Background Paper 2 Waste Plan Site Selection
Total Page:16
File Type:pdf, Size:1020Kb
Bournemouth, Dorset and Poole Waste Plan Background Paper 2 Waste Plan Site Selection November 2017 Background Paper 2 - Waste Plan Site Selection - November 2017 1 Introduction 4 2 Waste Local Plan 2006 - Allocated Sites 14 3 Existing Waste Facilities 18 4 Initial consideration of site options 66 4.1 East Dorset 66 4.2 Christchurch 105 4.3 West Dorset, Weymouth & Portland 122 4.4 North Dorset 185 4.5 Poole 245 4.6 Bournemouth 268 4.7 Purbeck 291 5 Draft Waste Plan 2015 consultation outcomes 314 6 Emerging Preferred Waste Site Allocations 2016 324 7 Draft Waste Plan 2017 - Sites in Blandford and Purbeck 336 8 Pre-Submission Draft Waste Plan - Site Alloactions 340 9 Appendix 1 - Waste Planning Principles 344 10 Appendix 2 -Physical and Operational Requirements 350 11 Waste Site Nomination Form 356 Background Paper 2 - Waste Plan Site Selection - November 2017 1 Introduction 3 Background Paper 2 - Waste Plan Site Selection - November 2017 1 Introduction 1.1 This paper follows on from Background Paper 1: Waste Arisings and Projections. Background Paper 1 explains in detail the quantities of different types of waste that are produced now and how the levels of waste are likely to change during the plan period. A comparison between need and existing capacity results in the need for new/improved facilities. 1.2 Through the development of the Waste Plan, policies have been developed and sites have been considered to assist in providing a more sustainable way of managing waste. This will help Bournemouth, Dorset and Poole divert waste from landfill and increase the amount of waste that is recycled, re-used or recovered locally. 1.3 The purpose of this background paper is to set out the approach taken to identify site options and to explain how sites were assessed for their suitability. The methodology takes into consideration advice on identifying sites contained in the National Planning Policy for Waste and accompanying guidance. 1.4 Work began on the production of the Bournemouth, Dorset and Poole Waste Plan in late 2012. Initial work focused on gathering evidence on current waste management facilities, waste arisings and forecasting. In December 2013, the Waste Plan Issues Paper was published to highlight the main waste planning issues facing Bournemouth, Dorset and Poole that had been identified and the potential options for addressing them. 1.5 The key issues had been identified through discussions with the Dorset Waste Partnership, Bournemouth and Poole waste management teams, the waste industry (both in Dorset and beyond, as appropriate), the District and Borough councils and adjoining authorities. A full review of existing waste management facilities and a survey of other authorities accepting waste originating in Dorset was also undertaken. 1.6 The Waste Plan Issues Paper set out an initial list of needs for new and improved waste management facilities. 1.7 Chapter 12 of the Waste Plan Issues Paper set out the proposed methodology for site selection. This provided stakeholders with an opportunity to comment on the proposed methodology for identifying sites for new or improved waste facilities. Generally, the feedback on the site selection methodology, guiding principles, social, economic and environmental considerations was positive. A number of suggestions were made and where appropriate these have been built into the methodology set out in this background paper. 1.8 This report sets out the systematic approach undertaken to identify sites and areas within Bournemouth, Dorset and Poole thought likely to meet the identified needs for waste facilities within the County (illustrated below). These site options and emerging preferred sites were presented in the 2015, 2016 and 2017 versions of the Draft Waste Plan. The chapters that follow detail the full lists of sites/areas considered throughout the plan production process and reasons for elimination from the process, where necessary. 1.9 The final list of site alloactions was included in the Pre-Submission Draft Waste Plan, published for consultation bewteen the 1 December 2017 and 31 January 2018. 4 Background Paper 2 - Waste Plan Site Selection - November 2017 Site Selection - Key Stages 1.10 This section sets out the key stages that have been undertaken to identify appropriate sites for new/improved waste facilities. 5 Background Paper 2 - Waste Plan Site Selection - November 2017 Stage 1: Initial Methods of Site Identification 1. A ‘call for sites’ process In October 2012, the waste industry was written to asking a series of questions with the aim of drawing out some of the issues that needed to be addressed through the Waste Plan. We specifically asked whether the waste industry had possible new sites or extensions to existing facilities (both in terms of physical extensions/expansion of activities on sites) to put forward. These letters were followed up in most cases by meetings and site visits. The district/borough councils were also written to, at this stage, to seek their input on potential sites for waste management activities. Again these letters were followed up by meetings and further correspondence. A number of opportunities were suggested by the waste industry and the local authorities. These were investigated further and a summary is included within this report. Consultation on the Waste Plan Issues Paper, in December 2013, provided an additional opportunity for the waste industry and other stakeholders to suggest potential sites and provide details using the waste sites nomination proforma. The form is attached at Appendix 3 and contains a list of the information required to enable sites to be considered. 2. A review of site allocations within the current Waste Local Plan 2006 The Waste Local Plan 2006 contained a schedule of 10 sites allocated for specific waste management facilities. These sites have been reviewed to see which have been developed and which have not. The reasons why allocated sites have not been brought forward was investigated to determine whether opportunities still exist within each site. This review is contained within Chapter 2. 3. A review of existing facilities There is already a network of waste facilities in Bournemouth, Dorset and Poole. Discussions with the waste industry has enabled the Waste Planning Authority to investigate potential opportunities for expansion of existing facilities. This does not necessarily always mean physical extensions, it could be that facilities have spare capacity and/or the activities that take place on site could be intensified or sites re-developed. Co-locating waste management facilities together with complementary activities can be a sustainable practise. This review can be found in Chapter 3, and has been updated throughout the preparation of the Waste Plan as new information has come to light. 6 Background Paper 2 - Waste Plan Site Selection - November 2017 Stage 2: Sieve search for new sites Sieve search for new sites This method of site identification started with the identified broad locations for waste development, contained in the Waste Plan Issues Paper. Following the Waste Plan Issues Consultation, the Waste Planning Authority had confidence that the waste management needs of Bournemouth, Dorset and Poole had been correctly identified, in general terms. Responses to this consultation were important to ensure that all needs have been identified, based on appropriate levels of growth assumptions for all waste streams. It should be noted that further work was undertaken on baseline waste arisings, growth and forecasting waste arisings throughout the preparation of the Waste Plan. Further discussions were held with the waste management authorities, the waste industry, district, borough and parish councils and other stakeholders at appropriate times, during the preparation of the Waste Plan, in order to clarify needs and consider site options. A comprehensive review of employment land and other possible opportunities suggested through the Waste Plan Issues Paper was undertaken. This exercise looked at the following areas of land: Industrial and employment land over 0.5 hectares that would be available in the short to medium term Existing waste management sites (see above) Allocations made in the adopted Waste Local Plan (see above) Sites put forward by the waste industry through a 'call for sites' exercise (see above) Discussions with district/borough/parish/town councils and other relevant stakeholders Rejected site options contained in the Gypsy, Traveller and Travelling Showpeople Site Allocations DPD This review resulted in a large number of site options for initial consideration. Chapter 4 summarises the identified needs for each district/borough and lists all of the sites that were considered, initial site details and reasons for progressing the site to the next stage. For each district/borough a list of specific documents and plans that were reviewed is also set out. Where sites were discounted a summary of the key reasoning is also set out. Waste Planning Issues A variety of issues were considered at this stage including: Guiding principles - these are the principles that underpin the Waste Plan. Sites and proposals that directly conflict with these aims are unlikely to be appropriate. Sustainable development is also a principle that has guided the identification of sites in the Waste Plan. A range of social, environmental and economic issues were considered early in the process. A more formal sustainability appraisal (SA) has 7 Background Paper 2 - Waste Plan Site Selection - November 2017 also been undertaken on short-listed sites. The SA is available as a separate background paper. Further information on waste planning principles considered is contained in Appendix 1. Physical and Operational Requirements Sites were considered for a range of waste management activities. Each potential site was assessed to consider if the required waste management facility would be achievable in principle. Different waste facilities have different land take requirements. Distinguishing, where possible, between essential minimum site requirements and those that are desirable was important.