PSE&G Information and Requirements for Electric Service
Total Page:16
File Type:pdf, Size:1020Kb
Information and Requirements for Electric Service Rev 4.03 Manual Owner: James Duswalt November 24, 2020 This Page Intentionally Blank October 17, 2019 – Rev 4.02 Record of Revisions Revision Sections Revision Date Reason for Revision Number Revised REV 01 June 1, 2005 All Revised entire Information and Requirements for Electric Service Manual. REV 02 January 6, 2006 Chapters 1, 2, 4, Additional material in Chapters 1, 2, 4, 6 and Appendix pages A-19, 51, 89 6 and Appendix and a new table on A-90. REV 02.01 November 30, 2006 Appendix Change graphic in Exhibit 19B. REV 02.02 April 23, 2008 Chapter 2, Title Typo in Table 2-2, change Manual Owner. Page REV 3.00 May 31, 2014 All Complete review of entire manual. REV 3.01 January 15, 2017 Chapters 1, 5, 6, Chapter 1 – Updated abbreviations in Section 1 and 3.1. 9, 10, 11 and Chapter 5 – Updated Section 3, Bulletin 16-066. Index Chapter 6 – Updated Figure 6.1 Chapter 9 – Updated abbreviations in Section 2. Chapter 10 – Updated Table 10-7, Bulletin 16-034. Updated Figures 10.9, 10.37, 10.38, 10.42, 10.43 and 10.44, Bulletin 16-066. Chapter 11 – Added New Chapter 11 – General Specification for Service to High-Rise Buildings, Bulletin 16-079. Index – Updated Index. REV 4.00 May 18, 2018 All Cover-to-cover review of entire manual completed in 2018 Implemented new template for entire manual Created a Forms chapter before the Index. Chapter 1: • Updated Section 1 – Purpose. • Updated Section 2 – Clarifications. • Deleted Section 3.6 – Designated Growth Area. • Changed title of Section 3.16 from Metalclad Switchgear to Metal Enclosed Switchgear. • Deleted Section 3.18 – Non-Growth Area. • Updated Section 4 – Ownership, Maintenance and Removal of Apparatus Provided by or for PSE&G. • Updated Section 8, paragraph 1. • Updated Section 13 and changed title from Expediting Electric Service to Pre-Requisites for Electric Service. • Deleted Section 16 – Smart Growth Related Customer Charges and Contributions. Chapter 2: • Updated Table 2-1. • Updated Section 2 – Service from the Primary System. Chapter 3: • Deleted Table 3-3 from Section 2.2. • Updated Section 3, paragraph 3. Record of Revisions October 17, 2019 – Rev 4.02 Information and Requirements for Electric Service iii Revision Sections Revision Date Reason for Revision Number Revised REV 4.00 May 18, 2018 All • Updated Section 4, paragraphs 2, 4 and 6. Cont’d • Updated Section 5, paragraph 3. • Updated Section 6, paragraphs 1 and 4. • Updated Section 7. • Updated Section 8, paragraph 1. • Updated Section 9. • Updated Section 10, introductory paragraph and paragraph 2. • Updated Section 11, introductory paragraph and paragraphs 1, 2 and 7. Deleted paragraphs 8 and 9. Chapter 4: • Updated Section 1, paragraphs 1 and 4. • Added paragraph 7 to Section 2. • Updated Section 3, paragraph 2. • Updated Section 4, paragraph 4. • Updated Section 5, paragraph 1. • Updated Section 6, paragraph 2, 3, and 5. Deleted paragraph 6 and renumbered subsequent paragraphs. • Updated Section 7, paragraph 4. • Updated Section 8, paragraph 2, 3 and 5 Chapter 5: • Updated Section 1, paragraph 7. Added new paragraph 10 and renumbered subsequent paragraphs. • Updated Section 2, paragraphs 2, 5, 7, 8, 9 and 10. • Updated Section 3, paragraphs 8, 10 and 11. Chapter 6: • Added new paragraph 5 to Section 2 and renumbered subsequent paragraphs. • Updated Section 7, paragraph 5 and added paragraph 10. • Added “Fire Pumps” the Section 8 heading and paragraphs 1 and 3. • Updated Section 12, paragraph 4. Added new paragraph 6. • Updated Section 15. Moved paragraph 3 to paragraph 1 and added paragraph 13. • Added Section 16. Chapter 7: • Converted all forms to a standard format. Created fillable forms. • Updated Sections 1.1 and 1.2. Chapter 8: • Updated Southern Construction Inquiry phone number ins Table 8-1. • Removed Division Office phone numbers in Table 8-2. Chapter 9: • Spelled out meaning of PJM in definition of PJM. • Updated any occurrence of NJAC to N.J.A.C. • Added Figures 9.1 and 9.2. • Updated Section 4.5 and added Section 4.7. Record of Revisions iv Information and Requirements for Electric Service October 17, 2019 – Rev 4.02 Revision Sections Revision Date Reason for Revision Number Revised REV 4.00 May 18, 2018 All Chapter 10: Cont’d • Updated reference from Chapter 1 Section 16 to Chapter 1 Section 17. • Updated Section 1.1, paragraph 2. Added paragraph 3. • Added note for F, updated Hand added I in the notes for Figure 10.1 and updated note 2. • Inserted Section 2 – Grouped Meter Mounting Equipment Specifications and Figure 10.2. Renumbered subsequent sections and figures. • Updated notes 3, 6 and 11 in the notes for Figures 10.4, 10.5 and 10.6. • Updated notes 9, 12 and 13 in the notes for Figures 10.8, and 10.9. • Updated notes 3, and 7 in the notes for Figures 10.11, and 10.12. • Updated Section 9.1, paragraphs 4, 5, 6, 13, 15 and 16, and removed 3-12 in. conduit diameter from Table 10-2. • Updated note 4 under Customer shall in the notes for Figures 10.16, 10.17 and 10.18. • Added notes 4 and 5 under Customer shall in the notes for Figure 10.19. • Updated notes 3, and 6 in the notes for Figure 10.26. • Updated title of Figure 10.27 to >801 A and updated notes 6, 7 and 11. • Updated notes 6, and 10 and added note 12 in the notes for Figure 10.28. • Updated note 1 under PSE&G will and updated notes 6 and 10, and added note 12 under Customer shall in the notes for Figure 10.29. • Added /Switchgear to the end of Section 18 heading. • Updated note 9 in the notes for Figure 10.30. • Added /Switchgear to the end of Section 19 heading and added > before 801 A. Updated note 4 for Figure 10.31. • Updated note 10 in the notes for Figure 10.31. • Updated notes 1, 2 and 3 in Section 21.1.1. • Updated Section 21.1.3. • Updated Section 25.2 paragraphs 1 and 4. • Updated first paragraph under Section 25.4 • Updated notes 4, 7, 9, and 10 and added note 15 in notes for Figure 10.38. • Updated Section 27 to 300 kVA and below. • Updated Section 27.1 and 27.3. • Deleted Figure – Fiberglass Pad Three-Phase Padmounted Transformers (500 kVA and below) – Type II (Highline Previous Design Type II Pad). • Updated Figure 10.39 title to 300 kVA and below. • Updated Section 28.2, paragraph 1. • Deleted “– Overhead Zones” from the end of Section 29 heading. • Added bullet to Section 29.1 paragraph 3. • Added “For Overhead Type Transformers” to Section 29.2 heading and updated paragraphs 2, 3, 4, 6, 8 and 9. • Deleted note 5 in notes for Figures 10.43 and 10.44. • Changed Figure “Vault Requirements – Customer-Installed Transformer Vault – Network Type Vaults Only” to Section 29.3. • Deleted figure “Vault Requirements – Customer-Installed Transformer Vault – Non-Network Type Vaults Only.” • Added Figures 10.46 and 10.47. • Updated Section 30.1 paragraph 2. Record of Revisions October 17, 2019 – Rev 4.02 Information and Requirements for Electric Service v Revision Sections Revision Date Reason for Revision Number Revised REV 4.00 May 18, 2018 All • Updated Section 30.3 paragraph 2. Cont’d • Updated Figures 10.1, 10.8, 10.11, 10.12, 10.13, 10.16, 10.17, 10.18, 10.19, 10.21, 10.23, 10.25, 10.28, 10.29, 10.30, 10.34, 10.39, 10.40, 10.41, 10.43, 10.44, 10.46 and 10.48. • Deleted Figure “Elevated Pad Specs – Installations in Flood Areas.” • Updated Table 10-7. Chapter 11: • Updated Section 1. • Updated Section 3.2, paragraph 4. • Updated Section 4.1 • Updated Section 8, paragraph 3. • Updated Figure 11.1. REV 4.01 November 30. 2018 Title page, TOC, Introduction – Updated sample reference and Section 8. Introduction, Chapter 3 – Updated Section 3 number 4 and Section 4 number 7. Removed Chapters 3, 4, 6, “open” from “120/240 three-phase four-wire open delta services.” from the 8, 10 and 11. last sentence of each paragraph. Chapter 4 – Updated Section 6 number 5, 1st bullet to “265/460 V” from “265/240V.” Chapter 6 – Section 16.2 – Added PSE&G – Central Sub Division Headquarters 72 W. Jersey Street, Elizabeth, NJ 07202, Patricia D'Alia (908) 558-7520 Fax (908) 353-7642. Chapter 8 – Table 8-1– added Electric Division of “M” to municipality of Hackensack and updated the Electric Division in the municipalities of Perth Amboy, Woodbridge, North Plainfield, Watchung and Plainfield from “CS” to “C.” Chapter 10 – Updated Figure 10.1 Notes. Updated Section 21.1.3 – removed “open” from “120/240 three-phase, four-wire open delta services.” Added “(primary)” and “(secondary)” to Figure 10.35 Note – General number 1. Chapter 11 – Section 2 – updated definition of “Internal Distribution System.” Section 4.1.1 changed “216Y/125” to “208Y/120” for customer requirements. Section 9 changed “216Y/125” to “208Y/120.” Updated Figure 1.1. Record of Revisions vi Information and Requirements for Electric Service October 17, 2019 – Rev 4.02 November 24, 2020 – Rev 4.03 Revision Sections Revision Date Reason for Revision Number Revised REV 4.02 October 17, 2019 Title page, TOC, Chapter 1 – Updated reference from N.J.A.C. 14:5-4.1 to N.J.A.C 14:3-8.4 in LOF, LOT, List of Sections 3.3 and 6 paragraph 5. Forms, Chapter 3 – Updated reference from N.J.A.C.