consultation

team. This

proposed

significant

rental many public

scale

increased

City

has

and of

comments

City

General of Thank

applications

Dear

Subject:

September

Toronto

ON

500

Ian

I1]fh

19

Jennifer

City

Chief

heritage

the

DunCan

made

identify

Duke

Planning

letter Planning

Planning’s Bloor

Planner

M5H3H1

TORONTO

and

Mr.

In

positive

units

site

realm,

you

Keesmaat,

contrast

Comments

revitalization

the

heritage

to

Duke,

and

comprises

locally

regarding

city

Division

Street

resources,

Ward

for 571

being

603

City

Official

15

St

process,

work

30,

solutions

with

Executive

additional

cycling

acknowledges

elements

188

the

building

MES

Suite

and

to

2016

letters

Planning

to

provided,

Commercial

19

respect

known

with

597

preservation,

revised

MCIP

751

Director

our

Plan 588

-

the 503

our

City

infrastructure

and

to Trinity-Spadina

Bloor

dated

RPP

of City

previous

STE

carried detail

objectives.

to

proposal

the

Amendment

internal

as

to

Markham

Planning’s

the

submission

Comments

612

the

the

the

staff

comments

19

March

and

Street

proposed

and

Partnership

proposed Markham

forward

OZ

Honest

above

the

letters

review and

appreciates

with

consideration

and

West,

and

addition

27th

Street.

comments

the

&

noted

of regard

raised

from

Ed’s

built

the

15

from

2015, Rezoning

and

2’

community the

marketplace,

Street.

738

188

This

proposed

Toronto Toronto

100

18th

properties

of

site

Submission

March

Official

form

the

the

the

previously.

to

to

Queen

and

Floor

805

the

as

proposal given

the

outcomes

and

amendments

782

ON

original

and

and

Application

East

Street

on-site December

informed

STE

M5H

and

provision

East

Mirvish

to Plan

Bathurst

day

Tower,

to

density.

the

proposing

West

2N2

better

York

December

19

other

care

proposal

continues

and

focus park,

from City

District

OZ

by

Village.

Hall

made 11,

understand

of

space.

Street,

Zoning

areas

We

Nos.:

the

the

our

on

on-site

2015

the

such

2015,

appreciate

revised energy

adjustments

to

to

meetings

of

We

26

comprehensive

By-law

advance

the

included

the

as

parkland,

to

continue

this

your

application,

the

www.toronto.calplanning

Tel:

Refer

efficiency, E-Mail:

proposal, Fax:

38

submission,

Director,

Gregg

letter

to-date

the

Amendment

Lennox

range

vision

to:

a

to

several

number

Community

efforts

guenstoronto.ca

(416)

Graig (416)

to

the

massing

details

and

such

appreciate

redevelopment

with

for

Uens

392-042?

392-1330

conservation

and

Street,

including

the

high

size

your

Planning

the

of

at

as

the

more

your

(41

and

the

site

6)39?-4647

level

of

581

team

the

to 1 west provide prescribed The A The conclude maintaining Proposed metres West submission The legibility Part with specific Markham Built three East-West The Bathurst Heritage officials continue City Street City demolished single the Street City access above impact 746 742-746 City these demolition

more

corner

proposed Bathurst

heritage City revised

IV

Planning

Staff Staff Planning

and the

Form heritage

buildings includes

West.

the composition

Wall

along

above

the

of

dynamic

a

comments

existing on

Bathurst

Street.

to

south remains

the

of

Preservation 5.0

entire

Street

are acknowledge

the 19-Storey

of

45

set

of

Laneway

Section

have

the and

to

proposal

their

a

Height

buildings Bathurst

Official

Markham

Street.

metre

the

supportive

degree 742-746 buildings,

southerly 9-storey

acknowledges staff

of

make

a

following adjacent

be

The

the

4.5

row

to

concerns buildings

context.

approach

3-dimensional

street

committed

conserved.

Street on

relate

helping

appreciate

of objectives

step

metre

retention and way

This at

Plan

angular retains Building

the

may

Heritage

this

would

building

at

738-746

Street line.

the

transition

contexts.

back

potentially

Massing of

for 760 better

As matters. proposal

five-part

and step

letter. about

as

not

to

to

impact the

We

the

to

part and a

plane.

a the Bathurst

result

and of

and define

the

of Intensification

Zoning

driveway

be

back

East

whole.

working Act

Enhanced

to

proposed

buildings form. Bathurst

these note

the

appreciates the

street

of

necessary,

A

changes Bloor

fall

would

the —

provided

these row

of

in by

this

reduction and Adjacent overall

of

City Bathurst-Bloor

and

these

abutting within

buildings

By-law

all

the

It

Street

shifting

Markham wall

of

with

Street

application,

through

a

is

changes

maintain

address

Street

retained

Planning

above

Public

loss

at

small three-storey

made

a

changes

height

in of

738

priority though

the

an

and

your on

amendment

in

of

West Heritage heritage an

all

the

with

angular assists

portion

the

conservation these

to

the Realm and

the

the

the

599-601

may

effort

base listed

the

team,

Street

and

driveway

Staff

the

will retained

Four the

and

site.

height staff

the for

City’s individual

740

historic

properties

have

buildings

base

scale buildings, greatly

buildings.

to pedestrian Alternative,

heritage plane

of

Heritage

required

also

recommend the

Building those

Bathurst

will Corners

The

Markham process. further

the

of

concerns.

on

of

community,

heritage

relationship

to

reduce

of

character be measured

this

applicant

building

on

the in

the

the

buildings

additional buildings

are

is

recommending

transitioning

5.0

Preservation

informed

the

resolve

However,

Study,

building

19-storey

proposed Scale

Street

connections

north,

still

shadowing

of it

Street

that

metre

structure

corner

appears

cultural

encroaches possible

of

is

from

our

and

of

is

the

as or

outstanding

encouraged

this

on

are heritage

to

by

step

discussed

this

well

building market reducing of

City

colleagues

building

removes

the

a

12

the

both

at proposed that

Services

area.

Lennox

heritage

are

height

impact

building

backs,

by

designation

585

storeys,

as Planning

site.

new

still the

into

developing

your buildings

negatively space.

The

fronting

Bloor

its

later

issues be

742,

of to

vehicular

development

ensuring

on

Street

supported.

the

staff

and value

to width.

revised

with

adjusted

retain

16.5 while

Bloor

in

Staff

be

744

Street

elected

and

under

that

the

on

and

as its

all

and

As

a

to

2

dedication

amount,

Should

parkland As

development

facilitating

proposed

Off-Site

to unencumbered,

the

comment. The

improves

PFR requirement

considered

The

supposed

Park

City provision

Please

Parkiand park

Plan

active

Regardless

laneway

other

north-south site

public

City

proposed

space

Parks,

in

Park

accommodate

noted

their

developability

Park

Park

park

in

Planning

Letter.

space.

control

Planning

means.

Space

within,

ground

note

the

park

Forestry,

their

the

memo

Park

dedication

in

immediately

development,

Letter

in

Letter

the

4

of

redevelopment

However,

requirements.

proposed Dedication

the

as

City

development

City of

the

the

on

width

of

June

on-site

site. application

quality

one

and/or

In

and

floor

Space

any

developability

acknowledges

dated

925

the

park

following

area

concludes

suggests

Planning

will

a

and

order

27,

of

application.

park

Parks,

massing

of

site.

square

off-site

uses

parkland.

of

combination

land

the

of

the

June

Recreation

consider

in

both

2016

abutting

Letter

to

i,20t)

on-site

we

park

the

park

We

Please

sites submission

abutting

blocks

that

Forestry

increase

of

for

staff’s regarding

27,

the

by

metres

also

memo.

vicinity,

changes

should

varied

reiterate

space

the

letter

square

of

and

parkland

as

stating 2016.

-

9-storey

other

The

and

the

July

provide

recognize

the

despite

a

(PFR)

previous

City

of

the

appreciates

as

whole.

the

and

proposed

available

those

Park

fails

agree

sizes

remainder

opportunities

your to

As

on-site

of

the metres,

opposed

19,

that

our

park

Planning

on-site

Recreation

the

building

requirements

the

Staff

noted

a

to this

City

Letter’s

2016

on

lands

that

previous

letter

the

While

letter

that

comments,

building

can

acknowledge

proposed

and each

proposal

within

with

park.

have

provision

will

park

this

to the

in

consolidating

relate

of

be

dated

Division.

detailing

fronting

off-site

City

the

our

assessment

of

inclusion

the

the

review

within

is

to

provided

Staff

area

comments

to

the

the

1,763

the

previous

satisfy

development

positively

should

site.

Planning

July

remainder

being

the

the

community.

of

City

blocks

do

preferred

park

that

Bloor

the

approximately

the

City

north,

a

19,

square

not

of

the comments

consolidated

filed

be

Planning

manner

suggests

the

treatment

the

space

that

memo,

2016

a

will

would

agree

Staff

Street

assessed

to

remainder

new

being

required the

obligation

and,

metre

approach

this

the

is

consider

not

(the

City

applicant

are

minimum

also

with

in

the

West

proposal

have

a

staff

importantly,

public

addressed

on

of

total

which

net

requirement

500

appreciative

‘Park

individually

Planning

provision

on-site

a

park

any

the

the

of

key

suggest

significant

parkiand

and

to

given

provision

the

metres

the

space.

provision

conclusions

should

facades

provide

parkiand

Letter’)

land

should

900

objective

the

required

park

parkland

off-site

the

agrees

processed

decreasing of

square

east-west

greatly

of

Through

provided

dedication

of

on

consider

scale

space

new

abutting

include

impacts

of

new,

regarding

the

of

dedication

the

the

or

of

dedication

part

with

of

park

metre

park

assists

of

through

efforts

the

the

a

and

of

the

by

an

how

the

on this

Site

the

space

the

the

on-

in 3 requirements, as detailed in PFR’s June 27, 2016 memo, are proposed to be satisfied, in the next formal submission.

Built Form, Hei%ht, and Density City Planning acknowledges and appreciates the consideration given to comments from both City Staff and the community regarding the massing of the proposed buildings. As our analysis of the site in the context of the Bathurst-Bloor Four Corners Study has progressed since your original submission we offer some more specific direction and recommendations regarding the proposed built form.

City Planning staff support the intensification of this site and acknowledge that the emerging policies from the Bathurst-Bloor Four Corners Study contemplate the construction of taller buildings on this site, subject to compliance with a number of performance criteria. It is important that redevelopment of this site address the City’s objectives regarding the built form and its impact on the public realm as explored through the Bloor-Bathursi four Corners Study. Please note the following recommendations regarding the proposed built form and the public realm.

The Public Realm The public realm along the Bathurst Street and West frontages should be a minimum of 6.0 metres from the curb to the building’s ground floor, excepting instances where existing heritage buildings have a setback of less than 6 metres. Where proposed new buildings are transitioning to the front setback of adjacent heritage buildings the recommended 6 metre setback may be less.

Please provide further details on the interface between the daycare and dog run uses to the east and the garage doors to the west of the Palmerston laneway. Please be advised this matter can be further detailed and addressed within the Site Plan Control application.

Please be advised that both public realm options proposed are consistent with the intent of the emerging Bathurst-Bloor Four Corners Study recommendations regarding public realm connections. City Planning Staff support the proposed Enhanced Public Realm Alternative.

A number of gates are shown on the plans bordering the proposed market and some of the interior pedestrian paths. While we acknowledge that the market may have to be inaccessible for the general public from time to time, please advise whether the diagonal connection to Bloor Street West and Bathurst Street is intended to be open.

The City intends that both Honest Ed’s alley and the new east-west connection through the site will be publicly accessible at all times. The City will seek the appropriate easements, where necessary, to secure this access permanently.

The plaza at the corner of Bathurst Street and Bloor Street West functions as both an important pedestrian gateway to the site and an acknowledgement of the location of the Honest Ed’s building. City Staff acknowledge and appreciate the approach to the public space at this corner including the southwest connection proposed through the Enhanced Public Realm Alternative. City Planning staff suggest that the height of this space below the cantilevered building be increased to open up the plaza to the intersection and adjacent public spaces.

4

The

step

Street

these

window primary

and

address The

primary

contemplated

impacts by

new A

Base

floor

expressions

order

staff Street.

they The

Ground

plans

City within

law

that While

provided.

The

that

number

the

orientation

proposed

backs

proposed

floor

development

stage

plans

transition

suggest

additional

spaces

public

heights

Planning

Buildings

to

Wall

and

width

The

detailed

the the

programming,

heritage

Significantly

privately-owned,

Photometric

owned, Details

facing

in

window

to

provide

floor

to

which

of

of

information

these

primary This

be

public

narrow

floor

Height

realm

at

may

floor

of

units

incorporating

toward

the

street

for

revised

buildings

this

windows,

advises

toward

of

the

of

Heights

tree

publicly-accessible

landscape matter

and

context,

areas.

flexibility

interface

development

range

height

assist this

the

have

heights

realm.

the

along

proposed

facing height

north/south

window

wall

and planting

drawings

the

Separation

more

type

live-work

to

on-site,

balance

the

City will

that,

related

from

in

regard

should

of

include

Bathurst

heights Lennox

Step

and

or

publicly-accessible

on

condition

addressing

at

west

at

drawings

of

the

details

in

a

be

Planning

floor in

facing

street

on

3.6

7.0

and

the

combination

facing

other

the

Backs

at-grade

ground

for secured

to

and addition

review

of

be

laneway,

frontage

the

units

additional

metres.

to

in

Bloor

Street

the

green

Distance

plans

ground

the

Street

light,

adjusted

on

level

details

condition. opportunities

7.2

the

lower

spaces,

at

condition.

are

public

the soft

staff

the

in

process,

floor

this

through

revised

metres

bike

Street

space

to should

should

view

typically

should

the

and

Typically,

on

facing shown

nature

floor

levels

and

of the

of

are

location.

green

to

realm

should

Bloor

podium

parking,

Bloor

all

4.5

spaces,

West,

and

within

typical

provide

hard

from concerned

City

plans

please include

design,

be

Site

reinforce

external

condition.

of

as

of

metre

created

space,

not

privacy.

adjusted

will

Street

Markham

Street

7.0

the

read landscaping,

Staff

11

Plan

the

Bathurst

of

the

range The

both

landscape

and,

submitted

be

increased

metres be

podium

metres. City

additional

the

floor/floor

street

as

tree

currently

West

light

advised

by

Control.

acknowledges

the

about

West

addition

required

within

Inadequate

buildings

a

to

from

Planning

the

planting,

maximum

area’s

Street

Street

remove

line.

fixtures

is

and

The

are

intersection.

the

plan

unique

at

the

separation

design

approximately

the that

tree

proposed

heights

the

of

at

The

the

separated

proposed

City’s

prevailing

West

public

minimum

on

requirements,

rights-of-way

office

the

would

City

the

planting.

Official

and

within

facing

south

nature

revised

of

of

Bathurst

and

site

current

and

Official 4.5

other

and

spaces

Planning

realm,

distance

or

building

supports support

frontage

plan

from

primary

distances

the

Lennox

metres.

of

live/work

plan

scale

separation

different

proposal

It

9

soft

the

rights-of-way

Street

7.0

to

is

to including

control

other

Plan

the

and

and

recommended

staff

and

complement

between

26

higher

landscaping

space.

setbacks

metre

the

on

window

City

Street.

following

result

privately-

metres

intended

Zoning

directs

architectural

facing

character

breaks

units

Bathurst

placement

will

distance

stage:

Planning

primary

ground

the

these In

in

require

be

in

to

with

that

units

and

By

up

to

the

as

is 5 visually

please its In has

considered regard street City the

order

street

Bathurst-Bloor

• been •

• • • •

Planning

wall

note

to

building metres The In provide building metre The The Further Bathurst by 20 and projections maximum Bloor calculation street The Bathurst In Bathurst increasing exceed taller the the average

enhance

for

wall

further

the

general,

order

metres.

increasing

design

north

development

a

Bathurst the

average

proposed the average street

common

than average

wall

façades

Street street

Staff

at

a

following

to

applicant

a

of

to

will

to improved

Street

Street Street

maximum

property

any adjacent

stepback

wall the

of the

height

currently Be the

the better

13.5

break

of

above

four

wall

suggest

West height

height

Street be

the

point,

the

height, with above average

advised street

street

height

maximum

practice.

of to

to to

metres

no

proposed

better to

Corners

relate

height up of

to

with

16 20 the

16.5 20

and spaces.

line

with

greater a a

will

of

of a

height

and

wall

wall comply

13.5 transitions

that point,

the

number height

metres

metres

metres.

of height

is proposed

the

the

that street

Markham

of

metres regard

and

toward

to

not be

the the

It

generally

of shear

the

between

metres.

of

height

75$ Study.

street

street The

the

is

redevelopment

than of the

a the the

a

appropriate revised 9.2 of

any

of

or with

or wall.

being

approach maximum

of

maximum City

20

heritage

to Bathurst

wall

and

width

13.5 dynamic

street 9.2

20 more,

the

less.

upward metre

9-storey

vertical

wall 13.5

wall

other of

the

metres

Street

the

metres

City

756 Planning transition

metre

decreasing

south,

employed the

facing

metres plans.

design

metres. wall

of fronting

fronting

emerging

and

street

segment

to

buildings

Bathurst

street

Planning

Street

should

of toward the

for

street

components at

of building

street

street

or

the

of decreasing

Markham

with

16.5

any

along

16.5

laneway

every

of

staff

wall

less.

downward the

wall

street

in

Bloor will

Bathurst

wall

the

the

point.

be

wall

wall of the

metres,

Bathurst-Bloor

the

Street

metres

this base

staff on

note

at

the

on

development height of

the a

street

be

west

is

street wall

the

maximum

either

at Street

heights

is

specific

any

Bloor in

Markham that

the

The

building

a a

frontage

note

one

and

the

not

positive maximum

Street

this Corner

not

in

toward

wall

and

heights

building of

height

both

wall

proposed

this

Corner

way

end

West intended

746

one

Street

exceed

the

location.

noted

includes

instance

height.

between

policies area. animate at

of of

in

of

way

this Four Bathurst building

the Street

site

aspect

of

between

should

the

this the 13.5

West Bloor

of

abutting

of

above, the

a

west.

could

and

street

to this

maximum Bloor

Corners south

16.5

proposed

one

frontage,

frontage

to

building

metres.

be

of

Bloor

the contemplated

should

not

should

Street

could

adjacent

Street

support

the

Markham

factored

The

be

projection

metres specifically wall

façade

east a

Street

exceed

heritage

achieved

proposal

Study Street

proposed

Please be

West

be

includes

is, of

development.

corner with

not

height and

the

and

to West

achieved

this

and a

on

into

be

an

policies

West

transition

Street

75$

and

varied a

above

average,

within

not also

with

23.4

that

of is of

the

and

two

by

20

and

is

6

Listed

Street

between

sunlight

designed, buildings.

site

Bloor

Street sidewalk

site

achieving

submission

the

City

with

Shadowing

The

of

are

heritage

adjacent

above

In

16.5

order

Bloor

will

contemplated.

will

proposed

Planning

this

West:

Four

public

buildings below

In

mechanical

Bloor

equinoxes. The

Street

p.m.

and The

Street

of

Reducing the

The

Street

metres

between

shadow

improve

the

building.

for

general,

to,

of

angular

Neighbourhood

and

Street

the

The

height

Markham

proposed

rear

33-metre

Corners

to

has

Bloor

east

or

the

Street

shadows

realm

are

in

West

intent

located

base

2:18

staff

Bathurst-Bloor

at above,

portion

reduced

the

applicant

West

as

the

side

several

the

of

11:18 plane.

the

the

the

This

Street

penthouse,

opposed In

and

West.

between

p.m.

buildings

mid

acknowledge

polices

the

of

north

29-storey

9-storey

property

facing

sunlight

Street

taller of

instances

ensure

and

a

the

the

condition

Bathurst

of a.m.

street

heritage

afternoon

Palmerston

the

at

suggestions

between

transition,

to

Bloor

side

the

Bathurst

Bathurst-Bloor

the

base

will

could

width shadow

to

comply

11:18

and

that

should

wall,

building

condition

proposed

and

line.

Four

the

equinoxes.

building

of

where

building

require

Street

Street

building

4:18

appears

that

a

Bloor

11:18

be

possibly

at

areas

of

a.m.

minimum

Tall

new

Street

Corners

Boulevard

impact

with

will

comply

the

for

adjusted

the

any

p.m.

a

West

on

could

and

height,

tall buildings

Street on

that street

between buildings

a.m.

equinoxes.

further

east-west

improve

street

able

and the

towers

public

the

Four

between

Bloor

the

building on

3:18

polices base

north

with

and

be

emerging

of

south-west

a

to

wall

to

West

Bloor

top

and

walls

as

minimum

Corners

improvements

reduced.

50%

increase

be

realm

p.m.

tall

on

4:18

Street

buildings

above

a

is

will

sunlight

sidewalk

storey,

oriented

is

the

45

remedied

the

will

beyond

recommended site

at

buildings.

Street

should

taller

of

at

p.m.

step

degree

west

the

at

Bathurst-Bloor

equinoxes.

West

polices

the

have

base

the

require

corner

sunlight

different

of

and

south/east

on

than

back

allow

at

tall

West

north

between

the

equinoxes.

side

be

3.5

buildings

further

through

the

Bloor the

angular

minimal

of

building

incorporated

shadows

regarding

of

16.5

that

metres

a

of

potential

however

the

equinoxes

continuous

sidewalk

on

minimum

Bloor

times

later

Albany

Street

tall

metres,

still

12:18

Bloor

sunlight

corner

plane

a

Four

changes

are

Tall

when

height

in

at

buildings

of

permitted

Street

and

sunlight.

further

West

this the

to

not

pm

of

Street

Avenue,

the

buildings measured

and Corners

of

of

into

additional

sunlight

incrementally

assist

not

condition

Bloor

corner

reduction

letter

required

Bloor

and

day.

5.t)

West

to

east

on

the

adjacent

West

adjustments

be

the

metres

by

The

1:18

the the

Street

is

The

in

Study

base

of

massed,

and

of

Street

on

situated

massing

from

the

in

proposal

the

Bathurst

step

Bathurst

from

Bathurst

on

to

Bloor

pm

to

the

revised

direct

Markham

base

of

when

comply to

West,

context

Bloor

policies

the

shadow

West a

backs

at

north

tall

a

1:18

height

on

to

the

at

in

the 7 With regard to shadowing on Bathurst Street, please provide more detailed information on the manner in which the development shadows Bathurst Street, specifically regarding the percentage of the public realm that is in direct sunlight between the hours of 11:18 am and 3:18 pm at the equinoxes.

Talt Buildings and Transition to Neighbourhoods As expressed in our previous comments and the emerging policies of the Bloor Bathurst Four Corners Study, Tall buildings are able to be accommodated on the east block of the development site. This site is unique in the study area. It is able to accommodate new park space, retain a significant number of heritage buildings, increase porosity in the public realm, and drive other City- building objectives in a significant way while providing an appropriate height and massing transition to adjacent Neighboztrhoods at heights greater than would be possible on any other sites in this area.

In order to ensure that the scale of these tall buildings transitions appropriately to adjacent areas of lower scale, these tall buildings must be situated beneath a 45-degree angular plane measured from all surrounding designated Neighbourhood areas. It appears that minimal changes to the proposal, excepting some more significant reductions to the proposed 29-storey building fronting Bathurst Street which substantially penetrates this angular plane, are necessary to achieve this transition.

Proposed 9-Storey Building on the West Block The proposed 9-storey building, fronting Bloor Street West, east of Markham Street encroaches into the angular plane as measured from the Neighbourhood. City Planning Staff acknowledge the rationale provided in the revised Urban Design Analysis, Planning Rationale & Avenue Segment Study dated May 17, 2016 with regard to this building and the assistance it provides in forming our recommendations on this part of the proposal.

The proposed building is situated in a the border of an uncharacteristically deep mixed use property, abutting the most shallow mixed use are designation fronting Bloor Street West from to West. This circumstance is not replicated anywhere along the Bloor Street West corridor from Spadina Avenue to Dundas Street West. City Planning Staff acknowledge that, while the Mixed Use Area designation is uncharacteristically shallows adjacent to the site, this area is designated as an Avenue by the City’s Official Plan and should be considered for some level of contextually appropriate intensification. In this context, as the proposed building is in close proximity to multiple forms of transit, is situated and massed in a manner which limits its impact on adjacent properties and streets, does provide a transition toward the south and west, and includes the retention of a corner heritage building, City Planning staff consider the proposed 9-storey building to be supportable provided:

• the dimensions of the 9-storey building and the laneway immediately to the south are adjusted to increase the area of the proposed on-site park,

• The massing of the upper floors toward the southwest are adjusted to increase the transition to the west and south.

• The units are oriented and any balconies are screened to mitigate impacts of privacy and overlook on the area to the west and southwest.

8

Further

spaces Residential

bedrooms.

The

our

the units

across Residential

Staff

Transportation

Comments

Other

Please

context provide

the

fronting

streets,

Building

City

The

Tall

houses

separation

ensuring It

adjacent between

When

Tall

appears

development.

previous

visuals

revised

City

staff

Buildings

support

assists

Buildings

the

is

Comments be

addressing

information

interior on

of

north

the plane

step

the

some

public

required

building

towers,

the

is

advised

Elevations

appreciates

City.

City a

that,

Markham

provide

from distances

mechanical

unit

Amenity Bloor

supportive

in

Units

Site

comments,

backs,

buildings

the

side

visuals

measured

implementing

Staff

streets.

to

City

in

and

and

mix

Transportation

Planning Plan

provision

excluding

for

that

Street

by

the

one

the

and of

for

and

regarding

floor

Planning

Separation

includes

are at

Street,

review.

Bloor

the

to

Space

site.

Control the

above

the

instance,

the

of

are

Unit City

25

penthouse

any

better

a

from

west

supportive

required

considerable

the

minimum

materiality

metres

While

frontages.

offset

of Plates

Street

balcony

building

Staff

as

Mix

comments,

the

proposed

rental

frontage

9.7%

the

16.5

Staff

application.

illustrate

recommended

Planning

the

City’s

Distance

as

this

size, expect

or

25

West

and

metres

also

of

interior

of

they

units

projections.

of

greater,

metres.

mass

of appears

the

27.9%

programming,

upper

includes

design

10%

tower

objective

north

the

the

encourage

the

a appear

within

will

units

above

similar

above

facades building

proposal

facades

of

and

This

floors

floorplates

2

earlier

sidewalk

to

work

be

the

bedroom

proposed

a

to

be

the

the

by

provided

the

to street

level

issue

units

currently

the

the

arc

of on

provide

will reducing

proposed

street

on

in

street

should

location

the

provision

the

intention,

re-massed

after

this

wall

of

may

the

proposed

be

of

units.

contain

rear

regard

under

line,

facades

wall

east

letter.

less

further

for be,

maintain

height

be

11:

the

development.

of

of

and

resolved,

a

by

block

18

than

height

separate

of

indoor

height

based

given

3

buildings,

range

should

to

of

a.m.

maintaining

discussed

bedrooms

of

affordable

eliminate

600

the

a

is

13.5

is

minimum

to

on

at

of

of

and

not

building,

contained

include

square

in

cover.

the

the

units

building

your

metres

in

this

The

separated

outdoor

and

or

façades

equinoxes.

shadowing

rental

a

all

elevations,

types

manner

instance,

more.

metres.

provision

3

secured

of

with

specifically

other

or

within

behind

25

units

amenity

more

not

and

from

Further

appropriate

metres

similar

tall

by

facing

within

on

tenures

within

an

of

the

please

the

building

the

angular

rental

to

those

to

the 9 /

Peter Yours proposed. Benjamin cc: [email protected] If The proposed many public Columbia to better The within A Gregory Community Lynda Councillor significant scale District conditions. with rental Please completed increased and Wind space residential Office City staff Conclusion

you

number

the

any

wind

City

Planning

are specific

and Venetas

positive from

application, units understand

have Study truly,

realm,

provide H.

the

Space

potential

Energy

also

Henriquez

will

revitalization

the

heritage Macdonald, study

Hoff

V6B

of

context

spaces to

City

on

the

being

any

Planning,

live-work interested regard

additional ensure

cycling

and

continue

recognizes

- the

elements

further

development —

503,

1T6

building

report

questions

197

architectural provided, the

within

matters

Live-Work

please of

preservation, —

to

the

19

a

details

infrastructure

Henriquez

Spadina

Planning information is

Toronto

the

Site

to

units

in

of

Duncan detail

carried proposed

not the

objectives.

contact

work and

how

detailed

Markham regarding manner

Plan

the

building,

site. of

acceptable

are

appreciates

and

Avenue

Units

opportunities

these

the

with and

proposed forward

Manager

the

Control being Street,

Partners

the The

public

consideration in

in

facility, on

East

and

addition

the

you Street. spaces

planner

which

this

details

the City

proposed.

Suite

Toronto,

in

the

above, from

York

application.

realm

and

letter. marketplace,

proposed Architects, the

its

staff

the

This proposed

may

these

created

of

600 of

assigned

your

current

amendments

the

District

rationale

and

or the

the

request

given

proposal

offset

Ontario,

While

Toronto,

original

spaces

wish

team,

on-site

live-work

private

District

by

form.

402

day

to

to

the

the

to locating

this further

for

the

differ

this

other

West care

M5H the

continues

arrange

park,

Ontario focus made removal

amenity

A

Energy

the

contributes local

file,

proposal

computer

spaces

space.

from

areas

detail

proposed Pender

3G6

the

the

on

to

community,

Graig

a

M5T

the

plan.

of

spaces

energy

meeting

facility adjustments

to

standard

may

of

We

on

the

such advance

application,

Street,

the

desktop

positively

Uens

2C$

the

City

location

continue

be

existing

have

proposal,

efficiency,

where

as

design

to

discussed

residential

at

staff

Vancouver,

and

the

discuss

a

study

comfortable

416-397-4647

to

number

of

to

range it’s

employment

the

to

would

massing

including

of

the the

such

appreciate

must

these Ward currently

and

further

amendments

facility, mix units.

and

of

like

as

British

the

be

spaces,

and

wind

size

of the

to

City

or

the

of

10