Tranche 2: Water Supply in Joka and Adjoining Area, Kolkata and Water
Total Page:16
File Type:pdf, Size:1020Kb
Initial Environmental Examination Document Stage: Final Project Number: 42266-025 March 2018 IND: Kolkata Environmental Improvement Investment Program (KEIIP) Tranche 2 – Water Supply in Joka and Adjoining Area, Kolkata and Water Loss Management at Anandapur and Patuli Area of East Kolkata Prepared by Kolkata Municipal Corporation, Government of West Bengal for the Asian Development Bank. This final initial environmental examination report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. SOUTH ASIA REGIONAL DEPARTMENT SAFEGUARDS INFORMATION LOG FOR SAUW PROJECTS Project: IND: KEIIP – Water supply in Joka & adjoining area, Kolkata and water loss management at Anandapur and Patuli area of East Kolkata Loan No.: Package No.: Water supply packages of tranche -2 including KEIIP/NCB/TR-2/WS26B/ 2017-18: Components: (i) Construction of 2 Under Ground Reservoir (UGR) cum Pumping Station (PS) at Prantik Phase III and KMC land on Julpia Road, Construction of 6 Elevated Service Reservoirs (ESRs) at Prantik Ph III, N-E of SSE STP, N-W of SSE STP, KMC land on Julpia Road, WBSETCL (West Bengal State Electricity Transmission Company Limited) and 22 Bigha, (ii) Laying of Transmission Main from existing Daspara PS to UGRs at Pratik Phase III and KMC land on Julpia Road; and transmission main from UGRs to 8 ESRs (6 proposed + 2 existing), (iii) Laying of water supply distribution network including providing household service connection in 4 distribution service areas in Joka and adjoining areas for the command area under proposed ESRs at Prantik Ph III, NE of SSE STP and NW of SSE STP and existing ESR at Prantik, (iv) Laying of water supply distribution network including providing household service connection in 4 distribution service areas in Joka and adjoining areas for the command area under proposed ESRs at Company pukur (KMC land at Julpia road), WBSETCL, 22 Bigha and existing ESR at Diamond Park, , (v) Construction of Elevated Service Reservoir (ESR) at Ramkantapur, Malpara, Charaktala; Laying of Transmission main from UGR at KMC land on Julpia Road to 3 ESRs; Laying of Distribution system and house connection within command area of 3 ESRs, (vi) Dedicated Water Supply Transmission Main from Junction of James Long Sarani to Daspara near existing Pumping Station along James Long Sarani, and additional work for water loss management (vii) Water Loss Management in Anandapur area and Patuli area under Jai Hind WTP Area (Eastern Kolkata) and new work package (viii) Water supply system instrumentation and information Technology Upgrade. Contract Type: Item rate contract Date of IEE: Draft IEE Updated/Revised IEE Others March 2018 Activity Status Comments (include date accomplished or obtained, if applicable) 1. Environmental Yes No This IEE covers the water assessment has been X supply packages under tranche prepared -2 and was prepared by KMC during loan approval stage 2. Yes No Activity Status Comments (include date accomplished or obtained, if applicable) Environmental X IEE was prepared after assessment based on designing of package latest project components and design 3. Statutory Requirements Forest Clearance Not applicable No Objection Certificate Not applicable Site Location Clearance Not applicable Environmental Compliance Not applicable Certificate X Permit to Construct (or equivalent) the following will require Consent to Establish and CTO from WBPCB: i) diesel generators; and (ii) hot mix plants, wet mix plants, stone crushers, etc. if installed for construction. X Permit to Operate (or equivalent) the following will require Consent to Operate from WBPCB: i) diesel generators; and (ii) hot mix plants, wet mix plants, stone crushers, etc. if installed for construction. Others Not applicable 5. Policy, legal, and Adequate Not Adequate IEE included policy, legal and administrative framework X admirative framework Frameworks included: X National regulation/law on EIA X Environmental agency X Relevant international environmental agreements X Environmental standards (IFC’s EHS Guidelines) 6. Anticipated environmental Impacts and risks: Mitigation Measures: Site-specific EMP to be impacts and mitigation Yes No prepared by contractor measures Biodiversity Not applicable conservation X Pollution X prevention and abatement X Health and X safety Physical cultural Not applicable resources Cumulative Not applicable impacts Transboundary Not applicable impacts 7. Impacts from Associated Addressed Not None Not applicable Facilities Addressed X 8. Analysis of Alternatives Yes No Not applicable 9. EMP budget included Yes No The indicative cost of EMP is X INR 2,350,000 Activity Status Comments (include date accomplished or obtained, if applicable) 10. EMP implementation Yes No Included in PAM during loan integrated in PAM and bid X processing documents Included in Section 8 of bid documents 11. Consultation and Yes No Community consultation has Participation X been carried out at following locations 1.Ward No 143 Prantik Abasan PH-III (Community Hall) on 21st Decemebr 2015, 4 female and 46 male participants (Total 50) were present during the consultations. 2.Ward No 144 Office of Borough XVI, Diamond Park on 19 December 2015, 8 female and 54 male participants (Total 62) attended the consultations. 3.Patoli area on 21st March 2017, 12 Male and 8 female members attended the consultations. Details of consultations are provided in Appendix 11 of IEE. 12. Grievance Redress Yes No GRM and GRC is constituted by Mechanism X project director on 12.08.2015 Description of GRM Included in IEE (main text) Identification of GRC members Included in IEE (Appendix 12 shows Notification and members) 13. Disclosure Endorsement to disclose on ADB website For follow-up Disclosed on project website For follow-up Relevant information available to For follow-up stakeholders and affected people in language and form they understand 14. Mobilized PMU Yes No PMU Environmental Staff: Environment Specialist X Dr. Chinmoy Chakrabarti [email protected] [email protected] 15. Mobilized PIU Yes No Not applicable Environment Specialist 16. Mobilized Environment Yes No Dr. Ardhendu Mitra Specialist at PMU level X [email protected] [email protected] 17. Mobilized Environment Yes No Not applicable Specialist at PIU level 18. Awareness training on Yes No Included in updated IEE compliance to safeguard X requirements 19. Others/Remarks Activity Status Comments (include date accomplished or obtained, if applicable) Initial Environmental Examination UPDATED March 2018 IND: Kolkata Environmental Improvement Investment Program (KEIIP) Tranche 2 – Water Supply in Joka & Adjoining Area, Kolkata and Water Loss Management at Anandapur and Patuli area of East Kolkata Kolkata Municipal Corporation DISCLAIMER This Environmental Impact Assessment is a document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. WEIGHTS AND MEASURES CFU - Colony Forming Unit cum/hr - cubic meter per hour cum/m3 - cubic meter dB(A) - Decibal in A network Ft - feet Ha - hectare Km - kilometer km2 or sq km - square kilometer KVA - Kilovolt ampere Lpcd - liter per capita per day M - meter m/yr - meter per year mg/l - milligram per liter MGD - million gallon per day MGH - million gallon per hour MPN - Most Probable Number MT - Metric Ton ML - million liter MLD - million liter per day Mm - Millimeter NTU - Nephelometric turbidity Unit This initial environmental examination is a document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. ABBREVIATIONS ADB - Asian Development Bank BOD - Biochemical Oxygen Demand BPS - Booster Pumping Stations CI - Cast Iron COD - Chemical Oxygen Demand CPHEEO - Central Public Health and Environmental Engineering Organisation DI - Ductile Iron DO - Dissolved Oxygen DSC - Design and Supervision Consultants DWF - Dry Weather Flows KMC - Executing Agency EKW - East Kolkata Wetlands GOI - Government of India GRC - Grievance Redressal Committee GRM - Grievance Redress Mechanism HDPE - High-Density Polyethylene INR - Indian National Rupee KEIP - Kolkata Environment Improvement Project KEIIP Kolkata Environment Improvement Investment Program KMA - Kolkata Metropolitan Area KMC - Kolkata Municipal Corporation KMDA - Kolkata Metropolitan Development Authority KMWSA - Kolkata Metropolitan Water and Sanitation Authority MOUD - Ministry of Urban Development MS