CARDINAL-HICKORY CREEK 345 Kv TRANSMISSION LINE PROJECT MACRO-CORRIDOR STUDY

Total Page:16

File Type:pdf, Size:1020Kb

CARDINAL-HICKORY CREEK 345 Kv TRANSMISSION LINE PROJECT MACRO-CORRIDOR STUDY CARDINAL-HICKORY CREEK 345 kV TRANSMISSION LINE PROJECT MACRO-CORRIDOR STUDY Submitted to: United States Department of Agriculture’s Rural Utilities Service (“RUS”) Applicant to RUS: Dairyland Power Cooperative Other participating utilities in the Cardinal-Hickory Creek Transmission Line Project: • American Transmission Company LLC, by its corporate manager ATC Management Inc. • ITC Midwest LLC September 28, 2016 Macro-Corridor Study Table of Contents TABLE OF CONTENTS EXECUTIVE SUMMARY Page No. 1.0 INTRODUCTION ............................................................................................... 1-1 1.1 Basis for this Macro-Corridor Study.................................................................... 1-1 1.2 Environmental Review Requirements and Process ............................................. 1-2 1.3 Project Overview ................................................................................................. 1-3 1.4 Overview of Utilities’ Development of a Study Area, Macro-Corridors and Alternative Corridors ........................................................................................... 1-4 1.5 Purpose and Need ................................................................................................ 1-2 1.6 Outreach Process .................................................................................................. 1-2 1.7 Required Permits and Approvals ......................................................................... 1-3 2.0 TECHNICAL ALTERNATIVES UNDER EVALUATION ................................... 2-1 2.1 Transmission Alternatives – Both High and Low Voltage .................................. 2-1 2.2 Non-Transmission Alternatives ........................................................................... 2-3 2.3 No-Action Alternative ......................................................................................... 2-3 3.0 THE UTILITIES’ MCS METHODOLOGY .......................................................... 3-1 3.1 Overview of MCS Requirements ......................................................................... 3-1 3.2 The Utilities’ Application of the MCS Requirements ......................................... 3-1 3.2.1 Identification and Evaluation of Mississippi River Crossing Locations ............................................................................................... 3-1 3.2.2 Development of the Project Study Area Based on Feasible River Crossing Locations, the Two End Points, and an Intermediate Substation.............................................................................................. 3-6 3.2.3 Collect Data and Receive Feedback about the Project Study Area ...... 3-8 3.2.4 Define Macro-Corridors........................................................................ 3-8 3.2.5 Refine Macro-Corridors into Alternative Corridors ............................. 3-9 3.2.6 Based on State Law Requirements, Select Two Alternative Routes in Wisconsin and One Alternative Route in Iowa ................................ 3-9 3.2.7 Reasonable Alternative Corridors for the Scoping Process ................ 3-11 4.0 PROJECT STUDY AREA CHARACTERISTICS .............................................. 4-1 4.1 Physiography and Geology .................................................................................. 4-1 4.1.1 Physiography......................................................................................... 4-1 4.1.2 Geology ................................................................................................. 4-1 4.2 Land Use and Land Cover ................................................................................... 4-5 4.2.1 Land Use and Land Cover - Wisconsin ................................................ 4-5 4.2.2 Land Use and Land Cover - Iowa ......................................................... 4-8 4.3 Sensitive Areas..................................................................................................... 4-8 4.3.1 Sensitive Areas – Wisconsin ................................................................. 4-8 4.3.2 Sensitive Areas – Iowa........................................................................ 4-11 Dairyland Power Cooperative TOC-1 Cardinal-Hickory Creek T-Line Project Macro-Corridor Study Table of Contents 4.3.3 Upper Mississippi River National Wildlife and Fish Refuge ............. 4-11 4.4 Wildlife Resources ............................................................................................. 4-12 4.5 Wetlands ............................................................................................................ 4-13 4.5.1 Wetlands - Wisconsin ......................................................................... 4-13 4.5.2 Wetlands - Iowa .................................................................................. 4-16 4.6 Cultural Resources ............................................................................................. 4-16 4.6.1 Cultural Resources - Wisconsin .......................................................... 4-16 4.6.2 Cultural Resources - Iowa ................................................................... 4-16 4.7 Hydrology (Open Water, Streams, Floodplains) ............................................... 4-21 4.7.1 Hydrology - Wisconsin ....................................................................... 4-21 4.7.2 Hydrology - Iowa ................................................................................ 4-21 4.7.3 Floodplains .......................................................................................... 4-21 4.7.4 Outstanding and Exceptional Waters .................................................. 4-24 4.8 Transportation Corridors and Sites (Major Highways, Rail, Airports) ............. 4-24 4.8.1 Major Highways.................................................................................. 4-24 4.8.2 Railroads ............................................................................................. 4-31 4.8.3 Airports ............................................................................................... 4-31 4.9 Socioeconomic Characteristics .......................................................................... 4-31 4.10 Recreational Resources ...................................................................................... 4-34 4.11 Existing Transmission Lines .............................................................................. 4-41 4.12 Other Utility Corridors ....................................................................................... 4-41 5.0 PROCESS THE UTILITIES USED TO DEVELOP THE MACRO- CORRIDORS ..................................................................................................... 5-1 5.1 State Routing Laws .............................................................................................. 5-1 5.1.1 Public Service Commission of Wisconsin ............................................ 5-1 5.1.2 Iowa Utilities Board .............................................................................. 5-1 5.2 Electrical System Requirements .......................................................................... 5-2 5.3 The Utilities’ Comprehensive Outreach Program................................................ 5-2 5.3.1 Tribal Nations ....................................................................................... 5-2 5.3.2 Governmental Agencies ........................................................................ 5-3 5.3.3 Public Officials ..................................................................................... 5-3 5.3.4 Utilities .................................................................................................. 5-3 5.3.5 Other Interested Parties ......................................................................... 5-4 5.4 Identification of Opportunities and Constraints ................................................... 5-8 5.4.1 Routing Opportunities Considered ....................................................... 5-8 5.4.2 Routing Constraints Considered ......................................................... 5-12 6.0 THE UTILITIES’ MACRO-CORRIDORS ........................................................... 6-1 6.1 Identification of Potential Macro-Corridors ........................................................ 6-1 6.2 Opportunities and Constraints Evaluation by Siting Area ................................... 6-1 6.2.1 Cardinal–to-Montfort Siting Area - Wisconsin .................................... 6-4 6.2.2 Montfort-to-Mississippi River Siting Area - Wisconsin ....................... 6-4 6.2.3 Mississippi River-to-Hickory Creek Siting Area - Iowa ...................... 6-5 6.3 Opportunity and Constraint Review of Potential Macro-Corridor Segments ...... 6-7 6.4 Macro-Corridor Analysis by Siting Area ............................................................. 6-7 Dairyland Power Cooperative TOC-2 Cardinal-Hickory Creek T-Line Project Macro-Corridor Study Table of Contents 6.4.1 Cardinal Substation-to-Montfort Siting Area - Wisconsin ................... 6-7 6.4.2 Montfort-to-Mississippi River Siting Area – Wisconsin ...................... 6-0 6.4.3 Mississippi River to Hickory Creek Substation Section - Iowa ........... 6-2 7.0 THE UTILITIES’ ALTERNATIVE CORRIDORS ................................................ 7-1 7.1 Alternative Corridors in Cardinal Substation-to-Montfort Siting Area ............... 7-1 7.1.1 Macro-Corridors Narrowed or Eliminated from
Recommended publications
  • Lexicon of Pleistocene Stratigraphic Units of Wisconsin
    Lexicon of Pleistocene Stratigraphic Units of Wisconsin ON ATI RM FO K CREE MILLER 0 20 40 mi Douglas Member 0 50 km Lake ? Crab Member EDITORS C O Kent M. Syverson P P Florence Member E R Lee Clayton F Wildcat A Lake ? L L Member Nashville Member John W. Attig M S r ik be a F m n O r e R e TRADE RIVER M a M A T b David M. Mickelson e I O N FM k Pokegama m a e L r Creek Mbr M n e M b f a e f lv m m i Sy e l M Prairie b C e in Farm r r sk er e o emb lv P Member M i S ill S L rr L e A M Middle F Edgar ER M Inlet HOLY HILL V F Mbr RI Member FM Bakerville MARATHON Liberty Grove M Member FM F r Member e E b m E e PIERCE N M Two Rivers Member FM Keene U re PIERCE A o nm Hersey Member W le FM G Member E Branch River Member Kinnickinnic K H HOLY HILL Member r B Chilton e FM O Kirby Lake b IG Mbr Boundaries Member m L F e L M A Y Formation T s S F r M e H d l Member H a I o V r L i c Explanation o L n M Area of sediment deposited F e m during last part of Wisconsin O b er Glaciation, between about R 35,000 and 11,000 years M A Ozaukee before present.
    [Show full text]
  • To View 2019 Convention Booklet
    Table of Contents Page Three Day Convenon Agenda ....................................................................... 3 Direconal Map – Radisson ........................................................................... 4 Annual Meeng Agenda‐Saturday ................................................................. 5 Outgoing/Rering Director & Rep Recognion ............................................. 6 2018 Annual Meeng Minutes ...................................................................... 7 Execuve Board Candidate Profiles ............................................................... 12 Snowmobile Friendly Awards ......................................................................... 14 Saturday Evening Banquet ............................................................................. 18 Guest Speaker—Sco Eilertson Bio ............................................................... 19 President’s Cup Award – Past Winners .......................................................... 20 2018 Scholarship Recipients .......................................................................... 21 Trail Pass Stascs .......................................................................................... 23 2018‐2019 AWSC Membership Totals ........................................................... 24 2018‐2019 Club Membership By County ....................................................... 25 Blue Mound State Park Master Plan Revision ................................................ 40 Saturday Bus Informaon ..............................................................................
    [Show full text]
  • LF0071 Ch9.Pdf
    Figure 9.2 Figure 9.2: Watersheds (HUC 10) and Sub‐Watersheds (HUC 12) of the Platte River Region. 9‐2 1. OVERVIEW a) Physical Environment The Platte River Region is characterized by broad open hilltops and river valleys, and steep wooded slopes. The soils in this watershed have formed in a silty, wind‐blown covering with the deepest deposits along the bluffs of the Mississippi River and thinning towards the east. Some valley soils are alluvial sands, loams, and peats. Some hilltops are almost treeless due to the thin soil while others have a deep silt loam cap. Soils are underlain with calcareous bedrock. b) Land Cover and Use The region is dominated by agricultural uses, in particular along the hilltops and valley bottoms. With the increasing price of corn and Figure 9.3: Land cover of the Platte River Region. soybeans over the last decade, many pastures, hayfields, and lands that were enrolled in the Conservation Reserve Program (CRP) are being converted to row crops. This large‐scale conversion of permanent vegetation to agricultural uses that expose open soil is also likely to have an adverse effect on water quality of streams in the region. Deciduous forests are found on the steep side slopes, with wetlands confined to riparian corridors. Most forested lands are part of farming operations and managed to provide forest products, including saw timber and firewood. c) Terrestrial Habitats Grassland management at multiple scales is a conservation opportunity in the Platte River Region. Small, scattered remnants of native prairie exist here along with substantial areas of "surrogate grassland" (although this is declining with conversions out of CRP).
    [Show full text]
  • Tri-State Area Integrated Walking, Bicycling and Hiking Network Plan.Pmd
    TRI-STATE AREA FINAL COPY INTEGRATED WALKING, BICYCLING, HIKING NETWORK PLAN HIKING BICYCLING, WALKING, INTEGRATED Photo courtsey of the Iowa Bicycle Coalition Table of Contents Chapter One Introduction and Summary……………….….............…………………………..………1 Purpose……………………………………………….............……………………..…...1 Goals and Objectives………………………………………….............………………....2 Chapter Two Existing Conditions……………………………….............……………………………..8 Bicycle Skill Levels……………………………………….............……………………..9 Facility Type or Categories…………………………………………...........………….....10 Existing Facilities………………………………………………………………..............14 Chapter Three Planning and Policy………………………………………………………............……...27 Approved Planned Facilities…………………………………………...........……….…..34 Complete Streets…………………………………………………………...........….……38 Education and Encouragement…………………………………………...........…..…….41 Design Criteria……………………………………………………………...........….…...42 Chapter Four Proposed Facilities and Justification…………………………………………............….45 Proposed Facilities…………………………………………………………...........……..46 Chapter Five Implementation Plan…………………………………………………………............…..53 Trail Costs……………………………………………………………………............…..53 Project Implementation Schedule……………………………………………............…..53 Funding Sources……………………………………………………………..........….….62 Chapter One INTRODUCTION AND SUMMARY In July 2005 a grass roots effort of community citizens gathered to envision the future of the greater Dubuque area. Through this process several hundred ideas were voted on by the community to
    [Show full text]
  • Rapid Ecological Assessment for Blue Mound State Park, Dane and Iowa Counties, Wisconsin
    Rapid Ecological Assessment for Blue Mound State Park, Dane and Iowa Counties, Wisconsin A Rapid Ecological Assessment Focusing on Breeding Passerine Birds, Bats, and High- quality Natural Communities Bureau of Parks and Recreation and Wisconsin Natural Heritage Inventory Program, Bureau of Natural Heritage Conservation Department of Natural Resources P.O. Box 7921, Madison, WI 53707 October 2015 PUB-NH-852 2015 Primary Author: Craig Anderson Contributors: Craig Anderson – community ecology, rare plants Rich Staffen – birds Kevin Swenson – bats Dan Buckler – bats Cover Photo: WI DNR 2 Rapid Ecological Assessment Table of Contents Purpose and Objectives.................................................................................................................... 6 Methods ........................................................................................................................................... 6 General Background Information .................................................................................................... 7 Ecological Context ........................................................................................................................... 7 Regional Biodiversity Needs and Opportunities…………………………………………………..9 Description of the Study Area……………………………………………………………………12 Rare Species and High Quality Natural Communities at and Surrounding BMSP ....................... 16 Management Considerations and Opportunities for Biodiversity Conservation at BMSP ........... 20 Primary Sites: Site-specific
    [Show full text]
  • Sturgeon Bay Segment 13.7 Mi
    Kewaunee & Door Counties Ice Age Trail 42 57 Kewaunee and Door Counties Potawatomi State Park Sturgeon PD Bay Kewaunee and Door Sturgeon Bay Counties Segment 42 57 il ra T te ta S Ice Age Trail Alliance e pe www.iceagetrail.org na Ah H Maplewood 57 42 C Forestville Forestville Segment J DOOR X KEWAUNEE M D il ra T Algoma ate St ee p 54 n na K Ah a g i h c i M Casco 42 e k 54 C Kewaunee River a Luxemburg Segment L A AB C F Kewaunee Bruemmer County Park 29 29 Existing Ice Age Trail, subject to change as it AB evolves toward completion Other Trail Unofficial Connecting Route 42 (unmarked) County Boundary Public or IATA Land E E Miles N 0 1 2 3 4 5 N U A W O W September 4, 2019 E R K B Tisch Mills BB Segment Tisch Mills MANITOWOC Ice Age Trail Databook 2020 – 2022 Edition 103 87°28' 87°26' 87°24' 87°22' GREEN BAY Sawyer Harbor Shoreline Rd. Eastern Terminus Ice Age Trail P DK2 0.7 Potawatomi P 0.7 Sturgeon State Park 44°52' Rd. Bay N . y 44°52' Norwa 0.3 P 0.3 DK3 0.4 Group P B Camp HH 0.4 L a S r . DK4 s N Rd. o orway n C re Egg Harbor Rd. ek PD M 1.3 Sturgeon Bay Segment 13.7 mi Michigan St. Duluth Av. Duluth GREEN 42 C 57 44°50' BAY Joliet Hickory BUS Av.
    [Show full text]
  • The Forest Vegetation of the Driftless Area, Northeast Iowa Richard A
    Iowa State University Capstones, Theses and Retrospective Theses and Dissertations Dissertations 1976 The forest vegetation of the driftless area, northeast Iowa Richard A. Cahayla-Wynne Iowa State University Follow this and additional works at: https://lib.dr.iastate.edu/rtd Part of the Botany Commons, Ecology and Evolutionary Biology Commons, Other Forestry and Forest Sciences Commons, and the Plant Pathology Commons Recommended Citation Cahayla-Wynne, Richard A., "The forest vegetation of the driftless area, northeast Iowa" (1976). Retrospective Theses and Dissertations. 16926. https://lib.dr.iastate.edu/rtd/16926 This Thesis is brought to you for free and open access by the Iowa State University Capstones, Theses and Dissertations at Iowa State University Digital Repository. It has been accepted for inclusion in Retrospective Theses and Dissertations by an authorized administrator of Iowa State University Digital Repository. For more information, please contact [email protected]. The forest vegetation of the driftless area, northeast Iowa by Richard A. Cahayla-Wynne A Thesis Submitted to the Graduate Faculty in Partial Fulfillment of The Requirements for the Degree of MASTER OF SCIENCE Department: Botany and Plant Pathology Major: Botany (Ecology) Signatures have been redacted for privacy Iowa State University Ames, Iowa 1976 ii TABLE OF CONTENTS Page INTRODUCTION 1 STUDY AREA 6 METHODS 11 RESULTS 17 DISCUSSION 47 SUMMARY 55 LITERATURE CITED 56 ACKNOWLEDGMENTS 59 APPENDIX A: SPECIES LIST 60 APPENDIX B: SCIENTIFIC AND COMMON NAMES OF TREES 64 APPENDIX C: TREE BASAL AREA 65 1 INTRODUCTION Iowa is generally pictured as a rolling prairie wooded only along the water courses. The driftless area of northeast Iowa is uniquely contrasted to this image; northeast Iowa is generally forested throughout, often with rugged local relief.
    [Show full text]
  • 365Ink63.Pdf
    We bought a new car this week. See, the wed- for Tots Chevy pickup came from there and he ding and the new house at the same time weren’t had a great experience with them. They simply enough after all. And no, I didn’t get rid of the weren’t a dealer for the three cars on Christy’s beat-up old Honda Passport I’ve been lamenting car model short list or they surely would have about. The lease was up on the good car and we made our dealer short list. And this is not say- decided to take care of it before we get married ing everyone else is bad -- certainly not. I’m just so we don’t have to rush it afterwards. saying these Nissan guys are good. They busted their hump to get my business and give customer My fiancee has done a little pre-emptive research service at every turn. After first meeting the very on the subject of new cars, and by that I mean cool Ken “Kenny Mac” MacNeil, he introduced she could go toe-to-toe with any salesman on any us to Nissan specialist Shane Lester, who contin- lot on stats, mileage, recent updates, and safety ued to help us throughout our shopping process, features. She’ll be driving this one so she gets to or as 365 Zen Master and 30-year car-selling choose. There was pretty much one criterion: It veteran Ralph Kluseman would say, “making an needs to get a zillion miles to the gallon.
    [Show full text]
  • Milebymile.Com Personal Road Trip Guide Iowa United States Highway #52
    MileByMile.com Personal Road Trip Guide Iowa United States Highway #52 Miles ITEM SUMMARY 0.0 The Savanna-Sabula Bridge The Savanna-Sabula Bridge, a truss bridge and causeway crossing the Mississippi River and connecting the city of Savanna, Illinois with the island city of Sabula, Iowa. The bridge carries United States Highway #52 over the river. This is where the Iowa part of the United States Highway #52 starts its run to terminate at the Iowa/Minnesota Stateline, just south of Prosper, Minnesota. The Savanna-Sabula Bridge is a registered National Historic Place. Altitude: 584 feet 2.7 Sabula, IA Sabula, Iowa, a city in Jackson County, Iowa, It is the Iowa's only island city with a beach and campground. Sabula Public Library, South Sabula Lakes Park, Altitude: 594 feet 3.7 Junction Junction United States Highway #67/State Highway #64, 608th Avenue, Sabula Lake Park, Miles, Iowa, a city in Jackson County, Iowa, Miles Roadside Park, United States Highway #67 passes through Almont, Iowa, Clinton, Iowa, Altitude: 633 feet 6.3 607th Avenue/602nd 607th Avenue, 602nd Avenue, Joe Day Lake, Big Sieber Lake, Altitude: Avenue 686 feet 10.2 Green Island Road Green Island Road, 540th Avenue, Densmore Lake, Upper Mississippi River Wildlife and Fish Refuge, Little Sawmill Lake, Sawmill Lake, located off United State Highway #52, along the Mississippi River in Iowa. Altitude: 823 feet 12.1 500th Avenue: Reeceville, 500th Avenue, County Road Z40, Community of Green Island, Iowa, IA Altitude: 837 feet 14.2 Green Island Road Green Island Road, Community of Green Island, Iowa, Upper Mississippi River Wildlife and Fish Refuge, Altitude: 610 feet 18.7 County Highway 234 County Highway 234, 435th Avenue, Bonnie Lake, Western Pond, located alongside United States Highway #52, part of Upper Mississippi River Wildlife and Fish Refuge.
    [Show full text]
  • 2009 STATE PARKS GUIDE.Qxd
    VISITOR INFORMATION GUIDE FOR STATE PARKS, FORESTS, RECREATION AREAS & TRAILS Welcome to the Wisconsin State Park System! As Governor, I am proud to welcome you to enjoy one of Wisconsin’s most cherished resources – our state parks. Wisconsin is blessed with a wealth of great natural beauty. It is a legacy we hold dear, and a call for stewardship we take very seriously. WelcomeWelcome In caring for this land, we follow in the footsteps of some of nation’s greatest environmentalists; leaders like Aldo Leopold and Gaylord Nelson – original thinkers with a unique connection to this very special place. For more than a century, the Wisconsin State Park System has preserved our state’s natural treasures. We have balanced public access with resource conservation and created a state park system that today stands as one of the finest in the nation. We’re proud of our state parks and trails, and the many possibilities they offer families who want to camp, hike, swim or simply relax in Wisconsin’s great outdoors. Each year more than 14 million people visit one of our state park properties. With 99 locations statewide, fun and inspiration are always close at hand. I invite you to enjoy our great parks – and join us in caring for the land. Sincerely, Jim Doyle Governor Front cover photo: Devil’s Lake State Park, by RJ & Linda Miller. Inside spread photo: Governor Dodge State Park, by RJ & Linda Miller. 3 Fees, Reservations & General Information Campers on first-come, first-served sites must Interpretive Programs Admission Stickers occupy the site the first night and any Many Wisconsin state parks have nature centers A vehicle admission sticker is required on consecutive nights for which they have with exhibits on the natural and cultural history all motor vehicles stopping in state park registered.
    [Show full text]
  • Comprehensive Outdoor Recreation Plan 2020-2025 Acknowledgments
    MIDDLET N COMPREHENSIVE OUTDOOR RECREATION PLAN 2020-2025 ACKNOWLEDGMENTS Staff Matt Amundson, Director of Parks, Recreation, and Forestry Rebecca Price, Assistant Director for Recreation Greg Lamping, Recreation Coordinator Carrie Schneck, Office Manager Mark Wegner, Assistant Director for Field Services/City Forester Abby Attoun, Director of Planning and Community Development Mark Opitz, City Planner and Zoning Administrator Parks, Recreation & Forestry Commission David Shaw, Citizen Member John Schaffer, Citizen Member Prepared by: Erin Summers, Citizen Member This document was prepared by MSA Professional Sue Poehlman, Citizen Member Services, Inc. with assistance from City Staff and Jim Koch, Citizen Member the Parks, Recreation & Forestry Commission of Nick Adams, Citizen Member Middleton, Wisconsin. Mark Sullivan, Council Member Project No.: 04928079 ii Middleton | Comprehensive Outdoor Recreation Plan Adoption Ordinance CONTENT CHAPTER 1: INTRODUCTION CHAPTER 4: ANALYSIS OF O1 1.1 Plan Purpose 29 NEEDS AND DEMANDS 1.2 Planning Process 4.1 Quantitative 1.3 The Role of Parks, Analysis Recreation & Trails 4.2 Geographic Analysis 4.3 Qualitative Analysis 4.4 Regional & State Insights CHAPTER 2: ABOUT MIDDLETON 05 2.1 Local & Regional Context CHAPTER 5: RECOMMENDATIONS 2.2 Transportation & 41 5.1 Existing Park Circulation Facilities 2.3 Demographics 5.2 New and Expanded 2.4 Physical Character & Park Facilities Environmental 5.3 Trail Improvements Resources 5.4 Programming 2.5 Existing Land Use & Recommendations Zoning 5.5 Other Recommendations
    [Show full text]
  • Supplemental Report on the Studies And
    PROPERTY OF Iowa DOT library HOWAFIO NEEOLES TAMMEN & BEFIGENOOFF January 24, 1975 Mr. Raymond L. Kassel Deputy Chief Engineer of Planning Iowa State Highway Commission Ames, Iowa 50010 Dear Mr. Kasse 1: We respectfully submit herewith our Supplemental Report on the studies and investigations of the construction of two new Mississippi River Toll Bridges at Dubuque, Iowa and the imposition of tolls in the present Julien Dubuque Bridge. The new bridges are known as the City Is land Bridge and the Route 520 Bridge. · Summary and Recommendations The following conclusions and recommendations are based upon Howard, Needles, Tammen and Bergendoff's estimated project costs and the traffic and revenue estimates prepared by Wilbur Smith & Associates, Inc., as presented in this report and previous reports and.studies. 1. Constructing the City Island Bridge as a four-lane toll facility with the existing Eagle Point Bridge as a private toll facility, and with the Julien Dubuque Bridge remaining "free", and with no additional river crossings in the area is not a feasible alternate. 2. Constructing the City Island Bridge as a four-lane toll facility; constructing the Route 520 bridge as a two­ lane toll facility; and imposing tolls on the existing Julien Dubuque Bridge appears to warrant more detailed structure cost and traffic-revenue studies. Authority and Purpose of Supplemental Report On September 18, 1974, the Iowa State Highway Commission authorized Howard, Needles, Tammen and Bergendoff, with Wilbur Smith & Associates, Inc., as a sub-contractor, to perform engineering services related to ~tpdating the October, 1968 study of Mississippi River Toll Bridges of Dubuque, Iowa.
    [Show full text]