Projects 2014-15 Obi Obi Creek Fencing & Revegetation (Macleod) PROJECT PLAN Project No. 1415-006 This Project Plan has been prepared by: Mark Amos Project Manager Lake Baroon Catchment Care Group PO Box 567 Maleny, Qld, 4552 Phone (07) 5494 3775 Email
[email protected] Website www.lbccg.org.au Disclaimer While every effort has been made to ensure the accuracy of this Project Plan, Lake Baroon Catchment Care Group makes no representations about the accuracy, reliability, completeness or suitability for any particular purpose and disclaims all liability for all expenses, losses, damages and costs which may be incurred as a result of the Plan being inaccurate or incomplete in any way. How to use this Plan This Plan is split into three distinct sections. The Summary (pp. 5-6) is a two page brief description of the project and includes details of the stakeholders, budgets, outputs and outcomes. The Project Plan (pp. 7-13) outlines the main details involved in implementing the project and in most cases should explain the project sufficiently. The Attachments (pp. 14-42) provides additional information to support the Project Plan. The various numbered Contents in the Project Plan directly correspond with the numbered sections in the Attachments and provides further information. Terms used in this Plan Lake Baroon and Baroon Pocket Dam are used interchangeably, although Lake Baroon is usually used when referring to the catchment and Baroon Pocket Dam refers to the dam as commercial water storage. PROJECT VERSIONS & APPROVALS Date Version/Description Result April 2014 Sunshine Coast Council Landholder Environment Grant Approved June 2014 November 2014 Draft LBCCG Project Proposal n/a 11/12/2014 Project presented to LBCCG Committee TBA (Minutes) Project Proposal forwarded to Seqwater for approval (email) TBA (A.