Suvarnabhumi Airport (VTBS/BKK) Runway Maintenance 3 Mar – 2 May 2017
Total Page:16
File Type:pdf, Size:1020Kb
Suvarnabhumi Airport (VTBS/BKK) Runway Maintenance 3 Mar – 2 May 2017 ICAO SAIOACG/7 & SEACG/24 March 2017 Bangkok, Thailand Maintenance Area (1) Suvarnabhumi Airport Runway Mar 2017 2 Maintenance Maintenance Area (2) Suvarnabhumi Airport Runway Mar 2017 3 Maintenance Maintenance Area (3) Suvarnabhumi Airport Runway Mar 2017 4 Maintenance Runway Utilization Scheme (19) Suvarnabhumi Airport Runway Mar 2017 5 Maintenance Runway Utilization Scheme (01) Suvarnabhumi Airport Runway Mar 2017 6 Maintenance Runway Utilization Survey • Bangkok ATFMU survey of RWY 19L (TORA 2,750 m) with airlines in 1st half February 2017 – based on Slot Coordination Schedule as of 24 Jan 2017 – Initial simulation indicates minor impact if departures for destinations within 1,300 NM can use RWY 19L (TORA 2,750 m) for departure • Simulation Result based on Airline Feedback – Scenario 1 : Wet Runway – Runway 19 Configuration – Scenario 2 : Dry Runway – Runway 19 Configuration – Scenario 3 : Runway 01 Configuration Suvarnabhumi Airport Runway Mar 2017 7 Maintenance Scenario 1 : “Uncertain” on 19R (TORA 3,700 m) Possible GDP/CTOT measure Suvarnabhumi Airport Runway Mar 2017 8 Maintenance Scenario 2 : “Uncertain” on 19L (TORA 2,750 m) Possible GDP/CTOT measure Suvarnabhumi Airport Runway Mar 2017 9 Maintenance Scenario 3 : RWY 01 Direction Suvarnabhumi Airport Runway Mar 2017 10 Maintenance Rubber Removal on RWY 19R (TOR 3,700 m) • Every Tuesday between 0200 – 0359 Local Time or 1900 – 2059UTC – Approximately 26 departures and 18 arrivals affected • Impact can be absorbed during 2100 – 2159UTC • Impacted airlines contacted through AOC and Slot Coordinator to reschedule arrivals out of the rubber removal period Suvarnabhumi Airport Runway Mar 2017 11 Maintenance Rubber Removal Impact Analysis Rubber Removal Suvarnabhumi Airport Runway Mar 2017 12 Maintenance Rubber Removal Impact (Tue 7 Mar 2017) Suvarnabhumi Airport Runway Mar 2017 13 Maintenance Still Missing RWY 19L (TORA 2,750 m) Readiness Info … • Asiana (AAR) • Shenzhen (CSZ) • Kenya Airways (KQA) • Aeroflot (AFL) • Xiamen Airline (CSX) • Air Astana (KZR) • Peach Aviation (APJ) • Juneyao Airline (DKH) • MOD • Azul Air (AZE) • El Al (ELY) • Egypt Air (MSR) • China Airline (CAL) • Eurowings (EWG) • Nippon Cargo (NCA) • Air China (CAL) • Flydubai (FDB) • Oman Air (OAS) • Shandong Airline (CDG) • FedEx (FDX) • Air Astral (REU) • Cebu (CEB) • Garuda (GIA) • RGE • Hainan Airlines (CHH) • Jet Airways (JAI) • Turkmenistan (TUA) • China Cargo Airline • Jin Air (JNA) • T-Way (TWB) (CKK) • Kuwait (KAC) • UPS • Spring Airlines (CQH) • Uzbekistan Airways • China Southern (CSN) (UZB) Suvarnabhumi Airport Runway Mar 2017 14 Maintenance ATFM Daily Plan Publication Situation Change Publish Analysis to ATFM Tactical ADP Measure? Email: "No Update" ATFM YES Publish Pre- Measure Tactical ADP Needed? Publish Tactical ADP NO ATFM Publish Measure Empty ADP Email: Needed? "No ATFM Measure" Note : 1. Activities with Red Outlines : Airlines will receive ATFM Daily Plan / notification from 2. Activities with Green Background : Carried out on Day before Operations (~ 1000UTC) 3. Activities with Pink BackgroundSuvarnabhumi : Carried out Airport on DayRunway of Operation (~0100UTC) Mar 2017 /3 Maintenance Sample ATFM Daily Plan : Normal Overload Suvarnabhumi Airport Runway Mar 2017 16 Maintenance Sample ATFM Daily Plan : Rubber Removal Suvarnabhumi Airport Runway Mar 2017 17 Maintenance Potential ATFM Measure Planned • ATFM Measure by affected Departure Airports Ground Delay Program (GDP) with CTOT Minimum Departures Interval (MDI) Minutes-in-Trail (MINIT) Note : 1. Scale and Scope of ATFM Measure depends on degree of demand-capacity imbalance 2. CTOT / CLDT will be made available for departure airports with GDP, MDI and MINIT to support voluntary flight adjustments, minimizing impact on flight operations Mar 2017 18 GDP/CTOT Delivery Sequence (UTC Time) Compliance EOBT CTOT E-Mail, AFTN, Web 0945 0955 1000 1010 Tactical ADP Out FPL In CTOT Out Departure 0100 0645 0745 0945 2 Hours 3 Hours /7 Suvarnabhumi Airport Runway Mar 2017 /7 Maintenance Tactical Operations • RWY 19L as primary runway for departures – PIC requiring RWY 19R (TORA 3,700 m) shall notify Ground Control before commencing pushback • Departures: Gate Hold procedure will be implemented – Pushback Time to be available on CTOT delivery website • Arrivals: Combined ATFM Measure may be deployed depending on traffic condition and weather conditions • Minimum Runway Occupancy Time procedure shall be strictly applied to maximize runway utilization • In case of situation potentially leading to “blocked runway”, airlines advised to divert using alternate aerodrome as per briefing Suvarnabhumi Airport Runway Mar 2017 20 Maintenance Alternate Aerodrome Briefing (1) Suvarnabhumi Airport Runway Mar 2017 21 Maintenance Alternate Aerodrome Briefing (2) Suvarnabhumi Airport Runway Mar 2017 22 Maintenance Bangkok ATFMU Contact Details • Tel: +66 2 287 8024 | +66 2 287 8025 • Fax: +66 2 287 8026 | +66 2 287 8027 • Mobile: +66 8 1829 5256 • E-Mail: [email protected] • AFTN: VTBBZDZX • Web Conference Help Desk : https://aerothai.adobeconnect.com/bkkatfmu • CTOT View Website : http://atfm.aerothai.aero or http://202.57.133.148 Suvarnabhumi Airport Runway Mar 2017 01 Maintenance References • Thailand AIP Supplement – A28/16 • ATC Procedure – VTBS NOTAM A0425/17 – VTBS NOTAM A0474/17 • ATFM Procedure – VTBS NOTAM to be A0455/17 Suvarnabhumi Airport Runway Mar 2017 24 Maintenance Multi-Nodal ATFM Operational Project Tiered Participation Model Level 3 ATFM Nodes Generate, Distribute, Comply to CTOT China Hong Kong China Singapore Thailand Level 2 ATFM Nodes Receive and Comply to CTOT Cambodia Indonesia Malaysia Philippines Level 1 ATFM Nodes Observers Lao PDR Viet Nam Advisory ATFM Node Suvarnabhumi Airport Runway Australia Mar 2017 25 Maintenance .