Appendix a Existing Information Sources
Total Page:16
File Type:pdf, Size:1020Kb
Appendix A Existing Information Sources This page intentionally left blank. FINAL Pre-Application Document South SWP Hydropower Relicensing, FERC Project No. 2426 APPENDIX A EXISTING INFORMATION SOURCES Adams, M.J, Pearl C.A, and Bury R.B. 2003. Indirect facilitation of an anuran invasion by non-native fishes. Ecology Letters 6:1–9 Adhya, Ron. 2008. Pyramid Lake Vista Del Lago Visitor Center Inclinometer Monitoring. Federal Energy Regulatory Commission. San Francisco. Aedo, John. 2014. Environmental Inspection Report for 2426 Project, September 9-13, 2013. FERC San Francisco Region. September 5, 2014. Aedo, J. R. 2011. Letter to Henry Ramirez acknowledging receipt of 2010 arroyo toad monitoring report. FERC. April 21, 2011 Ainsworth, G. 2011a. Email to Chris Dellith regarding implementation of change in arroyo toad survey frequency. ESA. May 31, 2011 Ainsworth, G. 2011b. Email to Dan Peterson regarding 2011 arroyo toad monitoring scope. ESA. February 14, 2011. Ainsworth, G. 2011c. Email to James Gleim and Dan Peterson regarding arroyo toad survey timing. ESA. May 18, 2011. Ainsworth, G. 2011d. Email to James Gleim regarding arroyo toad surveys. ESA. May 10, 2011. Ainsworth, G. 2011e. Email to James Gleim regarding implementation of change in arroyo toad survey frequency. ESA. May 27, 2011 Ainsworth, G. 2011f. Email to James Gleim with update on survey results. ESA. June 30, 2011. Ainsworth, G. 2011g. Emails with Greg Ainsworth regarding providing monitoring report to Samuel Sweet. ESA. January 11, 2011. Ainsworth, G. 2011h. Emails with Greg Ainsworth regarding providing monitoring report to Samuwl Sweet. ESA. January 10, 2011. Ainsworth, G. 2011i. Letter to Terry Becker regarding 2011 arroyo toad monitoring scope. ESA. February 14, 2011. Ainsworth, G. 2010a. Cover letter email to Dan Peterson for May 13, 2010 arroyo toad survey results. ESA Biological Associates. May 17, 2010. Ainsworth, G. 2010b. Cover letter to Dan Peterson for draft arroyo toad monitoring plan. ESA Biological Resources. January 25, 2010. Department of Water Resources/ Page A-1 August 2016 Los Angeles Department of Water and Power FINAL Pre-Application Document South SWP Hydropower Relicensing, FERC Project No. 2426 Ainsworth, G. 2010c. Email chain with Dan Peterson and James Gleim and others regarding FERC's approval of monitoring plan. September 2, 2010. Ainsworth, G. 2010d. Email chain with Dan Peterson and James Gleim regarding arroyo toad monitoring plan comments. April 14, 2010 Ainsworth, G. 2010e. Email to Kim Flaherty fulfilling requests regarding arroyo toad monitoring plan. April 7, 2010. Ainsworth, G. 2010f. Letter and draft arroyo toad monitoring plan to Dan Peterson. ESA Biological Resources. January 25, 2010. Allen, M.F. and T. Tennant. 2000. Evaluation of critical habitat for the California red- legged frog (Rana aurora draytonii). UC Riverside: Center for Conservation Biology. Alvarez, J. A., D. G. Cook, J. I. Yee, M. G. van Hattem, D. R. Fong, and R. N. Fisher. 2013. Comparative microhabitat characteristics at oviposition sites of the California red-legged frog (Rana draytonii). Herpetological Conservation and Biology 8:539−551. Arend, Philip H. 1977. The San Jacinto Wildlife Management Area: Fourth Choice Plan. Prepared for California Department of Water Resources. May 1977. Arnold, A.B. 1968. Memorandum to Mr. H.H. Eastin regarding DWR, Division of design and Construction. 1971. Final Geologic Report, Fairmont to Leona Siphon, Project Geology Report C-66. Memoranda dated August 29th, 1968 through October 8, 1970 (Pages 32 through 60) Aspen Environmental Group. 2007. Biological Assessment and report of sensitive resource surveys for Castaic Power Plant and vicinity. Report prepared for LADWP. September 2007. Aspen Environmental Group. 2004. Piru Creek Creel Census Survey September 2004 Survey Summary Report. California Aspen Environmental Group. 2003. Initial Study/Mitigated Negative Declaration, Piru Creek erosion repairs and bridge seismic retrofit project. Prepared for DWR. October 2003. Association of California Water Agencies (ACWA). 2013, Invasive Mussels Reported in Lake Piru. Available online: <http://www.acwa.com/news/endangered-and- invasive-species/invasive-mussels-reported-lake-piru>. Accessed: November 28, 2015. Department of Water Resources/ Page A-2 August 2016 Los Angeles Department of Water and Power FINAL Pre-Application Document South SWP Hydropower Relicensing, FERC Project No. 2426 Atwater, Tanya and Helmut Ehrenspeck, 2000. Plain English Geology Field Guide for the Western Santa Monica Mountains, from Point Mugu to Oak Ridge and the Santa Clarita River Valley, National Association of Geoscience Teachers-Far Western Section for Spring Field Conference, Department of Geosciences, California State University, Northridge. April 14-16. Backlin, A. R., C. J. Hitchcock, R. N. Fisher, M. L. Warburton, P. Trenham, S. A. Hathaway, and C. S. Brehme. 2003. Natural history and recovery analysis for Southern California Populations of the Mountain Yellow-Legged Frog (Rana muscosa), annual report. Prepared for Cal Fish and Wildlife (Contract # P0185110), Angeles National Forest, San Bernardino National Forest, Mount San Jacinto State Park, Coachella Valley Association of Governments, and BLM. NOTE: Should have been Backlin et al. 2004. Bailey, Elton D. 1949. Stream Survey for Piru Creek. Cal Fish and Wildlife. Ventura, California. August 2, 1949. Ball, Douglas. 2012. Quagga and Zebra Mussels Monitoring and Prevention Programs at LADWP: Presentation to the Bishop Administrative Office. Los Angeles Department of Water and Power (LADWP). Bishop, CA. Barnes, Jerry. 1993. Memorandum to Sara Chubb regarding Understanding between The Angeles National Forest and California Department of Fish and Game for management of the Fishery Resource of Pyramid Lake. USFS. California. October 19, 1993. Barry, Robert G. 2015. Memorandum to Tim Wehling (Chief Dams and Canals Section) regarding the Pearblossom Solar Array, Faulting and Seismicity Report. March 9, 2015. Barry, G. Robert. 2013a. Memorandum to David Panec (Chief, Dam Safety Branch, Division of Operations and Maintenance) regarding Peace Valley Pipeline, Station 188+00 to Station 210+00, Liquefaction Evaluation. January 29, 2013. Barry, G. Robert. 2013b. Memorandum to David Panec (Chief, Dam Safety Branch, Division of Operations and Maintenance) regarding Pyramid Dam, Further Review of Inclinometer Measurements. Project Geology Report No. 56-12-28. Department of Water Resources (DWR). June 26, 2013. Barry, G. Robert. 2013c. Memorandum to David Panec (Chief, Dam Safety Branch, Division of Operations and Maintenance) regarding Pyramid Dam, Results of Investigation of Possible Horizontal Movement Along Embankment/Foundation Interface and Associated Conclusions Regarding Deformation of Slope Inclinometers. Project Geology Report No. 56-12-34. DWR. July 8, 2013. Barry, G. Robert. 2013d. Memorandum to David Panec (Dam Safety Branch Division of Operations and Maintenance) regarding Pyramid Dam and Reservoir, Results of Compilation and Analysis of Landslide Mapping. DWR. January 22, 2013. Department of Water Resources/ Page A-3 August 2016 Los Angeles Department of Water and Power FINAL Pre-Application Document South SWP Hydropower Relicensing, FERC Project No. 2426 Barry, G. Robert. 2013e. Memorandum to David Panec (DSOD) regarding Castaic Lake, Sharon's Rest and Other Landslides; Status of Geologic Inspections, Mapping, and Evaluations. DWR. June 6, 2013. Barry, G. Robert. 2013f. Memorandum to David Panec (DSOD) regarding Pyramid Dam and Reservoir, Results of Compilation and Analysis of Landslide Mapping. Prepared for DWR. January 22, 2013. Barry, G. Robert. 2013g. Memorandum to Tony Meyers (Southern Field Division, Division of Operations and Maintenance) regarding Pyramid Reservoir, Vista del Lago Visitor's Center; Results of Geologic Inspection Regarding Cracks on the Ground. DWR. October 2, 2013. Barry, G. Robert. 2012a. Memorandum to David Panec (Dam Safety Branch, Division of Operations and Maintenance) regarding Pyramid and Castaic Dams, Results of San Gabriel Fault Investigation. DWR. August 13, 2012. Barry, Robert G. 2012b. Letter to David Panec about the results of the San Gabriel Fault Investigation. August 13, 2012. Bechtel, Jeck C., and Ronald D. Rawlings. 1967. Southern District California Aqueduct Recreation Land Use and Acquisition Plan Supplement No. I Peace Valley Aquatic Recreation Area. California Department of Parks and Recreation. California. Becker, G.S., K.M. Smetak, and D.A. Asbury. 2010. Southern Steelhead Resources Evaluation: Identifying Promising Locations for Steelhead Restoration in Watersheds South of the Golden Gate. Cartography by D.A. Asbury. Center for Ecosystem Management and Restoration. Oakland, CA. Begley, Eva. 2004a. Correspondence Related to Alamo Campground. California Department of Water Resources. Sacramento. Begley, Eva. 2004b. Trout Stocking Program, April 2002 to April 2004. California Department of Water Resources. Sacramento. Bietz, S. 2015. Archaeological site record P-19-190997. On file at South Central Coastal Information Center. Black, D. R. 2013a. Lake Pyramid Fall 2013 General Fish Survey. California Department of Fish and Wildlife. Inland Fisheries Division, Reservoir Research Project. South Coast Region. San Diego, CA. Black, D. R. 2013b. Lake Pyramid Spring 2013 General Fish Survey. California Department of Fish and Wildlife. Inland Fisheries Division, Reservoir Research Project. South Coast Region. San Diego, CA. Department of Water