The World Bank Report No: ISR11095

Implementation Status & Results South Eastern Europe and Balkans and Trebisnjica River Basin Management Project (BiH/) (P084608)

Operation Name: Neretva and Trebisnjica River Basin Management Project Project Stage: Implementation Seq.No: 8 Status: ARCHIVED Archive Date: 25-Jun-2013 (BiH/Croatia) (P084608)

Public Disclosure Authorized Country: South Eastern Europe and Balkans Approval FY: 2008 Product Line:Global Environment Project Region: EUROPE AND CENTRAL ASIA Lending Instrument: Specific Investment Loan Implementing Agency(ies): Key Dates Public Disclosure Copy Board Approval Date 29-May-2008 Original Closing Date 31-Dec-2013 Planned Mid Term Review Date 24-Oct-2011 Last Archived ISR Date 30-Dec-2012 Effectiveness Date 06-Mar-2009 Revised Closing Date 31-Dec-2014 Actual Mid Term Review Date 24-Oct-2011

Global Environmental Objectives Global Environmental Objective (from Project Appraisal Document) The development and global environmental objective of the Project i s to provide mechanisms for the efficient and equitable water allocation amongst the users of the Neretva and Trebisnjica river basin (NTRB) at the transboundary level, and for enhancing the basin ecosystems and biodiversity through improved water resources management. The project is consistent with the GEF operational programs: Integrated Land and Water Multiple Focal Area Operation Program, (OP#9) under the GEF International Public Disclosure Authorized Waters Focal Area and Coastal, Marine and Freshwater Ecosystem (OP#2) under the Biodiversity Focal Area. The project is fully consistent with the eligibility criteria of the World Bank- GEF Investment Fund for the Mediterranean Sea Partnership. Has the Project Development Objective been changed since Board Approval of the Project?

Yes No

Component(s)

Component Name Component Cost Improved transboundary water resource management 2.65 Improved management and use of wetlands ecosystems and biodiversity 3.19 High-priority investments for water pollution control 8.51 Public participation and management of project implementation 2.51 Public Disclosure Authorized Overall Ratings Previous Rating Current Rating Progress towards achievement of GEO Moderately Unsatisfactory Moderately Satisfactory Overall Implementation Progress (IP) Moderately Unsatisfactory Satisfactory Public Disclosure Copy Overall Risk Rating Moderate Moderate

Page 1 of 6 Public Disclosure Authorized The World Bank Report No: ISR11095

Implementation Status Overview The Project is again progressing well towards achieving the Objectives. Key hurdles that had halted the process in 2012 were resolved, notably where it concerns the construction of wastewater treatment plants, and the construction of a pilot for water-efficient irrigation in the Croatian delta.

The two countries, BiH and Croatia, and the two Entities in BiH, are cooperating in the project implementation and maintain their regularly Joint Bilateral Meetings, about once every 4-5 months. While several project activities had been concluded in 2012, key milestones were reached toward completion of the remaining activities that had seen delays the past years (for some of which additional funds had to be received from the FBiH Environmental Fund): * BiH: construction of the municipal wastewater treatment plant of - contract signed in June 2013; * BiH: rehabilitation of the municipal wastewater treatment plant of Ljubuski - contract signed in May 2013; * BiH: construction of the wastewater treatment plant of the visitors center of Nature Park - contract negotiated in June 2013; * BiH: construction of industrial wastewater treatment plant Unisgal-Surtec, Konjic - due to much higher bid price for the combined plant than estimated, one of the two firms will construct a recycling plant itself, releasing Grant funds and the second firm will utilize the Grant fund toward the construction of a smaller separate plant;

Public Disclosure Copy * Croatia delta: Glog water-efficient irrigation pilot - contract signed for detail design in May 2013; works scheduled to start in the Fall of 2013; a legal opinion was obtained that allowed to initiate the works despite a current administrative challenge to the zoning plans in the delta. * Croatia delta: visitors center and hike trail near the Bacina lake - was due to be completed by December 2012, however due to inclement weather and inundation the completion is re-scheduled for July 31, 2013. Joint: Preparation of the River Basin Management Plan, Environmental Flow study, Optimization of Hydropower reservoirs, and improvement of hydrographic network are under way. A Joint review of the drafts for the Management Plan was held in March 2013.

The Republika Srpska water management administration structure was changed in January 2103, merging the Water Agencies of the Sava and of the Adriatic. The Office is maintained, however. The implications for the project at this late stage are to be determined. Also, concerns have risen regarding the quality and EU-compliance of the River Basin Management Plan, as the intensity of consultations is below requirements, and the consultant staff skills mix may prove inadequate (no hands-on EU WFD experience). These comments were shared with the Government and Consultant.

While most activities will have been completed by the original Completion Date of December 31, 2013, all are now on track to be completed by the revised Completion Date of December 31, 2014.

Locations Country First Administrative Division Location Planned Actual South Eastern E Not Entered Trebisnjica

South Eastern E Not Entered Trebinje

South Eastern E Not Entered Opuzen

South Eastern E Not Entered Nevesinje

South Eastern E Not Entered Usce Neretve

South Eastern E Not Entered Neretva

South Eastern E Not Entered

Public Disclosure Copy South Eastern E Not Entered Metkovic

South Eastern E Not Entered Ljubuski

Page 2 of 6 The World Bank Report No: ISR11095

Country First Administrative Division Location Planned Actual South Eastern E Not Entered Bacinska Jezera

South Eastern E Not Entered Vjetrenica

South Eastern E Not Entered

South Eastern E Not Entered Alagovac

South Eastern E Not Entered Prud

South Eastern E Not Entered Modro Oko

Public Disclosure Copy South Eastern E Not Entered Orepak

South Eastern E Not Entered Opstina Bileca

South Eastern E Not Entered Konjic

South Eastern E Not Entered Dubrovacko-Neretvanska Zupanija

South Eastern E Not Entered Hercegovacko-Neretvanski Kanton

South Eastern E Not Entered Hutovo Blato

Results

Global Environmental Objective Indicators Indicator Name Core Unit of Measure Baseline Current End Target Increased inter-state cooperation and capacity Text Value Some capacity exists through Annual meetings and training for transboundary water resource management Inter-State Water Commission (process) Date 02-Jan-2008 12-Jun-2013 31-Dec-2014 Comments Meets plan. Reduction of water-borne municipal and Text Value Effluent BOD (avg mg/l) 155 Effluent BOD (avg mg/l) 20 industrial based pollution in selected Effluent N (avg mg/l) 25 Effluent N (avg mg/l) 15 municipalities (stress reduction) Effluent P (avg mg/l) 8 Effluent P (avg mg/l) 2 Effluent Cr (avg mg/l) 200 Effluent Cr (avg mg/l) 0.5 Date 02-Jan-2008 10-Dec-2012 31-Dec-2014 Comments These are average discharge WWTPs in Bileca, Trebinje concentrations for selected and waste diversion in key parameters Nevesinje operational.

Public Disclosure Copy WWTPS in Ljubuski, Konjic (2) in construction.

Page 3 of 6 The World Bank Report No: ISR11095

Improvementof river quality can only be measured after construction /rehabilitation of treatment plants. Improved maintenance of environmental flows Text Value Old regulations are Environmental water flows and improved ecosystem and natural inadequate. Too few samples maintained. Pollutant resources management in the basin (process). collected for river quality and processing and reduction flow. Poor management and improved. 80% of wetland no restoration of wetlands. No management and restoration management plan exists for completed. Management of HPP reservoirs. HPP reservoirs improved. Date 02-Jan-2008 10-Dec-2012 31-Dec-2014 Public Disclosure Copy Comments Continuing delays with environmental flow studies in support of the River Basin Management Plan. Reduction of saline water intrusion as a result Text Value 0 ha under management. 400 ha under pilot. M&E of implementation of a Pilot Scheme in Neretva system established, and Delta (stress reduction) sustainability monitored. Date 31-Dec-2008 14-Feb-2011 31-Dec-2014 Comments Study completed. Pilot is delayed.

Intermediate Results Indicators Indicator Name Core Unit of Measure Baseline Current End Target Improved transboundary water resource Text Value No transboundary river basin Transboundary river basin management of the Neretva and Trebisnjica management plan exists. Old management plan adopted by River Basin data on hydrology and water CC. Updated data on quality. hydrology and water quality, M&E system in place, and datadisseminated. Date 02-Jan-2008 13-Apr-2012 31-Dec-2014 Comments Fourth intermediary report was submitted in December 2012. Some concern on quality is being raised. Increased public participation in IWRM Text Value Civil society/ stakeholder Civil society/ stakeholder activities on WRM: ad hoc activities on WRM: regular No. of workshops: 0 No. of No. of workshops: 5 No. of communities meetings on communities that meet on Public Disclosure Copy WRM: 0 No. of small grantsfor WRM: 25 No. of small grants

Page 4 of 6 The World Bank Report No: ISR11095

NGOs for relevant activities: 0 for NGOs for relevant activities: 30 Date 02-Jan-2008 13-Apr-2012 31-Dec-2014 Comments On track. Second round of Small Grants in implementation. Nutrient load reduction (Nitrogen(N)) achieved Tones/year Value 0.43 0.43 under the project Date 31-Dec-2010 10-Dec-2012 31-Dec-2014 Comments Average month value at Unchanged. Indicator is Neretva Konjic Station (0.32), duplicative with #2, but is Bacevic Station (0.35), and being added for corporate

Public Disclosure Copy Trebizat Station (0.62). monitoring purposes. Improvement of river quality can only be measured after construction /rehabilitation of treatment plants. Voume(mass) of COD pollution load reduction Tones/year Value 10.01 10.01 achieved under the project Date 31-Dec-2010 10-Dec-2012 31-Dec-2014 Comments Average month value at Indicator is duplicative, but is Neretva Konjic Station being added for corporate (19.89), Bacevic Station monitoring purposes. (4.44), and Trebizat Station (5.70). Improvement of river quality can only be measured after construction / rehabilitation of treatment plants. The unit is mgO2/l.

Data on Financial Performance (as of 29-Mar-2013)

Financial Agreement(s) Key Dates Project Ln/Cr/Tf Status Approval Date Signing Date Effectiveness Date Original Closing Date Revised Closing Date P084608 TF-91967 Effective 09-Sep-2008 09-Sep-2008 06-Mar-2009 31-Dec-2013 31-Dec-2014 P084608 TF-91969 Effective 09-Sep-2008 09-Sep-2008 06-Mar-2009 31-Dec-2013 31-Dec-2014

Disbursements (in Millions) Project Ln/Cr/Tf Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed P084608 TF-91967 Effective USD 2.00 2.00 0.00 1.16 0.84 58.00 P084608 TF-91969 Effective USD 6.00 6.00 0.00 3.48 2.52 58.00 Public Disclosure Copy

Page 5 of 6 The World Bank Report No: ISR11095

Disbursement Graph Public Disclosure Copy

Key Decisions Regarding Implementation The Closing Date of the Project was extended through December 31, 2014. The preparation of the River Basin Management Plan is moving slower than expected, and measures are being discussed to improve the scope and depth of the plan. This will be followed up with additional monitoring in Fall 2013.

Restructuring History CD Approval on 06-Dec-2012

Related Projects There are no related projects. Public Disclosure Copy