Annex First School Allocation Exercise 2020

Total Page:16

File Type:pdf, Size:1020Kb

Annex First School Allocation Exercise 2020 Annex First School Allocation Exercise 2020 – Premises Information Item District Location No. of Expected No. Classrooms Completion (CR) / Date Approximate Internal Floor Area KG1 Sham Shui 1/F, Lai Tsui Shopping CR: 6 Readily Po Centre, Lai Tsui Court, 670 m2 Available 608 Lai Chi Kok Road KG2 Sha Tin G/F, Chun Yeung CR: 10 Readily 2 (Note) Shopping Centre, 1 103 m Available Chun Yeung Estate, 20 Kwei Tei Street, Fo Tan, Shatin KG3 Sham Shui G/F, Hoi Wing House, CR: 6 January 2020 Po Hoi Tat Estate, Cheung 706 m2 (tentative) Sha Wan, Kowloon KG4 Sai Kung Yung Ming Court, 5 CR: 6 January 2020 Chi Shin Street, 820 m2 (tentative) Tseung Kwan O KG5 Sham Shui 1/F, Long Tin House, CR: 6 May 2020 Po Pak Tin Estate Phase 550 m2 (tentative) 11 Note: According to the Housing Department (HD), the air-conditioning (A/C) provision for non-domestic properties, including kindergarten (KG) premises, at Chun Yeung Shopping Centre, Chun Yeung Estate will be fed by Central Water Cooled Air Conditioning System managed by HD. Installation of electrical air-conditioner in the KG premises facing Kwei Tei Street is not recommended. The KG premises are provided with chilled water pipes and Air Handling Unit Room only. The tenant will be required to provide and install their own Air Handling Unit and any associated system or duct works, and is responsible for future management and maintenance. The A/C charges is $68.2 per square metre per month for the KG premises at G/F Chun Yeung Shopping Centre, Chun Yeung Estate. Successful applicants should refer to the relevant clause in the Tenancy Agreement on the air-conditioning charges. The A/C charges quoted are subject to revision by the Hong Kong Housing Authority (HKHA). The adjustment in the charges, if any, will take effect from a date as notified by HKHA. For enquiries about the A/C charges, please contact Ms. Betty LIONG of HD at 2794 5311. .
Recommended publications
  • OFFICIAL RECORD of PROCEEDINGS Wednesday, 19 February 2020 the Council Met at Eleven O'clock
    LEGISLATIVE COUNCIL ― 19 February 2020 4539 OFFICIAL RECORD OF PROCEEDINGS Wednesday, 19 February 2020 The Council met at Eleven o'clock MEMBERS PRESENT: THE PRESIDENT THE HONOURABLE ANDREW LEUNG KWAN-YUEN, G.B.S., J.P. THE HONOURABLE JAMES TO KUN-SUN THE HONOURABLE LEUNG YIU-CHUNG THE HONOURABLE ABRAHAM SHEK LAI-HIM, G.B.S., J.P. THE HONOURABLE TOMMY CHEUNG YU-YAN, G.B.S., J.P. PROF THE HONOURABLE JOSEPH LEE KOK-LONG, S.B.S., J.P. THE HONOURABLE JEFFREY LAM KIN-FUNG, G.B.S., J.P. THE HONOURABLE WONG TING-KWONG, G.B.S., J.P. THE HONOURABLE STARRY LEE WAI-KING, S.B.S., J.P. THE HONOURABLE CHAN HAK-KAN, B.B.S., J.P. THE HONOURABLE CHAN KIN-POR, G.B.S., J.P. DR THE HONOURABLE PRISCILLA LEUNG MEI-FUN, S.B.S., J.P. THE HONOURABLE WONG KWOK-KIN, S.B.S., J.P. 4540 LEGISLATIVE COUNCIL ― 19 February 2020 THE HONOURABLE MRS REGINA IP LAU SUK-YEE, G.B.S., J.P. THE HONOURABLE PAUL TSE WAI-CHUN, J.P. THE HONOURABLE CLAUDIA MO THE HONOURABLE MICHAEL TIEN PUK-SUN, B.B.S., J.P. THE HONOURABLE STEVEN HO CHUN-YIN, B.B.S. THE HONOURABLE FRANKIE YICK CHI-MING, S.B.S., J.P. THE HONOURABLE WU CHI-WAI, M.H. THE HONOURABLE YIU SI-WING, B.B.S. THE HONOURABLE MA FUNG-KWOK, S.B.S., J.P. THE HONOURABLE CHARLES PETER MOK, J.P. THE HONOURABLE CHAN CHI-CHUEN THE HONOURABLE CHAN HAN-PAN, B.B.S., J.P.
    [Show full text]
  • Address of Estate Offices Under Hong Kong Housing Authority and Hong Kong Housing Authority Customer Service Centre
    香港房屋委員會轄下屋邨辦事處及香港房屋委員會客務中心地址 Address of Estate Offices under Hong Kong Housing Authority and Hong Kong Housing Authority Customer Service Centre 辦事處名稱 Name of Office 地址 Address 香港房屋委員會客務 Hong Kong Housing 九龍橫頭磡南道3號 3 Wang Tau Hom South Road, 中心 Authority Customer Kowloon Service Centre 鴨脷洲邨辦事處 Ap Lei Chau Estate 香港鴨脷洲邨利滿樓(高座)地下24- No. 24-31, G/F, Lei Moon House Office 31號 (High Block), Ap Lei Chau Estate, Hong Kong 蝴蝶邨辦事處 Butterfly Estate Office 屯門蝴蝶邨蝶聚樓地下 G/F, Tip Chui House, Butterfly Estate, Tuen Mun 柴灣邨物業服務辦事 Chai Wan Estate Property 柴灣柴灣邨灣畔樓地下 G/F, Wan Poon House, Chai Wan 處 Services Management Estate, Chai Wan Office 澤安邨辦事處 Chak On Estate Office 深水埗澤安邨華澤樓地下17A-24號 Unit 17A-24, G/F, Wah Chak House, Chak On Estate, Sham Shui Po 長青邨物業服務辦事 Cheung Ching Estate 青衣長青邨青槐樓地下20-29號 Unit 20-29, G/F, Ching Wai House, 處 Property Services Cheung Ching Estate, Tsing Yi Management Office 長亨邨物業服務辦事 Cheung Hang Estate 青衣長亨邨亨麗樓地下1-8號 Unit 1-8, G/F, Hang Lai House, 處 Property Services Chueng Hang Estate, Tsing Yi Management Office 長康邨辦事處 Cheung Hong Estate 青衣長康邨康平樓地下 G/F, Hong Ping House, Cheung Hong Office Estate, Tsing Yi 長貴邨物業服務辦事 Cheung Kwai Estate 長洲長貴邨長旺樓101-102號 Unit 101-102, Cheung Wong House, 處 Property Services Cheung Kwai Estate, Cheung Chau Management Office 祥龍圍邨物業服務辦 Cheung Lung Wai Estate 上水祥龍圍邨景祥樓地下 G/F, King Cheung House, Cheung 事處 Property Services Lung Wai Estate, Sheung Shui Management Office 長沙灣邨物業服務辦 Cheung Sha Wan Estate 深水埗長沙灣邨長泰樓一樓 1/F, Cheung Tai House, Cheung Sha 事處 Property Services Wan Estate, Sham Shui Po Management Office
    [Show full text]
  • Memorandum for the Hong Kong Housing Authority Response of the Director of Housing to the Addresses Made by Members of the Hong
    Paper No. HA 23/2020 Memorandum for the Hong Kong Housing Authority Response of the Director of Housing to the Addresses Made by Members of the Hong Kong Housing Authority at Housing Authority’s Annual Special Open Meeting Held on 8 June 2020 PURPOSE This paper invites Members to note the response of the Director of Housing to the addresses made by Members at the Hong Kong Housing Authority (HA)’s Annual Special Open Meeting held on 8 June this year. BACKGROUND 2. Members offered views on various public housing policies and HA’s management matters in the addresses made at the Annual Special Open Meeting on 8 June. The Director of Housing had planned to give response to these views at the Regular Open Meeting originally scheduled for 7 August but the Meeting was cancelled in view of the latest situation of the Coronavirus Disease 2019 epidemic (vide Paper No. HA 17/2020). A written response to the relevant views is now provided at Annex. INFORMATION 3. This paper is issued for Members’ information. Polly KWOK Secretary, Housing Authority Tel. No.: 2712 2712 Fax No.: 2624 5685 c.c. Members of HA Committees/Sub-Committees File Ref. : HD 4-2/PS1/1-55/3/1(2020) (Strategy Division) Date of Issue : 1 September 2020 Annex Response of the Director of Housing to the Addresses Made by Members of the Hong Kong Housing Authority at Housing Authority’s Annual Special Open Meeting Held on 8 June 2020 Chairman and Members, Housing Authority (HA) Members offered their valuable views on various public housing policies and HA’s management matters in their addresses made at the HA Annual Special Open Meeting on 8 June this year.
    [Show full text]
  • Special Conditions of Tender Chun Yeung Estate –Shop
    HONG KONG HOUSING AUTHORITY Special Conditions of Tender Chun Yeung Estate –Shop Tenders by way of RENTAL TENDERING are invited for the 3-year tenancy of the following premises located in Chun Yeung Estate, Shatin, New Territories. Monthly Air- conditioning Reference Approximate Charges Rent Shop No. Area in m2 (HK$) Trade (HK$) Chun Yeung Shopping Centre No. G04 73 4,978.60 Education & Cultural Centre 38,000 The monthly rent (exclusive of rates and air-conditioning charges) for the above premises is subject to tender. 2. Tenderers are reminded that the tenancy offered will be for a fixed term of 3 years with no option to renew. 3. Only the designated trade will be considered. Tendered rent will be final and not subject to negotiation. Tenderers shall tender monthly fixed rent for the whole lease term of 3 years. 4. Tenderers should note that under the Tenancy Agreement, either party may terminate the tenancy by giving to the other at least three calendar months’ notice in writing. However, in case of breach of any of the conditions contained in the Tenancy Agreement by the tenant, the Hong Kong Housing Authority (HA) shall be entitled to determine the tenancy by giving to the tenant at least one calendar month’s notice in writing. For the avoidance of doubt, where HA invokes section 19(1)(b) of the Housing Ordinance (Cap.283) to terminate the tenancy, the period for the notice to quit issued under that section shall be 1 calendar month. 5. The stated area of the premises is approximate only and no warranty is made as to its precise accuracy.
    [Show full text]
  • Information on Public Housing Completed from 2015-16 to 2019-20 Year of Completion Estate Name Housing Type Block Name Number Of
    Annex 1 Information on Public Housing Completed from 2015-16 to 2019-20 Any Contract Year of Housing Number Delay, if yes, Estate Name Block Name Completion Type of Flats the period of delay 2015-16 Public Hung Long House 469 Rental Hung Fuk Estate Hung Foon House 688 No delay Housing (PRH) Hung Lok House 553 Lower Ngau Tau Kok PRH Kwai Wah House 567 No delay Estate Ming Chuen House 545 Yuet Chuen House 751 Shui Chuen O Estate PRH No delay Ying Chuen House 807 Ling Chuen House 521 PRH Yat Long House 102 Long Ching Estate No delay Ching Long House 336 Orchid House 425 Marigold House 511 Peony House 511 So Uk Estate PRH No delay Cedar House 507 Willow House 507 Cherry House 456 Oi Tat House 858 Shing Tat House 856 Chun Tat House 868 On Tat Estate PRH No delay Yin Tat House 860 Hau Tat House 860 Him Tat House 780 Po Hing House 231 Po Heung Estate PRH No delay Po Shun House 252 Lei Yue Mun Estate PRH Lei Wong House 443 No delay Greenview Villa Subsidised (provided by the Sale Flat Greenview Villa 988 No delay Hong Kong Housing (SSF) Society (HKHS)) Any Contract Year of Housing Number Delay, if yes, Estate Name Block Name Completion Type of Flats the period of delay 2016-17 Wah Ha Estate PRH Wah Yan House 187 No delay Yan Tat House 392 Sin Tat House 1 034 Around On Tat Estate PRH Lai Tat House 1 034 half a month Chi Tat House 1 034 Ching Tat House 780 No delay Shin Leung House 313 Around Long Shin Estate PRH Shin Oi House 533 half a month Shin Yung House 357 Mau Chuen House 489 Lam Chuen House 493 Around Shou Chuen House 497 3.5 months Shui
    [Show full text]
  • 7Café X Lulu豬咖啡券及隨行杯銷售店舖地址香港區
    7Café x LuLu豬咖啡券及隨行杯銷售店舖地址 (凡購買7Café 咖啡券套票一本,即送LuLu豬隨行杯一隻) 香港區 屈地街28號屈地大廈地下 Ground Floor, Whitty Street Court, No.28 Whitty Street, Hong Kong 西營盤正街 18 號啟正中心地下 A 舖 Shop A, G/F., Kaiser Centre, No. 18 Centre Street, Sai Ying Pun, HK 西環第三街56-72號福滿大廈地下 A舖 Shop B, G/F., Edf. Kam Wan, 6-I Rua de S Lourenco, Macau 石塘咀山道 20 號高雅大廈地下 C 舖 Shop C, G/F & Cockloft, GOA Building, 20 Hill Road, HK 西環卑路乍街18A, 20及20A號如意大樓地下1號舖 Unit 1, Ground Floor, Yue Yee Mansion, Nos.18A, 20 & 20A Belcher's Street, Western,Hong Kong 德輔道西 301 號天興大廈 C 舖地下 Shop C, G/F., Tin Hing Mansion, 301 Des Voeux Road West, Hong Kong 德輔道西125號大興大廈地下E號舖位 Shop E, G/F., Tai Hing Bldg., 125 Des Voeux Rd West, HK 堅尼地城卑路乍街116-122A號聯康新樓地下B舖 Shop B, G/F, Luen Hong Apartment, 116-122A Belcher’s Street, Kennedy Town, Hong Kong 堅尼地城士美菲路45-51號及科士街34- Shop No. LG301, LG3/F., Chun Yeung Shopping 40號聯德聯興聯發聯安新樓Smithfield Centre, Chun Yeung Estate, Fo Tan, Shatin, N.T. Walk地下A1舖 永樂街 89-91 號喜利商業大廈 B 座地下 G/F., Blk B, Hiller Comm Bldg., 89-91 Wing Lok St., HK 中環皇后大道中 331-333號登富商業大廈地下 G/F, Teng Fuh Commercial Building, 331-333 Queen's Road Central, Central, HK 荷李活道123號荷李活華庭地下3號舖 Shop No.3, Ground Floor, Hollywood Terrace, No.123 Hollywood Road, HK 信德中心 G01 干諾道中 200 號地下 G01 Shun Tak Centre, 200 Connaught Rd C, HK- Macau Ferry Terminal, HK 上環蘇杭街106號地下B舖 Shop B, Ground Floor, 106 Jervois Street, Sheung Wan, Hong Kong 上環德輔道中298號地下及閣樓 G/F & the Cockloft, No. 298 Des Voeux Road Central, Sheung Wan, Hong Kong 般咸道55號地下 G/F., 55 Bonham Road, HK 半山西摩道 1 號輝煌臺 7 號舖 Shop 7, G/F., Fairview Height, 1 Seymour Road, HK 堅道
    [Show full text]
  • Special Conditions of Tender Chun Yeung Estate –Chinese Restaurant
    HONG KONG HOUSING AUTHORITY Special Conditions of Tender Chun Yeung Estate –Chinese Restaurant Tenders by way of RENTAL TENDERING are invited for the 6-year tenancy of the following premises located in Chun Yeung Estate, Shatin, New Territories. Monthly Air- conditioning Reference Approximate Charges Rent Shop No. Area in m2 (HK$) Trade (HK$) Chun Yeung Shopping Centre No. 101 564 38,464.80 Chinese Restaurant 150,000 cum Advertising Light Box No. D 7.5 The monthly rent (exclusive of rates and air-conditioning charges) for the above premises is subject to tender. 2. Tenderers are reminded that the tenancy offered will be for a fixed term of 6 years with no option to renew. 3. Only the designated trade will be considered. Tendered rent will be final and not subject to negotiation. Tenderers may tender monthly fixed rent; or monthly fixed rent linked to staged increases at triennial intervals, the rent tendered for the second 3-year period should not be less than the rent tendered for the first 3 years; or monthly base rent or turnover rent at a certain percentage of turnover, whichever is the higher; or monthly base rent or turnover rent at a certain percentage of turnover, whichever is the higher, linked to staged increases at triennial intervals, the rent tendered for the second 3-year period should not be less than the rent tendered for the first 3 years. 4. Tenderers are advised to note that the tenancy agreement will not include a provision for early determination of the term by giving notice in writing by either party to the other.
    [Show full text]
  • (Translation) Minutes of Meeting of Islands District Council Date : 24 February 2020 (Monday) Time : 10:30 A.M. Venue : Islan
    (Translation) Minutes of Meeting of Islands District Council Date : 24 February 2020 (Monday) Time : 10:30 a.m. Venue : Islands District Council Conference Room, 14/F, Harbour Building, 38 Pier Road, Central, Hong Kong. Present Chairman Mr YU Hon-kwan, Randy, MH, JP Vice-Chairman Mr WONG Man-hon Members Mr CHOW Yuk-tong, SBS, MH Mr YUNG Chi-ming, BBS, MH (Left around at 2:45 p.m.) Mr CHAN Lin-wai, MH Mr WONG Hon-kuen, Ken Mr HO Chun-fai Mr HO Siu-kei Ms WONG Chau-ping Ms YUNG Wing-sheung, Amy Ms TSANG Sau-ho, Josephine Mr KWOK Ping, Eric Mr TSUI Sang-hung, Sammy Mr FONG Lung-fei Ms LAU Shun-ting Mr LEE Ka-ho Mr LEUNG Kwok-ho Mr WONG Chun-yeung Attendance by Invitation Ms CHU Wai-sze, Fiona Chief Transport Officer/Planning/Ferry Review, Transport Department Miss HO Kit-ying, Florence Senior Transport Officer/Planning/Ferry 2 Transport Department In Attendance Mr LI Ping-wai, Anthony, JP District Officer (Islands), Islands District Office Mr LI Ho, Thomas Assistant District Officer (Islands)1, Islands District Office Ms LEUNG Tin-yee, Christy Assistant District Officer (Islands)2, Islands District Office Mr MOK Sui-hung Senior Liaison Officer (1), Islands District Office Mr CHAN Yat-kin, Kaiser Senior Liaison Officer (2), Islands District Office Ms LAI Wing-sau, Winsy District Environmental Hygiene Superintendent (Islands), Food and Environmental Hygiene Department Secretary Ms Dora CHENG Senior Executive Officer (District Council), Islands District Office ~~~~~~~~~~~~~~~~~~~~~~~~~~~~ I. Election of Chairmen and Vice-Chairmen of Committees The Chairman welcomed Members to the second meeting of the sixth-term Islands District Council (IDC).
    [Show full text]
  • Access Officer - Housing Department
    Access Officer - Housing Department District Venue/Premise/Facility Address Post Title of Access Officer Telephone Email Address Fax Number Number Central and Sai Wan Estate 5/F, North Terrace, Sai Wan Estate, Ka Wai Assistant Property Manager/SW 2817 2054 [email protected] 2872 0938 Western Man Road, Kennedy Town Southern Apleichau Estate No. 27, G/F, Lei Moon House(High Block), Ap Assistant Housing Manager/ALC(2) 2554 4941 [email protected] 3695 0353 Lei Chau Estate, H.K. Lei Tung Estate No. 108-116, G/F., Tung Cheong House, Lei Assistant Housing Manager/T(HKI5) 2814 8105 [email protected] 2580 9892 Tung Estate, Apleichau, H.K. Ma Hang Estate G/F, Ying Ma House, Ma Hang Estate, Stanley Assistant Property Manager/MHG 2813 7963 [email protected] 2813 4625 Shek Pai Wan Estate & Shopping G01, Pik Long House, Shek Pai Wan Estate, Assistant Housing Manager/SPW2 2294 9008 [email protected] 2294 9000 Centre H.K. Tin Wan Estate G/F, Tin Lai House, Tin Wan Estate Property Manager/TW 2538 5016 [email protected] 2538 7002 Wah Fu (I) Estate & Shopping G/F, Wah Chun House, Wah Fu (1) Estate, Ag. Assistant Housing 2551 2011 [email protected] 2875 1740 Centre Pokfulam, H.K. Manager/WF(I)2 Wah Fu (II) Estate G/F.,No.21-34,Wah Hing House,Wah Fu(II) Assistant Housing Manager/WF(II)2 2551 0660 [email protected] 2875 5153 Estate, Pofulam, Hong Kong Wah Fu (II) Estate Shopping 12A, 6/F, Wah Fu (II) Commercial Complex, Property Manager/Wah Fu (II) 2538 0074 [email protected] 2550 6020 Centre Wah Fu Road, Pokfulam, Hong Kong Shopping Centre Eastern Chai Wan Estate G/F, Wan Poon House, Chai Wan Estate, Chai Assistant Estate Manager/CHN 2234 7931 [email protected] 2673 6353 Wan Hing Man Estate Level 2, Community Building, Hing Man Estate, Assistant Housing Manager/HM 2558 6311 [email protected] 2505 2053 Chai Wan, H.K.
    [Show full text]
  • Administration's Paper on Measures for the Prevention and Control of Coronavirus Disease 2019 in Hong Kong
    LC Paper No. CB(2)673/19-20(01) For information on 10 March 2020 Prevention and Control of Coronavirus Disease 2019 in Hong Kong PURPOSE Further to the submissions to the Legislative Council (“LegCo”) Panel on Health Services on 10 and 30 January 20201 and to LegCo on 19 February 20202, this paper offers an update on the Government’s response and measures adopted to prevent and control the spread of coronavirus disease-2019 (“COVID-19”) in Hong Kong. LATEST SITUATION (a) Global and Mainland situation 2. On 30 January 2020, the World Health Organization (“WHO”) declared that the outbreak of the novel coronavirus infection constituted a Public Health Emergency of International Concern. As at 8 March 2020 (6 p.m.), besides the Mainland, 96 countries/areas in the world (including Hong Kong) had reported more than 24 107 confirmed cases of COVID-19, including 482 death cases. Please refer to Annex 1 for the details. 3. Among these countries/areas, the number of confirmed cases of COVID-19 has been running high in a number of regions, including Korea, Italy and Iran. The latest situation in these regions is summarised below – 1 Two information papers were submitted to the LegCo Panel on Health Services for discussion on 10 January (LC Paper No. CB(2)468/19-20(05)) and on 30 January (LC Paper No. CB(2)575/19-20(01)) respectively. 2 An information paper was submitted to LegCo for information on 19 February 2020. For more details, please refer to https://www.legco.gov.hk/yr19-20/english/counmtg/papers/cm20200219p-e.pdf.
    [Show full text]
  • Chun Yeung Estate Integrates with Artistic Atmosphere in Fo Tan (With Photos)
    Chun Yeung Estate integrates with artistic atmosphere in Fo Tan (with photos) The following is issued on behalf of the Hong Kong Housing Authority: Fo Tan has traditionally been an industrial area, but a number of local artists have been setting up studios in the district since 2000. This has created a vibrant art scene there and gradually turned part of Fo Tan into a community with a unique character. To echo this unique character of Fo Tan, the Housing Department's architectural project team adopted the language of Piet Mondrian, a well- known artist of the 20th century, as the main theme for the building facades and design details of Chun Yeung Estate during its design stage. "Piet Mondrian's art influenced not only the field of painting but also industrial product design and architecture. His artworks embellish straight lines and right angles with some vivid colour rectangles, showing vibrancy in tranquil and harmonious settings," Chief Architect of the Housing Department Mr Dominic Wong said today (December 27). "We applied Piet Mondrian's art style to the facades of domestic blocks and shopping malls, as well as public facilities including ground floor lobbies and lift lobbies on each floor. Drawing well-balanced grid lines infilled with geometric patches of vibrant colours on walls has brought a unique outlook to the estate and fluid flows of new energy to the community," Mr Wong said. Besides working to fit the project in with the artistic atmosphere in Fo Tan, the architectural project team considered and overcame geographical factors in the overall disposition and design.
    [Show full text]
  • Contract Residential Care Services for the Elderly – List of Contract Homes (As at 1 September 2021)
    Contract Residential Care Services for the Elderly – List of Contract Homes (as at 1 September 2021) Number of Number of Name of Contract Name of Home Address and Tel. No. Subsidised Non-subsidised Operator Period Places Places# Lower Ground, 1/F and 2/F, Sai Ying Pun Community Caritas Hong Caritas Evergreen 1.12.2016 – Complex, 2 High Street, Sai 121△ 29 Kong Home 30.11.2021 Ying Pun, Hong Kong Tel. No.: 2559 6685 G/F and 1/F, Choi Man House Po Leung Kuk and Yee Man House, Ho Man 1.8.2017 – Po Leung Kuk Merry Court for 110△ 38 Tin Estate, Kowloon 31.7.2022 the Senior Tel. No.: 2242 1713 3/F(including Open Courtyard) Evergreen (Tsz Wai Ying and 4/F, Ancillary Facilities Ching) Nursing 1.1.2018 – Investment Block, Tsz Ching Estate, Wong 102△ 45 Home Cum Day 31.12.2022 Limited Tai Sin, Kowloon Care Centre* Tel. No.: 2610 1775 T.W.G.Hs. Women's Welfare No. 501, 5/F, Oi Sin House, Oi Tung Wah Club Western Tung Estate, Shau Kei Wan, 1.4.2018 – Group of District, Hong 100△ 32 Hong Kong 31.3.2023 Hospitals Kong Residential Tel. No.: 3156 2111 Care Home for the Elderly 4/F, Ancillary Facilities Block, Ever Kind Altru Nursing Sau Mau Ping Estate, Kwun 1.6.2016 – 96△ 42 Asia Limited Home Tong, Kowloon 31.10.2021 Tel. No.: 2650 3000 Po Leung Kuk Eco-Home for the Podium Level and Level 2, Fu Senior cum Yun House, Fu Cheong Estate, 1.11.2018 – Po Leung Kuk 71△ 69 Sunny Green Day Sham Shui Po, Kowloon 31.10.2023 Care Centre for Tel.
    [Show full text]