REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region July 2017

No. Company Name and Address Project Name Date Approved Bess Cruz Ramos Proposed Two (2) Storey 3-Units Apartment 1 3-Jul-2017 Magdalene St., Sta. Teresita Vill., , City Magdalene St., Sta. Teresita Vill., Malanday, Marikina City Socorro N. Arellano Proposed 2nd Floor Extension Residence 2 3-Jul-2017 Lot 8-B San Diego St., Brgy. Malanday, Marikian City Lot 8-B San Diego St., Brgy. Malanday, Marikian City Josephine Galilea Noypi Barbershop (Interior Renovation) 3 Unit 112 Cordova Tower Marquinton Residence, Sto. Niño, Unit 112 Cordova Tower Marquinton Residence, Sto. Niño, 3-Jul-2017 Marikina City Marikina City Remigio C. Evangelista Renovation of Two (2) Storey Residence 4 3-Jul-2017 47 Shoe Ave., Concepcion I, Marikina City 47 Shoe Ave., Concepcion I, Marikina City Renovation of Good Vision Optical (Store) 60 sq.m Floor Area Felicidad D. Sindiong 5 Level 5 Unit E-513 SM Mega Mall, , 3-Jul-2017 #23 Galaxy St., Bel-air Village, City City Alvin Baes Renovation of Two (2) Storey Residence 6 3-Jul-2017 #22 A. De Guzman St., Parang, Marikina City #22 A. De Guzman St., Parang, Marikina City Aurora Lim Two (2) Storey Residence for Demolition 7 3-Jul-2017 1443 A Craig St., Sampaloc, 1441 & 1443 Craig St., Sampaloc, Manila Enrique Lalangan Two (2) Storey 2-Door Apartment 8 L12 B36 Jasmin St., Ruby Park, Victoria Homes, , L12 B36 Jasmin St., Ruby Park, Victoria Homes, Tunasan, 3-Jul-2017 City Muntinlupa City Yolanda E. Paje Two (2) Storey Residence 9 3-Jul-2017 L6 B6 Ph3 Mutual Homes, Putatan, Muntinlupa City L6 B6 Ph3 Mutual Homes, Putatan, Muntinlupa City Dobbery Convenience Store-Renovation Zhongwei Yu 10 Unit No. 5 G/F The Gramercy Residences, Kalayaan Ave., cor. 3-Jul-2017 Masangkay Piedad St., Crown Plaza, , Manila Salamanca St., Century City, Brgy. Poblacion, Makati City Andres V. Austria Proposed Additional 2nd Floor 4-Units Apartment 11 3-Jul-2017 B1 L3 Mani St., Manuela Homes, Talon Las Piñas City B1 L3 Mani St., Manuela Homes, Talon Las Piñas City Mercedes M. Javines Two (2) Storey Residence 12 B2 Lot 4 Yellow St., Veraville Villa Grande Classic, BFRV, B11 Lot 6 J. Barrios St., BF Resort Village, Talon Dos, Las Piñas 3-Jul-2017 Las Piñas City City Ernesto T. Dizon Proposed Two (2)Storey Residence 13 3-Jul-2017 226 D. Teresa St., Sta. Mesa, Manila #35 Macopa St., Manuela IV-A, Pamplona 3, Las Piñas City

Page 1 of 47

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region July 2017

No. Company Name and Address Project Name Date Approved William /Bernardita Punayo Proposed Two (2) Storey Duplex Residence 14 No. 15 St. Benedict St., St. Joseph Subd., Pulanglupa II, Las No. 15 St. Benedict St., St. Joseph Subd., Pulanglupa II, Las 3-Jul-2017 Piñas City Piñas City Renovation-Vionic Boutique Gifford T. Chu 15 Space No. 242 MM Second Floor, SM Business Central Park, Bay 3-Jul-2017 #23 Guerilla St., Sto. Niño, Marikina City City, City Renovation-Hush Puppies Boutique Gifford T. Chu 16 Space No. 230 MM Second Floor, SM Business Central Park, Bay 3-Jul-2017 #23 Guerilla St., Sto. Niño, Marikina City City, Pasay City Efmar Tumala Proposed One (1) Storey Warehouse 17 4-Jul-2017 15 Maryland St., Brgy. Pinagkaisahan, 253 Gexn. Luis St., Kaybihga, City Mary Anne B. Moriel Two (2) Storey House 18 4-Jul-2017 24 Balagtas St., Pamplona, Las Piñas City 24 Balagtas St., Pamplona, Las Piñas City Rameses P. Ylaya One (1) Storey Residential House 19 Lot 1 Blk. 4 Bautista St., cor. Gonio St., Panghulo, 4-Jul-2017 Lot 1 Blk. 4 Bautista St., cor. Gonio St., Panghulo, Malabon City City Aquilina R. Elutera One (1) Storey Chapel of Love of Jesus 20 4-Jul-2017 Beacon St., San Agustin, Malabon City Beacon St., San Agustin, Malabon City Rudy C. GesiteTien Shuei Phils. Trading Corp. Proposed Two (2) Storey Apartment Building 21 4-Jul-2017 167 Weast Riverside Quezon City Lot 1 Blk. 138 , Quezon City Oliver Isidro Two (2) Storey Residential with Deck 22 4-Jul-2017 Symaco Subd., Niugan, Malabon City Symaco Subd., Niugan, Malabon City PPI Holdings, Inc. Renovation of Pizza Hut Mall of Asia Outlet 23 4-Jul-2017 25/F Gateway Tower, Cubao, Quezon City G/F SM Mall of Asia, Pasay City Charito O. Crisostomo Proposed Construction of Two (2) Storey Residence 24 4-Jul-2017 #130 Doña Juana Subd., dampalit, Malabon City #130 Doña Juana Subd., dampalit, Malabon City Felix Y. Holifeña Two (2) Storey 2-Units Residential Building 25 Lot 27 & 29 B-16, Yokoyama St., Phase 4 BF Homes, Las Lot 27 & 29 B-16, Yokoyama St., Phase 4 BF Homes, Las Piñas 4-Jul-2017 Piñas City City Miguel R. Mendoza III Tribu Diwata Fire Exit Hallway & Main Entrance Renovation 26 4-Jul-2017 5347 Gen. Luna St., Poblacion, Makati City 5347 Gen. Luna St., Poblacion, Makati City

Page 2 of 47

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region July 2017

No. Company Name and Address Project Name Date Approved Nelia A. Baulis Proposed Renovation of Two (2) Storey Residence 27 4-Jul-2017 #888 Katihan Road, Poblacion, Muntinlupa City #888 Katihan Road, Poblacion, Muntinlupa City Ariel Figueroa/Robinson's Bank Corp. Proposed Robinson's Bank Muntinlupa Bayan (Fit-Out) 28 7/F Galeria Corporate Center, EDSA cor. Ortigas Ave., 6-Jul-2017 No. 52 National Rd. Brgy. Putatan, Muntinlupa City Quezon City Leonila C. Garcia Proposed Additional Second Floor w/ Mezzanine Residential Bldg. 29 B4-B L8 Aldawa St., Cuti Homes Subd., Manuyo 1, Las Piñas 6-Jul-2017 B4-B L8 Aldawa St., Cuti Homes Subd., Manuyo 1, Las Piñas City City Luisito Sagun Proposed Two (2) Storey Residential Bldg. 30 B22 L1 San Emilio St., Metrocor Homes- B, Talon V, Las B22 L1 San Emilio St., Metrocor Homes- B, Talon V, Las Piñas 6-Jul-2017 Piñas City City Ma. Carmen Ziegler Proposed Two (2) Storey Residential Bldg. 31 6-Jul-2017 B24 L1 Livorno St., Amore Portufino, Las Piñas City B24 L1 Livorno St., Amore Portufino, Las Piñas City Bibiano O. Reynoso IV Proposed Demolition of Two (2) Storey Residential Bldg. 32 6-Jul-2017 1377 A. Mabini St., , Manila 1377 A. Mabini St., Ermita, Manila Joseph J. Dungca Proposed Demolition of Old House Two (2) Storey Residential 33 6-Jul-2017 1823 Maria Natividad St., Sta. Cruz, Manila 1823 Maria Natividad St., Sta. Cruz, Manila Carmencita M. Santiago Proposed Demolition of Two (2) Storey Residential Bldg. 34 6-Jul-2017 Acacia cor. University Ave., Ayala , Muntinlupa City Acacia cor. University Ave., , Muntinlupa City Proposed Renovation of RCBC Macapagal Avenue Business Francis G. Reyes Center 35 6-Jul-2017 6819 RCBC Plaza Ayala Ave., Makati City Double Dragon Center, Macapagal Ave., cor. EDSA Ext., Pasay City Mark Christopher Kua/Pismo Digital Lifestyle Inc. Proposed The Loop (Fit-Out) 36 6-Jul-2017 2F Cyberzone SM Mall of Asia, Pasay City 2F Cyberzone SM Mall of Asia, Pasay City Jerome T. Go Alfamart Camarin New Construction of Alfamart 37 SM Hypermart Imus Aguinaldo Highway, Anabu 1, Imus, 6-Jul-2017 No. 1890 Lt. Bunag St., Area B, Camarin, Caloocan City Proposed Two (2) Storey Multi Family Dwelling with Roof Deck Louciana Aniag Tomas 38 Purok 7, Dilain San Agustin Village, Brgy. Moonwalk, Parañaque 6-Jul-2017 61 Andrew St., Multinational Village, Parañaque City City

Page 3 of 47

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region July 2017

No. Company Name and Address Project Name Date Approved Miguel M. Lopez Proposed Two (2) Storey Duplex 39 6-Jul-2017 55 Sunflower Rd., Pilar Village, Las Piñas City 55 Sunflower Rd., Pilar Village, Las Piñas City Robert Palomo Proposed Renovation of Picture Picture 40 6-Jul-2017 #83 Pinagtipunan St. , Mandaluyong City 3F Starmall Shaw, EDSA, Mandaluyong City Aljon De Guzman Repair of Residential Property 41 6-Jul-2017 1114 B & C Sulu St. Sta. Cruz, Manila 1114 B & C Sulu St. Sta. Cruz, Manila Christine Bagatsing Renovation of Xaria Store 42 4/F Madison Galleries, Lifestyle Mall, Don Jesus Blvd., 4/F Madison Galleries, Lifestyle Mall, Don Jesus Blvd., Alabang 6-Jul-2017 Alabang Hills, Cupang, Muntinlupa City Hills, Cupang, Muntinlupa City Cheryl Anne Madarang Proposed Two 92) Storey with Deck Residence 43 6-Jul-2017 2315 Rubi St., San Andres Bukid, Manila 2315 Rubi St., San Andres Bukid, Manila Francis Medina Proposed Renovation of Seven Eleven 44 6-Jul-2017 España Blvd., cor. Eloisa St., Sampaloc, Manila España Blvd., cor. Eloisa St., Sampaloc, Manila Proposed Façade and Wall Renovation (Single Storey LICA Management, Inc./Susan Destreza 45 Commercial Bldg., with Mezzanine) 6-Jul-2017 2326 Don Chino Roces Ext., Brgy. Magallanes, Makati City 2326 Don Chino Roces Ext., Brgy. Magallanes, Makati City Alden T. De Guia Proposed Two (2) Storey Residential 46 6-Jul-2017 620 Francisco St., Tondo, Manila 620 Francisco St., Tondo, Manila Proposed One (1) Storey Duplex Kingdom Hall of Jehovas Edgardo E. Quarte/Kingdom Halls for Jehovas Witnesses 47 Witnesses 6-Jul-2017 186 Rosevelt Ave., SFDM, Quezon City P. Burgos St., Plaza Rizal, San Jose, City Happy Living Corp/Katherine Yao Santos Proposed Renovation of Warehouse and Showroom 48 g/F Mezz., La Fuerza Compound 2241 Don Chino Roces g/F Mezz., La Fuerza Compound 2241 Don Chino Roces Ave., 6-Jul-2017 Ave., Brgy. Pio Del Pilar, Makati City Brgy. Pio Del Pilar, Makati City Geraldine G. Dela Rosa Proposed Façade Renovation 49 6-Jul-2017 6538 E. Ramos St., Brgy. Pio Del Pilar, Makati City 6538 E. Ramos St., Brgy. Pio Del Pilar, Makati City Leticia San Diego Proposed Second Floor Additional 50 6-Jul-2017 308 San Rafael St., cor. Legarda St., Quiapo, Manila 308 San Rafael St., cor. Legarda St., Quiapo, Manila Rosemarie Dy Lim Interior Renovation of Pet Express 51 2nd Floor Unit #3401 & 3348, Festival Mall, Alabang, 2nd Floor Unit #3401 & 3348, Festival Mall, Alabang, Muntinlupa 6-Jul-2017 Muntinlupa City City

Page 4 of 47

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region July 2017

No. Company Name and Address Project Name Date Approved Renato Reyes Proposed Two (2) Storey 3-unit Residence 52 6-Jul-2017 99 J.P. Rizal St., San Roque, Marikina City 99 J.P. Rizal St., San Roque, Marikina City Mark Lester & Joan Yap Proposed Duplex & Shop 53 6-Jul-2017 L-52 B-8 Beetlenut St., San Roque, Marikina City L-52 B-8 Beetlenut St., San Roque, Marikina City Kenneth Carredo Nuat Thai Foot & Body Massage Renovation 54 6-Jul-2017 Aviida Ayala-Alabang Zapote Rd., Muntinlupa City Aviida Ayala-Alabang Zapote Rd., Muntinlupa City Merlinda B. Mira Two (2) Storey with Deck Residential 55 Blk. 6 Lot 25 Karisma Ville, Bautista St., Panghulo, Malabon 6-Jul-2017 Blk. 6 Lot 25 Karisma Ville, Bautista St., Panghulo, Malabon City City Maria Luz Cruz/ Happy Bowl Food Express, Inc. Renovation of Two (2) Storey Structure 56 6-Jul-2017 219 Wilson St., Greenhills, San Juan City Plaza Leon XIII cor. Calle Soliman, Tondo, Manila Teodulo D. Pangilinan Two (2) Storey Church with Mezzanine 57 6-Jul-2017 1737 Road 2 Bagong Sikat, Punta, Sta. Ana, Manila 1712 Road 3 Bagong Sikat, J. Posada, Punta, Sta. Ana, Manila Michael Angelo Earl Uy Renovation-Jollibee-Malabon 58 Gov. Pascual Ave., cor. Gen. Luna St., Concepcion, Malabon 6-Jul-2017 Gov. Pascual Ave., cor. Gen. Luna St., Concepcion, Malabon City City Christopher Angelo P. Barrameda, Orchards of the ABBA Renovation of One (1) Storey Day Care 59 Corp. Commerce Ave. cor. Ave., Filinvest Corporate City, 6-Jul-2017 LA GranjaEstate, Bukidnon, Mindanao Alabang, Muntinlupa City Masahiro Katsumata Office Fit-Out of MDS Circuit Technology, Inc. 60 901 Asian Star Bldg., Filinvest Corporate City, Alabang, 901 Asian Star Bldg., Filinvest Corporate City, Alabang, 6-Jul-2017 Muntinlupa City Muntinlupa City Richard Sy BDO -Puregold (Interior Renovation) 61 6-Jul-2017 Liwasang Kalayaan, Marikina Heights, Marikina City Liwasang Kalayaan, Marikina Heights, Marikina City Danilo De Guzman, Jr./Venrock Capital Ventures, Inc. Renovation of Express Wash Laundry Center 62 7-Jul-2017 672 Boni Ave., Mandaluyong City 672 Boni Ave., Mandaluyong City Diala/Ferdinand Tordesillas Proposed Buritos & Burger Restaurant 63 7-Jul-2017 CNB Circle Mall, Marikina Heights, Marikina City CNB Circle Mall, Marikina Heights, Marikina City Victorino Ferdinand R. Soliven Proposed Two (2) Storey Residence of Klara Marquez 64 3rd Floor V.V. Soliven Building 1, EDSA cor. Annapolis St., Block 1, Lot 2 Windsor Place Residences, Provident Village, St. 10-Jul-2017 Brgy. Greenhills San Juan City Mary's Ave., Brgy.Jesus Dela Peña, Marikina City

Page 5 of 47

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region July 2017

No. Company Name and Address Project Name Date Approved Terence Jay F. Bautista Two (2) Storey Residential 65 10-Jul-2017 #4 Celia I St., Bayan-Bayanan, Malabon City #4 Celia I St., Bayan-Bayanan, Malabon City Michele D. Lopez/Smarter Kiddo Enhancement & L.C Proposed Two (2) Storey with Deck 66 10-Jul-2017 29 Pearl St., Concepcion Uno, Marikina City 1 Yellow Bird St., Strip 70 Concepcion Uno, Marikina City Music Eleven (11) Plaza Family KTV Rooms and Restaurant Manuel S. Negado 67 Unit 3B Eurocrest Building. #126 Jupiter St., Bel-Air Village, 10-Jul-2017 57 Tamarind Road Forbes Park, Makati City Makati City Jorhememar H. Manabat Proposed Two (2) Storey Residence 68 10-Jul-2017 101 E. Santos St., Concepcion 1, Marikina City 101 E. Santos St., Concepcion 1, Marikina City Remedio D. Libarios One (1) Storey Residence 69 801 Vermillion St., Agrohomes Subd., Putatan, Muntinlupa 10-Jul-2017 801 Vermillion St., Agrohomes Subd., Putatan, Muntinlupa City City Oscar Ali N. Martinez Two (2) Storey Three (3) Door Apartment 70 10-Jul-2017 L38 B105 Katarungan Village, Poblacion, Muntinlupa City L38 B105 Katarungan Village, Poblacion, Muntinlupa City Proposed Interior Renovation of Existing Two (2) Storey, Five (5) Perlita Digal Unit Multi-Family Dwelling 71 #5, L-7, B-17 Austin St., Provident Village, J. Dela Peña, 10-Jul-2017 #5, L-7, B-17 Austin St., Provident Village, J. Dela Peña, Marikina Marikina City City Dra. Rebecca A. Wata Proposed One (1) Storey Showroom with Mezzanine 72 10-Jul-2017 239 A. Bonifacio Ave., Tañong, Marikina City 239 A. Bonifacio Ave., Tañong, Marikina City Proposed One (1) Storey with Roofdeck Residential Mildred L. Tiamzon 73 #6, Lot 26-B, Blk 3 Walnut St., Marikina East Subd., San Roque, 10-Jul-2017 #6 Walnut St., Marikina East Subd., San Roque, Marikina City Marikina City Julius Joseph Beredo Demolition of Two (2) Storey Residential House 74 10-Jul-2017 126 A. Lake St., San Juan City 126 A. Lake St., San Juan City Proposed One (1) Storey with Mezzanine Commercial for MT. Francisco Dela Cruz 75 Sinai Motors 10-Jul-2017 B3 L1 Queensville Subd., Bagombong, Caloocan City 2970 J. Abad Santos St., Manuguit Corp, Tondo Manila Sonia A. Gan Demolition of Two (2) Storey Old House 76 10-Jul-2017 1426 Bambang St., Sta.Cruz, Manila 1739 P. Guevarra St., Sta.Cruz, Manila

Page 6 of 47

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region July 2017

No. Company Name and Address Project Name Date Approved Constante D. Dulin Renovation of New World Diagnostics - Malabon Branch 77 11-Jul-2017 205 D. Tuzon St., Maharlika, Quezon City Unit 101 & 102 Mezzanine Floor, Panco Square Hammerhead Jeans Store Renovation Eileen V. Sia 78 2F Malabon Citisquare Mall, C4 Road cor. Dagat-Dagatan Rd., 11-Jul-2017 29 Tungsten St. Goldendale Subd., Tinajeros, Malabon City Malabon City Proposed One 1 Storey Bldg., Three (3) Door Apartment with Maria Teresa J. Camaya 79 Provision of 2nd Floor with Deck 11-Jul-2017 87 Monserat St., MBS, Caloocan City 87 Monserat St., MBS, Caloocan City Edna A. Espina Two (2) Storey Residential (Three (3) Door Apartments) 80 B-01, L-59, Mutual Homes, Phase 1 & 2, Brgy. Putatan, B-01, L-59, Mutual Homes, Phase 1 & 2, Brgy. Putatan, 11-Jul-2017 Muntinlupa City Muntinlupa City Emily Sy One (1) Storey Warehouse 81 11-Jul-2017 1408 Mayhaligue St., Sta.Cruz, Manila Tindalo St., Tondo Manila Rubilyn Valenzuela Two (2) Storey Residential Building 82 11-Jul-2017 1540 Villanueva 3, Almanza 1, Las Pinas City Lot 4F-2A, Villanueva Compound., Almanza 1, Las Piñas City Hong Lian Hao Proposed Interior Renovation/Audionet-Axis Telecomm, Inc. 83 11-Jul-2017 Unit R212 SM Center Muntinlupa, Muntinlupa City Unit R212 SM Center Muntinlupa, Muntinlupa City Daryl Andrew M. Llanes Proposed Two (2) Storey Residential Building 84 Block 3, Lot 2, Gen. Capin Pin St., Soldiers Hills 2, Almanza Block 3, Lot 2, Gen. Capin Pin St., Soldiers Hills 2, Almanza Las 11-Jul-2017 Las Piñas City Piñas City Wilfredo Q. Mendoza, Jr. Proposed One (1) Unit, Two (2) Storey Residential Building 85 B6, L3, Maria Socorro St., San Antonio Valley 7 Pulang Lupa, 11-Jul-2017 Lot 5B, Block 87 C. Alberto St., BFRV Talon 2, Las Piñas City Las Piñas City Nemencio L. Dimalig Proposed One (1) Unit, Two (2) Storey Residential Building 86 11-Jul-2017 Pasong Kawayan I, Gen. Trias, Cavite City Lot 6, Block 87 Suzenne Gonzales, BFRV Talon 2, Las Piñas City Jose Tengco BNO Play - Renovation 87 Low rise 2, Level 2, Retail Unit 2-55, Solaire Resort & Casino, Low rise 2, Level 2, Retail Unit 2-55, Solaire Resort & Casino, 11-Jul-2017 Aseana Ave., Brgy.Tambo, Parañaque City Aseana Ave., Brgy.Tambo, Parañaque City Marieta V. Mendoza Proposed Two (2) Storey Renovation Residential 88 11-Jul-2017 107 Marikina St., Maypaso, Caloocan City 107 Marikina St., Maypaso, Caloocan City

Page 7 of 47

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region July 2017

No. Company Name and Address Project Name Date Approved Kevin Ray Mañibo Oren Thai Touch Massage & Spa (Fit-Out) 89 2nd Floor, Unit 16, Aseana Square Caltex Area, Pres. 2nd Floor, Unit 16, Aseana Square Caltex Area, Pres. Macapagal 11-Jul-2017 Macapagal , Parañaque Aseana City, Parañaque Oliver P. Castro/ Ecopath Corporation Timetrend Store/Ecopath Corporation (Renovation) 90 11-Jul-2017 307-B E. Dela Cruz, Marikina City SM MOA GF, Pasay City Catalino A. Abelinde, Jr. Two (2) Storey, Three (3) Units Residential Structure 91 Blk 2, Lot 14 St., Catherene St., Provident Village, Marikina 11-Jul-2017 Blk 2, Lot 14 St., Catherene St., Provident Village, Marikina City City Kate Pagkalinawan I Skin Aesthetic Lifestyle (Renovation/Fit-Out) 92 Parkwest Unit 203 7th Ave., Cor. 36th St., North BGC, 11-Jul-2017 Parkwest Unit 203 7th Ave., Cor. 36th St., North BGC, Taguig City City Elena P. Ocop Proposed Two (2) Storey Residence 93 11-Jul-2017 71 Servillano Batac Sr. St., NSHA BF Homes, Parañaque City 71 Servillano Batac Sr. St., NSHA BF Homes, Parañaque City Randy Carrillo/RDF Feed, Livestock & Foods, Inc. Hot Kitchen - Fit-Out 94 11-Jul-2017 Brgy. Lara, San Fernando, Unit 109, GF, Grace Mall, Levi Mariano Ave., Taguig City Venrock Capital Ventures, Inc. Propose Renovation of ExpressWash -Moonwalk 95 11-Jul-2017 Unit 701 The Infinity Bldg., 26th St., BGC Taguig City 15417-F E. Rodriguez St., Brgy.Moonwalk, Parañaque City Venmartan Ventures Corporation Proposed Renovation of SuperWash 96 U-6 G-2, 8101 Pearl Plaza, Pearl Drive, San Antonio, Pasig Unit 115 Grace Residences Drive, Cayetano Bvld., Brgy. Unasam, 11-Jul-2017 City Taguig City Venrock Capital Ventures, Inc. Proposed Renovation of ExpressWash 97 11-Jul-2017 Unit 701 The Infinity Bldg., 26th St., BGC Taguig City Unit B-183 Canaynay Ave., Sucat, Parañaque City Reden L. Dayao Hide Out Tea and Coffee House - Renovation 98 11-Jul-2017 Lot 428 Gen. Luna St., cor. Kalahi St., Malabon City Lot 428 Gen. Luna St., cor. Kalahi St., Malabon City Sps. Dante Edna Kabigting Proposed Construction of Two (2) Storey Residential Building 99 Lot 30 A Blk. 56 Primerose St., SGH Subd., Putatan, Lot 30 A Blk. 56 Primerose St., SGH Subd., Putatan, Muntinlupa 12-Jul-2017 Muntinlupa City City Chester Cuen Uyco/Schiff, Inc. Demolition of Two (2) Storey Old Residential Structure 100 301 Minnesota Mansion, 267 Ermin Garcia St., Cubao, 12-Jul-2017 Lot 19 Blk. 5 Boyle St., Palanan, Makati City Quezon City

Page 8 of 47

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region July 2017

No. Company Name and Address Project Name Date Approved Carlo Leonardo N. Leonio/Fambilt, Inc. Demolition of Two (2) Storey Old Residential Structure 101 7/F Mafre Insular Corporadte Center, 1220 Acacia Ave., 12-Jul-2017 212 Bougainvilla St., Ayala, Alabang, Muntinlupa City Ayala Alabang, Muntinlupa City Cynthia C. Alfonso Two (2) Storey Residence 102 L11 B122 Natividad St., Katarungan Village, Poblacion, L11 B122 Natividad St., Katarungan Village, Poblacion, 12-Jul-2017 Muntinlupa City Muntinlupa City San Juan De Dios Hospital Proposed Two (2) Storey E.R. Extension 103 12-Jul-2017 2772 Roxas Blvd., cor. Hernandez St., Pasay City 2772 Roxas Blvd., cor. Hernandez St., Pasay City Diala/Ferdinand Tordesillas Proposed buritos & Burger Restaurant 104 12-Jul-2017 CNB Circle Mall, Marikina Heights, Marikina City CNB Circle Mall, Marikina Heights, Marikina City Ma. Christina Cowan Proposed Demolition of Two (2) Storey Residential House 105 12-Jul-2017 7731 J.B. Roxas St., Brgy. Olympia, Makati City 7731 J.B. Roxas St., Brgy. Olympia, Makati City Joel Ugsimar Proposed Renovation of BPI 106 12-Jul-2017 Sulatan St. cor. Barangka Dr., Mandaluyong City Sulatan St. cor. Barangka Dr., Mandaluyong City Jefferson Gaw Proposed Demolition of Two 92) Storeyt Old House 107 12-Jul-2017 613-617Carvajal St., Binondo, Manila 613-617Carvajal St., Binondo, Manila Specialty Food Retailers, Inc./Salad Stop Steven Satmiento 108 2F 220A Ct 220 D SM Megamall J. Vargas cor. EDSA, Brgy. 12-Jul-2017 4F Urban Bldg., Sen. Gil Puyat, Ave., Makati City Wack Wack, Mandaluyong City Renato Sampang Proposed Renovation of East West Bank One Collectuion Site 109 & & 9 Floor Rockwell Business Center Sheridan St., 7 & 9 Floor Rockwell Business Center Sheridan St., Mandaluyong 12-Jul-2017 Mandaluyong City City Proposed Renovation Common Room by Pop Lunk Love Ma. Roma Agsalud 110 Enterprises 12-Jul-2017 #3 Noriel St., Katarungan Village, Antipolo, Rizal Entertainment Complex-, Muntinlupa City The Roman Catholic Archbishop of Manila/Fr. Reginald Proposed One (1) Storey Multi-purpose Hall Malicdem 111 Add- Complex cor. Cabildo & Beaterio St., 12-Jul-2017 Add-Manila Cathedral Complex cor. Cabildo & Beaterio St., , Manila Intramuros, Manila Melanie Joy C. Delos Santos Proposed Cambridge Child Development Center-Renovation 112 Unit 173-177 Cluster I, Blue Bay Walk, EDSA cor. Macapagal, Unit 173-177 Cluster I, Blue Bay Walk, EDSA cor. Macapagal, 12-Jul-2017 Pasay City Pasay City

Page 9 of 47

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region July 2017

No. Company Name and Address Project Name Date Approved Interior RenovATION OF bdo Unibank, Inc. Ma. Patricia F. Villareal g/F Units 102,103 & 104, Richville Corporate Center 113 12-Jul-2017 7th to 11th Flr. Gercon Building, Makati Ave., Makati City Condominium, No. 1314 Commerce Ave., Madrigal Business Park, Ayala Alabang, Muntinlupa City Angela Sibal Proposed Interior Renovation Players Kitchen 114 1 UGF Coral Wing Tower B, Okada Hotel, Tambo, Parañaque 12-Jul-2017 1 UGF Coral Wing Tower B, Okada Hotel, Tambo, Parañaque City City Proposed Interior Renovation sophias Play Palace Jump with Shirley Panganiban 115 China 12-Jul-2017 Unit 227-228 Robinson Tinajeros, Malabon City Unit 227-228 Robinson Tinajeros, Malabon City Lorielyn Sia Proosed Two (2) Storey 6-Units Residential Apartment 116 12-Jul-2017 #107 Ageros St., , Malabon City #107 Ageros St., Tugatog, Malabon City Ma. Victoria R. De Gulan Proposed Renovation Two (2) Storey Residence 117 12-Jul-2017 #2 Tla St., Maysilo, Malabon City #2 Tla St., Maysilo, Malabon City Adelaida L. Serafico Proposed Two (2) Storey Residential Building 118 13-Jul-2017 054 Uabas St., Admiral Village, Talon 3, Las Piñas City 054 Uabas St., Admiral Village, Talon 3, Las Piñas City Sps. Jesus/ Dolce M. Otamias Proposed Renovation of 1st Floor/Additional 2nd Floor 119 13-Jul-2017 848 Don Quijote St., Sampaloc, Manila 848 Don Quijote St., Sampaloc, Manila Ann Cecilia Leofando, Et. Al. Proposed Four (4) Units Additional 2nd Floor 120 13-Jul-2017 24 Fabian Compound Purok 4 Alabang, Muntinlupa City 24 Fabian Compound Purok 4 Alabang, Muntinlupa City Jose Mikkel J. Paris Petriolas Philippines, Inc./Antie Anne's Renovation 121 13-Jul-2017 1, , Makati City Greenbelt 1, Ayala Center, Makati City Brownmakers, Inc, Proposed Lounge Eyebrow Grooming and Waxing Saloon 122 13-Jul-2017 jollibee Plaza, Pasig City 004 LGF SM Marikina, Brgy. Calumpang, Marikina City Renovation of Commercial Space/7-Eleven Okada, Manila Philippine Seven Corp./Francis S. Medina 123 Okada Manila, New Seaside Drive, , Brgy. 13-Jul-2017 7F The Columbia Tower, Ortigas Ave., Mandaluyong City Tambo, Parañaque City Luis P. Medina, Jr. Demolition of Two (2) Storey Wooden Residence 124 13-Jul-2017 107 Mariposa Loop, Cubao, Quezon City #105 Lope K. Santos St., San Juan City, Philippines Nestor G. Untalan Proposed Two (2) Storey Studio Type Apartment 125 13-Jul-2017 Blk. 3 Lot 8 Summer Cypress St., Talon Village, Brgy. Talon, Blk. 3 Lot 8 Summer Cypress St., Talon Village, Brgy. Talon, Las

Page 10 of 47

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region July 2017

No. Company Name and Address Project Name Date Approved Las Piñas City Piñas City

Ken Andrew Sy Renovation of Worship Generation 126 2/F ABQ Bldg., Blk. 13 Lot 16 E. Rodriguez Jr. Ave., 14-Jul-2017 G/F Unit 2212A Alabang Town Center, Muntinlupa City Bagumbayan, Quezon City Sps. Rolando P. Dela Cuesta & Roxana A. Dela Cuesta Proposed Demolition of Two (2) Storey Residential House 127 14-Jul-2017 11 Buchanan North Greenhills, San Juan City, Metro, Manila 11 Buchanan North Greenhills, San Juan City, Metro, Manila Worthproperties, Inc. Proposed Two (2) Storey Building 128 Lot 3 Good Harvest Complex, C. Reymundo Ave., Brgy. 14-Jul-2017 1121-1123 Pedro Gil St., Manila Maybunga, Pasig City Roman Claro T. Jose Proosed Renovation & Additional 2nd Floor Residential Building 129 14-Jul-2017 #58 Mercury Road, Pilar Village, Las Piñas City #58 Mercury Road, Pilar Village, Las Piñas City Winnie M. Canlas Proposed Two (2) Storey Residential Building 130 L-1 A-1 Balagtas St., RFM Compound, Pamplona 1, Las L-1 A-1 Balagtas St., RFM Compound, Pamplona 1, Las Piñas 14-Jul-2017 Piñas City City Jose Paulo C. Kabuhat/Anna Lynne M. Tiu Two (2) Storey Residential with Roofdeck 131 L-13 B-60, Moran St., Rancho Estate 4, Concepcion 2, L-13 B-60, Moran St., Rancho Estate 4, Concepcion 2, Marikina 14-Jul-2017 Marikina City City Marilou Villareal Proposed Renovation of Rebranded/Zoo Coffe 132 14-Jul-2017 #39 Eisenhower St., Greenhills, San Juan City Unit 006 A&B SM Megamall Bldg. A, Mandaluyong City Chauntia Chan Two (2) Storey Residential Building 133 L12 B27 Wrangler St., Rancho Estate 2, Concepcion 2, L12 B27 Wrangler St., Rancho Estate 2, Concepcion 2, Marikina 14-Jul-2017 Marikina City City Edwin M. Coronacion Proposed Renovation of Two (2) Storey Residence 134 14-Jul-2017 12-B Chicago St., University Hills Subd., Caloocan City 12-B Chicago St., University Hills Subd., Caloocan City Joanne G. Yap Proposed Dragon Restaurant Interior Renovationb 135 Russia cor. Romania St., Betterliving, Brgy. Don Bosco, Russia cor. Romania St., Betterliving, Brgy. Don Bosco, 14-Jul-2017 Parañaque City Parañaque City William G. Yap Chubs Place Resto & Grill Interior Renovation 136 Russia cor. Romania St., Betterliving, Brgy. Don Bosco, Russia cor. Romania St., Betterliving, Brgy. Don Bosco, 14-Jul-2017 Parañaque City Parañaque City

Page 11 of 47

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region July 2017

No. Company Name and Address Project Name Date Approved Rodrigo Villanueva Proposed One (1) Storey Residential Duplex 137 25 B. Abel Nosce St. cor. Barcelona, BF Resort, Talon I, Las 14-Jul-2017 Lot 7 Blk 8 Torch Lily St., Talon Village, Las Piñas City Piñas City Elogina Bautista Two (2) Storey Residential Bldg. (Duplex) 138 14-Jul-2017 Sulucan St., Sta. Cruz Ext., Hulong Duhat, Malabon City Sulucan St., Sta. Cruz Ext., Hulong Duhat, Malabon City Marlyn Ramos Two (2) Storey Residential Bldg. (12-Doors) 139 14-Jul-2017 Dennis St., Gabriel Subd.,2, Hulong Duhat, Malabon City Dennis St., Gabriel Subd.,2, Hulong Duhat, Malabon City Ferdinand Mesina Proposed Two (2) Storey Building 140 14-Jul-2017 #3884 Masikap St., Bacood, Sta. Mesa, Manila #3884 Masikap St., Bacood, Sta. Mesa, Manila Francisco P. Garcia Renovation of Two (2) Storey Residence 141 14-Jul-2017 104 Lipa St., Ayala Alabang Village, Muntinlupa City 104 Lipa St., Ayala Alabang Village, Muntinlupa City Renato BoYong Mejica Two (2) Storey Residence 142 14-Jul-2017 Blk. 1 Lot 13 Airport Ville, Parañaque City Blk. 1 Lot 13 Airport Ville, Parañaque City Jim Ryan G. Edar Renovation of Midio Korean Selections Concept Store 143 Blk. 14 Lot 30 Pomelo St., Rainbow Village V, Bagumbayan, 17-Jul-2017 UGF-0100 Starmall, Alabang, Muntiunlupa City Caloocan City Eat Fresh Food Deli Corp./Bryan Daniel Chang So Proposed Restaurant - One (1) Storey 144 17-Jul-2017 32 Gen. Ordoñez St., Marikina Heights, Marikina City 32 Gen. Ordoñez St., Marikina Heights, Marikina City Susana F. Delos Santos Renovation of Baliwag Lechon Manok 145 17-Jul-2017 Lot 1 Mercedes Ave., San Miguel, Pasig City Food Center, Landmark, Filinvest, Muntinlupa City Raymo Gino L. Palaca Renovation of Localle Food Services 146 17-Jul-2017 106 Tulip St., Shamrock Village, Talon 3, Las Piñas City Blk. 5 Lot 8 BF Resort Drive, BF Resort Village, Las Piñas City Alfamart Trading Phils., Inc. Renovation of Alfamart 147 17-Jul-2017 SM Corporate Office Bldg., Pasay City 1082 Sulu cor. V. Fugoso St., Sta. Cruz, Manila Alfamart Trading Phils., Inc. Renovation of Alfamart 148 17-Jul-2017 SM Corporate Office Bldg., Pasay City Paz Mendoza St., Paco, Manila Ronald M. Salindong Dunkin Donuts Puregold Arvo 149 Unit 105, Puregold & , Liwasang Kalayaan, Unit 105, Puregold & Ayala Malls, Liwasang Kalayaan, Marikina 17-Jul-2017 Marikina Heights, Marikina City Heights, Marikina City Daisy Lucas Proposed Two (2) Storey 7-Units Residence 150 17-Jul-2017 104 A. Mabini St., San Roque, Marikina City 104 A. Mabini St., San Roque, Marikina City

Page 12 of 47

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region July 2017

No. Company Name and Address Project Name Date Approved Mary Louise M. Villanueva Proposed Additional 2nd Floor Residential with Deck 151 17-Jul-2017 Sumulong St., Parang, Marikina City Sumulong St., Parang, Marikina City Liwayway C. Melencia Proposed Two (2) Storey Residential Building with Roofdeck 152 17-Jul-2017 Ipil St., Brgy. Cembox, Makati City Ipil St., Brgy. Cembox, Makati City Paseo De Roxas cor. Legaspi St., Legaspi Village, Makati Proposed Interior Renovation BPI Pase Legaspi St., Legaspi City 153 Village, Makati City 17-Jul-2017 Paseo De Roxas cor. Legaspi St., Legaspi Village, Makati Paseo De Roxas cor. Legaspi St., Legaspi Village, Makati City City Liberty Cabrera Proposed Renovation of IKANO Philippines, Inc. 154 17-Jul-2017 Rockwell Hidalgo Drive, , Makati City Rockwell Hidalgo Drive, Rockwell Center, Makati City Shi Peter Lin Renovation Four Season Riviera Ground Floor Unit 155 Unit 3 Four Season Riviera, Muelle De la Industria cor. 17-Jul-2017 Muelle De La Industria cor., Numancia St., Tondo, Manila Numancia St., Tondo, Manila Allan Pastano Proposed Renovation of Zigzag Media, Inc. 156 U-901-6 V. Madrigal Bldg., 6793 Ayala Ave., Brgy. Bel Air, U-901-6 V. Madrigal Bldg., 6793 Ayala Ave., Brgy. Bel Air, Makati 17-Jul-2017 Makati City City Proposed Interior Renovation of BDO 6780 New Branch Ayala Patricia Villareal 157 Ave., 17-Jul-2017 6780 Ayala Ave., Makati City 6780 Ayala Ave., Makati City Richmond john Soriano Two (2) Storey Residential Building 158 25 Siquijor St., Ayala Employees Housing, Ayala Alabang, 25 Siquijor St., Ayala Employees Housing, Ayala Alabang, 17-Jul-2017 Muntinlupa City Muntinlupa City Padge Gunabo Interior Renovation 159 17-Jul-2017 SM Center, Muntinlupa, Tunasan, Muntinlupa City SM Center, Muntinlupa, Tunasan, Muntinlupa City Venalina T. Villamor Residential Two (2) Storey Building 160 393 Catalina St., De Castro Homesite Sta. Quiteria, Caloocan 17-Jul-2017 393 Catalina St., De Castro Homesite Sta. Quiteria, Caloocan City City Victoria Padilla Vda. De Artillaga Proposed Demolition of Two (2) Storey 161 17-Jul-2017 2235 Aurora Blvd., Pasay City 2235 Aurora Blvd., Pasay City Carmilita Ebid Proposed Two (2) Storey Duplex Residence 162 17-Jul-2017 Blk. 138 Lot 4 A Mabini St., Brgy. Rizal Pembo, Makati City Blk. 138 Lot 4 A Mabini St., Brgy. Rizal Pembo, Makati City

Page 13 of 47

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region July 2017

No. Company Name and Address Project Name Date Approved Rizza B. Latorre Proposed Two (2) Storey Residence 163 Lot 23 B23 Sherwood St., MGV Brgy. Marcelo Green, Lot 23 B23 Sherwood St., MGV Brgy. Marcelo Green, Parañaque 17-Jul-2017 Parañaque City City Rizaldy Z. Chua Roda Residence Two (2) Storey with Deck 164 17-Jul-2017 2342 Mercurio St., San Andres Bukid., Manila 2342 Mercurio St., San Andres Bukid., Manila Kitchen Nine Analisa O. Alicaya 165 Unit D1 River Park, Festival Supermall, , Alabang, 17-Jul-2017 0034 L. Summit Circle, Bayanan, Muntinlupa City Muntinlupa City Roque L. Ramones Two (2) Storey 2-Door Commercial Building 166 17-Jul-2017 165 Panghulo Rd., Panghulo, Malabon City 165 Panghulo Rd., Panghulo, Malabon City Hong Lian Hao Oppo Mobile Store (Fit out/Renovation) 167 17-Jul-2017 Level 4 SM Aura Premier, BGC, Taguig City, Metro , Manila Level 4 SM Aura Premier, BGC, Taguig City, Metro , Manila Abenson Ventures, Inc. Demolition of Two (2) Storey Commercial Buxilding 168 18-Jul-2017 Ortigas cor. Madison Sts., San Juan City Ortigas cor. Madison Sts., San Juan City Rey G. Posecion Renovation of Metropolitan Bank & Trust Co., Inc. 169 J.M. Building West Service Road cor. Montillano St., Alabang, J.M. Building West Service Road cor. Montillano St., Alabang, 18-Jul-2017 Muntinlupa City Muntinlupa City Eloise G. Dolon Proposed Additional 2nd Floor with Attic Residential 170 Lot 42 Blk. 32 Yelen Catral St., BF Resort Village, Talon 2, Lot 42 Blk. 32 Yelen Catral St., BF Resort Village, Talon 2, Las 18-Jul-2017 Las Piñas City Piñas City Michael Angelo Earl Uy Renovation-Jollibee-Malabon 171 Gov. Pascual Ave., cor. Gen. Luna St., Concepcion, Malabon 18-Jul-2017 Gov. Pascual Ave., cor. Gen. Luna St., Concepcion, Malabon City City Asia Structural Developer Corp./Roland G. Geringuillo Proposed Perimeter Fence 172 Pacific Drive cor. Lincoln Ave., Asiaworld Marina, Parañaque 18-Jul-2017 Pacific Drive cor. Lincoln Ave., Asiaworld Marina, Parañaque City City Remedios G. Manaloto Two (2) Storey Residential 173 B11 L2 Champaca St. cor. Sampaguita St., JPA Subd., B11 L2 Champaca St. cor. Sampaguita St., JPA Subd., Tunasan, 18-Jul-2017 Tunasan, Muntinlupa City Muntinlupa City Enita U. Cajigal Two (2) Storey Residential 174 B9 L24 Champaca St. cor. Sampaguita St., JPA Subd., B9 L24 Champaca St. cor. Sampaguita St., JPA Subd., Tunasan, 18-Jul-2017 Tunasan, Muntinlupa City Muntinlupa City

Page 14 of 47

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region July 2017

No. Company Name and Address Project Name Date Approved Josefina Del Mundo Proposed Two (2) Storey Apartment 175 18-Jul-2017 L95-A-7 Rivera St. Talipapa, Caloocan City L95-A-7 Rivera St. Talipapa, Caloocan City Hong Lian Pao Interior Renovation/Stormtech Phones & Accessories 176 Rm. 2 3rd Flr. Sinotil Phils. 672 Carlos Balanca St., San 18-Jul-2017 Unit R214 SM Center Muntinlupa Tunasan, Muntinlupa City Miguel, Manila Cheng Tzu-Pi/Ding Hao Real State Corp. Proposed Two (2) Storey Residence (with Roofdeck) 177 18-Jul-2017 #39 Pasencia St., Cris Mariel Subd., Las Piñas City #39 Pasencia St., Cris Mariel Subd., Las Piñas City Corazon Soriano Two (2) Storey Residential Building 178 L2 B1 Bulletin St., Forester Estate Subd., Sucat, Parañaque 18-Jul-2017 #60 Aguilar St. Santos Village, Zapote, Las Piñas City City Maria Lourdes O. Jamandre Two (2) Storey Duplex Residential 179 L26 B4 Dalandan St., San Isidro Subd., Pamplona Uno A, Las L26 B4 Dalandan St., San Isidro Subd., Pamplona Uno A, Las 18-Jul-2017 Piñas City Piñas City Edison/Edilberto Espino Proposed One (1) Storey Residential 180 18-Jul-2017 18 Gumamela St. Town & Country Exec. Vill. Antipolo City L16 B6 Josef St. cor. Vinzon St. Concepcion Uno, Marikina City Marie Antonette B. Dandan Two (2) Storey Residential Unit 181 18-Jul-2017 Hechanova St. BF West Executive Village, Las Piñas City Hechanova St. BF West Executive Village, Las Piñas City Bettina Hipolito and Julio Pangilinan Proposed Bungalow Residential 182 B3 L17 CRM Amelita Rd., BF Homes, Almanza 2, Las Piñas 18-Jul-2017 B35 Amelita Rd., BF Homes, Almanza 2, Las Piñas City City Edna Santos Renovation of 2 Units Two (2) Storey Res'l. 183 19-Jul-2017 #49-B Chile St. Greenheights Concepcion I, Marikina City #49-B Chile St. Greenheights Concepcion I, Marikina City Felix Flores Two (2) Storey Renovation 184 19-Jul-2017 9 Lazaro St. Sto. Niño, Marikina City 9 Lazaro St. Sto. Niño, Marikina City Arthuz O. Baylan Proposed 4 Unit Two (2) Storey Residence 185 19-Jul-2017 Palawan St. cor. Luzon Ave., Sampaloc, Manila Palawan St. cor. Luzon Ave., Sampaloc, Manila Construction of Proposed Two (2) Storey Duplex Rosalina G. Ishigaki 186 Blk. 10 Lot 11 C. Alvenida St., BF Resort Village, Talon Dos, Las 19-Jul-2017 #5 Alvecina Ext. BF Resort Village, Las Piñas City Piñas City Jose Sy Proposed Renovation of One (1) Storey with Mezzanine 187 19-Jul-2017 Eduard Keller 2723 Don Chino Roces St., Brgy. Bankal, Eduard Keller 2723 Don Chino Roces St., Brgy. Bankal, Makati

Page 15 of 47

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region July 2017

No. Company Name and Address Project Name Date Approved Makati City City

Ma. Luisa Larong Proposed Demolition of Two (2) Storey Residential 188 19-Jul-2017 Blk. 267 Lot 1 Target Range St., Pembo, Makati City Blk. 267 Lot 1 Target Range St., Pembo, Makati City Happy Maven Retail, Inc.-Interior Renovationb Jacqueline Guttierrez Yuentian 189 UG/F New Wing, Alabang Town Center, Brgy. Ayala Alabang, 19-Jul-2017 7C-5 68 Roces Don A. Roces Ave., Quezon City Muntinlupa City Edgardo Florendo Proposed Two (2) Storey Residential Building 190 19-Jul-2017 Lot 1-B-2 Calle Retiro cor. Aranga St., Sampaloc, Manila Lot 1-B-2 Aranga St., Sampaloc, Manila Glenn Almeda Proposed Two (2) Storey Residential 191 Blk. 3 Lot 4 Domenico St., Portofino Heights, , Blk. 3 Lot 4 Domenico St., Portofino Heights, Daang Hari, Brgy. 19-Jul-2017 Brgy. Almanza Dos, Las Piñas City Almanza Dos, Las Piñas City Eugene Rivo/Rsosemarie Manzano Proposed Two (2) Storey Duplex Residential 192 Lot 10 Blk. 3 Ashberry Estate, Gatchalian Subd., Las Piñas 19-Jul-2017 Lot 10 Blk. 3 Ashberry Estate, Gatchalian Subd., Las Piñas City City Rodora H. Cruz Renovation of Clinic 193 20-Jul-2017 #30 Valenzuela Loyola St. Grand Villas Pansol, Quezon City Unit C 167 M.H. Del Pillar Santulan Panghulo, Malabon Vicenta Bernante Proposed Two (2) Storey Residential Apartment 194 20-Jul-2017 L139 I Geremillo St., Brgy. Cupang, Muntinlupa City L139 I Geremillo St., Brgy. Cupang, Muntinlupa City Messaianic Israel Torah Community, Inc./Mariano D. De Prayer House- Fit-Out Ocampo 195 Unit 819, Tower-2 Pioneer Highland Madison St., Mandaluyong 20-Jul-2017 Unit 819, Tower-2 Pioneer Highland Madison St., City Mandaluyong City Menzi V. Orellana Proposed Two (2) Storey Residence 196 103 Danflor Compound National Hi-way Bayanan, Muntinlupa B1 L11 Brazilia Heights Subd. Campo Grands Tunasan, 20-Jul-2017 City Muntinlupa City Diego Marcos S. Yodico Residential Project (2 Storey) 197 20-Jul-2017 No. 38 L4 B1 Ipil St. Marikina Heights, Marikina City No. 38 L4 B1 Ipil St. Marikina Heights, Marikina City John Edison B. Lapuz Demolition of Old Two (2) Storey Residence 198 20-Jul-2017 840 San Rafael St. Brgy. Plainview, Mandaluyong City 840 San Rafael St. Brgy. Plainview, Mandaluyong City

Page 16 of 47

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region July 2017

No. Company Name and Address Project Name Date Approved Manuel Ang Demolition two (2) Storey Old House 199 21-Jul-2017 1472 St. Sta. Cruz, Manila 1412 Kusang Loob Cor. Laguna Sts., Sta. Cruz, Manila Alicia E. Bardeloza Proposed Renovation of Two (2) Storey Res. Bldg. 200 21-Jul-2017 D. Dagatan Longos, Malabon City B45 L25 P3 E2 D. Dagatan Longos, Malabon City Justin B. Loredo Proposed Two (2) Storey Residential Townhouse 201 21-Jul-2017 B3 L10 Molave St., Manuela 4-C, Las Piñas City B3 L10 Molave St., Manuela 4-C, Las Piñas City Hazel D. Dioquino Proposed Two (2) Storey Residential Townhouse 202 B7 L22 Rosalina St., St. Michael Subd. Talon Dos, Las Piñas 21-Jul-2017 B7 L22 Rosalina St., St. Michael Subd. Talon Dos, Las Piñas City City Bertrand S. Beltran & Rubim S. Beltran Proposed Two (2) Storey Two Units Residential Structure 203 21-Jul-2017 L55 B43 Starlite St., Concepcion Dos, Marikina City L55 B43 Starlite St., Concepcion Dos, Marikina City Jose R. Chanyungco Repair of Two (2) Storey Four Units Residential Apartment 204 04 Manhattan St., Provident Village, J. Dela Peña, Marikina 21-Jul-2017 04 Manhattan St., Provident Village, J. Dela Peña, Marikina City City Ma. Cecilia Dipos Renovation of Ilongo Grill 205 21-Jul-2017 1C & 4 J's Food Ventures Corp. Landmark Alabang, Muntinlupa City Mrs. Mailani H. Gustilo Two (2) Storey Wise Kids School- Renovation 206 21-Jul-2017 Villa Carolina Subdivision, Brgy. Tunasan, Muntinlupa City Villa Carolina Subdivision, Brgy. Tunasan, Muntinlupa City Alexander Scott Tan Renovation- Bonchon Chicken/Scottland Inc. 207 G/F 107 Scape Bldg. Diosdado Macapagal Ave. cor. Pearl G/F 107 Scape Bldg. Diosdado Macapagal Ave. cor. Pearl Drive, 21-Jul-2017 Drive, Pasay City Pasay City Alexander Scott Tan Renovation- Bonchon Chicken/Scottland Inc. 208 Unit A-1 38 Riverbanks Arcade A. Bonifacio Ave., Barangka, Unit A-1 38 Riverbanks Arcade A. Bonifacio Ave., Barangka, 21-Jul-2017 Marikina City Marikina City Antonio S. Gumary/Vic Sim Proposed Renovation of Aruga Dialysis Center 209 #1-B G/F Unique Bldg., Sierra Madre cor. Cordillera St., #1-B G/F Unique Bldg., Sierra Madre cor. Cordillera St., 21-Jul-2017 Mandaluyong City Mandaluyong City Sps. Marilyn & Rodrigo Lanas Residential House Construction- Two (2 ) Storey 210 Blk. 1-A Lot 70 Diamond Victoria Homes, Tunasan, Blk. 1-A Lot 70 Diamond Victoria Homes, Tunasan, Muntinlupa 21-Jul-2017 Muntinlupa City City

Page 17 of 47

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region July 2017

No. Company Name and Address Project Name Date Approved Proposed Interior Renovation of Reyes Barbeque 211 24-Jul-2017 Unit 6-066 Southpark Mall, Muntinlupa City Sps. Marilyn & Rodrigo Lanas Residential House Construction- Two (2) Storey 212 Blk. 1-A Lot 70 Diamond, Victoria Homes, Tunasan, Blk. 1-A Lot 70 Diamond, Victoria Homes, Tunasan, Muntinlupa 24-Jul-2017 Muntinlupa City City Francisco Reyes Proposed Interior Renovation of Reyes Barbeque 213 24-Jul-2017 Unit 6-606 Southmall Park, Muntinlupa City Unit 6-606 Southmall Park, Muntinlupa City Speedy Lyttle/Gruppos AAA Restaurant Corp. Poke Poke Restaurant (Fit-out) 214 2nd Level of Mega Atrium, SM Mega Mall, Wack wack 2nd Level of Mega Atrium, SM Mega Mall, Wack wack Village, 24-Jul-2017 Village, Mandaluyong City Mandaluyong City Corazon Abad Manuel Proposed 2nd Floor Studio 215 24-Jul-2017 345 Flores St., Brgy. 42, Pasay City 345 Flores St., Brgy. 42, Pasay City Alex Pagaduan Proposed Perimeter Fence 216 24-Jul-2017 2639 Gamban Ext., Pasay City 2639 Gamban Ext., Pasay City Wilson S. Go Fence Installation 217 24-Jul-2017 #1761 M. Guanzon St., Paco, Manila #1761 M. Guanzon St., Paco, Manila Edna Edrozo Proposed Two (2) Storey Residence 218 L-24 B-29 Bon River St., Rancho 2 Concepcion 2, Marikina 24-Jul-2017 L-24 B-29 Bon River St., Rancho 2 Concepcion 2, Marikina City City Frederick C. Tutaan Proposed Two (2) Storey Residential with Deck 219 Lot 3 Blk. 9 Catherine St., Sta. Teresita Village, Malanday, Lot 3 Blk. 9 Catherine St., Sta. Teresita Village, Malanday, 24-Jul-2017 Marikina City Marikina City Manuel Joso M. Tordesilla, II Proposed Renovation of Inspired Ventures, Inc. 220 24-Jul-2017 4F Greenbelt 5, Ayala Center, San Lorenzo, Makati City 4F Greenbelt 5, Ayala Center, San Lorenzo, Makati City Ma. Teresa R. Tantoco Enriquez Proposed Two (2) Storey Residence with Basement 221 24-Jul-2017 #1867 Sagu St., Dasmariñas Vill., Makati City #1922 Kamias St., Dasmariñas Vill., Makati City Eugenia A. Valdez Proposed Two (2) Storey Residential Building 222 24-Jul-2017 183-I 25F Ave., Brgy. East Rembo, Makati City 183-I 25F Ave., Brgy. East Rembo, Makati City Jeremy Honculada Proposed Fit-Out Renovation of AUB/Asia United Bank 223 24-Jul-2017 G/F Jeval Bldg., National Rd, Putatan, Muntinlupa City G/F Jeval Bldg., National Rd, Putatan, Muntinlupa City

Page 18 of 47

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region July 2017

No. Company Name and Address Project Name Date Approved Proposed Interior Renovation of B-Eye Solutions Business Jose Manuel Castillo, III 224 Intelligence, Inc. 24-Jul-2017 7F Allied Bank Center 6764 Ayala Ave., Makati City 7F Allied Bank Center 6764 Ayala Ave., Makati City Manuel L. Genabe, III/Medipatch Company Branch Proposed Office Renovation 225 24-Jul-2017 Jazz Centuria Makati Bay, Poblacion, Makati City Jazz Centuria Makati Bay, Poblacion, Makati City Mr. & Mrs. Kerwin & Sharon Law Proposed Two (2) Storey Split Level with Attic Residence 226 39 Unit D Mariano Marcos St., cor Barcelona St., Brgy. 24-Jul-2017 39 Van Buren St., North Greenhills, San Juan City Maytunas, San Juan City Makati Cinema Condo Corp.,/Carmela Misa Proposed Renovation of Exterior Walls 227 Makati Cinema Square No. 2130 Don Chino Roces Ave., Makati Cinema Square No. 2130 Don Chino Roces Ave., Brgy. Pio 24-Jul-2017 Brgy. Pio Del Pilar, Makati City Del Pilar, Makati City Adelaida L. Serafico Proposed Two (2) Storey 8-Units Residential with Roofdeck 228 24-Jul-2017 054 Ubas St., St. Admiral Village, Talon 3, Las Piñas City 054 Ubas St., St. Admiral Village, Talon 3, Las Piñas City Charmaine A. Follante & Lizalyn L. Lasay One (1) Storey Residence with Deck 229 24-Jul-2017 Charmaine A. Follante & Lizalyn L. Lasay Blk. 6 Lot 11 Phase III-D Dagat-Dagatan, Caloocan City Isagani M. De Castro Two (2) Storey 2-Unit Residence 230 24-Jul-2017 19 1st St., Goodrich Village, Concepcion, Marikina City 19 1st St., Goodrich Village, Concepcion, Marikina City Danilo L. Piol Proposed Two (2) Storey Residential Duplex 231 24-Jul-2017 Lot 1 Levitown Ave., Brgy. Don Bosco, Parañaque City Lot 1 Levitown Ave., Brgy. Don Bosco, Parañaque City Carson Chan/BYIMR, Inc. Proposed Interior Renovation of Showroom 232 24-Jul-2017 904 Arnaiz Ave., San Lorenzo Village, Makati City 904 Arnaiz Ave., San Lorenzo Village, Makati City Calvin Co Proposed Two (2) Storey Residential (Duplex) 233 25-Jul-2017 31 Paz St., Tugatog, Malabon City 31 Paz St., Tugatog, Malabon City One (1) Storey Residence Atty. Rickson L. Chiong 234 Blk. 1 Lot 115 Doña Annie St., Alabang Hills Village, Cupang, 25-Jul-2017 69 Pres. Ave., BF Homes, Parañaque City Muntinlupa City Milagros C. Lacson Proposed Renovation of Two (2) Storey Residential 235 25-Jul-2017 10 Rivera St., Tinajeros, Malabon City 10 Rivera St., Tinajeros, Malabon City Angelita Maniacop Onitsuka Tiger Renovation 236 Sonak Centre, @F KM18 West Service Rd., Marcelo Green, Unit 107C Level 1 Mainwing Shangri-la Plaza Mall., EDSA cor 25-Jul-2017 Parañaque City Shaw Blvd., Mandaluyong City

Page 19 of 47

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region July 2017

No. Company Name and Address Project Name Date Approved Club Clio-Lucky Chinatown Helen P. Cortez 237 LCTM 2 34a 2F Lucky Chinatown Mall, Reina Regente cor. Dela 25-Jul-2017 FMF Bldg., 126 Pioneer St., Mandaluyong City Reina St., Brgy. 293, Zone 28, District 3, Binondo, Manila Club Clio-Festival Mall Helen P. Cortez 238 Unit 2299 1A UGF Festival Supermall, Filinvest Corporate City, 25-Jul-2017 FMF Bldg., 126 Pioneer St., Mandaluyong City Alabang, Muntinlupa City Lilian Hizola Martirez Two (2) Storey Residence with Roofdeck 239 25-Jul-2017 137 Adela Hidalgo St., Pasay City 137 Adela Hidalgo St., Pasay City Timothy Pichay Doctor Leather Fit-out 240 25-Jul-2017 Rm. 310 Grace Bldg., Greenhills Ortigas Ave., San Juan City 254 (EM) 2F SM Mall of Asia, Bay Blvd., Pasay City Giligans Fit-out Jo Andrew G. Alquiros/Fijon-G Diners 241 Unit 106 GF. Ayala Malls, Liwasang Kalayaan, Marikina Heights, 25-Jul-2017 121-A Pinatubo S. Brgy. Ilaya, Mandaluyong City Marikina City Romeo E. Garcia Two (2) Storey Duplex Residence 242 L27 B4 B. Aldana St., San Isidro Subd., Pamplona, Las Piñas 25-Jul-2017 L27 B4 B. Aldana St., San Isidro Subd., Pamplona, Las Piñas City City Martin P. Yabut Proposed One (1) Storey Garage only 243 26-Jul-2017 2304 Tejeron St., Sta. Ana, Manila 2304 Tejeron St., Sta. Ana, Manila Proposed Interior Renovation of Ground Floor of Existing Four (4) Teresita T. Chua 244 Storey Building 26-Jul-2017 Lot c & Lot D Kalayaan Ave., Brgy. Olympia, Makati City Lot c & Lot D Kalayaan Ave., Brgy. Olympia, Makati City Nestor L. Lupangosy Proposed Renovation of Pan De Manila 245 Unit 10 6F Launchpad Bldg., Reliance cor. Sheridan St., Unit 10 6F Launchpad Bldg., Reliance cor. Sheridan St., Highway 26-Jul-2017 Highway Hills, Mandaluyong City Hills, Mandaluyong City Maria Cristina c. Lim Proposed interior Renovation of OFC 246 Unit 1D Unit 2A, 2B, 2C and 2D Pasong Tamo Building, 1173 Unit 1D Unit 2A, 2B, 2C and 2D Pasong Tamo Building, 1173 Don 26-Jul-2017 Don Chino Roces Ave., Brgy. San Antonio, Makati City Chino Roces Ave., Brgy. San Antonio, Makati City Donnabele V. Gonzalez Two (2) Storey Residence 247 26-Jul-2017 B1 L6-B Genesis St., Tiosejo, Tunasan, Muntinlupa City B1 L6-B Genesis St., Tiosejo, Tunasan, Muntinlupa City Mariano David Renovation & Additional 2nd Floor 248 B42 L22 E. Fernandez St., Katarungan Village, Poblacion, B42 L22 E. Fernandez St., Katarungan Village, Poblacion, 26-Jul-2017 Muntinlupa City Muntinlupa City

Page 20 of 47

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region July 2017

No. Company Name and Address Project Name Date Approved Proposed Additonal Two (2) Storey Residential Building Mr. & Mrs. Jorge/Betty Veranga 249 27 Luningning St., Damiana Vill., Brgy. Sta. Lucia, Rosario, Pasig 26-Jul-2017 Rosario, Pasig City City Edita R. villanueva Proposed Demolition of Two (2) Storey Residential House 250 26-Jul-2017 1628-1630 oroquieta St., Sta. Cruz, Manila 1628-1630 oroquieta St., Sta. Cruz, Manila Jeffrey Manuel Proposed Two (2) Storey Residential building 251 26-Jul-2017 Blk. 5 Lot 9 Las Piñas Classic, Pilar Village, Las Piñas City Blk. 5 Lot 9 Las Piñas Classic, Pilar Village, Las Piñas City Rogelio B. Bermas Proposed Two (2) Storey Residence Expansion Project 252 26-Jul-2017 20 Capadocia St., Multinational Vill., Parañaque City 20 Capadocia St., Multinational Vill., Parañaque City Levon Zak T. Rondina Titan Headquarters 9office renovation) 253 2nd floor Menarco Tower 32nd St., cor. 9th Ave., Bonifacio 2nd floor Menarco Tower 32nd St., cor. 9th Ave., Bonifacio global 26-Jul-2017 global city, Taguig City city, Taguig City Ivan A. Yao Owndays (Stall Renovation) 254 Space 310-312D SM Megamall Doña Julia Vargas Ave., Space 310-312D SM Megamall Doña Julia Vargas Ave., 26-Jul-2017 Mandaluyong City Mandaluyong City A& R Fashion House Corp. Renovation of Shapes Boutique 255 374 De Castro Cmpd., Tullahan Rd., Sta. Quiteria, Caloocan 26-Jul-2017 3rd Floor SM Mall of Asia, Pasay City City Miguel Buhay Demolition of 60 Sq. Meter Bungalow 256 26-Jul-2017 15 Siquijor St., Ayala Alabang, Muntinlupa City 15 Siquijor St., Ayala Alabang, Muntinlupa City Klarisse Anne C. Estorninos Two (2) Storey Residence 257 26-Jul-2017 B7 L23 #8 Visayas St., Ayala Alabang Vill., Muntinlupa City B7 L23 #8 Visayas St., Ayala Alabang Vill., Muntinlupa City Song Jin Hee Proposed Fit-Out/Renovation of Big Mama's Resto 258 26-Jul-2017 G/F Renaissance 1000, Ave., Pasig city G/F Renaissance 1000, Meralco Ave., Pasig city Store Space/Construction (Facelifting/Minor) Involving 62, 98 Marilyn E. Lansangan Square Meter Only 259 26-Jul-2017 44 Filomena St., North Susana, Commonwealth, Quezon city Quintesence /Stall no. 2275 B. Upper Ground Level Expansion Building, Alabang Town Center (ATC) Muntinlupa City Ricahrd Santiago/Ma. Joy Q. Nadal Ineng's Special BBQ 260 31-Jul-2017 6001 Cedar Bldg., West Park Condo, Muntinlupa City Alabang South Supermarket, Filinvest, Alabang, Muntinlupa City

Page 21 of 47

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region July 2017

No. Company Name and Address Project Name Date Approved Maria Josie S. Luces One (1) Storey Residence 261 B6 L10 Quencos St., South Greenheights, Putatan, B6 L10 Quencos St., South Greenheights, Putatan, Muntinlupa 31-Jul-2017 Muntinlupa City City Glorinia A. Pastoral Proposed Two (2) Storey Residential Building 262 L15 B14 Niccolo St., Portofino Heights Subd., Almanza Dos, L15 B14 Niccolo St., Portofino Heights Subd., Almanza Dos, Las 31-Jul-2017 Las Piñas City Piñas City Edwardo D. Tiro Residential /Renovation of Ground Floor 263 31-Jul-2017 712 Diamante St., Jackielou Subd., BFH, Parañaque City 712 Diamante St., Jackielou Subd., BFH, Parañaque City Winglip K. Chang Proposed Renovation of Kuya J Restaurant 264 31-Jul-2017 g/F Jazz Mall Bldg., Brgy. Bel-air, Makati City g/F Jazz Mall Bldg., Brgy. Bel-air, Makati City Ma. Elena M. Cacho Proposed Dunkin Donuts Store Renovation 265 31-Jul-2017 927 Pedro Gil St., Malate, Manila 927 Pedro Gil St., Malate, Manila Nicholson Santos Interior Fit-out Works CD-R King SM Supercenter, Pasig 266 31-Jul-2017 SM Supercenter, Frontera Verde, Pasig City SM Supercenter, Frontera Verde, Pasig City Digzylou Mae M. Umali Fit-out Renovation of Innovazzione Beauty & Wellness, Inc. 267 31-Jul-2017 TMI Centre, Arsodispo St., Intramuros, Manila Retail 1101 2F Uptown Parade, BGC, Taguig City Danilo D. Doctolero Proposed Two (2) Storey 4-Units Residence 268 L20 B4 Hope St., Santos Homes 2, Pulang Lupa 2, Las Piñas 31-Jul-2017 L20 B4 Hope St., Santos Homes 2, Pulang Lupa 2, Las Piñas City City Mark Ryan Dy Proposed Construction of Garage 269 31-Jul-2017 L8 B1 Bluebird Lane St., BF Pilar Southville, lAs Piñas City L8 B1 Bluebird Lane St., BF Pilar Southville, lAs Piñas City Enrico Lizardo Proposed Two (2) Storey Residence 270 31-Jul-2017 255 J. Rodriguez St., Caloocan City 255 J. Rodriguez St., Caloocan City Evelio Balbuena Proposed Bungalow with Loft for Convversion to 2nd Floor 271 B6 L17 Secretariat St., Alabang 400 Subd., Brgy. Cupang, B6 L17 Secretariat St., Alabang 400 Subd., Brgy. Cupang, 31-Jul-2017 Muntinlupa City Muntinlupa City Margregg Azanza Proposed Two (2) Storey Residence 272 31-Jul-2017 L5 B5 Camia St., Caloocan City L5 B5 Camia St., Caloocan City James Ronald Reyes Proposed One (1) Storey Warehouse 273 31-Jul-2017 354 Sta. Quiteria, Caloocan City 354 Sta. Quiteria, Caloocan City

Page 22 of 47

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region July 2017

No. Company Name and Address Project Name Date Approved Edwin T. Martin Two (2) Storey Apartment 274 31-Jul-2017 266 Alvarez St., Caloocan City 266 Alvarez St., Caloocan City Carlos C. Cornejo Proposed Renovation of Great Smile Dental Center 275 512 Sm City Manila, San Marcelino St. cor. Arroceros St., 512 Sm City Manila, San Marcelino St. cor. Arroceros St., Ermita, 31-Jul-2017 Ermita, Manila Manila Dion Carlo D. Manalastas Proposed Two (2) Storey Residence 276 31-Jul-2017 L36 B34 Younger St., Tondo, Manila L36 B34 Younger St., Tondo, Manila Enrique T. Lopez Proposed Renovation of Rustan Coffee Corp. 277 31-Jul-2017 822 Sisa St., Sampaloc, Manila SM San Lazaro Sta. Cruz, Manila Aledon, Crisanto Additonal 2nd Floor Residential 278 31-Jul-2017 Abbey Place, Susana Heights, Tunasan, Muntinlupa City Abbey Place, Susana Heights, Tunasan, Muntinlupa City Jockson Ong Two (2) Storey Residence Renovation 279 31-Jul-2017 s-f Roxas St., San Juan City s-f Roxas St., San Juan City Marcelino M. Florete, Jr. Renovation of Commercial Unit 280 31-Jul-2017 Retail 1 (One) BGC Corporate Center Bldg., Taguig City Retail 1 (One) BGC Corporate Center Bldg., Taguig City Benito C. Lim Proposed Renovation of Ground Floor 281 2503 Juan Luna St., cor. Del Fiero St., Gagalangin, Tondo, 31-Jul-2017 2503 Juan Luna St., cor. Del Fiero St., Gagalangin, Tondo, Manila Manila Deselyn Privado/Officine Corp. Interior Renovation of Geox 282 31-Jul-2017 MM 229 SM Mall of Asia, Pasay City MM 229 SM Mall of Asia, Pasay City Matthew Clement Velasco/ Eurowear Marketing Corp. Interior Renovation of Great Kids 283 31-Jul-2017 3117 MM Mall of Asia, Pasay City 3117 MM Mall of Asia, Pasay City Apolinario Arcadio Arcaraya/ American Star Aparrel, Inc. Dickies Concept Store 284 31-Jul-2017 355 MM Mall of Asia, Pasay City 355 MM Mall of Asia, Pasay City Juvy I. Albay Proposed 6-Units Two (2) Storey Residential Apartment 285 31-Jul-2017 49 Tandang Sora St., Brgy. Parang, Marikina City 49 Tandang Sora St., Brgy. Parang, Marikina City Edgardo Remonte Proposed Construction of Two (2) Storey Residence 286 77 Tangerine St., Bonita Homes, Concepcion Dos, Marikina 31-Jul-2017 77 Tangerine St., Bonita Homes, Concepcion Dos, Marikina City City Raul G. Valencia Proposed Car Wash & Detailing 287 31-Jul-2017 B.G. Molina cor. Pingkian St., Parang, Marikina City B.G. Molina cor. Pingkian St., Parang, Marikina City

Page 23 of 47

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region July 2017

No. Company Name and Address Project Name Date Approved Rhodora S. Torres Two (2) Storey Residential Building 288 31-Jul-2017 12 Sta. Rita St., Sto. Rosario Village, Baritan, mAlabon City 12 Sta. Rita St., Sto. Rosario Village, Baritan, mAlabon City Arnel D. Dizon Proposed 2nd Floor Extension office 289 31-Jul-2017 23 Sarmento St., Tinajeros, Malabon City 23 Sarmento St., Tinajeros, Malabon City Lina M. Caones Two (2) Storey Residential Building 290 31-Jul-2017 #735 Rizal Ave., Ext., Brgy. San Agustin, Malabon City #735 Rizal Ave., Ext., Brgy. San Agustin, Malabon City Marlene Bocobo Two (2) Storey Residential 291 31-Jul-2017 Lot 10-B Azure St., SSS Village Concepcion 2, Marikina City Lot 10-B Azure St., SSS Village Concepcion 2, Marikina City Katrina Ana Icban Proposed Two (2) Storey Residential Duplex 292 Lot 4 Blk 3 #31 Cherry St., SSS Village, Concepcion 2, Lot 4 Blk 3 #31 Cherry St., SSS Village, Concepcion 2, Marikina 31-Jul-2017 Marikina City City Jose Mario Pascual Renovation of Bruno's Cofee 293 Unit 1501 West Tower PSE Enter Exchange Rd., Ortigas, 31-Jul-2017 UGF Alabang Town Center, Alabang, Muntinlupa City Pasig City Agrifino Franco Two (2) Storey Residence 294 B4 Lot 7&9 Mahogany St., Pupa Homes, Putatan, Muntinlupa 31-Jul-2017 B4 Lot 7&9 Mahogany St., Pupa Homes, Putatan, Muntinlupa City City Jack A. Mendaros Proposed Two (2) Storey Residence 295 31-Jul-2017 Blk. 1 Lot 33 Tamara Lane Subd., Kaybiga, Caloocan City Blk. 1 Lot 33 Tamara Lane Subd., Kaybiga, Caloocan City Luningning Aragon Proposd 12-Unit Two (20 Storey Apartment with Roofdeck 296 31-Jul-2017 Lot 2 I. Matias St., Lamanza I, Las Piñas City Lot 2 I. Matias St., Lamanza I, Las Piñas City Trix Boutique Construction Nayda N. Mitschiener 297 Retail Space No. 1115-B No. 7 G/F, Alabang Town Center, 31-Jul-2017 Alabang Town Center, Muntinlupa City Muntinlupa City Jansen Aguilar Two (2) Storey Residence 298 B52 Primerose St., Southgreen Heights Vill., Puatatan, B52 Primerose St., Southgreen Heights Vill., Puatatan, Muntinlupa 31-Jul-2017 Muntinlupa City City Emauel Priela Repair of Two (2) Storey Residential 299 31-Jul-2017 1253 Don Quiote St., Sampaloc, Manila 1253 Don Quiote St., Sampaloc, Manila CAridaD M. GUANCO PROPOSED Renovation of Two (2) Storey Residence 300 31-Jul-2017 B10 L29 Area 3 brgy. Lonngos, Kaunlaran Vill., Malabon City B10 L29 Area 3 brgy. Lonngos, Kaunlaran Vill., Malabon City

Page 24 of 47

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region July 2017

No. Company Name and Address Project Name Date Approved Danilo Teodosio Proposed Demolition of Residential house 301 31-Jul-2017 #396 San Rafael St., Ayala Alabang Village, Muntinlupa City #396 San Rafael St., Ayala Alabang Village, Muntinlupa City Emerlita F. Ganzon Proposed Two (2) Storey Residence 302 31-Jul-2017 121 Crimson Lane Levitown Don Bosco, Parañaue City L25 B4 Yakal St., Dona Rosario Heights, Sucat, Muntinlupa City Kristia J. Gamboa/Nick C. Ramel Proposed Two (2) Storey Residence 303 31-Jul-2017 135 C. Rizal St., Poblacion, San Pedro, Laguna B5 Lot 6&7 Summitville 2, Putatan, Muntinlupa City Mr. & Mrs. Jonathan Urbino's Residence-Four (4) Storey Mr. & Mrs. Jonathan Urbino 303 Residence 3-Jul-2017 Lot 3 938 Murillo St., Quiapo, Manila Lot 3 938 Murillo St., Quiapo, Manila Bank Improvement of Catmon Pumping Station Retarding Basin, Marilou T. Espiritu 304 Malabon City 3-Jul-2017 Malabon City Malabon City Contract ID No. 17OA0056 Construction/Improvement of Luisito R. Tiqui 305 Riverwall/Dredging of Malabon Tullahan River, Malabon City 3-Jul-2017 Malabon City Malabon City Contract ID No. 17OA0057 Construction/Sealing of Riverwall Luisito R. Tiqui along Tullahan River, Brgy. Potrero, Malabon CityImprovement of 306 3-Jul-2017 Malabon City Riverwall/Dredging of Malabon Tullahan River, Malabon City Malabon City Contract ID 170 DO0086 Construction/Rehabilitation of Riverwall Cezarah Rowena C. Discaya along Tullahan River Sta. 5+600 - Sta. 5+900, Right Bank, 307 along Tullahan River Sta. 5+600 - Sta. 5+900, Right Bank, Marulas, Valenzuela City 3-Jul-2017 Marulas, Valenzuela City along Tullahan River Sta. 5+600 - Sta. 5+900, Right Bank, Marulas, Valenzuela City Arcie Jane Bañez Exterior Wall Treatment & Painting Works for NECC Maxims, Star 308 1 Newport Blvd., Newport City, Pasay Cruises Center and Marriot Hotel Manila 3-Jul-2017 City Resorts World Manila 1 Newport Blvd., Newport City, Pasay City Eldren P. Jumalon Proposed Billboard 309 4-Jul-2017 Pag-asa St., Maricaban, Pasay City Pag-asa St., Maricaban, Pasay City Mark Allan Te Proposed Seven (7) Storey Commercial/Office Building with Lower 310 Lot 795-CBI, Tandang Sora Ave., Brgy. Matandang Balara, & Upper Ground Floor, Mezzanine and Roofdeck 4-Jul-2017 Quezon City Lot 795-CBI, Tandang Sora Ave., Brgy. Matandang Balara,

Page 25 of 47

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region July 2017

No. Company Name and Address Project Name Date Approved Quezon City

Proposed Two(2) Storey Commercial Building, Twelve (12) Units Samson Teng/Metro Marketing Corp. Warehouse 311 Lot 1 Pcs-13-00218 E. Rodriguez Ave., Brgy. Sto. Nivo, 12-Jul-2017 Lot 1 Pcs-13-00218 E. Rodriguez Ave., Brgy. Sto. Nivo, Parañaque City Parañaque City Jezreel Alday Cerdo Building 312 4-Jul-2017 Bruger cor. Tagumpay St., Putatan, Muntinlupa City Bruger cor. Tagumpay St., Putatan, Muntinlupa City Contract ID: 17OD0101 Contract Name: Construction Flood Zenaida G. Quiambao Mitigation Structures-Construction/Rehabilitation of Sapang Alat 313 Sapang Alat Phase II, Sta. 0+000.00 to Sta. 1+720.00, Phase II, Sta. 0+000.00 to Sta. 1+720.00, Caloocan City 4-Jul-2017 Caloocan City Sapang Alat Phase II, Sta. 0+000.00 to Sta. 1+720.00, Caloocan City Contract ID No. 17-OD-0047 Construction of Flood Control Wall Ernesto T. Salazar along Meycauayan River, Sta. 1+100 to Sta. 1+315, 1st LD, 314 Meycauayan River, Sta. 1+100 to Sta. 1+315, 1st LD, Valenzuela City 4-Jul-2017 Valenzuela City Meycauayan River, Sta. 1+100 to Sta. 1+315, 1st LD, Valenzuela City Contract ID No. 17-OD-0051 Construction of Flood Control Wall Ernesto T. Salazar along Meycauayan River, Sta. 1+315 to Sta. 1+725, 1st LD, 315 Meycauayan River, Sta. 1+315 to Sta. 1+725, 1st LD, Valenzuela City 4-Jul-2017 Valenzuela City Meycauayan River, Sta. 1+315 to Sta. 1+725, 1st LD, Valenzuela City Felipe N. Camacho, Jr. Unit 2C & 2D Extension 316 4-Jul-2017 112 LPL Tower, Legaspi St., Legaspi Village, Makati City 112 LPL Tower, Legaspi St., Legaspi Village, Makati City Repainting and Improvement of Manuel L. Quezon Elementary Renato C. Ramos 317 School 5-Jul-2017 Brgy. Commonwealth, Quezon City Brgy. Commonwealth, Quezon City Renato C. Ramos Improvement of Road and Drainage of Labayani Street 318 5-Jul-2017 Labayani St., Brgy. North Fairview, uezon City Labayani St., Brgy. North Fairview, Quezon City Marlene Castro Proposed Day Care Center at Acacia 319 5-Jul-2017 Brgy. Pinagbuhatan, Pasig City Brgy. Pinagbuhatan, Pasig City

Page 26 of 47

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region July 2017

No. Company Name and Address Project Name Date Approved Construction and Improvement of Drainage System along Mabilis Carmen A. Miguel 320 & Matapang St., Quezon City 5-Jul-2017 Brgy. , Diliman, Quezon City Brgy. Pinyahan, Diliman, Quezon City Arnold A. Padilla Proposed Four (4) Storey Residential with Mezzanine 321 5-Jul-2017 N. Padilla St., San Miguel, Manila N. Padilla St., San Miguel, Manila Kristopher Virgil M. Cruz Proposed 3-Units Three (3) Storey Town House 322 5-Jul-2017 Lot C1, #115 P. Gomez St., Brgy. 13, Caloocan City Lot C1, #115 P. Gomez St., Brgy. 13, Caloocan City Robert Calangi Insta7) 323 Pasig Central Elementary School, Brgy. San Nicolas, Pasig 5-Jul-2017 Pasig Central Elementary School, Brgy. San Nicolas, Pasig City City Robert Calangi Installation/Fabrication of Security Grills of Safety Grills 324 VPE I & II, Dr. Sixto Antonio Elementary School, Brgy. VPE I & II, Dr. Sixto Antonio Elementary School, Brgy. Bambang, 5-Jul-2017 Bambang, Pasig City Pasig City Construction of Drainage Sytem at Interior St., (Back of Petron) Robert Calangi 325 along Ortigas Avenue 5-Jul-2017 along Ortigas Ave. Extn., Brgy. Rosario, Pasig City along Ortigas Ave. Extn., Brgy. Rosario, Pasig City Aina Gemenese Garcia Construction of Elevated Walkway 326 5-Jul-2017 Capitol Drive cor. Shaw Blvd., Brgy. Kapitolyo, Pasig City Capitol Drive cor. Shaw Blvd., Brgy. Kapitolyo, Pasig City Michael C. Millo Repair of Market Admin Office and Power House 327 5-Jul-2017 Pasig City Mega Market, Pasig City Pasig City Mega Market, Pasig City Construction of Drainage System and Upgrading of Pavement at Michael C. Millo 328 Interior Alleys at New Tuico (Alley 1,2,3) 5-Jul-2017 Brgy. Palatiw, Pasig City Brgy. Palatiw, Pasig City Michael C. Millo Construction ofRCCP Drainage Line and Upgrading of Road 329 G. Del Pilar La Del Pilar HOA, Nagpayong, Brgy. G. Del Pilar La Del Pilar HOA, Nagpayong, Brgy. Pinagbuhatan, 5-Jul-2017 Pinagbuhatan, Pasig City Pasig City Erlinda M. Sual Proposed Auditorium @ Seventh Floor Extension 330 7th Floor Pasig City Hall Bldg., Caruncho Ave., Brgy. San 7th Floor Pasig City Hall Bldg., Caruncho Ave., Brgy. San Nicolas, 5-Jul-2017 Nicolas, Pasig City Pasig City Construction of Four (4) Units Multi-purpose Covered Area Steel Erlinda M. Sual 331 and Concrete Louver Enclose 5-Jul-2017 along Sandoval Ave., Brgy. Pinagbuhatan, Pasig City along Sandoval Ave., Brgy. Pinagbuhatan, Pasig City

Page 27 of 47

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region July 2017

No. Company Name and Address Project Name Date Approved Erlinda M. Sual PLP-HRM Multi-purpose Building Interior Fit-out 332 Alcalde Jose St., PLP Compound, Brgy. Kapasigan, Pasig 5-Jul-2017 Alcalde Jose St., PLP Compound, Brgy. Kapasigan, Pasig City City 16OE0068-MFO 2- Flood Management Services- Construction/ Maintenance of Flood Mitigation Structures and Drainage Florina D. Gonzales 333 Systems- of Constancia Drainage MAin (RCBC) Phase II, Manila 5-Jul-2017 Sampaloc, Manila City City Sampaloc, Manila City Sampaloc, Manila City Construction of Rain Water Collection System (RWCS) in Teodora M. Abad 334 Fourteen Various Schools in Caloocan City and Valenzuela City 5-Jul-2017 Caloocan City & Valenzuela City Caloocan City & Valenzuela City Zenaida B. Serrano Construction of Three (3) Storey Residence 335 Lot 4 37 Circumferential Road, Araneta Village, Potrero, Lot 4 37 Circumferential Road, Araneta Village, Potrero, Malabon 5-Jul-2017 Malabon City City Construction of Rave Entrance Marker, Installation of Two (2) New Fiberglass Type Playground Facilities with Construction of Waiting Marlene Castro 336 Shed & Improvement of Botanical Garden at Rave City Park, F. 6-Jul-2017 Brgy. Maybunga, Pasig City Legaspi St., Brgy. Maybunga, Pasig City Brgy. Maybunga, Pasig Sps. Ruel T. Relova & Normita G. Relova Proposed Four (4) Storey Building 337 6-Jul-2017 Lot 7 Blk. 16 Dasdasan St., Brgy. San Roque, Marikina City Lot 7 Blk. 16 Dasdasan St., Brgy. San Roque, Marikina City Jun B. L. Ledda Christmas Bazaar 2017 Installation of Stalls 338 6-Jul-2017 84 a. Bonifacio Ave., Brgy. Barangka, Marikina City 84 a. Bonifacio Ave., Brgy. Barangka, Marikina City Carisma T. Amio/Rez L. Cotez Proposed Three (3) Storey Residence with Deck 339 6-Jul-2017 3462 A.C. Herrera St., Bo. Obrero, Tondo, Manila 3462 A.C. Herrera St., Bo. Obrero, Tondo, Manila Carisma T. Amio/Rez L. Cotez Proposed Three (3) Storey Residence with Deck 340 6-Jul-2017 3462 B.A. Tan St, Bo. Obrero, Tondo, Manila 3462 B.A. Tan St, Bo. Obrero, Tondo, Manila Ref No. 2017-039 Proposed Covered Walk and Pathwalk at NHA Jul N. Jahaddin 341 Main Office Compound 6-Jul-2017 NHA Main Office Compound, Elliptical Road, Quezon City NHA Main Office Compound, Elliptical Road, Quezon City Pedro Legislador Proposed Three (3) Storey (4 Units) Residence 342 12-Jul-2017 Lot 1-4 Marymount Country, San Andres St. Ramos Vill., Lot 1-4 Marymount Country, San Andres St. Ramos Vill., Brgy.

Page 28 of 47

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region July 2017

No. Company Name and Address Project Name Date Approved Brgy. Sun Valley, Parañaque City Sun Valley, Parañaque City

Romeo M. Cenon Ridley & EG Office Project/ Fit-Out 343 10th Flr. Rockwell Business Center Sheridan, Sheridan St., 10th Flr. Rockwell Business Center Sheridan, Sheridan St., 12-Jul-2017 , Mandaluyong City Greenfield District, Mandaluyong City Contract ID#: 17OH0071-Const./Maint. Of Flood Mitigation Structure and Drainage System- Improvement of Estero De Wilfredo M. Natividad 344 Incl. Fencing (Pandacan Pumping Station to Brgy. 870, 12-Jul-2017 Manila City Manila City Manila City Contract ID#: 17OI0044- Repair/Rehab. of School Building Kim Paulo G. Gonzales Bayanan Elementary School Unit 1, Bayanan Elementary School 345 12-Jul-2017 Muntinlupa City Main & Alternative Learning School Muntinlupa City Muntinlupa City Contract ID#: 17OI0054- Const. of Multi-Purpose Building Sucat Kim Paulo G. Gonzales 346 Muntinlupa City 12-Jul-2017 Muntinlupa City Muntinlupa City Contract ID#: 17OI0055- Const. of Multi-Purpose Building Kim Paulo G. Gonzales 347 Tunasan, Muntinlupa City, 12-Jul-2017 Muntinlupa City Muntinlupa City Amado L. Jugueta 2017 Pipe Laying Project at BLS Annex 31 (Z04) 348 12-Jul-2017 Brgy. Marcelo Green, Parañaque City Brgy. Marcelo Green, Parañaque City Christian Noel Ragojos San Lorenzo Place Showroom 349 12-Jul-2017 EDSA cor. Chino Roces Ave., Makati City EDSA cor. Chino Roces Ave., Makati City Christian Noel Ragojos Alorica Teleservices, Inc. 350 8F Philplans Corporate Center, 10th Ave. cor. Kalayaan Ave., 8F Philplans Corporate Center, 10th Ave. cor. Kalayaan Ave., 12-Jul-2017 Bonifacio Triangle Fort Bonifacio, Taguig City Bonifacio Triangle Fort Bonifacio, Taguig City 17OO0016-"Construction/Rehabilitation of Water Supply Burt Gregory T. Favorito Septage/Rain Water Collectors (RWCS), DPWH-NCR Regional 351 12-Jul-2017 2nd St., Port Area, Manila Office, 2nd St., Port Area, Manila 2nd St., Port Area, Manila

Page 29 of 47

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region July 2017

No. Company Name and Address Project Name Date Approved Arch. Raffy Magbanua Proposed Two (2) Storey Commercial Building 352 12-Jul-2017 #475 Padre Faura St. cor. M.H. Del Pilar, Ermita, Manila #475 Padre Faura St. cor. M.H. Del Pilar, Ermita, Manila Manuel Lim Three (3) Storey Residential Apartment w/ Roof Deck 353 12-Jul-2017 336 10th Ave. cor. Ilang-Ilang St. Grace Park, Caloocan City 336 10th Ave. cor. Ilang-Ilang St. Grace Park, Caloocan City Gina Gloria Diccion Three (3) Storey Duplex Res'l. 354 L16 B15 E. Vital St. BF Resort Village, Talon 2, Las Piñas 12-Jul-2017 L16 B15 E. Vital St. BF Resort Village, Talon 2, Las Piñas City City Michael C. Millo Repair & Repainting of San Antonio Hall 355 San Antonio Brgy. Hall, General Malavar St., San Antonio, San Antonio Brgy. Hall, General Malavar St., San Antonio, Pasig 12-Jul-2017 Pasig City City Melchor De Asis Renovation of Industrial Building 356 Lot 10,11 & 12 Blk. 92 Maria Clara St., Between 7th & 8th Lot 10,11 & 12 Blk. 92 Maria Clara St., Between 7th & 8th Ave., 12-Jul-2017 Ave., Calaanan, Caloocan City Calaanan, Caloocan City Luke Coughlan Bay Area Mixed-Used Project-Lot 1 (BPO, Hotel & Retail) 357 12-Jul-2017 Blk 9 cor.Macapagal Blvd., Aseana City, Parañaque City Blk 9 cor.Macapagal Blvd., Aseana City, Parañaque City Bay Area Mixed-Used Project-Lot 2 (Mall, Cinemas, Parking Luke Coughlan Building & Central Parking) 358 Blk. 9th cor. Asean Ave., cor. Macapagal Blvd., Aseana City, 12-Jul-2017 Blk. 9th cor. Asean Ave., cor. Macapagal Blvd., Aseana City, Parañaque City Parañaque City Gina Retutar Proposed Three (3) Storey Building 359 12-Jul-2017 119 Kalawit St., Bo. San Jose, Caloocan City 119 Kalawit St., Bo. San Jose, Caloocan City Troy Joseph J. Tecson 17-5016 Improvement of Road & Drainage of Sct. Torillo St. 360 12-Jul-2017 Sct. Torillo St., Quezon City Sct. Torillo St., Quezon City 17-6024- Improvement of NDH at Barangay San Bartolome, Emiliano R. Cerdon, Jr. 361 Novaliches, Quezon City 12-Jul-2017 Brgy. San Bartolome, Novaliches, Quezon City Brgy. San Bartolome, Novaliches, Quezon City Danilo C. Manalansan Proposed Office & Warehouse Building 362 #24 Selecta Drive Brgy. Pag-ibig sa Nayon, Balintawak, #24 Selecta Drive Brgy. Pag-ibig sa Nayon, Balintawak, Quezon 12-Jul-2017 Quezon City City Contract ID No. 17-OD-0057 Ernesto T. Salazar 363 Rehabilitation/Reconstruction/Upgrading of Damaged Paved 12-Jul-2017 Gov. T. Santiago St., Valenzuela City National Roads Including Drainage Based on Pavement

Page 30 of 47

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region July 2017

No. Company Name and Address Project Name Date Approved Management System/Highway -4, Gov. T. Santiagoi St., Valenzuela City Gov. T. Santiago St., Valenzuela City Contract Id: 17OD0115-Rehabilitation of Road withDrainage Jan Carlos L. Diu 364 Improvement along TTC Road, Valenzuela City 12-Jul-2017 0 0 Renato M. Montano Proposed Four (4) Storey Residence with Roofdeck 365 12-Jul-2017 L6 B6 Lorenzo Dela Paz St., Pandacan, Manila L6 B6 Lorenzo Dela Paz St., Pandacan, Manila Replacement & Repaint of Doors & Windows Repair of Toilet & Marilyn Chiu 366 Bath Repaint of Walls 12-Jul-2017 838 Palomo Bldg., Severino St., Sta. Cruz, Manila 838 Palomo Bldg., Severino St., Sta. Cruz, Manila Contract ID#: 17OH0091- Completion of the Repair/Renovation of Ulpiano B. Mateo Jr. Bureau of Quality and Safety (BCS) Office 4th Floor DPWH 367 12-Jul-2017 Manila City Central Office Bonifacio Frive Port Area, Manila Manila City #17-7005 Construction of Grouted Riprap at Buaya Creek (Phase Maria Teresita F. Pamintuan 368 II) 12-Jul-2017 Brgy. Quirino 2-A, Quezon City Brgy. Quirino 2-A, Quezon City Cecil Ong Proposed Three (3) Storey Residence with Deck 369 12-Jul-2017 1133-1137 Juan St., Tondo, Manila 1133-1137 Juan St., Tondo, Manila Sps. Angelo & Ellinor Geronimo, Angel John F. Geronimo Proposed Three (3) Storey 12-Units Residential Building 370 12-Jul-2017 Lot 3-C Blk. 2250 Sulo St., Sta. Cruz, Manila Lot 3-C Blk. 2250 Sulo St., Sta. Cruz, Manila Amelia N. Fulgencio Proposed Three (3) Storey with Roofdeck 4-Unit Residence 371 12-Jul-2017 #53 N. Vicencio St., Niugan, Malabon City #53 N. Vicencio St., Niugan, Malabon City OP-16-BOW-03 Proposed Muntinlupa Business Area Compound Joseph E. Zabat 372 Development Plan 12-Jul-2017 Muntinlupa Business Area Compound, Muntinlupa City Muntinlupa Business Area Compound, Muntinlupa City Contract ID# 17OH0076-Const./Repair./Rehab/Improvement of Augusto B. Bao-Idang Various Infrastructure including Local Projects-Roads & Drainage 373 12-Jul-2017 Zone 97 & Vicinity, Sta. Ana, Manila Improvement Zone 97 & Vicinity, Sta. Ana, Manila Zone 97 & Vicinity, Sta. Ana, Manila

Page 31 of 47

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region July 2017

No. Company Name and Address Project Name Date Approved Contract ID# 17OH0088-Repair/Rehab of Multi-purpose Building, Augusto B. Bao-Idang Brgy. 776, Sta. Ana, Manilancluding Local Projects-Roads & 374 12-Jul-2017 Brgy. 776 Zone 85, Sta. Ana, Manila Drainage Improvement Zone 97 & Vicinity, Sta. Ana, Manila Brgy. 776 Zone 85, Sta. Ana, Manila Robert Calangi Construction of CHB Lined Canal & Concreting of Alley 375 #490 Sandoval Drive., Sixto Ave., Brgy. Maybunga, Pasig 13-Jul-2017 #490 Sandoval Drive., Sixto Ave., Brgy. Maybunga, Pasig City City Robert Calangi Construction of CHB Lined Canal & Upgrading Concreting of Alley 376 13-Jul-2017 Lacandaso Alley, Brgy. San Miguel, Pasig City Lacandaso Alley, Brgy. San Miguel, Pasig City Robert Calangi Rehabilitation of Tapered Streetlights 377 13-Jul-2017 along P. Burgos St., Brgy. San Jose along P. Burgos St., Brgy. San Jose Eduardo De Leon Proposed Three (3) Storey Residence 378 13-Jul-2017 Lot 141 P. Burgos St., Sto. Niño, Marikian City Lot 141 P. Burgos St., Sto. Niño, Marikian City Victoria Madamba Proposed Four (4) Storey with Deck Residence 379 13-Jul-2017 4th-19th St., Villamor Airbase, Pasay City 4th-19th St., Villamor Airbase, Pasay City Victor D. Atienza Proposed Three (3) Storey Residential Building 380 13-Jul-2017 263-B Teresa St., Sta. Mesa, Manila 263-B Teresa St., Sta. Mesa, Manila Antonio Del Pozo Otayza Proposed Three (3) Storey Residential Apartment Building 381 13-Jul-2017 1187 Cristobal St., Paco, Manila 1187 Cristobal St., Paco, Manila Gloria Sohrabi Proposed Two (2) Storey Warehouse 382 13-Jul-2017 Eagle St., Sta. Elena, Marikina City Eagle St., Sta. Elena, Marikina City Mr. & Mrs. Esperanza Bacolod Proposed Three (3) Storey Residential 383 Blk. 7 Lot 9-10 Italia St., Trevi Executive Village, Concepcion Blk. 7 Lot 9-10 Italia St., Trevi Executive Village, Concepcion I, 13-Jul-2017 I, Marikina City Marikina City Diana C. Mano Proposed Billboard 384 13-Jul-2017 Masangkay cor. LA Torre cor. Binavidez St., Tondo, Manila Masangkay cor. LA Torre cor. Binavidez St., Tondo, Manila Marlyn Calderon Proposed Three (3) Storey Residential with Deck 385 13-Jul-2017 Tecson/Del Fierro St., Tondo, Manila Tecson/Del Fierro St., Tondo, Manila Roosevelt M. Ramos Proposed Three (3) Storey Residence with Deck 386 13-Jul-2017 3812 E. Biyaya St., Bacood Sta. Mesa, Manila 3812 E. Biyaya St., Bacood Sta. Mesa, Manila

Page 32 of 47

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region July 2017

No. Company Name and Address Project Name Date Approved Ralph S. Atienza Renovation of Gas Station 387 Pioneer St. cor. Sheridan St., Buayang Bato, Mandaluyong 13-Jul-2017 Pioneer St. cor. Sheridan St., Buayang Bato, Mandaluyong City City Michel Flores Billboard 388 13-Jul-2017 Barangka, Marikina City Barangka, Marikina City Mariano T. See Diet The Big Apple -Podium Phase 2 (Time Square West) 389 13-Jul-2017 7th Ave, BGC, Fort Taguig City 7th Ave, BGC, Fort Bonifacio Global City Taguig City Jun Y. Pin Proposed Fit-out for ADB Headquarters Third Atrium Office 390 13-Jul-2017 2F/3F/8F/ & 9F ADB Ave., Mandaluyong City 2F/3F/8F/ & 9F ADB Ave., Mandaluyong City Romeo M. Cenon BDO-Filinvest Northgate Aeon-Fit Out 391 Lot 2A&3, Blk. 45 Filinvest Corporate City, Alabang Zapote Lot 2A&3, Blk. 45 Filinvest Corporate City, Alabang Zapote Road 13-Jul-2017 Road cor. Northgate Bridgeway, Muntinlupa City cor. Northgate Bridgeway, Muntinlupa City Christian Noel Ragojos Proposed Shopee Office Fit-out 392 13-Jul-2017 37F Netpark 5th Ave., Bonifacio Global, Taguig City 37F Netpark 5th Ave., Bonifacio Global, Taguig City 17-8023 Improvement of Road and Drainage of Ragang St., Brgy. Philip C. Cham 393 Manresa, Quezon City 13-Jul-2017 Brgy. Manresax, Quezon City Brgy. Manresax, Quezon City Pipo Lumanao Proposed Ortigas Technopoint 2 (16-Storey Building) 394 13-Jul-2017 j. Vargas Ave., cor. Meralco Ave., Brgy. Ugong, Pasig City j. Vargas Ave., cor. Meralco Ave., Brgy. Ugong, Pasig City Pipo Lumanao Robinson Magnolia Residences-Tower C & Podium 395 13-Jul-2017 N. Domingo St., cor. Hemady Ave., New Manila, Quezon City N. Domingo St., cor. Hemady Ave., New Manila, Quezon City Lawrence L. Ong Proposed Unilab Non Pharma Building 396 14-Jul-2017 No. 66 United St., 1550, Mandaluyong City No. 66 United St., 1550, Mandaluyong City #17-4014 Improvement of Road & Drainage of Villa Ordinario, St. Manuel R. Bulaong, Jr. 397 Francis HOA along Katarungan St., 14-Jul-2017 Brgy. Kaligayahan, Quezon City Brgy. Kaligayahan, Quezon City Robert B. Henson Asian Hospital & Medical Center, Inc. 398 14-Jul-2017 2205 Civic Drive, Filinvest City, Alaabng, muntinlupa City 2205 Civic Drive, Filinvest City, Alaabng, muntinlupa City May Benevan C. Sabater Renovation Works at Counselor's Lounge 399 14-Jul-2017 7th Floor, City Hall, Caruncho Ave., San Nicolas, Pasig City 7th Floor, City Hall, Caruncho Ave., San Nicolas, Pasig City

Page 33 of 47

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region July 2017

No. Company Name and Address Project Name Date Approved Repair & Improvement of tanghalang pasigueno (lobby Area), May Benevan C. Sabater 400 Function Rooms 14-Jul-2017 City Hall Complex, brgy. San Nicolas, Pasig City City Hall Complex, brgy. San Nicolas, Pasig City Felix Nava Pangilinan Construction of Bayani Bridge 401 Bayani St., Brgy. Doña Imelda & 11th St., Damayang Lagi, Bayani St., Brgy. Doña Imelda & 11th St., Damayang Lagi, 14-Jul-2017 Quezon City Quezon City Proposed Supply and Installation of Two (2) Additional Pumps and Gary B. Montoya Motor and Gearboxes including Valve Automation in Putatan 402 14-Jul-2017 Putatan, Muntinlupa City Product Water Pump Station Putatan, Muntinlupa City Contract ID: 17OD0109-Construction of Flood Control River Wall Robert T. Imperio Along Tullahan River, Libis Baesa, Sta. 4+490 to Sta. 5+480, 403 14-Jul-2017 Libis Baesa, Caloocan City Caloocan City Libis Baesa, Caloocan City Reference No: 17OE0074 Contract Name: Local Infrastructure Leonardo S. Esteban Program-Building and other Structures, Improvement of Multi- 404 14-Jul-2017 Manila City 6th LD purpose Building, Brgy. 601, Sta. Mesa, Manila City Manila City 6th LD Reconstruction/Rehabilitation of C-6 Road from M.L. Quezon to Ricardo R. Chua Bridge, Taguig City (Sta. 4+140-Sta. 6+940) Left Side 405 14-Jul-2017 Taguig City Only Contract ID No. 17OD0003 Taguig City Reference No. 17OE0053 Contract Name: Locally Funded Project-National Building, Rehabilitation/Improvement/Repair of Ma. Roma Angeline D. Rimando 406 PSG 1st Guard Barrack Buildings, J.P. Laurel St., San Miguel, 14-Jul-2017 J.P. Laurel St., San Miguel, Manila Manila J.P. Laurel St., San Miguel, Manila Contract ID: 17OD0110-Construction of Flood Control River Wall Robert T. Imperio Along Tullahan River, Libis Baesa, Sta. 4+490 to Sta. 5+480, 407 14-Jul-2017 Libis Baesa, Caloocan City Caloocan City Libis Baesa, Caloocan City

Page 34 of 47

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region July 2017

No. Company Name and Address Project Name Date Approved Jose Maria Francisco Montejo Proposed Four (4) Storey Commercial Parking Building 408 14-Jul-2017 GSC Ortigas Ave., Greenhills, San Juan City GSC Ortigas Ave., Greenhills, San Juan City Ferdinand B. Garduque Three (3) Storey General Interior Renovation 409 14-Jul-2017 Metropolitan Ave., cor. Pasong Tamo, Makati City Metropolitan Ave., cor. Pasong Tamo, Makati City Ferdinand B. Garduque Additional 2nd Floor of Office Building 410 14-Jul-2017 Stp K5 Karangalan Village, Pasig City Stp K5 Karangalan Village, Pasig City Nerry Sunga Proposed Four (4) Storey Residential Building 411 14-Jul-2017 Blumentritt cor. Dimasalang St., Sampaloc, Manila Blumentritt cor. Dimasalang St., Sampaloc, Manila Rosalina T. Ropi Proposed Three (3) Storey Residential Building with Roofdeck 412 17-Jul-2017 229 J.P. Rizal, Tejeros, Makati City 229 J.P. Rizal, Tejeros, Makati City Daisy Cabayo Proposed Three (3) Storey Residential 413 17-Jul-2017 Blk. 190 Lot 6 Tambuli St., Pembo, Makati City Blk. 190 Lot 6 Tambuli St., Pembo, Makati City Andrew Stephen Tan Kaw Proposed Three (3) Storey Building Residence 414 Lot 1 &2 B19 Phase 2 Victoria Place Subd., Potrero, Malabon 14-Jul-2017 Lot 1 &2 B19 Phase 2 Victoria Place Subd., Potrero, Malabon City City Christopher M. Ignacio Ignacio Family Residence/Proposed Three (3) Storey Residence 415 Lot 11 Blk. 2 Ayala Southvale Sonera Village, Almanza Dos, Lot 11 Blk. 2 Ayala Southvale Sonera Village, Almanza Dos, Las 14-Jul-2017 Las Piñas City Piñas City Construction of RCCP Drainage Line and Upgrading of Road Mary Susan C. Pajara 416 Portion of Mulawin St., and Interior Alley 17-Jul-2017 Nagpayong, Brgy. Pinagbuhatan, Pasig City Nagpayong, Brgy. Pinagbuhatan, Pasig City Proposed Replacement of Waterline Risers and Miscellaneous Paul G. Marquez Works 417 Hardin ng Rosas and Hardin ng Doña Aurora, U.p. Diliman, 17-Jul-2017 Hardin ng Rosas and Hardin ng Doña Aurora, U.p. Diliman, Quezon City Quezon City Primicias Garcia Bordones Repainting of exterior Wall 418 18-Jul-2017 2339 EGI Taft Tower, Taft Ave., Malate, Manila 2339 EGI Taft Tower, Taft Ave., Malate, Manila #17-9010 Improvement of QMC Jogging Lane at Pylon, Quezon Ferdinand B. Tabora 419 Memorial Circle, Brgy. Central, Quezon City 18-Jul-2017 , Brgy. Central, Quezon City Quezon Memorial Circle, Brgy. Central, Quezon City

Page 35 of 47

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region July 2017

No. Company Name and Address Project Name Date Approved Zeyan How Demolition of Four (4) Storey Residential Building 420 18-Jul-2017 745 Madrid St., Biondo, Manila 745 Madrid St., Biondo, Manila Anna Kristina B. Evangelista Three (3) Storey Residence with Basement 421 18-Jul-2017 Lot 10 Blk. 2 Ayala Southvale Village, Las Piñas City Lot 10 Blk. 2 Ayala Southvale Village, Las Piñas City Katherine Liz Quiambao Three (3) Storey Residential 422 17-Jul-2017 Lot 9 Blk. 45 Soldiers Hills Village, Putatan, Muntinlupa City Lot 9 Blk. 45 Soldiers Hills Village, Putatan, Muntinlupa City Jimil D. Baclor Three (3) Storey Residence 423 17-Jul-2017 Blk. 2 Lot 3 Brazilia Heights, Brgy. T unasan, Muntinlupa City Blk. 2 Lot 3 Brazilia Heights, Brgy. T unasan, Muntinlupa City Improvement of Road and Drainage of 10th Ave., Brgy. Soccoro, Carmen A. Miguel 424 Quezon City 18-Jul-2017 Quezon City Quezon City Improvement of Drainage System of Mayaman St/ Kalayaan Ave., Carmen A. Miguel 425 Brgy. U.P. Village/Central 18-Jul-2017 Quezon City Quezon City Proposed Six (6) Storey Warehouse Building Proposed Two (2) Arvin Joseph Tan/ Moises Sallutan, Jr. 426 Level Office Extension 18-Jul-2017 South Super Highway South Super Highway Fredierick Artem A. Anda Improvement of DDG'S Office at CAAP Compound 427 18-Jul-2017 Civil Aviation Authority of the Philippines Civil Aviation Authority of the Philippines Benjamin A. Ando Vista GL Taft 428 18-Jul-2017 1334 Taft Ave., Ermita, Manila 1334 Taft Ave., Ermita, Manila Crisanto Brutas Fame Residences Tower 3 (44-Storey) 429 EDSA cor. Mayflower St., Brgy. Highway Hills, Mandaluyong 18-Jul-2017 EDSA cor. Mayflower St., Brgy. Highway Hills, Mandaluyong City City Glenda Inzose Three (3) Storey Apartment 430 18-Jul-2017 170 Bayanihan Alley , Bagong Barrio, Caloocan City 170 Bayanihan Alley , Bagong Barrio, Caloocan City Jacob Santos Three (3) Storey Apartment 431 18-Jul-2017 Lot 42 Naourata St., Brgy. 60, Caloocan City Lot 42 Naourata St., Brgy. 60, Caloocan City Sps. Macario & Geraldine Pagaragan, Jr Three (3) Storey Residential Building 432 18-Jul-2017 2nd Ave., L & B Compound Ilaya, Alabang Muntinlupa 2nd Ave., L & B Compound Ilaya, Alabang Muntinlupa

Page 36 of 47

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region July 2017

No. Company Name and Address Project Name Date Approved Emilia Machida Proposed Four (4) Storey Residential 433 19-Jul-2017 #59 Aurora St., Brgy. Maytunas, San Juan City #59 Aurora St., Brgy. Maytunas, San Juan City Antonio F. Guiruela Jr. Proposed Four (4) Storey Residential 434 19-Jul-2017 578 J. Ventanilla Int., Pasay City 578 J. Ventanilla Int., Pasay City MA. Luisa Larong Proposed Four (4) Storey Residential with Deck 435 19-Jul-2017 Blk. 267 Lot 1, Target Range St., Pembo, Makati City Blk. 267 Lot 1, Target Range St., Pembo, Makati City Jose T. Macadaeg, Jr. Construction of Shell Gasoline Station 436 19-Jul-2017 Paz Mguanzon St., Brgy. 829, Paco, Manila Paz Mguanzon St., Brgy. 829, Paco, Manila Dondon K. Egkayogen Proposed Six (6) Units Condominium (Three (3) Storey 437 Lot 5&6 Blk. 27, Road 10F, UPS-5, San Isidro, Parañaque Residential Building 19-Jul-2017 City Lot 5&6 Blk. 27, Road 10F, UPS-5, San Isidro, Parañaque City Vann Ryan R. Calimbahin Six (6) Storey Dormitory 438 19-Jul-2017 No. 1643 Camino Dela Fe St., Guadalupe Nuevo, Makati City No. 1643 Camino Dela Fe St., Guadalupe Nuevo, Makati City Rehabilitation of Launder cover along IsmanBlvd., Brgy. Pascualito Sr. Luciano 439 Kalawaan, Pasig City 19-Jul-2017 Ismar Blvd., Brgy. Kalawaan, Pasig City Ismar Blvd., Brgy. Kalawaan, Pasig City Construction of Four (4) Storey Building (Marin & Corona Tower, michael angelo c. co Pacific Coast Residences) 440 Montreal & Melbourne St., BF Homes BF International, Las 25-Jul-2017 Montreal & Melbourne St., BF Homes BF International, Las Piñas Piñas City City Contract ID No. 17OF0067 Construction of Slope Protection in Luisito R. Tiqui 441 Marikina River, Brgy. , Phase IV, Quezon City 19-Jul-2017 Brgy. Batasan Hills, Quezon City Brgy. Batasan Hills, Quezon City Contract ID No. 17OF0077 Improvement of Malabon-Tullahan Luisito R. Tiqui 442 River, Brgy. San Bartolome, Phase V, Quezon City 19-Jul-2017 San Bartolome, Quezon City San Bartolome, Quezon City Alfredo Alamar Three (3) Storey Commercial Building 443 19-Jul-2017 65 National Road, Putatan, Muntinlupa City 65 National Road, Putatan, Muntinlupa City Mauricio J. Victoriano Kidzoona Indoor Playground 444 19-Jul-2017 4th Level Cloverleaf Mall, Balintawak, Quezon City 4th Level Cloverleaf Mall, Balintawak, Quezon City

Page 37 of 47

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region July 2017

No. Company Name and Address Project Name Date Approved John Paul Pe Studio 7 445 19-Jul-2017 EDSA/Samar St., Brgy. South Triangle, Quezon City EDSA/Samar St., Brgy. South Triangle, Quezon City Opening/Concreting of Mindanao Avenue Extension Segment 2C Reynaldo N. Manalansan 446 (Phase I& II) Cities of Caloocan and Valenzuela (16O0036) 19-Jul-2017 Valenzuela City Valenzuela City Lucina Reyes Three (3) Storey Residential Commercial Building 447 20-Jul-2017 3440 M. Reyes St. cor. Gen. Lim St., Bangkal, Makati City 3440 M. Reyes St. cor. Gen. Lim St., Bangkal, Makati City 17OC0057- Bank Improvement/Slope Protection along Estero Elrani A. Nuñez 448 Tripa De Gallina, District I, Makati City, Metro Manila 20-Jul-2017 Makati City, Metro Manila Makati City, Metro Manila Proposed Road Improvement of Aranda St. (C & D) located at Mercedita C. Barrameda 449 Barangay Tejeros, Makati City 20-Jul-2017 Makati City Makati City Josefina S. Arellano Proposed Three (3) Storey Residence with Deck 450 #41 P. Parada St. Brgy. Sta. Lucia, San Juan City, Metro 20-Jul-2017 #41 P. Parada St. Brgy. Sta. Lucia, San Juan City, Metro Manila Manila 17OC0061-Upgrading of Drainage System along President Luisito M. Canlas 451 Avenue, Brgy. B.F., Parañaque City, Metro Manila 20-Jul-2017 Parañaque City Parañaque City 17OC0055-Expansion of TB DOTS and the Primary Health Care Ronald Martin N. Nuñez Services; Establish an Animal Bite Treatment Center (ABTC), 452 20-Jul-2017 Parañaque City, Metro Manila Brgy. Don Bosco, Parañaque City, Metro Manila Parañaque City, Metro Manila 17OC0071- Construction of Additional Fire Exits in Various School Leonora E. Viray 453 Building, First District, Parañaque City, Metro Manila 20-Jul-2017 Parañaque City, Metro Manila Parañaque City, Metro Manila 17OC0068- Construction of Multi-Purpose Building Tambo Jimmy D. Paguio 454 Elementary School, Parañaque City, Metro Manila 20-Jul-2017 Parañaque City, Metro Manila Parañaque City, Metro Manila 17OC0054- River Bank Improvement and Slope Protection along Elrani A. Nuñez 455 Makati- River, Brgy. Comembo, 2nd District, Makati City, 20-Jul-2017 Makati City, Metro Manila Metro Manila

Page 38 of 47

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region July 2017

No. Company Name and Address Project Name Date Approved Makati City, Metro Manila

17OC0063- Improvement/Cleaning & Desilting of Buli Creek Christopher Garrick Z. Nuñez 456 (Parañaque Section), Tahanan Village, Brgy. B.F., Parañaque City 20-Jul-2017 Parañaque City, Metro Manila Parañaque City, Metro Manila 17OC0066- Rehabilitation/Upgrading and Drainage Improvement Harold Benedict A. Lava of Mayapis St. and its Vicinity (Phase II), Brgy. San Antonio, 457 20-Jul-2017 Makati City, Metro Manila District I, Makati City, Metro Manila Makati City, Metro Manila Cesar P. Consing Bank of Philippine Island 458 10F South Park Cor. Center, National Rd., Alabang, 10F South Park Cor. Center, National Rd., Alabang, Muntinlupa 21-Jul-2017 Muntinlupa City City Cesar P. Consing BPI Call Center 459 21-Jul-2017 14F Vertis North Tower 1, EDSA, Quezon City 14F Vertis North Tower 1, EDSA, Quezon City Contract No.: NR-17-GIP-TO-03 - Proposed 2017 Total Pipe Replacement in HS H. Lopez at 16-TDO05H (Villafojas St.) and in Rolando C. Roncal 460 HS DGP 259 at 17-TDO061 (Pilar St.) and Partial Pipe 21-Jul-2017 Manila Replacement in HS DGP 259 at 17-TDO06G (Lico- Severino St.) in manila, under Tond 17OC0058- River Bank Improvement and Slope Protection along Elrani A. Nuñez Makati-Pateros River Phase II, Brgy. Comembo, District II, Makati 461 21-Jul-2017 Makati City, Metro Manila City, Metro Manila Makati City, Metro Manila 17OC0078- Bank Improvement/Sheet Piling of Parañaque River Elrani A. Nuñez 462 Diversion Channel, Parañaque City, Metro Manila 21-Jul-2017 Parañaque City Parañaque City Ben Murphy Quintiles Philippines, Inc. Fitout 463 21-Jul-2017 &f 8 Rockwell Drive, Rockwell Center, Makati City &f 8 Rockwell Drive, Rockwell Center, Makati City Fidel G. Fabile Proposed Four (4) Storey School Bldg. 464 21-Jul-2017 P. Diego Cera St. Daniel Fajardo, Las Piñas City P. Diego Cera St. Daniel Fajardo, Las Piñas City Deguilio E. Guino Three (3) Storey Four Units Residential Bldg. 465 21-Jul-2017 L9-A B126 M.H. Del Pilar, Makati City L9-A B126 M.H. Del Pilar, Makati City

Page 39 of 47

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region July 2017

No. Company Name and Address Project Name Date Approved Construction of Multi-Purpose Building @ Ilang-Ilang St., Brgy. Crizalde R. Tiu 466 Batasan Hills, Quezon City 21-Jul-2017 Ilang-Ilang St., Brgy. Batasan Hills, Quezon City Ilang-Ilang St., Brgy. Batasan Hills, Quezon City Evenizer C. Nolasco Repair and Improvement of Pasig Youth Center 467 21-Jul-2017 Market Ave.,St., Brgy. Palatiw, Pasig City Market Ave.,St., Brgy. Palatiw, Pasig City Repair and Improvement of Gym/Multi-Purpose HallPasig Youth Evenizer C. Nolasco 468 Center 21-Jul-2017 Rosario Elementary School, Brgy. Rosario, Pasig City Rosario Elementary School, Brgy. Rosario, Pasig City Evenizer C. Nolasco Installation of New Window Grills and New Ceiling 469 ADCOP Building, Pasig City Hall Compound beside Business ADCOP Building, Pasig City Hall Compound beside Business 21-Jul-2017 Center Building, Brgy. San Nicolas, Pasig City Center Building, Brgy. San Nicolas, Pasig City Evenizer C. Nolasco Construction of RCCP Drainage Line and Upgrading of Road 470 Interior Road, Caliwag St., M.H. Del Pilar St., Fontanillas, Interior Road, Caliwag St., M.H. Del Pilar St., Fontanillas, Brgy. 21-Jul-2017 Brgy. Pinagbuhatan, Pasig City Pinagbuhatan, Pasig City Replacement of 1-Defective and Supply and Installation of 2- Marlon U. Ronquillo Variable Frequency Drive at Balara Pump Station 471 MWSS Administration Building 489 Katipunan Road, 1105 21-Jul-2017 MWSS Administration Building 489 Katipunan Road, 1105 Balara, Balara, Quezon City Quezon City Crispin R. Ibay Jr. Proposed Four (4) Storey Residential Apartment 472 25-Jul-2017 L5 B27 Sampaguita St. Brgy. Pembo, Makati City L5 B27 Sampaguita St. Brgy. Pembo, Makati City Contract No. NR-17-SDS-PQ-04 (the "Contract") Proposed 2017 Arsenio P. Rombaoa Partial Pipe Replacement in HS Sucat Pasay, at 24-PQE010 473 HS Sucat Pasay, at 24-PQE010 (Daang Batang), in (Daang Batang), in Parañaque City, under Parañaque B.A. 25-Jul-2017 Parañaque City, under Parañaque B.A. (the"Project") HS Sucat Pasay, at 24-PQE010 (Daang Batang), in Parañaque City, under Parañaque B. Emmanuel Silvestre Proposed Four (4) Storey Building 474 25-Jul-2017 9270 Dita St., Brgy. San Antonio, Makati City 9270 Dita St., Brgy. San Antonio, Makati City Supply and Installation of One (1) Unit Multi-Cell Cooling Towe for Daniel S. La Torre the 500TR Centralized Air Conditioning Unit and One (1) Modular 475 Malacañang Palace Grounds, JP Laurel St., San Miguel 25-Jul-2017 Chiller including Interconnection Manila Malacañang Palace Grounds, JP Laurel St., San Miguel Manila

Page 40 of 47

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region July 2017

No. Company Name and Address Project Name Date Approved Belen C. Nuevo Proposed Four (4) Storey Townhouse 476 25-Jul-2017 P. Villanueva St., Brgy. San Rafael, Pasay City P. Villanueva St., Brgy. San Rafael, Pasay City Pedro Poveda Proposed Sewage Treatment Plan (STP) 477 25-Jul-2017 Brgy. Wack-wack, Mandaluyong City Brgy. Wack-wack, Mandaluyong City Kristoffer Jongco Proposed Three (3) Storey Commercial Building 478 Lot H-5 Marcos Alvarez Ave., Mikesell Subd., Talon 5, lAs Lot H-5 Marcos Alvarez Ave., Mikesell Subd., Talon 5, lAs Piñas 25-Jul-2017 Piñas City City Henry Ong Proposed Three (3) Storey Commercial/Residential Building 479 25-Jul-2017 Luzon St., cor. Benavidez St., Sta. Cruz., Manila Luzon St., cor. Benavidez St., Sta. Cruz., Manila Leslee M. Domingo Proposed Three (3) Storey Residence (38 SQ.M.) 480 25-Jul-2017 3439 San Roque St., Sta. Ana, Manila 3439 San Roque St., Sta. Ana, Manila Jose P. Giron Viventis Search Asia, Inc. 481 G/F Shopping Arcade, EDSA Shangri-la 1, Garden Way G/F Shopping Arcade, EDSA Shangri-la 1, Garden Way Ortigas 25-Jul-2017 Ortigas Center, Mandaluyong City Center, Mandaluyong City Randy P. Lucas Grand Westside Hotel/Pile Driving 482 25-Jul-2017 Bagong Nayong Pilipino Entertainment City, Parañaque City Bagong Nayong Pilipino Entertainment City, Parañaque City Melita T. Bermudez Proposed Three (3) Storey Residencesend 483 25-Jul-2017 B36 L11 Tarhata St., Pembo, Makati City B36 L11 Tarhata St., Pembo, Makati City Nelson C. Vida Proposed Dabalos Residence 484 25-Jul-2017 1814 San Marcelino St., Malate, Manila 1814 San Marcelino St., Malate, Manila Proposed Eight (8) Storey Malabon Hospital & Medical center Aldred Riondi T. Encabo 485 Building 27-Jul-2017 Gov. Pascual Ave., Brgy. Catmon, Malabon city Gov. Pascual Ave., Brgy. Catmon, Malabon city Christian Noel Ragojos shell Sahred Services (Asia) B.V. 21F Cafeteria renovation project 486 21F Solaris One Bldg., Dela Rosa St., Salcedo Village, makati 26-Jul-2017 21F Solaris One Bldg., Dela Rosa St., Salcedo Village, makati City City Aris G. Lazarte Construction of Bernardo Health Center/QCHD Activity Center 487 26-Jul-2017 Brgy. Pinagkaisahan, Quezon city Brgy. Pinagkaisahan, Quezon city Rehabilitation of Roofdeck and Auditorium at General l. Geronimo Aris G. Lazarte 488 Elementary School 26-Jul-2017 Geronimo St., Sampaloc, Manila Geronimo St., Sampaloc, Manila

Page 41 of 47

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region July 2017

No. Company Name and Address Project Name Date Approved Aris G. Lazarte Rehabilitation and Repainting of R. Avaceña High School 489 27-Jul-2017 Nepomuceno St., San Miguel, Manila Nepomuceno St., San Miguel, Manila Oliva O. Raquillas Construction of Retaining Wall at Salapan River Calvary 490 26-Jul-2017 Brgy. Damayan Lagi, Quezon city Brgy. Damayan Lagi, Quezon city Michael C. Millo Proposed Connecting Covered Bridgeway of D' Beacon Tower 491 26-Jul-2017 Chino Roces Ave., cor. Arnaiz St., Makati City Chino Roces Ave., cor. Arnaiz St., Makati City Construction of Drink and Wash Area Lingkod Eskwela 2017 Crisanto L. Llanes 492 (Phase 1 North Area) 26-Jul-2017 Phase 1 North Area) Phase 1 North Area) Proposed Fouur (4) Storey Residential Building with Mezzanine Paolo Jose C. Mantolino 493 and Roofdeck 26-Jul-2017 2841 e. Zobel St., cor. Ma. Aurora, Poblacion,makati city 2841 e. Zobel St., cor. Ma. Aurora, Poblacion,makati city theresa Dublin Baluyot Proposed four (4) Storey residential Building with Roofdeck 494 26-Jul-2017 L22 B18 St.,brgy. Guadalupe Nuevo, Makati City L22 B18 Corregidor St.,brgy. Guadalupe Nuevo, Makati City UPS SPMO 2016-054B One (1) Lot Construction of Drainage Edwin M. Quisumbing System for university of the philippines diliman Sports Complex 495 26-Jul-2017 University of the philippines, Diliman, Quezon City track oval and football Field University of the philippines, Diliman, Quezon City 17-6029-Construction of greater Lagro Community Center at Brgy. Leonel D. Ceniza 496 Greater Lagro 26-Jul-2017 Brgy. Greater Lagro, Quezon City Brgy. Greater Lagro, Quezon City MFO-2- Flood Management Services- Construction/Maintenance of Flood Mitigation Structures and Drainage Systems, - Moises Malabanan 497 Construction/Installation/Improvement of Drainage System and 26-Jul-2017 Sampaloc, Manila Appurtenances at España Blvd., manila City, Sampaloc, Manila Sampaloc, Manila Local Infrastructure Program-Construction/Rehabilitation of Rommel A. Ignacio Schools, Benigno Aldana Elementary Schools, Brgy. 422, Manila 498 26-Jul-2017 Manila City City Manila City Wendell Bert V. ela Cruz Installation of Flow Meter 499 26-Jul-2017 Brgy. Camarin, Caloocan City Brgy. Camarin, Caloocan City

Page 42 of 47

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region July 2017

No. Company Name and Address Project Name Date Approved Wendell Bert V. ela Cruz Installation of Flow Meter 500 Various location in Quezon City (Brgy. 170, Holy Spirit & Various location in Quezon City (Brgy. 170, Holy Spirit & 27-Jul-2017 Novaliches Proper) Novaliches Proper) Wendell Bert V. ela Cruz Installation of Flow Meter 501 26-Jul-2017 Various location in Muntinlupa City, Brgy. Putatan & Alabang Various location in Muntinlupa City, Brgy. Putatan & Alabang Wendell Bert V. ela Cruz Installation of Flow Meter 502 Various Location in las Piñas city (Brgy. Talon 1, Zapote & Various Location in las Piñas city (Brgy. Talon 1, Zapote & 26-Jul-2017 Fajardo) Fajardo) Wendell Bert V. ela Cruz Installation of Flow Meter 503 Various Location in Manila City (Brgy. 857, 154, 650,6,760, Various Location in Manila City (Brgy. 857, 154, 650,6,760, 410 & 27-Jul-2017 410 & 637) 637) Wendell Bert V. ela Cruz Installation of Flow Meter 504 26-Jul-2017 brgy. Magallanes, Makati City brgy. Magallanes, Makati City Wendell Bert V. ela Cruz Installation of Flow Meter for Various Location in Parañaque City 505 26-Jul-2017 Brgy. Sun Valley, North Daang Hari & Tambo Brgy. Sun Valley, North Daang Hari & Tambo Wendell Bert V. ela Cruz Installation of Flow Meter for Various Location in Parañaque City 506 27-Jul-2017 Various Location in Malabon city (Brgy. Potrero & Catmon) Various Location in Malabon city (Brgy. Potrero & Catmon) Wendell Bert V. ela Cruz Installation of Flow Meter for Various Location in Parañaque City 507 Various Location in Valenzuela City ( Brgy. Along Gov. I. Various Location in Valenzuela City ( Brgy. Along Gov. I. Santiago 26-Jul-2017 Santiago near Mc Arthur Highway near Mc Arthur Highway Wendell Bert V. ela Cruz Installation of Flow Meter for Various Location in Parañaque City 508 26-Jul-2017 Various Location in pasay city 9brgy. 201 Merville villamor Various Location in pasay city 9brgy. 201 Merville villamor Conrado c. Binondo Conversion of Existing ATS to Soft Closed Transition 509 26-Jul-2017 baesa Pumping Station in Sta. Quiteria, Caloocan baesa Pumping Station in Sta. Quiteria, Caloocan Conrado c. Binondo Conversion of Existing ATS to Soft Closed Transition 510 26-Jul-2017 North C Pumping Station in Novaliches, Quezon city North C Pumping Station in Novaliches, Quezon city Conrado c. Binondo Conversion of Existing ATS to Soft Closed Transition 511 26-Jul-2017 Commonwealth Pumping Station in Quezon City Commonwealth Pumping Station in Quezon City Conrado c. Binondo Conversion of Existing ATS to Soft Closed Transition 512 26-Jul-2017 Daang Hari Pumping Station, TS Cruz, Las Piñas city Daang Hari Pumping Station, TS Cruz, Las Piñas city

Page 43 of 47

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region July 2017

No. Company Name and Address Project Name Date Approved Conrado c. Binondo Conversion of Existing ATS to Soft Closed Transition 513 26-Jul-2017 Litex Pumping Station in Road, Quezon City Litex Pumping Station in Payatas Road, Quezon City Edmond Y. Llorente Replacement of Flowmeters Phase 2 514 26-Jul-2017 Brgy. Daang Bakal, Mandaluyong City Brgy. Daang Bakal, Mandaluyong City Edmond Y. Llorente BMA: Meter Replacement 515 26-Jul-2017 Brgy. Santolan & Ugong, Pasig city Brgy. Santolan & Ugong, Pasig city Edmond Y. Llorente Replacement of Critical Flowmeters Phase 2 516 26-Jul-2017 Brgy. Lower Bicutan & Uper Bicutan, Taguig City Brgy. Lower Bicutan & Uper Bicutan, Taguig City Edmond Y. Llorente Replacement of Critical Flowmeters Phase 2 517 26-Jul-2017 Brgy. San, Roque, Marikina City Brgy. San, Roque, Marikina City Edmond Y. Llorente BMA: Meter Replacement 518 26-Jul-2017 Brgy. 764, Manila Brgy. 764, Manila Edmond Y. Llorente BMA: Meter Replacement 519 Brgy. Guadalupa Nuevo, Kasilawan, Bel-air, & Sta. Cruz, Brgy. Guadalupa Nuevo, Kasilawan, Bel-air, & Sta. Cruz, Makati 26-Jul-2017 Makati City City Edmond Y. Llorente Replacement of Critical Flowmeters Phase 2 520 26-Jul-2017 Brgy. Vasra, Old Balara, Horseshoe & Payatas, Quezon city Brgy. Vasra, Old Balara, Horseshoe & Payatas, Quezon city Edmond Y. Llorente Replacement of Critical Flowmeters Phase 2 521 26-Jul-2017 Brgy. Guadalupe Makati City Brgy. Guadalupe Makati City Edmond Y. Llorente Replacement of Critical Flowmeters Phase 2 522 Brgy. Manggahan, Maybunga, San Miguel, Caniogan & San Brgy. Manggahan, Maybunga, San Miguel, Caniogan & San 26-Jul-2017 Antonio, Pasig city Antonio, Pasig city Edmond Y. Llorente Replacement of Critical Flowmeters Phase 2 523 26-Jul-2017 Brgy. Sta. Lucia, San Juan City Brgy. Sta. Lucia, San Juan City Edmond Y. Llorente BMA: Meter Replacement 524 Brgy. Bagumbayan, Fort Bonifacio, , Brgy. Bagumbayan, Fort Bonifacio, Upper Bicutan, , & 27-Jul-2017 Pinagsama, & Ligid Tipas, Taguig City Ligid Tipas, Taguig City Edmond Y. Llorente BMA: Meter Replacement 525 26-Jul-2017 Brgy. West Rembo, Makati City Brgy. West Rembo, Makati City Edmond Y. Llorente BMA: Meter Replacement 526 27-Jul-2017 Brgy. Sto. Niño, Marikina City Brgy. Sto. Niño, Marikina City

Page 44 of 47

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region July 2017

No. Company Name and Address Project Name Date Approved Edmond Y. Llorente BMA: Meter Replacement 527 26-Jul-2017 Brgy. Wack-wack, Mandaluyong City Brgy. Wack-wack, Mandaluyong City Edmond Y. Llorente BMA: Meter Replacement 528 26-Jul-2017 Brgy. Ugong Norte, Vasra project 6 & Libis, Quezon City Brgy. Ugong Norte, Vasra project 6 & Libis, Quezon City Edmond Y. Llorente BMA: Meter Replacement 529 Brgy. Culiat, Vasra Project 6, Old Balara, Old Capitol State, Brgy. Culiat, Vasra Project 6, Old Balara, Old Capitol State, West 26-Jul-2017 West Triangle, Laging Handa & Hordeshoe, Quezon City Triangle, Laging Handa & Hordeshoe, Quezon City Edmond Y. Llorente BMA: Meter Replacement 530 26-Jul-2017 Brgy. Wack-wack & Highway Hills, Mandaluyong city Brgy. Wack-wack & Highway Hills, Mandaluyong city Evenizer C. Nolasco Rehabilitation of Drainage System 531 31-Jul-2017 Portion of Lapu-lapu St., Brgy. Manggahan, Pasig City Portion of Lapu-lapu St., Brgy. Manggahan, Pasig City Covered Basketball Court at Intersection of Planas Site I & II Antonio Hernandez 532 Road, Brgy. Bagong Lipunan ng Crame 31-Jul-2017 Quezon City Quezon City Sps. Carlito/ Imelda M. Someros Proposed Three Storey Residential Building wfith Roof Deck 533 31-Jul-2017 1730 San Pedro St., Malate, Manila 1730 San Pedro St., Malate, Manila Augusto P. Argueza Proposed Three (3) Storey Residential Building 534 31-Jul-2017 2446 Mag Arellano St., Bacood, Sta. Mesa, Manila 2446 Mag Arellano St., Bacood, Sta. Mesa, Manila Jesus A. Asuncion Proposed Renovation of Second Floor Offices at Bocobo Hall 535 2nd Floor, Bocobo Hall, College of Law Complex, UP Diliman, 2nd Floor, Bocobo Hall, College of Law Complex, UP Diliman, 31-Jul-2017 Quezon City Quezon City 17OE0072, MFO 2, Flood Management Services- Construction/Maintenance of Flood Mitigation Structures and Alex H. Abelido 536 Drainage Systems Construction of Pump House, 31-Jul-2017 Manila City Structure/Riverwall at Valencia Pump Station (Phase I) Manila City Manila City 17OE0071, MFO 2, Flood Management Services- Construction/Maintenance of Flood Mitigation Structures and Alex H. Abelido 537 Drainage Systems Construction of Pumping Station, Retarding 31-Jul-2017 Manila City Pond/ Riverwall Package II Valencia Pumping Station, Manila City Manila City

Page 45 of 47

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region July 2017

No. Company Name and Address Project Name Date Approved Jonathan E. Pol Mandarin 2 (4M Wall Mounted Pole) 538 31-Jul-2017 BDO Bldg., Paseo De Roxas St., cor. Buendia St., Makati City BDO Bldg., Paseo De Roxas St., cor. Buendia St., Makati City Antonio G. Ferrer Proposed Three (3) Storey Apartment 539 31-Jul-2017 59 Galauran St., Caloocan City 59 Galauran St., Caloocan City Anil Kumar Malayatil Renovation/Fit-out 12 Insular Life Building 540 Insular Life Drive Filinvest Corporate City 1781 Alabang, Insular Life Drive Filinvest Corporate City 1781 Alabang, 31-Jul-2017 Muntinlupa City Muntinlupa City Gary B. Montoya Anchor Grandsuites Project 541 31-Jul-2017 Masangkay St., Binondo, Manila Masangkay St., Binondo, Manila Contract ID No.O17OB0312 Rehabilitation of Marikina River Benigno R. Ramos Drainage Outfall including Lateralsfor the 2nd District, Marikina 542 31-Jul-2017 Marikina City City Marikina City Contract ID No.O17OB0309 Construction of RCBC including Benigno R. Ramos Drainage Laterals along Bonanza Creek, Fortune Ave., Brgy. 543 31-Jul-2017 Marikina City Fortune, Marikina City Marikina City Contract ID No. 17OB0326 Construction of RCBC Drainage Luisito R. Tiqui Outfall from Katipunan St. to Lilac Bridge Approach (Balanti 544 31-Jul-2017 Brgy. Concepcion Dos, Marikina city Creek) Brgy. Concepcion Dos, Marikina City Brgy. Concepcion Dos, Marikina city Contract ID No. 17OB0325 Construction of RCBC Drainage Outfall along Olive Street to Russet Pumping Station including Luisito R. Tiqui 545 Rehabilitation of Pumps, Brgy. Concepcion Dos, Marikina City 2nd 31-Jul-2017 Marikina City LD, Marikina City Marikina City Construction of Slope Protection Structures and Other Geral Nemesio G. Chua improvement including Removal of Informal Settlers along Sin 546 31-Jul-2017 Las Piñas City Nombre Creek, Las Piñas City Las Piñas City Geral Nemesio G. Chua Construction of Slope Protection Structures and Other 547 31-Jul-2017 Las Piñas City, Metro, Manila improvement such as Maintenance Road including Removal of

Page 46 of 47

REGIONAL REPORT ON THE APPROVED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-National Capital Region July 2017

No. Company Name and Address Project Name Date Approved Informal Settlers along Pasong Baka (Zapote River to Emaus, Sta. Niño, Moonwalk PH 2 to M. Alvarez Police Station) Las Piñas City, Metro Manila Francisco Jesus/Eleanor Lerma Proposed Three (3) Storey Residence Building 548 31-Jul-2017 1328 Asturias St., Sta. Cruz, Manila 1328 Asturias St., Sta. Cruz, Manila Reynaldo S.L. Perez Proposed Road Improvement of Taylo St. (C&D) 549 31-Jul-2017 Brgy. Pio Del Pilar, Makati City Brgy. Pio Del Pilar, Makati City Mr./Mrs. Gerald Lim Proposed Three (3) Storey Residence Building 550 31-Jul-2017 215 Quidote St., Balut, Tondo, Manila 215 Quidote St., Balut, Tondo, Manila Proposed Interior Renovation of Five (5) Storey Residential Studio Cesar B. Rodriguez/BMI Realty 551 with Basement & Deck 31-Jul-2017 2375 Nuestra De Antipolo, Guadalupe Nuevo, Makati City 2375 Nuestra De Antipolo, Guadalupe Nuevo, Makati City Richard G. Navida Renovation of Records Management Center 552 31-Jul-2017 MWSS Compound Katipunan Balara, Quezon City MWSS Compound Katipunan Balara, Quezon City

Page 47 of 47