Merowe Dam, Sudan

Total Page:16

File Type:pdf, Size:1020Kb

Merowe Dam, Sudan Merowe Dam, Sudan The Merowe Dam in Northern Sudan is one of the world’s most destructive hydropower projects. Built on the Nile’s fourth cataract between 2003 and 2009, the dam created a reservoir with a length of 174 kilometers. With a capacity of 1,250 megawatts, the project doubled Sudan’s electricity generation. It also displaced more than 50,000 people from the fertile Nile Valley to arid desert locations. Thousands of people who refused to leave their homes were flushed out by the rising waters of the reservoir. No proper environmental impact assessment for the Merowe Dam was ever carried out. Project construction was started without approval by Sudan’s environmental ministry, which violates the country’s laws. The project also submerged immeasurable archeological treasures in its reservoir. The people affected by the Merowe Dam strenuously resisted their displacement from the Nile valley, and proposed to be resettled along the banks of the new reservoir. The government completely ignored their views, and brutally oppressed any protests. Several people were killed and many more were injured in crack-downs by the security forces. The UN Rapporteur on Housing Rights expressed “deep concern” about the human rights violations in the project, and asked the dam builders to halt construction in 2007. The $1.8 billion Merowe Dam was funded by China Export Import Bank and Arab financiers, and built by Chinese, German and French companies. Civil society organizations are trying to hold these actors to account for their complicity in human rights abuses in the project. International Rivers has supported the communities affected by the Merowe Dam for many years, and continues to monitor the situation in the project. CONTACT US: Peter Bosshard [email protected] +1 510 848 1155 http://www.internationalrivers.org/en/africa/merowe-dam-sudan .
Recommended publications
  • Sudan Country Report BTI 2016
    BTI 2016 | Sudan Country Report Status Index 1-10 2.44 # 125 of 129 Political Transformation 1-10 2.48 # 125 of 129 Economic Transformation 1-10 2.39 # 124 of 129 Management Index 1-10 2.02 # 124 of 129 scale score rank trend This report is part of the Bertelsmann Stiftung’s Transformation Index (BTI) 2016. It covers the period from 1 February 2013 to 31 January 2015. The BTI assesses the transformation toward democracy and a market economy as well as the quality of political management in 129 countries. More on the BTI at http://www.bti-project.org. Please cite as follows: Bertelsmann Stiftung, BTI 2016 — Sudan Country Report. Gütersloh: Bertelsmann Stiftung, 2016. This work is licensed under a Creative Commons Attribution 4.0 International License. BTI 2016 | Sudan 2 Key Indicators Population M 39.4 HDI 0.473 GDP p.c., PPP $ 4068.9 Pop. growth1 % p.a. 2.1 HDI rank of 187 166 Gini Index 35.4 Life expectancy years 62.0 UN Education Index 0.306 Poverty3 % 38.9 Urban population % 33.6 Gender inequality2 0.628 Aid per capita $ 30.2 Sources (as of October 2015): The World Bank, World Development Indicators 2015 | UNDP, Human Development Report 2014. Footnotes: (1) Average annual growth rate. (2) Gender Inequality Index (GII). (3) Percentage of population living on less than $3.10 a day at 2011 international prices. Executive Summary The period 2011 – 2013 has seen a further regression in Sudan’s democratic and economic transformation. Political instability continues on four main fronts. At the elite government level, there are disputes within the ruling party, with military and security figures appearing more powerful than Islamist civilians.
    [Show full text]
  • Sudan's Deep State
    Violent Kleptocracy Series: East and Central Africa Sudan’s Deep State How Insiders Violently Privatized Sudan’s Wealth, and How to Respond By The Enough Project April 2017 REUTERS / Alamy Stock Photo Sudan’s Deep State Violent Kleptocracy Series: East & Central Africa Executive Summary Sudan’s government is a violent kleptocracy, a system of misrule characterized by state capture and co-opted institutions, where a small ruling group maintains power indefinitely through various forms of corruption and violence. Throughout his reign, President Omar al-Bashir has overseen the entrenchment of systemic looting, widespread impunity, political repression, and state violence so that he and his inner circle can maintain absolute authority and continue looting the state. The result of this process, on the one hand, has been the amassment of fortunes for the president and a number of elites, enablers, and facilitators, and on the other hand crushing poverty and underdevelopment for most Sudanese people.* A Failed State? For nearly three decades, President al-Bashir has maintained his position at the pinnacle of Sudan’s political order after seizing power through a military coup in 1989. During his rule, the government of Sudan has perhaps been best known for providing safe haven to Osama bin Laden and other Islamic militants in the 1990s, for committing genocide1 and mass atrocities against its citizens in Darfur, for the secession of South Sudan in 2011, and for ongoing armed conflict—marked by the regime’s aerial bombardment of civilian targets and humanitarian aid blockade—in South Kordofan and Blue Nile. Often portrayed as a country wracked by intractable violence and hampered by racial, religious, ethnic and social cleavages, Sudan ranks consistently among the most fragile or failed states.2 At the same time, Sudan has considerable natural resource wealth and significant economic potential.
    [Show full text]
  • A Case Study of Merowe Dam, Sudan
    University of Plymouth PEARL https://pearl.plymouth.ac.uk 01 University of Plymouth Research Outputs University of Plymouth Research Outputs 2020-06-12 Economic Contributions of Mega-Dam Infrastructure as Perceived by Local and Displaced Communities: A Case Study of Merowe Dam, Sudan Abdullah, A-N http://hdl.handle.net/10026.1/15761 10.3390/agriculture10060227 Agriculture MDPI AG All content in PEARL is protected by copyright law. Author manuscripts are made available in accordance with publisher policies. Please cite only the published version using the details provided on the item record or document. In the absence of an open licence (e.g. Creative Commons), permissions for further reuse of content should be sought from the publisher or author. Article Economic Contributions of Mega‐Dam Infrastructure as Perceived by Local and Displaced Communities: A Case Study of Merowe Dam, Sudan Al‐Noor Abdullah 1, Sanzidur Rahman 1,2,*, Stephen Essex 3 and James Benhin 1 1 Plymouth Business School, University of Plymouth, Plymouth PL4 8AA, UK; al‐[email protected] (A.‐N.A.); [email protected] (J.B.) 2 Faculty of Economics, Shandong University of Finance and Economics, Jinan 250001, China 3 School of Geography, Earth and Environmental Sciences, University of Plymouth, Plymouth PL4 8AA, UK; [email protected] * Correspondence: [email protected] Received: 8 April 2020; Accepted: 1 June 2020; Published: 12 June 2020 Abstract: Investigations on the socioeconomic impacts of mega‐dam projects have tended to focus on conventional cost–benefit analysis, while studies exploring perceptions of local communities, who are some of the prime beneficiaries of these development initiatives, are limited.
    [Show full text]
  • 23.3 News 393-394Jw
    NATURE|Vol 440|23 March 2006 NEWS SPECIAL REPORT S. TORFINN/PANOS S. Up to 50,000 people will lose their homes to the Merowe dam. Tide of censure for African dams A wave of Chinese-built dams in Africa, particularly the Merowe project in Sudan, could have devastating consequences for local communities. Jim Gilesreports. On the arid plains that surround the Nile Thayer Scudder, an anthropologist at the Cali- to 10,000 families will be affected, and four north of Khartoum in Sudan, a huge dam fornia Institute of Technology in Pasadena, resettlement schemes are under way. A project is slowly taking shape. The billion-dollar who has spent decades studying hydropower of this scale in Europe or North America would Merowe project will more than double the projects. “If governments don’t care, or are cor- have required years of independent study amount of electricity that Sudan can produce, rupt, why will the Chinese engineers worry?” before being given the go-ahead, say dam and is just one of a dozen new dam projects The surge of large dam projects that began experts. But the first environmental-impact being built across Africa using Chinese money in the 1960s caused many lessons to be learned assessment was completed in 2002, just a year and expertise. the hard way. Projects in China, India, North before construction began. But scientists and environmentalists who America and elsewhere caused serious down- Contrary to rules for dam projects adhered have studied the dam say that poor local peo- stream erosion through the removal of sedi- to by other big funders such as the World ple will suffer because necessary precautions ment, and the majority of resettled people Bank, the assessment was conducted, not by are not being taken.
    [Show full text]
  • The Merowe Dam on the Nile - by Amelia Carolina Sparavigna
    06/12/2010 Archaeogate - The Merowe Dam on th… http://www.archaeogate.org/egittologia/article.php?id=1332 The Merowe Dam on the Nile - by Amelia Carolina Sparavigna Redazione Archaeogate, 03-12-2010 The huge reservoir of the Merowe Dam on Nile River is featured in an image photographed on 5 October 2010 by a crewmember on the International Space Station [1]. The dam is located near the Fourth Cataract of the river, in that part of Nubia desert where the Nile is creating its Great Bend, a contorted path of the river through the bedrocks of Bayuda Massif. Few years ago, the satellite imagery showed a fertile strip of land with many villages, where the paleochannels of the Nile hosted vivid green cultivated fields. With term "paleochannel", we call the old dry bed of rivers. Now, a huge part of this valley is under the waters of Merowe Dam reservoir that flooded villages, fields and archaeological sites. The dam was built to generate hydroelectric power, intended to help industrial and agricultural development of the country. The upper panel of Figure 1 is reproducing the NASA image, which illustrates the current extent of the water reservoir behind the dam. All the gates were closed in 2008. In the lower part of the image, we can see for a comparison, on the left, a part of the region before the flood as found in Google Maps imagery and, on the right, the same area as shown by NASA images, after rotation, size adjustment and enhancement with a suitable image processing. The aim of this paper is to show the influence of paleochannels in the development of this dam reservoir, as can be seen from the satellite imagery.
    [Show full text]
  • Getachew Ppt GERD and Nile Conference(1)
    Nile and GERD Conference Advances in Water Resources Assessment and Optimal Management of Multipurpose Cascade Reservoirs in the Nile River Basin Getachew Tegegne (Ph.D.) Hydraulic, Hydrologic and Water Resources Engineering Assefa M. Melesse (Ph.D.) Professor of Water Resources Engineering Florida International University Contents 1. The Nile River Basin 2. Statement of the problem - Motivation 3. Water resources assessment from both the gauged and ungauged basins 4. Water resources management under emerging scenarios 5. Water resources planning and development 1. The Nile River Basin ü The Nile River Basin includes portions of 11 countries: Ethiopia, Eritrea, Burundi, Democratic Republic of Congo, Kenya, Rwanda, Tanzania, Uganda, South Sudan, Sudan, and Egypt. ü Area coverage: 3.18 × 106 km2 ü The average monthly flow of the White Nile ranging from 580 to 1,270 m3/s at Malakal in South Sudan. 15% of the annual Nile discharge. Fairly stable flow throughout the year ü The average monthly flow of the Blue Nile ranging from 150 to 5,600 m3/s at the Soba gauging station in Khartoum. 85% of the annual Nile discharge. Highly seasonal. Water resources development in the Nile River Basin ü The Low Aswan Dam (1902) in Egypt across the main Nile ü The Sennar Dam (1925) and JeBel Aulia Dam (1937) in Sudan across the Blue Nile and White Nile, respectively. ü A 1959 agreement Between Egypt and Sudan initiated the construction of the Roseries Dam (1966) and Khashm El GirBa Dam (1964) in Sudan. ü The High Aswan Dam (1970) in Egypt. ü Sudan’s modern expansion: The Merowe Dam (2009), the Upper AtBara and Setit Dam complex (2016), and the heightening of the Roseries Dam (2013).
    [Show full text]
  • Merowe Sudan Studies
    Neutral? Against What? Bystanders and Human Rights Abuses: The case of Merowe Dam by Nicholas Hildyard The Corner House (published in Sudan Studies , No 37, April 2008 by the Sudan Studies Society of the United Kingdom, http://www.sssuk.org) "All the perpetrator asks is that the bystander do nothing. He appeals to the universal desire to see, hear, and speak no evil. The victim, on the contrary, asks the bystander to share the burden of pain. The victim demands action, engagement, and remembering.” Judith Herman Trauma and Recovery: The Aftermath of Violence – from Domestic Abuse to Political Terror 1 It is now widely accepted that companies have a responsibility to ensure that their activities do not harm the environment or cause human rights and other abuses. The recognition of such responsibilities is not only enshrined in the national environmental and social regulations which bind companies operating in specific jurisdictions, but also in the in-house codes of conduct that many companies have adopted to promote socially-responsible corporate behaviour. But are there limits to such responsibilities? And if so, what or where are they? If a company supplies turbines for a hydroelectric dam, does it have a responsibility, legal or moral, to ensure that the dam’s environmental and social impacts are minimized? Or do its ethical policies and legal obligations extend only to ensuring that the manufacture of the turbine is environmentally sound and without human rights impacts? What of other actors involved in the dam or any other project?
    [Show full text]
  • Merowe Dam Archaeological Salvage Project
    SUDAN & NUBIA iii) Sites which are going to be affected by the construc- Merowe Dam Archaeological tion of the power transmission lines. iv) Although the monumental sites of the Napata Region Salvage Project will not be directly affected by these activities, NCAM is con- cerned with the expected environmental changes. These sites (MDASP) include the famous Pharaonic and Napato-Meroitic towns Salah Mohamed Ahmed and cemeteries at Jebel Barkal, Nuri, Sanam, el-Kurru, Hillat el-Arab, the Post-Meroitic tumuli of ez-Zuma, the Christian monastery of Ghazali and the later strongholds at Merowe Introduction East, Kagabi, ed-Datti and possibly other sites located fur- ther downstream. The idea of building a dam at the 4th Cataract of the Nile dates to the period of the Anglo-Egyptian administration in General results of recent work the Sudan (1943). It was previously referred to as ‘the Hamdab Many campaigns to the region have been organized during Dam’ and recently re-named ‘the Merowe Dam’ after a small the last 13 years. These are principally: island, the northern part of which is going to be cut through by the structure of the dam itself (Back cover, top). Most of * Campaigns by NCAM on both banks of the Nile and the local inhabitants pronounce the name of this island as on some islands. One of these campaigns was directed by a ‘Mirowy’. UNESCO expert (Prof. Jean Leclant). For various reasons, this project was not realized over the * The University of Rome in the downstream portions of last 50 years. Since it came to power in 1989, the present the region.
    [Show full text]
  • Newsletter Egypt and Sudan
    Newsletter Egypt and Sudan Issue 5, 2018 Introduction Neal Spencer Keeper, Department of Ancient Egypt and Sudan In 1972, fifty years after the tomb of Tutankhamun was discovered, fifty objects from the king’s burial were displayed at the British Museum in a special exhibition, attracting 1.7 million visitors over nine months. Such visitor numbers remain unheard of today, though a new record has just been set for a touring British Museum exhibition. The Hong Kong Science Museum welcomed over 850,000 visitors to Egyptian mummies: exploring ancient lives last summer. Such exhibitions take years of planning, and the last weeks have seen us send the latest group of Egyptian mummies to a London hospital for dual-energy CT-scanning. While the scanning will reveal new insights into the ancient individuals, some will undoubtedly become the stars of future exhibitions, whether in Bloomsbury or beyond. Back at the British Museum, the Roxie Walker Galleries of Egyptian Funerary Archaeology (Rooms 62–63) were updated with new displays to reflect the fast-changing world of bioarchaeological research, while nearby a rare queen’s diadem was put on display, a three-year loan from the al-Sabah collection. Other contributions in this newsletter highlight collections research and conservation, fieldwork and training programmes. As 2017 drew to a close, the British Museum was awarded two major grants. The Cultural Protection Fund will support a project entitled Circulating Artefacts: a cross-platform alliance against the looting of pharaonic antiquities, working with colleagues in Egypt and Sudan to track objects circulating on the art market and in private collections – this will also be a fantastic research resource.
    [Show full text]
  • Merowe Dam Project. Land Use and Vegetation in the Flooding Area of a Planned Hydrodam in Northern Sudan
    Merowe Dam Project. Land use and Vegetation in the Flooding Area of a planned Hydrodam in Northern Sudan Arnaud Malterer i Draft Report Author - A. Malterer 2013 Contents List of Figures iv List of Plates v List of Tables vi Abbreviations viii 1. Introduction I 2. Literature Survey I 2.1 Sudan – Natural Landscape, Population and Economic Situation I 2.1.1 Geography I 2.1.2 Natural Environment I 2.1.3 Climate II 2.1.4 Population II 2.1.5 Economic Situation III 2.1.6 The Energy Problem III 2.2 The Merowe Dam Project III 3. Natural Characteristics of the Investigation Area IV 3.1 Site Description IV 3.2 Relief V 3.3 Climate and Water Budget VI 3.4 Geology and Soil Conditions VII 4. Goals and Objectives VIII 5. Methodology VIII 5.1 Analysis of Literature, Maps and Aerial Photographs VIII 5.2 Empiric Investigation of Land use VIII 5.3 Inventory of native Vegetation VIII 6. Results IX 6.1 Land Use in the Investigation Area IX 6.1.1 Agriculture IX 6.1.1.1 Economy and Development of the Landscape X 6.1.1.2 Areas and Structures of Cultivation X 6.1.1.3 Cultivation Methods and Irrigation XII 6.1.1.4 Range of Species and Crop Rotation XIII 6.1.1.5 Cultivated Species XIII 6.1.1.6 Plant Protection and fertilization XV 6.1.1.7 Ownership and tenure XV 6.1.1.8 Livestock husbandry XV 6.1.2 Fishery XVII 6.1.3 Use of raw materials and wood XVII 6.1.4 Settlements XVII 6.1.5 Infrastructure XVIII 6.2 The wild-growing vegetation in the study area XVIII 6.2.1 Phytogeographic classification XIX 6.2.2 The river-oases vegetation of the periodically flooded Nile Valley plains XIX 6.2.3 The xenomorphic desert vegetation of the valley terraces, wadis and sand dunes XXII 7.
    [Show full text]
  • Sine Tarby Christensen
    Dammed if You Do – Damned if You Don’t Chinese Financed Infrastructure Projects in Sudan CMI – BADS Sine Tarby Christensen Supervisor – Bjørn Møller Number of tabs: 163,430 Table of Content: Map of Dams and Hydroelectric Schemes in Sudan ........................................................4 Acronyms and abbreviations...........................................................................................5 1. Introduction ................................................................................................................6 1.1 Research Question................................................................................................................................. 7 1.2 Methodology..........................................................................................................................................9 2. Traditional Development Assistance in Africa........................................................... 10 2.1 Western Aid Conditionality and the Concept of Good Governance ................................................ 13 2.2 Bringing Infrastructure Back on Track ............................................................................................. 15 2.3 Our Common Interest ........................................................................................................................ 16 3. Large Dams ............................................................................................................... 19 3.1 The World Commission on Dams......................................................................................................26
    [Show full text]
  • THE MEROWE DAM in the SUDAN Lahmeyer International S Involvement and Assistance
    THE MEROWE DAM IN THE SUDAN Lahmeyer International s Involvement and Assistance The Merowe Dam and Hydropower Project is located on the River Nile about midway between Khartoum and the Egyptian border. The purpose of the project is electric power generation (about 5,600 GWh/year), supply of water for irrigation and flood control. At present, some 600 MW of power only are installed in the Sudan for about 35 Million people which is less than 20 Watts per person. However, most of the population has no access to electricity at all. The future Merowe reservoir will also help to extend the operational life time of the Aswan High Dam (Nasser Dam) in Egypt as most of the river sediments are trapped by the Merowe Dam. It has to be highlighted that the Aswan High Dam is the back bone of the agricultural industry in Egypt as water for irrigation is released uniformly throughout the entire year. Nowadays, no single farmer in Egypt can be found who would vote against this dam as their yearly production has increased significantly. In fact, a similar agricultural development concept will be implemented downstream of the Merowe dam to feed the biggest portion of the 35 Million people of the Sudan. It is also emphasized that the Merowe hydropower plant will generate sustainable and clean CO2 free energy as almost no biomass exists in the future reservoir. About 90 % of the future reservoir area is desert land without any vegetation at all. The Merowe Dam Project is indeed one of the most environmentally friendly energy generation projects in the world as almost no green house gases are emitted (reservoir is mainly located in the desert) into the atmosphere, supporting the international action plan to counter global warming.
    [Show full text]