Priority list 2005-2006

Sl. Name of Projects Estimated No. Cost (Rs. in Crore) 1 Districts Sports Complex at Jengging. 30.00 2 Road from NH-52A Nirjuli to Sagalee (SH:Doimukh to Toru -45km) 20.86 3 C/o road from Sagalee to Sakiang CO Hq. (60 KM) 35.00 4 Flood Protection work on the right bank of Siang river near 21 miles to protect Pasighat township, adjoining villages and agricultur e land. 5.43 5 Anti-erosion scheme to protect Agricultur al filed of Kerang and Bogne villages. 7.48 6 Improvement & Upg radation of road network in Lumla township. 3.80 7 Anti-erosion work to protect twonship against 6.66

Sl. Name of Projects Estimated No. Cost (Rs. in Crore) erosion from river Siang and its tributaries on its right bank. 8 C/o Multipur pose outdoor stadium at Itanagar. 9.47 9 C/o Landing Ground AT Sarkam near Yingkiong 2.07 10 C/o Changlang-Khonsa road (65 km) 30.55 11 Anti-erosion at N & Mowa Town area 7.00 12 Water supp ly scheme at Sagalee Township 2.60 13 Anti-erosion work at Cide river to protect agril field at Karko 2.53 14 C/o Motorable Road from Jengging to Ramsing in Upper . 4.00 15 Flood Protection work on Remi river to protect Mirem village and Vast agril . Land Areas. 2.13 16 C/o Outdoor stadium at Sagalee 3.00 17 Flood protection work on either bank of Remi River to protect vast Agril . Land areas of Miglung, Remi and Yagrung vill age. 5.90 18 Flood protection works on Pagla Nadi to protect Rani village, Agril land areas and NH-52 7.42 19 C/o road from Tuting to Singa via Jido (90 km) 78.23 20 C/o Road from Bameng to Lada (70 KM ) 30.00 21 Improvement of Menga-Giba road (21KM ) 3.00 22 C/o road from Rumgong to Paksing via Mopung, Molom, Bogne, Kerang Phase-I 49.63 23 C/o road from Palizi to Thrizino (17 KM) including widening culverts, drainages, R&B wall, Soling and metaling, black toping and carpeting (17 KM ) 9.50 24 Anti-erosion work to protect ALC Yingkiong andYingkiong township from river Siang. 7.36 25 Anti-erosion work to protect Rupa and Tenga Valley. 3.40 26 Anti-erosion work to protect Tippi Industrial area and vill age. 2.60 27 Eco-Tourism and Adventur e Tour ism 15.00 28 Flood Control work at Jairampur 2.87 29 Flood protection work at Bomjir and Anpum and Bijari area. 4.00 30 Flood protection work at Dura Nallah near Rengging Nokyin Erak Sirki confluence, Sile Korong betwee n Pasighat and Rangg ing 9.00 31 Flood protection work on the left bank of Siang river to protect Sigar, Motum and Borguli villages and its adjoining areas. 7.41 32 Anti-erosion work at Noa Dihing river to protect Miao

township and seven villages I.e., Pessi, Lowang, Chamuk, Phupkagam, Singpho and Miao Singpho of Miao Sub- division 3.50 33 Road from Jamiri to Buragaon (34 KM) including widening culverts, drainages, R&B walls soling and metaling, black toping and carpeting. 8.00 34 Anti-erosion works on Noa Dihing river to protect Diyum circle 6.22 35 Flood control works to protect township and WRC land of West Siang dist. 3.00

Sl. Name of Projects Estimated No. Cost (Rs. in Crore) 36 C/o link road from Koloriang to Damin via Parsi Parlo - 50 KM 53.00 37 C/o Indoor & Outdoor stadium at Singchun g in West Kamen District 2.00 38 C/o Tamen Tali Road via Yirkoum (60 KM ) 50.00 39 C/o road from Geku to Reklat to connect Pasighat- Mariyang road near Sili (60 KM ) 30.00 40 Anti-erosion work of Noa Dihing river to protect both bank of river in the downstream of BRTF road bridg e Ph-I 2.97 41 C/o road from Pakarizo to Aranalo 6.60 42 C/o road from BRTF road to Jorging via Pango ( 90 KM ) 78.28 43 C/o Outdoor stadium for DNGC Itanagar 2.16 44 C/o Nyorak to Rime Moku Road in (20 Km) 12.00 45 C/o Wak-Yomcha-Liromoba Road (78 Km) 39.00 46 C/o Road from Lumla SDO Hq. To Bhutan Border, Dokson (29 Km) 3.00 47 C/o Road from Pakke to Wai (18 Km) 4.69 48 C/o Road from Itanager to Seijusa covering 36 vill ages (108 Km) 80.00 49 Improvement of road from Itanagar to Papu-Nallah via Juli village (12 Km) 3.50 50 Flood protection work on Lohit to protect Tezu District HQ from Tezu Khola, Jalukbari, Tindolong, SSB Camp and Danglat area. From Tezu Khola to Jalukbari 2.99 51 Flood protection work at Tabang Nallah to save Upper Loili ang, Lower Loili ang, Huseli ang, Pomli ang, Mekali ang, BRC, Pig farm, Air Field, Danglat etc. at 2.99 52 Flood protection works on Dur anall ah to protect Changli ang village Govt. Primary Schoo l, Micro Hydel, PCL, Complex, NH-52 road and Duraliang village 2.03 53 Flood protection on right bank and left bank at Tezu Nallah to protect Tezu township, Shivajhi Nagar, Tafragam, Khoroli ang village 2.99 54 Flood protection works on Dikrong river from Hoj to Banderdewa 10.00 55 Flood protection work on Pachin river from Naharlagun to Nirjuli 10.00 56 Flood protection work on left and right bank of Balijan river 3.00 57 Improvement of landing ground at Daporijo (SH: WBM, BT, Secur ity fencing and RR Miss ionary drain) 7.36 58 Improvement of Doimukh - Harmuty road (13 Km) 3.40 59 Improvement of Nirjuli - Doimukh - Hoj - Potin road (42 Km) 20.00 60 C/o Sarianagur i to Longding road via Kanu bari, Banfera, Wanu and Zedua 35.00 61 Restoration/renovation of road from Namsang to Soha 3.00 62 Improvement of Longd ing - Pumao road (18 Km) 8.00 63 C/o road from Subansiri Bridge Point to Siyum via Bui - Gusar - Payeng (80 Km) in left bank of Subansiri river 50.00 Total 956.58