on top of renewables

2018 The Company & Services Table of contents

03 Company background 04 The team 08 Company Values statement 10 Sustainability 11 Engineering Methodology and Technology 12 Project Management Approach 13 Offices Locations 14 General services provided 15 Design approach Company Background

OnRenewables (OnR) was founded in June 2017 by Rafael Peris and Jose Carlos Sanchez with the mission to contribute to introduce the renewable energy sources into the planet earth on a practical, easy and affordable way while protecting and preserving the environment.

We are a global engineering and project management firm for the solar business focused on guiding and supporting our clients through their challenges, ultimately our challenges too.

We bring together professionals from diverse disciplines and with complementary skills, on a uniquely global scale. The depth of expertise and sheer numbers of specialists allow OnR to take on complex, strategic projects that no other firm could deliver so flexible, dynamic, cost-efficient and fast.

OnR looks at every project with a fresh perspective, no matter how big or small it may be. The firm supports and promotes in its people a willingness to think laterally. Often, this willingness to take a creative approach produces ideas and concepts that may not have been immediately obvious, but which often deliver the best solutions.

OnRenewables currently serves several customers worldwide and employs six people and several collaborators based in our offices in Valencia (), Marbella (Spain) and Tokyo (). The Team OnRenewables. The Team 5

Rafael Peris

Co-Founder and Managing Partner

[email protected]

+81 90 5440 1010

rafael_peris

Rafael has over 11 years of experience in the solar Rafael Peris, is the Co-Founder and acts as photovoltaic industry, in different roles from project Managing Partner at OnR. In this role, development, site and project management to engineering and construction leadership in different countries such as Rafael is responsible for leading the Spain, , , Germany, Puerto Rico, Mexico and development and execution of the Japan. Over the past 5 years with Sonnedix, he managed locally the EPC team in several projects in Puerto Rico Company’s long term strategy and plans. before being relocated to Japan to establish and manage He is also in charge of sales and customer locally the engineering department for Sonnedix Japan K.K. care, overseeing the project management Rafael worked in various management and leadership positions in the solar sector such as for Phoenix Solar, AES on a day-to-day basis. Corporation and GP Joule. He started his career as an industrial engineer in the automotive sector as part of the EPC team for providing assembly production lines for German and US car makers in Europe, shifting to the solar Prior to his role, Rafael was Head of Engineering at sector in 2006. Sonnedix Japan K.K., in charge of all project technical matters for the company in Japan. Sonnedix is a global Rafael holds a Bachelor of Engineering in Electrical and solar power producer with 500 MW of operating Electronics from the University Polytechnic of Valencia, generating capacities, substantially owned by investors Spain with his thesis about solar air collectors from the advised by J.P. Morgan Asset Management. Hochshule Mittweida, Germany. OnRenewables. The Team 6

José Carlos Sanchez

Co-Founder and Engineering Partner

[email protected]

+34 684 24 82 18

jctirado

Prior to his role, he was PV Designer at the one of the top five Jose Carlos Sanchez; is the Co-Founder largest and most successful IPP in the recent years in the and acts as Engineering Partner at OnR. solar business “Sonnedix”. Jose Carlos served for Sonnedix UK (London) from December 2013 to August 2015, time In this role, Jose Carlos leads the when he was requested and transferred to Sonnedix Japan engineering and construction department (Tokyo) to support the engineering department from August 2015 to June 2017. as well as the relationship with During his professional career, which spans more than 17 subcontractor and suppliers. He ensures years, Jose Carlos earned industry-widerecognition for his that the services are delivered to our expertise in civil and mechanical design, topographical and geotechnical surveys and construction, overall thanks to the customer with the highest standards of technical complexity of the civil engineering and construction projects he was involved. Also, he has taken responsibilities quality, on time and on budget, providing roles in major projects in numerous countries such Japan, UK, creative and innovative solutions project Puerto Rico, Chile, Mexico, Holland and Spain in different sectors, from PV plants, highways, bridges to airports, ports by project. and luxurious villas.

Jose Carlos holds a Superior Technical Vocation Training Certificate on Construction Management by the IES Guadalpin, Marbella, Spain. OnRenewables. The Team 7

Luis Carmona

Lead Drafter

Prior to his role, Luis was Draftsman at Sonnedix Japan K.K Luis Carmona, is the Lead Drafter at OnR. supporting the engineering department efforts from In his roles, Luis leads the design of December 2016 to June 2017. technical drawings in the multiple involved During the past six years Luis worked in various positons as draftsman for different engineering and architect firms disciplines for solar power plants such as mainly for the design and construction of new residential civil, preparing drawings and topographical buildings. and relief maps used in major construction Luis, holds a Bachelor of Building Engineering from the University of Sevilla, Spain. or civil engineering projects for earthworks, drainage system, inverter station slabs and buildings; mechanical, preparing drawings showing the detail and assembly ofthe racking systems; electrical preparing the wiring and layout diagrams of PV power plants. Company Values Statement OnRenewables. Company Values Statement 9

Mision, Vision and Values

Integrity Professionalism Integrity is having the courage to make the tough calls, taking pride in our work, being transparent and honest with Professionalism is the culmination of competence, our team, and being respectful of everyone. knowledge, resourcefulness, quality, attitude, and cooperation related to how we provide our professional Clarity services. Our company strives to provide its clients with not only a superb service, but also with an exceptional Clarity, leverages internal and external resources, reduces experience over the entire course of a project. While it is conflict and stress, improves efficiency and greatly important to be recognized for quality and knowledge, it is enhances people’s ability to work together. also essential to leave our clients with a positive view of our entire organization. Demonstration of a positive attitude, Commitment competence and cooperation on all levels creates an immeasurable positive impact when it comes to a client Commitment to our customers and our team means we are choosing to return to the firm or recommending our services accountable, take ownership, model servant leadership, and to another potential client, thus leading to growth. operate with a sense of urgency. OnRenewables. Sustainability 10

Sustainability

Running a business responsibly is key to its long-term sustainability: all decisions we make, whether regarding the governance and strategy of our company or about the planning, design and delivery of projects, have consequences for society. Sustainability – at the heart of corporate social responsibility (CSR) – helps us ensure that those consequences are positive, adding value for our clients and the communities we work in. Using our ingenuity to deliver lasting value for all – that’s our approach to sustainability. We have the knowledge to do it – and we believe we have the responsibility to do it. It’s that simple.

We are OnRenewables We bring together professionals from diverse disciplines and with complementary skills, on a uniquely global scale. Engineering Methodology and Technology

We solve clients’ problems with the most advance methodology, technology and software available in the renewables market. We deploy from software to analyze and design in 3D the civil works and module layout, to software to calculate the civil earthwork, drainage systems, racking system, plant performance and yield as well as sizing the equipment for complying with the interconnection requirements.

Following some of the tools

AutoCAD Civil, PSS/E, Robot Structural Analysis, SAP 2000, PVSyst, Matlab/Simulink, CivilStorm, PondPack, FlowMaster, Battery Sizing Analysis, Network Analysis, Protective Device Coordination, DC Systems, Cable Systems, Ground Grid Systems, Dynamic & Transients, PV Array / Solar Panel, Cable Thermal Analysis, Power Monitoring & Simulation, Switching Sequence Management, etc. Project Management Approach

Getting things done on time, on budget and on quality is the essence of our project management. OnR’s project management is based on a pro-active 24/7 approach, storing, tracking and retrieving the information related to the things that need to get done, that way, we avoid delays, cost overruns and/or unnecessary lower quality in our projects.

We provide “front-end” planning by thinking in advance, generating a series of actions which can later be undertaken without further planning. OnRenewables. Offices locations 13

Offices Locations

VALENCIA

OnRenewables, S.L. 18 Calle Ingenierio Manuel Maese (Ground floor) 46011 - Valencia Spain

MARBELLA

OnRenewables, S.L. 5 Calle Juan de la Cierva (Floor # 1, Office # 6) 29603 - Marbella Spain

TOKYO

3-12-23-505 Kamimeguro Meguro ku 153-0051 Tokyo. Japan OnRenewables. General services provided 5

General services provided

Nr. Design Owner's Technical Permitting and EPC Management On-Site Tests Engineering Engineering Consultation Business Support (separate quotation)

1 Cartography and Assistance in project Red-flag memo Assistance in project Site management Geotechnical tests mapping tender processes (pre-due diligence) evaluation (e.g. boring, DPSH, Swedish test) 2 Topographical survey Assistance in EPC Technical due Assistance in project Selection of Material sample lab and data processing RFP processes diligence development subcontractors tests

3 Civil and drainage Bid comparison, PPA and Permitting Site daily Compaction tests design contractor interconnection management coordination and classification, assessment supervision recommendation for awarding

4 Mechanical design Preparation of Market analysis Securing project land Liaising with project Racking system tests technical and easements manager and (pull out and requirements for subcontractors horizontal traction EPC Contracts test)

5 Electrical design Assistance in EPC Project feasibility Securing point of Review and Racking system contract studies interconnection and implement design and galvanization and negotiations PPAs quality control on site corrosion test 6 Module and Engineering control Environmental Securing tariff Site report creation Shading analysis facility layouts and monitoring impact assessments (EPC Contractor submittals review, comment and approval/rejection)

7 Transmission line Procurement analysis Site investigations Obtain project Project Management I-V Curve analysis design and selection and assessments environmental including quality reports approval factory visits and vendor qualification

8 Energy yield Construction Site-specific solar Obtain project Liaising with the client, Electrical isolation assessment monitoring to ensure resources studies construction and subcontractors and cable tests project is on budget, operating permits other stakeholders on time and with the such as lenders, project expected quality owner, landowner, municipality, utilities, etc. 9 Cost and O&M Commissioning Tariff, policy and Facilitate and setting Ensure project Module lab tests optimization design assistance regulatory studies up client operations in completion on specific-on-demand budget, on time and countries with the highest quality standards 10 Ultimate design Assistance to punch Quality and Facilitate and setting Find ways to Thermal analysis for the highest list creation, follow manufacturing up project needs in proactive prevent project return up and closure audits specific-on-demand and solve pro countries 11 Project cost Assistance to project Repowering Local partners and Assessing and Drone surveys for budgeting acceptance assessment and contractors search minimizing project marketing and site engineering and selection for risk management clients purposesblems 12 Grid code O&M monitoring and Energy storage Liaise with locals Create project status other… compliance supervision integration and clients & progress reports OnRenewables. Design approach 15

Which tasks do we consider for designing high performing PV Plants?

Obtain single all cadastral maps of the project lands to consolidate Consolidated cadastral it into one single project cadastral maps for defining the project maps boundary.

Obtain and integrate topographical data either via topographical Topographical Data onsite survey, aerial or satellite data into the project boundary to assess the actual terrain condition.

Analyze actual terrain condition to determine useable space for Actual terrain analysis panels placement with none or limited civil works considering the slope direction and inclination.

Define which is the optimum final terrain shape to reduce earth Final terrain analysis work and maximize plant capacity and performance.

Calculate cut and fill figures (cubic meters) to estimate earthwork Cut and Fill Calculation cost.

Define and calculate the adequate drainage system elements such Drainage system as retention ponds, ditches, manholes, etc.

Define the optimum racking system configuration to maximize Racking system plant capacity and performance such as panels per table, landscape, portrait, tilted angle, mono-pole, bi-pole, etc.

Place arrays considering the shadings as per customer preference Arrays distribution and the terrain condition.

Obtain the optimum module layout maximizing plant capacity Module layout and performance.

Different racking Define areas with special racking system configuration due to the different soil conditions (more slope, different foundation, different configuration areas azimuth, etc. OnRenewables. Design approah 16

Internal shadow Calculate real near shadow losses due to the arrays themselves on control (I) the layout.

Internal shadow Calculate real near shadow losses due to internal elements such as control (II) inverter stations and houses on the layout.

External shadow Calculate real far shadow losses such as external trees and control mountains.

Performance and With the final layout calculate the plant performance and yield. yield report

String connection Define the cabling configuration for the string.

Inverter placement Define the right location and optimum cabling for the inverters and cabling and transformers stations.

Trenches layout Define the trenches layout and cabling length.

Trenches type Define the cable trenches types with the layout. onrenewables @on_renewables onrenewables onrenewables.es