04_TRANSPORTATION AND INFRASTRUCTURE Gardermoen Line New Railway to Gardermoen airport

Airport Express Train S – Nitelva: 20 km railway track from to Lillestrøm station, including “Romeriksporten”, with tunnel length 14 km. Three – level crossing near Lillestrøm with new tracks, old tracks and new roads. Constru- ction plan, tender documents and site attendance during construction period.

Åråsen – Leirsund: Detail plan and site development plan. Underground conditions required integrated landsca- ping/geotechnical engineering/construction design.

Leirsund – Kløfta: as above (detail plan and site development plan). Arrival and departure zone at Gardermoen: Roads, bridges, railway station, parking facilities at the airport. Construction plan, tender documents and site at- tendance during construction period. Railway Station: New station buildings and new tracks, new waterfront, technical infrastructure and re- construction of existing roads. Construction plan, tender documents and site attendance. Special requirements associated to poor ground conditions and the vicinity of the lake Mjøsa, with varying water levels influencing con- struction works.

PROJECT PROJECT TYPE LOCATION CLIENT TIME PERIOD 5 projects connected Detail plans, constru- Oslo, Lillestrøm, National Railway 1994 - 1999 to new high speed ction plans, tender Leirsund, Kløfta, Gar- Administration, NSB railway tracks and documents, site dermoen and Eidsvoll Gardermobanen AS new roads to the new development plans in and Norwegian Public Oslo Airport at Gar- Roads Administration dermoen, Norway SCOPE OF WORK OUR SERVICES Several of these projects were carried out in • Site investigations collaboration with other consultants. Four of • Geotechnical engineering these are now integrated in Multiconsult AS. • Design of Foundations (Formerly Fjellanger Widerøe Plan AS, Arild • Planning and design of roads Berg AS, NOTEBY AS and 13.3 Landscape Ar- and railways chitects AS). • Planning and design of in- frastructure, water, sewage, trenches and cables • Plans for bridges and culverts • Rock engineering • Rock tunnels • Noise and vibration analyses and abatement • Detailed Site and Development Plans • Landscape Design • Architectural Design • Technical Supervision and Verification and Construction Management

DISCIPLINES • Text 04_000, rev. 12.10.2016 04_000, rev. |

IT Access Oslo’s main airport The Gardermoen Line - Airport Express Train www.multiconsult.no