CARDINAL-HICKORY CREEK 345 kV TRANSMISSION LINE PROJECT MACRO-CORRIDOR STUDY

Submitted to: United States Department of Agriculture’s Rural Utilities Service (“RUS”) Applicant to RUS: Dairyland Power Cooperative

Other participating utilities in the Cardinal-Hickory Creek Transmission Line Project:

• American Transmission Company LLC, by its corporate manager ATC Management Inc.

• ITC Midwest LLC

September 28, 2016

Macro-Corridor Study Table of Contents

TABLE OF CONTENTS

EXECUTIVE SUMMARY Page No.

1.0 INTRODUCTION ...... 1-1 1.1 Basis for this Macro-Corridor Study...... 1-1 1.2 Environmental Review Requirements and Process ...... 1-2 1.3 Project Overview ...... 1-3 1.4 Overview of Utilities’ Development of a Study Area, Macro-Corridors and Alternative Corridors ...... 1-4 1.5 Purpose and Need ...... 1-2 1.6 Outreach Process ...... 1-2 1.7 Required Permits and Approvals ...... 1-3

2.0 TECHNICAL ALTERNATIVES UNDER EVALUATION ...... 2-1 2.1 Transmission Alternatives – Both High and Low Voltage ...... 2-1 2.2 Non-Transmission Alternatives ...... 2-3 2.3 No-Action Alternative ...... 2-3

3.0 THE UTILITIES’ MCS METHODOLOGY ...... 3-1 3.1 Overview of MCS Requirements ...... 3-1 3.2 The Utilities’ Application of the MCS Requirements ...... 3-1 3.2.1 Identification and Evaluation of Crossing Locations ...... 3-1 3.2.2 Development of the Project Study Area Based on Feasible River Crossing Locations, the Two End Points, and an Intermediate Substation...... 3-6 3.2.3 Collect Data and Receive Feedback about the Project Study Area ...... 3-8 3.2.4 Define Macro-Corridors...... 3-8 3.2.5 Refine Macro-Corridors into Alternative Corridors ...... 3-9 3.2.6 Based on State Law Requirements, Select Two Alternative Routes in and One Alternative Route in ...... 3-9 3.2.7 Reasonable Alternative Corridors for the Scoping Process ...... 3-11

4.0 PROJECT STUDY AREA CHARACTERISTICS ...... 4-1 4.1 Physiography and Geology ...... 4-1 4.1.1 Physiography...... 4-1 4.1.2 Geology ...... 4-1 4.2 Land Use and Land Cover ...... 4-5 4.2.1 Land Use and Land Cover - Wisconsin ...... 4-5 4.2.2 Land Use and Land Cover - Iowa ...... 4-8 4.3 Sensitive Areas...... 4-8 4.3.1 Sensitive Areas – Wisconsin ...... 4-8 4.3.2 Sensitive Areas – Iowa...... 4-11

Dairyland Power Cooperative TOC-1 Cardinal-Hickory Creek T-Line Project Macro-Corridor Study Table of Contents

4.3.3 National Wildlife and Fish Refuge ...... 4-11 4.4 Wildlife Resources ...... 4-12 4.5 Wetlands ...... 4-13 4.5.1 Wetlands - Wisconsin ...... 4-13 4.5.2 Wetlands - Iowa ...... 4-16 4.6 Cultural Resources ...... 4-16 4.6.1 Cultural Resources - Wisconsin ...... 4-16 4.6.2 Cultural Resources - Iowa ...... 4-16 4.7 Hydrology (Open Water, Streams, Floodplains) ...... 4-21 4.7.1 Hydrology - Wisconsin ...... 4-21 4.7.2 Hydrology - Iowa ...... 4-21 4.7.3 Floodplains ...... 4-21 4.7.4 Outstanding and Exceptional Waters ...... 4-24 4.8 Transportation Corridors and Sites (Major Highways, Rail, Airports) ...... 4-24 4.8.1 Major Highways...... 4-24 4.8.2 Railroads ...... 4-31 4.8.3 Airports ...... 4-31 4.9 Socioeconomic Characteristics ...... 4-31 4.10 Recreational Resources ...... 4-34 4.11 Existing Transmission Lines ...... 4-41 4.12 Other Utility Corridors ...... 4-41

5.0 PROCESS THE UTILITIES USED TO DEVELOP THE MACRO- CORRIDORS ...... 5-1 5.1 State Routing Laws ...... 5-1 5.1.1 Public Service Commission of Wisconsin ...... 5-1 5.1.2 Iowa Utilities Board ...... 5-1 5.2 Electrical System Requirements ...... 5-2 5.3 The Utilities’ Comprehensive Outreach Program...... 5-2 5.3.1 Tribal Nations ...... 5-2 5.3.2 Governmental Agencies ...... 5-3 5.3.3 Public Officials ...... 5-3 5.3.4 Utilities ...... 5-3 5.3.5 Other Interested Parties ...... 5-4 5.4 Identification of Opportunities and Constraints ...... 5-8 5.4.1 Routing Opportunities Considered ...... 5-8 5.4.2 Routing Constraints Considered ...... 5-12

6.0 THE UTILITIES’ MACRO-CORRIDORS ...... 6-1 6.1 Identification of Potential Macro-Corridors ...... 6-1 6.2 Opportunities and Constraints Evaluation by Siting Area ...... 6-1 6.2.1 Cardinal–to-Montfort Siting Area - Wisconsin ...... 6-4 6.2.2 Montfort-to-Mississippi River Siting Area - Wisconsin ...... 6-4 6.2.3 Mississippi River-to-Hickory Creek Siting Area - Iowa ...... 6-5 6.3 Opportunity and Constraint Review of Potential Macro-Corridor Segments ...... 6-7 6.4 Macro-Corridor Analysis by Siting Area ...... 6-7

Dairyland Power Cooperative TOC-2 Cardinal-Hickory Creek T-Line Project Macro-Corridor Study Table of Contents

6.4.1 Cardinal Substation-to-Montfort Siting Area - Wisconsin ...... 6-7 6.4.2 Montfort-to-Mississippi River Siting Area – Wisconsin ...... 6-0 6.4.3 Mississippi River to Hickory Creek Substation Section - Iowa ...... 6-2

7.0 THE UTILITIES’ ALTERNATIVE CORRIDORS ...... 7-1 7.1 Alternative Corridors in Cardinal Substation-to-Montfort Siting Area ...... 7-1 7.1.1 Macro-Corridors Narrowed or Eliminated from Consideration ...... 7-1 7.1.2 Alternative Corridors Proposed ...... 7-4 7.2 Alternative Corridors in the Montfort-to-Mississippi River Siting Area...... 7-6 7.2.1 Macro-Corridors Narrowed or Eliminated from Consideration ...... 7-6 7.2.2 Alternative Corridors Proposed ...... 7-7 7.3 Mississippi River-to-Hickory Creek Siting Area ...... 7-9

8.0 REFERENCES ...... 8-1

APPENDIX A - DESCRIPTION OF TRANSMISSION LINE STRUCTURE APPENDIX B - LIST OF DATA SOURCES APPENDIX C - LIST OF FIELD RECONNAISSANCE APPENDIX D - SUMMARY OF PUBLIC OUTREACH APPENDIX E - TRIBAL OUTREACH LETTER, MAILING LIST, AND COMMENTS APPENDIX F - REPORT ON 2016 OPEN HOUSES AND SUMMARY OF PUBLIC COMMENTS APPENDIX G - LIST OF IN-PERSON FEDERAL, STATE, AND LOCAL AGENCY OUTREACH APPENDIX H - FEDERAL, STATE, AND LOCAL AGENCY CORRESPONDENCE AND EMAILS APPENDIX I - LIST OF PUBLIC OFFICIAL OUTREACH APPENDIX J - REPORT ON 2014 OPEN HOUSES AND SUMMARY OF PUBLIC COMMENTS APPENDIX K - LIST OF UTILITY AND NON-GOVERNMENTAL ORGANIZATION OUTREACH APPENDIX L - SUMMARY OF PUBLIC INFORMATIONAL MATERIALS APPENDIX M - USGS 7-1/2’ TOPOGRAPHIC QUADRANGLE MAPS FOR THE ALTERNATIVE CORRIDORS IN THE CARDINAL TO MONTFORT SITING AREA APPENDIX N - USGS 7-1/2’ TOPOGRAPHIC QUADRANGLE MAPS FOR THE ALTERNATIVE CORRIDORS IN THE MONTFORT TO MISSISSIPPI RIVER SITING AREA APPENDIX O - USGS 7-1/2’ TOPOGRAPHIC QUADRANGLE MAPS FOR THE ALTERNATIVE CORRIDORS IN THE MISSISSIPPI RIVER TO HICKORY CREEK SITING AREA APPENDIX P - LIST OF PREPARERS WITH DISCIPLINES

Dairyland Power Cooperative TOC-3 Cardinal-Hickory Creek T-Line Project Macro-Corridor Study Table of Contents

LIST OF TABLES

Page No.

Table 1-1: Feasibility Review of the ACA Crossing Locations ...... 1-0 Table 1-2: Federal Approvals and Other Compliance Requirements ...... 1-3 Table 1-3: State of Wisconsin Approvals and Other Compliance Requirements ...... 1-4 Table 1-4: State of Iowa Approvals and Other Compliance Requirements ...... 1-5 Table 4-1: Geologic Types by County – Wisconsin and Iowa ...... 4-3 Table 4-2: NLCD Definitions for Land Cover Classes ...... 4-7 Table 4-3: Historic Districts and Places by County – Wisconsin and Iowa ...... 4-17 Table 4-4: Highways in Wisconsin by County ...... 4-26 Table 4-5: Highways in Iowa by County ...... 4-28 Table 4-6: Population by County – Wisconsin and Iowa ...... 4-32 Table 4-7: Unemployment Rate by County – Wisconsin and Iowa ...... 4-32 Table 4-8: Race and Ethnicity by County – Wisconsin and Iowa ...... 4-33 Table 4-9: Recreational Areas by County – Wisconsin and Iowa ...... 4-34 Table 5-1: Location, Dates, and Attendance at Open Houses ...... 5-7 Table 6-1: Identification of Potential Macro-Corridors within Siting Areas of the Project Study Area ...... 6-6 Table 6-2: Macro-Corridors Retained as Shown on Figure 3-3 ...... 6-9 Table 6-3: Potential Macro-Corridors Removed, Shown as “Inactive” on Figure 3-3 ...... 6-10

Dairyland Power Cooperative TOC-4 Cardinal-Hickory Creek T-Line Project Macro-Corridor Study Table of Contents

LIST OF FIGURES

Page No.

Figure 1-1: RUS NEPA Process for Developing an EIS ...... 1-2 Figure 1-2: Map of Project Study Area ...... 1-1 Figure 3-1: Map of ACA Study Area with the Seven River Crossing Locations ...... 3-4 Figure 3-2: Map of Montfort Substation Siting Area ...... 3-7 Figure 3-3: Map of Macro-Corridors Presented at May 2016 Public Open Houses ...... 3-10 Figure 4-1: Map of Physiography within the Project Study Area ...... 4-2 Figure 4-2: Map of Geology within the Project Study Area ...... 4-4 Figure 4-3: Map of Land Use and Land Cover in the Project Study Area ...... 4-6 Figure 4-4: Map of Major Sensitive Areas within the Project Study Area ...... 4-9 Figure 4-5: Map of Wetlands in the Eastern Half of the Project Study Area ...... 4-14 Figure 4-6: Map of Wetlands in the Western Half of the Project Study Area ...... 4-15 Figure 4-7: Map of Historic Places in Eastern Half of the Project Study Area ...... 4-19 Figure 4-8: Map of Historic Places in Western Half of the Project Study Area ...... 4-20 Figure 4-9: Map of the Hydrologic Features in the Project Study Area ...... 4-22 Figure 4-10: Map of Floodplains in the Project Study Area ...... 4-23 Figure 4-11: Map of Outstanding and Exceptional Resource Waters in the Project Study Area ...... 4-25 Figure 4-12: Map of Highways, Railroads, and Airports in Eastern Half of the Project Study Area ...... 4-29 Figure 4-13: Map of Highways, Railroads, and Airports in Western Half of the Project Study Area ...... 4-30 Figure 4-14: Map in Recreational Areas in Eastern Half of the Project Study Area ...... 4-39 Figure 4-15: Map of Recreational Areas in Western Half of the Project Study Area...... 4-40 Figure 4-16: Map of Existing Transmission Lines and Pipelines within the Project Study Area ...... 4-42 Figure 5-1: Map of Initial Study Area from 2014 ...... 5-6 Figure 5-2: Map of Routing Opportunities ...... 5-10 Figure 5-3: Map of Routing Constraints in the Project Study Area ...... 5-15 Figure 6-1: Map of Routing Opportunities and Constraints ...... 6-2 Figure 6-2: Map of Potential Macro-Corridors ...... 6-3 Figure 7-1: Map of Alternative Corridors ...... 7-2 Figure 7-2: Map of Alternative Corridors in the Cardinal Substation-to-Montfort Siting Area ...... 7-5 Figure 7-3: Map of Alternative Corridors in the Montfort-to-Mississippi River Siting Area ...... 7-8 Figure 7-4: Map of Alternative Corridor in the Mississippi River-to-Hickory Creek Siting Area ...... 7-10

Dairyland Power Cooperative TOC-5 Cardinal-Hickory Creek T-Line Project Macro-Corridor Study List of Abbreviations

LIST OF ABBREVIATIONS

Abbreviation Term/Phrase/Name

ACA Alternative Crossings Analysis

ACA Study Area Area shown on Figure 3-1

AES Alternatives Evaluation Study together, American Transmission Company LLC by its corporate ATC manager, ATC Management Inc. CFR Code of Federal Regulations

CPCN Certificate of Public Convenience and Necessity

CTH County Highway

Dairyland Dairyland Power Cooperative

DATCP Department of Agriculture, Trade and Consumer Protection

EIS Environmental Impact Statement RUS Staff Instructions, Part 1970-O, Environmental--Miscellaneous Exhibit D Resources, (April 1, 2016), Exhibit D, Guidance for Creating a Macro- Corridor Study, FAA Federal Aviation Administration

Futures Future Scenarios Potential river crossing location at the Dubuque to Galena 161 kV line Galena 161 kV Line crossing in Dubuque, Iowa GMP General Management Plan Potential river crossing location at the Highway 61/151 crossing in Highway 151 Bridge Dubuque, Iowa INHF Iowa Natural Heritage Foundation

Iowa DNR or IDNR Iowa Department of Natural Resources

IUB Iowa Utilities Board

Iowa SHPO Iowa State Historic Preservation Office

ITC Midwest ITC Midwest LLC

Dairyland Power Cooperative i Cardinal-Hickory Creek T-Line Project Macro-Corridor Study List of Abbreviations

Abbreviation Term/Phrase/Name Potential river crossing location at the Julien Dubuque Bridge/Highway Julien Dubuque Bridge 20 crossing in Dubuque, Iowa kV Kilovolt Potential river crossing location at the Lock and Dam No. 10 in L&D 10 Guttenberg, Iowa Potential river crossing location at the Lock and Dam No. 11 in Dubuque, L&D 11 Iowa MCS Macro-Corridor Study

MISO Midcontinent Independent System Operator Inc.

MTEP MISO Transmission Expansion Plan

MVP Multi-Value Project

MVP Portfolio A Portfolio of 17 MVPs Potential river crossing location at the Turkey River Substation to the Nelson Dewey Nelson Dewey Power Plant crossing in Cassville, Wisconsin NEPA National Environmental Policy Act

NERC North American Electric Reliability Corporation

New Rules 81 Fed. Reg. 11032-11047

NLCD National Land Cover Dataset

NPDES National Pollutant Discharge Elimination System Permit

NPS

NRHP Nation Register for Historic Places

NTAs Non-Transmission Alternative(s)

Portfolio MVP Portfolio

Project Cardinal-Hickory Creek Transmission Line Project

Project Study Area Area shown on Figure 1-2

PSCW Public Service Commission of Wisconsin

Dairyland Power Cooperative ii Cardinal-Hickory Creek T-Line Project Macro-Corridor Study List of Abbreviations

Abbreviation Term/Phrase/Name

Refuge Upper Mississippi National Wildlife and Fish Refuge

RPSs Renewable Portfolio Standards or Goals

ROW Right-of-Way

RUS Rural Utilities Service RUS Staff Instructions, Part 1970-O, Environmental--Miscellaneous RUS Guidance Resources, (April 1, 2016). SH State Highway

SHPO State Historic Preservation Office

SNA State Natural Areas

SPCC Spill Prevention Control and Countermeasures Potential river crossing location at the Millville to Stoneman 69 kV Stoneman transmission line and Turkey River to Stoneman 161 kV line crossing (co-located) in Cassville, Wisconsin USACOE United States Army Corps of Engineers

USC United States Code

USDA United States Department of Agriculture

USFWS United States Fish and Wildlife Service

US GS United States Geologic Services

Utilities collectively, Dairyland, ITC Midwest, & ATC

WDNR Wisconsin Department of Natural Resources

WisDOT Wisconsin Department of Transportation

WSHS Wisconsin State Historical Society

USH United States Highway

Dairyland Power Cooperative iii Cardinal-Hickory Creek T-Line Project Macro-Corridor Study Introduction

1.0 INTRODUCTION

1.1 Basis for this Macro-Corridor Study Dairyland Power Cooperative (“Dairyland”), a cooperative organized under the laws of Wisconsin; American Transmission Company LLC by its corporate manager, ATC Management Inc., (together, “ATC”), and ITC Midwest LLC (“ITC Midwest”) (all collectively, “Utilities”), propose to construct and own a 345 kilovolt (“kV”) transmission line connecting northeast Iowa and south-central Wisconsin called the Cardinal – Hickory Creek Transmission Line Project (“Project”). This Project meets multiple needs:

• Addresses reliability issues on the regional bulk transmission system; • Cost-effectively increases transfer capacity to enable additional renewable generation needed to meet state renewable portfolio standards and support the nation’s changing energy mix; • Alleviates congestion on the transmission grid to reduce the overall cost of delivering energy; and • Responds to public policy objectives aimed at enhancing the nation’s transmission system and reducing carbon-dioxide emissions.

Dairyland plans to request financing from the Rural Utilities Service (“RUS”) and RUS has determined that funding of Dairyland’s ownership interest in the Project would be a federal action and therefore subject to review under National Environmental Policy Act (“NEPA”), 42 United States Code (“U.S.C.”) § 4321. See also 7 Code of Federal Regulations (“C.F.R.”) § 1970.8.

RUS has determined that it will prepare an Environmental Impact Statement (“EIS”) for the Project to comply with its environmental review requirements under NEPA. On March 2, 2016, RUS published new NEPA rules. See 81 Fed. Reg. 11032-11047 (“New Rules”). On April 1, 2016, RUS created a guidance requiring the submission of a Macro-Corridor Study (“MCS”) as a preliminary routing study that is completed before the RUS initiates its NEPA process (RUS, 2016, RD Instruction 1970-O, Exhibit D, Guidance for Creating a Macro-Corridor Study, “Exhibit D”).

According to this new guidance, the purpose of the MCS is:

…to identify areas that appear to be suitable for siting electric transmission facilities based on regulatory, environmental, engineering, and economic constraints. Such a study is conducted to identify routing options for a particular line, and how those options might be planned to avoid or minimize problems, impacts, delays, and unnecessary expense in development of a proposed project (RUS, 2016, Exhibit D, § 1.2).

Dairyland Power Cooperative 1-1 Cardinal-Hickory Creek T-Line Project Macro-Corridor Study Introduction

This MCS was developed in accordance with the requirements set forth in the new RUS guidance (“RUS Guidance”) (RUS, 2016, Exhibit D).

1.2 Environmental Review Requirements and Process RUS is the lead federal agency and will conduct its NEPA review pursuant to the RUS regulations outlined in 7 C.F.R. § 1970 et seq. The RUS NEPA process will evaluate a broad range of environmental issues including potential impacts to residences, farmland, threatened and endangered species, wetlands, floodplains, forested areas, climate change, public health and safety, air quality, and cultural and historic resources. The NEPA process will also identify measures to mitigate potential adverse impacts of the Project and evaluate other alternatives that meet the identified purpose and need for the Project. RUS will also consider socioeconomic and environmental justice issues.

Figure 1-1 illustrates the steps in the RUS NEPA process for developing an EIS. The scoping process includes a notice in the Federal Register, public scoping meetings, and agency consultation. Based on the input that RUS receives from the public scoping process and on materials developed by the Utilities including this MCS, RUS will determine the scope of the EIS.

Figure 1-1: RUS NEPA Process for Developing an EIS

RUS Determine Notice of Intent is Identify Lead Level of NEPA Published in Conduct Scoping Agency Documentation Federal Register

Prepare and Public Hearing Review and Review Scoping Distribute Draft and Comment on Respond to Public EIS Draft EIS Comments

Prepare and Public Review and Prepare Record of Distribute Final Comment of Final Decision EIS EIS

Source: RUS, 2009, p. 1-4.

The Project will involve federal lands and will require permits from other federal agencies. Two agencies, the United States Fish and Wildlife Service (“USFWS”) and the U.S. Army Corps of Engineers (“USACOE”), have agreed to participate in RUS’s NEPA process as cooperating agencies. Additional

Dairyland Power Cooperative 1-2 Cardinal-Hickory Creek T-Line Project Macro-Corridor Study Introduction

cooperating agencies may be identified. While RUS and these cooperating agencies will work together to prepare the EIS, each federal agency will independently develop its own decision document.

1.3 Project Overview The Project would create a 345 kV transmission line connection between the Hickory Creek Substation in Dubuque County, Iowa, with the Cardinal Substation in the Town of Middleton, Wisconsin (near Madison, Wisconsin) and include the following facilities1:

• A new 345 kV terminal within the existing Hickory Creek Substation2 in Dubuque County, Iowa; • A new intermediate 345/138 kV substation near the Village of Montfort in either Grant or Iowa County, Wisconsin; • A new 345 kV terminal within the existing Cardinal Substation in the Town of Middleton in Dane County, Wisconsin; • A new 45- to 65-mile (depending on the final route) 345 kV transmission line between the Hickory Creek Substation and the intermediate substation; • A new 45- to 60-mile (depending on the final route) 345 kV transmission line between the intermediate substation and the existing Cardinal Substation; • A rebuild of the Mississippi River Crossing at Cassville to accommodate a section of the 345 kV transmission line between Hickory Creek and the intermediate substation, and Dairyland’s 161 kV transmission line; • A short, less than one-mile, 69 kV line in Iowa to enable the removal of the 69 kV line that crosses the Mississippi River at Cassville; • Facility reinforcement needed in Iowa and Wisconsin due to the addition of the Hickory Creek Substation/Cardinal Substation 345 kV transmission line and the removal of the existing 69 kV Mississippi River crossing at Cassville; and • Rebuild of the Turkey River Substation in Dubuque County, Iowa with two 161/69 kV transformers, four 161 kV circuit breakers, and three 69 kV circuit breakers.

The Midcontinent Independent System Operator, Inc. (“MISO”), the regional transmission organization, has approved the Project. MISO approved this Project together with a number of other projects (called Multi-Value Projects or MVPs) based on planning analysis showing that it provided multiple benefits

1 ITC Midwest owns the existing Hickory Creek Substation. ATC owns the Cardinal Substation and would also own the new intermediate substation. Dairyland would own an undivided minority interest in all of the new 345 kV line. The majority interest in the new 345 kV line will be split by ITC Midwest and ATC. 2 The Hickory Creek Substation was energized on October 30, 2015.

Dairyland Power Cooperative 1-3 Cardinal-Hickory Creek T-Line Project Macro-Corridor Study Introduction

(economics, reliability, and public policy) to the region. Specifically, MISO applied three criteria to develop the MVPs:

• Criterion 1: The MVP must enable the transmission system to deliver energy reliably and economically in support of documented Federal or state energy policy mandates or laws. • Criterion 2: The MVP must provide multiple types of economic value across multiple pricing zones with a total cost/benefit ratio prescribed in Attachment FF of the Tariff. • Criterion 3: The MVP must address at least one transmission issue associated with a projected violation of a North American Electric Reliability Corporation (“NERC”) or Regional Entity standard and at least one economic-based transmission issue that provides economic value across multiple pricing zones (MISO, 2012, § 3.1).

Depending on the Mississippi River crossing location that is ultimately selected for this Project, the 345 kV line would be approximately 125 miles long. The typical right-of-way (“ROW”) width for the Project would be 200 feet in Iowa and 150 feet in Wisconsin. In addition, unique ROW widths have been developed in certain areas to mitigate potential impacts to sensitive resources, such as avian species at the Upper Mississippi National Wildlife and Fish Refuge (“Refuge”) crossing locations. Descriptions of and figures for the typical transmission line structures are found in Appendix A. The study area for the Project is presented in Figure 1-2 (“Project Study Area”).

1.4 Overview of Utilities’ Development of a Study Area, Macro-Corridors and Alternative Corridors The operator of the regional transmission grid (“MISO”) approved the two end-points and intermediate substation. The Mississippi River and the Refuge lie between the two end-point substations. Because crossing the Mississippi River and the Refuge are the most significant siting constraints for this Project, the Utilities began their macro-corridor analysis by determining feasible locations for crossing the Mississippi River and potentially the Refuge.

After an in-depth evaluation of seven alternative crossing locations, the Utilities determined that five of the locations were not technically and economically feasible. The two remaining crossings for the Project are located near Cassville, Wisconsin. Both locations cross through the Refuge and would require USFWS approval. Based on this conclusion, the Utilities developed the overall Project Study Area, which is shown in Figure 1-2.

While additional justification is provided in Section 3.2.1, Table 1-1 provides a summary of the key factors that were analyzed to determine the feasibility for each alternative crossing location.

Dairyland Power Cooperative 1-4 Cardinal-Hickory Creek T-Line Project Macro-Corridor Study Introduction

Table 1-1: Feasibility Review of the ACA Crossing Locations

Existing Linear Crossing Location Feasibility Review – Key Factors Infrastructure Present L&D 11 Existing Lock and • Safety and technical engineering considerations prohibit construction of transmission facilities on or near Lock and Dam No. 11, per USACE review. Dam; no overhead • If selected, the existing 161 kV and 69 kV lines through the Refuge at Stoneman would remain in place. transmission lines • The L&D 11 crossing would be located on lands outside of Refuge boundaries. • The crossing would require routing through urban residential development and downtown Dubuque, and the City of Dubuque has said this Project would not be permittable within the City limits. • The ACA route would cross numerous residential properties. All trees within the ROW would need to be removed. • There are no existing overhead transmission corridors across the Mississippi River at or near Lock and Dam No. 11. • The crossing presents technical challenges; it would require a 3,200-foot crossing of the Mississippi River with projected structure heights of 250 to 300 feet with permanent lighting. • The Project would be visible from multiple viewpoint locations at Eagle Point Park. • Lock and Dam No. 11 is a listed site on the National Register of Historic Places (NRHP); there are visual/scenic considerations related to the NRHP listing.

Dubuque-Wisconsin Existing bridges; no • IDOT stated that it would not be able to issue a permit for attachment of the transmission line to either bridge. Bridge overhead transmission • IDOT would not be able to safely perform ongoing routine bridge maintenance while the transmission line is energized. As a result, the line would need to be de-energized during these lines & maintenance activities, which would not allow for the reliable use of a transmission line at these locations and would not meet the purpose and need of the Project. • Unresolvable engineering conflicts with bridge safety prohibit construction of transmission facilities on both bridges, per IDOT review of the Project. Julien Dubuque • If selected, the existing 161 kV and 69 kV lines through the Refuge at Stoneman would remain in place. Bridge • Both bridge crossings are located on lands outside the Refuge. • The crossings require routing through urban residential development and downtown Dubuque; the City of Dubuque has said this Project would not be permittable within the City limits.. • Corridors to both locations would cross numerous residential properties. All trees within the easement area would need to be removed. • At these locations, the Project would result in shutdown or disruption of traffic flow on major bridges between Iowa and Wisconsin/Illinois during construction and maintenance of the transmission line. • Neither bridge location has existing overhead transmission lines.

Galena 161 kV Existing 161 kV • If selected, the existing 161 kV and 69 kV lines through the Refuge at Stoneman would remain in place. transmission line • The crossing would be located on lands outside the Refuge. • The crossing requires routing through urban residential development and downtown Dubuque. The City of Dubuque has said this Project would not be permittable within the City limits. • The corridor would cross numerous residential properties. All trees within the ROW would need to be removed. • Requires routing new 345 kV line through Schmitt Island and Riverview Park; the new line would cross recreational fields for which federal funds were obtained, the use of which may limit or prohibit redevelopment of these areas. • It provides an opportunity to co-locate with an existing 161 kV overhead line.

L&D 10 Existing Lock and • Safety and technical engineering considerations prohibit construction of transmission facilities on or near Lock and Dam No. 10, per USACE review. Dam; no overhead • If selected, the existing 161 kV and 69 kV lines through the Refuge at Stoneman would remain in place. transmission lines. • Crosses within the Refuge managed by USFWS and USACE.1 • Would require routing in immediate proximity of the Refuge, which contains cultural resources. Any excavation or removal of archeological resources activities within the Refuge would require an Archaeological Resources Protection Act of 1979 (ARPA) permit. • Guttenberg, Iowa has more than 350 recorded historic-aged resources including three NRHP districts and several individually-listed NRHP properties (including Lock and Dam No. 10 itself). • No existing utility ROWs are located at or near the L&D 10 crossing or on the Wisconsin side of this crossing location; the Wisconsin side is primarily mature woodlands and agricultural fields. • Alternative crossing locations immediately upstream and downstream of L&D 10 are limited by proximity to a private airfield to the north of L&D 10 and Goetz Island, Swift Slough, and Guttenberg Ponds Sanctuary within the Refuge to the south. • The L&D 10 ACA route is the longest compared to all other ACA routes.

Dairyland Power Cooperative 1-0 Cardinal-Hickory Creek T-Line Project Macro-Corridor Study Introduction

Existing Linear Crossing Location Feasibility Review – Key Factors Infrastructure Present Stoneman Existing 161 and 69 kV • It crosses lands within the Refuge, which is designated as a Wetland of International Importance (Ramsar) and a GIBA. transmission lines. • The crossing would require routing through Refuge lands, which include cultural resources. Any excavation or removal of archeological resources within the Refuge would require an ARPA permit. • The crossing presents an opportunity to co-locate new 345 kV line with an existing 161 kV corridor across the Refuge. • The existing 69 kV transmission line would be removed, reducing the current design at Stoneman from two separate transmission corridors to a single corridor for the entire length through the Refuge. • The new consolidated facilities would use low-profile structures that place all conductors on one horizontal plane and the shield wire would be marked with avian flight diverters, which are not present on the existing line. The larger structures would provide a more visible structure for avian species; the reduced span length and use of flight diverters would limit avian interactions by increasing overall visibility of the transmission line. • The crossing requires routing through urban/residential development in Cassville, Wisconsin. Residences, schools, daycares, places of worship, airports, or businesses are in immediate proximity to the Stoneman crossing location in Cassville. • Alternative alignments at the Stoneman location are limited by the presence of the Cassville Municipal Airport. Transmission line structures located in the airport’s conical surface would likely require additional design and evaluation by the FAA, and may be limited in height. • There is an existing retired power plant, a substation, and municipal infrastructure located on the Wisconsin side.

Nelson Dewey Oak Road, existing • Crosses lands within the Refuge, which is designated as a Wetland of International Importance (Ramsar) and a Globally Important Bird Area (GIBA). power plant, substation, • Provides an opportunity to relocate the existing 161 kV transmission line and ROW from the Stoneman crossing to the Nelson Dewey crossing to co-locate with the new 345 kV for this and 161 kV and 69 kV Project. lines. • The existing 69 kV transmission line would be removed. This would allow for the natural revegetation (in consultation with the USFWS) of the existing 161 kV and 69 kV transmission corridors present at the existing Stoneman crossing through the Refuge. • Would include the use of low-profile structures that place all conductors on a single horizontal plane in addition to a marked shield wire, which is not present on the existing lines through the Refuge. The larger structures would provide a more visible structure for avian species; the reduced span length and use of flight diverters would limit avian interactions by increasing overall visibility of the transmission line. • Requires crossing fewer acres of ROW through Refuge lands compared to the Stoneman crossing location. • Would require routing through Refuge lands, which include cultural resources. Any excavation or removal of archeological resources within the Refuge would require an ARPA permit. • Existing infrastructure at this location includes Oak Road within the Refuge on the Iowa side. On the Wisconsin side, there is an existing retired power plant, a substation, and access to existing 161 kV, 138 kV, and 69 kV transmission corridors.

1 – L&D 10 crossing location (Guttenberg, Iowa) includes lands managed and operated under a 2001 cooperative agreement between the USACE and the USFWS (USFWS 2006). Although there is a 'break' in the Refuge where Lock and Dam No. 10 crosses the Mississippi River, this 'break' relates specifically to the management and operation of the lock and dam facility and does not include a gap in the overall Refuge boundaries at this location (as compared to the gap in the Refuge at Dubuque, Iowa). As a result, the Lock and Dam No. 10 is considered by the Utilities as a Refuge crossing alternative. Although L&D 11 also includes a break in Refuge lands, the L&D 11 crossing location is within the City of Dubuque at the same general location of the remaining non-Refuge locations.

Dairyland Power Cooperative 1-1 Cardinal-Hickory Creek T-Line Project Macro-Corridor Study Introduction

As explained in Section 5.3 of this MCS, the Utilities collected data and feedback from numerous sources including, but not limited to, federal, state and local agencies, public officials, landowners, utilities, the general public, and other interested parties both for the study area and for potential macro-corridors. Additional data and feedback was collected allowing the Utilities to finalize the study area and the macro- corridors that were presented in a series of public open houses in May 2016. Based on this additional feedback and continued analysis of corridor constraints, the Utilities narrowed the macro-corridors to the alternative corridors that are presented in Section 7 of this MCS.

Dairyland Power Cooperative 1-0 Cardinal-Hickory Creek T-Line Project Sauk City ALLAMAKEE Lynxville Dane ST80 £14 COUNTY RICHLAND 130 SAUK 23 COUNTY ST ST COUNTY £12 Harpers Ferry ST60 60 ST 78 61 Avoca 14 60 ST ST19 Steuben £ Blue River 133 Muscoda Lone Rock £ ST ST19 ST364 ST179 ST ST133 Spring Green Mazomanie Eastman Arena £14 £12 CRAWFORD CARDINAL COUNTY ST131 Boscobel Black Earth 130 ST23 SUBSTATION ST £14 27 ST80 ST35 ST Cross Plains Middleton Woodman #* Wauzeka W I S C O N S I N ST78 ST76 DANE Madison COUNTY 60 £12 £18 Prairie du Chien ST Highland Blue Mound ST133 State Park McGregor Gov. Dodge State Park Blue Mounds Barneveld ST340 IOWA £18 Mount Horeb COUNTY ST23 Ridgeway £18 Verona £18 Fennimore Mount Hope £18 Montfort Cobb Dodgeville

Patch Grove ST78 PROPOSED 69 Linden ST191 ST £61 SUBSTATION Clayton Bagley £151 ST92 Livingston SITING AREA £ Bloomington ST39

GRANT ST39 Hollandale COUNTY Mineral Point Belleville Lancaster 129 ST80 ST69 ST35 ST Rewey 35 ST 78 £52 ST ST39 ST92 Blanchardville New Glarus ST133 151 Guttenberg £ CLAYTON 23 81 ST COUNTY ST81 ST

£61 CARDINAL-HICKORY CREEK Monticello Osterdock Platteville £151 Belmont Project Study Area Substation TRANSMISSION LINE Siting Area Cassville PROJECT Outside Project Study Area ST69 Millville ST133 ST126 ST81 Argyle GREEN Tennyson ST80 FIGURE 1-2 #* SubstationCOUNTY Mississippi River Potosi £151 North Buena Vista £ DarlingtonDarlington PROJECT STUDY AREA Interstate, US or State Highway ST81 LAFAYETTE ST81 £61 £ COUNTY State Boundary City / Village Balltown MINNESOTA 23 ST78WISCONSIN County Boundary Open Water Dickeyville ST Lake Luxemburg I O W A Michigan ST3 Holy Cross Sherrill Cuba City Monroeµ Rickardsville IOWA £52 Gratiot Browntown £61 Benton Shullsburg DUBUQUE Durango ST386 11 SouthILLINOIS Wayne 0 1 2 3 4 5 ST80 ST11 ST Map Area Shown in Red ST69 COUNTY #* Sageville Miles ST78 ST924 ST11 Hazel Green 136 ST Asbury HICKORY ££15161 Dubuque CREEK Graf 20 Dyersville SUBSTATION £ ST966 £20 ST968 Centralia I L L I N O I S F:\Projects\C-HC\Mxds\MCS\Figure 1-2 Project Study Area.mxd Data Sources: ATC, DPC, IDOT, IDNR, ITC, USGS, WDNR, WDOT. 7/29/16 Macro-Corridor Study Introduction

1.5 Purpose and Need In addition to an MCS, the RUS Guidance also requires the submission of an Alternatives Evaluation Study (“AES”), which identifies the electrical need and evaluates different alternatives for meeting that need. The AES for the Project was submitted to RUS in July 2016. While the purpose and need for this Project is described in depth in Chapter 2 of that AES, a brief summary is provided below.

The Utilities are transmission-owning members of MISO. In 2011, as part of the 2011 MISO Transmission Expansion Plan (“MTEP”), MISO designated the Project an MVP as part of a portfolio of transmission projects developed to provide economic, reliability, and public policy benefits across what was then the entire MISO footprint -- all or portions of 13 states and one Canadian province.3 MISO developed a portfolio of 17 MVPs (“Portfolio” or “MVP Portfolio”) through a comprehensive and broad stakeholder analysis and confirmed the Portfolio’s benefits in the 2014 MTEP Triennial MVP Review (MISO, 2014).

This MVP Project, among other things, is intended to enhance the reliability of the regional bulk transmission system and to cost-effectively enable the delivery of renewable energy necessary to satisfy state renewable portfolio standards or goals (“RPSs”). The Project is also designed to relieve congestion on the transmission system to reduce the overall cost of delivering energy. In addition, the Project would respond to public policy objectives aimed at enhancing the nation’s transmission system and reducing carbon-dioxide emissions.

1.6 Outreach Process Beginning in 2012, the Utilities began a comprehensive outreach program to inform and solicit input from numerous parties, including federal, state, and local agencies, tribal nations, public officials, landowners, utilities, and the general public. At different times, information was provided to and feedback sought from these groups. After refining their proposal, the Utilities presented their proposed revisions and solicited further feedback. Based on this iterative and consultative process, the Utilities were able to complete the following steps:

• Develop an Initial Study Area (Figure 5-1) • Develop a Mississippi River crossing study area (“ACA Study Area”) (Figure 3-1) • Develop the Project Study Area (Figure 1-2)

3 The MISO footprint is currently comprised of all or portions of 15 states and one Canadian province (MISO, 2014).

Dairyland Power Cooperative 1-2 Cardinal-Hickory Creek T-Line Project Macro-Corridor Study Introduction

• Develop Potential Macro Corridors (Figure 6-1) • Finalize Macro-Corridors (Figure 3-3) • Finalize Alternative Corridors (Figure 7-1)

This extensive outreach program is described in-depth in Section 5.3.

1.7 Required Permits and Approvals The Utilities will be required to obtain approvals from multiple federal and state agencies prior to constructing the Project. For the Mississippi River crossing, the Project must obtain approvals from multiple federal agencies that must complete environmental reviews under NEPA. The Project must also obtain authorizations from the states of Iowa and Wisconsin. Tables 1-2, 1-3, and 1-4 identify the primary permits and other approvals that may be required by federal agencies, the state of Wisconsin and the state of Iowa, respectively. This preliminary listing of regulatory requirements is subject to change as the Project proceeds.

Table 1-2: Federal Approvals and Other Compliance Requirements

Agency Permits or Other Compliance U.S. Department of Agriculture, Rural NEPA compliance as lead agency, including National Historic Utilities Service Preservation Act – Section 106, tribal consultation. U.S. Fish and Wildlife Service Use authorization if right-of-way required on National Wildlife Refuge or Wetland Management District lands and Special Use Permit if crossing National Wildlife Refuge; May need Incidental Take or Non-Purposeful Take Permit under Section 7 of Endangered Species Act of 1973 if impacts to endangered/threatened species cannot be avoided; If constructing near an active eagle nest, Non-Purposeful Take Permit under the Bald and Golden Eagle Protection Act. U.S. Army Corps of Engineers Section 10 Permit of the Rivers and Harbors Act of 1899. (“USACOE”) Nationwide permit or individual permit under Section 401 and Section 404 of the Clean Water Act of 1977 (“CWA”); If USACOE land is crossed, an easement will be required and if a civil works project is impacted, a permit under Section 14 of the Rivers and Harbors Act of 1899, codified in 33 U.S.C. § 408 (commonly referred to as “Section 408”) may also be required. U.S. Coast Guard Authorization for Structures or Work in or Affecting Navigable Waters of the United States. Federal Aviation Administration Form 7460-1 Objects Affecting Navigable Airspace. Federal Highway Administration Permit required to cross federal highways and interstate highways (usually coordinated through state department of transportation). U.S. Environmental Protection A spill prevention, control, and countermeasure (“SPCC”) plan for the Agency intermediate substation. National Park Service (“NPS”) Land and Water Conservation Fund (“LWCF”) approval may be required if LWCF-funded lands are crossed. Natural Resources Conservation Easement on property encumbered by NRCS obtained/managed Service (“NRCS”) conservation easement.

Dairyland Power Cooperative 1-3 Cardinal-Hickory Creek T-Line Project Macro-Corridor Study Introduction

Table 1-3: State of Wisconsin Approvals and Other Compliance Requirements

Agency Permit, Regulatory Compliance, or other Coordination Public Service Commission of Certificate of Public Convenience and Necessity (“CPCN”). Wisconsin (“PSCW”) Wisconsin Department of Natural Endangered Resource Review, which may result in Incidental Resources (“WDNR”) Take Authorization if impacts to endangered/threatened species cannot be avoided; Construction Site Erosion Control and Stormwater Discharge Permit; General Utility Crossings Permit; CWA Section 401 Water Quality Certification (if CWA Section 404 permit is required by USACE); Chapter 30 permit to place temporary bridges in or adjacent to navigable waters, pursuant to Wis. Stat. § 30.123 and Wis. Admin. Code ch. 320; Chapter 30 permit to place miscellaneous structures within navigable waterways, pursuant to Wis. Stat. § 30.12 and Wis. Admin. Code ch. 329; Chapter 30 permit for grading on the bank of a navigable waterway, pursuant to Wis. Stat. § 30.19 and Wis. Admin. Code ch. 341; Wetland Individual permit, pursuant to Wis. Stat. § 281.36 and Wis. Admin. Code chs. NR 103 and 299. Wisconsin Department of Application to Construct and Operate and Maintain Utility Transportation (“WisDOT”) Facilities on Highways Rights-of-Way (Form DT1553); Access Driveway Permit (may be required); Drainage Permit (may be required); Road Crossing Authorization; Oversize Loads or Excessive Weights on Highways. Wisconsin State Historical National Historic Preservation Act, Section 106 consultation. Society/Office of Preservation Planning (“WSHS”) Wisconsin Department of Agricultural Impact Statement. Agriculture, Trade and Consumer Protection (“DATCP”)

Dairyland Power Cooperative 1-4 Cardinal-Hickory Creek T-Line Project Macro-Corridor Study Introduction

Table 1-4: State of Iowa Approvals and Other Compliance Requirements

Agency Permit, Regulatory Compliance, or other Coordination Iowa Utility Board (“IUB”) and Electric Transmission Line Franchise. Iowa municipality, if crossed Iowa Department of Natural CWA § 401 Water Quality Certification (if CWA Section 404 Resources (“Iowa DNR”) permit is required by the U.S. Army Corps of Engineers); National Pollutant Discharge Elimination System (“NPDES”) Permit; Flood Plain Development Permit; Sovereign Land Construction Permit. Department of Transportation Utility Accommodation Permit; Work within Right-of-Way Permit. Iowa Historical Society/Office of National Historic Preservation Act, Section 106 consultation (if Preservation Planning CWA Section 404 permit is required by the USACOE)

Dairyland Power Cooperative 1-5 Cardinal-Hickory Creek T-Line Project Macro-Corridor Study Technical Alternatives Under Evaluation

2.0 TECHNICAL ALTERNATIVES UNDER EVALUATION

In this Section 2, the Utilities provide a summary of the technical alternatives that were evaluated in the AES. Each alternative was evaluated for its ability to fulfill the purpose and need for the Project. (See subsection 1.5 above for a brief description of the Project’s purpose and need.) For efficiency purposes, information contained in the AES is presented only in summary form in this MCS. For a thorough discussion of these technical alternatives, please see the AES.

2.1 Transmission Alternatives – Both High and Low Voltage This Project is one of 17 MVPs that MISO developed between 2008 and 2011 (AES, § 2.1). At the request of several Midwestern governors, MISO evaluated the most cost effective way that all of the MISO states could comply with their respective RPSs.

To accomplish this, MISO ran multiple scenarios. In one scenario, MISO assumed each state built enough in-state renewables to comply with its respective RPSs and then built the attendant transmission, i.e. MISO assumed a large amount of renewable generation within each state. In another scenario, MISO assumed that states would purchase the most economical renewables regardless of location and would build the required transmission. Through this iterative process, MISO tested whether local renewables alone were more or less expensive than a mix of local renewables with renewables from the wind-rich upper Great Plains (AES, § 3.1.1). During this time, MISO produced three high-voltage solutions: a portfolio of 345 kV lines, a portfolio of 765 kV lines, and a portfolio of high-voltage direct current lines. MISO and stakeholders agreed that a portfolio of 345 kV lines should be considered for further analysis (AES, § 3.3.2).

While MISO’s initial study focused on the ability to transmit renewables, it expanded its analysis during the MVP process to evaluate which lines, when considered with a whole portfolio, would provide reliability benefits to and reduce congestion on the regional grid. MISO conducted these analyses assuming four separate future scenarios (“Futures”):

• Business as Usual with Mid-Low Demand and Energy Growth Rates; • Business as Usual with Historic Demand and Energy Growth Rates; • Carbon Constraint; and • Combined Energy Policy (MISO, 2011, Executive Summary, p. 7).

Each Future had differing assumptions for each variable such as how quickly demand for electricity would grow and the price of natural gas (AES, § 3.3.3).

Dairyland Power Cooperative 2-1 Cardinal-Hickory Creek T-Line Project Macro-Corridor Study Technical Alternatives Under Evaluation

In 2011, MISO and stakeholders selected (by near consensus) a 345 kV portfolio. Stakeholders agreed these 17 MVPs were “no regrets” projects, namely, they provided a robust solution to a number of challenges (AES, § 3.3.3). MISO recently reconfirmed this robustness in its Triennial Review of the 345 kV Portfolio (MISO, 2014, p. 9). This entire process took hundreds of hours of high-powered computer time and months of working with stakeholders. Indeed, MISO spent approximately 35,000 hours of staff time and convened more than 200 stakeholder meetings (Rauch, Direct Testimony, p. 19r:18-22).

The Utilities have also considered whether any other high-voltage alternative could meet the purpose and need of this Project (AES, § 3.3.4). Any high-voltage alternative to this Project must stand in the shoes of this Project independently and in the context of the overall Portfolio. MISO approved a line connecting the Hickory Creek 345 kV substation on the Salem – Hazelton 345 kV transmission line in Iowa to the Cardinal Substation in Wisconsin because of the dominant west-to-east flows of renewable energy across the footprint. Given there are limited connection points to the regional grid in northeast Iowa and southwestern and south-central Wisconsin and since the proposed Project takes a route that is relatively direct between the available connection points, any other high-voltage alternative connecting northeast Iowa to south-central Wisconsin would necessarily be longer and would still have to traverse the Mississippi River. Because it would be longer, that alternative would be more expensive than this Project (AES, § 3.3.4).

Alternatives considered in the MVP process had to meet MISO’s purpose and need: reliability reinforcement, congestion relief, increasing transfer capability for RPS compliance and meeting public policy needs. RPS compliance was not only a requirement, it was a primary purpose for starting the MVP process. Accordingly, MISO only studied an alternative if it allowed the MISO states to meet their RPSs. A portfolio of low-voltage alternatives could not meet this fundamental requirement. Therefore, MISO did not study an entire portfolio of low-voltage alternatives during the MVP process (AES, § 3.3.5).

While MISO did not consider an entire portfolio of low-voltage alternatives, it did consider whether portions of the MVP Portfolio could be low-voltage. In relation to this Project, MISO considered whether rebuilding the overloaded 138 kV lines between northeastern Iowa and southwestern Wisconsin would be better than a 345 kV line (MISO, 2012, p. 29). MISO rejected this lower-voltage alternative because the estimated cost was greater than the Project and it would not provide the same level of benefits (AES, § 3.3.5).

In sum, there are no reasonable transmission alternatives to this Project; neither high nor low voltage alternatives meet the Project’s purpose and need of the Project.

Dairyland Power Cooperative 2-2 Cardinal-Hickory Creek T-Line Project Macro-Corridor Study Technical Alternatives Under Evaluation

2.2 Non-Transmission Alternatives One of the main objectives of this Project is to support the transfer of renewable energy from Iowa to Wisconsin through increasing the transfer capability between the two states. Put simply: only transmission can provide a permanent increase in transfer capability between Iowa and Wisconsin. Because non-transmission alternatives (“NTAs”) cannot meet the objectives specified by MISO, MISO did not evaluate NTAs during the MVP process. Nevertheless, pursuant to the RUS Guidance, NTAs must be considered. Accordingly, the AES evaluated generation, storage, energy efficiency and demand response as NTAs.

As to generation as an NTA, MISO found that a mix of regional and local renewable generation was the most cost-effective because the Project was required to convey regional renewables into load centers. An alternative with mainly local renewable generation was rejected by MISO as not cost effective (AES, § 3.4.1.1.1).

Similarly, storage would not be a cost effective alternative. The only available storage in Wisconsin would be batteries. Battery storage is not a cost-effective alternative at this time due to the large amount of storage capacity that would be required to match the beneficial impacts of the Cardinal-Hickory Creek Project (AES, § 3.4.1.2).

MISO considered energy efficiency in all four of its Futures and found that energy efficiency could not eliminate the need for the Project. To replace this Project with energy efficiency, energy efficiency efforts would have to eliminate demand to a level that all the RPSs would be met with existing renewable resources and the reliability and congestion benefits would be achieved through a dramatic reduction in flows on the regional grid. Such an increase in energy efficiency is simply not possible (AES, § 3.4.1.3).

Lastly, demand response (load reduction and load shifting) would neither provide the reliability benefits of this Project nor would it increase the transfer capability between Iowa and Wisconsin (AES, § 3.4.1.4). In sum, NTAs are not feasible alternatives to this Project.

2.3 No-Action Alternative Under a no-action alternative, the Utilities would construct neither the Project nor any alternative to the Project. The no-action alternative would not fulfill the purpose and need to enhance regional reliability, increase economic benefits through alleviating transmission congestion, increase transfer capability between Iowa and Wisconsin to ensure compliance with existing RPSs and increase flexibility to address other public policies (AES, § 3.5). The purpose and need of the Project cannot be met by a no-action alternative.

Dairyland Power Cooperative 2-3 Cardinal-Hickory Creek T-Line Project Macro-Corridor Study The Utilities’ MCS Methodology

3.0 THE UTILITIES’ MCS METHODOLOGY

3.1 Overview of MCS Requirements According to the RUS Guidance,

…the MCS identifies where on the ground the linear infrastructure could be constructed. Specifically, it identifies the study area encompassing the end points of a proposed line and develops large corridor options for locating the facilities. It provides information on environmental, social, and cultural factors for the macro-corridor options within the study area (RUS, 2016, Exhibit D, § 1.2).

The RUS Guidance provides specific steps to develop macro-corridors.

The macro-corridor selection process should be accomplished in phases to systematically narrow the number of alternatives. In the first analysis, resource data are analyzed to identify suitable areas (opportunities) for siting and unsuitable areas (constraints) to be excluded or avoided. In further phases of the siting process, tighter environmental and engineering constraints can be applied to further narrow potential transmission corridors and corridor options as appropriate (RUS, 2016, Exhibit D, § 3.2).

3.2 The Utilities’ Application of the MCS Requirements The following methodology allowed the Utilities to systematically investigate and narrow the size and number of corridor alternatives for the Project.

3.2.1 Identification and Evaluation of Mississippi River Crossing Locations Connecting the Hickory Creek Substation with the intermediate substation requires a crossing of the Mississippi River at a location included within the USFWS-managed Refuge, the longest linear refuge in the United States. The Refuge extends north to south through Minnesota, Wisconsin, Iowa, and Illinois for approximately 260 river miles and has 240,000 acres of Mississippi River floodplain (USFWS, 2006, pp. 1-2). The Utilities have been meeting with the USFWS since April 2012 to discuss a potential crossing of the Refuge as part of the Mississippi River crossing required for the Project.

At the same time that the Utilities were conducting initial meetings with USFWS, ITC Midwest was conducting a preliminary routing analysis for the Iowa portion of the Project between the Hickory Creek Substation and the Turkey River Substation. For purposes of this preliminary routing analysis, ITC Midwest defined an initial study area between the Hickory Creek Substation in Dubuque County north to the Turkey River Substation in Clayton County. One of the primary objectives of this preliminary routing analysis was to determine whether or not a prospective route for the Project could be located and potentially-constructed within this initial study area. ITC Midwest viewed the existing Millville to Stoneman 69 kV transmission line and Turkey River to Stoneman 161 kV line crossing (co-located) just

Dairyland Power Cooperative 3-1 Cardinal-Hickory Creek T-Line Project Macro-Corridor Study The Utilities’ MCS Methodology east of the existing Turkey River Substation as a potential crossing for the Project. Although discussions with the USFWS were ongoing at the time, ITC Midwest needed to determine if a prospective constructible route could be located within this initial study area, should this general crossing location be identified as feasible for the Project. As part of this routing analysis, ITC Midwest sent letters to federal, state, and local agencies in July 2013 requesting assistance in identifying human, cultural, and natural resources located within the initial study area in Iowa. A copy of this letter and the responses received from these agencies is included in Appendix H.

The Utilities continued meeting with USFWS in 2013 and during that time the USFWS requested a thorough written analysis from the Utilities of all existing infrastructure crossings of the Mississippi River that could potentially meet the Project’s need, and in particular, those that provided options for avoiding the Refuge. Based on this request, the Utilities completed an examination of potential Mississippi River and Refuge crossing locations. To comply with the USFWS’s request, the Utilities first defined northern and southern boundaries for their Mississippi River crossing analysis using the following criteria, not listed in order of importance:

• Meet the Project’s purpose and need; • Provide multiple opportunities on the Iowa side which requires that route planning begin with routes near and parallel to roads, railroad rights-of-way, or division lines of land. Iowa Code § 478.18(2) and 199 Iowa Administrative Code [IAC] 11.1(7)); • Provide multiple opportunities on the Wisconsin and Illinois side to follow existing utility corridors, highways, railroad corridors, and recreational trails in accordance with the state’s routing priorities. Wis. Stat. § 1.12(6); Ill. Stat. 220 ILCS 5/8-406.1; • Allow adequate area for routing to avoid municipalities, where possible; • Allow adequate area for routing to avoid conservation areas and sensitive habitats, where possible; • Allow for multiple potential crossing locations of the Mississippi River with existing linear infrastructure present; and • Provide opportunities to limit impacts to densely populated areas.

Utilities’ delineation of the river crossing study area was presented in the Alternative Crossings Analysis (“ACA”) report submitted to USFWS in April 2016 (ACA, § 3.1). Based on the above criteria and with input from USFWS, the Utilities defined the northern boundary along the river as Guttenberg and the southern boundary as Dubuque. The Utilities then delineated a river-crossing study area referred to as the “ACA Study Area” (ACA, § 3.2).

Dairyland Power Cooperative 3-2 Cardinal-Hickory Creek T-Line Project Macro-Corridor Study The Utilities’ MCS Methodology

Within the ACA Study Area, the Utilities identified seven alternative crossing locations for evaluation, all at existing infrastructure crossings of the Mississippi River. Locating the Project near existing infrastructure would reduce the need for new corridors and reduce new environmental and human impacts. These seven crossing locations listed from north to south are:

• Lock and Dam No. 10 in Guttenberg, Iowa (“L&D 10”); • Turkey River Substation to the Nelson Dewey Power Plant crossing in Cassville, Wisconsin (“Nelson Dewey”); • Millville to Stoneman 69 kV transmission line and Turkey River to Stoneman 161 kV line crossing (co-located) in Cassville, Wisconsin (“Stoneman”); • Lock and Dam No. 11 in Dubuque, Iowa (“L&D 11”); • Highway 61/151 crossing in Dubuque, Iowa (“Highway 151 Bridge”); • Dubuque to Galena 161 kV line crossing in Dubuque, Iowa (“Galena 161 kV Line”); and • Julien Dubuque Bridge/Highway 20 crossing in Dubuque, Iowa (“Julien Dubuque Bridge”).

A map of the seven river crossing locations is set forth below as Figure 3-1.

Four of these crossings were located outside of the Refuge boundaries (Lock and Dam No. 11, Highway 151 Bridge, Galena 161 kV Line, Julien Dubuque Bridge) and three were located within the Refuge (Lock and Dam No. 10, Stoneman, and Nelson Dewey). At USFWS staff’s request, the Utilities assessed the engineering constraints and potential environmental and social impacts of conceptual routes to the four non-Refuge crossing locations and of conceptual routes to the three Refuge crossings (ACA, Chapter 5).

Dairyland Power Cooperative 3-3 Cardinal-Hickory Creek T-Line Project !

!

!

!

!

!

!

!

!

!

!

Clayton Bagley Bloomington Locator !!Map !

! WISCONSIN! !

! Grant IOWALancaster 129 County «¬ ! «¬35 ! ! ! ILLINOIS ! ! ! 81 ! 81 «¬ ! «¬ L&D 10 ! ! 52 ! ¤£ ! ^_ ! Guttenberg ! !

! ! ¤£61 ! ! !

Nelson !

! ! !

! ! ! ! ! ! ! ! ! ! ! ! ! Osterdock Dewey ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ^_ Cassville Stoneman Millville ^_ Tennyson «¬133 Potosi North Buena Vista

Clayton County ¤£151 Balltown Dubuque Dickeyville County

Sherrill «¬3 Luxemburg Holy Cross ¤£52 Rickardsville 136 «¬ Durango L&D 11

61 New Vienna *# Sageville ^_ ¤£

Highway 151 Bridge 11 Hickory Creek Asbury Dubuque ^_ «¬ Substation«¬136 Bankston ^_ Galena 161 kV East Graf ^_ Dubuque

Dyersville Jo Daviess Centralia Julien Dubuque County Bridge Delaware Epworth Peosta Farley County ¤£20 ¤£52 «¬136 ¤£61

Worthington ¤£151 Jackson County

*# Substation Existing 345 kV County Figure 3-1 Municipal ACA Study Area Existing 161 kV Cardinal-Hickory Creek Area Cardinal-Hickory Creek !! Existing 138 kV Transmission Line Project Initial Study Area State ACA Study Area with the Seven River Crossing Locations ^_ Alternative Crossing Location Not to Scale

COPYRIGHT© 2016 BURNS & INC. McDONNELL ENGINEERING COMPANY, Path:R:\ITC\74417_Hickory_Crk_Cassville\GIS\DataFiles\ArcDocs\ACA_Report_Figures\Figure3_1_PreviouslyFigure1_6_ACA_AnalysisArea_20160405.mxd ebrenna 7/13/2016 Source: Energy Velocity, NTAD, UGSG; ESRI, ATC, ITC Midwest, Burns & McDonnell Issued 7/13/2016 Macro-Corridor Study The Utilities’ MCS Methodology

Consistent with the USFWS Mitigation Policy, the Utilities examined whether there were feasible alternatives to avoid impacts to the Refuge. The Utilities provided information to and sought analyses from federal, state, and local entities with permitting authority over the relevant crossing locations (ACA, Chapter 7). Some entities informed the Utilities that the non-Refuge alternatives conflicted with technical engineering requirements of existing infrastructure and others indicated that they would not issue the necessary permits because of conflicts with the requirements of local ordinances (ACA, § 5.6.1.2.1, 5.6.1.2.4, 5.6.2.2.1, 5.6.2.2.3, 5.6.3.2.1, 5.6.3.2.2, 5.6.4.2.2). Based on the thorough analysis contained in the ACA, the Utilities determined that all of the crossing locations outside of the Refuge are not feasible for the Project (ACA, § 5.6.5).

As to the crossing alternatives located within the Refuge, the Utilities concluded that one of the crossings within the Refuge, Lock and Dam No. 10, would have extensive impacts to the human and natural environments, including impacts to the City of Guttenberg (ACA, § 5.7.1). The USACOE also evaluated this crossing and informed the Utilities that it could not approve a crossing on or by the dam due to conflicts with dam operations and safety concerns (ACA, § 5.7.1.2.1). The Utilities eliminated Lock and Dam 10 from further consideration because it was deemed not feasible due to these considerations.

The only crossing locations that were found worthy of additional analysis are located within the Refuge, both near Cassville, Wisconsin: (1) Nelson Dewey and (2) Stoneman (ACA, §§ 5.7.2-5.7.3). Use of either of these crossing locations for the Project would require approval from the USFWS, the USACOE, state authorities, and, depending on the specific locations, local Iowa authorities.

The Utilities are proposing the use of structures within the Refuge that would minimize the potential future impact on resources and habitats within Refuge lands (ACA, § 8.2.1 to 8.2.3). The Utilities are presenting a 345 kV/345 kV design, but would operate the lines at 345 kV/161 kV until system conditions warranted operating the facility at 345 kV/345 kV. While the current needs are for a 345 kV line and a 161 kV line, the increase in voltage capability of the second circuit is a prudent and cost-effective investment to accommodate additional transmission facilities in a manner that would avoid future impacts to the Refuge if another 345 kV transmission line between Iowa and Wisconsin is needed in the future. See Appendix A for a description of the structures that would be used within the Refuge and that would cross the Mississippi River. The low-profile design of the 345 kV/ 345 kV structure proposed by the Utilities is designed to minimize avian impacts by matching the length of the insulators on both circuits and by reducing the number of planes of wires for birds to avoid. The USFWS has not yet provided the Utilities with a determination regarding whether the proposed transmission line can be constructed within the Refuge.

Dairyland Power Cooperative 3-5 Cardinal-Hickory Creek T-Line Project Macro-Corridor Study The Utilities’ MCS Methodology

3.2.2 Development of the Project Study Area Based on Feasible River Crossing Locations, the Two End Points, and an Intermediate Substation. The goal when developing the Project Study Area is to outline a small enough area to encompass only reasonable alternatives (i.e., based on engineering and cost considerations that meet the purpose and need), but large enough to include an adequate number of alternative corridors (RUS, 2016, § 3.1). After eliminating the five infeasible Mississippi River locations from further consideration, the Utilities developed a study area based on the Stoneman and Nelson Dewey crossings. The Project Study Area encompasses these two river crossings and the two end-point substations that were approved by MISO. (See Figure 1-2 for the Project Study Area.)

The northern boundary of the Project Study Area was established in part due to the location of the Wisconsin River. During the development of the Project Study Area, the Utilities determined that including areas north of the Wisconsin River would add a second and third major river crossing to the Project and would encounter additional civic and environmental sensitivities, like the community of Spring Green and the Lower Wisconsin Riverway. For these reasons, the Project Study Area boundary does not include the Wisconsin River, or lands north of it. The Utilities defined the Project Study Area as shown in Figure 1-2 with sufficient size to allow for evaluation of areas with differing environmental, engineering and regulatory constraints (RUS, 2016, § 3.1).

The MISO-approved design for the Project included an intermediate substation in the vicinity of Montfort, Wisconsin. The potential siting area for this intermediate substation location was developed by evaluating a number of siting criteria including suitable topography, the locations of existing transmission lines that provide routing opportunities for the new line, the locations of the existing lower voltage lines that would need to interconnect with this substation, and the avoidance of siting constraints that occur in the area. The resulting siting area for this intermediate substation is shown below in Figure 3-2 (“Montfort Substation Siting Area”).

Dairyland Power Cooperative 3-6 Cardinal-Hickory Creek T-Line Project

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

! ! !

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

! !

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

! !

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

! !

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

! !

)"G Rd ! w ! lo Bridge Rd Bluff Rd Bluff ol

Volenec Ln Volenec r H ! ge !

ad Oak St B ! ! ! ! ! ! ! ! ! ! !

! ! ! ! ! ! ! ! ! ! £18 Route 66 ! ! ! !

I ! )" ! !

Main St !

West St West ! ! ! Park St ! !

Edgington Rd !

Blue River Rd ! ! !

Maple St ! ! ! ! ! !

Highland Rd ! ! ! A St ! ! ! ! ! ! ! Montfort Eden ! ! ! ! ! ! !

! ! ! ! ! ! ! ! ! ! ! ! ! !

Grant St ! ! Substation ! ! ! ! ! ! ! #* ! Motel St 1st St ! A St ! !

! ! ! ! ! ! !

! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! JohnsonSt ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !

! ! ! ! ! Wall StWall ! ! ! ! ! ! ! ! ! ! £18

Old 18 £18 £ Elm St ! ! ! Clifton St Cobb !

! t Benson S !

! M Bethel Rd Bethel

! #0 #0 #0 a ! #0 #0 #0 #0 #0 #0 #0 #0 #0 #0 #0 #0 #0 #0 r i ! ly

! AndersonLn n Dr ! !

!

!

! ! ! !!!!

!

! ! !!

! !

! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! Ebenezer Rd ! ! ! ! ! ! ! ! B ! ! ! ! ! ! ! )" "B ! ) !

! Stockyard Rd ! # ! 0 #0 #0 !

! ! !

! ! !

! GRANT ! IOWA DrinkwaterRd !

! COUNTY ! COUNTY !

! !

! ! ! !

! ! XX ! ! )" Macro-Corridors ! La Platte La Rd 80 CARDINAL-HICKORY CREEK

ST! ! ! TRANSMISSION LINE Substation

! Project Study Area ! PROJECT Siting Area ! ! Outside Project Study Area ! FIGURE 3-2 ! ! #* Substation ! MONTFORT SUBSTATION Rd Vickerman

! ! #0 Wind Turbine ! SITING AREA Hopewell Rd ! ! G

! 69 kV Transmission Line )" ! )"IG )"IG ! ! ! ! 138 kV Transmission Line ! ! ! MINNESOTA ¤£ US Highway ! WISCONSIN ! ") County Highway ! ! Lake Road

! ! Michigan ! Rock Church Rock Rd State Boundary City / Village

! Goldman Ln ! ! IOWA ! County Boundary ! Open Water ! ! ! ILLINOIS ! Map Area Shown in Red

!

! µ Felland Rd Felland

! ! 0 1,000 2,000 3,000 4,000

! Drinkwater Rd Drinkwater ! Martinville Rd ! Feet ! )"X )"X )"X ! ! ! ! ! !

! XX ! )" !

!

Hickory Grove Rd Grove Hickory ! ! ! F:\Projects\C-HC\Mxds\MCS\Figure 3-2 Montfort Substation Siting Area.mxd Data Sources: ATC, USGS, WDNR, WDOT. 7/15/16

! !

!! ! !

! !

!! ! !

! ! ! ! ! ! ! ! ! ! ! !! ! ! ! !

! ! !

! ! ! ! !

! ! !

! ! ! !

! ! !

!

!

! !

! ! !

!

! !

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

! ! !

!! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! Macro-Corridor Study The Utilities’ MCS Methodology

3.2.3 Collect Data and Receive Feedback about the Project Study Area The Utilities continue to collect data and information about the Project Study Area to help identify and analyze areas of routing opportunities and constraints (RUS, 2016, Exhibit D, § 3.2). The Utilities collected data regarding the land use, natural resources, and human environment. The Utilities collected this data from a variety of federal, state, local agencies, units of government, independent experts, landowners, NGO’s, utilities, other interested parties, and the general public. The data collected included such information as historical and cultural resources, recreation areas, airports, existing utility and transportation corridors, geology, soil types, wetlands, water resources, flood hazard areas, environmentally sensitive areas, wildlife resources, existing land uses, land cover, and socioeconomic data such as, population characteristics, employment statistics, and racial/ethnic demographics, all of which are discussed in Section 4. Appendices B and C, respectively, provide tables listing the databases utilized and field reconnaissance that has been conducted to date. Appendix D summarizes the public outreach that has been completed. The data was compiled in a GIS database and/or a stakeholder- relationship management software and used to support development and refinement of the macro- corridors.

3.2.4 Define Macro-Corridors Once the Project Study Area was defined, the Utilities began to investigate potential macro-corridors. The RUS Guidance defines “macro-corridor” as follows:

…broad linear area of land within which the alternative corridors can be located for further study and comparison. This area encompasses the end points of a proposed transmission corridor and is located within the larger study area. The macro-corridor may consist of one contiguous broad area within which many alternative corridors could be located or more than one broad linear area each providing an alternative corridor possibility (i.e., each macro-corridor could become a corridor alternative but much wider) (RUS, 2016, § 3.1).

The Utilities focused on several overarching objectives to identify potential macro-corridors, including the following:

• Compliance with Wisconsin and Iowa laws regarding the routing of transmission lines. In Wisconsin, this includes maximizing opportunities to use existing utility and transportation rights-of-way. In Iowa, this requires that the planning for a route begins with routes that are near or parallel to roads, railroad rights-of-way, or division lines of land; • Compliance with North American Electric Reliability Corporation (“NERC”) electrical system planning standards; • Compliance with the RUS Guidance; and

Dairyland Power Cooperative 3-8 Cardinal-Hickory Creek T-Line Project Macro-Corridor Study The Utilities’ MCS Methodology

• Minimization of environmental, cultural, engineering, economic, socioeconomic, and land use impacts.

Field reconnaissance was conducted to verify information for the Project Study Area and to refine the potential macro-corridors. (See Appendix C listing the field reconnaissance activities.) More detailed analysis of constraints and the mitigation potential of possible adverse impacts also helped reduce the number of reasonable corridors. This required the collection of more detailed (location-specific) data. After developing the macro-corridors, the Utilities sent a letter to tribal nations requesting input. See Appendix E regarding Tribal outreach.4 The Utilities also held open houses in May 2016 to seek feedback to further refine these corridors (Figure 3-3). Appendix F provides a report on the 2016 open houses and a summary of the public comments received.

3.2.5 Refine Macro-Corridors into Alternative Corridors Input from federal, state, and local agencies, utilities, landowners, and other interested parties was key to enabling the Utilities to winnow the macro-corridors to alternative corridors. The RUS defines “alternative corridors” as follows:

…linear areas within a macro-corridor that are deemed most suitable for placement of the proposal when the natural environment, built (man-made) environment, and engineering requirements are considered. The width of the corridor must be large enough to allow latitude in specifically locating the transmission line but not so broad as to be meaningless (RUS, 2016, § 3.1).

Based on additional feedback, the Utilities selected two alternative corridors in Wisconsin and a refined alternative corridor in Iowa; these alternative corridors are described in Section 7.

3.2.6 Based on State Law Requirements, Select Two Alternative Routes in Wisconsin and One Alternative Route in Iowa Based on state law requirements, the Utilities will ultimately be submitting two alternative routes in Wisconsin to the PSCW for consideration and one route in Iowa to the IUB. The RUS Guidance defines “route” as “a constructible right-of-way (ROW) within an alternative corridor” (RUS, 2016, § 3.1). The Utilities anticipate submitting their applications to the PSCW and IUB, in 2018 and 2019 respectively.

4 As of the filing of this MCS, the Utilities have not received any input from tribal nations.

Dairyland Power Cooperative 3-9 Cardinal-Hickory Creek T-Line Project ALLAMAKEE ST80 £14 COUNTY RICHLAND 130 SAUK 23 COUNTY ST ST COUNTY £12 Harpers Ferry ST60 60 ST 78 61 14 60 ST ST19 £ 133 £ ST ST19 ST364 ST179 ST ST133 CRAWFORD £14 12 COUNTY £ £ ST131 CARDINAL 130 ST23 SUBSTATION ST £14 27 ST80 ST35 ST #* W I S C O N S I N ST78 ST76 DANE COUNTY 60 £12 £18 ST Blue Mound ST133 State Park McGregor Gov. Dodge State Park Wisconsin River ST340 IOWA £18 COUNTY ST23 £18 £18 £18

78 PROPOSED ST 191 ST69 61 SUBSTATION ST £ 151 92 Clayton SITING AREA £ ST ST39

GRANT ST39 COUNTY 129 80 ST69 ST35 ST ST 35 ST 78 £52 ST ST39 ST92

ST133 151 Guttenberg £ CLAYTON 23 Macro-Corridors 81 ST COUNTY ST81 ST CARDINAL-HICKORY CREEK TRANSMISSION LINE Project Study Area Substation PROJECT Siting Area £61 151 Osterdock £ Outside Project Study Area 69 EnvironmentallyST Sensitive Lands* Millville 133 FIGURE 3-3 ST 81 ST126 MACRO-CORRIDORSST * Includes Federal WildlifeGREEN Refuges, State Fishery Areas, Managed ST80 Forests, Natural Areas,COUNTY Parks, Waterfowl/Wetland Management Mississippi River £151 Areas, Wildlife Refuges, County Parks, and Municipal Parks. North Buena Vista £ Darlington ST81 LAFAYETTE ST81 #* Substation £61 MINNESOTA £ COUNTY WISCONSIN Interstate, US or State Highway

Balltown Lake State Boundary City / Village ST23 ST78 Michigan County Boundary Open Water Luxemburg I O W A Sherrill ST3 Holy Cross IOWA

£52 Rickardsville ILLINOIS µ £61 Map Area Shown in Red ST386 £ 0 1 2 3 4 5 DUBUQUE Durango 80 ST11 ST ST11 ST69 COUNTY #* Sageville Miles ST78 ST924 ST11 136 ST Asbury HICKORY ££15161 Dubuque CREEK Graf 20 Dyersville SUBSTATION £ ST966 £20 ST968 Centralia I L L I N O I S F:\Projects\C-HC\Mxds\MCS\Figure 3-3 Macro-Corridors.mxd Data Sources: ATC, DPC, IDOT, IDNR, ITC, USGS, WDNR, WDOT. 9/08/16 Macro-Corridor Study The Utilities’ MCS Methodology

3.2.7 Reasonable Alternative Corridors for the Scoping Process Utilities have identified the alternative corridors described in Section 7 and determined they are reasonable for the development and evaluation of alternatives for this Project and should be presented as part of the Project scoping process. These alternative corridors should be included in the Notice of Intent so that they can be studied during the RUS scoping process. The Utilities recognize that, through its NEPA process, the RUS and cooperating agencies will be evaluating whether any additional alternative corridors should be evaluated in the federal EIS.

Dairyland Power Cooperative 3-11 Cardinal-Hickory Creek T-Line Project Macro-Corridor Study Project Study Area Characteristics

4.0 PROJECT STUDY AREA CHARACTERISTICS

Data were collected for Project Study Area resources likely to be affected by construction, maintenance, and operation of the Project. Summaries of the data for resources within the Project Study Area are presented below for each state (Wisconsin and Iowa).

4.1 Physiography and Geology

4.1.1 Physiography The Project Study Area is within the Central Lowland physiographic province. Physiographic regions are broad divisions of land based on terrain, rock type, and geologic formations and history. The Central Lowland physiographic province is a part of the Interior Plains division and is divided into several different sections in Iowa. The Project Study Area is located at the interface of the Dissected Till Plains section and the Wisconsin Driftless section. The Dissected Till Plains area was flattened by the most recent glaciation, resulting in the gently rolling hills and fertile soils. The Wisconsin Driftless section, however, contains areas of rough terrain that was unglaciated. These areas are dissected by tributaries of the Mississippi River, creating great relief in some areas along its banks (USGS, 2003; USGS and NPS, 2000).

The entire Wisconsin portion of the Project Study Area is within the Wisconsin Driftless section. The Iowa portion of the Project Study Area contains both the Dissected Till Plains section and the Wisconsin Driftless section. The Project Study Area physiography is depicted on Figure 4-1.

The Project Study Area includes several areas that contain known algific slopes. This landform, also known as a cold air slope, is very rare and is only found in the ‘’ of Iowa, Wisconsin, Illinois, and Minnesota. Algific slopes stay cool on hot summer days as a result of their geologic and topographical formation.

4.1.2 Geology The geology of the Project Study Area is dominated by sedimentary formations impacted by previous glacial activity in the Till Plains and dissected by erosion in the Driftless Area. The primary sedimentary formations include dolostone (dolomite) with some shale and sandstone. The acreages of the geologic types found within the various counties in the Project Study Area are listed in Table 4-1. The distribution of geologic types within the Project Study Area is depicted in Figure 4-2.

Dairyland Power Cooperative 4-1 Cardinal-Hickory Creek T-Line Project Sauk City ALLAMAKEE Lynxville Dane 27 ST80 COUNTY ST £14 131 RICHLAND ST SAUK 23 COUNTY 130 ST £12 ST COUNTY Harpers Ferry 60 ST 78 61 Avoca 60 ST ST19 Steuben £ Blue River 133 Muscoda Lone Rock ST ST19 ST364 ST179 ST Spring Green Mazomanie Eastman £14 Arena £12 CRAWFORD CARDINAL COUNTY ST131 Boscobel Black Earth SUBSTATION ST130 £14

27 ST80 ST23 ST35 ST Middleton Wauzeka Woodman #* ST78 W I S C O N S I N DANE Madison ST76 COUNTY 12 £18 Prairie du Chien ST60 £ Wisconsin River Highland Blue Mound ST133 State Park McGregor Gov. Dodge State Park Blue Mounds Barneveld £18 Mount Horeb ST340 IOWA £ COUNTY ST23 Ridgeway £18 Verona £18 Fennimore Mount Hope £18 Montfort Cobb Dodgeville

Patch Grove ST78 69 Linden ST191 ST £61 £151 Clayton Bagley ST92 Livingston Bloomington ST39

GRANT ST39 Hollandale COUNTY Mineral Point Belleville Lancaster 129 ST80 ST35 ST Rewey ST35 £52 ST78 ST39 ST92 New Glarus Blanchardville 69 ST133 151 ST Guttenberg £ CLAYTON ST81 ST23 ST81 CARDINAL-HICKORY CREEK COUNTY £61 Project Study Area TRANSMISSION LINE Outside Project Study Area PROJECT Monticello Osterdock Platteville £151 Belmont PHYSIOGRAPHIC SECTIONS Cassville Wisconsin Driftless Dissected Till Plains Millville 133 FIGURE 4-1 ST 81 ST126 PHYSIOGRAPHYST Argyle Eastern LakeGREEN Till Plains Tennyson ST80 COUNTY Mississippi River Potosi £151 North Buena Vista £ Darlington #* Substation ST81 LAFAYETTE ST81 Interstate, US or State Highway £61 MINNESOTA COUNTY WISCONSIN State Boundary City / Village Balltown Lake Michigan County Boundary Dickeyville ST23 Open Water

Luxemburg Holy Cross I O W A Sherrill Cuba City ST3 IOWA Monroe £52 µ Rickardsville Gratiot ILLINOIS Browntown £61 Benton Shullsburg Map Area Shown in Red 0 1 2 3 4 5 ST386 South Wayne DUBUQUE Durango 80 ST11 ST ST11 ST69 COUNTY #* Sageville Miles ST78 ST924 Hazel Green ST136 Asbury HICKORY ££15161 Dubuque CREEK Graf 20 Dyersville SUBSTATION £ ST966 £20 ST968 Centralia I L L I N O I S F:\Projects\C-HC\Mxds\MCS\Figure 4-1 Physiography.mxd Data Sources: ATC, DPC, IDOT, IDNR, ITC, USGS, WDNR, WDOT. 7/15/16 Macro-Corridor Study Project Study Area Characteristics

Table 4-1: Geologic Types by County – Wisconsin and Iowa

State/County Rock Type Acres Wisconsin Dane dolostone (dolomite) 53,498 Dane sandstone 41,614 Dane shale 1,118 Grant dolostone (dolomite) 254,667 Grant sandstone 78,630 Grant shale 548 Iowa dolostone (dolomite) 195,066 Iowa sandstone 88,406 Iowa shale 1,058 Lafayette dolostone (dolomite) 16,316 Lafayette sandstone 1,930 Lafayette shale 3,463 Iowa Clayton dolostone (dolomite) 19.914 Clayton shale 6,184 Dubuque dolostone (dolomite) 32,053 Dubuque shale 3,416

Dairyland Power Cooperative 4-3 Cardinal-Hickory Creek T-Line Project Sauk City ALLAMAKEE Lynxville Dane £14 COUNTY RICHLAND ST80 £ £12 ST131 ST130 SAUK ST23 COUNTY COUNTY Harpers Ferry 60 ST60 ST 78 61 Avoca ST ST19 Steuben £ Blue River 133 Muscoda Lone Rock ST19 ST364 ST179 ST Spring Green Mazomanie Eastman £14 Arena £12 CRAWFORD CARDINAL COUNTY ST131 Boscobel Black Earth SUBSTATION ST130 £14 27 ST80 ST23 ST35 ST Middleton Woodman * Wauzeka # W I S C O N S I N ST78 ST76 DANE Madison COUNTY £12 £18 Prairie du Chien Highland Blue Mound Wisconsin River 133 State Park ST60 ST McGregor Gov. Dodge State Park Blue Mounds Barneveld £18 Mount Horeb ST340 IOWA COUNTY ST23 Ridgeway £18 Verona £18 Fennimore Mount Hope £18 Montfort Cobb £18 Dodgeville

Patch Grove ST78 69 Linden ST191 ST £61 Clayton Bagley £151 ST92 Livingston £ Bloomington ST39

GRANT ST39 Hollandale COUNTY Mineral Point Belleville Lancaster 129 ST80 ST69 ST35 ST Rewey 35 ST 78 £52 ST ST39 ST92 Blanchardville New Glarus ST133 151 Guttenberg £ CLAYTON ST23 81 ST81 COUNTY ST CARDINAL-HICKORY CREEK Project Study Area TRANSMISSION LINE PROJECT Outside Project Study Area £61 Monticello Osterdock Platteville £151 Belmont GEOLOGY 69 Cassville Dolostone (dolomite) STShale Millville 133 FIGURE 4-2 ST 81 ST126 STGEOLOGY Argyle SandstoneGREEN Tennyson COUNTY Mississippi River Potosi £151 North Buena Vista £ Darlington #* Substation ST81 LAFAYETTE ST81 Interstate, US or State Highway MINNESOTA COUNTY WISCONSIN State Boundary City / Village Balltown ST78 Lake Dickeyville Michigan County Boundary Open Water ST23 ST3 Luxemburg Holy Cross I O W A Sherrill Cuba City IOWA Monroeµ 52 Rickardsville £ Gratiot ILLINOIS Browntown £61 Benton Shullsburg Map Area Shown in Red 0 1 2 3 4 5 ST386 South Wayne DUBUQUE Durango 80 ST11 ST ST11 ST69 COUNTY #* Sageville Miles ST78 ST924 Hazel Green 136 Asbury ST HICKORY ££15161 Dubuque CREEK Graf 20 Dyersville SUBSTATION £ ST966 £20 ST968 Centralia I L L I N O I S F:\Projects\C-HC\Mxds\MCS\Figure 4-2 Geology.mxd Data Sources: ATC, DPC, IDOT, IDNR, ITC, USGS, WDNR, WDOT. 7/15/16 Macro-Corridor Study Project Study Area Characteristics

4.2 Land Use and Land Cover Land use and land cover data was obtained from United States Geologic Service (“USGS”) National Land Cover Dataset (“NLCD”) (USGS, 2011). Land cover data are derived from satellite imagery and describe general categories of land use. Figure 4-3 depicts land use and land cover classes within the Project Study Area. Table 4-2 provides definitions for land cover classes as defined by NLCD.

The Utilities assessed land-cover classes that would be generally compatible with transmission line construction and operation. Opportunity land-cover classes include property, field, or survey lines associated with cultivated crops and pasture/hay as well as barren, scrub, and grassland categories. Developed areas classified as developed-medium intensity, developed-low intensity, and developed-open space were also considered as more compatible with transmission line construction and operation than developed-high intensity areas.

The Utilities also assessed some land-cover classes as avoidance areas because they may present challenges to transmission line routing. When possible, areas identified by NLCD as open water, forest, wetlands and developed-high intensity, were assessed as avoidance areas, except where utility corridors already exist in Wisconsin. In areas where avoidance is not possible, appropriate agency consultation will be made and applicable mitigation measures taken.

4.2.1 Land Use and Land Cover - Wisconsin In Wisconsin, a large portion of the Project Study Area is covered by cultivated crops and pasture/hay with forest interspersed throughout. Grassland/herbaceous cover type occurs, but to a lesser extent. Forest areas are often associated with water and wetlands. Forested areas are more prevalent near the Mississippi and Wisconsin Rivers with primarily agricultural land cover seen throughout the rest of the Project Study Area. Developed areas are primarily associated with the communities of Dodgeville, Platteville, Mount Horeb, and Lancaster, but are also scattered throughout the region in smaller communities. Wetlands are most prevalent in drainages and in-and-around the Mississippi and Wisconsin Rivers, but occur throughout the Project Study Area.

Land cover types within the Wisconsin portion of the Project Study Area include land classified as: open water; developed-open space; developed-low intensity; developed-medium intensity; developed-high intensity; barren land; emergent and woody wetlands; deciduous, evergreen, and mixed forest; grassland/herbaceous; pasture/hay; cultivated crops; and shrub/scrub land.

Dairyland Power Cooperative 4-5 Cardinal-Hickory Creek T-Line Project Sauk City ALLAMAKEE Lynxville Dane ST80 £14 130 COUNTY RICHLAND ST SAUK ST23 COUNTY COUNTY £12 Harpers Ferry 60 ST 78 61 Avoca 60 ST ST19 Steuben £ Blue River 133 Muscoda Lone Rock ST ST19 ST364 ST179 ST Spring Green Mazomanie Eastman £14 Arena £12 CRAWFORD CARDINAL COUNTY ST131 Boscobel Black Earth SUBSTATION ST130 £14 27 ST80 ST23 ST35 ST Middleton Woodman #* Wauzeka W I S C O N S I N ST78 ST76 DANE Madison COUNTY £12 £18 Prairie du Chien £61 Highland Blue Mound ST133 State Park McGregor Wisconsin River Gov. Dodge State Park Blue Mounds ST60 Barneveld ST340 IOWA £18 Mount Horeb COUNTY ST23 Ridgeway £18 Verona 18 Fennimore £ 18 Mount Hope £ Montfort 18 Cobb £ Dodgeville

Patch Grove ST78 69 Linden ST191 ST £61 Clayton Bagley ST92 Livingston Bloomington ST39

GRANT ST39 Hollandale COUNTY Mineral Point Belleville Lancaster 129 ST80 69 ST35 ST Rewey ST ST35 ST78 £52 ST39 ST92 Blanchardville New Glarus ST133 151 Guttenberg £ CLAYTON ST23 81 ST81 COUNTY ST CARDINAL-HICKORY CREEK Project Study Area TRANSMISSION LINE Outside Project Study Area £61 PROJECT Monticello Osterdock £ Platteville £151 Belmont £ LAND USE / LAND COVER Cassville Barren Land ST69 Open Water Millville 133 FIGURE 4-3 ST 81 ST126 LAND USEST / LAND COVERArgyle CultivatedGREEN Crops Pasture /Hay Potosi Tennyson ST80 DevelopedCOUNTY - Open Space, Scrub/Grassland Mississippi River £151 Low/Medium Intensity /Herbaceous North Buena Vista £ Darlington ST81 Developed - High Wetlands LAFAYETTE ST81 Intensity £61 MINNESOTA Forest COUNTY WISCONSIN Balltown #* Substation ST78 Lake Dickeyville Michigan Interstate, US or State Highway ST23 Luxemburg Holy Cross I O W A Sherrill Cuba City State Boundary City / Village ST3 IOWA Monroe £52 Rickardsville County Boundary Open Water Gratiot ILLINOIS Browntown £61 Benton Shullsburg Map Area Shown in Red ST386 South Wayne 0 1 2 3 4 5 DUBUQUE Durango 80 ST11 ST ST11 ST69 COUNTY #* Sageville Miles µ ST78 ST924 ST11 Hazel Green ST136 Asbury HICKORY ££15161 Dubuque CREEK Graf 20 Dyersville SUBSTATION £ ST966 £20 ST968 Centralia I L L I N O I S F:\Projects\C-HC\Mxds\MCS\Figure 4-3 Land Use Land Cover.mxd Data Sources: ATC, DPC, IDOT, IDNR, ITC, NLCD, USGS, WDNR, WDOT. 7/15/16 Macro-Corridor Study Project Study Area Characteristics

Table 4-2: NLCD Definitions for Land Cover Classes

Class (Number) NLCD Definition Barren (31) Barren areas of bedrock, desert pavement, scarps, talus, slides, volcanic material, glacial debris, sand dunes, strip mines, gravel pits, and other accumulations of earthen material. Generally, vegetation accounts for less than 15% of total cover. Shrub/Scrub (52) Areas dominated by trees generally greater than 5 meters tall and greater than 20% of total vegetation cover. More than 75% of the tree species maintain their leaves all year. Canopy is never without green foliage. Grassland/ Areas dominated by grammanoid or herbaceous vegetation, generally greater than Herbaceous (71) 80% of total vegetation. These areas are not subject to intensive management such as tilling, but can be utilized for grazing. Pasture/Hay (81) Areas of grasses, legumes, or grass-legume mixtures planted for livestock grazing or the production of seed or hay crops, typically on a perennial cycle. Pasture/hay vegetation accounts for greater than 20% of total vegetation. Cultivated Crops Areas used for the production of annual crops, such as corn, soybeans, vegetables, (82) tobacco, and cotton, and also perennial woody crops such as orchards and vineyards. Crop vegetation accounts for greater than 20% of total vegetation. This class also includes all land being actively tilled. Developed- Low Includes areas with a mixture of constructed materials and vegetation. Impervious Intensity (22) surfaces account for 20–49% of total cover. These areas most commonly include single family housing units. Developed- Medium Includes areas with a mixture of constructed materials and vegetation. Impervious Intensity (23) surfaces account for 50–79% of the total cover. These areas most commonly include single-family housing units. Developed- Open Includes areas with a mixture of some constructed materials, but mostly vegetation Space (21) in the form of lawn grasses. Impervious surfaces account for less than 20% of total cover. These areas most commonly include large-lot single-family housing units, parks, golf courses, and vegetation planted in developed settings for recreation, erosion control, or aesthetic purposes. Open Water (11) All areas of open water, generally with less than 25% cover of vegetation or soil. Deciduous Forest Areas dominated by trees generally greater than 5 meters tall and greater than 20% (41) of total vegetation cover. More than 75% of the tree species shed foliage simultaneously in response to seasonal change. Evergreen Forest Areas dominated by trees generally greater than 5 meters tall and greater than 20% (42) of total vegetation cover. More than 75% of the tree species maintain their leaves all year. Canopy is never without green foliage. Mixed Forest (43) Areas dominated by trees generally greater than 5 meters tall and greater than 20% of total vegetation cover. Neither deciduous nor evergreen species are greater than 75% of total tree cover. Woody Wetlands Areas where forest or shrubland vegetation accounts for greater than 20% of (90) vegetative cover and the soil or substrate is periodically saturated with or covered with water. Emergent Areas where perennial herbaceous vegetation accounts for greater than 80% of Herbaceous vegetative cover and the soil or substrate is periodically saturated with or covered Wetlands (95) with water. Developed- High Includes highly developed areas where people reside or work in high numbers. Intensity (24) Examples include apartment complexes, row houses, and commercial/industrial. Impervious surfaces account for 80–100% of the total cover.

Dairyland Power Cooperative 4-7 Cardinal-Hickory Creek T-Line Project Macro-Corridor Study Project Study Area Characteristics

4.2.2 Land Use and Land Cover - Iowa Generally, the land cover types within the Iowa portion of the Project Study Area are similar to those in Wisconsin, with the exception that mixed forest is not present in Iowa. The area is covered predominantly by cultivated crops and pasture/hay with forest interspersed throughout. The areas around the Mississippi River are heavily wooded in Iowa with large areas of deciduous forest. Developed areas are primarily associated with the communities of Millville, Luxemburg, and Holy Cross.

4.3 Sensitive Areas When routing a transmission line, the goal is to minimize potential effects to sensitive areas as much as feasible. The following sections summarize some of the major sensitive areas, which are protected environmental areas with significant permitting challenges and/or encompassing a large geographic expanse, within the Project Study Area. These major sensitive areas are depicted below on Figure 4-4.

4.3.1 Sensitive Areas – Wisconsin

4.3.1.1 and the Ice Age Complex at Cross Plains The Ice Age Trail is a National Scenic Trail located entirely within Wisconsin. The Ice Age Trail crosses the eastern edge of the Project Study Area, west of the Cardinal Substation in Dane County. The trail is also one of 42 designated Wisconsin state trails and the only one specifically designated as a "State Scenic Trail." From Interstate State Park on the Minnesota border to on Lake Michigan, the Ice Age Trail winds for more than 1,000 miles, following the edge of the last continental glacier in Wisconsin.

The Ice Age Trail goes through several state and federal lands in Wisconsin, including traveling many miles through county and private lands. In addition to the state parks and forests listed below (from west to east along the trail), the Ice Age Trail travels through many state wildlife and fishery areas and some state natural areas (WDNR-b, 2015).

Dairyland Power Cooperative 4-8 Cardinal-Hickory Creek T-Line Project Sauk City ALLAMAKEE Lynxville Dane ST80 £14 COUNTY RICHLAND 130 SAUK 23 COUNTY ST ST COUNTY £12 Harpers Ferry ST60 60 ST 78 £61 Avoca 14 ST60 ST ST19 Steuben £ Blue River ST133 Muscoda Lone Rock £ ST19 ST364 ST179 ST133 Arena Pines and Spring Green Sand Barrens SNA Mazomanie Eastman Arena £14 Black Earth £12 Retternmund CRAWFORD Prairie SNA ST131 Boscobel CARDINAL COUNTY Black Earth ST130 ST23 SUBSTATION Pleasant Valley £14 Conservancy SNA 27 ST80 ST35 ST Middleton Woodman Cross Plains #* Wauzeka State Park DANE ST78 W I S C O N S I N New Observatory Madison ST76 COUNTY Woods SNA 60 £12 £18 Prairie du Chien ST Highland Blue Mound ST133 Trout Creek State Park McGregor Gov. Dodge Watershed SNA State Park Blue Mounds Wisconsin River Ridgeway Pine Barneveld Pine Relict SNA £18 Mount Horeb ST340 IOWA Thompson Cliff SNA COUNTY ST23 Ridgeway Memorial Prairie SNA £18 Verona 18 Fennimore £ 18 Mount Hope £ Montfort Barneveld Cobb Prairie SNA Borah Creek Dodgeville Prairie Patch Grove SNA ST78 69 Linden ST191 ST £61 Clayton Bagley £151 ST92 Livingston £ Bloomington ST39

GRANT ST39 Hollandale COUNTY Pecatonica River Mineral Point Belleville Woods SNA Lancaster 129 ST80 ST69 ST35 ST Rewey 35 ST 78 £52 ST ST39 ST92 Blanchardville New Glarus ST133 Belmont £151 Guttenberg Mound CLAYTON State Park ST23 ST81 ST81 Belmont Mound CARDINAL-HICKORY CREEK COUNTY Woods SNA Project Study Area TRANSMISSION LINE Nelson Dewey Belmont State Park Prairie SNA Outside Project Study Area £61 PROJECT Monticello Osterdock Dewey Heights Platteville £151 Belmont Prairie SNA MAJOR SENSITIVE AREAS Cassville Cassville Bluffs Upper Mississippi River WildlifeST69 & Fish Refuge Millville SNA ST133 FIGURE 4-4 126 ST81 State ParkGREEN ST MAJOR SENSITIVE AREASArgyle Tennyson ST80 COUNTY Mississippi River Potosi £151 State Preserve or Natural Area North Buena Vista £ DarlingtonDarlington ST81 * LAFAYETTE ST81 # Substation £61 COUNTY Interstate, US or State Highway White Pine Hollow MINNESOTA State Preserve Balltown WISCONSIN State Boundary City / Village ST23 ST78 Dickeyville Lake Michigan County Boundary Open Water 3 Luxemburg Holy Cross I O W A Sherrill Cuba City ST Monroe IOWA 52 Rickardsville µ £ Gratiot Browntown £61 Benton Shullsburg ILLINOIS Durango ST386 South Wayne 0 1 2 3 4 5 DUBUQUE 80 Map Area Shown in RedST11 ST ST11 ST69 COUNTY #* Sageville Miles ST78 ST924 ST11 Hazel Green 136 ST Asbury HICKORY ££15161 Dubuque CREEK Graf 20 Dyersville SUBSTATION £ ST966 £20 ST968 Centralia I L L I N O I S F:\Projects\C-HC\Mxds\MCS\Figure 4-4 Major Sensitive Areas.mxd Data Sources: ATC, DPC, IDNR, IDOT, IDNR, ITC, USGS, WDNR, WDOT. 9/08/16 Macro-Corridor Study Project Study Area Characteristics

In 2001, Congress appropriated funds for the acquisition of specific lands in the Cross Plains unit of the Ice Age Reserve for an Ice Age National Scenic Trail Interpretive Site, called the Ice Age Complex. The Ice Age Complex at Cross Plains is a unit of the National Park Service (“NPS”) located west of Madison, southeast of Cross Plains, and south of Highway 14. The Ice Age Complex at Cross Plains contains lands owned and managed by the NPS, the WDNR, Dane County Parks, the USFWS, and private citizens. The Ice Age Complex is what is referred to as an Affiliated Area by the NPS. The NPS developed a General Management Plan (“GMP”) for the lands within the boundaries of the Complex.

4.3.1.2 State Natural Areas State natural areas (“SNAs”) protect outstanding examples of Wisconsin's native landscape of natural communities, significant geological formations, and archeological sites. They are valuable for research and educational use, for the preservation of genetic and biological diversity and for providing benchmarks for determining the impact of use on managed lands. They also provide some of the last refuges for rare plants and animals (WDNR, 2016). Several SNAs are located within the Project Study Area, including the Arena Pines and Sand Barrens SNA, Barneveld Prairie SNA, Belmont Mound Woods SNA, Belmont Prairie SNA, Cassville Bluffs SNA, Dewey Heights Prairie SNA, Ipswich Prairie SNA, Military Ridge Prairie Fee SNA, Pine Cliff SNA, Pleasant Valley Conservancy SNA, Ridgeway Pine Relict SNA, and Thompson Memorial Prairie SNA.

4.3.1.2.1 Governor Dodge State Park Located outside of Dodgeville in Iowa County, Governor Dodge State Park is one of the state's largest parks, with 5,350 acres of steep hills, bluffs, and deep valleys plus two lakes and a waterfall. Located in the Wisconsin’s Driftless Area, it is home to numerous species of wildlife and over 150 species of birds. Additionally, the tremendous variations in topography, exposures to sunlight and soil types provide a diverse array of habitats that support hundreds of plant species. The forests are oak-hickory in type, with many dozens of other tree species and shrubs mixed in. The sandstone areas support white pine (Pinus strobus), red pine (Pinus resinosa), and Jack pine (Pinus banksiana), and the spring wildflowers of the forests include bloodroot (Sanguinaria Canadensis), hepatica (Hepatica nobilis) and Dutchman's breeches (Dicentra cucullaria). The soil slopes produce almost solid communities of ferns, including giant interrupted ferns (Osmunda claytoniana L.) (WDNR, 2014).

4.3.1.2.2 Located near the Village of Blue Mounds in Dane and Iowa Counties, Blue Mound State Park sits atop the largest hill in the southern half of Wisconsin and features observation towers affording views of the Wisconsin River Valley and to the north, the buttes, mounds, and forests of the Driftless

Dairyland Power Cooperative 4-10 Cardinal-Hickory Creek T-Line Project Macro-Corridor Study Project Study Area Characteristics

Area to the south and west, and the glacial plains and City of Madison to the east. It is home to numerous species of wildlife, over 150 species of birds, and an abundance of flowering plant life (WDNR-a, 2015).

4.3.2 Sensitive Areas – Iowa

4.3.2.1 Merritt Forest State Preserve Clayton County, Iowa contains the 20-acre Merritt Forest State Preserve, which is located on the northwest boundary of the Project Study Area. This old-growth forest contains several trees that are over 300 years old. Tree species primarily include white oak (Quercus alba) and red oak (Quercus rubra), sugar maple (Acer saccharum), and basswood (Tilia Americana), while blue beech (Fagus grandifolia), witch hazel (Hamamelis Virgininca), alternate-leaved dogwood (Cornus alternifolia), and leatherwood (Dirca palustris) make up the understory of the forest.

Several dozen bird species have been sighted on the preserve and nearly 200 different plant species have been identified in the forest (IDNR, no date-a).

4.3.2.2 Turkey River Mounds State Preserve Turkey River Mounds State Preserve, a 62-acre area containing ancient Native American mounds, is also located within Clayton County. A total of 43 effigy mounds are located in the vicinity, with 38 mounds being located within the state preserve. These mounds were used as burial sites and ceremonial places between 500 BC and AD 900, and range in height from 1.3- to 6- feet tall. The conical mounds range from 20 to 100 feet in diameter, while linear mounds are anywhere from 80- to 175- feet long. The preserve is also home to a wide variety of plant communities that inhabit its ridge, cliffs, and slopes (IDNR, no date-a).

4.3.2.3 White Pine Hollow State Preserve White Pine Hollow State Preserve is located in northwest Dubuque County, approximately two miles northwest of Luxemburg. This 712-acre preserve is located in the western portion of the Paleozoic Plateau landform region along the Silurian Escarpment. This area is deeply dissected, with steep rock bluffs and outcroppings dominating its landscape. With its highest point being 320 feet above its lowest elevation, this preserve has a wide variety of habitats that support hundreds of plant and animal species (IDNR, no date-a).

4.3.3 Upper Mississippi River National Wildlife and Fish Refuge There are several important conservation properties within the Project Study Area. The most notable conservation area is the Refuge. Established in 1924, the Refuge is approximately 260 river-miles long,

Dairyland Power Cooperative 4-11 Cardinal-Hickory Creek T-Line Project Macro-Corridor Study Project Study Area Characteristics

stretching from the of the Chippewa River in Wisconsin to Rock Island, Illinois. The Refuge has 240,000 acres of Mississippi floodplain throughout four states along the Mississippi River: Minnesota, Wisconsin, Iowa, and Illinois. It is an important habitat for migratory birds, fish, and other wildlife, as well as many species of plants (USFWS, 2013-a). Over 306 species of birds visit the Refuge for its habitat, and 119 species of fish and 42 species of mussels live in the waters of the Refuge. In addition to these species, 51 species of mammals have been spotted on the Refuge. The Refuge is designated as a Wetland of International Importance (Ramsar) and a Globally Important Bird Area. Up to 40 percent of North American waterfowl utilize the river during annual migration. Some species in particular are more reliant on the Refuge. For example, approximately 50 percent of all canvasback ducks (Aythya valisineria) stop in the Refuge during their migration. Tundra swans (Cygnus columbianus) are also common visitors to the Refuge, with approximately 20 percent of the eastern United States population using the Refuge every year. Bald eagles (Haliaeetus leucocephalus) are a common sight during certain months as well. There have been 167 active eagle nests in recent years and approximately 2,700 bald eagles visit the Refuge during their spring migration. The Refuge is also an important area for tourists. The area receives nearly 3.7 million annual visits (USFWS, 2006). These visitors enjoy the scenic river overlooks from 500-foot-high bluffs, as well as exploring the river, its backwaters, and its islands. Tourists can also enjoy views from the National Scenic Byways located on either side of the Refuge.

The Refuge management is headquartered in Winona, Minnesota, and has four administrative districts: Winona District, La Crosse District, McGregor District, and the Savanna District. There are 11 locks and dams within the Refuge, and the districts are divided by river pools that are created by the locks and dams. As of 2006, the Refuge had 37 permanent employees and an annual base budget of $3.1 million. The headquarters also coordinate the Trempealeau and Driftless Area National Wildlife Refuges (USFWS, 2006). In 2006, the Refuge published a Comprehensive Conservation Plan (“CCP”) to set goals for the next 15 years after publication. The CCP delineated 43 objectives and strategies created to “help the Refuge achieve its purposes and contribute to the mission and policies of the National Wildlife Refuge System, while being sensitive to the needs of partner states and agencies, conservation organizations, communities, and the general public” (USFWS, 2006, p. v). The CCP also noted that “staff may be confronted with health, safety, or societal needs which must be addressed. Examples include a right of way expansion for a utility…” (USFWS, 2006, p. 160).

4.4 Wildlife Resources The Project Study Area includes areas providing valuable habitat for a number of terrestrial and avian species, including migratory birds that frequent wildlife conservation areas in the Project Study Area.

Dairyland Power Cooperative 4-12 Cardinal-Hickory Creek T-Line Project Macro-Corridor Study Project Study Area Characteristics

Typical animal species found in the Project Study Area include cottontail rabbit (Sylvilagus floridanus), the white-tailed deer (Odecoileus virginianus), badger (Taxidea taxus), coyotes (Canis latrans), raccoons (Procyon lotor), gray wolf (Canis lupis), blue jay (Cyanocitta cristata), American robins (Turdus migratorius), mallard duck (Anas platyrynchos), wild turkey (Meleagris gallopavo), ring-necked pheasant (Phasianus colchicus), the bobwhite quail (Colinus virginianus), gray (Hungarian) partridge (Perdix perdix), mourning dove (Zenaida macroura), bald eagle, barn owl (Tyto alba), osprey (Pandion haliaetus), beaver (Castor canadensis), and gray squirrel (Sciurus carolinensis), as well as a wide variety of fish, amphibians, reptiles, and plants.

4.5 Wetlands Wetlands are assessed as avoidance areas to minimize impacts on these environmentally sensitive resources. Wetlands are considered a valuable resource because they clean water, recharge water supplies, reduce flood risks, and provide habitat for many species of wildlife and vegetation (EPA, 2001). Executive Order 11990, Protection of Wetlands (May 24, 1977), directs all federal agencies to issue or amend existing procedures to ensure consideration of wetlands protection during decision-making processes and to ensure the evaluation of the potential impacts of any new construction proposed in a wetland. In addition, wetlands that are “waters of the U.S.” are under USACE jurisdiction, and activities that may impact such wetlands are subject to additional permitting requirements. If wetlands cannot be avoided, the appropriate agencies will be consulted and required permits will be obtained prior to construction.

Figure 4-5 shows the wetlands in the eastern half of the Project Study Area, and Figure 4-6 shows wetlands in the western half.

4.5.1 Wetlands - Wisconsin Data for Wisconsin wetlands were obtained from the Wisconsin Wetlands Inventory. Wetlands are concentrated along the Mississippi and Wisconsin Rivers and their tributaries. Small, isolated wetlands are also mapped throughout the Project Study Area. Wetlands occur throughout the Project Study Area and will be avoided where possible through line routing and by careful structure placement.

Dairyland Power Cooperative 4-13 Cardinal-Hickory Creek T-Line Project RICHLAND )"JJ )"C )"OO "KP COUNTY ST60 ) Wisconsin River £14 SAUK )"G ST60 COUNTY )"Y 78 )"P Avoca ST ST19 ST19 ST133 Muscoda Lone Rock )"G )"K ST133 Spring Green Mazomanie )"G Arena £14 )"F )"C )"C )"KP £12 )"KP )"P )"K )"NN Black Earth

)"N )"T )"FF £14 CARDINAL Cross Plains SUBSTATION M ST130 )" ST80 )"PP ST23 )"P Middleton #* )"T "I )"JJ Q ) )"K 12 )" )"HH ST78 £ II )"P )" Madison )"G )"H )"S )"ZZ )"J Q T )" Highland )" )"M )"F "JG )"J )"Q ) )"M )"Y DANE COUNTY ST23 )"S Z Blue Mounds )"I )" Barneveld ID "P )"BH )" ) )"PD 18 Mount Horeb IOWA £ J COUNTY Ridgeway )" GRANT Verona 18 COUNTY £ )"YZ ST78 £18 92 Montfort £18 "Z E ST £ T ) )" Cobb )"Z )"H )" ST69 )"Q CH Dodgeville )" )"Y )"G )"B )"BB )"B )"XX )"JG )"G )"B )"H CARDINAL-HICKORY CREEK )"IG Project Study Area PB )"K TRANSMISSION LINE )" )"H )"U Linden )"Y ST191 Outside Project Study Area )"X )"HK PROJECT WETLANDS )"A )"E Livingston )"E )"A )"A FIGURE 4-5 ST39 )"D )"W )"G Wetland )"YD WETLANDS QQ )" #* Substation County Highway Hollandale )"A Interstate, US or State )"H Highway Railroad ST39 ST39 "F JG ) MINNESOTA )" )"K WISCONSIN Belleville Mineral Point State Boundary City / Village )"DD )"J )"O )"J U Lake )"D )" Michigan County Boundary Open Water ST80 DDD )"DD Rewey )"A )" )"CC )"O IOWA µ )"S )"W ILLINOIS )"CC Map Area Shown in Red 0 New1 Glarus2 3 4 5 Blanchardville G GREEN )" Miles £151 COUNTY )"D LAFAYETTE "NN ST23 ) )"D COUNTY )"N )"G "J F ) )"D )"B )" Platteville )"F )"N Monticello )"C F:\Projects\C-HC\Mxds\MCS\Figure 4-15 Wetlands.mxd Data Sources: ATC, DPC, IDOT, IDNR, ITC, USGS, WDNR, WDOT. 7/15/16 Fennimore )"I )"X JJ )"K £18 )"G 18 )"Q £18 Mount Hope )" Montfort £ Cobb CH Dodgeville )"P )" )"F )"B Patch Grove )"B J XX )" )" )"B )"IG )"G £61 Linden )"K )"X )"Q )"Y ST23 Clayton Bagley )"E Livingston )"E IOWA Bloomington COUNTY ST39 )"YD )"QQ )"D A )" 39 Mineral Point ST DD 80 )" VV ST )"J )" ST133 Lancaster 129 ST35 ST )"A Rewey ST35 )"V "S )"V ) GRANT COUNTY )"G 151 D £ )" ST23 Guttenberg )"N ST81 ST81 )"VV )"G )"B £61 )"B )"C )"Y Platteville 151 Belmont G £ XX )" N )" )"G £52 )" )"O 126 ST Z Cassville )"U )" 133 Millville ST ST80 )"X CLAYTON )"N Tennyson O COUNTY Potosi )" )"F )"F Mississippi River £151 CARDINAL-HICKORY CREEK Project Study Area North Buena Vista TRANSMISSION LINE Darlington PROJECT Outside Project Study Area LAFAYETTE ST81 £61 COUNTY WETLANDS FIGURE 4-6 Wetland Balltown WETLANDS )"K #* Substation County Highway Dickeyville Interstate, US or State )"Q Highway Railroad)"E D MINNESOTA )" WISCONSIN State Boundary 3 Luxemburg City / Village ST Holy Cross I O W A Sherrill )"HH Cuba City £61 Lake )"J Michigan County Boundary Open Water )"O )"U £52 Rickardsville HHH )" IOWA DUBUQUE Shullsburgµ COUNTY Benton ST386 ILLINOIS)"I Durango Map Area Shown in Red J 0 1 2 3 4 5 ST136 )" )"P New Vienna Miles )"A #* Sageville I )" )"U )"W HICKORY ST11 Hazel Green )"O ST924 CREEK Z Asbury )" ZZ I SUBSTATION Dubuque £61 )" )" Bankston Dyersville £151 F:\Projects\C-HC\Mxds\MCS\Figure 4-6 Wetlands.mxd Data Sources: ATC, DPC, IDOT, IDNR, ITC, USGS, WDNR, WDOT. 7/15/16 Macro-Corridor Study Project Study Area Characteristics

4.5.2 Wetlands - Iowa Data for Iowa wetlands were also obtained from the National Wetlands Inventory. Wetlands in the Iowa portion of the Project Study Area are also mainly concentrated along the Mississippi River and small, isolated wetlands are also mapped throughout the Project Study Area. Although, occurrence of wetlands in Iowa is less concentrated than in Wisconsin, they will be treated similarly and will be avoided, where possible, by structure placement in siting the proposed transmission lines.

4.6 Cultural Resources Historic districts and historic sites that are registered with the National Register for Historic Places (“NRHP”), including landmarks, districts, and monuments, were assessed as areas to avoid. Avoidance is preferred, but if a new corridor is developed that contains large historic districts or sites, appropriate steps will be taken to address concerns regarding potential adverse impacts. Data on cultural and historic resources in the Project Study Area were obtained from NRHP (2009). The NRHP districts and sites are listed in Table 4-3 and shown in Figures 4-7 and 4-8. In addition to data collected from the NRHP, a review of data from the state historic preservation offices (“SHPO”) was conducted to identify state- designated cultural sites and resources that might be considered for NRHP registration.

4.6.1 Cultural Resources - Wisconsin Data from the Wisconsin State Historical Society (“WSHS”) determined that there are archaeologically sensitive areas throughout the Project Study Area in Wisconsin including, but not limited to, the following: cabins, campsites/villages, cemeteries/burial grounds, quarries, rock art, and workshop sites. If routes impacting them are chosen, these sites would require verification and investigation with the WSHS prior to construction. The sites identified by the WSHS have not been evaluated to determine their eligibility for listing on the NRHP.

4.6.2 Cultural Resources - Iowa Among other areas, the Iowa SHPO identified archaeologically sensitive areas at the Nelson Dewey/Stoneman crossing alternative, on the Iowa side of the Mississippi River, as it would cross in proximity to one mound group, thought to be from the Woodland period. This mound group has only been investigated through archival research and thus its integrity is unknown. If either of these crossing alternatives were chosen, the mound group location would need to be verified and its integrity investigated with Iowa SHPO and State Archeologist prior to start of construction activities. This site has not been evaluated to determine its eligibility for listing on the NRHP.

Dairyland Power Cooperative 4-16 Cardinal-Hickory Creek T-Line Project Macro-Corridor Study Project Study Area Characteristics

Table 4-3: Historic Districts and Places by County – Wisconsin and Iowa

State/Type County Name Wisconsin Historic District or Area Dane Mazomanie Downtown Historic District Historic District or Area Grant Bayley Avenue Historic District Historic District or Area Grant Courthouse Square Historic District Historic District or Area Grant Division Street Historic District Historic District or Area Grant Main Street Commercial Historic District Historic District or Area Grant West Main Street Historic District Historic District or Area Iowa Grove Street Historic District Historic District or Area Iowa Hyde Chapel Historic District or Area Iowa Iowa Street Historic District Historic Place Dane Dahle, Henry L. and Sarah, House Historic Place Dane Dahle, Herman B. and Anne Marie, House Historic Place Dane Heiney's Meat Market Historic Place Dane Hoff Department Store Historic Place Dane Lie, Aslak, Cabin Historic Place Dane Little Norway Historic Place Dane Mazomanie Town Hall Historic Place Dane Mount Horeb Public School Historic Place Dane Mt. Horeb Opera Block Historic Place Dane Skindrud, Eric and Jerome, Farm Historic Place Grant Agriculture and Manual Arts Building/Platteville State Normal School Historic Place Grant Arthur, L. J., House Historic Place Grant Ballantine, James, House Historic Place Grant Beebe House Historic Place Grant Denniston House Historic Place Grant Evans, Jonathan H., House Historic Place Grant First Congregational Church Historic Place Grant Grant County Courthouse Historic Place Grant Kinney, Patrick and Margaret, House Historic Place Grant Lancaster Municipal Building Historic Place Grant Lancaster Post Office Historic Place Grant Mitchell-Rountree House Historic Place Grant Rountree Hall Historic Place Grant Rountree, J. H., Mansion

Dairyland Power Cooperative 4-17 Cardinal-Hickory Creek T-Line Project Macro-Corridor Study Project Study Area Characteristics

State/Type County Name Historic Place Grant Historic Place Grant Stonefield Historic Place Iowa Adler, Emanuel D., House Historic Place Iowa Brisbane, William Henry, House Historic Place Iowa Cassidy Farmhouse Historic Place Iowa Dodge Mining Camp Cabin Historic Place Iowa Harris House Historic Place Iowa Ihm House Historic Place Iowa Iowa County Courthouse Historic Place Iowa Jones, David J. and Maggie, House Historic Place Iowa Kittleson House Historic Place Iowa Linden High School Historic Place Iowa Linden Methodist Church Historic Place Iowa Old Rock School Historic Place Iowa Plum Grove Primitive Methodist Church Historic Place Iowa Roberts House Historic Place Iowa Roethlisberger House Historic Place Iowa Thomas Stone Barn Historic Place Lafayette First Capitol Iowa Historic Place Clayton Seventeen places on INHF Lands Historic Place Clayton Round Barn, Millville Township Historic Place Clayton Stonefield Historic Place Clayton Stonefield Historic Place Dubuque Western Hotel

Dairyland Power Cooperative 4-18 Cardinal-Hickory Creek T-Line Project JJ 80 OO RICHLAND )" C Wisconsin River ST )" )" 78 KP 60 COUNTY ST )" £12 ST )"G SAUK COUNTY )"Y )"P ST19 Avoca £14 ST60 ST133 Muscoda Lone Rock )"G ST19 )"K Spring Green Mazomanie )"G £14 Arena Mazomanie )"F £12 )"C )"C Downtown Historic District )"KP )"P Taliesin )"K )"NN Black Earth

T CARDINAL )"N )" £14 )"FF £ SUBSTATION ST130 Cross Plains )"M PP 23 ST80 )" ST Middleton )"P #* £14 )"T )"I )"JJ )"Q )"HH )"K Madison Hyde Chapel ST78 II £12 )"P )" )"G )"H DANE )"S )"J )"ZZ COUNTY Q T )" Highland )" M )"F JG "J Q )" Blue Mound )" ) )" State Park )"M )"Y Grove Street S Historic District )" ST23 Gov. Dodge )"I State Park )"Z ID Blue Mounds "P )"BH Barneveld )" ) )"PD 18 Mount Horeb IOWA £ Ridgeway )"J COUNTY Verona GRANT ST80 £18 COUNTY YZ )" ST78 92 18 ST £ Montfort "Z E T ) )" Cobb )"Q Dodgeville )"Z )"H )" CH ST69 )" )"Y )"G )"B ST191 )"BB Iowa Street ST80 XX )" Historic District )"JG )"G )"B )"H CARDINAL-HICKORY CREEK )"IG Project Study Area PB )"K TRANSMISSION LINE )" £151 )"H )"U Linden )"Y Outside Project Study Area )"X )"HK PROJECT HISTORIC PLACES )"A )"E Livingston )"E ST191 )"A or )"AHistoric Place FIGURE 4-7 ST39 )"D )"W )"G or Historic District or Area )"YD HISTORIC PLACES )"QQ #* Substation Hollandale )"A )"H Interstate, US or State Highway ST39 39 )"F Mineral Point ST )"JG County Highway )"K MINNESOTA Belleville Historic District WISCONSIN Railroad )"DD )"J "O J Mineral Point Lake ) )" )"U State Boundary City / Village ST23 )"D DDD )"DD Michigan Rewey )"A )" County Boundary Open WaterCC )"O IOWA )" )"S )"W ILLINOIS µ )"CC Map Area Shown in Red New Glarus Blanchardville 0 1 2 3 4 5 )"G GREEN COUNTY Miles )"D 80 NN ST LAFAYETTE Foster Park )" COUNTY )"D £151 Historic District )"N )"G "J F ) )"D )"B ST23 )" Platteville )"F )"N Monticello )"C F:\Projects\C-HC\Mxds\MCS\Figure 4-7 Historic Places.mxd Data Sources: ATC, DPC, IDNR, IDOT, INHF, ITC, NPS, USGS, WDNR, WDOT. 7/15/16 K Fennimore G )"I Q JJ )" £18 )" 18 )" £18 Mount Hope )" Montfort £ Mounds Archeological District £18 Cobb CH Dodgeville )"P )" )"F )"B Patch Grove )"B J XX )" )" )"B )"IG )"G £61 Linden )"K )"X )"Q )"Y Clayton Bagley )"E Livingston )"E Bloomington £151 IOWA ST39 COUNTY YD QQ )" )"D )" )"A Mineral Point Historic District )"DD ST80 )"J Mineral Point )"VV ST133 Courthouse Square 129 Historic District Lancaster ST )"A Rewey ST35 )"D GRANT )"V ST35 )"S COUNTY )"V Front Street (River Park Drive) Historic District )"G Guttenberg National Fish Hatchery Bayley Avenue, Division Guttenberg and Aquarium Historic District Street, Main Street )"N 81 Commercial, and West Main St. Mary's Catholic Church ST Foster Park Street Historic Districts. 23 Historic District Historic District ST ST81 £61 )"VV )"G )"B £151 )"B )"C )"Y Platteville Belmont )"G )"XX )"N )"G )"O 126 Z Cassville )"U ST )" Millville ST133 )"X CLAYTON £52 )"N Tennyson O F COUNTY £ Potosi )" )" )"F £151 CARDINAL-HICKORY CREEK Project Study Area North Buena Vista Mississippi River TRANSMISSION LINE Darlington PROJECTLAFAYETTE Outside Project Study Area COUNTY ST81 HISTORIC PLACES £61 H )" or Historic Place FIGURE 4-8 or Historic District or Area Balltown HISTORIC PLACES )"K #* Substation Dickeyville Interstate, US or State Highway )"Q )"E County Highway D MINNESOTA )" WISCONSIN Railroad ST3 Luxemburg I O W A Sherrill HH Holy Cross )" Cuba City Lake £61 Michigan State Boundary City / Village £ )"J )"O "U County Boundary) Open Water ST136 Rickardsville HHH £52 )" IOWA Four Mounds Estate Benton Shullsburg DUBUQUE 386 ILLINOIS)"I µ ST Historic District Durango Map Area Shown in Red COUNTY )"J 0 1 2 3 4 5 New Vienna Lock and Dam No. 11 ST80 ST11 )"P Historic District A #* Sageville Miles )" I St. Boniface of Holy Ghost Catholic Historic District )" )"U New Vienna Cathedral, Dubuque Millworking, Jackson ST11 )"W Historic District HICKORY Hazel Green )"O Park, Langworthy, Old Main, Upper ST924 CREEK Central Avenue Commercial, Upper Main Dubuque )"Z SUBSTATION Street, Washington Street and East 22nd )"ZZ )"I Street, and West Eleventh Street ££15161 Bankston Historic Districts. Dyersville F:\Projects\C-HC\Mxds\MCS\Figure 4-8 Historic Places.mxd Data Sources: ATC, DPC, IDNR, IDOT, INHF, ITC, NPS, USGS, WDNR, WDOT. 7/15/16 Macro-Corridor Study Project Study Area Characteristics

4.7 Hydrology (Open Water, Streams, Floodplains) The hydrologic features in the Project Study Area are depicted in Figure 4-9.

4.7.1 Hydrology - Wisconsin There are multiple waterways that flow through the Wisconsin portion of Project Study Area. The most dominant waterway is the Mississippi River, which separates Wisconsin and Iowa. The largest water body is Black Hawk Lake in Iowa County, Wisconsin. There are numerous unnamed water bodies that are in the Wisconsin portion of the Project Study Area as well.

4.7.2 Hydrology - Iowa As stated above, the most dominant waterway in the Project Study Area is the Mississippi River. There are a few unnamed water bodies in the Iowa portion of the Project Study Area.

4.7.3 Floodplains In January 2015, Presidential Executive Order (“E.O.”) 13690 was issued to create a new flood risk reduction standard. The Federal Flood Risk Management Standard (“FFRMS”) is designed to be a flexible framework to increase resiliency against flooding and to help preserve the natural values of floodplains. Specifically, the FFRMS creates a national minimum flood risk management standard to ensure that federal actions located in or near a floodplain, when there are no other practical alternatives, last as long as intended by considering risks, changes in climate, and vulnerability.

The original E.O. on floodplains analysis in NEPA – E.O. 11988 – was revised in 2015 to address E.O. 13690. According to the revised implementation guidelines, a higher flood elevation and corresponding horizontal floodplain than the 100-year floodplain are required to be used for federally funded projects. The revised implementation guidelines contain other requirements for federal actions that include projects that require a federal permit (FEMA, 2015).

There are a number 100-year floodplains located within the Project Study Area, which are shown below on Figure 4-10. The most prominent floodplain in the Project Study Area is the Mississippi River floodplain in the Refuge, which has been designated as a Wetland of International Importance and a Globally Important Bird Area. Floodplains have been and will continue to be considered during the routing process and any federal requirements will be followed.

Dairyland Power Cooperative 4-21 Cardinal-Hickory Creek T-Line Project ALLAMAKEE Lynxville Sauk City £14 Dane COUNTY ST80 £ RICHLAND 130 131 ST SAUK ST COUNTY ST23 COUNTY £12 Harpers Ferry 60 ST 78 61 Avoca 14 60 ST ST19 Steuben £ Blue River 133 Muscoda Lone Rock £ ST ST19 ST364 ST179 ST Spring Green Mazomanie Eastman Arena £14 £12 CRAWFORD CARDINAL COUNTY ST131 Boscobel Black Earth SUBSTATION ST130 £14 27 ST80 ST23 ST35 ST Middleton Woodman #* Wauzeka W I S C O N S I N ST78 ST76 DANE Madison COUNTY £12 £18 Prairie du Chien Highland Blue Mound ST133 State Park McGregor Gov. Dodge 60 State Park Blue Mounds ST Wisconsin River Barneveld ST340 IOWA £18 Mount Horeb COUNTY ST23 Ridgeway £18 Verona £18 Fennimore Mount Hope £18 Montfort Cobb £18 Dodgeville

Patch Grove ST78 69 Linden ST191 ST £61 Clayton Bagley ST92 Livingston £151 Bloomington ST39

GRANT ST39 Hollandale COUNTY Mineral Point Belleville Lancaster 129 ST80 ST69 ST35 ST Rewey ST35 £52 ST78 ST39 Blanchardville New Glarus ST133 £151 Guttenberg ST23 81 ST81 CLAYTON ST CARDINAL-HICKORY CREEK Project Study Area COUNTY TRANSMISSION LINE PROJECT Outside Project Study Area £61 Monticello Osterdock Platteville £151 Belmont HYDROLOGY Cassville ST69 Millville 133 FIGURE 4-9 Major River Open Water ST 81 ST126 STHYDROLOGY Argyle GREEN Tennyson ST80 COUNTY Mississippi River Potosi £151 #* Substation North Buena Vista £ Darlington ST81 Interstate, US or State Highway LAFAYETTE ST81 £61 MINNESOTA £ COUNTY WISCONSIN State Boundary City / Village Balltown ST78 Lake County Boundary Dickeyville Michigan ST23 Luxemburg I O W A ST3 Holy Cross Sherrill Cuba City IOWA Monroeµ 52 Rickardsville DUBUQUE £ Gratiot ILLINOIS Browntown COUNTY £61 Benton Shullsburg Map Area Shown in Red 0 1 2 3 4 5 Durango ST386 11 South Wayne ST80 11 ST ST ST69Miles New Vienna #* Sageville ST78 ST924 ST11 Hazel Green Asbury ST136 HICKORY ££15161 Dubuque CREEK Graf 20 Dyersville SUBSTATION £ ST966 I L L I N O I S £20 ST968 Centralia F:\Projects\C-HC\Mxds\MCS\Figure 4-9 Hydrology.mxd Data Sources: ATC, DPC, IDOT, IDNR, ITC, USGS, WDNR, WDOT. 7/15/16 Sauk City ALLAMAKEE Lynxville Dane COUNTY ST80 £14 RICHLAND £ 130 ST SAUK 12 COUNTY 23 £ COUNTY ST Harpers Ferry 60 ST 78 61 Avoca 14 60 ST ST19 Steuben £ Blue River 133 Muscoda Lone Rock £ ST ST19 ST364 ST179 ST Spring Green Mazomanie Eastman Arena £14 £12 CRAWFORD CARDINAL COUNTY ST131 Boscobel Black Earth SUBSTATION ST130 £14 27 ST80 ST23 ST35 ST Middleton Woodman #* Wauzeka ST78 W I S C O N S I N Madison ST76 DANE COUNTY £12 £18 Prairie du Chien Highland Blue Mound ST133 State Park McGregor Gov. Dodge State Park Blue Mounds ST60 Wisconsin River Barneveld ST340 IOWA £18 Mount Horeb COUNTY ST23 Ridgeway £18 Verona £18 Fennimore Mount Hope £18 Montfort Cobb £18 Dodgeville

Patch Grove ST78 69 Linden ST191 ST £61 Clayton Bagley ST92 Livingston Bloomington ST39

GRANT ST39 Hollandale COUNTY Mineral Point Belleville Lancaster 129 ST80 69 ST35 ST Rewey ST ST35 £52 ST39 ST92 Blanchardville New Glarus ST133 £151 Guttenberg ST23 81 ST81 CLAYTON ST CARDINAL-HICKORY CREEK Project Study Area COUNTY TRANSMISSION LINE PROJECT Outside Project Study Area £61 Monticello Osterdock Platteville £151 Belmont FLOODPLAINS Cassville ST69 Millville ST133 FIGURE 4-10 100 Year Floodplain Floodway 126 ST81 GREEN ST FLOODPLAINSArgyle 500 Year Floodplain Tennyson 80 COUNTY Mississippi River Potosi £151 ST North Buena Vista £ Darlington ST81 #* Substation LAFAYETTE ST81 Interstate, US or State Highway £61 MINNESOTA £ COUNTY WISCONSIN State Boundary City / Village Balltown Lake ST78 Michigan Dickeyville ST23 County Boundary Open Water

Luxemburg Holy Cross I O W A Sherrill Cuba City ST3 IOWA Monroe £52 Rickardsville µ DUBUQUE Gratiot ILLINOIS Browntown £61 Benton Shullsburg Map Area Shown in Red 0 1 2 3 4 5 COUNTY ST386 South Wayne Durango 80 ST11 ST ST11 ST69 New Vienna #* Sageville Miles ST78 ST924 ST11 Hazel Green 136 ST Asbury HICKORY ££15161 Dubuque CREEK Graf 20 Dyersville SUBSTATION £ ST966 I L L I N O I S £20 ST968 Centralia F:\Projects\C-HC\Mxds\MCS\Figure 4-10 Floodplains.mxd Data Sources: ATC, DPC, FEMA, IDOT, IDNR, ITC, USGS, WDNR, WDOT. 7/15/16 Macro-Corridor Study Project Study Area Characteristics

4.7.4 Outstanding and Exceptional Waters In Wisconsin, waters designated as Outstanding Resource Waters or Exceptional Resource Waters are surface waters that provide outstanding recreational opportunities, support valuable fisheries and wildlife habitat, have good water quality, and are not significantly impacted by human activities. There are approximately 21 Outstanding and Exceptional Resource Waters located within the Wisconsin portion of the Project Study Area as shown on Figure 4-11. This portion of Wisconsin is also known for trout streams.

The Iowa DNR manages the Outstanding Iowa Waters program. This program gives certain surface waters the classification as outstanding state resource waters based on water quality standards, thereby warranting special protection (IDNR, 2010). No current Outstanding Iowa Waters are located within the Project Study Area.

4.8 Transportation Corridors and Sites (Major Highways, Rail, Airports)

4.8.1 Major Highways There are several federal, state, and county highways that occur within the Project Study Area as well as railroads and aviation facilities. There are numerous U.S. highways (“USH”), state highways (“SH”) and county highways (“CTH”) in the Project Study Area. Highways are a transmission line siting opportunity in Wisconsin and are identified as the second-highest priority corridor. In Iowa, planning for a route must begin with routes near and parallel to roads, railroad rights-of-way, or division lines of land. Roads include, but are limited to, county roads and federal and state highways.

The highways found within the Project Study Area in Wisconsin are listed by county in Table 4-4. The highways in Iowa are listed in Table 4-5. The transportation corridors found within Wisconsin and Iowa are depicted in Figures 4-12 and 4-13, respectively.

Dairyland Power Cooperative 4-24 Cardinal-Hickory Creek T-Line Project Sauk City Lynxville Dane ST80 £14 ST130 £12 ALLAMAKEE RICHLAND ST23 SAUK £ COUNTY COUNTY COUNTY Harpers Ferry 60 ST 78 61 Blue Avoca Lone 14 60 ST ST19 Steuben £ 133 Muscoda £ ST ST19 364 ST179 River ST Rock Spring ST DANE Eastman Green Mazomanie Arena £14 COUNTY £12 CARDINAL CRAWFORD ST131 Boscobel Black Earth SUBSTATION COUNTY ST130 £14 Cross ST27 ST80 ST23 Plains ST35 Elvers Creek Middleton Woodman Trout Creek #* Wauzeka Ryan Creek Prairie du W I S C O N S I N ST78 Madison ST76 Chien Garfoot Creek BlackEarth Creek 12 £18 Highland £ Marquette 133 ST Cass Valley Creek Strutt Creek Blue River Harker Creek Love Creek McGregor Blue Sugar River ST60 Wisconsin River Lee Creek Barneveld Mounds ST340 18 Mount Horeb Ridgeway £ ST23 Schlapbach Creek £18 £18 Mount Fennimore IOWA Verona £18 Montfort Gordon Creek £18 Hope Cobb Dodgeville COUNTY Fryes Feeder Deer Creek Martin Creek Patch Grove ST78 69 Linden ST191 ST Clayton Borah Creek £61 Bagley ST92 Livingston Bloomington ST39 GRANT Hollandale COUNTY ST39 Mineral Point Belleville Lancaster 80 ST35 ST129 ST Rewey ST69 ST35 92 £52 Little Platte River ST39 ST New Blanchardville Glarus ST133 £151 Guttenberg ST23 ST81 ST81 CARDINAL-HICKORY CREEK Project StudyCenter Area Br TRANSMISSION LINE Hefty Creek PROJECT Outside Project Study Area £61 Monticello Osterdock Platteville £151 Belmont Cassville FIGURE 4-11 Outstanding andBurgy ExceptionalST69 Millville ST133 OUSTANDING AND EXCEPTIONAL Water ResourcesCreek 126 ST81 Argyle Tennyson ST WATER RESOURCES North 80 CLAYTON Mississippi River Potosi £151 ST Buena Galena River Darlington * GREEN COUNTY Vista ST81 # SubstationCOUNTY ST81 Interstate, US or State Highway £61 MINNESOTA LAFAYETTE WISCONSIN State Boundary SylvesterCity / Village Balltown COUNTY Lake ST78 Michigan Creek Dickeyville ST23 County Boundary Open Water Holy Cuba Luxemburg I O W A Sherrill Monroe ST3 Cross City IOWA DELAWARE 52 Rickardsville µ £ Gratiot ILLINOIS Browntown COUNTY Shullsburg £61 Benton Map Area Shown in Red South 0 1 2 3 4 5 DUBUQUE Durango ST386 11 New 80 ST Wayne ST ST11 69 Richland Vienna * COUNTY STMiles # Creek Hazel ST78 Sageville 924 ST ST11 Green ST136 Bankston HICKORY Asbury ££15161 Dubuque £ CREEK Graf Dyersville SUBSTATION £20 ST966 I L L I N O I S £20 ST968 Centralia F:\Projects\C-HC\Mxds\MCS\Figure 4-11 OEWR.mxd Data Sources: ATC, DPC, IDOT, IDNR, ITC, USGS, WDNR, WDOT. 7/26/16 Macro-Corridor Study Project Study Area Characteristics

Table 4-4: Highways in Wisconsin by County

County Road Type Road Name Dane County Highway CTH ID Dane County Highway CTH JG Dane County Highway CTH Z Dane County Highway CTH F Dane County Highway CTH E Dane County Highway CTH J Dane County Highway CTH P Dane County Highway CTH Y Dane County Highway CTH KP Dane County Highway CTH JJ Dane County Highway CTH PD Dane County Highway CTH S Dane County Highway CTH FF Dane State Highway STH 19 Dane State Highway STH 78 Dane State Highway STH 92 Dane U.S. Highway USH 14 Dane U.S. Highway USH 18 Grant County Highway CTH U Grant County Highway CTH A Grant County Highway CTH D Grant County Highway CTH F Grant County Highway CTH I Grant County Highway CTH E Grant County Highway CTH VV Grant County Highway CTH J Grant County Highway CTH K Grant County Highway CTH Y Grant County Highway CTH B Grant County Highway CTH G Grant County Highway CTH N Grant County Highway CTH XX Grant County Highway CTH V Grant County Highway CTH O Grant State Highway STH 129

Dairyland Power Cooperative 4-26 Cardinal-Hickory Creek T-Line Project Macro-Corridor Study Project Study Area Characteristics

County Road Type Road Name Grant State Highway STH 133 Grant State Highway STH 35 Grant State Highway STH 80 Grant State Highway STH 81 Grant U.S. Highway USH 151 Grant U.S. Highway USH 18 Grant U.S. Highway USH 61 Iowa County Highway CTH ID Iowa County Highway CTH A Iowa County Highway CTH Z Iowa County Highway CTH Q Iowa County Highway CTH F Iowa County Highway CTH I Iowa County Highway CTH E Iowa County Highway CTH X Iowa County Highway CTH J Iowa County Highway CTH P Iowa County Highway CTH K Iowa County Highway CTH Y Iowa County Highway CTH B Iowa County Highway CTH T Iowa County Highway CTH HHH Iowa County Highway CTH H Iowa County Highway CTH CH Iowa County Highway CTH G Iowa County Highway CTH YZ Iowa County Highway CTH M Iowa County Highway CTH XX Iowa County Highway CTH HH Iowa County Highway CTH FF Iowa County Highway CTH ZZ Iowa County Highway CTH BB Iowa County Highway CTH IG Iowa County Highway CTH II Iowa County Highway CTH BH Iowa State Highway STH 130

Dairyland Power Cooperative 4-27 Cardinal-Hickory Creek T-Line Project Macro-Corridor Study Project Study Area Characteristics

County Road Type Road Name Iowa State Highway STH 191 Iowa State Highway STH 23 Iowa State Highway STH 39 Iowa State Highway STH 80 Iowa U.S. Highway USH 14 Iowa U.S. Highway USH 151 Iowa U.S. Highway USH 18 Lafayette County Highway CTH X Lafayette County Highway CTH B Lafayette County Highway CTH G Lafayette County Highway CTH XX Lafayette U.S. Highway USH 151

Table 4-5: Highways in Iowa by County

County Road Type Road Name Clayton U.S. Highway USH 52 Dubuque State Highway SH 3 Dubuque State Highway SH 136 Dubuque U.S. Highway USH 52

Dairyland Power Cooperative 4-28 Cardinal-Hickory Creek T-Line Project RICHLAND )"JJ "OO )"C KP Wisconsin River ) ST60 COUNTY )" SAUK )"G COUNTY )"Y 78 )"P 19 Avoca ST60 ST ST Muscoda Lone Rock G ST19 )"K ST133 )" Spring Green Mazomanie )"G Arena £14 )"F )"C )"C KP £12 )" KP )" MIDDLETON )"P MUNICIPAL )"K )"NN Black Earth AIRPORT

)"N ST130 )"T )"FF CARDINAL £14 SUBSTATION Cross Plains )"M ST80 )"PP )"P Middleton ST23 #* SOUTHWIND )"T I AIRPORT )"JJ Q )" )"K £12 )" )"HH ST78 II P )" Madison PIERICK )" )"G )"H DANE )"S AIRPORT )"J )"ZZ COUNTY Q T )" Highland )" M )"F JG "J Q )" Blue Mound )" ) )" State Park )"M )"Y )"S Gov. Dodge DODGEVILLE State Park Z Blue Mounds )"I ST23 )" Barneveld )"ID )"P )"BH MUNICIPAL )"PD AIRPORT 18 Mount Horeb IOWA £ Ridgeway )"J COUNTY Verona HECKLERS' £18 DOCKEN GRANT )"YZ STRIP COUNTY FIELD Montfort "Z E T ) )" Cobb )"Q )"Z )"H )" ATKINS RIDGE CH Dodgeville AIRPORT SUGAR RIDGE )" )"Y )"G AIRPORT )"B )"BB )"XX MEMORIAL )"JG )"G )"B HOSPITAL )"H CARDINAL-HICKORY CREEK HELIPORT DESMET Project Study Area )"IG 78 AIRPORT TRANSMISSIONST LINE )"H )"U 69 Linden )"Y Outside Project Study Area ST )"X )"HK PROJECT ST191 ST92TRANSPORTATION )"A )"E Livingston )"E )"A )"A TUSCHEN FIGURE 4-12 ¤£ US Highway Railroad ST39 )"D )"W )"G )"YD AIRPORT TRANSPORTATION ST State Highway o Public Airport QQ Private Airport )" ") County Highway o or Airfield IOWA COUNTY )"A ST39 Hollandale )"H Road f Heliport AIRPORT )"F )"JG )"K MINNESOTA Belleville Mineral Point WISCONSIN State Boundary City / Village )"DD )"J )"O )"J )"D )"U Lake ST80 DDD )"DD Michigan County Boundary Open Water Rewey )"A )" JIM BENSON BAKERS FIELD CC )"O FIELD IOWA )" ST39 µ )"S )"W ILLINOIS )"CC Map Area Shown in Red 0New Glarus 1 2 3 4 5 BlanchardvilleBlanchardville G )" Miles £151 GREEN D )" COUNTY LAFAYETTE )"NN ST23 )"D COUNTY )"N )"G "J F ) )"D )"B )" Platteville )"F )"N Monticello )"C F:\Projects\C-HC\Mxds\MCS\Figure 4-11 Transportation.mxd Data Sources: ATC, DPC, FAA, IDOT, IDNR, ITC, USGS, WDNR, WDOT. 7/15/16 I K 18 G )" Q )"X Mount Hope )"JJ )" £ )" )" Montfort £18 £18 STUPEK FARMS Cobb CH Dodgeville )"P )" )"F )"B Patch Grove )"J "XX MEMORIAL ) )"B HOSPITAL HELIPORT ST35 )"IG )"G Linden )"K )"X )"Q )"Y £61 £151 Bagley 39 Clayton E ST IOWA COUNTY C JEIDY FARMS )" Livingston )"E Bloomington AIRPORT AIRPORT IOWA )"YD COUNTY QQ )"D )" )"A Mineral Point

VV )"J )" Lancaster 129 ST80 ST )"A Rewey 35 JIM BENSON ST ST35 FIELD GAA PRIVATE )"V AIRPORT "S )"V MARTIN FIERRO ) AIRPORT LANCASTER )"G ST133 MUNICIPAL £151 WALTERS AIRPORT )"D HELIPORT )"N ST23 Guttenberg GRANT ST81 ST81 )"VV COUNTY )"G £61 )"B C )"Y )"B )" Platteville 151 Belmont G CASSVILLE £ XX )" N )" )"G £52 MUNICIPAL )" )"O AIRPORT ST126 U )"Z Cassville ST133 )" Millville )"X CLAYTON )"N Tennyson O COUNTY Potosi )" )"F )"F £151 CARDINAL-HICKORY CREEK Project Study Area North Buena Vista Mississippi River TRANSMISSION LINE Darlington PROJECTLAFAYETTE Outside Project Study Area COUNTY ST81 £61 )"H TRANSPORTATION FIGURE 4-13 ¤£ US Highway Railroad Balltown TRANSPORTATION ST State Highway o Public Airport)"K Private Airport ") County Highway o or Airfield Dickeyville f )"Q Road )"EHeliport D MINNESOTA )" WISCONSIN State Boundary City / Village ST3 Luxemburg I O W A Sherrill HH Holy Cross )" Cuba City Lake )"J Michigan County Boundary Open Water )"O )"U Rickardsville HHH £52 )" IOWA DUBUQUE µ Shullsburg COUNTY Benton ILLINOISI £61 )" Durango Map Area Shown in Red )"J 0 1 2 3 4 5 80 11 )"P 386 RIGDON ST ST New Vienna ST Miles A #* AIRPORT )" Sageville )"I )"U )"W HICKORY ST11 Hazel Green )"O ST924 136 CREEK ANDERSON Z ST Asbury )" SUBSTATION AIRPORT )"ZZ )"I Dubuque £61 Bankston Dyersville £151 F:\Projects\C-HC\Mxds\MCS\Figure 4-13 Transportation.mxd Data Sources: ATC, DPC, FAA, IDOT, IDNR, ITC, USGS, WDNR, WDOT. 7/27/16 Macro-Corridor Study Project Study Area Characteristics

4.8.2 Railroads There are three active railroads that occur within the Project Study Area: one near the Cardinal Substation that generally follows USH 14 along the northern boundary of the Project Study Area, and one on each bank of the Mississippi River. The railroad along the northern boundary of the Project Study Area is owned by Wisconsin and Southern Railroad. The railroad on the east bank of the Mississippi River is owned by Burlington Northern and Santa Fe Railway. The railroad on the west bank of the Mississippi River is owned by Canadian Pacific Railway. Figures 4-12 and 4-13 depict railroad corridors within the Project Study Area.

4.8.3 Airports Airports and heliports are potential constraints to transmission line routing depending on the proximity to the airport or heliport and the transmission structure height. The permitted height of a transmission structure located in proximity to a public airport is determined by the classification of the airport, and the location of the proposed structure relative to the airport and the regulated airport imaginary surfaces. The imaginary surfaces are defined and regulated at a federal level by the Federal Aviation Administration (“FAA”) and further regulated at the state level by the Wisconsin and Iowa Departments of Transportation. Federal regulations apply only to public use airports; each state has regulations that apply to both public and private airports.

There are several airports and heliports within the Project Study Area. Public airports include the Cassville and Lancaster Municipal Airports. Private airfields include the Dodgeville Municipal Airport, Pierick Airport, C Jeidy Farms, Docken Field, Martin Fierro, and Southwind. There is one heliport located at Dodgeville Memorial Hospital. Public and private airports, and heliports are shown on Figures 4-12 and 4-13. Site-specific analysis of routing near airports and heliports was conducted during the corridor-development process.

4.9 Socioeconomic Characteristics While the Project Study Area includes highly populated areas such as Dane County, the macro-corridors and alternative corridors traverse through relatively low-population areas. For instance, in Wisconsin, the Villages of Cassville and Montfort have populations of less than 1,000 each, town of Middleton has a population of about 6,000 and Iowa and Grant counties have about a population of about 75,000 combined. In Iowa, Clayton and Dubuque counties have a population of around 114,000. Population estimates for 2015 show a decrease in population in Clayton County, Cassville, and Guttenberg since 2000. The county populations within the Project Study Area are listed in Table 4-6.

Dairyland Power Cooperative 4-31 Cardinal-Hickory Creek T-Line Project Macro-Corridor Study Project Study Area Characteristics

Table 4-6: Population by County – Wisconsin and Iowa

County Population Wisconsin Iowa 23,813 Grant 52,250 Lafayette 16,829 Dane 523,643 Iowa Dubuque 97,125 Clayton 17,644

The top employment industries in the Project Study Area include educational services, health care, social assistance, and manufacturing (U.S. Census Bureau, 2014 and 2015). The estimated unemployment rates from 2014 are listed by county in Table 4-7. The data shows that unemployment rates in the Project area were lower than the 6.2% national average for 2014 (BLS, 2014)

Table 4-7: Unemployment Rate by County – Wisconsin and Iowa

State/County Unemployment Rate Wisconsin Iowa 4.7 % Grant 4.8 % Lafayette 4.3 % Dane 5.5 % Iowa Dubuque 4.7 % Clayton 5.2 %

According to U.S. Census data, the populations near the macro-corridors and alternative corridors are primarily White and primarily not Hispanic/Latino. Race and ethnicity found within the Project Study Area are listed in Table 4-8 by county.

Dairyland Power Cooperative 4-32 Cardinal-Hickory Creek T-Line Project Macro-Corridor Study Project Study Area Characteristics

Table 4-8: Race and Ethnicity by County – Wisconsin and Iowa

Black or American Native African Indian and Hawaiian and Two or State & White American Alaska Asian Other Pacific more Hispanic County Alone Alone Native alone Alone Islander Alone Races or Latino Wisconsin Iowa 97.1% 0.4% 0.2% 0.6% 0 1.0% 1.6% Grant 96.8% 1.3% 0.2% 0.6% 0 0.9% 1.3% Lafayette 96.8% 0.3% 0.4% 0.2% 0 0.7% 3.8% Dane 84.9% 5.1% 0.2% 5.2% 0% 2.7% 6.1% Iowa Dubuque 94.0% 1.6% 0.1% 1.4% 0.2% 2.8% 2.1% Clayton 97.9% 0.1% 0.1% 0.4% 0% 1.3% 1.7%

Executive Order 12898 (Federal Actions to Address Environmental Justice in Minority Populations and Low-Income Populations) requires all federal agencies to assess whether their programs, policies, and activities have disproportionately high and adverse human health or environmental effects on minority and low-income populations in the United States. The criteria for a finding of possible environmental justice issues is the occurrence of more than 50 percent of the population affected by the federal agency’s proposed action being minority or low-income. Data was collected on the income and poverty status of the populations within the census tracts of the Project Study Area.

For the purposes of the analysis of environmental justice, minority refers to anyone who is racially classified as African American, Asian American, Native American or Alaskan Native, or Pacific Islander, anyone who self- classifies as “other” race, or two or more races, or anyone classified as Hispanic. Hispanic is considered an ethnicity, not a separate race; Hispanics are considered minorities regardless of their racial self-affiliation. A minority population is identified when the minority population of the potentially affected area is greater than 50 percent or meaningfully greater than the percentage of the minority population in the general population or other appropriate unit of geographical analysis. Low income is determined by a set of money-income thresholds that varies by family size and composition. If the total income for a family or unrelated individual falls below the relevant poverty threshold, then the family or unrelated individual is classified as low- income or “below the poverty level” at the time of the census (CEQ, 1997). None of the communities in the Project Study Area are areas of concern in relation to environmental justice issues.

Dairyland Power Cooperative 4-33 Cardinal-Hickory Creek T-Line Project Macro-Corridor Study Project Study Area Characteristics

4.10 Recreational Resources Recreational resources are located throughout the Project Study Area. They include state, county, and municipal parks; trails; and SNAs in Wisconsin; and several state preserves and parks in Iowa. Some of the more prominent recreational areas in the Project Study Area are the Refuge, the Military Ridge State Trail, the Blue Mound State Park, the Governor Dodge State Park, the Turkey River Mounds State Preserve, and the White Pine Hollow State Preserve. The recreational areas found within the Project Study Area are listed in Table 4-9 and depicted on Figures 4-14 and 4-15.

Table 4-9: Recreational Areas by County – Wisconsin and Iowa

Name County Wisconsin American Legion Park Dane Barneveld Prairie State Natural Area Dane Black Earth Community Park Dane Black Earth Creek Fishery Area Dane Black Earth Creek Wildlife Area Sunnyside Unit Dane Blue Mound State Park Dane Boecks Park Dane Brigham County Park Dane Cave of the Mounds National Natural Landmark Dane Cedar Glen Conservancy Dane Cedar Glen Park Dane Cedar Hill Conservancy Dane Cherrywood Acres Oak Savannah Conservancy Dane Cherrywood Acres Park Dane Cherrywood Conservancy Dane Cross Plains State Park - IANSR Dane Dorothy Statz Conservancy Dane Duane R. Hofstetter Conservation Park Dane Festge County Park Dane Garfield Park Dane Gausewitz Park Dane Glacial Valley Park Dane Glaciers Edge Park Dane Goth Park Dane Grandma Foster Park Dane Grundahl Park Dane

Dairyland Power Cooperative 4-34 Cardinal-Hickory Creek T-Line Project Macro-Corridor Study Project Study Area Characteristics

Name County Hickory Hills Park Dane Himsel Park Dane Holfelder Park Dane Ibinger Ridge Park Dane Ice Age National Scenic Trail - US National Park Service Dane Jaycee Park Dane Jerry Barsness Field Dane Liberty Park Dane Lions Park Dane Madison Bike Trail - Bike Lane or Paved Shoulder Dane Mazomanie Lion's Park Dane Mazomanie Lion's Park (Leased Area) Dane Mounds View Park Dane Municipal Park Dane Nesheim Park Dane Noll Valley (Oak Savanna) Conservancy Dane Pheasant Point Woods Conservancy Dane Pioneer Park Dane Pleasant Valley Conservancy Dane Pleasure Valley Natural Resource Area Dane Rem-Elvers Creek Dane Rem-Vermont Creek Dane Salmo Pond County Park Dane Stewart County Park Dane Stream Bank Protection Fee Program Dane Sugar River E-Way Dane Summer Frolic Sunrise Park Dane Sunny Field Park Dane Sutter Farm Park Dane Thompson Memorial Prairie Dane Veteran's Memorial Park Dane Vicki-Ann Park Dane Viking Park Dane Voss Park Dane Walking Iron County Park Dane Waltz Park Dane

Dairyland Power Cooperative 4-35 Cardinal-Hickory Creek T-Line Project Macro-Corridor Study Project Study Area Characteristics

Name County Westview Conservancy Dane Westview Park Dane White Oak Woodland Conservancy Dane Zander Community Nature Park Dane Baus Park Grant Bell Park Grant Bloomington Ball Fields Grant Bloomington Fairgrounds Grant Cassville Bluffs Grant City Hall Park Grant Dewey Heights Prairie State Natural Area Grant Grant County Fairground Grant Harrison Park Grant Highland Park Grant Indian Park Grant Jenor Tower Park Grant Klondyke Park Grant Legion Park Grant Memorial Park Grant Miners Field Grant Montfort Ballfield Grant Montfort Swimming Pool Grant Mound View Park Grant MVC Borah Creek Prairie SNA Grant Grant Oakwood Nature Park Grant Pool Park Grant Prairie View Park (Undeveloped) Grant Rem-Bailie Branch Grant Rem-Blue River Grant Rem-Borah Creek Grant Rem-Grant River Grant Rem-Little Grant River Grant Rem-Little Platte River Grant Rem-Martin Branch Grant Rem-Rogers Branch Grant

Dairyland Power Cooperative 4-36 Cardinal-Hickory Creek T-Line Project Macro-Corridor Study Project Study Area Characteristics

Name County Riverside Park Grant Rollo Jamison Grant Ryland Park Grant School Community Playground Grant Schreiner Park Grant Sherman park Grant Skate Park Grant Smith Park Grant Sports Center Grant Tower Park Grant U.W. Platteville Grant U.W. Platteville Greenbelt Park Grant Upper Mississippi River National Wildlife and Fish Refuge Grant Valley View Park Grant Village Park Grant Westview Park Grant Arena Pines and Sand Barrens State Natural Area Iowa Arena Village Park Iowa Barneveld Memorial Park Iowa Barneveld Prairie State Natural Area Iowa Blue Mound State Park Iowa Centennial Park Iowa Cobb-Highland Nature Center Iowa Governor Dodge State Park Iowa Harris Park Iowa Highland Village Park Iowa Kittleson Krest Park Iowa Mecalf Park Iowa Military Ridge Prairie Fee Iowa Oakham Lawn Park Iowa Pecatonica River Woods Iowa Pine Cliff Iowa Quail Ridge Park Iowa Rem-Blue River Iowa Rem-Conley Smith Creek Iowa Rem-Dickinson Creek Iowa

Dairyland Power Cooperative 4-37 Cardinal-Hickory Creek T-Line Project Macro-Corridor Study Project Study Area Characteristics

Name County Rem-Harker Creek Iowa Rem-Love Creek Iowa Rem-Otters Creek Iowa Ridgeway Pine Relict Iowa Ridgeway Pine Relict State Natural Area Iowa School Park Iowa Springer Park Iowa Stream Bank Protection Fee Program Iowa Thompson Memorial Prairie Iowa Trout Creek Fishery Area-Iowa Iowa Trout Creek Watershed Iowa Village Park Iowa Wilson Park Iowa Lafayette Belmont Mound Woods State Natural Area Lafayette Belmont Prairie State Natural Area Lafayette First Capitol State Park Lafayette Ipswich Prairie State Natural Area Lafayette Platte Mound Park Lafayette Iowa Driftless Area NWR Clayton Turkey River Mounds State Preserve Clayton Upper Mississippi River National Wildlife and Fish Refuge Clayton Bankston Park Dubuque Driftless Area NWR Dubuque Holy Cross City Park Dubuque Luxemburg City Park Dubuque White Pine Hollow State Preserve Dubuque

Dairyland Power Cooperative 4-38 Cardinal-Hickory Creek T-Line Project RICHLAND )"JJ )"C )"OO KP COUNTY 60 )" ST £14 )"G ST60 SAUK Lower Wisconsin River Road Scenic Byway COUNTY )"Y 78 Ice Age Trail )"P Avoca ST ST19 ST19 ST133 Muscoda Lone Rock K ST133 )"G )" Spring Green Mazomanie )"G Arena £14 )"F )"C )"C )"KP £12 )"KP )"P )"K )"NN Taliesin Black Earth

)"N )"T Ice Age Trail )"FF £14 CARDINAL Cross Plains SUBSTATION M ST130 )" ST80 )"PP ST23 )"P House on Middleton the Rock #* )"T "I )"JJ Q ) )"K 12 )" )"HH ST78 £ II )"P )" Madison )"G )"H DANE )"S )"J )"ZZ COUNTY Q T )" Highland )" Ice Age Trail M )"F JG "J Q )" Blue Mound )" ) )" State Park )"M )"Y ST23 )"S Gov. Dodge State Park Blue Mounds Milita Military Ridge State Trail I )"Z ID ry R P )" BH Barneveld )" idg )" PD )" e State Trail )" 18 Mount Horeb IOWA £ J COUNTY Ridgeway )" GRANT Verona 18 COUNTY £ )"YZ ST78 £18 92 Montfort £18 "Z E ST £ T ) )" Cobb )"Z )"H )" ST69 )"Q CH Dodgeville )" )"Y )"G )"B )"BB )"B )"XX )"JG )"G )"B )"H CARDINAL-HICKORY CREEK )"IG Project Study Area PB )"K TRANSMISSION LINE )" )"H )"U Linden )"Y 191 Outside Project Study Area X ST HK PROJECT )" )" RECREATION )"A Recreational Areas* )"E Livingston )"E )"A )"A FIGURE 4-14 ST39 )"D )"W )"G * Includes Federal and State Wildlife Refuges, State Fishery Areas, )"YD RECREATION State Natural Areas, and Federal, State, County and Municipal Parks. ! ! )"QQ ! ! ! Trail Scenic Byway )"A Cross Plains Ice Age Hollandale )"H Complex Rustic Road ST39 ST39 )"F )"JG K MINNESOTA Ice Age Trail Corridor Mineral Point )" WISCONSIN Belleville DD J #* Substation County Highway )" )" )"O Interstate, US or State )"J U Lake Railroad )"D )" Michigan Highway ST80 DDD )"DD Rewey )"A )" State Boundary City / Village )"CC )"O IOWA County Boundary Open Water

)"S )"W ILLINOIS )"CC Map Area Shown in Red New Glarusµ Blanchardville GREEN 0 1 2 3 4 5 G Su )" gar R Ice Age Trail COUNTY iver 151 S £ Miles t D a " t ) e

T

r LAFAYETTE NN a i " l ST23 ) Ice Age Trail )"D COUNTY )"N )"G "J F ) )"D )"B )" Platteville )"F )"N Monticello F:\Projects\C-HC\Mxds\MCS\Figure 4-14 Recreation Resources.mxd Data Sources: ATC, DPC, IDNR, IDOT, ITC, USGS, WDNR, WDOT. 9/08/16 ! ! !!! ! !! ! !! ! ! ! !! ! ! ! ! ! ! ! ! ! !! ! ! ! !! ! ! ! !! ! ! ! ! ! !! ! ! ! ! !! !! ! ! ! ! Fennimore I ! ! K G )" Q !! ! )"X JJ )" £18 )" 18 )" ! ! £18 Mount Hope )" Montfort £ Cobb CH Dodgeville )"P )" )"F )"B Patch Grove )"B J XX )" )" )"B Great River Road )"IG )"G £61 Linden )"K )"X )"Q )"Y ST23 Clayton Bagley )"E Livingston )"E IOWA COUNTY ST39 Bloomington )"YD )"QQ )"D A )" 39

! ST

Mineral Point!

!

! ! ! DD

!

ST80 ! )" J ! VV 133 )" !

ST ! )" Lancaster !

! ST129 ! A ! ST35 )" Rewey !

! !

! ST35 !

!

!

!

! !

V !

!

)" !

!

! S ! )"

V !

!

)" !

!

GRANT !

!

!

!

! COUNTY G !

)" ! !

151 ! ! D £ !

! " ! Guttenberg ) ST23 ! ! N !! )" !! River Bluffs !!

!!

Scenic !! ! ST81 ! Byway 81 !! ST !! VV !! )"G )" !! !! ! ! !

! ! !

B ! !

)" ! ail !

61 r! !!!! !

£ te T!!

ta ! !! ! ! ! ! ! ! S! ! ! ! ! !! a ! ! ! ! !! ic !! C ! ! B !! " ! n ! ) " o ! ! ) ! t ! a ! ! ! c !! ! ! ! Y Pe ! ! !! )" !! ! ! ! !! ! ! !! ! ! ! ! !!

!! ! !

Platteville 151 Belmont ! G ! !! "

) !

! £ ! £ ! !

XX ! ! !

! ! ! ! ! )" ! !

! ! G ! 52 )"N )" )"O ! ! £ !

! ST126 !

! U )"Z ! Cassville )" !! !! !! 133 !! Millville ST !!

80 ! ST X ! ! )" ! !! ! ! ! CLAYTON ! ! ! !!

! )"N Tennyson O F ! !

COUNTY Potosi )" )" ! F

!

! !

)"! Mississippi River £151 CARDINAL-HICKORY CREEK Project Study Area !! !! North Buena Vista ! ! ! ! !! Darlington !! TRANSMISSION LINE !! !! !!

Outside Project Study Area !! ! !

!

PROJECT ! ! ST81 ! LAFAYETTE RECREATION !! !! 61 ! !! £ COUNTY !! Great River Road Recreational Areas* !! !! !! !! !! FIGURE 4-15 * Includes Federal and State Wildlife Refuges, State Fishery Areas, !! Great River Road ! !

! Balltown RECREATION State Natural Areas, and Federal, State, County and MunicipalK Parks. ! ! )" ! ! ! ! ! ! Ice Age Trail Corridor ! ! ! Trail ! ! !

! !

! Dickeyville )"Q Scenic Byway RusticE Road ! ! )" !

! !

MINNESOTA ! "D #* Substation County Highway ! ) WISCONSIN Interstate, US or State !! Luxemburg !! ST3 I O W A Sherrill HH Railroad !! Highway ! Holy Cross )" Cuba City Lake ! £61 !! £ !! Michigan !

State Boundary ! J City / Village ! )" ! !

! ! ! O ! ! " ! ! ) ! U ! !

" ! !! ) ! !

! ! ! ! ! ! !! !! ! !! ! !! ! ! HHH ! ! County Boundary ! ! ! £52 Rickardsville Open Water ! !! ! £ ! ! ! ! ! ! ! ! ! !

IOWA ! !! !

)" ! !

DUBUQUE !

!! Shullsburg !

COUNTY Benton !! !

!

! ILLINOISI !

!

! !!

! )" !

! !

! ! !

! 386 !

! ! !

! ! ! !

! !

! ! ! !

!

Herita ! ST

g !

e !

T l !

! µ i !

! r !

!

! a !

! !

Durango ! ! ! ! ! Map Area Shown in Red !

! )"J ! ! !

136 ! 0 1 2 3 4 5 P

!

ST ! )"

! ! ! !

! !

! !

!

New Vienna !

!

! A

!

! ! !

! " ! )

!

* !

# ! Sageville !

! !

!

! I Miles

! !

!

! )" ! ! ! !

! U

! )" ! !

!

!

! !

!

!

!

! W !

! )"

!

! Hazel Green O

! 11 " ! )

! ST

HICKORY !

!

! ! !

! 924

!

!

!

! ST

!

!

CREEK !

!

!

! Z

! !

!

! ! !

! )"

!

! !

Asbury ! ZZ )"I SUBSTATION ! "

! Dubuque £61 )

! !

!

!

!

! !

Bankston ! ! 151

! £

Dyersville ! £ !

!

F:\Projects\C-HC\Mxds\MCS\Figure 4-15 Recreation Resources.mxd ! Data Sources: ATC, DPC, IDNR, IDOT, ITC, USGS, WDNR, WDOT. 7/27/16

! !

!

! !

!

!

! !

!

!

! ! ! !

! !

! ! ! ! !

!

!

!

!

! !

! ! !

!

! !

!

!

!

!

!

!

! ! !

! ! ! ! !

!

! !

!

! !

!

!

!

!

! !

!

!

!

! !

!

! !

!

!

!

!

!

!

! !

!

!

! !

!

!

! ! !

!

!

!

!

!

! ! ! !

! !

! !

!

!

! !

!

! ! ! ! ! ! !

!

! ! ! ! ! ! !

!

! !

!

!

!

!

!

! ! ! ! Macro-Corridor Study Project Study Area Characteristics

4.11 Existing Transmission Lines There are several 69 kV transmission lines that occur within the Project Study Area, a few 138 kV lines, a 161 kV line, and a 345 kV line. Also, other 345kV transmission lines connect to the Cardinal and Hickory Creek Substations from other directions. The existing transmission lines are depicted on Figure 4-16.

4.12 Other Utility Corridors Other utility corridors including pipelines and distribution lines are abundant within the Project Study Area. Pipelines are also depicted on Figure 4-16.

Dairyland Power Cooperative 4-41 Cardinal-Hickory Creek T-Line Project Tap Dane Lynxville Sauk City Troy SW STR Troy ST80 Dane RICHLAND £14 ST131 ST130 SAUK 23 Herpers Ferry COUNTY ST COUNTY £12 ALLAMAKEE Harpers Ferry ST60 Lone Rock COUNTY ST60 Blue River Avoca ST78 19 £61 Muscoda Avoca 14 ST60 19 ST Steuben Blue River ST133 133 Lone Rock £ ArenaSW STR Mazomanie ST 364 ST179 Muscoda Avoca SW STR ST Spring Green Wick Drive ST Blue River SW STR Spring Green Eastman Mazomanie Arena £14 £12 Boscobel Wyoming Valley SW STR Wyoming Valley CRAWFORD Boscobel CARDINAL 131 Black Earth COUNTY ST Boscobel Muni SUBSTATION Boscobel Muni Eastside ST130 ST23 Black Earth SW STR Black Earth £14 Pheasant Branch ST27 King ST80 ST35 Wauzeka SW STR Wauzeka Middleton Woodman #* Wauzeka Timberlane SW STR Timberlane Pleasant View Brisbois DPC Prairie Du Chien ST78 Gran Grae W I S C O N S I N ST76 Madison DPC Prairie Du Chien SW STR DANE 60 £12 £18 Prairie du Chien ST Highland COUNTY Eastman ST133 Hillside North East Mount Horeb Muni McGregor Cross Country Blue Mounds Barneveld 340 18 Mount Horeb ST Wisconsin River IOWA £ Hooterville 23 Mount Horeb COUNTY ST Ridgeway Mt. Hope £18 Verona Fennimore Lands End £ Verona £18 Eden Mount Hope £18 Dodgeville Montfort Cobb £18 Dodgeville

Patch Grove ST78 69 Linden ST191 ST £61 Clayton Bagley Forward SW STR Forward ST92 Livingston Bloomington ST39 Bloomington GRANT New Hollandale Hollandale Rock Branch ST39 Belleville COUNTY Mineral Point New Hollandale Tap Rewey 69 Lancaster 80 Mineral Point SW STR Mineral Point ST Belleville ST35 ST129 ST ST35 Lancaster Rewey Jerrett ST78 £52 Blanchardville ST39 ST92 New Glarus Guttenberg Blanchardville ST133 £151 New Glarus SW STR New Glarus Guttenberg DPC Glen Haven Tap Glen Haven ST23 81 Lancaster ST81 CLAYTON ST CARDINAL-HICKORY CREEK Project Study Area COUNTY TRANSMISSION LINE Monticello SW STR Outside Project Study Area Belmont PROJECT Monticello Cassville £61 Platteville 151 Monticello (ALTE) Osterdock Nelson Dewey SW YD Pioneer(ALTE) £ EXISTING TRANSMISSION LINES Potosi SW STR Potosi Hillman Belmont Tap Belmont DPC Platteville ! Cassville DPC LaMont *# Substation ! 16169 kV Turkey River ST Millville Millville 133 FIGURE 4-16 ! ! ! ! Turkey River (New Location) ST 81 DPC Argyle 69 kV 345 kV 126 ST Argyle ! GREEN ST EXISTING UTILITIES ! 138 kV 345 kV Approved/Under Tennyson 80 COUNTY Construction Mississippi River Potosi £151 ST North Buena Vista £ Darlington ST81 Approximate Gas Pipeline North Monroe 81 Darlington Elmo SW STR Elmo ST £61 MINNESOTA Interstate, US or State Highway LAFAYETTE WISCONSIN Balltown State Boundary City / Village COUNTY ST78 Lake Dickeyville DPC Gratiot SW STR Michigan Idle Hour SW STR Idle Hour Cuba City SW STR Cuba City ST23 Wiota Jennings Rd SW STA County Boundary Open Water Monroe Central Luxemburg Holy Cross I O W A Sherrill Cuba City South ST3 IOWA DPC Gratiot Wiota SW STR South Monroe Richardsville Kieler Cuba City Cuba City South SW STR DUBUQUE DPC Shullsburg Browntown Monroe £52 Benton SW STR Benton Shullsburg SW STR ILLINOIS µ COUNTY £ Rickardsville Gratiot Browntown 61 Miner Blacksmith £ Benton Shullsburg Map Area Shown in Red 0 1 2 3 4 5 Durango ST386 ST11 South Wayne New Vienna Liberty ST80 11 Sageville ST ST69 Blacksmith SW STR #* Miles Lore ST78 ST924 ST11 Hazel Green

ST136 Asbury Dubuque 61 HICKORY ££151 John Deere CREEK Royster-Clark Nitrogen Graf £20 Dyersville SUBSTATION £ Salem ST966 I L L I N O I S Tap £20 ST968 Centralia F:\Projects\C-HC\Mxds\MCS\Figure 4-15 Existing Utilities.mxd Data Sources: ATC, DPC, IDOT, IDNR, ITC, USGS, WDNR, WDOT. 7/15/16 Macro-Corridor Study Process the Utilities Used to Develop the Macro-Corridors

5.0 PROCESS THE UTILITIES USED TO DEVELOP THE MACRO-CORRIDORS

The Utilities developed their macro-corridors by first identifying numerous corridors that would qualify under the state siting laws. These corridors were subsequently narrowed and some revised or eliminated based on potential resource impacts and input from numerous parties.

5.1 State Routing Laws Both Wisconsin and Iowa law specify how the Utilities must begin route planning and select their alternative routes for a new transmission line project.

5.1.1 Public Service Commission of Wisconsin The PSCW and the WDNR work together to review and either approve or deny the required state approvals for proposed transmission projects in Wisconsin. The PSCW has jurisdiction over the CPCN that must be obtained by a public utility prior to constructing a transmission line that is 345 kV or greater in the state of Wisconsin. The WDNR issues permits for transmission line projects requiring a CPCN, including wetlands and storm water discharge permits. Wis. Stat. §§ 283.33(1)(a) or (am) and 281.36.

In determining the route, the PSCW must follow the Siting Priorities Law, which establishes priority transmission corridors. The Siting Priorities Law provides:

(6) Siting of electric transmission facilities. In the siting of new electric transmission facilities, including high-voltage transmission lines, as defined in s. 196.491 (1) (f), it is the policy of this state that, to the greatest extent feasible that is consistent with economic and engineering considerations, reliability of the electric system, and protection of the environment, the following corridors should be utilized in the following order of priority:

(a) Existing utility corridors. (b) Highway and railroad corridors. (c) Recreational trails, to the extent that the facilities may be constructed below ground and that the facilities do not significantly impact environmentally sensitive areas. (d) New corridors. (Wis. Stat. § 1.12(6)).

5.1.2 Iowa Utilities Board The IUB is responsible for reviewing and granting approval for the Project in Iowa for any portion of the transmission line outside of municipal boundaries. (Iowa Code § 478.1). A franchise from the IUB must be obtained for each county traversed by a proposed transmission line of 69 kV or more before

Dairyland Power Cooperative 5-1 Cardinal-Hickory Creek T-Line Project Macro-Corridor Study Process the Utilities Used to Develop the Macro-Corridors

construction can begin. (Iowa Code § 478.1(1)). The IUB must find that the proposed line is necessary to serve a public use and represents a reasonable relationship to an overall plan of transmitting electricity in the public interest.

Transmission line routes must comply with Iowa Code § 478.18(2) and 199 IAC 11.1(7), which require that the planning for routes begin with routes that are near or parallel to roads, railroad right-of-way, or division lines of land. “A transmission line shall be constructed near and parallel to roads, to the right-of- way of the railways of the state, or along the division lines of the lands, according to the government survey, wherever the same is practicable and reasonable, and so as not to interfere with the use by the public of the highways or streams of the state, nor unnecessarily interfere with the use of any lands by the occupant.” (Iowa Code § 478.18(2)).

5.2 Electrical System Requirements The Project must connect the Hickory Creek Substation in northeast Iowa to the Cardinal Substation in south-central Wisconsin, with both endpoints selected by MISO as part of the development and approval of the MVP Portfolio. To achieve the full benefits indicated by the MVP analysis, MISO also requires an intermediate substation, which is planned as a 345/138 kV substation near Montfort, Wisconsin (referred to as the “Montfort Substation Siting Area”).

5.3 The Utilities’ Comprehensive Outreach Program Over the last four years, the Utilities provided information to and sought feedback from different groups. Below, the outreach efforts are described according to five categories: tribes, governmental agencies, public officials, utilities, and all other interested parties. Appendix D contains a summary of all public outreach.

5.3.1 Tribal Nations Twenty Native American tribes were identified as having a potential interest in the Project. The Utilities sent letters to these tribes on May 11, 2016, providing information and maps regarding the Project and requesting input on the macro-corridors. The letter, which expressly stated it was not formal consultation, requested comments on the macro-corridors and offered to meet with the tribes. The letter and a list of tribal recipients are attached at Appendix E. To date, no comments have been received in response to this outreach.

Dairyland Power Cooperative 5-2 Cardinal-Hickory Creek T-Line Project Macro-Corridor Study Process the Utilities Used to Develop the Macro-Corridors

5.3.2 Governmental Agencies From 2012 up through the preparation of this MCS, the Utilities contacted federal, state, and local agencies to obtain baseline resource data and to discuss routing concerns and permitting requirements. Appendix G provides a list of all in-person outreach (substantive meetings and calls) with federal, state, and local agencies with jurisdiction over the Project. All federal, state, and local agency correspondence and substantive emails are attached at Appendix H.

5.3.3 Public Officials The Utilities have conducted two waves of outreach to legislators (federal and state) as well as local public officials and staff (collectively “Public Officials”). In 2014, the Utilities sent letters to nearly 585 Wisconsin Public Officials having a jurisdiction within 1 mile of potential corridors that fell under Wisconsin Siting Priorities Law. The Utilities met with at least one local official from nearly all of 73 local units of government falling within that same area. The outreach conducted with Public Officials is listed in Appendix I. The outreach process used by the Utilities in Wisconsin followed ATC’s standard procedures for such outreach.

In 2016, after the study area had been narrowed and the macro-corridors defined, the Utilities sent open house invitation letters to nearly 358 Wisconsin Public Officials having jurisdiction within 300 feet of the macro-corridors and met with at least one local official from nearly all of the 47 local units of government within that narrowed area. The Utilities also sent letters to 183 Wisconsin Public Officials who no longer had jurisdiction over the macro-corridors that were under consideration at that time, because the area the Public Officials represented was not within 300 feet of the macro-corridors.

In Iowa and Illinois, outreach with public officials was conducted over the same time period as in Wisconsin but was more focused on the Mississippi River crossing areas. Outreach was conducted with the cities of Dubuque and Guttenberg in Iowa as well as East Dubuque, Illinois. In addition, outreach was conducted with Clayton and Dubuque counties in Iowa.

Appendices F and J contain reports explaining how these Public Officials were identified and the outreach conducted. In addition to these two waves of outreach, the Utilities periodically receive and respond to requests or comments from Public Officials.

5.3.4 Utilities As part of the outreach process, electric utilities, municipal utilities or cooperatives with service territories within the Initial Study Area and Project Study Area were contacted prior to public open houses so that they were aware of the Project and the upcoming public outreach. This practice helps inform utilities who

Dairyland Power Cooperative 5-3 Cardinal-Hickory Creek T-Line Project Macro-Corridor Study Process the Utilities Used to Develop the Macro-Corridors

may get questions from their own electric customers located within the study areas. Appendix K lists the utility outreach conducted.

5.3.5 Other Interested Parties The Utilities obtained input from other interested parties through several forums: conversations at open houses and other meetings; phone calls in response to open house invitations, newsletters, and media coverage; email; and mail. “Other Interested Parties” includes landowners and businesses near a corridor; the general public in a study area; non-governmental organizations (e.g. environmental groups, renewable energy advocates, hunting and fishing organizations, lake associations, snowmobile groups, all-terrain vehicle groups, trails groups, civic groups, and chambers of commerce); and any other party who has expressed an interest in this Project. Appendix K also lists the outreach conducted with non- governmental organizations.

5.3.5.1 Public Open Houses The Utilities have hosted two rounds of open houses, which facilitate one-on-one exchanges between the Utilities and interested parties. Attendees could attend and participate any time during the hosted time frame, obtain information and visit the following key topic stations:

• Transmission Planning; • Regulatory Review Process; • Environmental; • Engineering and Design; • Real Estate and ROW; and • Comments and Feedback.

Members of the Utilities’ routing and siting teams, local relations, government affairs, and project managers also were available at meetings to discuss the Project with interested parties. In Wisconsin, GIS stations also were available at the 2016 open houses in order to provide detailed maps of macro-corridors for landowners and other interested parties.

In Iowa, public outreach is typically commenced with a formal public informational meeting conducted by the Iowa Utilities Board. (See Iowa Code § 478.2). Iowa code states that a utility cannot contact landowners regarding right-of-way acquisition until after this public informational meeting is held. (Iowa Code § 478.2(4)). However, for this Project, a public open house was held in May 2016 in Iowa to obtain landowner and stakeholder feedback on the macro-corridors for purposes of developing this MCS.

Dairyland Power Cooperative 5-4 Cardinal-Hickory Creek T-Line Project Macro-Corridor Study Process the Utilities Used to Develop the Macro-Corridors

5.3.5.1.1 Open Houses in 2014 Open house meetings were held on October 6 to 9, 2014, only in Wisconsin in the communities of Lancaster, Belmont, Dodgeville, and Middleton.5 In 2014, the Utilities were using the Initial Study Area, which is shown in Figure 5-1.

Invitations were sent to landowners within the Initial Study Area whose property was located within one mile of any existing corridor listed as a priority under Wisconsin law (viz., existing utility corridors, highway and railroad corridors, and recreational trails). Invitations also were sent to Public Officials in that same area and anyone the Utilities identified with a possible interest in the Project. The invitation included an invitation letter, a map of the Initial Study Area and a postage-paid self-mailer comment card for written comments. A total of 23,474 invitations were mailed for the 2014 open houses. Anyone receiving an invitation also received a reminder phone call. An explanation of these outreach activities can be found in the 2014 open house report attached at Appendix J.

A postal patron newsletter, media articles, and newspaper ads also included information about open house dates, times and locations.

At the open houses, attendees could provide comments either through written comment cards or entering them into computer kiosks. Comments also were received through the mail and the Project website. Comments about the Project were entered into the electronic stakeholder-relationship management system, reviewed by the Project team and used for routing and siting. These comments were used to help narrow the study area and define the macro-corridors.

Appendix J also includes a summary of the comments received through the 2014 open houses. The complete up-to-date compilation of the written comments will be submitted to RUS in late summer or early fall 2016.

5 Open Houses were not held in Iowa in 2014 because of limitations contained in Iowa law on when utilities may contact landowners. (See Iowa Code § 478.2).

Dairyland Power Cooperative 5-5 Cardinal-Hickory Creek T-Line Project Harpers Ferry 60 ST78 ST19 £61 ST60 Blue River Muscoda Avoca Lone Rock ST ST19 ST179 Steuben ST133 RICHLAND SAUK Spring Green ST364 Eastman COUNTY 14 Mazomanie ALLAMAKEE COUNTY Arena £ £12 COUNTY Boscobel CARDINAL 131 Black Earth CRAWFORD ST SUBSTATION 130 COUNTY ST ST76 ST27 ST80 ST23 ST35 £14 Middleton Woodman Wauzeka ST78 Wisconsin River DANE Madison Marquette COUNTY 60 £12 Prairie du Chien ST Highland Blue Mound £18 ST133 ST23 State Park McGregor Gov. Dodge State Park Barneveld Blue Mounds ST340 IOWA £18 Mount Horeb COUNTY Ridgeway 18 Verona Fennimore £ Northrup £18 18 Mount Hope £ £18 King WPA Montfort Cobb Dodgeville

Patch Grove Swan Pond WPA ST78 69 Linden ST191 ST £61 Clayton Bagley ST92 Livingston Bloomington ST39 GRANT Hollandale ST39 Belleville COUNTY Mineral Point Lancaster 129 ST80 ST35 ST W I S C O N S I N ST35 Rewey ST78 ST39 New Glarus CLAYTON ST133 £151 Blanchardville COUNTY Guttenberg ST23 ST69 ST81 ST81

£61 Belmont Monticello Osterdock Platteville £151 Cassville Millville ST133 ST126 ST81 Argyle GREEN Tennyson COUNTY Mississippi River Potosi £151 CARDINAL-HICKORY CREEK North Buena Vista £ Darlington Initial Study Area ST81 ST136 81 TRANSMISSION LINE LAFAYETTE ST Outside Initial Study Area COUNTY PROJECT Colesburg EXISTING TRANSMISSION LINES Balltown FIGURE 5-1 ST78 *# Substation ! ! Dickeyville 161 kV INITIAL STUDY AREA FROM 2014 ! ! ! ! 3 69 kV 345 kV ST ! 345 kV Approved/Under Luxemburg Holy Cross Sherrill ! 138 kV Cuba City Construction 52 £ Approximate Gas PipelineMonroe Gratiot Rickardsville MINNESOTA BrowntownInterstate, US or State Highway DUBUQUE £61 Benton Shullsburg WISCONSIN ST386 11 South Wayne Durango 80 11 ST State Boundary COUNTY Sageville ST ST Lake ST69 City / Village New Vienna Michigan ST78 County Boundary ST924 Hazel Green Open Water Asbury IOWA HICKORY Bankston £61 Dubuque µ CREEK DELAWARE Graf ILLINOIS SUBSTATION 0 1 2 3 4 5 COUNTY ST966 Map Area Shown in Red Dyersville Centralia Miles I O W A £151 J O D A V I E S S Epworth Peosta STEPHENSON ST967 Farley £20 COUNTY ST963 ST955 I L L I N O I S COUNTY £52 151 Worthington £

F:\Projects\C-HC\Mxds\MCS\Figure 5-1 Initial Study Area from 2014.mxd Data Sources: ATC, DPC, IDOT, ITC, USGS, WDOT. 7/15/16 Macro-Corridor Study Process the Utilities Used to Develop the Macro-Corridors

5.3.5.1.2 Open Houses in 2016 Between the first and second round of open houses, the study area was narrowed from the Initial Study Area (Figure 5-1) to the Project Study Area (Figure 1-2) and the macro-corridors were defined. The 2016 open houses were held May 16-19, 2016, in the communities of Platteville, and Barneveld, Wisconsin (in Barneveld two open house events were hosted back-to-back days), and Peosta, Iowa. Landowners and Public Officials within 300 feet of a macro-corridor, parties who had expressed an interest in the Project, and parties who had been previously identified by the Utilities as someone who may be interested in the Project received an invitation.

A postal patron newsletter, media articles, and newspaper ads also included information about open house dates, times, and locations.

In Wisconsin, attendees could obtain information at interactive GIS stations that contained satellite imagery reflecting specific parcels, areas of interest, and any macro-corridor. Similar to the 2014 open houses, written comments could be submitted at the open houses via mail, email, or the Project website. Appendix F also includes a summary of the comments received through the 2016 open houses.

Based on the input received at the 2016 open houses along with additional data and field reconnaissance, the Utilities further refined the macro-corridors into alternative corridors.

As summary of the locations, dates and attendance at the 2014 and 2016 open houses is displayed below as Table 5-1. The number of “individuals” counted in this table includes those who signed in and also attempted to capture those persons who did not sign in. (The Utilities had someone standing at the door counting people who walked past the sign-in sheets.)

Table 5-1: Location, Dates, and Attendance at Open Houses

Location Date Individuals Round 1 Open Houses Grant City Fairgrounds Youth and Agriculture Center, Monday, October 6, 2014 163 916 East Elm St, Lancaster, WI 53813 Belmont Convention Center and Banquet Hall, 102 W Tuesday October 7, 2014 103 Mound View Ave, Belmont, WI 53510 Dodger Bowl, 318 King St, Dodgeville, WI 53533 Wednesday, October 8, 2014 194 Marriott Madison West, 1313 John Q Hammons Dr, Thursday, October 9, 2014 133 Middleton, WI 53562 TOTAL Round 1 593

Dairyland Power Cooperative 5-7 Cardinal-Hickory Creek T-Line Project Macro-Corridor Study Process the Utilities Used to Develop the Macro-Corridors

Location Date Individuals Round 2 Open Houses Peosta Community Center, 7896 Burds Road, Peosta, Monday, May 16, 2016 37 IA 52068 Pioneer Lanes, 1185 US (Business) 151, Platteville, Tuesday, May 17, 2016 186 WI 52068 Deer Valley Lodge, 401 West Industrial Drive, Wednesday, May 18, 2016 262 Barneveld, WI 53507 Deer Valley Lodge, 401 West Industrial Dr, Thursday, May 19, 2016 198 Barneveld, WI 53507 TOTAL Round 2 683

TOTAL (Round 1 and 2 Combined) 1,276

5.3.5.2 Newsletters Appendix L summarizes the public informational materials--such as newsletters, fact sheets, website, and maps--that have been released or distributed.

5.4 Identification of Opportunities and Constraints6 The criteria considered for routing transmission lines include routing opportunities (existing linear features as specified in Wisconsin and Iowa law) and routing constraints or sensitivities (elements of the human and natural environment that could conflict with the location of a transmission line). The subsections below summarize the routing criteria used for this Project.

5.4.1 Routing Opportunities Considered RUS defines routing opportunities as areas that provide the highest potential for routing a line based on the presence of existing linear features, which allow for co-location and minimization of adverse impacts.7 As discussed in section 5.1, the states of Wisconsin and Iowa both have transmission siting

6 Section 5.4 does not apply to the potential river crossings, which were evaluated in the ACA. See Section 3.2.1, above. 7 The RUS Guidance defines “opportunities” as follows: Areas within which transmission line construction would be more compatible with the current land use, or have a reduced likelihood of additional impacts, resulting in more efficient line operation and management. Potential opportunities include but are not limited to existing transmission line/utility corridors, transportation rights-of-way, industrial areas, National Corridors, or along property boundaries. (RUS, 2016, Exhibit D, Attachment D-2, p. 3).

Dairyland Power Cooperative 5-8 Cardinal-Hickory Creek T-Line Project Macro-Corridor Study Process the Utilities Used to Develop the Macro-Corridors

laws specifying how route planning must be initiated (Iowa) and how routing opportunities must be considered.

Figure 5-28 presents a map illustrating the routing opportunities identified within the Project Study Area and the type of existing linear facility being utilized by each.

The following subsections describe why these linear features are considered opportunities and how the Utilities considered them in developing the macro-corridors.

5.4.1.1 Existing Utility Corridors Under Wisconsin law, existing utility corridors are given top priority in locating a route for a new a transmission line. Several utility corridors exist within the Project Study Area in Wisconsin. Following or co-locating with these existing features minimizes aesthetic, land use, and environmental effects. In addition, these existing features are often considered opportunities because the surrounding properties have usually already been developed or adapted to the presence of a transmission line.

Smaller-scale utility facilities (electric/gas distribution lines) were not generally considered strong opportunities due to their location (because they serve individual customers these facilities are located nearby customers). Additionally, a larger amount of ROW in addition to the existing ROW would likely be needed to accommodate the Project.

8 Naming Convention for the Maps: Each routing opportunity within the Project Study Area is identified with a segment letter and segment number. The segment letter corresponds to the type of linear feature that the routing opportunity follows: A - ATC transmission line; D – Dairyland transmission line; C - County highway; G - Gas pipeline; M - Major road; N – New (greenfield) corridors; O – Other; P – Public land survey system section line; R – Railroad; S - State highway; and U - Federal highway. Each segment is also given a unique number that is listed after the letter. For example, A100 denotes a unique segment that follows an existing ATC transmission line in the Project Study Area.

Dairyland Power Cooperative 5-9 Cardinal-Hickory Creek T-Line Project F F X )" )"W )" )" )"E )"O OO )"TB SAUK KP )"W )" )"JJ )"G )"C )" )"M RICHLAND )"JJ "WC COUNTY )"Y Harpers Ferry ) 60 COUNTY ST ST78 P CRAWFORD £61 Avoca ST60 )" ST19 Steuben )"E Blue River ST133 Muscoda Lone Rock )"G Mazomanie ST19 K COUNTY ST179 A060 )" )"D Spring Green A520 A061 ST364 Eastman R010 R008 )"N C U013 U008 £14 )"F 12 )" CC Arena £ )" C001 C060 N140 Boscobel "P Black Earth CARDINAL ST131 )"M ) NN )"K )" U006 SUBSTATION N )"N Q )" )"G ST130 )"T )" M N282 )"FF F )" )" M ST76 )"S 80 PP N106 23 S002 )" 27 ST ST N105 N104 C002 ST35 ST )" N103 N102 N101 14 C137 £ Middleton Woodman )"Q C061 * Wauzeka P A110 C100 JJ # )" S039 )" )"Q N614 N612 HH ST78 )"II N1820 )"

P N1821 Madison )" C003 Marquette C139 H S C010 C140 K )" J A041 )" )" S040 )" 60 T A120 C161 £12 £18 Prairie du Chien ST )" Highland )"T Blue Mound C018 C032 )"C ST133 N641 ST23 State Park N330 )"M )"Q N340 McGregor Gov. Dodge C062 C065 N400 C016 N1643 )"Q State Park Blue Mounds

C034 I ID N337 )" BH N580 )" C014 PD ST340 )" C063 £18 U025 U023 U161 )" £ Barneveld S003 C200 Wisconsin River N660 Ridgeway U159 IOWA S043 N362 MV N460 Mount Horeb £18 Verona )" 18 Fennimore G121 A121 COUNTY YZ £ U038 T001 )" DANE )"J )"J £18 Montfort A204 U034 U029 Z JJ U101 " F A206 A205 N1823 )" E ) )" Cobb G004 )"H )"T )" COUNTY P N720 A140 G " S045 )" ) A227 S071 Q N1565 BB X G122 )" PB

" D102 " ) Patch Grove Dodgeville )"Y ) )" )"B C366 JG A302 )"H )" U102 ST78 G123 PROPOSED Y 191 )"H ST69 K SUBSTATION Linden )" ST HK )" £61 D103 )" 92 A )"D Clayton Bagley K ST )" A E A361 SITING AREA )" A )" )" S126 )" Bloomington N801 39 ST YD )"D )"W )" G )"A )" )"U C260 N1980 N1500 )"D )"QQ Hollandale )"A H ST39 )"F )" JG Belleville

A U103 S128 S320 " N1140 K )" ) A362 G125 " A305 Mineral Point ) A500 DD D260 )"O )" )"VV Lancaster ST129 ST80 A501 ST35 C320 W I S C O N S I N

S220 D105 S301 ST35 D182 Rewey )"CC GRANT N2020 39 )"D D090 N2075 )"D W ST

D261 D080 )" COUNTY S221 A366 )"S W N2000 S113 )"J )" )"CC )"D S114 S128.5 G Blanchardville H A307 )" )" New Glarus CLAYTON ST133 S112 £151 G126 A503 D £

U107 )"

N1240 N1220 COUNTY Guttenberg )"N D181 NN ST23 A100 Potential Opportunity)" A367 81 )"D ST81 D180 ST N961 N960 CARDINAL-HICKORY CREEK )"VV D107 N1960 )"B )"G Segment ID G127

S304 TRANSMISSION LINE

S109 N920 C Segment Designator: S116 )"

D262 D043 N955 )"G A ATC Line N Greenfield )"D )"U S129 PROJECT D202 D142 Belmont N J )"Y £61 D041 151 )" C)"County Highway R Railroad )"EE Osterdock S117 £ G Monticello XX £ )" D DPC Line S State"F Highway

N )" )"G O FIGURE 5-2 )"A C ) N1940 A424 )" N1910 )" )" A422 N902 G Gas Pipeline U US Highway U109 A421 A419 A286 A285 69 Cassville )"Z OPPORTUNITIES )"N ST Millville ST133 X Argyle )" ST126 ST81 )"C )"N Tennyson O F Potosi )" £151 )" "D )"M Project North Buena Vista Mississippi River £ )"F ) Study Area Substation Darlington ST81 LAFAYETTE ST81 Siting Area )"M Outside Project Study Area EXISTING LINEAR CORRIDORSY GREEN COUNTY K )"M )" Colesburg )" COUNTY )"FF )"S Balltown EXISTING TRANSMISSION LINES )"H SS ST78 )"Y )" Dickeyville D Q *# )"D! ! State Boundary )" )" Substation 161 kV DR City / Village 3 )"O ! ! ST HH )"E ! ! )" Luxemburg Holy Cross Sherrill )" )"J 69 kV 345 kV Monroe Cuba City ! ! 345 kV Approved/Under County Boundary KK Open Water 138 kV Construction )"M )" )"U KS £52 )"N MM )" £Rickardsville Gratiot )" U OTHER Browntown £61 Benton )"I )" )"P KS ST386 11 D South Wayne )"M )" Durango 80 11 Shullsburg Interstate, US or ST )" 136 ST )"J ST State Highway)"KK Railroad ST69 ST Sageville Approximate)"B Gas µ #* Hazel Green )"I ST78County Highway Pipeline ST924 )"W Road )"HK DUBUQUE )"Z )"O 0 1 2 3 4 5 Asbury )"ZZ )"I "DD COUNTY HICKORY £61 PP ) )" P Miles Dubuque )"M )" CREEK Graf SUBSTATION Dyersville ST968 ST966 Centralia J O D A V I E S S STEPHENSON I O W A COUNTY I L L I N O I S COUNTY Epworth Peosta ST955 ST967 Farley £20 £52 ST963

Data Sources: ATC, IDOT, IDNR, ITC, USGS, WDNR, WDOT. 7/28/16 Macro-Corridor Study Process the Utilities Used to Develop the Macro-Corridors

5.4.1.2 Transportation Corridors In Wisconsin, transportation corridors are given second priority after existing utility corridors. In Iowa, route development must begin with routes that are near, among others, roads and active railroad corridors.

Accordingly, the Utilities identified existing federal, state and county highways as well as active railroad corridors in Wisconsin. In Iowa, the Utilities identified roads and active railroad corridors.

5.4.1.3 Division Lines of Land (Including Section, Quarter Section, and Quarter-Quarter Section Lines) In Iowa, in addition to beginning route development with roads and railroad right-of-way, a utility must also start with division lines of land. The Utilities, therefore, identified division lines of land in Iowa. Wisconsin does not recognize land division lines in its Siting Priorities Law, so land division lines were only considered in Wisconsin when utilizing new corridors (see subsection 5.7.1.5).

5.4.1.4 Recreational Trails In Wisconsin, recreational trails are third in the order of siting priority. Where primary and secondary opportunities were absent in Wisconsin, the Utilities explored nearby recreational trails.9 The Utilities are not currently proposing that the Project co-locate with any recreational trails.10

5.4.1.5 New Corridors If no other priority corridors are available in Wisconsin, then, and only then, may the Utilities look to new corridors. Where new corridors were considered in Wisconsin, the Utilities tried to follow section lines, quarter section lines, property lines, fence lines, and/or other linear features to the extent practicable. In Iowa, planning for a route must begin with routes that are near and parallel to roads, railroad rights-of- way, or division lines of land. When a route near and parallel to these features is not practicable and reasonable for engineering reasons, deviations may be proposed. In Iowa, although deviations based on landowner preference or minimizing interference with land use may be permitted, route planning must be shown to begin with a route or routes near and parallel to roads, railroad rights-of-way, or division lines of land.

9 In some cases, the environmental constraints associated with a trail could prevent recreational trails from being utilized. The law also specifies that recreational trails are only a priority “to the extent that the facilities may be constructed below ground.” Wis. Stat. § 1.12(6)(c). 10 The Project parallels USH 151 and, for approximately 16.9 miles along this proposed corridor, the Military Ridge State Trail also generally parallels USH 151.

Dairyland Power Cooperative 5-11 Cardinal-Hickory Creek T-Line Project Macro-Corridor Study Process the Utilities Used to Develop the Macro-Corridors

5.4.2 Routing Constraints Considered Constraints are natural and human environmental factors that could conflict with constructing or operating a transmission line and/or could have more rigorous permitting or licensing requirements.11 Routing constraints include, but are not limited to, those identified below (in no order of priority):

• Agricultural Lands of Statewide Importance; • Airport Obstruction-Free Zones/Airport Approach Flight Paths; • Airports (public and private); • Archeological Sites; • Center Pivot Irrigation Systems (where structures would interfere with irrigation); • Confined Animal Feeding Operations (“CAFO”); • Conservation Easements; • County Forests and Forest Management Areas; • County Parks and Recreation Areas; • Designated or Registered National Historic Districts; • Existing Residential Areas; • Federal, State, and County Land (not otherwise protected); • Floodways/Floodplains; • Geologically Unstable or Highly Erosive Areas; • Hospitals/Nursing Homes; • Landfills/Dumps; • Licensed Day Cares; • Memorial Parks/Cemeteries; • Military Reservation/Installation; • Mines, Quarries and Gravel Pits;

11 RUS defines “constraints” as following: Areas having one or more physical, environmental, institutional or statutory impediments to corridor designation. Areas that may be crossed by corridors only if necessary, and if reasonable mitigation or avoidance of significant impacts can be obtained. Areas where the proposed action conflicts with existing land use, development, or resources. These areas should be avoided when other reasonable alternatives exist. In addition to resource and land use constraints, engineering and economic constraints must be considered (e.g., topography, span limitations, railroads/highway/river crossings, access roads, etc.) (RUS, 2016, Exhibit D, Attachment D-2, p. 1).

Dairyland Power Cooperative 5-12 Cardinal-Hickory Creek T-Line Project Macro-Corridor Study Process the Utilities Used to Develop the Macro-Corridors

• Municipal Parks and Parks Owned or Administered by Other Governmental Subdivisions; • National and State Wilderness Areas; • National Forests; • National Landmarks; • National Monuments; • National Recreation Areas; • National Register Historic Sites; • National Wild and Scenic Rivers; • National Wildlife Refuges; • Native American Tribal Land; • Nature Conservancy Preserves; • Occupied Buildings/Dwellings; • Open Water Expanses greater than 1,000 Feet; • Places of Worship; • Planned Residential Areas (Reference: Smart Growth Legislation Definition) or other planned development; • Playgrounds; • Population Centers (incorporated and unincorporated municipalities); • Prime Farmlands (ref. A-1 zoning); • Reserve Program Lands (conservation, wetland); • Scenic Areas/Hill Crossings at Crests; • Scenic Travel Routes; i.e., designated rustic roads; • Schools; • State and National Recreation Trails; • State Forests and Forest Management Areas; • State Natural Areas; • State Parks and Recreation Areas; • State Scientific Areas; • State Wildlife Refuges, Wildlife Areas, Game Management Areas; • State-Designated Wild and Scenic Rivers; • Threatened and Endangered Species Critical Habitat Areas (Federal and State) • Unique Habitats (oak savanna, fen, prairie remnants, etc.); • VORTAC Tower Sites;

Dairyland Power Cooperative 5-13 Cardinal-Hickory Creek T-Line Project Macro-Corridor Study Process the Utilities Used to Develop the Macro-Corridors

• Waterfowl Nesting or Rearing Areas; • Wellhead Protection Areas; and • Wetlands considered Areas of Special Natural Resource Interest as well as other wetlands.

Figures 5-3 shows these constraints in the eastern and western halves of the Project Study Area, respectively.

Dairyland Power Cooperative 5-14 Cardinal-Hickory Creek T-Line Project ST78 60 19 ST ST K 133 Lone Rock )"G )" ST Muscoda Avoca SAUK )"Y RICHLAND COUNTY Spring Green COUNTY Mazomanie Arena £14 )"F )"C )"C )"KP )"KP )"P Black Earth )"NN CARDINAL SUBSTATION )"G 130 )"N ST )"T )"M )"FF Cross Plains ST80 )"PP ST23 £14 )"P #* )"T Middleton I JJ Q )" )"K )" )" )"HH ST78 II )"P )" )"H )"S )"J )"ZZ "P T ) )"Q Highland )" )"M )"F )"JG )"J Q ST23 Madison )" )"Y Blue Mound State Park )"S Gov. Dodge State Park Z Blue Mounds )"I BH )" Barneveld )"ID )" 18 ID PD £ DANE Mount Horeb )" )" IOWA HHH Ridgeway COUNTY )"J COUNTY )" Verona £18 )"YZ 18 £ Montfort )"Z )"E Cobb )"Z )"H )"T )"G GRANT )"CH COUNTY Dodgeville )"Y )"B BB )"Q )" )"B "XX JG ) )"B )"H )" "IG CARDINAL-HICKORY CREEK Project ) ST78 Study Area TRANSMISSION LINE)"H )"U Linden )"Y Outside Project Study Area )"X ST191 )"HK PROJECT E A )" 92 )" )"K )"A p Airfield nmSTSchool Livingston FIGURE 5-3 )"A G "J 39 D W CONSTRAINTS o GAirport #0 VORTAC Tower Site )" ) ST YD )" )" )" )"E )" GF Assisted Living Facility WDOT Designated QQ )"A )" æ Rustic Road PB D Cemetery )" )" Hollandale )"H WDOT Designated JGî Church ST39 )" Scenic Byway Mineral Point Belleville EXISTING LINEAR CORRIDORS Day Care Center Pivot Irrigation DD )"K )" DDD GF Hospital Landfill )" )"DD )"U EXISTING TRANSMISSION LINES ST80 /" National Register Quarry )"A *# Substation ! ! 161 kV Historic Place Rewey W I S C O N S I N ! ! 69 kV ! ! 345 kV ! Environmentally Sensitive Lands* )"D ! 138 kV 345 kV Approved/Under Construction ST39 S W * Includes Federal Wildlife Refuges, State Fishery Areas, Managed )" )" Forests, Natural Areas, Parks, Waterfowl/Wetland Management OTHER )"J O Areas, Wetlands, Wildlife Refuges, County)"New Parks, Glarus and Municipal Parks. Blanchardville G Interstate, US or )" State Highway Railroad State Boundary City / Village £151 County Highway Approximate Gas )"D D Pipeline GREEN )" Road County Boundary COUNTY Open Water )"NN CC ST23 0 1 2 3 4 5 )" LAFAYETTE G µ )"N Miles COUNTY )"

)"B "C ) G O )" )"N )" Monticello G )"D )"J EE )"B Platteville £151 Belmont )" )" )"XX )"X )"G Data Sources: ATC, IDOT, IDNR, ITC, USGS, WDNR, WDOT. 9/9/16 CRAWFORD )"Q COUNTY C )"K )"Q )"G )" I Fennimore )" £18 JJ £18 Mount Hope )" Montfort Cobb CH )"P )" "F )"B )"X ) )"Q Patch Grove )"B J XX )" )" )"B )"IG

Linden )"K IOWA )"X )"A £61 COUNTY Clayton Bagley )"E Livingston )"E Bloomington )"G ST39 )"QQ )"D )"A Mineral Point Lancaster )"VV )"J W I S C O N S I N 129 ST80 35 ST )"A ST Rewey ST35 GRANT )"V COUNTY )"V )"G 133 151 ST )"D £ Guttenberg )"N

ST81 ST81 )"VV

)"B )"C O 61 )"B )" CLAYTON Y £ )" £151 Belmont COUNTY Platteville £ )"G )"XX )"N )"G Cassville )"U )"Z Millville ST133 )"X ST126 N Tennyson )" Potosi )"O )"F £151 North Buena Vista Mississippi River LAFAYETTE CARDINAL-HICKORY CREEK Project COUNTYEnvironmentally Sensitive Lands* Study Area TRANSMISSION LINE * Includes Federal Wildlife Refuges, StateST 81Fishery Areas, Managed PROJECT Outside Project Study Area Forests, Natural Areas, Parks, Waterfowl/Wetland Management )"H Areas, Wetlands, Wildlife Refuges, County Parks, and Municipal Parks. FIGURE 5-3 p Airfield nm School Balltown CONSTRAINTS Airport VORTAC Tower o #0 State Boundary City / Village I O W A GF WDOT Designated AssistedD Living Facility Dickeyville )" Rustic Road EXISTING LINEAR CORRIDORS æ Cemetery County)"Q Boundary Open Water WDOT Designated EXISTING TRANSMISSION LINES î Church Scenic Byway )"E ST3 Luxemburg Sherrill *# ! ! HH Day Care Holy Cross Substation 161 kV )" Cuba City Center Pivot Irrigation 0 1 2 3 )"U 4 5 ! ! ! ! GF J DUBUQUE 69 kV 345 kV Hospital Landfill)" ! ! 345 kV Approved/Under µ Miles National Register Quarry COUNTY 138 kV Construction /" Historic Place £52 Rickardsville OTHER HICKORY Shullsburg ST136 A CREEK Interstate, US or £61 Benton I )" ST386 State Highway £ Railroad )" SUBSTATION Durango Approximate Gas )"J County Highway Pipeline )"Z Road ST80 ST11 New Vienna Sageville * Dubuque I U # Hazel Green )" )" Data Sources: ATC, IDOT, IDNR, ITC, USGS, WDNR, WDOT. 9/9/16 Macro-Corridor Study The Utilities’ Macro-Corridors11F

6.0 THE UTILITIES’ MACRO-CORRIDORS12

6.1 Identification of Potential Macro-Corridors To identify potential macro-corridors within the Project Study Area, Utilities conducted an opportunities and constraints analysis using the results from field reconnaissance and GIS. Initial screening criteria were used to reduce the number of potential corridors. Specifically, the Utilities looked for routing opportunities that were not negatively impacted by routing constraints. Figure 6-1 shows the routing opportunities overlaid by constraints. In Wisconsin, all corridors were initially analyzed using a 3,000- foot to one-mile wide corridor centered on existing linear features. Each potential macro-corridor was then divided into segments allowing an analysis of each segment. In Iowa, the Utilities initially identified a broad potential macro-corridor, measuring approximately 12-miles long and approximately 5-miles wide and encompassing portions of Clayton and Dubuque Counties.

6.2 Opportunities and Constraints Evaluation by Siting Area To better organize and summarize the analysis of routing opportunities and constraints considered in this MCS analysis, the Project Study Area is divided into three geographic areas, as follows:

• the “Cardinal Substation-to-Montfort Siting Area” that considered the routing options in the eastern part of the Wisconsin portion of the Project Study Area between the existing Cardinal Substation and the intermediate substation location in the Montfort area; • the “Montfort-to-Mississippi River Siting Area” that considered the routing options in the western part of the Wisconsin portion of the Project Study Area between the intermediate substation location in the Montfort area and river crossing location; and • the “Mississippi River-to-Hickory Creek Siting Area” that considered the routing options in the Iowa portion of the Project Study Area between the river crossing location and the existing Hickory Creek Substation.

The potential macro-corridors within each of the three siting areas are identified by color-code in Figure 6-2.

12 Section 6 does not apply to the potential river crossings, which were evaluated in the ACA. See Section 3.2.1, above.

Dairyland Power Cooperative 6-1 Cardinal-Hickory Creek T-Line Project F F X )" )"W )" )" )"E )"O OO )"TB SAUK KP )"W )" )"JJ )"G )"C )" )"M RICHLAND )"JJ "WC COUNTY )"Y Harpers Ferry ) 60 COUNTY ST ST78 P CRAWFORD £61 Avoca ST60 )" ST19 Steuben )"E Blue River ST133 Muscoda Lone Rock )"G Mazomanie ST19 K COUNTY ST179 A060 )" )"D Spring Green A520 A061 ST364 Eastman R010 R008 )"N C U013 U008 £14 )"F 12 )" CC Arena £ )" C001 C060 N140 Boscobel "P Black Earth CARDINAL ST131 )"M ) NN )"K )" U006 SUBSTATION N )"N Q )" )"G ST130 )"T )" M N282 )"FF F )" )" M ST76 )"S 80 PP N106 23 S002 )" 27 ST ST N105 N104 C002 ST35 ST )" N103 N102 N101 14 C137 £ Middleton Woodman )"Q C061 * Wauzeka P A110 C100 JJ # )" S039 )" )"Q N614 N612 HH ST78 )"II N1820 )"

P N1821 Madison )" C003 Marquette C139 H S C010 C140 K )" J A041 )" )" S040 )" 60 T A120 C161 £12 £18 Prairie du Chien ST )" Highland )"T Blue Mound C018 C032 )"C ST133 N641 ST23 State Park N330 )"M )"Q N340 McGregor Gov. Dodge C062 C065 N400 C016 N1643 )"Q State Park Blue Mounds

C034 I ID N337 )" BH N580 )" C014 PD ST340 )" C063 £18 U025 U023 U161 )" £ Barneveld S003 C200 Wisconsin River N660 Ridgeway U159 IOWA S043 N362 MV N460 Mount Horeb £18 Verona )" 18 Fennimore G121 A121 COUNTY YZ £ U038 T001 )" DANE )"J )"J £18 Montfort A204 U034 U029 Z JJ U101 " F A206 A205 N1823 )" E ) )" Cobb G004 )"H )"T )" COUNTY P N720 A140 G " S045 )" ) A227 S071 Q N1565 BB X G122 )" PB

" D102 " ) Patch Grove Dodgeville )"Y ) )" )"B C366 JG A302 )"H )" U102 ST78 G123 PROPOSED Y 191 )"H ST69 K SUBSTATION Linden )" ST HK )" £61 D103 )" 92 A )"D Clayton Bagley K ST )" A E A361 SITING AREA )" A )" )" S126 )" Bloomington N801 39 ST YD )"D )"W )" G )"A )" )"U C260 N1980 N1500 )"D )"QQ Hollandale )"A H ST39 )"F )" JG Belleville

A U103 S128 S320 " N1140 )" ) A362 G125

A305 Mineral Point A500 DD D260 )"O )" )"VV Lancaster 129 ST80 A501 ST35 ST C320 W I S C O N S I N

S220 D105 S301 ST35 D182 Rewey )"CC GRANT N2020 D 39 )"D D090 N2075 )" )"W ST

D261 D080 COUNTY S221 A366 )"S A100 Potential OpportunityW N2000 S113 )"J )" )"CC )"D

S128.5 CARDINAL-HICKORY CREEK S114 G Blanchardville H Segment ID A307 )" )" New Glarus CLAYTON ST133 S112 £151 G126 A503 D £ Segment Designator: U107 )" TRANSMISSION LINE

N1240 N1220 COUNTY Guttenberg )"N D181 ST23 A ATC Line )"NN N Greenfield A367 81 )"D PROJECT C County Highway R Railroad ST81 D180 ST N961 N960 )"VV D107 N1960 )"B )"G D DPC Line S State Highway G127

S304 FIGURE 6-1 G Gas Pipeline U US Highway S109 N920 C S116 )"

D262 D043 N955 )"G )"D "U S129 OPPORTUNITIES & CONSTRAINTS Y D202 ) 61 D142 D041 Belmont )"N "J EE )" £ 151 G ) School )" Osterdock S117 XX £ )" p Airfield Monticellonm F

N )" )"G O )"A C )" N1940 A424 )" N1910 )" )" A422 N902 U109 A421 A419 A286 A285 o Airport #0 VORTAC69 Tower Cassville )"Z )"N ST Millville 133 Project GF WDOT Designated ST )"X 81 Argyle Assisted Living Facility ST126 Study Area ST Substation)"C Rustic Road æ Cemetery )"N Potosi Tennyson )"O "F Siting Area Mississippi River £151 ) F )"D )"M WDOT Designated North Buena Vista )" Outside Project Study Area î Church

Scenic Byway Darlington ST81 LAFAYETTE ST81 )"M Day Care Center Pivot Irrigation Y GREEN COUNTY K )"M )" GF Hospital Landfill Colesburg )" COUNTY )"FF )"S Balltown EXISTING LINEAR CORRIDORS National Register Quarry )"H 78 /" SS ST )"Y Historic Place )" Dickeyville )"D )"Q EXISTING TRANSMISSION)"D LINES 3 )"O DR ST HH )"E )" Luxemburg Holy Cross Sherrill )" )"J *# Substation ! ! 161 kV MonroeEnvironmentally Sensitive Lands* Cuba City KK ! ! ! ! )"M )" )"U 69 kV 345 kVN MM * Includes Federal Wildlife Refuges, State Fishery Areas, ManagedKS 52 ! )" " £ ! 345 kV Approved/Under Forests, Natural Areas, Parks, Waterfowl/Wetland Management ) £Rickardsville Gratiot138 kV )" U Construction BrowntownAreas, Wetlands, Wildlife Refuges, County Parks, and Municipal Parks. £61 Benton )"I )" )"P KS Durango ST386 11 )"D South Wayne )"M )" ST80 11 Shullsburg KKOTHERST ST136 )"J ST )" State Boundary ST69 City / Village * Sageville )"B # Hazel Green )"I ST78Interstate, US or Railroad ST924 )"W State Highway Approximate Gas County )"BoundaryHK Open Water DUBUQUE )"Z )"O County Highway Pipeline Asbury )"ZZ )"I Road "DD COUNTY HICKORY £61 PP ) 0 1 2 3 4 5 )" M P CREEK Dubuque )" )" Graf µ Miles SUBSTATION Dyersville ST968 ST966 Centralia J O D A V I E S S STEPHENSON I O W A COUNTY I L L I N O I S COUNTY Epworth Peosta ST955 ST967 Farley £20 £52 ST963

Data Sources: ATC, IDOT, IDNR, ITC, USGS, WDNR, WDOT. 9/9/16 F F X )" )"W )" )" )"E )"O OO )"TB SAUK KP )"W )" )"JJ )"G )"C )" )"M RICHLAND )"JJ "WC COUNTY )"Y Harpers Ferry ) 60 COUNTY ST ST78 P CRAWFORD £61 Avoca ST60 )" ST19 Steuben )"E Blue River ST133 Muscoda Lone Rock )"G Mazomanie ST19 K COUNTY ST179 A060 )" )"D Spring Green A520 A061 ST364 Eastman R010 R008 )"N C U013 U008 £14 )"F 12 )" CC Arena £ )" C001 C060 N140 Boscobel "P Black Earth CARDINAL ST131 )"M ) NN )"K )" U006 SUBSTATION N )"N Q )" )"G ST130 )"T )" M N282 )"FF F )" )" M ST76 )"S 80 PP N106 23 S002 )" 27 ST ST N105 N104 C002 ST35 ST )" N103 N102 N101 14 C137 £ Middleton Woodman )"Q C061 * Wauzeka P A110 C100 JJ # )" S039 )" )"Q N614 N612 HH ST78 )"II N1820 )"

P N1821 Madison )" C003 Marquette C139 H S C010 C140 K )" J A041 )" )" S040 )" 60 T A120 C161 £12 £18 Prairie du Chien ST )" Highland )"T Blue Mound C018 C032 )"C ST133 N641 ST23 State Park N330 )"M )"Q N340 McGregor Gov. Dodge C062 C065 N400 C016 N1643 )"Q State Park Blue Mounds

C034 I ID N337 )" BH N580 )" C014 PD ST340 )" C063 £18 U025 U023 U161 )" £ Barneveld S003 C200 Wisconsin River N660 Ridgeway U159 IOWA S043 N362 MV N460 Mount Horeb £18 Verona )" 18 Fennimore G121 A121 COUNTY YZ £ U038 T001 )" DANE )"J )"J £18 Montfort A204 U034 U029 Z JJ U101 " F A206 A205 N1823 )" E ) )" Cobb G004 )"H )"T )" COUNTY P N720 A140 G " S045 )" ) A227 S071 Q N1565 BB X G122 )" PB

" D102 " ) Patch Grove Dodgeville )"Y ) )" )"B C366 JG A302 )"H )" U102 ST78 G123 PROPOSED Y 191 )"H ST69 K N822 SUBSTATION Linden )" ST HK )" £61 D103 )" 92 A )"D Clayton Bagley "K ST )" A )"E A361 SITING AREA ) )"A )" Bloomington N801 39 N840 ST YD )"D )"W )" G )"A )" )"U C260 N1980 N1500 )"D )"QQ Hollandale )"A H ST39 )"F )" JG Belleville

A U103 S128 S320 " N1140 K )" ) A362 G125 " A305 Mineral Point ) A500 DD D260 )"O )" )"VV Lancaster ST129 ST80 A501 ST35 C320 W I S C O N S I N

S220 D105 S301 ST35 D182 Rewey )"CC GRANT N2020 39 )"D D090 N2075 )"D W ST

D261 D080 )" COUNTY S221 A366 )"S W N2000 S113 )"J )" )"CC )"D S114 S128.5 G Blanchardville H A307 )" )" New Glarus CLAYTON ST133 S112 £151 G126 A503 D £

U107 )"

N1240 N1220 COUNTY Guttenberg )"N D181 A100 ST23 Cardinal Substation-to-Montfort)"NN A367 81 )"D ST81 D180 ST N961 N960 CARDINAL-HICKORY CREEK )"VV D107 N1960 )"B )"G A100 Montfort-to-Mississippi River G127

S304 TRANSMISSION LINE S109 N920 C A100 S116 )" Mississippi River-to-Hickory Creek Substation

D262 D043 N955 )"G )"D "U S129 PROJECT Segment ID Y D202 ) 61 D142 D041 Belmont )"N )"J EE )" £ 151 G Monticello )" Osterdock S117 XX £ )" Segment Designator: "F

N )" )"G O FIGURE 6-2 )"A C ) N1940 A424 )" N1910 )" A ATC)" Line N Greenfield A422 N902 U109 A421 A419 A286 A285 Z 69 Cassville )" C County Highway)"N R RailroadST Millville 133 POTENTIAL CORRIDORS ST )"X 81 Argyle D DPC Line S State Highway ST126 ST )"C G Gas Pipeline U US Highway )"N Potosi Tennyson )"O "F Mississippi River £151 ) F Project )"D )"M North Buena Vista £ )" Substation Study Area 81 Darlington Siting Area ST LAFAYETTE ST81 )"M Outside Project Study Area Y GREEN Environmentally Sensitive Lands* COUNTY K )"M )" Colesburg )" COUNTY )"FF )"S Balltown * Includes Federal Wildlife Refuges, State Fishery Areas, Managed )"H Forests, Natural Areas, Parks, Waterfowl/Wetland Management SS EXISTING LINEARST78 CORRIDORS )"Y )" Dickeyville )"D )"Q )"D Areas, Wildlife Refuges, County Parks, and Municipal Parks. 3 )"O DR ST HH )"E EXISTING TRANSMISSION LINES )" Luxemburg Holy Cross Sherrill )" )"J Monroe Cuba City *# ! ! M KK "U Substation 161 kV )" )" ) ! ! N MM State Boundary KS £52 Rickardsville ! ! )" )" City / Village )" Gratiot69 kV 345 kV Browntown U ! 345 kV Approved/Under £61 Benton )"I )" )"P ! 138 kV KS ST386 11 ConstructionD South Wayne )"M County Boundary Open)" Water Durango 80 11 Shullsburg ST )" 136 ST )"J ST )"KK ST69 ST Sageville OTHER )"B #* Hazel Green )"I ST78 924 HK ST )"W Interstate, US or Railroad )" DUBUQUE )"Z )"O State Highway 0 1 2 3 4 5 Asbury )"ZZ )"I County Highway"DD Approximate Gas COUNTY HICKORY £61 PP ) Pipeline )" Road M "P µ Miles Dubuque )" ) CREEK Graf SUBSTATION Dyersville ST968 ST966 Centralia J O D A V I E S S STEPHENSON I O W A COUNTY I L L I N O I S COUNTY Epworth Peosta ST955 ST967 Farley £20 £52 ST963

Data Sources: ATC, IDOT, IDNR, ITC, USGS, WDNR, WDOT. 9/9/16 Macro-Corridor Study The Utilities’ Macro-Corridors11F

A description of the opportunities and constraints for each of these three siting areas is provided below.

6.2.1 Cardinal–to-Montfort Siting Area - Wisconsin This siting area is bounded by the following:

• the Cardinal Substation in the east; • the Wisconsin River in the north; • the communities of Mount Horeb and Dodgeville in the south; and • the Eden substation and Iowa County border in the west.

This area has numerous existing utility corridors: an existing 138 kV transmission line from the Wyoming Valley Substation to the Eden Substation and a network of 69 kV transmission lines. Transportation corridors include: USH 14, USH 18, USH 80, USH 151, SH 23, SH 78, SH 92, SH 191, CTH B, CTH H, CTH ID, CTH J, CTH K, CTH P, CTH PD, CTH S, CTH T, CTH Y, CTH YZ, CTH Z, and CTH ZZ. Additional transportation opportunities include a railroad corridor near the Cardinal Substation and multiple local roads. When new corridors were required, the Utilities ensured that property, field, fence and section lines were available within the macro-corridor.

The major constraints within the Cardinal-to-Montfort Siting Area are the Ice Age Trail Corridor and Complex; Governor Dodge and Blue Mound State Parks; the Lower Wisconsin Riverway and associated wetlands; the House on the Rock; and several Important Bird Areas and SNAs. Additional constraints are the City of Dodgeville, and several smaller communities, along with residential development associated with those municipalities. Table 6-1 provides additional examples of constraints within the Cardinal-to- Montfort Siting Area.

6.2.2 Montfort-to-Mississippi River Siting Area - Wisconsin This area is bounded by the following:

• the Montfort Substation Siting Area in the east; • the Mississippi River at Cassville in the west; • the communities of Fennimore and Bloomington in the north; • Platteville in the southeast; and • an existing 138 kV transmission line in the south.

Three existing utility corridors are located in this area: an existing 138 kV transmission line from the intermediate substation location to Cassville, an existing 138 kV transmission line from Platteville to

Dairyland Power Cooperative 6-4 Cardinal-Hickory Creek T-Line Project Macro-Corridor Study The Utilities’ Macro-Corridors11F

Cassville, and a network of 69 kV transmission lines. Existing transportation corridors within this section are USH 18, USH 61, USH 151, SH 35, SH 80, SH 81, SH 129, SH 133, CTH A, CTH D, CTH V, a railroad corridor near the Mississippi River and multiple local roads. When new corridors were required to connect potential macro-corridors, Utilities sought opportunities along property, field, fence and section lines.

The major constraints within the Montfort–to-Mississippi River Siting Area include the Refuge, and the Great River Road National Scenic Byway. Additional constraints are two confined animal feeding operations, two Important Bird Areas, the communities of Platteville, Fennimore, Lancaster, Cassville, and residential development associated with those municipalities. Table 6-1 provides additional examples of constraints within the Montfort-to-Mississippi River Siting Area.

6.2.3 Mississippi River-to-Hickory Creek Siting Area - Iowa This siting area is bounded by the following:

• the Mississippi River crossing area in the north; • the Hickory Creek Substation in the south; and • the communities of Millville in the northeast, Luxemburg in the west, and Holy Cross in the east.

The routing opportunities include existing transportation corridors such as USH 52, SH 3, SH 136, multiple local roads, and a railroad corridor near the Mississippi River. In addition to roads and railroad corridors, Iowa law requires that routing begin with division lines of land, of which there are a number.

The major constraints associated with this siting area are the Turkey River Mounds State Preserve; White Pine Hollow State Preserve; Merritt Forest State Preserve; three Important Bird Areas; the Refuge; Bankston Park; and the Great River Road National Scenic Byway. Table 6-1 provides additional examples of constraints within the Mississippi River-to-Hickory Creek Siting Area.

The potential macro-corridors within each of the three siting areas are described in Table 6-1.

Dairyland Power Cooperative 6-5 Cardinal-Hickory Creek T-Line Project Macro-Corridor Study The Utilities’ Macro-Corridors11F

Table 6-1: Identification of Potential Macro-Corridors within Siting Areas of the Project Study Area

Routing Opportunities Existing Utility Corridors Routing Opportunities Along Along Property, Field, Siting Area (applicable only in Wisconsin) Existing Transportation Corridor and Survey Lines Constraints Segment ID’s Cardinal Substation Existing 138 kV transmission line Opportunities include USH 14, USH Property, field, fence, and Lower Wisconsin Riverway and A001, A002, A003, A004, A005, A020, A021, A022, A023, A024, A025, A028, -to-Montfort Siting from Wyoming Valley to Eden 18, USH 80, USH 151; SH 23, SH 78, section lines associated wetlands; Ice Age Trail A040, A041, A042, A043, A044, A045, A046, A047, A048, A060, A061, A062, Area Substation, a network of 69 kV SH 92, SH 191; CTH B, CTH H, Corridor, Ice Age Complex, and Ice Age A063, A080, A100, A101, A110, A120, A121, A140, A141, A180, A181, A182, WISCONSIN transmission lines, and a natural gas CTH ID, CTH J, K, CTH P, CTH National Scientific Reserve; Governor A200, A201, A202, A203, A204, A205, A206, A227, A460, A461, A462, A463, pipeline. PD, CTH S, CTH T, CTH Y, CTH Dodge and Blue Mound State Park; A520, C001, C002, C003, C010, C012, C014, C016, C018, C019, C020, C030, C032, YZ, CTH Z, and CTH ZZ. Thompson Memorial Prairie, Barneveld C034, C040, C060, C061, C062, C063, C064, C100, C137, C138, C139, C140, C141, Additional opportunities include a Prairie, Arena Pines, Pleasant Valley C142, C160, C161, C180, C197, C200, C340, C350, C360, C362, C364, C366, G001, railroad corridor and multiple local Conservancy, and Sand Barrens State G002, G003, G004, N001, N002, N003, N004, N020, N040, N060, N061, N080, roads. Natural Areas; Black Earth Creek Fishery N081, N100, N101, N102, N103, N104, N105, N106, N120, N1280, N140, N1570, Area; Black Earth and Trout Creek N1572, N1575, N160, N1615, N1620, N1622, N1625, N1630, N1635, N1640, N1641, Wildlife Areas; the House on the Rock; N1642, N1643, N1644, N1650, M1655, N1660, N1670, N1680, N170, N171, N180, Cave of the Mounds National Natural N1820, N1821, N1822, N1823, N1930N 200, N220, N260, N261, N262, N280, N281, Landmark; Blackhawk Lake Recreation N282, N283, N284, N300, N302, N303, N320, N330, N334, N335, N337, N340, Area; private conservation lands; N342, N345, N360, N361, N362, N380, N400, N460, N520, N521, N540, N541, Governor Dodge State Park, Military N560, N580, N581, N610, N612, N614, N620, N621, N640, N641, N660, N680, Ridge-York Prairie, and Pecatonica River N720, R001, R002, R003, R004, R005, R007, R008, R009, R00, R011, R012, R013, Prairie Important Bird Areas; City of 2001, S002, S003, S020, S021, S040, S041, S042, S043, S045, S071, S081, S120, Dodgeville; Villages of Arena, Blue S121, T001, U001, U002, U003, U004, U005, U006, U007, U008, U009, U010, U011, Mounds; Cobb; Mazomanie, Mount U012, U013, U017, U018, U019, U020, U021, U022, U023, U024, U025, U026, U27, Horeb, Black Earth, and Cross Plains; U028, U029, U030, U031, U032, U033, U034, U035, U036, U037, U060, U062, residential congestion. U063, U064, U159, U160, U161 Montfort-to- A 138 kV transmission line from USH 18, USH 61, and 151; SH 35, SH Property, field, fence, and Upper Mississippi National Wildlife and A284, A285, A286, A287, A288, A302, A303, A304, A305, A306, A307, A308, Mississippi River Wyoming Valley to Montfort; a 138 80, SH 81, SH 129, SH 133; CTH A, section lines. Fish Refuge; Great River Road National A310, A311, A312, A313, A357, A358, A361, A362, A363, A364, A365, A366, Siting Area kV transmission line from CTH D, and CTH V. Additional Scenic Byway; Mississippi Valley A367, A368, A369, A370, A380, A381, A400, A401, A402, A403, A404, A415, WISCONSIN Platteville to Cassville; a network of opportunities include a railroad Conservancy; Wyalusing to Dewey and A416, A47, A418, A419, A420, A421, A422, A423, A424, A425, A426, A427, A428, 69 kV transmission lines; a natural corridor near the Mississippi River Mississippi River Pool 12, 13, and 14 A429, A430, A440, A441, A442, A443, A500, A50, A502, A503, A504, A505, A555, gas pipeline and multiple local roads. Important Bird Areas; Crapps Farm C260, C300, C310, C320, D035, D040, D041, D042, D043, D045, D050, D080, D090, Partnership Confined Animal Feeding D100, D102, D103, D104, D105, D106, D107, D108, D109, D12, D143, D144, D160, Operation; Majestic View LLC Confined D161, D162, D180, D181, D182, D200, D201, D202, D203, D204, D220, D221, Animal Feeding Operation; Cities of D222, D223, D260, D261, D262, D280, G121, G122, G123, G124, G125, G126, Lancaster, Platteville, Cassville, and G127, G28, G129, G130, G131, G132, G160, G161, G180, G181, G182, N1100, Fennimore; residential congestion. N1140, N1141, N1220, N1240, N1500, N1880, N1900, N910, N1920, N1921, N1940, N1960, N1980, N1981, N2000, N2020, N2021, N2042, N2070, N2075, N800, N801, N820, N821, N822, N840, N860, N880, N900, N901, N902, N920, N921, N922, N940, N950, N955, N960, N961, R023, R024, R025, S109, S110, S111, S112, S113, S114, S115, S116, S117, S118, S119, S125, S126, S127, S128, S129, S130, S131, S132, S200, S201, S202, S202, S220, S221, S242, S244, S245, S246, S300, S301, S302, S303, S304, S305, S306, S320, U038, U039, U067, U068, U069, U070, U071, U072, U073, U101, U02, U103, U104, U105, U106, U107, U108, U109 Iowa – Mississippi N/A USH 52; SH 3, SH 136; multiple local Property, field, fence, and Merritt Forest State Preserve; Turkey N/A River-to-Hickory roads; and a railroad corridor near the section lines River Mounds State Preserve; White Pine Creek Siting Area Mississippi River. Hollow State Preserve; Bankston Park; IOWA Wyalusing to Dewey, White Pine Hollow State Preserve, and Mississippi Important Bird Areas; Upper Mississippi National Wildlife and Fish Refuge; Great River Road National Scenic Byway.

Dairyland Power Cooperative 6-6 Cardinal-Hickory Creek T-Line Project Macro-Corridor Study The Utilities’ Macro-Corridors11F

6.3 Opportunity and Constraint Review of Potential Macro-Corridor Segments GIS analyses were conducted to review each potential macro-corridor segment. For each segment the opportunities were compared against the constraints. The segments with the best opportunities and the overall lower presence of routing constraints were prioritized for further analysis. Corridor segments were compared to other segments providing similar function. Over 480 segments were analyzed.

The Utilities evaluated the preliminary results of these analyses to eliminate those segments that were most constrained and to reduce the width of the corridors where appropriate. Potential macro-corridors that maximized the use of the legally specified routing priorities and had the fewest constraints were retained for additional review and analysis, while the remaining corridors were removed from further consideration. The results of the review and analysis are discussed below and presented in Tables 6-2 and 6-3.

6.4 Macro-Corridor Analysis by Siting Area

6.4.1 Cardinal Substation-to-Montfort Siting Area - Wisconsin This section begins with segments that exit the Cardinal substation to the west and follow an existing 69 kV transmission line, railroad, and USH 14. These segments are common to all macro-corridors, as these provide the only routing opportunities west out of the Cardinal Substation because of constraints in this area including the Ice Age Trail.

Once beyond the Ice Age Trail and Complex, the Utilities selected two general paths for macro-corridors: one westerly and the other southerly. The Utilities eliminated from consideration the potential corridors that proceeded northerly because of significant residential development (the communities of Cross Plains, Black Earth, Mazomanie, and Arena) and environmental constraints, such as the Lower Wisconsin Riverway and associated wetlands. Additionally, segments that connect these removed northern routes to corridors in the south were also removed as they were no longer necessary.

The macro-corridor that proceeded westerly from the Ice Age Trail and Complex was created to avoid the residential development and civic constraints to the north. Once beyond the Ice Age Trail and Complex, this westerly path was forced to use a new, cross-country segment. Several options were considered for connecting this cross-country segment to a corridor that follows an existing 138 kV transmission line. Of these options, the Utilities selected the segments that follow CTH Z, CTH ZZ, and a new segment of cross-country corridor. Because of potential for impacts to cultural sites, residential development, and environmental sensitivities such as Governor Dodge State Park and Driftless Area Land Conservancy

Dairyland Power Cooperative 6-7 Cardinal-Hickory Creek T-Line Project Macro-Corridor Study The Utilities’ Macro-Corridors11F

lands, Segments C138, C139, C140, C160, N080, N641, S041 were chosen in lieu of the other options that generally followed CTH T, SH 23, and multiple new, cross-country corridors. Segments that connected to these eliminated options (those following CTH T, SH 23, and the cross-country corridors) became non-functional, dead-end segments and were removed from further consideration.

The Utilities chose to co-locate with an existing 138 kV transmission line corridor into the Montfort Substation Siting Area because it maximized the use of an existing utility corridor while also minimizing constraints. Though this macro-corridor was first drawn as a 3000-foot-wide corridor, it was later narrowed to 1,000 feet recognizing that a new line would be located as closely as possible to the existing corridor.

Dairyland Power Cooperative 6-8 Cardinal-Hickory Creek T-Line Project Macro-Corridor Study The Utilities’ Macro-Corridors11F

Table 6-2: Macro-Corridors Retained as Shown on Figure 3-3

Siting Area Routing Opportunity Corridor Description Reason Retained Segment ID’s Cardinal–to-Montfort Siting Existing 69 kV transmission line, USH Exits the Cardinal Substation to the west following This was deemed the only feasible option to exit the Cardinal substation to A001, A002, A003, A004, A005, N001, N002, N003, Area 14, and railroad corridor several existing linear features. Common segments the west, because of limited existing linear features and the fact that the N004, N020, R001, R002, R003, R004, U001, U002, WISCONSIN to all other macro-corridors. area is constrained by the Ice Age Trail Corridor and Complex. U003, U004 New cross-country corridor Follows a generally straight westerly path, south of This corridor was retained because it avoided the residential development, N080, N100, N101N N102, N103, N104 the communities of Cross Plains, Black Earth, civic constraints, and environmental sensitivities associated with corridors Mazomanie, and Arena. that traversed the communities to the north. Existing 138 kV transmission line, Follows a south and westerly direction along county These corridors were retained because it provided a direct opportunity to A121, C138, C139, C160, C161, N641 CTH Z, CTH ZZ, and new cross- highways and cross-country corridors to connect to connect to the existing 138 kV transmission line which connected to the country corridor an opportunity along an existing 138 kV Montfort Substation Siting Area. Other corridors that similarly followed transmission line. county and state highways, and cross-country opportunities impacted cultural resources, environmental sensitivities (Governor Dodge State Park and Driftless Area Land Conservancy lands, and residential development. Existing 69 kV transmission line, CTH Follow a southerly direction from just west of the These corridors were retained because they provided much stronger A040, A041, A042, A043, A044, A045, A046, A047, J, SH 78, local roads, and new cross- Cardinal substation to the community of Mount opportunities when compared to other, removed segments. They C018, N1640, N1650, N1655, N1660, N1670, N302, country corridors Horeb. connected the Cardinal substation to several opportunities that head west N340, S002.5, S002.7 to the Montfort Substation Siting Area, while generally avoided constraints associated with the community of Mount Horeb. Existing 69 kV transmission lines, USH Follow a westerly direction from Mount Horeb to These corridors were retained because they provided strong opportunities A182, A201, A202, A203, A204, A205, A206, A207, 18, USH 151, SH 39, CTH B, CTH Q, the Montfort Substation Siting Area. while minimizing impacts to sensitivities like the Military Ridge State A227, A462, A463, C340, C350, C360, C362, C364, and multiple local roads. Trail, Cave of the Mounds National Natural Landmark, multiple State C366, N1565, N1572, N1575, N1622, N1625, S071, Natural Areas, Blue Mound State Park, and local communities. U017, U018, U019, U020, U021, U022, U023, U024, U025, U026, U027, U028, U029, U030, U031, U032, U033, U034, U035, U060, U061, U062, U063 CTH K and a new cross-country Segments that connect the northern corridors to the This connector was retained because it avoided constraints associated with C003, N400 corridor southern to provide geographical diversity. the City of Dodgeville, Dodgeville Municipal Airport, and Governor Dodge State Park, that other options could not. Montfort-to-Mississippi River Existing 138 kV transmission line Segments that exit the Montfort Substation Siting This corridor was retained because it provided a strong, existing linear A361, A362, A363, A364 Siting Area Area and travel in a straight, southwesterly opportunity with minimal impact to constraints. It also avoided the WISCONSIN direction to the community of Lancaster community of Montfort that other corridors did not. Existing 138 kV transmission line Segments that follow a southwesterly direction This corridor was retained because it provided a strong, existing linear A365, A366, A367 from the community of Lancaster opportunity with minimal impact to constraints. It also avoided the community of Lancaster that other corridors did not. Existing 69 kV transmission line, SH Segments exit the Montfort Substation Siting Area These corridors were retained because they all provided viable options A302, A302, N800, N801, N820, N821, N822, N840, 80, and new cross-country corridors to the south toward the community of Livingston leaving the Montfort Substation Siting Area, while avoiding constraints S125, S127 associated with the community of Livingston. Existing 69 kV transmission line, and Segments follow a southerly direction from These corridors were retained because they provided shorter, straighter A305, A306, A307, N880 new cross-country corridor Livingston toward Platteville opportunities with less residential impacts than other options. Existing 138 and 69 kV transmission Segments are generally located in the vicinity of the Corridors were retained because the sufficiently avoided residential A284, A285, A286, A287, A288, A308, A310, A311, lines, USH 151, and a new cross- community of Platteville development, and civic and environmental constraints associated with the A312, A313, A357, A401, A415, A416, A417, A418, country corridor community of Platteville. G130, G131, G132, N1900 N1910, N900, N901, N902, N922, N940, N950, N960, N961, U067, U068, U069, U070, U071, U072, U073 Existing 138 kV transmission line Segments follow a westerly path from Platteville to Corridor was retained because it provided a shorter more direct A419, A420, A421, A422, A423, A424 Cassville opportunity that had less residential development and civic constraints than the geographically similar 69 kV transmission line corridor. Existing 138, 161, and 69 kV Segments are located in the vicinity of the Corridors were retained because they provided more constructible options A369, A370, A425, A427, A428, D203, D204, D221, transmission lines community of Cassville Segments are located in the that were less impactful to residential development and civic constraints D222, D223, D224, D225 vicinity of the community of Cassville than other options in the area. Iowa – Mississippi River-to- N/A N/A N/A N/A Hickory Creek Siting Area IOWA

Dairyland Power Cooperative 6-9 Cardinal-Hickory Creek T-Line Project Macro-Corridor Study The Utilities’ Macro-Corridors11F

Table 6-3: Potential Macro-Corridors Removed, Shown as “Inactive” on Figure 3-3 Siting Area Routing Opportunity Corridor Description Reason Removed Segment ID’s Cardinal-to- Existing 69 kV transmission line, Follows a north and westerly direction The corridors that go through the communities of Cross Plains, Black Earth, C001, C002, C060, N081, N120, N1280, N120, N1280, N140, N160, Montfort Siting USH 14, SH 78, CTH H, CTH K, a along an existing 69 kV transmission line, Mazomanie, and Arena were removed because of residential development and N170, N171, N180, N200, N220, N260, N261, N262, N280, N281, Area railroad corridor, multiple local roads, USH 14, and a railroad corridor. civic sensitivities associated with those communities, as well as, environmental N282, N520, N521, N540, N541, R005, R006, R007, R008, R009, WISCONSIN and new cross-country corridors. Connectors to corridors in the south constraints like the Lower Wisconsin Riverway and associated wetlands. R010, R011, R012, R013, S001, U005, U006, U007, U008, U009, follow CTH H, CTH K, local roads, and Connector corridors were also removed because they no longer served a purpose. U010, U011, U012, U013 new cross-country routes. New cross-country corridor Follows a generally straight westerly path, This corridor was retained because it avoided the residential development, civic N080, N100, N101N N102, N103, N104 south of the communities of Cross Plains, constraints, and environmental sensitivities associated with corridors that Black Earth, Mazomanie, and Arena. traversed the communities to the north. Existing 138 kV transmission line SH Connectors to an existing 138 kV These corridors were removed because of cultural resource impacts, residential A110, A120, C100 N105, N106, N1820, N1821, N283, N284, N610, 23, CTH T, local roads, and new transmission line development, and environmental impacts to Governor Dodge State Park and N612, N614, N620, N621, S040 cross-country corridors Driftless Area Land Conservancy lands. Segments that follow the existing transmission line became non-functional without their connector segments. Existing 69 kV transmission line, Follow a southerly direction from just These corridors were removed because they impacted the community of Mount A048, A460, A461, C010, C012, C014, C016, C030, C032, C034, USH 18, SH 78, SH 92, CTH J, west of the Cardinal substation to the Horeb, and/or added additional mileage in the wrong direction. C197, C200, N1630, N1635, N1641, N1642, N1643, N1643.5, N1644, CTH P, CTH PD, CTH S, local community of Mount Horeb. N1680, N1930, N330, N334, N345, N360, N362, S002, S003, S020, roads, and new cross-country S021, U159, U160 corridors Existing 69 kV transmission lines, Follow a westerly direction from Mount These corridors were removed because they impacted sensitivities--such as the A140, A141, A180, A181, A200, C040, C062, C064, C180, G004, USH 23, USH 191, a natural gas Horeb to the Montfort Substation Siting Military Ridge State Trail, Cave of the Mounds National Natural Landmark, N1615, N1620, N1823, N380, N460, N560, N680, S045, S081, T001 pipeline, CTH H, CTH ID, CTH K, Area. multiple State Natural Areas, and Blue Mound State Park-- and the communities CTH YZ, Military Ridge State Trail, of Dodgeville, Blue Mounds, Barneveld, and Ridgeway. and new cross-country corridors a natural gas pipeline, SH 23, CTH H, Segments that connect the northern These corridors were removed due to impacts to constraints like the City of C061, C062, C063, C140, C141, C142, G002, G003, N1560, N1821, CTH Y, CTH Z, and new cross- corridors to the southern to provide Dodgeville, Dodgeville, Municipal Airport, and Governor Dodge State Park N1822, N580, N581, N660, S042, S043 country corridors geographical diversity Montfort-to- existing 69 kV transmission line, a Follows a westerly and then southerly These corridors were removed due to impacts to the community of Montfort and D100, D102, D103, G121, G122, G123, G160, G161, N1100, S200, Mississippi River natural gas pipeline, USH 18, USH direction from the Montfort Substation because an existing 138kV transmission line provided a straighter, shorter, more S201, U038, U039, U101, U102, U103, U104 Siting Area 61, and SH 129 Siting Area to the community of Lancaster direct opportunity that impacted less constraints. WISCONSIN Existing 161 and 69 kV transmission Segments follow a southerly and westerly These corridors were removed due to impacts to the community of Lancaster and A500, A501, A502, A503, A504, A505, C260, D182, D260, D261, lines, USH 61, SH 35, SH 81, SH direction from the community of because an existing 138kV transmission line provided a straighter, shorter, more D262, D280, N1140, N1141, N1220, N1500, N1980, N1981, N2000, 133, and new cross-country corridor Lancaster direct opportunity that impacted less constraints. N2020, N2021, N2042, S114, S115, S116, S220, S221, S300, S301, S302, S303, S304, S305, S320, U105 Existing 69 kV transmission line, and Segments exit the Montfort Substation Portions of the utility and transportation corridors were removed because they A303, S126 SH 80 Siting Area to the south toward the travelled directly through the community of Livingston. community of Livingston SH 80 and new cross-country corridor Follow a southerly direction from These corridors were removed because they were greater in length, less straight, N1180, N860, S128, S128.5 Livingston to the community of Platteville and more impactful to residential constraints than other options. Existing 69 kV transmission line, a Segments are generally located in the These corridors were removed because they did not sufficiently avoid the A381, A400, A402, A403, A404, C300, C310, C320, D080, D090, natural gas pipeline, SH 80, SH 81, vicinity of the community of Platteville residential development, civic and environmental constraints associated with D104, D105, D106, D035, D040, D160, D161, D162, G124, G125, and new cross-country corridor Platteville. Connector segments were also removed as they did not follow a path G126, G127, G128, G129, G180, G181, N920, N921, N955, N2070, consistent with the southwesterly direction of the Project. N2075, S111, S112, S113, S109, S129, S130 Existing 69 kV transmission line and Segments follow a westerly path from Corridor was removed because it was longer and more impactful to residential D041, D042, D043, D045, D050, D107, D108, D109, D142, D143, connector segments along new cross- Platteville to Cassville development and civic constraints than 138kV transmission line to the south. D144, D180, D200, D201, D202, N1921, N1940, N1960, U107, U108, country corridors U109 SH 133, SH 81, and a railroad Segments are located in the vicinity of the Corridors were removed because they impacted residential development and R023, S117, S118, S119, S244, S245, S246, S306 corridor community of Cassville civic constraints associated with the community of Cassville and were not constructible due to geographic constraints. Iowa – Mississippi N/A N/A N/A N/A River-to-Hickory Creek Siting Area IOWA

Dairyland Power Cooperative 6-10 Cardinal-Hickory Creek T-Line Project Macro-Corridor Study The Utilities’ Macro-Corridors11F

The macro-corridor that proceeded southerly from the Ice Age Trail and Complex moves towards the community of Mount Horeb and connects to several opportunities that head west to the Montfort Substation Siting Area. The Utilities sought to avoid the constraints associated with Mount Horeb. The segments selected for the macro-corridor generally follow an existing 69 kV transmission line, SH 78, CTH J, local roads, and new cross-country opportunities. The Utilities rejected geographically similar segments following existing transmission lines, USH 18, SH 78, SH 92, CTH J, CTH P, CTH PD, CTH S, local roads, and cross-country opportunities because they impacted the community of Mount Horeb, added additional mileage in the wrong direction, or had more routing constraints when compared to the remaining segments.

From the community of Mount Horeb, several opportunities follow a westerly direction to the Montfort Substation Siting Area. Of these opportunities, the Utilities selected the following for the macro-corridor: existing 69 kV transmission lines, USH 18, USH 151, SH 39, CTH B, and CTH Q, and multiple local roads. These segments avoided sensitive constraints such as the Military Ridge State Trail, Cave of the Mounds National Natural Landmark, multiple SNAs, and Blue Mound State Park. Segments U017 through U029, which followed a portion of the USH 18 corridor, were moved to the south to avoid development north of the highway. The width of the segments on the south side of the highway remains at 3,000 feet to allow for routing flexibility. The Utilities removed from consideration geographically similar segments following the Military Ridge State Trail, USH 23, USH 191, existing 69 kV transmission lines, a natural gas pipeline, CTH H, CTH ID, CTH K, CTH YZ, and cross-country opportunities because they neither avoided the sensitive constraints noted above nor the communities of Blue Mounds, Barneveld, Dodgeville, and Ridgeway.

To provide geographic diversity, the Utilities evaluated potential connections between the northern and southern macro-corridors. Of these, the only one retained as a macro-corridor followed CTH K and a cross-country corridor. The geographically similar segments following SH 23, CTH H, CTH Y, CTH Z, a natural gas pipeline and cross-country opportunities were removed as a result of potential impacts to the community of Dodgeville, the Dodgeville Municipal Airport and environmental constraints such as Governor Dodge State Park.

6.4.2 Montfort-to-Mississippi River Siting Area – Wisconsin In this siting area, corridors begin at the Montfort Substation Siting Area and follow either a southwesterly direction or a southerly and then westerly direction to the proposed crossing of the Mississippi River near Cassville, Wisconsin.

Dairyland Power Cooperative 6-0 Cardinal-Hickory Creek T-Line Project Macro-Corridor Study The Utilities’ Macro-Corridors11F

Several routing opportunities exit the Montfort area including a group of segments following an existing 138 kV transmission line to the southwest to the Lancaster, Wisconsin area. The Utilities retained the existing 138 kV corridor as a macro-corridor over geographically similar opportunities that follow USH 18, USH 61, SH 129, an existing 69 kV transmission line, and a natural gas pipeline from Montfort to Lancaster. These latter corridors were removed from consideration because they did not avoid constraints in and around the community of Montfort and because the existing 138 kV transmission line provides a more direct route that was shorter in length. Additionally, because the retained corridor followed the existing 138 kV transmission line, it was narrowed from 3,000 to 1,000 feet to recognize that a new line would be located as closely as possible to the existing line and could possibly be double-circuited with that existing line.

The existing 138 kV corridor proceeds just south of the community of Lancaster; at the community of Lancaster, several opportunities continue to the south and west toward Cassville. Of these, the same existing 138 kV transmission line discussed above was retained as the macro-corridor over geographically similar opportunities following an existing 69 kV transmission line, USH 61, SH 133, and a new cross- country corridor. The retained corridor provided a much stronger opportunity because it followed a shorter, more direct path that also avoided residential and civic constraints associated with the community of Lancaster. Additionally, the removed corridors generally have a greater number of angles and would have higher associated costs to construct than the retained corridor. The removal of these corridors resulted in several other segments to become non-functional; these non-functional segments followed existing 161 and 69 kV transmission lines, SH 133, and cross-country opportunities and were also removed.

Another group of segments exit the Montfort Substation Siting Area and head south toward the community of Livingston. These segments include a 69 kV transmission line, SH 80, and several cross- country corridors were added to avoid constraints associated with the community of Livingston. The Utilities retained all of these options as macro-corridors except for the portions that travelled directly through Livingston. From Livingston, an existing 69 kV transmission line and SH 80 continue to provide the main opportunities to the south toward the community of Platteville. A few cross-country segments were considered to avoid the community of Rewey and to provide geographic diversity. Of these potential corridors, the segments following the existing transmission line and a cross-country corridor added to the west of Rewey were retained as macro-corridors over the other options. The three removed corridors--a corridor along SH 80, a cross-country corridor east of Rewey, and a cross-country connector segment--were removed because they were generally less straight, greater in length, and did not avoid residential constraints as well as the retained corridors.

Dairyland Power Cooperative 6-1 Cardinal-Hickory Creek T-Line Project Macro-Corridor Study The Utilities’ Macro-Corridors11F

A number of routing opportunities were present near the community of Platteville, including an existing 138 kV transmission line, an existing 69 kV transmission line, USH 151, SH 80, SH 81, and a natural gas pipeline. In order to avoid the residential development, and civic and environmental constraints associated with Platteville, a number of cross-country segments were considered. Of these numerous opportunities, the segments following the existing 138 and 69 kV transmission lines, USH 151, and a cross-country corridor to the north and west of Platteville, were retained as macro-corridors. The corridors that were removed did not avoid constraints in and around Platteville. Additionally, several connector segments between the Platteville area and Lancaster area were removed because they did not follow a path consistent with the general southwesterly direction of the Project and would have added unnecessary length.

From Platteville, two existing transmission corridors (138 kV and 69 kV) provide the main opportunities west to Cassville. Of these potential corridors, the segments following the existing 138 kV corridor were retained as a macro corridor because they were shorter, more direct, impacted less residential development and had fewer civic constraints than the existing 69 kV corridor. Additionally, the existing 69 kV corridor is located near the Lancaster Municipal Airport. With the removal of this 69 kV corridor, several connector segments to the north and south became non-functional and were also removed. Lastly, while this macro-corridor was originally envisioned with a width of 3,000 feet; it was narrowed to 1,000 feet because it followed an existing transmission corridor.

In the Cassville area, numerous existing linear features presented routing opportunities including the two 138 kV transmission lines, a 161 kV transmission line, a 69 kV transmission line, SH 133, SH 81, and a railroad. Of these opportunities, as specified by the Wisconsin Siting Priorities Law, the Utilities retained as macro-corridors only those that followed existing utility corridors. The potential corridors following the state highways and the railroad were removed due to residential and civic constraints associated with the community of Cassville as well as challenging topography in the area that made them unbuildable.

6.4.3 Mississippi River to Hickory Creek Substation Section - Iowa As a result of the analyses contained within the ACA report, the Utilities determined the only remaining feasible alternative crossing locations extended through Refuge lands near Cassville, Wisconsin. Both the Nelson Dewey and Stoneman crossing locations would extend through Refuge lands in Clayton County, Iowa and extend across the Mississippi River into Wisconsin. The initial macro-corridor in Iowa, identified on Figure 6-2, included the Project endpoint at Hickory Creek Substation and sufficient area to include the remaining feasible crossing locations at Nelson Dewey and Stoneman, eventually connecting with the Montfort Substation Siting Area. As a result of the limited distance between the Hickory Creek

Dairyland Power Cooperative 6-2 Cardinal-Hickory Creek T-Line Project Macro-Corridor Study The Utilities’ Macro-Corridors11F

Substation and these Refuge crossing locations (approximately 12 miles) and the presence and location of existing routing constraints between these areas, one large macro-corridor was developed for Iowa in portions of Dubuque and Clayton Counties. This initial macro-corridor was approximately 12-miles long and five-miles wide.

The development of the macro-corridor in Iowa also took into account the necessary and available area to site a prospective route in this area according to Iowa Code § 478.18(2) and 199 IAC 11.1(7), which set forth that routing in Iowa should begin with roads, active railroad ROW, and division lines of land, including section, quarter section, and quarter-quarter section lines.

The specific boundary of the macro-corridor in Iowa also took into account the presence of known routing constraints within northern Dubuque County and southern Clayton County, avoiding the towns of Luxemburg and Holy Cross (Dubuque County) and North Buena Vista (Clayton County). Additionally, the macro-corridor in the Mississippi River-to-Hickory Creek Siting Area sought to avoid the White Pine Hollow State Preserve, Merit Forest State Preserve, Clayton County Conservation Board-owned and/or managed lands, and dense residential development and steep slopes present along Highway 52 in Clayton County (Figure 7-3).

Additional information about the macro-corridor in the Mississippi River-to-Hickory Creek Siting Area is provided in Section 7.3, below.

Dairyland Power Cooperative 6-3 Cardinal-Hickory Creek T-Line Project Macro-Corridor Study The Utilities’ Alternative Corridors

7.0 THE UTILITIES’ ALTERNATIVE CORRIDORS

The Utilities presented their macro-corridors in the May 2016 open houses. Based on the input received from these open houses and on additional comparative analyses, the Utilities narrowed and further refined the macro-corridors resulting in the alternative corridors that are presented in Figure 7-1. This Section 7 describes how and why the macro-corridors were altered in designing the alternative corridors.

7.1 Alternative Corridors in Cardinal Substation-to-Montfort Siting Area

7.1.1 Macro-Corridors Narrowed or Eliminated from Consideration In developing the alternative corridors in the Cardinal Substation-to-Montfort Siting Area, the Utilities:

• Removed a number of macro-corridors after further comparative analysis revealed better routing opportunities; • Narrowed some macro-corridors recognizing that the Project would be located as close as possible to existing linear features and associated access; and • Expanded slightly a few macro-corridors to gain additional flexibility in the routing process.

Specifically, the corridors surrounding and adjacent to the Cardinal Substation were trimmed on the north, south, and east sides as the existing substation configuration requires a new line to exit the south side of the substation and the general path of the Project requires that it head immediately to the west. It was determined that these corridors surrounding the substation would not be used for a new line, as they did not correspond to the existing substation configuration or follow a path consistent with the Project.

The macro-corridors directly west of the Cardinal Substation were narrowed from 1,500 to 500 feet on the north side of the existing 69 kV transmission line to recognize that a new line would be located as closely as possible to the existing transmission line. The macro-corridor that continues west past the Ice Age Trail and Complex along an existing 69 kV transmission line was narrowed from 3,000 to 1,000 feet for the same as reason as above. Additionally, in this area, the macro-corridor following an existing railroad corridor was expanded slightly to be 100 feet to the south of the existing railroad ROW. Because of civic and environmental constraints, this macro-corridor had previously been located only on the north side of the railroad corridor. The Utilities concluded that having a small amount of additional adjacent land to the south would provide routing and engineering flexibility.

Dairyland Power Cooperative 7-1 Cardinal-Hickory Creek T-Line Project F F X )" )"W )" )" )"E )"O OO )"TB SAUK KP )"W )" )"JJ )"G )"C )" )"M RICHLAND )"JJ "WC COUNTY )"Y Harpers Ferry ) 60 COUNTY ST ST78 P CRAWFORD £61 Avoca ST60 )" ST19 Steuben )"E Blue River ST133 Muscoda Lone Rock )"G ST19 K COUNTY ST179 )" )"D Spring Green 364 Mazomanie ST Eastman )"N Arena £14 F )"C )"CC )" £12 Boscobel P CARDINAL 131 )"M )" Black Earth K ST )"NN SUBSTATION )" N )"N Q )" )"G ST130 )"T )" M )"FF F )" )" M 76 )"S 80 PP 23 )" ST 35 ST27 ST )" ST ST N101 N100 £14 Middleton Woodman N104 N103 N102 )"Q Wauzeka #*

P C138 Q )" )"T )"K )"JJ 78 )" )"HH ST P II Madison )")" M Marquette )" C139 H S K )" A041 )" )" C160 )"J 12 18 Prairie du Chien ST60 )"T T £ £ Highland )" Blue Mound JG J C 133 N641 23 State Park )" )" M )" ST Q ST Y A044 S )" McGregor )" )" )" Q Gov. Dodge )" State Park Barneveld Blue Mounds )"I BH "ID )"P 340 )" 18 U025 ) U023 Mount Horeb )"PD ST £ U020 Wisconsin River U017 IOWA Ridgeway "MV U028 18 Verona ) Fennimore A121 COUNTY Dodgeville "Z DANE £ £18 ) )"YZ )"J JJ )"J £18 Montfort U040 U029 Z COUNTY )" A206 Cobb A205 A210 U030 )"H )"T )" )"E P G

" N1565 Y )" ) B A227 S071 Q )" BB "X )"F )" )" U062 " PB ) Patch Grove C340 ) )" )"B C366 )"H )"JG GRANT 78 PROPOSED ST COUNTY Y 191 )"H ST69 K N822 SUBSTATION Linden )" ST HK )" £61 )" 92 A )"D Clayton Bagley K ST )" A "E A361 Livingston SITING AREA )" A )" Bloomington ) 39 )" ST YD )"D )"W )" G )"A )" )"U )"D )"QQ Hollandale )"A "H A ST39 )"F ) JG Belleville )" A362 "K )" A305 Mineral Point ) )"DD A363 )"O )"VV Lancaster 129 ST80 ST35 ST )"A W I S C O N S I N 35 Rewey CC ST )" D )"V )"D W ST39 )" A366 "S )" )"V ) )"J )"W )"CC )"D G Blanchardville H 133 A307 )" 151 )" New Glarus CLAYTON ST "D £ Guttenberg ) COUNTY )"N A100 ST23 Alternative Corridor)"NN ST81 A367 ST81 )"CARDINAL-HICKORYD CREEK VV G Segment ID )" A308 )" B )"C TRANSMISSION LINE Segment Designator: )" A ATC Line N Greenfield D U )"G )" )" )"B Belmont PROJECTN CJ County Highway R Railroad A368 )"Y £61 Platteville 151 )" )" "EE Osterdock XX £ )"G D DPC Line MonticelloS State Highway) N )" G A )"F A424 )" )" )"O FIGURE 7-1 )" G)"CGas Pipeline U US Highway A422 A421 N902 Cassville A420 A419 A286 A285 )"Z ALTERNATIVE CORRIDORS M Road )"N ST69 Millville 133 ST "X 81 Argyle ) ST126 ST )"C Inactive Corridor )"N Tennyson O F Potosi )" £151 )" Project "D )"M North Buena Vista Mississippi River £ )"F ) Study Area Substation ST81 ST81 Darlington Siting Area LAFAYETTE Outside )"ProjectM Study Area Y GREEN Environmentally Sensitive Lands* COUNTY K )"M )" Colesburg )" *COUNTY Includes Federal Wildlife Refuges,)"FF State Fishery Areas, Managed)"S Balltown )"H Forests, Natural Areas, Parks, Waterfowl/Wetland Management SS EXISTING LINEARST78 CORRIDORS )"Areas,Y Wildlife Refuges, County Parks, and Municipal Parks. )" Dickeyville )"D )"Q )"D 3 )"O DR ST HH )"E EXISTING TRANSMISSION LINES )" Luxemburg Holy Cross Sherrill )" )"J Monroe Cuba City *# Substation ! ! 161 kV )"M )"K )"U N MM State Boundary City / Village KS £52 Rickardsville ! ! ! ! )" )" )" Gratiot69 kV 345 kV Browntown U ! £61 Benton )"I )" )"P ! 138 kV 345 kV Approved/Under County Boundary Open WaterKS ST386 11 ConstructionD South Wayne )"M )" Durango 80 11 Shullsburg ST )" 136 ST )"J ST )"KK ST69 ST Sageville OTHER )"B #* Hazel Green I 78 )" ST HK ST924 )"W Interstate, US or )" 0 1 2 3 4 5 DUBUQUE Z O State Highway Railroad )" )" DD Approximate Gas COUNTY Asbury 61 )"ZZ )"I County Highway)" HICKORY £ PP Pipeline µ Miles )" P Dubuque Road )"M )" CREEK Graf SUBSTATION Dyersville ST968 ST966 Centralia J O D A V I E S S STEPHENSON I O W A COUNTY I L L I N O I S COUNTY Epworth Peosta ST955 ST967 Farley £20 £52 ST963

Data Sources: ATC, IDOT, IDNR, ITC, USGS, WDNR, WDOT. 9/9/16 Macro-Corridor Study The Utilities’ Alternative Corridors

From this point, the macro-corridors that follow cross-country segments and county highways west to an existing 138 kV transmission line were revised in several locations. First, the cross-country macro- corridor from Stage Coach Substation to CTH Z was generally moved two quarter-sections lines (2,640 feet) to the south to avoid residential congestion and environmental constraints, like the Pleasant Valley Conservancy SNA. In addition, the corridor was expanded in some places on the south side by an additional quarter section (1,320 feet) to allow for additional routing and engineering flexibility. This corridor was previously one-mile wide in most places, and now ranges from 3,960- to 6,600-feet wide. The segments of the macro-corridor that follow CTH Z were reduced to 1,500 feet on the west side of the highway and revised to follow a quarter section line on the east side in an effort to retain flexibility but also narrow the corridor recognizing that a new line would be placed as close to the road as possible. Additionally, the segments following CTH ZZ were narrowed to exclude lands on the south side of the highway that enter into Governor Dodge State Park, and were expanded slightly on the north to encompass quarter-section lines. The remaining segments along this macro-corridor were left unchanged.

In the Mount Horeb area, , a cross-country macro-corridor east of the community was removed because the macro-corridor following the existing 69 kV transmission line around the east side of Mount Horeb maximized the use of existing utility corridors and avoided a residential area. Cross-country macro- corridors north and west of the Mount Horeb area were also eliminated from consideration because the selected corridor follows an existing utility corridor.

From Mount Horeb, the segments that follow USH 18 west to Dodgeville were generally narrowed from 3,000 to either 2,000- or 1,500-feet wide. In several areas, routing on either the north or south side of the highway was not feasible; in such situations, the corridor was located on just one side of the highway and the width reduced to 1,500 feet. In the area just east of Dodgeville, the macro-corridor was narrowed to 2,000 feet (1,000 feet on either side of the highway) to recognize that the new line would be placed as close to the highway as possible to reduce impacts and maximize the use of existing linear feature.

In the vicinity of Dodgeville, the macro-corridors were all retained but in some cases their widths were narrowed from 3,000- to either 2,000- or 1,000- feet. The macro-corridors following USH 18 and an existing 69 kV transmission line around the north side of Dodgeville were reduced to 1,000 feet (500 feet on either side of the linear feature) recognizing the new line would be placed as close as possible to the road and existing transmission line. The macro-corridors south and west of Dodgeville that follow USH 151, CTH B, and a local road were narrowed to 2,000 feet recognizing that the new line will follow these transportation corridors but also retained routing and engineering flexibility.

Dairyland Power Cooperative 7-3 Cardinal-Hickory Creek T-Line Project Macro-Corridor Study The Utilities’ Alternative Corridors

From the area west of Dodgeville to the Montfort Substation Siting Area, the macro-corridors were largely unchanged with the exception of a small area immediately east of the Substation Siting Area that was eliminated from consideration because of recently constructed wind turbines.

Lastly, the macro-corridor following CTH K, connecting the northern cross-country corridor to the southern macro-corridor along USH 18, was eliminated from consideration. This macro-corridor was created to connect the northern and southern routes in the event that a viable route could not be found around the community of Mount Horeb. After further analysis, the Utilities concluded that they had a sufficient area for a constructible route: the macro-corridor that largely follows an existing 69 kV transmission line east of Mount Horeb and then heads westerly on a highway south of that community. The eliminated macro-corridor that had followed CTH K had difficult topographic and residential constraints that would have made construction challenging and costly.

7.1.2 Alternative Corridors Proposed The alternative corridors in the Cardinal Substation-to-Montfort Siting Area would connect the Project from the Cardinal Substation in the east to the mid-point Montfort Substation Siting Area near Montfort, Wisconsin as shown in Figure 7-2.

This siting area begins with corridors that range from 1,000- to 2,000-feet wide and exits the Cardinal Substation to the west towards the Ice Age Trail and Complex along an existing transmission line, railroad, and highway. From the area of the Ice Age Trail and Complex, the corridors head either west or south and then west to the Substation Siting Area.

The corridors that follow a westerly path from the Ice Age Trail and Complex, generally follow new cross-country segments, county highways, and an existing 138 kV transmission line to the Montfort Substation Siting Area. Generally, the corridors along the existing transmission lines are 1,000-feet wide, while those following county highways are approximately 1,500-feet wide. The cross-country segments in this area are generally one mile in width.

The corridors that head south from the Ice Age Trail to the Mount Horeb area generally follow an existing 69 kV transmission line and a few cross country segments. In this area, the corridors along the existing transmission line and cross-country segments are generally 3,000-feet wide.

Dairyland Power Cooperative 7-4 Cardinal-Hickory Creek T-Line Project G Muscoda )" ST60 ST78 KP 19 ST19 )" )"K ST ST133 Lone Rock G Y Avoca )" )" SAUK Spring Green COUNTY Mazomanie £12 Arena £14 )"F £ )"G )"C )"C )"KP )"KP )"P )"NN Black Earth CARDINAL 130 )"N ST )"T SUBSTATION )"FF Cross Plains ST80 )"PP ST23 P £14 Middleton )" N101 N100 N080 N104 N103 N102 T #* )" N1640 )"I C138 )"JJ )"Q HH )"K )" ST78 A040 )"II Madison )"P A041 )"H )"S

C139 J )"ZZ C160 )" Q T )" Highland )" A043 M )"F JG )"J Q N641 )" Blue Mound )"

)" A044 M ST23 State Park N302 )" )"S Gov. Dodge Blue Mounds N1670 I State Park )"Z Barneveld P G )" BH )"ID )" PD )" )" Y U025 U024 U023 ID )" )" £18 U022Mount Horeb )" U027 £ IOWA Ridgeway DANE U020 U017 COUNTY U018 COUNTY Verona U028 £18 A121 )"YZ U029 )"J A204 U031 Montfort U040 Z GRANT A205 U036 U035 A210 )" )"E A206 Cobb Z U030 )"T COUNTY )" )"H )"Q "CH N1565 ) Dodgeville "Y )"G A227 S071 ) )"B U062 BB XX )" )" N1625 C360 B C350 C340 )" A100 C362 JG Cardinal Substation-to-Montfort )"B C366 H CARDINAL-HICKORY CREEK )" )" A100 Montfort-to-MIssissippi River F A361 )" TRANSMISSION78 LINE ST A100 Mississippi River-to-Hickory Creek Substation

"H U N800 ) S125 )" 69 PROPOSED Linden )"Y PROJECT Segment ID ST ST191 HK SUBSTATION )" FIGURE 7-2 Segment Designator: A ATC Line N Greenfield A SITING AREA K ST92 )" )" ALTERNATIVE CORRIDORS C County Highway R Railroad )"E Livingston )"E )"A )"A CARDINAL TO MONTFORT D DPC Line S State Highway A304 ST39 )"D )"W )"G G Gas Pipeline U US Highway )"YD SUBSTATION)"A SITING AREA )"QQ Inactive Corridor )"PB Hollandale )"H ST39 JG Project )" Substation Mineral Point Study Area Belleville A305 EXISTING LINEAR CORRIDORS Siting Area DD DDD )"K )" OutsideO Project Study Area )"J )" )"DD )"U EXISTING TRANSMISSION LINES )" ST80 Rewey )"A *# Substation ! ! 161 kV Environmentally Sensitive Lands* N880 W I S C O N S I N ! ! ! ! 69 kV 345 kV * Includes Federal Wildlife Refuges, State Fishery Areas, Managed)"CC A306 )"O ! ! 138 kV 345 kV Approved/Under Forests, Natural Areas, Parks, Waterfowl/Wetland Management Construction ST39Areas, Wildlife Refuges, County Parks, and Municipal Parks. )"S )"D )"W )"CC OTHER "J )"W ) State Boundary City / Village A307 Blanchardville New Glarus )"G Interstate, US or Railroad State Highway County Boundary Open Water £151 County Highway ApproximateGREEN Gas )"D Pipeline Road COUNTY 0 1 2 3 4 5

D ST23 µ Miles )" LAFAYETTE )"N )"N )"A COUNTY )"G

B )" C F A308 )" )" )"G )"D Monticello Platteville )"G "J £151 Belmont ) )"C )"EE Data Sources: ATC, IDOT, IDNR, ITC, USGS, WDNR, WDOT. 9/9/16 Macro-Corridor Study The Utilities’ Alternative Corridors

The corridors that head west from Mount Horeb to Dodgeville, and then to the Montfort Substation Siting Area generally follow USH 18, USH 151, existing 69 kV transmission lines, and county highways. The segments along USH 18 and USH 151 range in width from 1,000 to 2,000 feet, while those along county highways range from 2,000 to 3,000 feet. The corridors that follow existing transmission lines are generally 1,000-feet wide. The area immediately east of the Montfort Substation Siting Area was left wider to provide additional flexibility based on the unknown location of the new substation.

The alternative corridor within the Cardinal Substation-to-Montfort Siting Area would be approximately 45- to 50- circuit miles long and, depending on the route chosen, it may pass through or near the municipalities of Blue Mounds, Barneveld, Ridgeway, Dodgeville, and Cobb.

Appendix M contains the USGS 7-1/2’ topographic quadrangle maps for the recommended alternative corridors in the Cardinal Substation-to-Montfort Siting Area.

7.2 Alternative Corridors in the Montfort-to-Mississippi River Siting Area

7.2.1 Macro-Corridors Narrowed or Eliminated from Consideration As discussed in more detail below, a number of macro-corridors in the Montfort-to-Mississippi River Siting Area were removed after further comparative analysis facilitated a further culling of corridors. Additionally, the widths of corridors following existing utility or transportation corridors were narrowed when appropriate. In a few instances, macro-corridors were slightly expanded to gain additional flexibility in addressing constraints.

Macro-corridors exiting the Montfort Substation Siting Area to the south to Livingston were both narrowed or removed. Macro-corridors generally following cross-country segments on the west and south sides of Livingston were eliminated from consideration because a corridor east of Livingston followed an existing 69 kV transmission line south to the Platteville area.

In the Platteville area, a macro-corridor consisting of cross-country segments around the north side of the city was eliminated from consideration because the segments around the east side of the community followed an existing transmission line. The east side alternatives also had fewer environmental impacts when compared to the segments on the north side of the City. As a result of the removal of these cross- country segments, macro-corridors on the west side of Platteville became non-functional, dead-end segments and were also removed. On the south side of Platteville, a macro-corridor following USH 151 was trimmed in a few areas to more closely adhere to the highway, but was generally left at 3,000 feet in

Dairyland Power Cooperative 7-6 Cardinal-Hickory Creek T-Line Project Macro-Corridor Study The Utilities’ Alternative Corridors

width. The remaining corridors in this section all follow existing transmission lines and were left unchanged.

7.2.2 Alternative Corridors Proposed The alternative corridors in this section would connect the Project from the Montfort Substation Siting Area in the east to the Mississippi River crossing near Cassville, Wisconsin as shown in Figure 7-3.

The Montfort-to-Mississippi River Siting Area begins with two alternative corridors that exit the Montfort Substation Siting Area directly to the southwest or to the south towards Platteville.

The corridor heading southwest follows an existing 138 kV transmission line all the way to the Mississippi River and is 1,000-feet wide.

The corridor that exits the Substation Siting Area to the south generally follows an existing 69 kV transmission line and a few cross-country segments. The segments that follow the existing transmission line are generally 3,000 to 5,000 feet wide, while the cross-country segments are generally 3,000-feet wide. In the Platteville area, a number of segments follow USH 151, existing 138 and 69 kV transmission lines, and cross-country segments on the east and south sides of the community. In this area, corridors along existing transmission lines are generally 1,000-feet wide, while the corridors following USH 151 and cross-country segments are generally 3,000 feet in width. An area directly east of Platteville that encompasses several routing opportunities was left wider to retain engineering and routing flexibility. From Platteville, a 1,000-foot-wide corridor follows an existing 138 kV transmission line west to the Cassville area. In the Cassville area, Segments A370, A425 through A430, and D221 through D225 are all 1,000-feet wide and follow existing transmission lines to the proposed river crossings.

The alternative corridor within the Montfort-to-Mississippi River Siting Area would be approximately 30- to 50- circuit miles long and, depending on the route chosen, it may pass through or near Livingston, Rewey, Platteville, and Cassville.

Appendix N contains the USGS 7-1/2’ topographic quadrangle maps for the alternative corridors in the Montfort-to-Mississippi River Siting Area.

Dairyland Power Cooperative 7-7 Cardinal-Hickory Creek T-Line Project Woodman P "S )" PP Wauzeka ) )" CARDINAL-HICKORY CREEK Q II )" )"P )" TRANSMISSION LINE )"K PROJECT ST60 )"T C160 Highland FIGURE 7-3 )"M C )"Q N641 )" ST133 ALTERNATIVE CORRIDORSST23 MONTFORT TO MISSISSIPPI

)"Q RIVER SUBSTATION Gov. Dodge I IOWA State Park G )" BH SITING AREA )" COUNTY )" Wisconsin River A100 Cardinal Substation-to-Montfort A100 Montfort-to-Mississippi River £18 Fennimore A121 YZ £ A100 Mississippi River-to-Hickory )" 18 Mount Hope )"JJ £ Montfort Creek SubstationU040 A204 U031 A206 A205 U036 U035 A210 )"X Cobb Segment ID Segment Designator: CH )"P N1565 )" Dodgeville )"F )"B A227 S071 A ATC Line N Greenfield XX C County Highway R Railroad C360 C350 C340 U063 Patch Grove )" N1625D DPC Line S State)"B Highway )"J C362 )"G G )"GasB PipelineC366 U US Highway

Inactive Corridor N800 S125 PROPOSED Linden K )"Y )"A )" £61 SUBSTATION Project SITING AREA Study Area Substation Bagley )"E A361 Livingston )"E )"Q Siting Area Bloomington Outside Project Study Area

A304 ST39 )"D )"YD )"A )"QQ )"D EXISTING LINEAR CORRIDORS GRANT A362 COUNTY EXISTING TRANSMISSIONMineral Point LINES W I S C O N S I N A305 ! DD Lancaster *# Substation ! 161 kV )" A363 )"J )"VV ! ! ! ! ST80 69 kV 345 kV ST129 ! ! 345 kV Approved/Under ST35 A364 )"A Rewey 138 kV

N880 Construction ST35 A306 OTHER )"V Interstate, US or S V A366 Railroad )" )" State Highway Approximate Gas A307 County Highway Pipeline )"G Road 133 151 ST )"D £ N )" Environmentally Sensitive Lands* ST23 ST81 * Includes Federal Wildlife Refuges, State Fishery Areas, Managed ST81 Forests, Natural Areas, Parks, Waterfowl/Wetland Management )"VV Areas, Wildlife Refuges, County Parks, and Municipal Parks. )"G A367 )"B )"C

A308 State Boundary City / Village )"B A368 Y County Boundary )" £61 U067 Belmont Open Water Platteville £151 )"G A369 D203 N U069 )"G D223 )" A312 0)"O 1 2 3 4 5

N902 A424 A423 A422 N922

A421 A420 A419 A418 A415 A286 N940 Z Cassville )"U )" U071 µ Miles ST133 CLAYTON )"X COUNTY ST126 N £52 )" Tennyson )"O "F £ Potosi LAFAYETTE ) £151 D F North Buena Vista )" )" Mississippi River COUNTY Darlington

ST81 I O W A )"H )"O DUBUQUE I )"U )"K COUNTY Balltown Dickeyville )" Data Sources: ATC, IDOT, IDNR, ITC, USGS, WDNR, WDOT. 9/9/16 Macro-Corridor Study The Utilities’ Alternative Corridors

7.3 Mississippi River-to-Hickory Creek Siting Area As a result of information gathered from the May 2016 Public Open Houses and continued routing analyses, the Utilities reassessed the macro-corridor in the Mississippi River-to-Hickory Creek Siting Area to determine if any additional areas were suitable for removal and/or adjustment. Although the location and distance of the Project endpoint at the Hickory Creek Substation to the remaining feasible crossing locations provides a limited area in which to locate alternative corridors, an analysis was performed to determine if any additional constraints may be avoided, while still assuring an adequate corridor for the development of prospective Project routes. This additional corridor review, combined with information gathered from the open houses, assisted in further reducing the Project’s proximity to sensitive resources and lands in both Clayton and Dubuque counties.

To reduce potential conflicts with sensitive resources in Clayton County, an area on the northern end of the initial macro-corridor in the Mississippi River-to-Hickory Creek Siting Area was removed to avoid the entirety of the Turkey Rivers Mounds State Preserve and Clayton County Conservation Board lands, as well as the habitats contained within the Turkey River Bottoms (near the confluence of Turkey River and the Mississippi River) (Figure 7-4). Avoiding these areas would reduce potential impacts to these resources while still maintaining adequate east-west options for locating prospective routes in this location that could extend through the Refuge at either the Nelson Dewey or Stoneman crossing location.

On the eastern edge of the northern portion of the initial macro-corridor in the Mississippi River-to- Hickory Creek Siting Area, two additional areas were removed to avoid areas of extensive steep slopes and topographical relief, as well as unique and sensitive habitats. Of these two areas on the eastern edge, the northern block was removed to prevent prospective routes from being located on or near the braided channel in this area of the Refuge/Mississippi River, and to avoid lands and known migratory waterfowl habitat at Wood Duck Slough and Dead Lake. The second smaller block on the eastern edge was removed as a result of the presence of known algific slopes and similar potential habitat.

An area on the western edge of the initial macro-corridor in the Mississippi River-to-Hickory Creek Siting Area was also reduced to avoid extraneous lands to the west of Highway 52. As previously mentioned, the dense residential development along Highway 52 in Clayton County, and the presence of steep slopes at the same general location, would result in numerous routing challenges for a prospective route through this area; therefore, this additional area was removed from the center of the initial macro- corridor in the Mississippi River-to-Hickory Creek Siting Area, resulting in an approximately 1-mile wide reduction in corridor width.

Dairyland Power Cooperative 7-9 Cardinal-Hickory Creek T-Line Project Guttenberg ST81

)"N

A367 )"VV

A368 )"Y £61

Osterdock D203 B A369 )" A427 )"N

D223 A424 A423 A422 A421 Cassville )"U

Millville ST133 CLAYTON GRANT COUNTY COUNTY )"O )"N Tennyson W I S C O N S I N Potosi

North Buena Vista

Mississippi River

Colesburg Balltown I O W A A100 Cardinal Substation-to-Montfort CARDINAL-HICKORY CREEK A100 Montfort-to-Mississippi River TRANSMISSION LINE A100 Mississippi River-to-Hickory Creek Substation PROJECT Segment ID FIGURE 7-4 Segment Designator: A ATC Line N Greenfield ALTERNATIVE CORRIDORS C County Highway R Railroad 3 D DPC Line S State Highway ST Luxemburg MISSISSIPPI RIVER TO HICKORY Sherrill G Gas Pipeline U US Highway Holy Cross CREEK SUBSTATION SITING AREA Inactive Corridor

Project Substation Study Area EXISTING LINEAR CORRIDORS Siting Area DELAWARE Outside Project Study Area DUBUQUE £52 Rickardsville EXISTING TRANSMISSION LINES COUNTY COUNTY *# Substation ! ! 161 kV Environmentally Sensitive Lands* ! ! 69 kV ! ! 345 kV * Includes Federal Wildlife Refuges, State Fishery Areas, Managed ! ! 345 kV Approved/Under Forests, Natural Areas, Parks, Waterfowl/Wetland Management 138 kV Construction Areas, Wildlife Refuges, County Parks, and Municipal Parks. ST136 ST386 OTHER Durango State Boundary City / Village Interstate, US or Railroad County Boundary Open Water State Highway Approximate Gas New Vienna County Highway Pipeline #* Road 0 Sageville 1 2 3 µ Miles

HICKORY CREEK Dubuque SUBSTATION ST924

Bankston Asbury

Data Sources: ATC, IDOT, IDNR, ITC, USGS, WDNR, WDOT. 9/9/16 Macro-Corridor Study The Utilities’ Alternative Corridors

Similar to the removal of the section along Highway 52, the Utilities also propose removing additional lands just south of the towns of Luxemburg and Holy Cross. Due to the presence of these municipalities and the available space in which to locate prospective routes in these areas, additional extraneous lands where removed at both these locations. Taking into account these modifications, the alternative corridor within the Mississippi River-to-Hickory Creek Siting Area would range from approximately 10.7- to 12- miles long and would range from approximately 2.5- to 4-miles wide.

Appendix O contains the USGS 7-1/2’ topographic quadrangle maps for the alternative corridor in the Mississippi River-to-Hickory Creek Siting Area.

Appendix P provides a list of the individuals who participated in the preparation of this MCS.

Dairyland Power Cooperative 7-11 Cardinal-Hickory Creek T-Line Project Macro-Corridor Study References

8.0 REFERENCES

ACA, the Utilities’. (2016). Alternative Crossings Analysis. Submitted to USFWS April 2016.

AES, the Utilities’. (2016). Alternatives Evaluation Study. Submitted to RUS July 2016.

BLS (Bureau of Labor Statistics). (2014). Databases, Tables, & Calculators by Subject. Retrieved from http://data.bls.gov/timeseries/LNS14000000.

CEQ. (1997). Environmental Justice: Guidance Under NEPA. Retrieved from http://energy.gov/nepa/ downloads/environmental-justice-guidance-under-nepa-ceq-1997.

EPA. (2001). Functions and Values of Wetlands. Retrieved from http://nepis.epa.gov/Exe/ZyPDF.cgi/ 200053Q1.PDF?Dockey=200053Q1.PDF.

FEMA. (2015). Federal Flood Risk Management Standard (FFRMS). Retrieved from https://www.fema.gov/federal-flood-risk-management-standard-ffrms.

IDNR. (no date). State Preserves Guide. Retrieved from http://www.iowadnr.gov/Places-to-Go/State- Preserves/State Preserves Guide (Listing of all 95 Preserves).pdf.

IDNR. (2010, February 17). Iowa Antidegradation Implementation Procedure. Retrieved from http://www.iowadnr.gov/Environmental-Protection/Water-Quality/Water-Quality- Standards/Antidegradation/Iowa Antidegradation Implementation Procedure.pdf.

MISO. (2010, November 19). Regional Generation Outlet Study. Retrieved from https://www.misoenergy.org/Library/Repository/Study/RGOS/Regional%20Generation%20Outle t%20Study.pdf.

MISO. (2011). MTEP 2011 Report. Retrieved from https://www.misoenergy.org/Library/Repository/ Study/MTEP/MTEP11/MTEP11%20Report.pdf.

MISO. (2014, September). MTEP14 MVP Triennial Review. Retrieved from https://www.misoenergy.org/ Library/Repository/Study/Candidate%20MVP%20Analysis/MTEP14%20MVP%20Triennial%20 Review%20Report.pdf.

Rauch Direct Testimony. (2014, September 15). Direct Testimony of Laura Rauch. Submitted on behalf of MISO before the Public Service Commission of Wisconsin in Docket No. 5-CE-142, PSC Ref# 218120.

RUS. (2002, February). Scoping Guide for RUS Funded Projects Requiring Environmental Assessments with Scoping and EIS. Retrieved from http://www.rd.usda.gov/files/UEP_Bulletin_1794A- 603.pdf.

RUS. (2009, May). Macro-Corridor Study: Hampton - Rochester - La Crosse 345kV Transmission System Improvement Project. Retrieved from http://www.rd.usda.gov/files/UWP_WI64- Dairyland_CapXHRLC_MCS-Full.pdf.

RUS. (2016, April 1). RUS Staff Instructions, Part 1970-O, Environmental--Miscellaneous Resources. Retrieved from http://www.rd.usda.gov/publications/regulations-guidelines/instructions.

Dairyland Power Cooperative 8-1 Cardinal-Hickory Creek T-Line Project Macro-Corridor Study References

U.S. Census Bureau. (2014). United States Census American Community Survey 2014 ACS 5-Year Population Estimate. Retrieved from www.census.gov.

U.S. Census Bureau. (2015). United States Census 2015 Population Estimate. Retrieved from www.census.gov.

USFWS. (2006). Upper Mississippi River National Wildlife & Fish Refuge Comprehensive Conservation Plan. Retrieved February 2016 from http://www.fws.gov/midwest/planning/uppermiss/ index.html.

USFWS. (2013). Upper Mississippi River National Wildlife and Fish Refuge: About the Refuge. Retrieved from https://www.fws.gov/refuge/Upper_Mississippi_River/about.html.

USGS. (2003). A Tapestry of Time and Terrain. Barton, K., D. Howell, and J. Vigil. Retrieved April 2015 from http://pubs.usgs.gov/imap/i2871/.

USGS and NPS. (2000). Geologic provinces of the United States: interior plains province. Retrieved December 2012 from http://www2.nature.nps.gov/geology/ usgsnps/province/intplain.html.

USGS. (2011). National Land Cover Database 2011. Retrieved from http://www.mrlc.gov/nlcd2011.php.

WDNR. (2014). Governor Dodge State Park. Retrieved from http://dnr.wi.gov/topic/parks/name/ govdodge.com.

WDNR. (2015a). Blue Mound State Park. Retrieved from http://dnr.wi.gov/topic/parks/name/ bluemoun.com.

WDNR. (2015b). Ice Age National Scenic Trail. Retrieved from http://dnr.wi.gov/topic/parks/name/ iceagetrail.com.

WDNR. (2016). State Natural Areas Program. Retrieved from http://dnr.wi.gov/topic/lands/ naturalareas.com.

Dairyland Power Cooperative 8-2 Cardinal-Hickory Creek T-Line Project