engineer, 50 Purok 1, San Felipe, San Fernando, Pampanga I, Makati City, Metro Manila MMIIDEO- Makati City, Metro Manila DPWH-NCR

Page 67 of 80

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region February 2018

DPWH-Quezon E.P. De Guzman Consulting Engineer Contractor 18-OF0020-Improvement of Drainage along NLEX City 1st District 645 250 Mc Arthur St., , Brgy. Pasong Service Road, Quezon City 28-Feb-2018 Engineering Tamo, Quezon City Quezon City Office DPWH-Quezon D.R. Robles Construction 18-OF0103-Improvement of Drainage along Mindanao City 1st District 646 Blk. 21 Lot 11 Phase 5 Dizon Estate, San Agustin, Ave. Ext., Quezon City 28-Feb-2018 Engineering San Fernando, Pampanga Quezon City Office DPWH-Quezon D.R. Robles Construction 18-OF0110-Construction of Slope Protection Kaybukot City 1st District 647 Blk. 21 Lot 11 Phase 5 Dizon Estate, San Agustin, Creek, Brgy. Gulod, Quezon City, Phase II 28-Feb-2018 Engineering San Fernando, Pampanga Brgy. Gulod, Quezon City, Phase II Office DPWH-Quezon D.R. Robles Construction 18-OF0036-Rehabilitation/Improvement of Drainage City 1st District 648 Blk. 21 Lot 11 Phase 5 Dizon Estate, San Agustin, System of Biak na Bato, Quezon City 28-Feb-2018 Engineering San Fernando, Pampanga Quezon City Office Aquaterra Konstrukt, Inc./Legacy Construction Corp. DPWH-Quezon (Joint Venture) 18-OF0040-Road Improvement of D. Tuazon Street, City 1st District 649 f-136, 3rd Floor Bldg.. FI Jose Rizal Drive, Smile Quezon City 28-Feb-2018 Engineering City Homes 1, Zabarte Ext., Novaliches, Quezon Quezon City Office City Aquaterra Konstrukt, Inc. DPWH-Quezon 18-OF0096 Rehabilitation/ Improvement of Culiat Creek, f-136, 3rd Floor Bldg.. FI Jose Rizal Drive, Smile City 1st District 650 Quezon City 28-Feb-2018 City Homes 1, Zabarte Ext., Novaliches, Quezon Engineering Quezon City City Office DPWH-Quezon 18-OF0007-Road Improvement of Speaker Perez, Alpiz Construction & Development Corp. City First District 651 Quezon City 28-Feb-2018 131-A, Panay Ave., South Triangle, Quezon City Engineering Speaker Perez, Quezon City Office DPWH-Quezon 18-OF0046-Rehabilitation/Improvement of Drainage Alpiz Construction & Development Corp. City First District 652 System of Apo Street, Quezon City 28-Feb-2018 131-A, Panay Ave., South Triangle, Quezon City Engineering Apo Street, Quezon City Office

Page 68 of 80

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region February 2018

DPWH-Quezon 18-OF0017-Rehabilitation/Improvement of Drainage Alpiz Construction & Development Corp. City First District 653 System of Speaker Perez St., Quezon City, Phase II 28-Feb-2018 131-A, Panay Ave., South Triangle, Quezon City Engineering Speaker Perez, Quezon City Office DPWH-Quezon C.E. Mercado Construction 18-OF0115-Construction of Slope Protection Zabarte City 1st District, 654 57 along National Road, Brgy. Niugan, Angat, Creek, Quezon city 28-Feb-2018 Engineering Bulacan Brgy. Zabarte, Quezon City Office Proposed Four (4) Storey Residence with Mezzanine Ramon Borromeo 655 and Deck 28-Feb-2018 J.B. Roxas St., Brgy. Olympia, Makati City J.B. Roxas St., Brgy. Olympia, Makati City Normando R. De Leon Advertising Billboard 656 Estrera Compound, Magdaong Road, SLEX, Estrera Compound, Magdaong Road, SLEX, Poblacion, 28-Feb-2018 Poblacion, Muntinlupa City Muntinlupa City Cynthia Antonio Proposed Two (2) Storey with Roofdeck with Events 657 Lot 7&8, Sta. Teresita Subd., Malanday, Marikina Place 28-Feb-2018 City Lot 7&8, Sta. Teresita Subd., Malanday, Marikina City Lea Rodil Proposed Two (2) Storey Residential 658 28-Feb-2018 Ipil St., Marikina Heights, marikina City Ipil St., Marikina Heights, marikina City Jerome Go/Alfamart Trading Phil., Inc. Proposed Alfamart One (1) Storey Commercial Building 659 28-Feb-2018 Lot 10 Blk. 2, St. Mary Ave., Tañong, Marikina City Lot 10 Blk. 2, St. Mary Ave., Tañong, Marikina City Karen Roa Proposed Four (4) Storey Residential and Commercial 660 Lot 11 Blk. 53 Cordillera St., Brgy. Malamig, Lot 11 Blk. 53 Cordillera St., Brgy. Malamig, 28-Feb-2018 Mandaluyong City Mandaluyong City Mr. & Mrs. Samuel Lucanas Proposed Three (3) Storey Studio Apartment with Deck 661 64 Dela Paz cor. Guerilla St., Sto. Niño, Marikina 28-Feb-2018 64 Dela Paz cor. Guerilla St., Sto. Niño, Marikina City City Kids Church SDW Realty & Development, Inc. 662 Unit 6007, 6008,6011, 6012 6/F East Wing, Shangri-la 28-Feb-2018 Pioneer cor. Reliance Sts., 1501, Mandaluyong City Plaza Mall, Mandaluyong City Proposed Two (2) Storey Five (5) units Studio Type Naorman T. Miranda & Arnold T. Miranda with Roofdeck 663 2059 cor. Dallas St., M. Reyes St., Pio Del Pilar, 28-Feb-2018 2059 cor. Dallas St., M. Reyes St., Pio Del Pilar, Makati Makati City City

Page 69 of 80

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region February 2018

Proposed Three (3) Storey Residential Building with Charles V. Jose Roofdeck 664 Lot 1-A Blk. 177 Morning Glory St., Brgy. Pembo, 28-Feb-2018 Lot 1-A Blk. 177 Morning Glory St., Brgy. Pembo, Makati Makati City City Framecon Builders Rehabilitation of MPB PCCAES Brgy. Batasan Hills, 665 #625 Diversion Road San Anton San Leonardo, Quezon City 28-Feb-2018 DPWH Nueva Ecija Brgy. Batasan Hills, Quezon City Framecon Builders Rehabilitation/Improvement of Drainage System of Baco 666 #625 Diversion Road San Anton San Leonardo, St., Quezon City 28-Feb-2018 DPWH Nueva Ecija Baco St., Quezon City Framecon Builders Road Improvement of Soliven St., Brgy. 667 #625 Diversion Road San Anton San Leonardo, Commonwealth, Quezon City Phase II 28-Feb-2018 DPWH Nueva Ecija Soliven St., Brgy. Commonwealth, Quezon City Phase II Construction/Maintenance of Flood Control Structures, Framecon Builders Tributaries & Drainage System at Brgy. Payatas, 668 #625 Diversion Road San Anton San Leonardo, 28-Feb-2018 DPWH Quezon City Nueva Ecija Brgy. Payatas, Quezon City Framecon Builders Improvement/Concreting Road Brgy. Philam, Quezon 669 #625 Diversion Road San Anton San Leonardo, City 28-Feb-2018 DPWH Nueva Ecija Brgy. Philam, Quezon City Proposed Renovation of UPMO-FCMO-Satellite Officer for Pasig-Marikina River Channel Improvement Project Framecon Builders & World Bank Funded Control Projects including Office 670 #625 Diversion Road San Anton San Leonardo, 28-Feb-2018 DPWH Equipment and Furnitures and the Proposed Multi- Nueva Ecija Purpose Building, West Bank Road, Manggahan Flood , Rosario, Pasig City DPWH- Quezon Rosand Builders Corporation Rehabilitation/Reconstruction/Upgrading of Batasan City 1st District 671 94 Doña Rosario Ext., Brgy. Novaliches Proper, Road, Quezon City 28-Feb-2018 Engineering Quezon City Quezon City Office DPWH-Quezon Rehabilitation/Improvement of Drainage System of New Arcond Builders, Inc. City First 672 Halcon St. 28-Feb-2018 107 Mabilis St., Piñyahan, Diliman, Quezon City Engineering Quezon City District

Page 70 of 80

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region February 2018

Construction of Slope Protection Marikina River at Vista A.L. Salazar Construction, Inc./Yakal Construction Real Subd., Phase II, Quezon City 673 Joint Venture 28-Feb-2018 Marikina River at Vista Real Subd., Phase II, Quezon Fatima, Ormoc City City Alpiz Construction & Development Corp./MDRIDR Road Improvement of NS Amoranto St., Quezon City 674 Const. & Dev't. Corp. Joint Venture 28-Feb-2018 DPWH Amoranto St., Quezon City 2 Pio Del Pilar St., Sto. Niño, Marikina City I.D.R Construction Preventive Maintenance of Susano Road, Quezon City 675 Katipunan Rd. cor. Pio Del Pilar St., Sto. Niño, 28-Feb-2018 DPWH Susano Road, Quezon City Marikina City Proposed Constrcution of Small Scale Pilot Trial on the I.D.R Construction Use of Marble Dust as Mineral Filler in Hot Mix Asphalt 676 Katipunan Rd. cor. Pio Del Pilar St., Sto. Niño, (HMA) along Kanlaon St., Q.C. K007+602-K006+711 28-Feb-2018 DPWH Marikina City with Exception Kanlaon St., Quezon City I.D.R Construction Road Improvement of West 4th St. and West 6th St., 677 Katipunan Rd. cor. Pio Del Pilar St., Sto. Niño, Q.C. 28-Feb-2018 DPWH Marikina City West 4th St. and West 6th St., Quezon City Proposed Constrcution of Small Scale Pilot Trial on the I.D.R Construction Use of Evotherm as warm Mix Asphalt Additive along 678 Katipunan Rd. cor. Pio Del Pilar St., Sto. Niño, Tandang Sora Ave., K0013+(-230.90)-K0013+671.10 28-Feb-2018 DPWH Marikina City with Exception, Q.C. Tandang Sora Ave., Quezon city Constrcution of Small Scale Pilot Trial on the Use of I.D.R Construction Viatop plus FEP in Asphalt Pavement along 679 Katipunan Rd. cor. Pio Del Pilar St., Sto. Niño, 28-Feb-2018 DPWH Commonwealth Ave., Q.C. Marikina City Commonwealth Ave., Quezon City Golden Success Trading & Construction Road Improvement of Fairlane St., Q.C. 680 #1 Mozzart cor. Beethoven Greenville Subd., Brgy. 28-Feb-2018 DPWH Fairlane St., Quezon City Sauyo, Quezon City Asphalt Overlay with Concreting of Del Monte Ave., LMG Construction/I.D.R Construction 681 Q.C. 28-Feb-2018 DPWH Sto. Domingo, Nueva Ecija Del Monte, Quezon City

Page 71 of 80

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region February 2018

Construction/Maintenance of Flood Control Structures, RCDG Construction Corporation/Prismodial Tributaries and Drainage System Brgy. Holy Spirit, Q.C. 682 Construction Corporation, Joint Venture 28-Feb-2018 DPWH (Phase 3) 4 Republic Ave., Brgy. Holy Spirit, D@, Quezon City Holy Spirit, Quezon city Precious Construction Preventive Maintenance of La Mesa Dam 683 28-Feb-2018 DPWH #136 Zone San Isidro Magarao, camarines Sur La Mesa Dam, Quezon City Rehab./Improvement of Tullahan River, North Fairview, Precious Construction 684 Quezon City 28-Feb-2018 DPWH #136 Zone San Isidro Magarao, camarines Sur Tullahgan River, North FAirview3, Quezon City Triches Construction and Trading Road Improvement of Don Victorino St., Brgy. Holy 685 Lot 1A Blk. 8 Amethyst St., Goldriverville Subd., Spirit, Quezon City 28-Feb-2018 DPWH Burgos, Rodriguez, Rizal Quezon City Triches Construction and Trading Construction of Slope Protection Asyenda Balai, Q.C. 686 Lot 1A Blk. 8 Amethyst St., Goldriverville Subd., 28-Feb-2018 DPWH Balai, Quezon City Burgos, Rodriguez, Rizal Aga & Sons Construction Development Corporation Proposed Seven (7) Storey BNC Building Project 687 L 11-A-7 M. Eusebio Ave., Brgy. San Miguel, Pasig South Superhighway, ACSIE Ave., LA Huerta, 28-Feb-2018 City Parañaque City Design and Build Phase I Construction of the Four (4) Alexi Lousse Construction and General Storey Shoe and Leathercraft Building 688 Merchandise 28-Feb-2018 #2 Mayor Juan Chanyungco St., Sta. Elena, marikina Brgy. Bayabas, Dipaculao, Aurora City Full-Blast Construction of the R-1 Enhancement Project FF Cruz & Co., Inc. 689 PEATC Compound, Km. 11, CAVITEX, Aguinaldo Blvd., 28-Feb-2018 800 EDSA, Quezon City Parañaque City Nadenn Eve O. Guido Construction of One (1) Storey-Bakery Arbee Bakeshop 690 Lot 1 Blk. 5 Florante cor. Laura Sts., Pamplona Uno, Lot 1 Blk. 5 Florante cor. Laura Sts., Pamplona Uno, 28-Feb-2018 Las Piñas City Las Piñas City Proposed Renovation of Three (3) Storey Residence Martin F. Fulge with Deck 691 Blk. 189 Lot 4 Las Maria St., Zone 8, Pembo, Makati 28-Feb-2018 Blk. 189 Lot 4 Las Maria St., Zone 8, Pembo, Makati City City

Page 72 of 80

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region February 2018

DPWH- Quezon I.M. Construction Corp. 18-OF0100- Construction of Slop e Protection City 1st District 692 47 Kasay-Kasay St., Mira Nila Subd., Tandang Sora Tributaries, Brgy. Fairview, Quezon City 28-Feb-2018 Engineering District 2, Quezon City Brgy. Fairview, Quezon City Office DPWH- Quezon I.M. Construction Corp. 18-OF0081- Rehabilitation/Improvement of Drainage City 1st District 693 47 Kasay-Kasay St., Mira Nila Subd., Tandang Sora System of Mauban Street, Quezon City 28-Feb-2018 Engineering District 2, Quezon City Brgy. Mauban, Quezon City Office Shirvan Cabales Opina Proposed Three (3) Storey Residence 694 Lot 34-B Blk. 5, Guyabano St., Doña Josefa Village, Lot 34-B Blk. 5, Guyabano St., Doña Josefa Village, 28-Feb-2018 Almanza Uno, Las Piñas City Almanza Uno, Las Piñas City 18-OF0097- Rehabilitation/Improvement of Flood DPWH-Quezon E.L. Anolin Construction Control, Structure of Flood Control Structures and City 1st District 695 28-Feb-2018 #14 B Mariano St., Brgy. Sta. Ana, San Mateo, Rizal Tributaries at Brgy. Batasan Hills Phase 3, Quezon City Engineering Batasan Hills, Quezon City Office DPWH-Quezon 18-OF0070- Road Improvement of Shorthorn Street, E.L. Anolin Construction City 1st District 696 Brgy. Bahay Toro, Quezon City 28-Feb-2018 #14 B Mariano St., Brgy. Sta. Ana, San Mateo, Rizal Engineering Brgy. Baghay Toro, Quezon City Office DPWH-Quezon LMG Construction/E.L. Anolin Construction (Joint 18-OF0041- Road Improvement of Mayon Street, City 1st District 697 Venture) Quezon City 28-Feb-2018 Engineering #14 B Mariano St., Brgy. Sta. Ana, San Mateo, Rizal Mayon Street, Quezon City Office Philippine Chemsteel Industries, Inc. Contract ID#: 17OH0101 Proposed Asphalt Overlay at 698 2309 Antel Global Corporate Center, Doñ Julia Compound, CCP Complex, Pasay City 28-Feb-2018 DPWH-LPMDEO Vargas Ave., Ortigas, Pasig City Pasay City Contract ID: 18OH0019 Proposed Improvement of Socor Construction Corporation Drainage along A. Linao St., San Gregorio St., to P. Gil 699 Velasquez St., Bangiad Floodway Brgy. San Juan 28-Feb-2018 DPWH-SMDEO St., Manila City Taytay, Rizal Manila City Contract ID: 18OH0024 Asset Preservation Program- Socor Construction Corporation Preventive Maintenance-Tertiary Road along Sta. Lucia 700 Velasquez St., Bangiad Floodway Brgy. San Juan 28-Feb-2018 DPWH-SMDEO (SQ2738LZ) Chainage o-Chainage 698, Manila City Taytay, Rizal Manila City

Page 73 of 80

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region February 2018

Northern Builders #18OH0020 Rehabilitation of Seawall at the Back of DPWH-SMDEO, 701 Km. 131 C.P. Romulo Highway, Baras-Baras, Tarlac Diokno Bouleverd (Phase VII) Pasay City 28-Feb-2018 Port Area, Manila City Pasay City #18OH0086 Construction of Slope Pro tection in DPWH-Quezon Northern Builders Marikina River Sta. 17+617 to Sta. 17+769, Brgy. City 1st District 702 Km. 131 C.P. Romulo Highway, Baras-Baras, Tarlac 28-Feb-2018 Batasan Hills, Quezon city Engineering City Brgy. Batasan Hills, Quezon City Office #18OH0088 Preventive Maintenance of Fairview Ave., SO5451LZ (K0022+931 to K0023+250), SO5455LZ DPWH-Quezon Northern Builders (K0024+9-881) to K0024+ (-836), K0024+638 to City 1st District 703 Km. 131 C.P. Romulo Highway, Baras-Baras, Tarlac K0025+203) SO5456LZ (K0023+076 to K0023+500, 28-Feb-2018 Engineering City K0024+(-907) to K0024+(-323), SO5468LZ (Chainage 0 Office to Chainage 025), S Quezon city #18OH0089 Preventive Maintenance of Regalado DPWH-Quezon Northern Builders Avenue (North) SO5457LZ (K0025+389 to City 1st District 704 Km. 131 C.P. Romulo Highway, Baras-Baras, Tarlac 28-Feb-2018 K0025+1012) Quezon City Engineering City Quezon city Office #18O00001 Proposed Widening of Fort Bonifacio- Northern Builders DPWH-NCR 2nd Nichols Field Road (Lawton Ave.) Project Phase II, Fort 705 Km. 131 C.P. Romulo Highway, Baras-Baras, Tarlac 28-Feb-2018 St.,Port Area, Bonifacio, Taguig City City Manila Taguig City 18-OE0092- Organizational Outcome 1: Ensure Safe DPWH-North and Reliable National Road System-Asset Preservation Manila C & F Construction and Development Corp. Program-Preventive Maintenance-Tertiary Roads-H. Engineering 706 28-Feb-2018 #34 Inaman St., Masambong, Quezon City Lopez St.-K006+(-528) - K006+215.9, Tondo Manila District, City Nagtahan, Sta. H. Lopez St., Tondo, Manila City Mesa, Manila DPWH-QC Second 18-OG0018- Concreting of Road and Drainage C & F Construction and Development Corp. Engineering 707 Improvement of Mother Ignacia (Phase 4), Quezon City 28-Feb-2018 #34 Inaman St., Masambong, Quezon City District #790 Mother Ignacia (Phase 4) Quezon City EDSA, Diliman, Quezon City

Page 74 of 80

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region February 2018

DPWH-QC Second 18-OG0033- Improvement/Rehabilitation of Drainage C & F Construction and Development Corp. Engineering 708 Sytem at Sct. Chuatoco St., Quezon City 28-Feb-2018 #34 Inaman St., Masambong, Quezon City District #790 Sct. Chuatoco St., Quezon City EDSA, Diliman, Quezon City DPWH-QC Second 18-OG0034- Improvement/Rehabilitation of Drainage C & F Construction and Development Corp. Engineering 709 Sytem at Sct. Chuatoco St., Quezon City 28-Feb-2018 #34 Inaman St., Masambong, Quezon City District #790 San Juan River, Quezon city EDSA, Diliman, Quezon City DPWH-QC First 18-OF0012- Improvement of Sta. Catalina St., and San Engineering C & F Construction and Development Corp. Simon St., Brgy. Holy Spirit, Quezon City District, Sta. 710 28-Feb-2018 #34 Inaman St., Masambong, Quezon City Sta. Catalina St., and San Simon St., Brgy. Holy Spirit, Catalian St., Quezon City Brgy. Holy Spirit, Quezon City DPWH-QC 18-OG0102- Construction of Road Network including Second C & F Construction and Development Corp. Drainage System and Sidewalk University of the Engineering 711 28-Feb-2018 #34 Inaman St., Masambong, Quezon City Philippines, Diliman, Quezon City District #790 University of the Philippines, Diliman, Quezon City EDSA, Diliman, Quezon City DPWH-QC First Engineering 18-OF0030- Upgrading of Republic Avenue, Brgy. Holy C & F Construction and Development Corp. District, Sta. 712 Spirit, Quezon City 28-Feb-2018 #34 Inaman St., Masambong, Quezon City Catalian St., Republic Avenue, Brgy. Holy Spirit, Quezon City Brgy. Holy Spirit, Quezon City

Page 75 of 80

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region February 2018

DPWH-QC First 18-OF0079- Road Improvement of Sta Monica St., and Engineering C & F Construction and Development Corp. Sto. Niño St., Brgy. Holy Spirit, Quezon City District, Sta. 713 28-Feb-2018 #34 Inaman St., Masambong, Quezon City Sta Monica St., and Sto. Niño St., Brgy. Holy Spirit, Catalian St., Quezon City Brgy. Holy Spirit, Quezon City 18-OE0074- Organizational Outcome 1: Ensure Safe DPWH-North and Reliable National Road System-Asset Preservation Manila C & F Construction and Development Corp. Program-Preventive Maintenance-Tertiary Roads-Solis Engineering 714 28-Feb-2018 #34 Inaman St., Masambong, Quezon City (SO2360LZ) chainage 725.0-Chainage 887.0, Tondo, District, Manila City Nagtahan, Sta. Solis, Tondo, Manila City Mesa, Manila 18-OE0088- Organizational Outcome 1: Ensure Safe DPWH-North and Reliable National Road System-Asset Preservation Manila C & F Construction and Development Corp. Program-Preventive Maintenance-Tertiary Roads-J. Engineering 715 28-Feb-2018 #34 Inaman St., Masambong, Quezon City Rizal Avenue, -K0006+651.80-K006+509.10- District, K0006+337.73-K006+672.00 Tondo, Manila City Nagtahan, Sta. J. rizal Ave., Tondo, Manila City Mesa, Manila 18-OE0094- Organizational Outcome 1: Ensure Safe and Reliable National Road System-Asset Preservation Program-Rehabilitation/Reconstruction/Upgrading of Eight J'S Construction Services DPWH-North 716 damaged Paved Roads-Tertiary Roads-J. Nepomuceno 28-Feb-2018 Brgy. Quintong, San Carlos City, Pangasinan Manila DEO St. (SO2561LZ) Chainage 0 to Chainage 180 Manila City Manila City 18-OE0096- Organizational Outcome 1: Ensure Safe and Reliable National Road System-Asset Preservation Eight J'S Construction Services Program-Rehabilitation/Reconstruction/Upgrading of DPWH-North 717 28-Feb-2018 Brgy. Quintong, San Carlos City, Pangasinan damaged Paved Roads-Tertiary Roads-Q. Paredes St., Manila DEO (SO2302LZ) Chainage 0 to Chainage 308, Sta. Cruz, M Manila City

Page 76 of 80

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region February 2018

18-OE0086- Organizational Outcome 1: Ensure Safe and Reliable National Road System-Asset Preservation Eight J'S Construction Services Program-Rehabilitation/Reconstruction/Upgrading of DPWH-North 718 28-Feb-2018 Brgy. Quintong, San Carlos City, Pangasinan damaged Paved Roads-Secondary Roads-Dasmariñas Manila DEO St., (SO2404LZ) Chainage 088.20-Chainage 499.00 Binondo Manila 18OE0104 - Organizational Outcome 2: Protect Lives and Properties Against Major Floods - Flood Victoria Development and Construction Supply Management Program - Construction/Maintenance of DPWH-North 719 Corp. Flood Mitigation Structures and Drainage System- 28-Feb-2018 Manila DEO 103 Lopez Jaena St., Tacloban City Construction of Valencia Pumping Station Retarding Basin, Manil Manila City 18OE0105 - Organizational Outcome 2: Protect Lives and Properties Against Major Floods - Flood Victoria Development and Construction Supply Management Program - Construction/Maintenance of DPWH-North 720 Corp. Flood Mitigation Structures and Drainage System- 28-Feb-2018 Manila DEO 103 Lopez Jaena St., Tacloban City Construction of Valencia Pumping Station Retarding Basin, Manil Manila City 18OE0107 - Organizational Outcome 2: Protect Lives and Properties Against Major Floods - Flood Victoria Development and Construction Supply Management Program - Construction/Maintenance of DPWH-North 721 Corp. Flood Mitigation Structures and Drainage System- 28-Feb-2018 Manila DEO 103 Lopez Jaena St., Tacloban City Construction of Valencia Pumping Station Retarding Basin, Manil Manila City 18OE0106 - Organizational Outcome 2: Protect Lives and Properties Against Major Floods - Flood Victoria Development and Construction Supply Management Program - Construction/Maintenance of DPWH-North 722 Corp./G.F. Fabian Construction (JV) Flood Mitigation Structures and Drainage System- 28-Feb-2018 Manila DEO 103 Lopez Jaena St., Tacloban City Construction of Valencia Pumping Station Retarding Basin, Manil Manila City

Page 77 of 80

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region February 2018

17OE0180 Construction of Two (2) Storey Six (6) Sto. Cristo Construction and Trading Classroom School Building (Revised 3-24-17), Emilio DPWH-North 723 28-Feb-2018 Sto. Cristo Hermosa, Bataan Jacinto Elementary School, Manila City Manila DEO Manila City 17OE0176 Construction of Four (4) Storey Twenty (20) Hexamindz Corporation Classroom School Building, A.V. Hernandez Elementary DPWH-North 724 28-Feb-2018 Pearl St., Marifori Heights Subd., Davao City School, Tondo, Manila City Manila DEO Manila City 17OE0174 Construction of Four (4) Storey Twenty (20) Hexamindz Corporation Classroom School Building, (Revised 3-24-17) Timoteo DPWH-North 725 28-Feb-2018 Pearl St., Marifori Heights Subd., Davao City Paez Integrated School, Tondo, Manila City Manila DEO Manila City 18OE0038- Organizational Outcome 2: Protect Lives and Properties Against Major Floods - Flood Aarcon Builders Management Program - Construction/Maintenance of DPWH-North 726 Unit 206 FSS Bldg., #18 Scout Tuason Castor, Flood Mitigation Structures and Drainage System-Bank 28-Feb-2018 Manila DEO Quezon City Improvement (Steel Sheet Pile) Estero De Valencia, Sta. 1+0 Manila City 18OE0047- Organizational Outcome 2: Protect Lives and Properties Against Major Floods - Flood Aarcon Builders Management Program - Construction/Maintenance of DPWH-North 727 Unit 206 FSS Bldg., #18 Scout Tuason Castor, Flood Mitigation Structures and Drainage System-Bank 28-Feb-2018 Manila DEO Quezon City Improvement (Steel Sheet Pile) Estero De Calubcob, Sta. 0+0 Manila City 18OE0028- Organizational Outcome 2: Protect Lives and Properties Against Major Floods - Flood Aarcon Builders Management Program - Construction/Maintenance of DPWH-North 728 Unit 206 FSS Bldg., #18 Scout Tuason Castor, Flood Mitigation Structures and Drainage System-Bank 28-Feb-2018 Manila DEO Quezon City Improvement (Steel Sheet Pile) Estero De Calubcob, Sta. 0+1 Manila City

Page 78 of 80

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region February 2018

Contract ID 18OD0092- Improvement of Roads and Summit Meridien Const. Group., Inc. DPWH MM 3rd Drainage System along A. Francisco St. and De 729 12 Mindanao Ave., PH 4 Britanny Subd., Sta. 28-Feb-2018 DEO, Marulas, Guzman St., Brgy. Paso De Blas, valenzuela City Monica, Quezon City Valenzuela City Paso De Blas, Valenzuela City Contract ID 18OD0089- Improvement of Roads and Summit Meridien Const. Group., Inc. DPWH MM 3rd Drainage System along Ilang-Ilang St., Brgy. Karuhatan, 730 12 Mindanao Ave., PH 4 Britanny Subd., Sta. 28-Feb-2018 DEO, Marulas, Valenzuela City Monica, Quezon City Valenzuela City Karuhatan, Valenzuela City Contract ID 18OD0084- Construction of Flood Control Summit Meridien Const. Group., Inc. DPWH MM 3rd Wall/Riprapping along the Bank of Creeks in Brgy. 176, 731 12 Mindanao Ave., PH 4 Britanny Subd., Sta. 28-Feb-2018 DEO, Marulas, Phase 3, Package III, Caloocan City Monica, Quezon City Valenzuela City Caloocan City Contract ID 18OD0062- Improvement of Roads and DPWH MM 3rd Diadema Enterprises Drainage along F. Alarcon St., Brgy. Maysan, 732 28-Feb-2018 DEO, Marulas, 140 Matulungin St., Diliman, Quezon City Valenzuela City Valenzuela City Maysan, Valenzuela City Contract ID 18OD0120- Upgrading of Sapang Bakaw DPWH MM 3rd Diadema Enterprises 733 St., Valenzuela City 28-Feb-2018 DEO, Marulas, 140 Matulungin St., Diliman, Quezon City Valenzuela City Valenzuela City Contract ID 18OD0067- Improvement of Drainage DPWH MM 3rd Diadema Enterprises System along Happy Site (Phase II), Brgy. Marulas, 734 28-Feb-2018 DEO, Marulas, 140 Matulungin St., Diliman, Quezon City Valenzuela City Valenzuela City Marulas, Valenzuela City Contract ID 18OD0065- Rehabilitation of Road along DPWH MM 3rd Diadema Enterprises Degula St. and Fe St. Don Pedro Subdivision, Brgy. 735 28-Feb-2018 DEO, Marulas, 140 Matulungin St., Diliman, Quezon City Marulas, Valenzuela Valenzuela City Marulas, Valenzuela City Contract ID 18OD0119- Improvement of Roads and Drainage System Sapang Bakaw St., Brgy. Lawang DPWH MM 3rd Diadema Enterprises Bato (From Canumay-Bignay Road to East Service 736 28-Feb-2018 DEO, Marulas, 140 Matulungin St., Diliman, Quezon City Road, Brgy. Canumay, East to T. Santiago St.) Brgy. Valenzuela City Lingunan, Valenzuela City Valenzuela City

Page 79 of 80

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region February 2018

17OB0435 Construction of Four (4) Storey, Eight (8) Henscha Phils., Inc. Classroom, Ricardo P. Cruz Sr. Elementary School., 737 28-Feb-2018 DPWH 107 Carmay West, Rosales, Pangasinan Taguig City 17OB0448 Construction of Four (4) Storey, Twelve (12) Henscha Phils., Inc. 738 Classroom, Ciriaco P. Tinga, Elementary School 28-Feb-2018 DPWH 107 Carmay West, Rosales, Pangasinan Taguig City 17OB0463 Construction of Four (4) Storey, Twenty Four Henscha Phils., Inc. (24) Classroom, Cipriano P. Sta. Teresa Elementary 739 28-Feb-2018 DPWH 107 Carmay West, Rosales, Pangasinan School Taguig City 17OB0437 Construction of Four (4) Storey Seven (7) Henscha Phils., Inc. 740 Classroom, Bagumbayan national High School 28-Feb-2018 DPWH 107 Carmay West, Rosales, Pangasinan Taguig City

Page 80 of 80