USACE Environmental Assessment CENAE-RDC; NAE-2017-01342 MEMORANDUM FOR RECORD SUBJECT: Department of the Army Environmental Assessment and Statement of Findings for the Above-Referenced Standard Individual Permit Application This document constitutes the Environmental Assessment, 404(b)(1) Guidelines Evaluation, as applicable, Public Interest Review, and Statement of Findings for the subject application. The construction, connection, operation, and maintenance of the proposed electric transmission facility at the proposed location for the U.S.-Canada international border crossing at Beattie Township will require authorization from the United States Department of Energy (DOE) in the form of a Presidential permit. The applicant applied to DOE on July 27, 2017 for a Presidential permit for the proposed Project in accordance with Executive Order (EO) 10485 (September 3, 1953), as amended by EO 12038 (February 3, 1978), and the regulations at 10 Code of Federal Regulations (CFR) 205.320 et seq. (2000), "Application for Presidential Permit Authorizing the Construction, Connection, Operation, and Maintenance of Facilities for Transmission of Electric Energy at International Boundaries." As required by 10 CFR 205.320(a), any entity "who operates an electric power transmission or distribution facility crossing the border of the United States, for the transmission of electric energy between the United States and a foreign country, shall have a Presidential permit." The DOE Office of Electricity, Transmission Permitting and Technical Assistance Division, is responsible for reviewing Presidential permit applications and determining whether to grant a permit for electric transmission facilities that cross the United States' international border. The Presidential permit Docket Number for this project is PP-438. DOE will author an independent assessment in support of their permit decision and pursuant to the National Environmental Policy Act (NEPA). 1.0. Introduction and Overview: Information about the proposal subject to one or more of the Corps Regulatory authorities is provided in Section 1, detailed evaluation of the activity is found in Sections 2 through 11 and findings are documented in Section 12 of this memorandum. Further, summary information about the activity including administrative history of actions taken during project evaluation is attached (ORM2 Summary) and incorporated in this memorandum. 1.1 Applicant: Central Maine Power Company (CMP or Applicant), 83 Edison Drive, Augusta, Maine 04336; Application number: NAE-2017-01342 1.2 Activity location: Multiple locations of aquatic resources from Beattie Township to Lewiston, Maine Aquatic resources between Beattie Township, Maine (United States Geological Survey (“USGS”) Boundary Pond quadrangle sheet; Lat/Long 1 CENAE-RDC; NAE-2017-01342 45.5165 60°N; - 70.187398°W) and Lewiston, Maine (USGS Lake Auburn East quadrangle sheet; Lat/Long 44.140075°N; - 70.719526°W) Aquatic resources between Lewiston (USGS Lake Auburn East quadrangle sheet; Lat/Long 44.140075°N; -70.719526°W) and Pownal (USGS North Pownal quadrangle sheet; Lat/Long 43.931707°N; - 70.204229°W); and Aquatic resources between Windsor (USGS Weeks Mills quadrangle sheet; Lat/Long 44.286523°N; -69.562329°W) and Wiscasset (USGS Westport quadrangle sheet; Lat/Long 43.9532 14°N; -69.696120°W). 1.3 Description of activity requiring permit: Pursuant to our authority under Section 404 of the Clean Water Act (33 U.S. Code ) and Section 10 of the Rivers & Harbors Act of 1899 (33 U.S. Code § 403), the New England District proposes to authorize the discharge of fill material into waters of the U.S. and work under a navigable water of the U.S. associated with the New England Clean Energy Connect (NECEC) power line project within the State of Maine. The applicant proposes to construct a 144.9-mile long, 320 kilovolt (kV) High Voltage Direct Current (HVDC) transmission line from Beattie Township to Lewiston; a converter station to convert the Direct Current (DC) electricity to Alternating Current (AC) electricity on Merrill Road in Lewiston; a new substation on Fickett Road in Pownal; and a new 26.5-mile, 345-kV AC transmission line from the existing Coopers Mills Substation in Windsor to the existing Maine Yankee Substation in Wiscasset. The applicant also proposes to rebuild several existing transmission lines and upgrade three substations. The Project is being proposed in response to a Request for Proposals (RFP) for Long-Term Contracts for Clean Energy Projects from the State of Massachusetts. The clean energy delivered by the Project is intended to provide firm, guaranteed, and tracked year-round energy deliveries that will reduce winter electricity price spikes, improve system reliability and resiliency, and provide renewable energy certificates and other environmental attributes to help Massachusetts meet its greenhouse gas (GHG) emissions reduction goals. CMP will not seek any cost recovery from Maine customers for the Project. Rather the Project will be paid for entirely by an affiliate of Hydro-Québec and Massachusetts ratepayers. The NECEC project will result in direct and indirect, permanent and temporary impacts to aquatic resources associated with construction and upgrade of transmission lines and the construction of substations or converter stations including impacts to freshwater wetlands. A total of 4.87 acres of jurisdictional wetlands will be permanently impacted and 47.64 acres will be temporarily impacted. Permanent fills are limited in size and are at separate and distinct locations along the corridor, and include minor fills for substation construction or limited pole placement in wetlands (ranging from approximately 30 to 195 square 2 CENAE-RDC; NAE-2017-01342 feet of fill per structure). An additional 111.55 acres of forested wetlands will be affected by clearing and conversion to scrub-shrub and emergent cover types. This area for total wetlands converted includes 105.25 acres of forested wetland, 3.678 acres of forested wetland habitat proximate to vernal pools, and 2.622 forested wetland associated with state mapped Inland Waterfowl & Wading Bird Habitat (IWWH). The USACE authority in this activity is limited to jurisdictional work beneath a navigable water and discharges of fill into waters of the U.S. Large portions of the project, approximately 98%, are outside waters of the U.S. and the USACE has no authority in these upland areas. The administrative record indicates: For the approximately 8,600 acres of total land associated with the project, only approximately 1,500 acres constitute waters of the U.S. (approximately 17%). Only approximately 1.9% of the project will result in impacts to waters of the U.S. Of the 1404 wetlands located within the transmission line portions of the project area (202.83 miles, inclusive of rebuild sections), only 82 (5.84%) will be impacted in part by permanent fill. Of the total amount of forest conversion for the project (approximately 1,038 acres), only 111.55 acres are waters of the U.S. (approximately 11%). Of the 1,450 transmission poles proposed by the applicant, only 98 (6.7%) will be located in wetlands. Permanent wetland fill for the transmission line portions of the project is limited to a 30 to 195 square foot area per transmission line structure, for a total of approximately 0.15 acres. Approximately 15.95 acres of land will be developed for the converter station, substation, and termination station components (i.e., station development sites) of the Project. Only two of the eight converter or substations will impact waters of the U.S. With the addition of access road related impacts for one of the two HDD termination stations, a total of 4.72 acres of wetland will be permanently filled for these elements of the project. A total of 757 vernal pools are located within the project area, only 83 of which (11%) will be impacted by permanent fill. Of the 83, only four will have permanent fill in the pool depression and the remaining 79 will be indirectly impacted by permanent fill in the 100 foot vernal pool envelope surrounding the depression. Permanent fill in each of these areas is approximately 50 square feet on average. USACE jurisdiction is limited to only those pools which are considered waters of the U.S. 3 CENAE-RDC; NAE-2017-01342 Of 742 waterbodies (rivers, streams, and open water areas) within the project area, only an estimated 224 will be temporarily spanned for access during construction. There will be no regulated discharge or activities in these 224 crossings. For all unavoidable crossings, the streams will be spanned with temporary bridges. At the Kennebec River, a HDD will be utilized to cross beneath the bed of the river. None of the four open water areas will require construction crossings, however they will be spanned by transmission lines. The following discussion of project elements includes activities that do not impact navigable or other waters of the U.S. They are presented to provide context only, otherwise they are outside USACE jurisdiction and authority. The HVDC portion of the transmission line will be placed on single steel poles that will average approximately 100 feet tall and will be spaced approximately 1,000 feet apart. The new 345-kV lines and the reconstructed 115-kV lines will be constructed on a variety of different structures, with variable heights including 125-foot tall steel structures, 80-foot tall single pole structures, 75-foot tall, wooden H-frames, and 45-foot tall, wooden, single pole structures. The applicant has divided the project into five transmission line segments and construction or upgrades of substations. CMP is the developer of the portion of the NECEC Project from the Québec-Maine border to the Lewiston, Maine area and all transmission upgrades on the U.S. side of the border. The facilities on the U.S. side of the border are entirely located in Maine. The NECEC Project will cross the Québec-Maine border in Beattie Township.
Recommended publications
  • 2012 Annual Report Maine Public Reserved
    2012 ANNUAL REPORT to the JOINT STANDING COMMITTEE on AGRICULTURE, CONSERVATION AND FORESTRY MAINE PUBLIC RESERVED, NONRESERVED, AND SUBMERGED LANDS Seboeis Lake Unit MAINE DEPARTMENT OF AGRICULTURE, CONSERVATION AND FORESTRY Division of Parks and Public Lands March 1, 2013 2012 ANNUAL REPORT Maine Department of Agriculture, Conservation and Forestry Division of Parks and Public Lands TABLE OF CONTENTS I. INTRODUCTION…………………………………………………………………….. 1 II. 2012 HIGHLIGHTS…………………………………………………………………..1 III. SCOPE OF RESPONSIBILITIES………………………………………………….. 4 IV. LAND MANAGEMENT PLANNING……………………………………………….. 8 V. NATURAL/HISTORIC RESOURCES……………………………………………...9 VI. WILDLIFE RESOURCES……………………………………………………………11 VII. RECREATION RESOURCES………………………………………………………12 VIII. TIMBER RESOURCES……………………………………………………………...18 IX. TRANSPORTATION………………………………………………………………… 22 X. PUBLIC ACCESS…………………………………………………………………… 22 XI. LAND TRANSACTIONS……………………………………………………………. 23 XII. SUBMERGED LANDS……………………………………………………………… 24 XIII. SHORE AND HARBOR MANAGEMENT FUND………………………………… 24 XIV. COASTAL ISLAND PROGRAM…………………………………………………… 24 XV. ADMINISTRATION………………………………………………………………….. 25 XVI. INCOME AND EXPENDITURES ACCOUNTING – CY 2012………………….. 26 XVII. FINANCIAL REPORT FOR FY 2014……………………………………………… 29 XVIII. CONCLUSION……………………………………………………………………….. 36 Appendix A: Map of DPPL Properties & Acquisitions in 2012…………………. 37 Appendix B: Table of 2012 DPPL Acquisitions and Dispositions………………… 38 Appendix C: Federal Forest Legacy Projects Approved and Pending……………... 39 Cover Photo by Kathy Eickenberg
    [Show full text]
  • Maine Open Water Fishing Laws Summary, 1975 Maine Department of Inland Fisheries and Game
    Maine State Library Digital Maine Inland Fisheries and Wildlife Law Books Inland Fisheries and Wildlife 1-1-1975 Maine Open Water Fishing Laws Summary, 1975 Maine Department of Inland Fisheries and Game Follow this and additional works at: https://digitalmaine.com/ifw_law_books Recommended Citation Maine Department of Inland Fisheries and Game, "Maine Open Water Fishing Laws Summary, 1975" (1975). Inland Fisheries and Wildlife Law Books. 301. https://digitalmaine.com/ifw_law_books/301 This Text is brought to you for free and open access by the Inland Fisheries and Wildlife at Digital Maine. It has been accepted for inclusion in Inland Fisheries and Wildlife Law Books by an authorized administrator of Digital Maine. For more information, please contact [email protected]. Maine Open Water Fishing Laws Summary Maine Department of Inland Fisheries and Game 284 State Street, Augusta, Maine 04330 0££K) auie^M 'e+snSny '+994S 9+p+S VQZ FISHING LICENSES Commissioner of Indian Affairs stating that the person described is an awe0 pue sauaijsij pupguj jo juauupiedaQ auip^Aj Indian and a member of that tribe. For this purpose, an Indian shall RESIDENT NONRESIDENT be any member on tribal lists of the Penobscot and Passamaquoddy 16 years and older . $ 6.50 Season: age 16 and older $15.50 Tribes, or a person on the membership list of the Association of Combination ............. 10.50 12-15 years inclusive .. 2.50 Aroostook Indians and who has resided in Maine for at least 5 years. ‘ 3-day . ’ 6.50 15-day* “ ........................ 10.50 “ Leave or furlough . 2.50 7-day ................................. 7.50 3-day ................................
    [Show full text]
  • 7.0 Wildlife and Fisheries Overview
    Redington Wind Farm Redington Pond Range, Maine Section 7: Wildlife and Fisheries Prepared by Woodlot Alternatives, Inc. Topsham, Maine Redington Wind Farm Page i Section 7 – Wildlife and Fisheries Table of Contents 1.0 Introduction............................................................................................................. 1 2.0 Ecological Setting of Project area........................................................................... 3 3.0 Natural Communities and Wetlands ....................................................................... 5 3.1 Methods................................................................................................................ 5 3.2 Natural Community Descriptions ........................................................................ 7 3.2.1 Terrestrial Communities ................................................................................ 8 3.2.2 Beech-Birch-Maple Forest............................................................................. 9 3.2.3 Spruce-Northern Hardwood Forest.............................................................. 10 3.2.4 Spruce-Fir-Mountain Sorrel-Feathermoss Forest ........................................ 11 3.2.5 Fir-Heartleaved Birch Subalpine Forest ...................................................... 11 3.2.6 Regenerating Forest Stands.......................................................................... 14 3.2.7 Wetlands and Streams.................................................................................. 16 4.0 Fish
    [Show full text]
  • State of Maine Land Use Regulation Commission
    STATE OF MAINE LAND USE REGULATION COMMISSION Application for Development of ) PRE-FILED TESTIMONY TransCanada Maine Wind Development, Inc. ) OF DYLAN VOORHEES Kibby Mountain Wind Farm ) NATURAL RESOURCES Rezoning Application ZP 709 ) COUNCIL OF MAINE I. Summary My name is Dylan Voorhees. I am the Clean Energy Director for the Natural Resources Council of Maine (NRCM). NRCM is a private, non-profit, membership organization established in 1959 to advocate for the protection and conservation of Maine’s natural resources. NRCM has a strong interest in the development of clean forms of electricity generation that will help reduce the environmental and public health harm caused by existing forms of power production. We share the view articulated in the Maine Land Use Regulation Commission’s (the “Commission”) Comprehensive Land Use Plan that “windpower offers an attractive alternative to the burning of fossil fuels.”1 NRCM also has a strong interest in land conservation for areas with unique natural resource, recreation, and remote resource values. Accordingly, we recognize that the Commission has an important responsibility in considering how to balance impacts and benefits when it comes to wind power projects in its jurisdiction. NRCM has carefully examined the application, visited the site, and strongly concludes that this project conforms to the Commission’s evaluation criteria and policies, Maine’s energy policies, 1 Comprehensive Land Use Plan (1997), Chapter 3, Natural and Cultural Resources, p. 40 ZP 709, Kibby Wind Farm 1 Voorhees Pre-Filed Testimony and the public interest. The Kibby Wind Farm would generate a substantial amount of new renewable power in Maine at a time when we need to reduce our dependence on fossil fuels.
    [Show full text]
  • People in Nature: Environmental History of the Kennebec River, Maine Daniel J
    The University of Maine DigitalCommons@UMaine Electronic Theses and Dissertations Fogler Library 2003 People in Nature: Environmental History of the Kennebec River, Maine Daniel J. Michor Follow this and additional works at: http://digitalcommons.library.umaine.edu/etd Part of the History Commons, Natural Resources Management and Policy Commons, Nature and Society Relations Commons, and the Sustainability Commons Recommended Citation Michor, Daniel J., "People in Nature: Environmental History of the Kennebec River, Maine" (2003). Electronic Theses and Dissertations. 188. http://digitalcommons.library.umaine.edu/etd/188 This Open-Access Thesis is brought to you for free and open access by DigitalCommons@UMaine. It has been accepted for inclusion in Electronic Theses and Dissertations by an authorized administrator of DigitalCommons@UMaine. PEOPLE IN NATURE: ENVlRONMENTAL HISTORY OF THE KENNEBEC RIVER, MAINE BY Daniel J. Michor B.A. University of Wisconsin, 2000 A THESIS Submitted in Partial Fulfillment of the Requirements for the Degree of Master of Arts (in History) The Graduate School The University of Maine May, 2003 Advisory Committee: Richard Judd, Professor of History, Advisor Howard Segal, Professor of History Stephen Hornsby, Professor of Anthropology Alexander Huryn, Associate Professor of Aquatic Entomology PEOPLE IN NATURE: ENVIRONMENTAL HISTORY OF THE KENNEBEC RIVER, MAINE By Daniel J. Michor Thesis Advisor: Dr. Richard Judd An Abstract of the Thesis Presented in Partial Fulfillment of the Requirements for the Degree of Master of Arts (in History) May, 2003 The quality of a river affects the tributaries, lakes, and estuary it feeds; it affects the wildlife and vegetation that depend on the river for energy, nutrients, and habitat, and also affects the human community in the form of use, access, pride, and sustainability.
    [Show full text]
  • Draft Department Order
    STATE OF MAINE DEPARTMENT OF ENVIRONMENTAL PROTECTION 17 STATE HOUSE STATION AUGUSTA, MAINE 04333-0017 DEPARTMENT ORDER IN THE MATTER OF Draft Order CENTRAL MAINE POWER COMPANY ) SITE LOCATION OF DEVELOPMENT ACT See Appendix A for Location ) NATURAL RESOURCES PROTECTION ACT NEW ENGLAND CLEAN ) FRESHWATER WETLAND ALTERATION ENERGY CONNECT ) SIGNIFICANT WILDLIFE HABITAT L-27625-26-A-N (approval) ) WATER QUALITY CERTIFICATION L-27625-TG-B-N (approval) ) L-27625-2C-C-N (approval) ) L-27625-VP-D-N (approval) ) L-27625-IW-E-N (approval) ) FINDINGS OF FACT AND ORDER OVERVIEW This Order conditionally approves Central Maine Power Company's applications for State land use permits for the New England Clean Energy Connect project. The record of this proceeding demonstrates that the project will satisfy the Department’s permitting standards subject to the conditions in this Order. Issuance of this Order follows a 29-month regulatory review, which included six days of evidentiary hearings and two nights of public testimony. Twenty-two parties, consolidated into ten groups, participated in the evidentiary hearings by helping to shape the administrative review process, providing sworn testimony from dozens of witnesses, cross examining those witnesses, and submitting argument on the interpretation and application of relevant permitting criteria. Hundreds of Maine citizens testified during the public hearings and submitted written comment on the many issues the application presented. The hearing and public comment process provided the Department with critical information and analysis of the applicant's proposal, its impacts, whether and how those impacts can be mitigated, and the availability of alternatives. The record shows the project as originally proposed would have had substantial impacts, particularly in the 53.5-mile portion of the corridor that extends from the Quebec border to The Forks, known as Segment 1.
    [Show full text]
  • Williams Hydroelectric Project FERC Project No
    ENVIRONMENTAL ASSESSMENT FOR HYDROPOWER LICENSE Williams Hydroelectric Project FERC Project No. 2335-039 Maine Federal Energy Regulatory Commission Office of Energy Projects Division of Hydropower Licensing 888 First Street, NE Washington, DC 20426 November 2016 TABLE OF CONTENTS TABLE OF CONTENTS ..................................................................................................... i LIST OF FIGURES ............................................................................................................ iii ACRONYMS AND ABBREVIATIONS............................................................................ v EXECUTIVE SUMMARY ............................................................................................... vii 1.0 INTRODUCTION ................................................................................................ 1 1.1 APPLICATION .................................................................................................... 1 1.2 PURPOSE OF ACTION AND NEED FOR POWER ......................................... 1 1.2.1 Purpose of Action .......................................................................................... 1 1.2.2 Need for Power .............................................................................................. 3 1.3 STATUTORY AND REGULATORY REQUIREMENTS ................................. 3 1.3.1 Federal Power Act ......................................................................................... 3 1.3.2 Clean Water Act ...........................................................................................
    [Show full text]
  • Introduction
    Breaching of the Edwards Dam, July 1, 1999 The Kennebec River is the third largest river in Maine consolidating the flows from many large lakes in north-central Maine, then flowing south through agricultural areas and small towns and cities of the central part of the state to merge with the Androscoggin River at Merrymeeting Bay. Introduction Geography The Kennebec River originates at Moosehead Lake flowing 145 miles to Merrymeeting Bay where it joins the Androscoggin River, then to the Atlantic Ocean at Phippsburg and Georgetown. The upper Kennebec flows from Moosehead Lake about 4 miles before reaching Indian Pond, the first of many impoundments. Flowing out of Indian Pond through Harris Dam, a major hydroelectric station, its passes through the Kennebec gorge then runs south draining into Wyman Lake, and through Wyman Dam, another large hydroelectric impoundment. From there it passes through urban and industrial areas of Madison, Skowhegan, Waterville-Winslow, and, with the Biomonitoring Retrospective 78 Maine DEPLW1999-26 Dec. 1999 removal of the Edwards Dam in Augusta in July, 1999, the Kennebec head of tide now occurs between Augusta and Sidney. The river eventually empties into Merrymeeting Bay in Richmond. Six major tributaries enter the river: the Moose River is the major tributary of Moosehead Lake, Dead River, Sandy River, Sebasticook River, Messalonskee Stream and Cobbosseecontee Stream. The basin covers approximately 5,893 square miles with approximately 3,850 miles of rivers and streams. Basin Summary Statistics Biomonitoring
    [Show full text]
  • Maine State Legislature
    MAINE STATE LEGISLATURE The following document is provided by the LAW AND LEGISLATIVE DIGITAL LIBRARY at the Maine State Law and Legislative Reference Library http://legislature.maine.gov/lawlib Reproduced from scanned originals with text recognition applied (searchable text may contain some errors and/or omissions) STATE OF MAINE 117TH LEGISLATURE SECOND REGULAR SESSION A REVIEW OF STATE DAM ABANDONMENT AND REGISTRATION LAWS AND FEDERAL DAM LICENSING LAWS Staff Study January 1996 Prepared at the request of the Legislative Council Staff: Jill Ippoliti, Legislative Analyst John G. Kelley, Legislative Analyst Office of Policy & Legal Analysis 13 State House Station Augusta, ME 04333, Rm.101/107/135 (207) 287-1670 TABLE OF CONTENTS Executive Sunnnary ....................................................................................................................... 1 Introduction .................................................................................................................................. 4 Part A: Questions and answers concerning Maine dams and state laws relating to dams ................................................................................................................ 5 A. Introduction ................................................................................................................. 5 B. Background on dams in Maine ..................................................................................... 5 C. Dam maintenance ........................................................................................................
    [Show full text]
  • Environmental Assessment
    NEW ENGLAND CLEAN ENERGY CONNECT ENVIRONMENTAL ASSESSMENT DOE/EA-2155 U.S. DEPARTMENT OF ENERGY OFFICE OF ELECTRICITY WASHINGTON, DC JANUARY 2021 This page intentionally left blank. TABLE OF CONTENTS APPENDICES ................................................................................................................................. V FIGURES ........................................................................................................................................ V TABLES .......................................................................................................................................... V ACRONYMS AND ABBREVIATIONS ........................................................................................ VII 1. CHAPTER 1 INTRODUCTION .................................................................................................... 1 1.1 PRESIDENTIAL PERMITS .................................................................................................... 2 1.2 SCOPE OF DOE’S ENVIRONMENTAL REVIEW ................................................................ 2 1.3 RELATED ENVIRONMENTAL REVIEWS .......................................................................... 3 1.3.1 Department of the Army Environmental Assessment and Statement of Findings for the Above-Referenced Standard Individual Permit Application [i.e., CENAE-RDC; NAE-2017-01342]” (July 7, 2020) and Environmental Assessment Addendum; Central Maine Power Company (CMP); New England Clean Energy Connect (NECEC); File No. NAE-2017-01342
    [Show full text]
  • Memo and Draft Decision Document
    STATE OF MAINE DEPARTMENT OF AGRICULTURE, CONSERVATION & FORESTRY LAND USE PLANNING COMMISSION AMANDA E. BEAL 22 STATE HOUSE STATION COMMISSIONER AUGUSTA, MAINE 04333-0022 JANET T. MILLS JUDY C. EAST GOVERNOR EXECUTIVE DIRECTOR Memorandum To: LUPC Commissioners From: Bill Hinkel, Regional Supervisor Date: December 30, 2019 Re: Central Maine Power Company’s proposed New England Clean Energy Connect Project Deliberative Session Background At its meeting on September 11, 2019, the Commission held a deliberative session on the Site Law Certification for Central Maine Power Company’s (“CMP”) proposed New England Clean Energy Connect project (“proposed Project”). The deliberative session concluded without a vote on a draft Site Law Certification decision document. On January 8, 2020, the Commission will resume its deliberative session. As with all Commission meetings, deliberative sessions occur at a meeting that is open to the public. However, because the record is closed, the Commission does not receive further comment or argument on the Site Law Certification from the parties or the public. The deliberative session is an opportunity for Commission members to review with staff and one another the testimony and written comments received regarding the Commission’s role in certifying the proposed Project, discuss issues in dispute, discuss the evidence in evaluating the applicable review criteria, and consider, for a possible vote, the Draft Decision Document provided by staff. The role of the Commission is to certify to the Department of Environmental Protection: a) whether the proposed Project is an allowed use within the subdistricts in which it is proposed; and b) whether the proposed Project meets any land use standards established by the Commission that are not duplicative of those considered by the Department of Environmental Protection in its review of the proposed Project under the Site Location of Development Law.
    [Show full text]
  • State of Maine Department of Conservation Land Use Regulation Commission
    STATE OF MAINE DEPARTMENT OF CONSERVATION LAND USE REGULATION COMMISSION IN THE MATTER OF MAINE MOUNTAIN POWER, LLC ) BLACK NUBBLE WIND FARM ) ) PRE-FILED TESTIMONY REDINGTON TOWNSHIP, FRANKLIN ) APPALACHIAN MOUNTAIN CLUB COUNTY, MAINE ) DR. KENNETH D. KIMBALL ) ZONING PETITION ZP 702 ) I. INTRODUCTION My name is Kenneth Kimball. I hold a doctorate in botany from the University of New Hampshire, a Masters in zoology from the University of New Hampshire and a Bachelors of Science in ecology from Cornell University. I have been employed as the Research Director for the Appalachian Mountain Club since 1983. I have overall responsibility for the club’s research in the areas of air quality, climate change, northeastern alpine research, hydropower relicensing, windpower siting policy and land conservation and management. I was the organizer of the Northeastern Mountain Stewardship Conference, held in Jackson, NH in 1988, co-organizer of the National Mountain Conference held in Golden, CO in 2000 and one of the original founders of what is now the biannual Northeastern Alpine Stewardship Symposiums. I have conducted research on New Hampshire and Maine’s mountains, including on Mount Katahdin, Saddleback, Sunday River Whitecap and the Mahoosucs. I am currently the principal investigator of a NOAA-funded research project titled “Climate and air pollutant trends and their influence on the biota of New England’s higher elevation and alpine ecosystems”, which includes partner organizations the University of New Hampshire and Mount Washington Observatory. I have been involved in research and policy development related to windpower siting in the northeast for over a decade. I have organized and chaired several forums on the need for states to develop windpower siting policy in Massachusetts and New Hampshire and spoken at a number of forums on this need.
    [Show full text]