Mamata Opens Jindal's Cement Unit Construction (Also See in Jpeg)
Total Page:16
File Type:pdf, Size:1020Kb
powered by bluebytes Monday , January 11, 2016 Mamata opens Jindal's cement unit construction (also see in Jpeg) Publication: The Political & Business Daily , Agency: Correspondent, Edition: Kolkata, Page No: 12, Location: Top, Height: 12, Width: 16, Size(sq.cms): 192 Highlight Keywords Export Options Entire Page 6 PDF JPEG Advance PDF Qualify Article Mamata opens Jindal's cement unit construction Construction of the plant as well as commer cial production is likely to start in a year. ORMER chief minister The group's present] Buddhadeb Bhatt cement capacity of six mil Facharya's lion tonnes will go up to cavalcade ;was attacked 16 million tonnes, near Salboni on November Economic Analyst JSW 2, 2008 by Maoists, when Steel Parth Jindal said. he, along with the then JSW group Chairman. Union steel minister Ram Sajjan Jindal termed it as"a Vilas ;Paswan, was small beginning", but "a lot returning from the same more could follow like site after laying the downstream steel, paints foundation for the J5W besides cement". ' steel plant in junglemahal. Group may have failed to when he, along with the JSW has about 4,000 i West Bengal Chief execute its Rs 35,000 then Union steel minister acres in its possession, Minister Mamata Banerjee crore 10mt integrated Ram Vilas Paswan, was but) the cement grinding today inaugurated the steel project at Salboni in returning from the same unit is being constructed commencement ceremony West Bengal due to iron site after laying the foun on 134 acres. for the construction of the ore linkage issues, but it's dation for the JSW steel cement unit at the same pulling out all the stops to plant. The raw material linkage site. "Chief Minister put up a Rs 800crore The present project, for the grinding unit Gupta returned peacefully as cement grinding unit at the which entails setting up a said, has been finalised. Junglemahal is smiling same site. 2.4million tonne cement After the cement plant, during the tenure of the Ironically, former chief grinding unit at Salboni of a 300mw captive power ruling Trinamool minister Buddhadeb West Midnapore district, plant has been proposed to Congress," said a senior Bhattacharya's cavalcade is likely to be the third be built at a cost of Rs TMC leader. was attacked near Salboni such facility after 2,000 crore, Jindal had Sajjan Jindal's JSW on November 2, 2008, Vijaynagar and Dolvi. said earlier. .