Building NOC cases of BB division pending as on 01.12.2014. Sr. Name of the Subjet Date of Status/Remarks No. party submission in division

1 M/s. Aawas 997 - Usarali - NOC for 03-08-2012 Feasibility report yet to be received from Group proposed layout scheme on ADEN (M) PNVL / Sr. DCM/Sr. DEE(TD)/ Sr. S. No. 1 to 93 at village - DSTE CSTM. Usarali, Tal - PaNVL, Dist - Raigad. 2 M/s Sunny 991 - PNVL- NOC for 27-12-2012 Letter sent to party on 20.10.2014 for Housing proposed construction at attestation of documents. Pvt. Ltd. Plot No. 5 at Sector no. 15, New (East) 3 M/s Impact 978-LTT- Redevelopement 07-11-2012 Proposal is pending with DEN (HQ) CSTM Design Group of building for LIG & MIG for reply of queries. tenements on land bearing CTS No. 47 (Pt) at Tilak Nagar, Chembur, .

4 M/s Spaceage 973-Kon- NOC for proposed 27-09-2012 This is post facto NOC case. There are no consultant STP on plot bearing No. guidelines for issue of post facto NOC. 85/A to 91/5, village -Kon, Thal Panvel.

5 M/s. G. J. 970-Mamdapur(Neral)- NOC 23-08-2012 Structural Stability Certificate is not Panjwani for construction of building submitted by party. Letter sent to party on on Plot bearing No. 35, 09.11.2013, 01.09.2014, 05.09.2014 & Hissa No.1 (pt) at village 20.10.2014. Mamadapur(Neral) 6 M/s. Vinay 957-SNPD - NOC for 16-06-2012 File sent to Sr. DEE (TD) KYN on 20.10.2014 for Relators proposed Res. Bldg. on CTS Singnature in OPT. No.23, Sector No. 04 at Sanpada, Navi Mumbai. 7 M/s MCGM 926 - KJRD- Proposed plan 23-11-2012 Railway Land boundary is not tallying with for New Transport Garage in approved land plan. Letter has been sent lieu of Kurla garage on plot to TILR on 20.10.2014 for submission of beaing CTS No. 108/C at updated land plan as per Railway Village Hariyali near Reservation of Land. Kanjurmarg station (BMC) 8 M/s. 895- SNPD- NOC for 01-06-2011 File sent to Sr. DEE (TD) on 20.10.2014 for Khandekar proposed development on signature in OPT. Arch. plot bearing No. 22, in sector -4 at Sanpada , Navi Mumbai. 9 M/s. Sameer 880 - BUD : NOC for 02-12-2010 Construction feasibility has not been S. Ketkar proposed construction of received due to non finalization of 3rd line Bldg. on plot bearing No. alignment on Kalyan- section 325 at village - Kulgaon, Badlapur. 10 M/s. Rajguru 857 - MLND : NOC for 08-04-2010 Details of Land acquired in this location has been developers proposed construction of asked from Dy.CE (C) vide Letter dt. 20.10.2014 . SRA Scheme on plot bearing CTS No. 1464 to 1473 of village - Nahur,Mulund, situated at P. J. N. Road, & Ghoshala Road Mulund (West). 11 Smt. 815 - Bhisegaon (KJT) : 27-12-2010 Land boundary under dispute. The matter is on Shakuntala NOC for proposed residential Court. Hingmire and commercial Bldg. on CTS NO. 576 to 586 at village - Bhisegaon, Karjat.

12 M/s. 753 - TNA : NOC for 10-07-2007 Feasibility report yet to be received from Bramhman extension of existing Bldg. Sr. DEE (G) CSTM & Construction Society on PB S. No. 151/4, CS No. Organization. 748 at Brahman Society at Naupada, Thane. 13 M/s. Spaceage 1071 - Parsik : NOC for 08-01-2014 Feasibility report awaited from MRVC. Consultant proposed Bldg. on property bearing CTS No. 185 & Gut No. 181 at village - Parsik, Tal & Dist - Thane. 14 M/s. Dream 1027 - Atgaon : NOC for 08-07-2013 As per Dy. C. E. ( C ) GC's letter No.: Realtor proposed development of CE/C/GC/117/IV. dtd. 24.03.2014 Bldg. on Old Survey No. Feasibility report can not be given without 168/2 (new Survey No. finalization of proposed alignment for 3rd 226/2) at Atgaon, Dist - line. Reminder given on 21.10.2014 to Dy. Thane. C. E. ( C ) to give feasibility.

15 Architectural 968 : DR-MTN : NOC for 04-05-2012 ADEN (T) BY's Feasibility report is yet to be Consultant redevelopment on plot received. Reminder -III sent on bearing CTS NO. 69/10 of 01.07.2014. Reminder- IV sent on Matunga division situated at 20.10.2014. Lakhasmi Napoo Road, Dadar (E), Mumbai. 16 M/s.Sun City 1066 - Chinchvali : NOC for 27-03-2014 Feasibility checking by ADEN (N) LNL is in Construction proposed residential building process. on survey No. 14, Gut No. 3/C at village - Chinchvali, Tal - , Dist - Raigad. 17 M/s. Mehta 1061: MTN-KCE - NOC for 06-05-2014 Office Note prepared & put up to Branch Enterprises redevelopment of Bldg. on Officers for signature in OPT. C. S. No. 500-C/10, Plot No. 8/A-2 at K. A. Subramaniyam road, Matunga-19. 18 M/s. Aesthetic 1055 : Khandala - NOC for 06-02-2014 Feasibility checking is in process. Planner (Mr. proposed construction of Arshad Amir building on Survey No. 113 Porbanderwala at Khandala, Tal - Maval, ) Dist - Pune. 19 Shri - Shekhar 1049 - Badlapur (Kulgaon) - 17-10-2013 Feasibility report yet to be recd. From Parab NOC for proposed Bldg. on ADEN (T) KYN & Sr. DCM & Sr. DSTE S. No.13, H. No. 1 / 4 at CSTM. village - Kulgaon, Badlapur, Tal - Ambernath, Dist - Thane.

20 Mr. Hasan 1047: Badlapur ( Belavali) - 28-05-2013 This is post facto NOC case. There are no Asgar Ali NOC for proposed Bldg. on guidelines for issue of post facto NOC. Choudhary plot No.4, S.No.83,Hissa No.4 (Pt) at village - Belavali, Badlapur (West), Tal- Ambernath, Dist - Thane.

21 Smt. Darshana 1040 : Badlapur ( Belwali) - 02-09-2013 Feasibility report yet to be recd. from Sr. A. Damle NOC for proposed DSTE & Construction Organization construction of Bldg. on S. Reminder - II sent on 18.08.2014. No. 77, Hissa No. 1,2 & 3 at Reminder-III sent on 21.10.2014. village - Belwali, Tal - Ambernath, Dist - Thane. 22 Mr. Manohar 1031 : Kanchgaon - NOC for 23-08-2013 Feasibility report yet to be Recd. from V. Choudhary proposed Bldg. on S. No. 71 ADEN (Wks) KYN & Br. Officers. (New), H. No. 2,3 etc at Rerminder - III Sent on 18.08.2014. village - Kanchgaon, Tal - Reminder-IV sent on 21.10.2014. KYN, Dist - Thane. 23 M/s. 1016 : Shelu (Banshivali) - 06-05-2013 3rd and 4th line is passing through this Destination NOC for development of area. The alignment of the same is under proposed Bldg. on CTS No. finalisation. The case will be processed 37/1, 37/3, 38 & 39/2 at after finalisation of alignment. village - Bandhivali, Shelu, Tal- KJT, Dist - Rigad. 24 M/s. Jay Ambe 1032: Kharbav (Malodi) - 13-08-2013 Feasibility Report yet to be recd. from Builders & NOC for proposed ADEN (NE) KYN & Sr. DCM CSTM. Developers development of Residential Reminder - IV sent on 18.08.2014. Building on plot bearing Reminder-V sent on 20.10.2014. S.No. 67 & 37 at village - Malodi, Kharbav, Tal - Bhiwandi, Dist - Thane. 25 M/s. Krupa 1038 - Karjat : NOC for 20-09-2013 Feasibility report yet to be recd. from Sindhu Builder proposed Residential ADEN(T) KYN & Const Org. Remidner - V & Developers Building on land bearing sent on 18.08.2014. Reminder-VI sent on Survey No. 2/3 at village - 20.10.2014. Kosane, Karjat, Tal - Karjat, Dist - Raigad. 26 M/s. DOT 1028 - KJRD - NOC for 17-07-2013 Feasibility report yet to be recd. From Architects proposed development of Constn. Organization. Reminder- IV sent on Slum Rehabilitation on CTS 18.08.2014. Reminder-V sent on No. 122 at village - Hariyali, 20.10.2014. Karve Nagar, Kanjurmarg (East), Mumbai. 27 M/s. G. N. 1026 - Usarali (Khurd) - 29-01-2013 The feasibility has been received from all Gandhe NOC for proposed BOs. Preparation of OPT is under (Architect() development of Bldg. on Plot finalisation. bearing Survey No. 07, Hissa No. 02 at village - 28 Mr. N. M. 1021 - Kurla - NOC for 21-05-2009 Party not submitted the structural stability Mahale proposed redevelopment Certficate & Floorwsie plan attested by (Architect) Scheme on plot bearing CTS Architect. Party has been asked to submit NO. 9/A & 10/1A at S. G. the documents on 20.10.2014. Barve Marg, L-ward, Kurla.

29 M/s Anand V. 1086 - CMBR(Deonar)- NOC 14.07.2014 Feasibility report yet to be received from Dhoke for proposed ADEN (M) MNKD & all Branch Officers. redevelopement of building on land bearing CTS No. 74- A/3-A, 74-A/01 & 75 at village - Deonar, Chembur, Mumbai

30 M/s. Omkar 980-CHF- NOC for Party has Feasibility report yet to be received from Developers proposecd construction of approch on all Branch Officers. building plot bearing no. 12-12-2012 570/to 570/72 of village with Kurla for Co. Housing incomplete society Ltd at Sainath document Nagar. and left out . And again submitted on 21.07.2014. 31 M/s. H. S. 716 - Sion – Matunga : NOC 10.09.2007 1) Structural Certificate, 2) Methodology Thakker & for proposed construction of certificate has not submitted by party. Associates Commercial Building on plot Party has been asked to submit the bearing C.S No. 411/6, plot documents on 20.10.2014. No. 11 of Sion-Matunga Estate, Sion (West) Mumbai.

32 Shri Sadashiv 572 - Asangaon – NOC for 23.11.2004 Structural Certificate not submitted by Shankar proposed construction of party. Party has been asked to submit the Chande Building (Type - “A & B”) on document on 20.10.2014. plot bearing S. No. 107, Hissa No. 2 at Village – Asangaon, Tal – Shahapur, Dist – Thane. 33 Shri P. N. 845 - CRD - NOC for 19.01.2010 1) Structural Certificate, 2) Methodology Sanghadia Redevelopment (Irani certificate not submitted by party. Party (Architect) Chawl) on plot bearing C. has been asked to submit the documents S. No.94 of Lower Parel on 20.10.2014. Division, Delise Road ( N. M. JoshiMarg)Currey Road, Mumbai. 34 M/s. AIMS 870 - Chembur - NOC for 18.08.2010 1) Structural Certificate, 2) Municipal Consultants Redevelopment Scheme on Authority / Grampanchayat letter not plot bearing C.T. S. No. submitted by party. Party has been asked 811/ 01 to 11 at N. G. to submit the documents on 20.10.2014. Achraya Marg, M-Ward, Chembur, Mumbai. 35 M/s. Smita 950. - Vithalwadi – NOC for 14.09.2011 Municipal Authority / Grampanchayat Conductors proposed construction of letter not submitted by party. Party has Ltd. building on Plot bearing been asked to submit the documents on C.T.S. No. 164, 165, 168, 20.10.2014. 169 & 170 at Vithalwadi, Tal – Ulhasnagar, Dist – Thane. 36 Shri Harish 825 - Dombivli – NOC for 09.10.2009 1) Municipal Authority / Grampanchayat D. Shetty proposed construction of letter, 2) Owners letter for NOC. 3) building on plot bearing Documents regarding ownership of land Survey No. 34 (Pt), CTS No. not submitted by party. Party has been 4022 to 4034 at Dombivli asked to submit the documents on (West), Tal – Kalyan, Dist – 20.10.2014. Thane. 37 M/s. Sidharth 993 - Badlapur ( Belavli) – 29.10.2012 Feasibility report yet to be received from Developers NOC for proposed building (Recd. On ADEN (T) KYN and Dy. C E. ( C ) Survey. on land bearing Survey No. 05.11.2012) 82, Hissa No. 2 & Survey No. 83, Hissa No. 1(Pt) at village – Belavali, Badlapur, Tal- Ambernath, Dist – Thane. 38 M/s. Suyog 1072 - Ulhasnagar – NOC 28.03.2014 Feasibility report yet to be recd. From Associates for proposed building on ADEN (T) KYN & Sr. DEE (G) CSTM, Sr. Plot No. 161 (Pt),Unit No. 67 DCM CSTM. to 81, Sheet No. 29, on CTS No. 30285 at village – Ulhasnagar -03. 39 Mr. Dattatraya 1039 - Karjat (Halivali) – Recd. On Feasibility report yet to be received from B. Awate. M/s. NOC for development of 16.07.2013 ADEN (T) KYN. Aarini Dream proposed building on plot build Pvt. Ltd., bearing Survey No. 36/3/A, 37/1 at village – Hariyali, Tal- Karjat, Dist - Raigad.

40 Mr. 1054 - Karjat – NOC for 19.12.2013 Feasibility report yet to be received from Upendrabhai proposed Residential ADEN (T ) KYN & Sr. DSTE, Sr. DOM, Sr. Patel. building on property survey DCM & Construction Orgnization. No. 2/8/A/1 & 2/8/A/2 at village – Diksal, Karjat, Tal – Karjat, Dist – Raigad.

41 Mr. Ulhas H. 1037 - Badlapur – NOC for 11.06.2013. Feasibility report yet to be received from ADEN Ambvane. proposed building on Land (T) KYN & Constructon Organization. Intially letter bearing survey circulated to all branch officers on 17.10.2013. No.70/1,70/2 at village – Kasgaon, Badlapur, Tal – Ambernath, Dist – Thane.

42 Mr. Shripad S. 947 - Neral : NOC for proposed 27.02.2012 Feasibility report yet to be received from Sr. DCM, Apte. Residential Building on land Sr. DSTE & Construction Organization. bearing Survey No. 72 at Neral, Tal - Karjat, Dist - Raigad. 43 M/s. Hitendra M. 1057 - Shelu (Karjat) – NOC 26.08.2013. Feasibility report yet to be received from Sr. Patel. for development of DSTE, Sr. DEE (G), Sr. DCM & Construction proposed building on plot Organization. Bearing Survey No. 23 & 46, Hissa No. 3/A at village – Bandhivali, Karjat, Shelu, Tal – Karjat, Dist – Raigad.

44 M/s. Rachana 941 - Badlapur (Belavali)– 04.01.2012. Feasibility report yet to be received from Relators. NOC for proposed building Construction Organization. on Land bearing survey No.78, Hissa No. 3 (Pt), Plot No. 05 at village – Belavali, Badlapur (West). 45 M/s. Darshana 1035 - Badlapur ( Belavli) – 13.08.2013. Feasibility report yet to be received from Damle. NOC for proposed building Construction Organization and ADEN (T) KYN on land bearing Survey No. 166 at village – Chikhaloli, Badlapur (East), Tal – Ambernath,

46 Mr. Pritesh B. 995 - Badlapur (Belavali) – 27.12.2012. Requirement of land for 3rd line to construction Ghorpade. NOC for proposed building department - required distance from Railway is on land bearing Survey No. 33.10 and which morethan provided distance 53, Hissa No. 2 at village – 23.0 m. Hence NOC can not be granted. Belavali, Badlapur (East),

47 M/s. Prakash 994 - Badlapur ( Belavli) – 12.03.2013. As per Construction organization's letter dated Sharma NOC for proposed building 22.07.2013, the proposed 3rd line alignment of on land bearing Survey No. Kalyan- Karjat sections not finlized, will take few 49, Hissa No. 02 (Pt) at month hence feasibility report can not be given village – Belavli, Badlapur till date. Reminder to Dy. C. E. ( C ) on 20.10.2014. (East), Tal – Ambernath, for submitting feasibility report as early as Dist – Thane. possible.

48 M/s. Infinity 1029 - Shelu – NOC for 17.05.2013. As per Construction organization's letter dated Group. proposed building on land 22.07.2013, the proposed 3rd line alignment of bearing Survey No. 55/1, Kalyan- Karjat section is not finlized hence 55/2-A, 55/3, 55/4, 55/5, feasibility report can not be given till date. 54/2 at village –Damat, Construction has been asked to finalise the Shelu, Tal- Karjat, alignment at the earliest.

49 Mrs. Ila Ravi 1084 - Diwa (Mhatardi) – 07.05.2014 Drawing under Preparation. Patil NOC for proposed construction of building On survey No. 74, Hissa No. 9/B at village – Mhatardi, Diwa,Tal- TNA, Dist - TNA.

50 Mrs. Ila Ravi Patil 1085 - Diwa (Mhatardi) – 07.05.2014 Drawing under Preparation. NOC for proposed construction of building On survey No. 94,at village – Mhatardi, Diwa,Tal- TNA, Dist - TNA. 51 Mr. Prakash 1093 - Badlapur : NOC for 30.05.2013 Letter written to party on 22.10.2014 for Sharma proposed construction of submitting the Stability Certificate, Building on land bearing Floorwise plan etc attested by Architect. Survy No. 34 & 33 (Pt) at village - Belavali, Tal- ABH, Dist - Thane. 52 M/s. Aman 1088 - Lonavla - NOC for 21.07.2014 Letter written to party on 22.10.2014 for Developers proposed construction of submitting all the documents with attestation by buildsing on land bearing CTS Architects. No. 186/26, 188, 189 /A at Old Khandala Road, "H"-Ward, Lonavla.

53 01-03-2007 This is post facto NOC case. There are no (690) Sub: KJRD-NOC for guidelines for issue of post facto NOC. proposed rehabilation scheme M/s Shri Sharad Mahajanunder R&R for PAPs on lnd bearing CTS No. 119(pt) S ward at Vuillage hariyali, KJRD (East)

54 986 - GC- NOC for proposed This is post facto NOC case. There are no M/s. construction of residential guidelines for issue of post facto NOC. Vardhamad building on plot bearing No. 19-12-2012 Developers 871 to 881 at vilage Kirol, GC, Mumbai

55 984 - MTN - NOC for proposed redevelopment of existing Bldg. ( Uma Niwas) M/s. Sumedha on plot bearing No. 8 B/ 4, Incomplete proposal. Party has been 18-10-2012 Gore C. S. No. 500 G /10 of DR- advised accordingly. MTN Estate Scheme on K. A. Subramaniam road, Matunga, Mumbai -19 56 916- GV - NOC for M/s. Rajan temporary RMC Plant on plot Feasibility report yet to be received from Kulkarni & 13-06-2011 bearing CTS No. 74 to 83 at ADEN(M) MNKD & MRVC. Associates Govandi, Mumbai

57 908-KYN (E) - NOC for proposed Bldg. on ploty M/s. Pappu bearing S. No. 220 (Pt), Remark awaited from ADEN (T) KYN . 11-07-2011 Developers 221/1,2 (Pt), 222, 223 (Pt) , Reminder sent on 31.10.2013 224 (Pt) at Lokgram , Kalyan (East). 58 1059-LNL - Proposal for isssue of NOC for proposed File sent to HQ on 06.11.2014. 2) Querries group housing scheme on sent to Division regarding correct feasibility M/s. Creations 22.01.2014 land bearing CTS No. 184, report of ADEN (N) LNL on 26.11.2014 for 185, 185/1 at ward "H", submitting to HQ. Lonavla, Tal- Maval, Dist - Pune. 59 911- MZN - NOC for inform to party to submit stability proposed Redevelopment of M/s. Alfa Mana certificate in requrie formate, floor wise Building on property bearing Realtors Pvt. 11-07-2011 plan & other relivent documents with CTS No. 110 of Mazgaon Ltd. attasted. Party not submitted same Division, "E"-ward, at documents till date. Mazgaon, Mumbai. Building NOC cases of NGP division pending as on 01.12.2014. Sr. Name of Party Subject Date of Status / Remarks No. submission in Div. 1 Smt. Rama Issue of NOC for constn. of bldg. 17.01.2011 Proposal submitted to HQ Jaiprakash on Plot No. 6, Kh. No.55, 56, on 30-10-2014. The same Chourasia. 57/1, Mouza- Mankapur. was returned by HQ on 18-11-2014 for compliance. 2 Smt. Manjiri Issue of NOC for constn. of bldg. 11.10.2011 Proposal submitted to HQ Pravin Naik. on Plot No. 19, Kh. No.111/2, on 30-10-2014. The same 112/2, Mouza- Somalwada. was returned by HQ on 11-11-2014 for compliance. 3 Shri Moreshwar Issue of NOC for constn. of bldg. 31.07.2013 Approval of Branch Mahadevrao on Plot No. 30, Kh. No.102/1, Officers is under process. Halbe. 157, Mouza- Somalwada.

4 Shri Milind Issue of NOC for constn. of bldg. 17.12.2013 Drg. is under preparation. Jagannath on Plot No. 114, Kh. No.71, Kapure, POAH of Mouza- Zingabai Takli. Shri Arun Fattuji Lokhande. 5 Smt. Yogini S. Issue of NOC for constn. of bldg. 06.12.2013 Revised drg. & structural Dhote on Plot No. 30, Kh. No.102/1, stability certificate is 157, Mouza- Somalwada. awaited from the party.

6 Smt. Manda Issue of NOC for constn. of bldg. 31.12.2013. Revised drg. & structural Dilipsingh Tomar on Plot No. 114, Kh. No.71, stability certificate is Mouza- Zingabai Takli. awaited from the party & drg. is under preparation.

7 Shri Praful Issue of NOC for constn. of bldg. 26.03.2014 Feasibility report awaited Bhaurao on Plot No. 48, 49, 50, Kh. from ADEN (S). Wahadude. No.158/1, Mouza- Somalwada. 8 Shri Narayan Issue of NOC for constn. of bldg. 23.01.2012 Letter dtd. 5.9.2014 sent to Govindrao Joshi. on Plot No. 4, Kh. No.97/1, party for submission of Mouza- Zingabai Takli. revised set of drg. & structural stability certificate. Party has not submitted the above details till date. 9 Shri Lalit Vasudeo Issue of NOC for constn. of bldg. 05.06.2014 OPT drg. handed over to Mahajan on Plot No. 36, Kh. No.111, party for sign. of Architect 112/1, Mouza- Somalwada. & party. OPT drg. Awaited duly signed by Architect & Party. 10 Shri Tushar Issue of NOC for constn. of bldg. 05.06.2014 OPT drg. handed over to Vasudeo Mahajan. on Plot No. 9, Kh. No.100/2, party for sign. of Architect 103/2, Mouza- Somalwada. & party. OPT drg. awaited duly signed by Architect & Party. 11 Smt. Pornima Issue of NOC for constn. of bldg. 06.06.2014 Drg. is under preparation. Haridas Dhongde. on Plot No. 36, Kh. No.158/1, Mouza- Somalwada. 12 Shri. Shekhar Issue of N.O.C. for construction 9/11/2011 Drg. is under preparation. Chintaman of building on plot No. 22- Gondane A,Khasra No. 158/1, Mouza- Somalwada.

13 Shri, I.S. Pathan P. No. 141, Z. Takli 7/10/2011 Drg. is under signature of Branch Officers. 14 Shri. Mod. Jamil, P.No.46,47 20/04/2009 Site report not signed by Mod. Yunus ADEN (N). Letter to ADEN (N) on 02.09.2014 for signing feasibility report. 15 Shri. Gondhali P.No. 62 Z.Takali 20/03/2013 Letter dtd. 8.9.2014 sent to Padma party for submission of revised set of drg. & structural stability certificate. Party has not submitted the above details till date. 16 Smt. Veena Kirar P.No. 44-A Z. Takali 29/05/2012 Letter to ADEN (N) for submission of feasibility report dtd. 02.09.2014.

17 Shri. Kiran Kumar P.No. 37 Dhantoli 18/01/2013 Letter dtd. 8.9.2014 sent to Ghiya, C/o Shri. party for submission of M. Mulik revised set of drg. & structural stability certificate. Party has not submitted the above details till date. 18 Smt. Rekha P.No. 1 Somalwada 28/08/2012 Approval of Sr. DSTE is Sudharrao awaited. B.P. copy of drg. Bhasme Submitted on 24.09.2014 19 Issue of N. O.C. for construction Letter sent to ADEN (N) Shri Dnyaneshwar of building on plot No. 35, for submission of feasibility Chandrabhanji 07/08/2014 Khasra No. 99, Mouza- Zingabai report. Bagde. Takli. 20 Issue of N.O.C. for construction Drg. is under preparation. Shri Dhananjay of building on plot No.23, Khasra 30/06/2014 Nemichand Jain. No. 100/2, 103/2, Mouza- Somalwada. Issue of N.O.C. for construction Drg. is under preparation. 21 Shri Mohnish of building on plot No. 12, 30/06/2014 Manoj Kothari. Khasra No. 100/2, 103/2, Mouza- Somalwada. 22 Issue of N.O.C. for construction Feasibility report awaited Smt. Nirmala Vijay of building on plot No. 7, Khasra 11/09/2014 from ADEN (HQ). Nagmote. No. 54/2, Mouza- Somalwada. 23 Issue of N.O.C. for construction Feasibility report awaited Shri Azizur of building on plot No. 10, from ADEN (N). 11/09/2014 Rehman Rafique. Khasra No. 75, Mouza- Zingabai Takli. Building NOC cases of BSL division pending as on 01.12.2014. Sr. Name of Subject Date of Status / Remarks No the submission party in division 1 Shri. G. J. To issue NOC for construction of 03-06-2012 Proposal submitted to HQ on Rane house by Shri. Ganesh Janardan 2-09-2014. Proposal returned Rane, of Jalgaon on his own private by HQ on 11-9-2014 for land on Plot No. 15 in Gat No. 171/2 compliance of queries. between Jalgaon Sirsoli sections at Proposal re-submitted to HQ Km 416/25-27 adjoining to railway on 19-09-2014 & returned by land. HQ on 1-10-2014 for compliance. Party has been advised accordingly 2 Smt. To issue NOC for construction of 25-07-2012 Structural Stability certificate Meenal private building on private land at and Municipal Corporation’s Tushar Survey No. 8/1 & 8/2 at village letter is not submitted. Letter Bafna Vihitgaon, Tal. Dist. Nasik. given to the applicant for submission of certificates on dated 24-07-2014. 3 Shri To issue NOC for construction of 25-06-2014 Case is under scrutiny at HQ. Dadawadi Temple building on their own private Sansthan land, bearing plot No. 5/6 of Nazul Trust sheet No. 65 in Mouje Peth Amravati, Pragane – Badnera, Tal. & Dist. Amravati, total admeasuring area 1416.06 Sq. M. 4 Smt. To issue NOC for the construction of 30-10-2012 Proposal submitted to HQ on Sushma B. private building of Smt. Sushma B. 5.11.14. The same was Kabra Kabra, NKRD on own private land of returned by HQ on 20.11.2014 sheet No. 44/16+3A/1+3B/1A/2 for compliance. between Railway Kms. 189/27- 190/01, NKRD. 5 Shri. P. To issue NOC for the construction of 30-01-2014 Proposal submitted to HQ on Sonawala Anant Arogya Nidhi Public Trust’s 5.11.14. The same was A.A.N.P.T. building, 184/23-25 in survey No. returned by HQ on 19.11.2014 17/7 B+9, area measuring 3900Sq. for compliance. M. at Vihitgaon, Devlali Tal. Dist. Nasik in between IGP-BSL section 6 Shri. Md. To issue NOC to Shri. Mohmmad 20-01-2013 Proposal submitted to HQ on R. U. Rizwan Usman Memon of Nasik Road, 5.11.14. The same was Meman for construction of residential building returned by HQ on 21.11.2014 on his own private land on plot No. 2 for compliance. of survey No. 245/1 at Devlali Dist. Nasik measuring 700 Sq. M, adjoining to Railway land. 7 Shri A. S. To issue NOC for construction of 05-12-2007. Re-submitted the case on Patil private building adjoining Railway (Proposal 30.9.2014 after compliance of land boundary from Survey No. 281, closed on querries raised by HQ on CTS No. 8218 & Plot No. 1, at Km 15.9.2010 due 3.7.2014 and 18.7.2014. HQ 418/18-20 of Shri. Ananda Sada Patil. to non- has returned the case on compliance of 18/11/14 for compliance. queries. Case reopened on applicant’s request & resubmitted on 25-02- 2014) 8 Shri. J. S. To issue NOC for construction of 10-10-2013 The height of proposed Thakur residential building on his own land building was more than on Plot No. 148 of Gat No. 44 CTS Railway’s guide lines and site No. 7850 area measuring 137.37 sq. check report. (Letter given to m. at Pimprala shivar Dist. Jalgaon, applicant on dated 25-07- adjoining Railway land. 2014.) Applicant submited the revised drawing on dated 30- 09-2014. 9 Shri. U. A. To issue NOC for the construction of 25-10-2013 Proposed building plan is not Shitole private house of Shri. Umesh Ajabrao submitted by applicant and Rs. Shitole, on gat No. 28 area 0.41 2000 is also not remitted by Hector at Mouje Kherda Bu. Dist. applicant. (Letter given to the Washim, between Railway Kms. applicant on dated 25-07- 642/1-3 on down side of MZR-YTL 2014) Narrow gauge section. 10 Shri. B. J. NOC for the construction of proposed 18-01-2010. Proposal submitted to HQ on Dabore building on city survey No. 2211/49 at (Proposal 4.4.2014, returned by HQ for railway Km 420/18-20 on MMR-BSL closed on compliance of queries. The section belongs to Shri. Bansi Jagan 15.9.2010 due case resubmitted to HQ on Dabore. to non- 31-10-2014. compliance of queries. Case reopened on applicant request Dt. 31.12.13) 11 Smt. S. R. To issue NOC for construction of 28-02-2014 The case is under scrutiny at Nadiyana house on own private land, on plot HQ. No. 21/A in survey N o. 22/1 near railway Km 669/19 on Badnera Narkhed section Mouje- Akoli, Tal. &i Dist. Amravati. 12 Shri. L.D To issue NOC for construction of 30.8.2014 The case is submitted to HQ Rajurkar house on plot No. 16-17, Nazul sheet on 11-11-2014. No.54, Mouje – Rajapeth near Railway KM 670/A/15 Taluka & Distric – Amravati. Building NOC cases of PA division pending as on 01.12.2014.

Sr. Name of Subject Date of Status / Remarks No. party submissio n in Div. 1 Dinesh m. Issue of NOC for construction of 8.2.2011 Proposal submitted to HQ Korgaonkar building on CTS No. 523 at kms. on 25.7.12 and returned 46/7-8 on MRJ-KOP section near by HQ on 29.8.12 for Kolhapur. compliance of queries regarding ownership of land. Reply sent on 13.9.12 & on 11.6.2014. Proposal under scrutiny in HQ. 2 Vaishnavi Issue of NOC for construction of 4.1.2011 Proposal submitted to HQ associates building on survey No. 252/1 on 10.3.2012. It is , 2,3,4 & 5/1- 5, returned by HQ for CTS No. 4493 at kms. 176/3-5 (Up compliance of queries. side) on PA-LNL section at Party has been advised to Chinchwad, Pune submit proper structural stability certificate, municipality certificate and plan showing drainage arrangement etc. 3 Mrs. V.D. Proposed construction of building 1.3.2013 Proposal submitted to HQ Jamdade at survey no 122 at Barmati. on 12.2.2014 and returned by HQ on 23.7.2014 for compliance of queries regarding Railway land width. Letter sent to party on 1.9.14 for joint survey with revenue dept. & Railway. 4 R.G.Chaudh Issue of NOC for construction of 17.4.2014 Case is under scrutiny at ari, URI-YT building at Rly. Kms. 232/500-700 HQ. between YT-URI stations on PA- DD section 5 Shri.P.M. on Survey No. 63/2+3+4, 65/4 1 B, 27.4.2013 Proposal submitted to HQ Jain and 63/5A/6A, 64/A/2-A and 64/A on 1.9.2014 and returned others (Part), 2388, 2381 and 2179 (Part) by HQ on 16.9.2014 for at Rly. Kms. 183/13-15 DN Road compliance of queries. Party has been advised accordingly. Building NOC case of SUR division pending as on 01.12.2014.

1 Manisha To obtain construction permission 29/08/20 Case is Under process. balasaheb in Daund C.T.S. No. 2561 N.A. 13 jadhav Plot No. 98/99