Conoeting of Barangay BOHOL FIRST DISTRICT ENGINEERING

Total Page:16

File Type:pdf, Size:1020Kb

Conoeting of Barangay BOHOL FIRST DISTRICT ENGINEERING Department of Public Work and Highways (DPWH) Contract ID: 19HA0051 Contract Name: Conoeting of Barangay Pig-ot to Cabadug Road, Brgy. Pig-ot & Brgy. Cabadug, Loon, Bohol Project ID: P00347401VS Location of the Contract: Loon, Bohol Republic of the Philippines DEPARTMENT OF PUBUC WORKS AND HIGHWAYS BOHOL FIRST DISTRICT ENGINEERING OFFICE REGIONAL OFFICE VII Tagbilaran City, Bohol NOTICE TO PROCEED June 6, 2019 Mrc. ROSE MARIE N. QUIETA Proprietress O.Q. Construction and Supply Poblacion, Sierra Bullones Bohol Dear Madam: Since the attached Contract Agreement with you for the above stated Contract has been approved, we hereby instruct you to proceed, effective upon the date of your receipt of this Notice, with the implementation of the provisions of the Contract, in accordance with the terms of the Contract Agreement, including the Conditions of Contract, Specifications, and Drawings. Please acknowledge your receipt and acceptance of this Notice by signing both copies thereof in the space provided below. Keep one copy and return the other to us. Very truly yours, I acknowledge receipt of this Notice on Name and Signature of Contractort Representative: Position DPWH-INFR-52-2015 Page 1 of 1 7- Department of Public Work and Highways (DpWH) Contract ID: 19HA0052 Contract Name: Construetionllmprovement of Access Roads leading to Seapofts Antequera-Balilihan via Dorol Road leading to Chocolate Hills via Balilihan- Hanopol-Batuan Road from Catagbacan International Cruise Ship port, Antequera and Balilihan, Bohol Project ID No. P00330075Vs Location of the Contract: Antequera and Balilihan, Bohol Republic of the phitippines DEPARTMENT OF PUBUC WORKS AND HIGHWAYS BOHOL FIRST DISTRICT ENGINEERING OFFICE REGIONAL OFFICE VII Tagbilaran City, Bohol l-rPl,rlH - Bgllgl tS'r .it r.[A,lED gvz,aA ffilt -ILE HO. U NOTICE TO PROCEED July 23, 2018 Engr. HERBERT MALMIS President HERBERT MALMIS General Merchandise & Contractor, Inc. M.H. Del Pilar Street Tagbilaran City Dear Sir: Since the attached Contract Agreement with you for the above stated Contract has been approved, we hereby. instruct you to proceed, effective upon the date of your receipt of this Notice, with the implementation of the provisions of the Contract, in accordance with the terms of the Contract Agreement, including the Conditions of Contract, Specifications, and Drawings. acknowledge your receipt and flerye acceptance of this Notice by signing- both copies thereof in the space provided below. Keep one copy and return the other to us. Very truly yours, I acknowledge receipt of this Notice on JC% 4 , An ' Name and Signature of Contractor,s Representatir., 4.. Position DPWH.INFR-s2-2016 Page 1 of 1 Depaftment of Public Works and Highways (DPWH) Contract ID: 19HA0053 Contract Name: Construction/Maintenance of Flood Mitigation Structures and Drainage $ystems - Construction of Bungabong Flood Control, Boctol, Balilihan, Bohol Project ID: P00321358Vs Location of the Contract: Balilihan, Bohol Republic of the Philippines DEPARTMENT OF PUBUC WORKS AND HIGHWAYS BOHOL FIRST DISTRICT ENGINEERING OFFICE REGIONAL OFFIEE VII Tagbilaran City, Bohol rDPWi . B0t{01 tsl ltr"0 ,iLL1,\SEg gu 7 Mlizfrlnt * ll-E N0. v t NOTICE TO PROCEED July 15, 2019 Mnn. ROSE MARIE N, QUIETA Proprietress O.Q. Construction and Supply Poblacion, Sierra Bullones Bohol Dear Madam: Since the attached Contract Agreement with you for the above stated Contract has been approved, we hereby instruct you to proceed, effective upon the date of your receipt of this Notice, with the implementation of the provisions of the Contract, in accordance with the terms of the Contract Agreement, including the eonditions of Contract, Specifications, and Drawings. Please acknowledge your receipt and acceptanee of this Notice by signing both copies thereof in the space provided below. Keep one copy and return the other to us, Very truly yoursr -Ig FRANcrs ANrdr\O L, rloRes District ensir@p tw I acknowledge receipt of this Notice on tJrrlg lQ, I l4 Name and Signature of Contl'actort Representative: Position : DPWH-INFR-s2-2016 Page 1 of 1 Department of Public Works and Highways (DPWH) Contract ID: 19HA0054 Contract Name: Concreting of Barangay Poblacion-Bongbong Road, Brgy, Poblacion and Brgy. Bongbong, Catigbian, Bshol Project ID: P00347402VS Location of the Contract: Catigbian, Bohol Republic of the Philippines DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS BOHOL FTRST DISTRICT ENGINEERING OFFICE REGIONAL OFFICE VII Tagbilaran City, Bohol iopwu - BoHoL lsT DEP , ( r .r rt A$ED !v +DAlElv lnl ': ILE N0. I{OTICE TO PROCEED July 15, 2019 Mns. ROSE MARIE N, QUIETA Proprietress O,Q. Construction and Supply Poblacion, Sierra Bullsnes Bohol Dear Madam: Since the attached Contract Agreement with you for the above stated Contract has been approved, we hereby instruct you to proceed, effective upon the date of your receipt of this Notice, with the implementation of the provisions of the Contract, in accordance with the terms of the Contract Agreement, including the Conditions of Contract, Specifications, and Drawings. Please acknowledge your receipt and acceptance sf this Notice by signing both copies thereof in the space provided below. Keep one copy and return the other to us. Very truly yours, ffif)lffi, #rB I acknowledge receipt of this Notice on Name and Signature of Contractort Representative: Position I DPWH.INFR-52-2016 Page 1 of 1 Department of Public Work and Highways (DPWH) Contract ID: 19HA0055 CitY, Contract Name: Concreting of lct. San Isidro'Binayran:Dampas Road, Tagbilaran Bohol Project ID: P00346050VS Location of the Contract: Tagbilaran City, Bohol RePubllc of the PhlllPPines DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS BOHOL FIRIST DISTRICT ENGINEERING OFFXCE REGIONAL OFFICE VII Tagbilaran QtY, Bohol DPII'}I.BOHOL IS} iqrmnsro svhoArtulelfi rlLE NO. U NOTICE TO PROCEED June 6, 2019 Engr. HECIFORA P, YU President N.N. YU Construction, Inc. Sta. Cruz, CalaPe Bohol Dear Madam: has been Since the agached Contract Agreement with you for the above stated Contraet your of this ipprovea, we hereby instruct ybu to proceed, etfe*iue upon the date of receipt itlii.., with the im6tementatiin of t'he prwisions of the Contract, in accordance with the and terms of the ContrJJndeement, induding the Conditions of Contract, Speciflcations, Drawings. please acknowledge your receipt and acceptance of this Notice by signing both copies thereof in the space provided below. Keep one copy and return the other ts us' Very truly yours, FRAilcrs L. FLoREs District enlind@^r[hd I acknowledge receipt of this Notice on rlUilE ll , t0lq Name and Signature of Csntractor's Represenhtive: Position : Page 1 of 1 Dn /H-INFR-s2-2016 Department of Public Work and Highways (DPWH) Contract ID: 19HA0056 Contract Name: Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tagbilaran East Road (Tagbilaran-Jagna), K0247 + (-606) - K0247 + (- 451.50), K0247 + (-263) - KA247 + 000, K0252 + 883 - K0253 + 498 Location of the Contract: Alburquerque and Baclayon, Bohol Republic of the Philippines DEPARTMENT OF PUBUC WORKS AND HIGHWAYS BOHOL FIRST DISTRICT ENGINEERING OFFICE REGIONAL OFFICE VII Tagbilaran City, Bohol iopwt -BolloL lsl r.lF, r^ qEttA$Eo t ' B\ 4.oAIl lz lt1, t-ILE NO. U NOTICE TO PROCEED August 9,20L9 Mr. RONNIE S. TIU President CEBU 7H Technochem Industries, Inc. 209 Greenhills Road, Casuntingan Mandaue City Cebu Dear Sir: Since the attached Contract Agreement with you for the above stated Contract has been approved, we hereby instruct you to proceed, effective upon the date of your receipt of this Notice, with the implementation of the provisions of the Contract, in accordance with the terms of the Contract Agreement, including the Conditions of Contract, Specifications, and Drawings. Please acknowledge your receipt and acceptance of this Notice by signing both copies thereof in the space provided below. Keep one copy and return the other to us. Very truly yours, LORES I acknowledge receipt of this Notice on i\e. u1 aoll NameandSignatureofContractor,sRepresenta,,u".ffi.,,u Position i o.t c) DPWH.INFR.52.2O16 Page 1 of 1 - Depaftment of Public Work and Highways (DPWH) Contract ID: 19HA0057 Contract Name: Constructionllmprovement of Access Road leading to Declared Tourism Destinations - Jct. TCSR Poblacion I - Poblacion II Road leading to World War II Shelters, Heritage Houses and Cawasan Falls, Sikatuna, Bohol Project ID: P00330532VS Location of the Contract: Sikatuna, Bohol Republic of the Philippines DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS BOHOL FIRST DISTRICT ENGITTIEERING OFFTCE REGIONAL OFFICE VII Tagbilaran Gty, Bohol - lDPuItt B0H0L tSI cF n , [!us$gd] (oewlnla NOTICE TO PROCEED July 23, 2019 - Mr, ALFONSO L. NAZARENO Proprietor GAIL Construction and Supply Sta. Cruz, Calape Bohol Dear Sir: Since the attached Contract Agreement with you for the above stated Contract has been approved, we hereby instruct you to proceed, effective upon the date of your receipt of this Notice, with the implementation of the provisions of the Contract, in accordance with the terms of the Contract Agreement, including the Conditions of Contract, Specifications, and Drawings. Plegse acknowledge your receipt and acceptance of this Notice by signing both copies thereof in the space provided below. Keep one copy and return the other to us. Very truly yours, I acknowledge receipt of this Notice on ,hlU \to ,1011 Name and Signature of Contractor's Representative: Position DPWH.INFR-52.2016 Page 1 of I fl- . Department of Public Work and Highways (DPWH) Contract ID: 19HA0058
Recommended publications
  • TAKING ACTION in ASIAN CITIES Poverty Reduction and Environmental Management
    Poverty reduction and environmental management: TAKING ACTION IN ASIAN CITIES Poverty reduction and environmental management: TAKING ACTION IN ASIAN CITIES Copyright - Engr. Maria Nenita R. Chiu, Municipal Planning and Development Coordinator, Municipality of Maribojoc ecoBUDGET Trademark is registered by ICLEI European Secretariat GmbH - Ms. Amor Maria J. Vistal, Executive Assistant to the Municipal Mayor, Municipality of Maribojoc - Engr. Joseph R. Anania, Municipal Planning and Development Coordinator, Municipality of Pilar Disclaimer - Engr. Ednardo A. Avenido, Municipal Planning and Development Coordinator, Municipality of Talibon This publication has been produced with the financial assistance of the European - Ms. Joannevit R. Avenido, Municipal Planning and Development Office Staff, Municipality of Talibon Union. The contents of this document are the sole products of Realising DReAMS for - Engr. Noel. C Mendaǹa, Municipal Planning and Development Coordinator, Municipality of Tubigon South and Southeast Asian Local Authorities and can under no circumstances be - Mrs. Yolanda L. Labella, Municipal Agriculturist, Municipality of Tubigon regarded as reflecting the position of the European Union. - Ms. Rita Amor M. Narvasa, Planning Officer, Municipality of Tubigon European Commission Acknowledgement - Hon. Erico B. Aumentado (Deceased) Governor (2007 to 2010), Province of Bohol This project is funded by the European Union - Hon. Edgardo M. Chatto, Governor (2010 to Present), Province of Bohol - Hon. Concepcion O. Lim, Vice-Governor, Province of Bohol Visibility of funding - Hon. Abeleon R. Damalerio, Board Member and Project Senior Officer, Province of Bohol The Realising DReAMS project has been supported by the European Union Directorate-General - Ms. Coleen R. Montalba, Project Finance Officer, DReAMS Project Management Office (Bohol) - Mr. Anthony C.
    [Show full text]
  • Part I ABATAN WATERSHED CHARACTERIZATION REPORT
    Part I [Type text] Page 0 Abatan Watershed Characterization Report and Integrated Watershed Management Plan September 2010 Part I ABATAN WATERSHED CHARACTERIZATION REPORT I. INTRODUCTION AND BACKGROUND INFORMATION The Abatan Watershed is the third largest of the 11 major watershed networks that support water needs and other requirements of the island province of Bohol. It covers some 38,628 hectares or close to 9% of the province‟s total land area. It has three distinct land divisions, coastal, lowland and upland. The coastal areas are marine and not along the most of the river. Table 1. Municipalities and their barangays comprising the Abatan Watershed Municipality Barangay Percent Angilan, Bantolinao, Bicahan, Bitaugan, Bungahan, Can-omay, Canlaas, 1. Antequera Cansibuan, Celing, Danao, Danicop, Mag-aso, Poblacion, Quinapon-an, 100 Santo Rosario, Tabuan, Tagubaas, Tupas, Ubojan, Viga, and Villa Aurora Baucan Norte, Baucan Sur, Boctol, Boyog Sur, Cabad, Candasig, Cantalid, Cantomimbo, Datag Norte, Datag Sur, Del Carmen Este, Del Carmen Norte, 2. Balilihan 71 Del Carmen Sur, Del Carmen Weste, Dorol, Haguilanan Grande, Magsija, Maslog, Sagasa, Sal-ing, San Isidro, and San Roque 3. Calape Cabayugan, Sampoangon, and Sohoton 9 Alegria, Ambuan, Bongbong, Candumayao, Causwagan, Haguilanan, 4. Catigbian Libertad Sur, Mantasida, Poblacion, Poblacion Weste, Rizal, and 54 Sinakayanan 5. Clarin Cabog, Danahao, and Tubod 12 Anislag, Canangca-an, Canapnapan, Cancatac, Pandol, Poblacion, and 6. Corella 88 Tanday Fatima, Loreto, Lourdes, Malayo Norte, Malayo Sur, Monserrat, New 7. Cortes Lourdes, Patrocinio, Poblacion, Rosario, Salvador, San Roque, and Upper de 93 la Paz 8. Loon Campatud 1 9. Maribojoc Agahay, Aliguay, Busao, Cabawan, Lincod, San Roque, and Toril 39 10.
    [Show full text]
  • PHL-OCHA-Bohol Barangay 19Oct2013
    Philippines: Bohol Sag Cordoba Sagasa Lapu-Lapu City Banacon San Fernando Naga City Jagoliao Mahanay Mahanay Gaus Alumar Nasingin Pandanon Pinamgo Maomawan Handumon Busalian Jandayan Norte Suba Jandayan Sur Malingin Western Cabul-an San Francisco Butan Eastern Cabul-an Bagacay Tulang Poblacion Poblacion Puerto San Pedro Tugas Taytay Burgos Tanghaligue San Jose Lipata Saguise Salog Santo Niño Poblacion Carlos P. Garcia San Isidro San Jose San Pedro Tugas Saguise Nueva Estrella Tuboran Lapinig Corte Baud Cangmundo Balintawak Santo Niño San Carlos Poblacion Tilmobo Carcar Bonbonon Cuaming Bien Unido Mandawa Campao Occidental Rizal San Jose San Agustin Nueva Esperanza Campamanog San Vicente Tugnao Santo Rosario Villa Milagrosa Canmangao Bayog Buyog Sikatuna Jetafe Liberty Cruz Campao Oriental Zamora Pres. Carlos P. Garcia Kabangkalan Pangpang San Roque Aguining Asinan Cantores La Victoria Cabasakan Tagum Norte Bogo Poblacion Hunan Cambus-Oc Poblacion Bago Sweetland Basiao Bonotbonot Talibon San Vicente Tagum Sur Achila Mocaboc Island Hambongan Rufo Hill Bantuan Guinobatan Humayhumay Santo Niño Bato Magsaysay Mabuhay Cabigohan Sentinila Lawis Kinan-Oan Popoo Cambuhat Overland Lusong Bugang Cangawa Cantuba Soom Tapon Tapal Hinlayagan Ilaud Baud Camambugan Poblacion Bagongbanwa Baluarte Santo Tomas La Union San Isidro Ondol Fatima Dait Bugaong Fatima Lubang Catoogan Katarungan San Isidro Lapacan Sur Nueva Granada Hinlayagan Ilaya Union Merryland Cantomugcad Puting Bato Tuboran Casate Tipolo Saa Dait Sur Cawag Trinidad Banlasan Manuel M. Roxas
    [Show full text]
  • Department of Public Works and Highways Bohol 1St District Engineering Office Final Annual Procurement Plan for FY 2020
    Department of Public Works and Highways Bohol 1st District Engineering Office Final Annual Procurement Plan for FY 2020 Code (PAP) Procurement PMO/ Is this an Early Mode of Procurement Schedule for Each Procurement Activity Source of Funds Estimated Budget (PhP) Remarks Project End-User Procurement (brief description of Project) Activity? Advertisement/ Submission/O Notice of Contract Total MOOE CO (Yes/No) Posting of pening of Bids Award Signing IB/REI Construction of Multi-Purpose Building, (Municpal Hall), 2/4/2020 - - Municipality of Albuquerque, Bohol DEO NO Competitive Bidding 2/24/2020 24/02/2020 02/03/2020 11/03/2020 GoP 49,500,000.00 49,500,000.00 To be returned 1/31/2020 - - Construction of Baclayon Seawall, Poblacion, Baclayon, Bohol DEO NO Competitive Bidding 2/19/2020 19/02/2020 26/02/2020 06/03/2020 GoP 2,970,000.00 2,970,000.00 To be returned Preventive Maintenance - Jct. (TER) Dauis-Panglao Road - 11/8/2019 - 310102100528000 K0006+651 - K0007+000 DEO YES Competitive Bidding 11/27/2019 27/11/2019 13/01/2020 22/01/2020 GoP 9,226,880.00 9,226,880.00 Asphalt Overlay Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones - La Paz (Cortes) - Cabaguan- Lourdes-Anislag (Corella) Road in support of the Agribusiness 11/15/2019 - 300204100168000 Industry, Cortes, Bohol DEO YES Competitive Bidding 12/4/2019 04/12/2019 14/01/2020 23/01/2020 GoP 24,500,000.00 24,500,000.00 Concreting of Road Construction/Improvement of Access Roads leading to Declared Tourism Destinations - Jct.
    [Show full text]
  • The Hydrology of Central Bohol
    NORGES VASSDRAGS- OG ELEKTRISITETSVESEN VASSD RAGSDIREKTORATET HYDROLOGISK AVDELING THE HYDROLOGY OF CENTRAL BOHOL The Philippines A field and desk study OPPDRAGSRAPPORT 6 - 81 NORGES VASSDRAGS- OG ENERGIVERK BIBLIOTEK OPPDRAGSRI~PPORT 6-81 Rapportens tittel: Dato: 1981-05-20 THE HYDROLOGY OF CENTRAL BOHOL. Rapporten er: Apen The phi lippines. Opplag: 50 A field and desk study. Saksbehandler/Forfatter: Leif-Egil LØrum EDB-kontoret Oppdragsgiver: NORCONSULT A. S. Sammendrag: Hydrologien i de sentrale deler av Bohol-provinsen på Filippinene er vurdert på grunnlag av feltbefaring og analyse av allerede publiserte nedbør- og avløpsdata. Datagrunnlaget for estimering av hydrologiske parametre til bruk ved forprosjektstudie av vannkraftverk i provinsen er relativt spinkelt. Middelavløp, flomstørrelser og lavvannsverdier er overført til prosjektområdene ved hjelp aven antatt sammenheng med nedbørfeltenes størrelse og beliggenhet. Varighetskurven fra den antatt beste måle• stasjonen er foreløpig valgt som representativ for de sentrale deler av Bohol. En vesentlig kompliserende faktor er de karst-hydrologiske problemene i området. Eksistensen av drenering i undergrunnen er åpenbar enkelte steder. Det topografiske og hydrologiske vannskillet stemmer ikke overens for nedslagsfeltet til Bilar River. En reduksjon til effektivt drenering sa real er antydet. En forsvarlig analyse av hydrologien i området krever at supplerende målestasjoner opprettes så snart som mulig. Enkelte eksisterende måle• stasjoner kan dessuten forbedres. Flere alternativer for
    [Show full text]
  • Annual Report 2013-2014
    Annual Report 2013-2014 Participatory Research, Organization of Communities and Education Towards Struggle for Self- Reliance (PROCESS)-Bohol, Inc. Purok 5, Esabo Road, Tiptip District, Tagbilaran City 6300 Bohol, Philippines Tel. Nos. (038) 416-0067, (038) 510-8255 Email: [email protected] Webpage: http://www.processbohol.org Participatory Research, Organization of Communities and Education towards Struggle for Self-Reliance (PROCESS)-Bohol, Inc. Purok 5, Esabo Road, Tiptip District, TagbilaranCity 6300 Bohol, Philippines Tel. Nos. (038) 416-0067, (038) 510-8255 Email: [email protected] Webpage: http://www.processbohol.org annual report (FY 2013-2014) INTRODUCTION The Participatory Research, Organization of Communities and Education towards Struggle for Self-reliance (PROCESS) is a non-stock, non-profit, non-government organization established on March 2, 1982 in Manila with the aim of creatively animating the formation of strong and autonomous people’s organizations and building up their capabilities for participatory and self-reliant development. Since its establishment, PROCESS has been involved in the organization and empowerment of fishing and farming communities in the upland and coastal areas of Northern Luzon, Western Visayas and Bohol. PROCESS started its operation in Bohol in March 1985 in the coastal Municipality of Tubigon. Since then, in partnership with various stakeholders, it continuously facilitated the formation and strengthening of people’s organizations and self-help groups of fisherfolk, farmers, urban poor, women and children province-wide. On March 2, 1998, PROCESS-Bohol, Inc. acquired it juridical personality as independent from its Head Office in Manila on the strength of its registration with the Securities and Exchange Commission (SEC).
    [Show full text]
  • Province/City Nutrition Action Officer Educational Position/ Office/Agency Contact Details Name Background Desig
    Republic of the Philippines Department of Health National Nutrition Council Region VII NUTRITION ACTION OFFICERS DIRECTORY BOHOL PROVINCE PROVINCE/CITY NUTRITION ACTION OFFICER EDUCATIONAL POSITION/ OFFICE/AGENCY CONTACT DETAILS NAME BACKGROUND DESIG. ADDRESS OFFICE BOHOL MR. LARRY M. PAMUGAS PNAO City Agriculture Office, Bohol Province (038) 501-7535 1st District ALBUQUERQUE MS. GEMMALIZA Y. BONGAIS MNAO Office of the Mayor , Albuquerque, Bohol 539-9031/ 539-9080 ANTEQUERA MS. TARCISIA R. BALUCA MNAO Office of the Mayor, Antequera, Bohol 506-5007 BACLAYON DR. FILOMENA D. TALO MNAO Office of the Mayor, Baclayon, Bohol 540-9280/ 411-3459(fax) BALILIHAN MRS. DAVELINDA M. CHATTO MNAO Office of the Mayor, Balilihan, Bohol 411-2338 loc. 105 CALAPE MRS. ELIZABETH M. CORTES MNAO Office of the Mayor, Calape, Bohol 507-9320/ 507-9085(fax) CATIGBIAN MS. MYRA C. MADRANGCA MNAO Office of the Mayor, Catigbian, Bohol 411-2902 CORELLA DR. ROGELIO G. FELIAS Doctor of Medicine MNAO Municipal Health Office, Corella, Bohol 235-3568/ 411-2784(fax) CORTES MS. MARIENNE B. UY Doctor of Medicine MNAO Office of the Mayor, Cortes, Bohol 503-9083 DAUIS DR. JONI L. CO Doctor of Medicine MNAO Municipal Health Office, Dauis, Bohol 411-4745 LOON DR. MA. VICTORIA D. LAMAPARAS Doctor of Medicine MNAO Municipal Health Office, Loon, Bohol 505-8080/ 505-9131(fax) MARIBOJOC DR. REY PERPETUO G. BELDEROL Doctor of Medicine MNAO Municipal Health Office, Maribojoc, Bohol 500-0557 PANGLAO DR. JULITA L. COGO Doctor of Medicine MNAO Municipal Health Office , Panglao, Bohol 502-8038 SIKATUNA DR. PAZ MANIWANG Doctor of Medicine MNAO Office of the Mayor, Sikatuna, Bohol 541-0020 TAGBILARAN CITY DR.
    [Show full text]
  • SOIL FERTILITY MAP ( Key Rice Areas ) PROVINCE of BOHOL
    123°40' 124°0' 124°20' 124°40' CEBU Hilutangan Channel R E P U B L I C O F T H E P H I L I P P I N E S DEPARTMENTDEPARTMENT OFOF AGRICULTUREAGRICULTURE BUREAU OF SOILS AND Canigao Channel WATER MANAGEMENT Elliptical Road Cor. Visayas Ave., Diliman, Quezon City SOIL FERTILITY MAP ( Key Rice Areas ) PROVINCE OF BOHOL ° Getafe Talibon ! ! SCALE 1:110,000 Bien Unido ! 0 2 4 6 8 10 Kilometers Projection : Transverse Mercator President Carlos P. Garcia ! Datum : PRS 1992 DISCLAIMER : All political boundaries are not authoritative Cebu Strait Buenavista Trinidad ! ! LOCATION MAP Carcar Bay Ubay NEGROS OCC. ! 10°40' CEBU CAMOTES SEA Tañon Strait LEYTE Cansaga Bay LUZON 15°0' CEBU LEYTE Inabanga ! Carcar Bay 10°0' Badian Bay BOHOL Cogton Bay 10°0' VISAYAS Panglao Bay 10°0' 10°0' 9°20' BOHOL SEA SIQUIJOR Maria Bay CAMIGUIN MINDANAO San Miguel 5°0' ! 124°0' 124°40' 120°0' 125°0' Clarin ! Tubigon Cambugsay ! Dam Danao ^ Cabulao Bay Sagbayan ! Alicia ! Dagohoy Calape ! ! Calape Bay Mabini ! San Isidro ! Catigbian Cebu Strait ! Cogton Bay Pilar ! Carmen Pilar Dam ! Candijay ! Sierra Bullones ! Loon ! Batuan ! Antequera ! Guindulman ! Balilihan ! Anda ! Maribojoc ! Cortes ! Duero Bilar ! Sevilla ! Maribojoc Bay ! Corella Sikatuna Guindulman Bay ! ! 9°40' 9°40' LEGEND AREA Jagna ! MAPPING UNIT DESCRIPTION ha % Tagbilaran \ Loboc 1,691 4.78 ! Low 1,791 5.06 Dauis 5,673 16.03 ! Baclayon ! Moderately Low Garcia Hernandez 19,447 54.96 ! Alburquerque Valencia Bohol 365 1.03 ! Dimiao ! Moderately High ! 6,205 17.54 Loay ! -- Lila High ! 213 0.60 Panglao T O T A L 35,386 100.00 ! Paddy Irrigated Paddy Non Irrigated Area estimated based on field survey, other information from DA-RFO's, MA's, NIA Service Area, NAMRIA Land Cover (2010), and BSWM Land Use System Map Panglao Bay CONVENTIONAL SIGNS MISCELLANEOUS INFORMATION ROADS BOUNDARY HYDROLOGY SOURCES OF INFORMATION : Topographic information taken from NAMRIA Topographic Map at a scale of 1:50,000.
    [Show full text]
  • Development and Management of Inter-Municipal Water Supply System of BIAD 1 Phase One (1)
    Republic of the Philippines PROVINCE OF BOHOL City of Tagbilaran COMPREHENSIVE PROJECT PROFILE I. PROJECT DESCRIPTION 1. PROJECT TITLE : Development and Management of Inter-Municipal Water Supply System of BIAD 1 Phase One (1) 2. PROJECT TYPE : Capital Forming Forming 3. PROJECT COMPONENTS a) Clustering of Municipalities particularly the towns of Cortes, Dauis Maribojoc, Panglao and Tagbilaran City in the Province of Bohol b) Laying of Water Pipeline parallel to the circumferential road and other major thoroughfares passing in particular through the BIAD-1 municipalities of Cortes, Dauis, Maribojoc, Panglao and Tagbilaran City in the Province of Bohol c) Installation of one sump each for the municipalities of Cortes, Dauis, Maribojoc, Panglao and Tagbilaran City with the corresponding accessories d) Construction of an appropriate treatment plant that will be utilized in the purification process of surface water drawn from the Abatan River which will be located in Maribojoc. c) Construction of one appropriate clean water reservoir including chlorination facilities to be utilized as storage facility for treated surface water drawn from the Abatan River in Maribojoc. 4. PROJECT LOCATION/ AREA COVERAGE The proposed water supply project using surface water source is hoped to be eventually serviceable in all towns comprising BIAD-1, namely: Alburquerque, Antequera, Baclayon, Balilihan, Corella, Cortes, Dauis, Loay, Lila, Loboc, Maribojoc, Panglao, Sevilla, Sikatuna and Tagbilaran City. However, since this project is specifically intended for the first phase of the Inter-Municipal Water Supply System which covers the whole coverage area of BIAD 1 comprising fifteen municipalities – the project will only cover the four (4) municipalities and one city.
    [Show full text]
  • Province, City, Municipality Total and Barangay Population BOHOL 1,255,128 ALBURQUERQUE 9,921 Bahi 787 Basacdacu 759 Cantiguib 5
    2010 Census of Population and Housing Bohol Total Population by Province, City, Municipality and Barangay: as of May 1, 2010 Province, City, Municipality Total and Barangay Population BOHOL 1,255,128 ALBURQUERQUE 9,921 Bahi 787 Basacdacu 759 Cantiguib 555 Dangay 798 East Poblacion 1,829 Ponong 1,121 San Agustin 526 Santa Filomena 911 Tagbuane 888 Toril 706 West Poblacion 1,041 ALICIA 22,285 Cabatang 675 Cagongcagong 423 Cambaol 1,087 Cayacay 1,713 Del Monte 806 Katipunan 2,230 La Hacienda 3,710 Mahayag 687 Napo 1,255 Pagahat 586 Poblacion (Calingganay) 4,064 Progreso 1,019 Putlongcam 1,578 Sudlon (Omhor) 648 Untaga 1,804 ANDA 16,909 Almaria 392 Bacong 2,289 Badiang 1,277 National Statistics Office 1 2010 Census of Population and Housing Bohol Total Population by Province, City, Municipality and Barangay: as of May 1, 2010 Province, City, Municipality Total and Barangay Population Buenasuerte 398 Candabong 2,297 Casica 406 Katipunan 503 Linawan 987 Lundag 1,029 Poblacion 1,295 Santa Cruz 1,123 Suba 1,125 Talisay 1,048 Tanod 487 Tawid 825 Virgen 1,428 ANTEQUERA 14,481 Angilan 1,012 Bantolinao 1,226 Bicahan 783 Bitaugan 591 Bungahan 744 Canlaas 736 Cansibuan 512 Can-omay 721 Celing 671 Danao 453 Danicop 576 Mag-aso 434 Poblacion 1,332 Quinapon-an 278 Santo Rosario 475 Tabuan 584 Tagubaas 386 Tupas 935 Ubojan 529 Viga 614 Villa Aurora (Canoc-oc) 889 National Statistics Office 2 2010 Census of Population and Housing Bohol Total Population by Province, City, Municipality and Barangay: as of May 1, 2010 Province, City, Municipality Total and
    [Show full text]
  • MA005M Infrastructure Bohol V
    (! (! (! (! (! (! (! (! (! (! (! (! (! (! ! (! (! ( (! (! (! ! (! ( (! (! (! (! (! (! (! ! ! ((! ( (! (! (! (! (! (! (! (! (! (! (! (! (! (! (! (! (! (! (! (! (! (! (! (! (! (! (! ⛳☍ (! (! (! ! ( (! (! (! (! (! ! ! (! ( ( (! (! (! (! (! MA005M-v01 (! (! (! (! Calawisan (! Ibabao ! San Dapitan (! Agu(s Marigondon (! Tabunok Cogon (!(! (! Roque Pilipog (! (! Basbas (! (!Gabi (! Suba BALIRONG Lawaan (! Bangbang (! (! ! San ! ( Tangke (! (! Mohon ( Day-asMigu(!el Cordova (! (! Minglanilla Talisay Alegria (! (! (! P(!ooc Dumlog (! Naga Villa Solana Subdivision (! ! Coro(!na ( del Biasong City mar Subdivision Colon (! ´ Cebu (! Guilao Naga (! Tina-an Banacon ! (! 0 ( 0 Mahanay 0 (! 0 San 0 0 (! Fernando Philippines . 0 San 0 (! 0 Fernando 5 (! Typhoon Haiyan (Yolanda) 2 1 Tugas 1 Jetafe (! Infrastructure - Bohol (! (! (! Bien Unido Naupa (! Lapinig Bonbonon (as of 19 Nov-2013) (! (! ! ( (! Talibon (! Bancal Pitogo (! (! Bien President Carlos Map shows Bohol. Infrastructure, major Jetafe Talibon Polestico Garcia (! Pangpang (! Unido (! Cangmangao transport terminals are shown for (! Aguining (! (! reference. Please be advised that Tagum Esmino Sur (! datasets may not be complete. Buenavista Trinidad (! (! (! Basiao Camanbugan Ubay Tapal (! (! (! (! Tipolo (! Trinidad Guinobatan (! (! Sinandigan (! (! (! Buenavista Cahoring Union Inabanga (! Dita (! Bugang (! (! (! (! San Lumangog (! Miguel Ubay Cagting Inabanga (! (! (! San City Miguel 0 !( 0 Clarin Bacani 0 (! (! Town 0 (! 0 Tubigon (! Danao 0 . (! Candajec (! !( 0 Village 0 0 San Danao 0 0
    [Show full text]
  • Integrated Community-Based Eco-Tourism Development
    Republic of the Philippines Province of Bohol City of Tagbilaran COMPREHENSIVE PROJECT PROFILE I. PROJECT DESCRIPTION 1. Project Title: INTEGRATED COMMUNITY-BASED ECOTOURISM DEVELOPMENT 2. Project Type : Capital Forming and Technical Assistance 3. Project Components: 3.1 INCLUSION OF CORELLA, SEVILLA AND SIKATUNA IN THE ABATAN RIVER COMMUNITY LIFE TOUR Expanding the geographical scope of the existing Abatan River Community Life Tour facility under the Abatan River Development Management Council Comprising the alliance of the Municipal Local Government Units (LGUs) of Antequera, Balilihan, Catigbian, Cortes and Maribojoc with the inclusion of the LGUs of Corella, Sevilla and Sikatuna for ecotourism asset complementation. Abatan River Community Life Tour 3.1.1 Project Component Brief The integrated tourism project is conceptualized through the Bohol Integrated Area Development (BIAD) framework which adheres to the principle of inter-LGU clustering taking into consideration geographic proximity to each other, shared natural and agricultural resource base, local economy and industry, among others. The BIAD system or framework serves as the structural and operational umbrella from which priority high impact projects for the Bohol Province are identified. The BIAD I Integrated Community-Based Ecotourism Development has also been conceptualized as a strategy to address high incidence of poverty among the communities in BIAD I. Such kind of development has also been considering the fact that the area is teeming with tourism potential. The initiative is consistent with the province’s vision as ecotourism destination in the country. 3.1.2 Project Component Location The integrated project is located within the Barangays of the respective Municipalities of Antequera, Balilihan, Cortes, Corella, Maribojoc, Sevilla and Sikatuna in the province of Bohol.
    [Show full text]