86 CONNECTICUT RIVER BASIN 01184000 CONNECTICUT RIVER at THOMPSONVILLE, CT LOCATION.--Lat 41°59'14", Long 72°36'21"

Total Page:16

File Type:pdf, Size:1020Kb

86 CONNECTICUT RIVER BASIN 01184000 CONNECTICUT RIVER at THOMPSONVILLE, CT LOCATION.--Lat 41°59'14 86 CONNECTICUT RIVER BASIN 01184000 CONNECTICUT RIVER AT THOMPSONVILLE, CT LOCATION.--Lat 41° 59'14", long 72° 36'21", Hartford County, Hydrologic Unit 01080205, on right bank just upstream from Enfield Dam, 1.0 mi downstream from Thompsonville, 3.0 mi downstream from Massachusetts-Connecticut State line, and at mile 63.6. DRAINAGE AREA.--9,660 mi2. WATER-DISCHARGE RECORDS PERIOD OF RECORD.--July 1928 to current year. REVISED RECORDS.--WSP 741: 1932. WDR CT-77-1: 1976. WDR CT-83-1: Drainage area, 1982. GAGE.--Water-stage recorder and crest-stage gage. Datum of gage is 38.48 ft above sea level. November 28, 1986 to August 2, 1990, recorder at site 200 ft downstream at datum 0.28 ft lower. Telephone telemetry at station. Satellite telemetry at station. REMARKS.--Records good, except for periods of estimated record, which are fair. Flow regulated by power plants, by diversion from Chicopee River Basin and by First Connecticut and Second Connecticut Lakes, Lake Francis, Moore and Comerford Reservoirs, Quabbin Reservoir, and other reservoirs, combined usable capacity, about 107 billion ft3. EXTREMES FOR CURRENT YEAR.--Maximum discharge, 105,000 ft3/s, Apr. 4, gage height, 6.68 ft; minimum discharge, 1,910 ft3/s, Aug. 10, gage height, -2.38 ft. DISCHARGE, CUBIC FEET PER SECOND WATER YEAR OCTOBER 2004 TO SEPTEMBER 2005 DAILY MEAN VALUES DAY OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP 1 13,600 5,520 31,600 e17,100 e10,800 12,100 56,500 46,200 21,300 19,300 3,660 e8,970 2 12,400 6,950 44,900 e16,000 e10,500 11,700 59,900 45,900 26,100 17,000 6,260 10,700 3 10,900 7,760 49,000 17,600 e10,400 11,700 80,600 41,900 24,800 16,000 7,310 16,000 4 10,100 8,320 41,200 19,500 e10,000 11,900 103,000 37,400 20,300 13,800 7,110 14,100 5 8,980 8,840 30,900 23,900 e10,600 10,800 98,700 33,100 14,000 12,100 5,890 8,600 6 8,140 13,500 24,200 24,700 e10,000 11,000 84,000 28,800 12,000 11,300 5,070 6,530 7 8,850 12,800 21,800 21,400 e10,300 9,040 78,000 24,400 12,400 12,700 3,560 5,850 8 8,630 12,600 19,200 18,000 e10,500 11,000 77,200 24,000 12,700 11,800 5,270 4,700 9 7,090 10,900 21,400 17,300 e10,300 12,300 80,500 20,500 14,100 14,000 3,530 4,560 10 5,480 8,420 24,800 14,500 13,400 13,100 76,600 18,900 13,300 16,900 3,450 3,810 11 6,260 8,210 27,600 15,000 17,900 10,200 65,800 21,700 11,800 17,400 4,120 2,830 12 5,340 8,400 31,200 15,600 16,700 10,300 56,600 19,600 16,200 19,800 5,460 2,380 13 5,650 9,560 27,400 15,700 15,700 10,100 48,300 17,500 18,000 15,800 3,420 4,130 14 4,970 7,560 25,900 22,800 13,800 9,780 39,400 17,300 16,200 11,600 4,770 5,550 15 5,300 6,820 21,300 46,000 14,900 10,000 33,700 15,600 14,000 11,700 5,560 4,810 16 9,310 8,060 e18,000 43,700 16,800 10,000 32,600 16,700 18,900 12,400 3,940 5,350 17 13,100 7,380 e15,500 35,500 18,500 9,240 29,300 17,300 27,500 9,100 4,430 3,680 18 12,300 6,580 e14,200 e29,000 18,100 11,400 28,100 18,900 33,500 10,800 4,380 3,780 19 12,000 6,600 e13,400 e22,900 18,900 10,100 25,600 17,000 37,500 15,500 4,380 3,510 20 11,900 7,580 e11,000 e18,500 16,300 8,500 25,400 15,900 36,700 14,100 4,180 4,110 21 13,300 8,260 e11,700 e15,300 14,900 9,850 28,200 15,000 33,300 10,900 3,210 4,630 22 9,950 7,960 e10,800 e14,000 13,600 10,800 29,500 11,900 25,800 7,780 4,050 4,190 23 8,030 8,940 e10,500 e13,100 13,300 10,700 34,100 13,900 18,500 6,580 5,740 5,360 24 7,930 9,220 27,700 e12,600 12,400 14,200 49,100 16,900 16,200 5,730 4,340 3,700 25 8,330 12,500 41,700 e12,400 12,700 14,700 72,400 27,300 10,700 6,690 3,590 2,920 26 7,600 17,600 e33,800 e12,000 12,200 13,100 71,500 31,200 10,500 7,800 3,550 3,070 27 6,600 21,400 e23,900 e11,700 12,000 12,500 61,900 29,900 10,900 7,480 3,310 4,670 28 5,890 24,000 e18,800 e11,500 11,900 16,200 55,900 23,900 10,100 6,470 2,890 3,340 29 6,970 26,000 e15,700 e11,400 --- 41,800 55,800 20,800 e13,600 4,260 5,410 5,500 30 5,890 29,500 e16,300 e11,200 --- 63,700 49,300 20,400 e17,100 5,210 7,540 6,510 31 7,170 --- e17,500 e11,000 --- 58,600 --- 20,400 --- 5,520 e7,870 --- TOTAL 267,960 337,740 742,900 590,900 377,400 480,410 1,687,500 730,200 568,000 357,520 147,250 167,840 MEAN 8,644 11,260 23,960 19,060 13,480 15,500 56,250 23,550 18,930 11,530 4,750 5,595 MAX 13,600 29,500 49,000 46,000 18,900 63,700 103,000 46,200 37,500 19,800 7,870 16,000 MIN 4,970 5,520 10,500 11,000 10,000 8,500 25,400 11,900 10,100 4,260 2,890 2,380 STATISTICS OF MONTHLY MEAN DATA FOR WATER YEARS 1928 - 2005, BY WATER YEAR (WY) MEAN 10,190 14,920 15,950 14,190 13,540 24,870 45,320 26,910 13,940 7,939 7,061 7,303 MAX 31,730 33,310 39,000 30,180 39,100 89,210 76,050 51,520 42,600 28,810 22,530 42,700 (WY) (1978) (1996) (1997) (1978) (1981) (1936) (1960) (1972) (1984) (1973) (1955) (1938) MIN 2,690 5,015 5,548 4,311 4,386 6,965 14,920 9,611 4,900 3,202 2,911 2,719 (WY) (1964) (1965) (1948) (1931) (1940) (1940) (1995) (1941) (1964) (1962) (1965) (1964) e Estimated CONNECTICUT RIVER BASIN 87 01184000 CONNECTICUT RIVER AT THOMPSONVILLE, CT—Continued SUMMARY STATISTICS FOR 2004 CALENDAR YEAR FOR 2005 WATER YEAR WATER YEARS 1928 - 2005 ANNUAL TOTAL 5,747,520 6,455,620 ANNUAL MEAN 15,700 17,690 16,820 HIGHEST ANNUAL MEAN 24,920 1996 LOWEST ANNUAL MEAN 7,847 1965 HIGHEST DAILY MEAN 86,400 Apr 3 103,000 Apr 4 278,000 Mar 20, 1936 LOWEST DAILY MEAN 3,040 Aug 9 2,380 Sep 12 968 Oct 20, 1963 ANNUAL SEVEN-DAY MINIMUM 4,710 Jun 29 3,890 Sep 22 1,870 Aug 15, 1964 MAXIMUM PEAK FLOW 105,000 Apr 4 282,000 Mar 20, 1936 MAXIMUM PEAK STAGE 6.68 Apr 4 a16.60 Mar 20, 1936 INSTANTANEOUS LOW FLOW 1,910 Aug 10 968 Oct 20, 1963 10 PERCENT EXCEEDS 31,000 36,000 37,200 50 PERCENT EXCEEDS 10,800 12,500 11,200 90 PERCENT EXCEEDS 6,120 4,740 4,100 a From floodmarks. 1,000,000 500,000 200,000 100,000 50,000 20,000 DISCHARGE, 10,000 IN CUBIC FEET PER SECOND 5,000 2,000 1,000 O N D J F M A M J J A S 2004 2005 88 CONNECTICUT RIVER BASIN 01184000 CONNECTICUT RIVER AT THOMPSONVILLE, CT—Continued WATER-QUALITY RECORDS PERIOD OF RECORD.--Water years 1956, 1966 to current year. PERIOD OF DAILY RECORD.-- SPECIFIC CONDUCTANCE: October 1974 to September 1999, December 2001 to August 2004. WATER TEMPERATURES: October 1955 to September 1956, October 1973 to September 1999, December 2001 to August 2004. INSTRUMENTATION.--Water-quality monitor since October 1973. EXTREMES FOR PERIOD OF DAILY RECORD.-- SPECIFIC CONDUCTANCE: Maximum, 443 microsiemens Feb. 15, 1992; minimum, 46 microsiemens April 2, 1977. WATER TEMPERATURES: Maximum, 36.5° C Aug. 30, 1977; minimum, 0.0° C on many days during winter periods. WATER-QUALITY DATA, WATER YEAR OCTOBER 2004 TO SEPTEMBER 2005 Turbdty white Dis- pH, Specif. Instan- light, solved water, conduc- Hard- Magnes- Potas- taneous det ang Dis- oxygen, unfltrd tance, Temper- Temper- ness, Calcium ium, sium, dis- 90+/-30 solved percent field, wat unf ature, ature, water, water, water, water, charge, corrctd oxygen, of sat- std uS/cm air, water, mg/L as fltrd, fltrd, fltrd, Date Time cfs NTRU mg/L uration units 25 degC deg C deg C CaCO3 mg/L mg/L mg/L (00061) (63676) (00300) (00301) (00400) (00095) (00020) (00010) (00900) (00915) (00925) (00935) OCT 14..
Recommended publications
  • J. Matthew Bellisle, P.E. Senior Vice President
    J. Matthew Bellisle, P.E. Senior Vice President RELEVANT EXPERIENCE Mr. Bellisle possesses more than 20 years of experience working on a variety of geotechnical, foundation, civil, and dam engineering projects. He has acted as principal-in-charge, project manager, and project engineer for assignments involving geotechnical design, site investigations, testing, instrumentation, and construction monitoring. His experience also includes over 500 Phase I inspections and Phase II design services for earthen and concrete dams. REGISTRATIONS AND Relevant project experience includes: CERTIFICATIONS His experience includes value engineering of alternate foundation systems, Professional Engineer – Massachusetts, ground improvement methodologies, and temporary construction support. Mr. Rhode Island, Bellisle has also developed environmental permit applications and presented at New Hampshire, New York public hearings in support of public and private projects. Dam Engineering PROFESSIONAL AFFILIATIONS Natural Resources Conservation Services (NRCS): Principal-in- American Society of Civil Charge/Project Manager for various stability analyses and reports to assess Engineers long-term performance of vegetated emergency spillways. Association of State Dam - Hop Brook Floodwater Retarding Dam – Emergency Spillway Safety Officials Evaluation - George H. Nichols Multipurpose Dam – Conceptual Design of an Armored Spillway EDUCATION - Lester G. Ross Floodwater Retarding Dam – Emergency Spillway University of Rhode Island: Evaluation M.S., Civil Engineering 2001 - Cold Harbor Floodwater Retarding Dam – Emergency Spillway B.S., Civil & Environmental Evaluation Engineering, 1992 - Delaney Complex Dams – Emergency Spillway Evaluation PUBLICATIONS AND Hobbs Pond Dam: Principal-in-Charge/Project Manager for the design PRESENTATIONS and development of construction documents of a new armored auxiliary spillway and new primary spillway to repair a filed embankment and Bellisle, J.M., Chopy, D, increase discharge capacity.
    [Show full text]
  • DRAFT Northeast Regional Mercury Total Maximum Daily Load
    DRAFT Northeast Regional Mercury Total Maximum Daily Load Connecticut Department of Environmental Protection Maine Department of Environmental Protection Massachusetts Department of Environmental Protection New Hampshire Department of Environmental Services New York State Department of Environmental Conservation Rhode Island Department of Environmental Management Vermont Department of Environmental Conservation New England Interstate Water Pollution Control Commission April 2007 DRAFT Contents Contents .......................................................................................................................................................ii Tables ..........................................................................................................................................................iv Figures.........................................................................................................................................................iv Acknowledgements .....................................................................................................................................v Executive Summary ...................................................................................................................................vi Abbreviations ...........................................................................................................................................xiii Definition of Terms..................................................................................................................................xvi
    [Show full text]
  • MMI 53 River Street Dam.Pdf
    TOWN OF ACTON JUNE 7, 2019 | ACTON, MA PROPOSAL Studies Related to the Dam Located at 53 River Street June 7, 2019 Mr. John Mangiaratti, Town Manager Town of Acton Town Manager’s Office 472 Main Street Acton, MA 01720 RE: River Street Dam Removal and Fort Pond Brook Restoration Acton, Massachusetts MMI #4458-02 Dear Mr. Mangiaratti: The Milone & MacBroom team of structural engineers, bridge scour experts, geotechnical engineers, and hydraulic engineers are uniquely qualified to design the dam removal, and evaluate the potential upstream and downstream infrastructure impacts associated with the removal of the Dam at River Street to improve ecological functions of the Fort Pond Brook. When reviewing our proposal, we ask that you consider the following: Our team brings expertise and a proven track record of success in dam removal projects throughout New England. Milone & MacBroom professionals have backgrounds in hydrology and hydraulics, engineering design, fisheries expertise, and wetland biology. Our staff also includes invasive species experts, fisheries biologists, and permitting specialists. We also integrate the creative innovation of our extensive in-house team of landscape architects and frequently include passive recreational park features at our dam removal sites. We have the ability to integrate dam removal with the natural site opportunities through careful analysis and planning so that your project is technically sound, environmentally sensitive, and aesthetically pleasing. Our team of experts has performed many dam removal projects throughout New England and the Northeast. Milone and MacBroom are pioneers in the field, having completed our first dam removals in the 1990s. With over 40 constructed dam removal projects, we have completed more than any other design firm in the Northeast.
    [Show full text]
  • LIS Impervious Surface Final Report
    PROJECT COMPLETION REPORT Mapping and Monitoring Changes in Impervious Surfaces in the Long Island Sound Watershed March 2006 James D. Hurd, Research Associate Daniel L. Civco, Principal Investigator Sandy Prisloe, Co-Investigator Chester Arnold, Co-Investigator Center for Land use Education And Research (CLEAR) Department of Natural Resources Management & Engineering College of Agriculture and Natural Resources The University of Connecticut Storrs, CT 06269-4087 Table of Contents Introduction . 4 Study Area and Data . 5 Land Cover Classification . 7 Sub-pixel Classification Overview . 8 Initial Sub-pixel Classification . 10 Post-classification Processing . 10 Validation . 13 Reseults and Discussion. 15 References . 18 Appendix A: Per Pixel Comparison of Planimetric and Estimated Percent Impervious Surfaces .. 21 Appendix B: Comparison of Planimetric and Estimated Percent Impervious Surfaces Summarized Over Grid Cells of Various Sizes. 34 Appendix C: Summary of Impervious Surfaces per Sub-regional Watershed . 46 Appendix D: Table of Deliverables . 56 i List of Figures Figure 1. Hydrologic impact of urbanization flowchart . 5 Figure 2. Study area . 6 Figure 3. Examples of land cover for 1985, 1990, 1995, and 2002 . 8 Figure 4. IMAGINE Sub-pixel Classifier process . 9 Figure 5. Examples of raw impervious surface estimates for 1985, 1990, 1995, and 2002 11 Figure 6. Examples of final impervious surface estimates for 1985, 1990, 1995, and 2002 14 Figure A-1. 1990 West Hartford validation data (area 1) and difference graph . 22 Figure A-2. 1990 West Hartford validation data (area 2) and difference graph . 23 Figure A-3. 1995 Marlborough validation data and difference graph . 24 Figure A-4. 1995 Waterford validation data (area 1) and difference graph .
    [Show full text]
  • New Hampshirestate Parks M New Hampshire State Parks M
    New Hampshire State Parks Map Parks State State Parks State Magic of NH Experience theExperience nhstateparks.org nhstateparks.org Experience theExperience Magic of NH State Parks State State Parks Map Parks State New Hampshire nhstateparks.org A Mountain Great North Woods Region 19. Franconia Notch State Park 35. Governor Wentworth 50. Hannah Duston Memorial of 9 Franconia Notch Parkway, Franconia Historic Site Historic Site 1. Androscoggin Wayside Possibilities 823-8800 Rich in history and natural wonders; 56 Wentworth Farm Rd, Wolfeboro 271-3556 298 US Route 4 West, Boscawen 271-3556 The timeless and dramatic beauty of the 1607 Berlin Rd, Errol 538-6707 home of Cannon Mountain Aerial Tramway, Explore a pre-Revolutionary Northern Memorial commemorating the escape of Presidential Range and the Northeast’s highest Relax and picnic along the Androscoggin River Flume Gorge, and Old Man of the Mountain plantation. Hannah Duston, captured in 1697 during peak is yours to enjoy! Drive your own car or take a within Thirteen Mile Woods. Profile Plaza. the French & Indian War. comfortable, two-hour guided tour on the 36. Madison Boulder Natural Area , which includes an hour Mt. Washington Auto Road 2. Beaver Brook Falls Wayside 20. Lake Tarleton State Park 473 Boulder Rd, Madison 227-8745 51. Northwood Meadows State Park to explore the summit buildings and environment. 432 Route 145, Colebrook 538-6707 949 Route 25C, Piermont 227-8745 One of the largest glacial erratics in the world; Best of all, your entertaining guide will share the A hidden scenic gem with a beautiful waterfall Undeveloped park with beautiful views a National Natural Landmark.
    [Show full text]
  • Winter 2011 Volume 23 Number 4
    HE ABITAT TA newsletter of the Connecticut H Association of Conservation and Inland Wetlands Commissions, Inc. winter 2011 volume 23 number 4 VERNON CONSERVATION COMMISSION IMPLEMENTS TOWN-WIDE INVASIVE AQUATIC PLANT MANAGEMENT PROGRAM by Thomas Ouellette, Vernon Conservation Commission he Town of Vernon, led by the Conservation the Town’s Water Pollution Treatment Facility, and Commission and the Department of Parks then flows more than four miles south to Manchester. Tand Recreation, has been engaged since 2008 Within Vernon, the Hockanum River, which transits in a program to proactively identify, monitor, and industrial, commercial, residential and natural control populations of non-native invasive aquatic environments, is designated by the Connecticut plants within two principal Department of Energy and watersheds, and to plan for their Environmental Protection (DEEP) removal. Concerns relate to as impaired for recreation and for the exclusion of native aquatic habitat for fish, other aquatic life vegetation by proliferating and wildlife. non-native species, and to the resulting oxygen depletion and The Tankerhoosen River is a elimination of fish and wildlife tributary of the Hockanum River, habitat in surface waters. with headwaters in Tolland. Impairment of recreational From Walker Reservoir East activities, i.e., swimming, near I-84 Exit 67 in Vernon, boating, and fishing, are the Tankerhoosen extends also of concern. The town’s approximately five miles to its coordinated effort, which confluence with the Hockanum includes both professional field River at the Manchester town investigations and volunteer line. It is fed by a number of surveys as described below, streams, including Railroad may be instructive to other Brook, which originates at Bolton communities striving to protect Notch Pond in Bolton and flows the health of their rivers Hockanum River and Tankerhoosen River Watersheds.
    [Show full text]
  • Upper Connecticut River Paddler's Trail Strategic Assessment
    VERMONT RIVER CONSERVANCY: Upper Connecticut River Paddler's Trail Strategic Assessment Prepared for The Vermont River Conservancy. 29 Main St. Suite 11 Montpelier, Vermont 05602 Prepared by Noah Pollock 55 Harrison Ave Burlington, Vermont 05401 (802) 540-0319 • [email protected] Updated May 12th, 2009 CONNECTICUT RIVER WATER TRAIL STRATEGIC ASSESSMENT TABLE OF CONTENTS Introduction ...........................................................................................................................................2 Results of the Stakeholder Review and Analysis .............................................................................5 Summary of Connecticut River Paddler's Trail Planning Documents .........................................9 Campsite and Access Point Inventory and Gap Analysis .............................................................14 Conclusions and Recommendations ................................................................................................29 Appendix A: Connecticut River Primitive Campsites and Access Meeting Notes ...................32 Appendix B: Upper Valley Land Trust Campsite Monitoring Checklist ....................................35 Appendix C: Comprehensive List of Campsites and Access Points .........................................36 Appendix D: Example Stewardship Signage .................................................................................39 LIST OF FIGURES Figure 1: Northern Forest Canoe Trail Railroad Trestle ................................................................2
    [Show full text]
  • Geographical Distribution and Potential for Adverse Biological Effects of Selected Trace Elements and Organic Compounds in Strea
    Geographical Distribution and Potential for Adverse Biological Effects of Selected Trace Elements and Organic Compounds in Streambed Sediment in the Connecticut, Housatonic, and Thames River Basins, 1992-94 By Robert F. Breault and Sandra L. Harris Abstract exceed sediment-quality guidelines over a wider geographical area, although usually by lower Streambed-sediment samples were collected ratios of contaminant concentration to sediment- in 1992-94 at selected sites in the Connecticut, quality guideline than the organic compounds. Housatonic, and Thames River Basins to determine the geographical distribution of trace elements and organic compounds and their INTRODUCTION potential for adverse biological effects on aquatic organisms. Chromium, copper, lead, mercury, The Connecticut, Housatonic, and Thames River Basins study unit is one of 59 National Water-Quality nickel, zinc, chlordane, DDT, PAHs, and PCBs Assessment (NAWQA) study units nationwide. The were detected in samples from throughout the study unit drainage basin comprises an area of almost basins, but concentrations of these constituents 16,000 mi2 and extends through parts of the Province of generally were lowest in the northern forested Quebec, Canada, eastern Vermont, western New Hamp- drainage basins and highest in the southern shire, west-central Massachusetts, nearly all of Connect- urbanized drainage basins of Springfield, icut, and small parts of New York and Rhode Island. Massachusetts, and Hartford, New Haven and The study unit is entirely within the New Bridgeport, Connecticut. Possible anthropogenic England Physiographic Province (Fenneman, 1938), a sources of these contaminants include industrial plateau-like upland that rises gradually from the sea but effluent; municipal wastewater; runoff from includes numerous mountain ranges and individual agricultural, urban and forested areas; and peaks.
    [Show full text]
  • CT DEEP 2018 FISHING REPORT NUMBER 1 Channel Catfish (Ictalurus Punctatus) 4/26/2018 Brown Trout (Salmo Trutta)
    CT DEEP 2018 FISHING REPORT NUMBER 1 Channel catfish (Ictalurus punctatus) 4/26/2018 Brown Trout (Salmo trutta) YOU CAN FIND US DIRECTLY ON FACEBOOK. This page features a variety of information on fishing, hunting, and wildlife watching in Connecticut. The address is www.facebook.com/CTFishandWildlife. INLAND REPORT OPENING DAY – We had a short blast of warm air temperatures that gave anglers a comfortable Opening Day, however, water temperatures were very cold, possibly contributing to difficult catching for many. Fisheries staff were out at eight of the twelve Trout Parks were stocked on Opening Day and the many kids Connecticut’s Trout & Salmon Stamp: Connecticut present enjoyed helping us stock. Catch percentage has implemented a Trout and Salmon Stamp. 100% was from 60 to 80% at a number of the Trout Parks of the revenue from your investment comes to the including Stratton Brook, Black Rock, Kent Falls, DEEP Bureau of Natural Resources for Fisheries Chatfield Hollow, Valley Falls Park, Southford Falls, and programs. Great Hollow. Many other locations, both river and The Trout and Salmon Stamp is $5 for anyone age 18 stream as well as lake and pond did not give up their or older, including those 65 or older, and $3 for CT recently stocked trout so easily. residents age 16-17. The Stamp is required for the harvest (keeping) of Over 300,000 trout were stocked before Opening Day trout or salmon. into nearly 100 lakes and ponds and over 120 rivers The Stamp is required to FISH in one of these places: and streams located throughout Connecticut.
    [Show full text]
  • A Hiking and Biking Guide
    Amherst College Trails Cadwell Memorial Forest Trail, Pelham Goat Rock Trail, Hampden Laughing Brook Wildlife Sanctuary Trails, Hampden Redstone Rail Trail, East Longmeadow Amherst College trails near the main campus traverse open fields, wetlands, This 12,000-acre forest offers a trail includes 24 individually numbered stations, each The 35-acre Goat Rock Conservation Area connects two town parks via a popular Laughing Brook Wildlife Sanctuary features woodlands, meadows, and streams along The Redstone Rail Trail connects two major destinations in town. The wide and flat flood plain, upland woods, and plantation pines. The Emily Dickinson railT is with information about a different aspect of the forest’s wildlife habitat. The main hiking trail called the Goat Rock Ridge Trail, which runs along the Wilbraham its four-mile trail system in its 356 acre property. Laughing Brook was once the home asphalt path connects town soccer fields and industrial district with the center of south of the Fort River. trail links to the M&M Trail. Mountain ridge for a little over a mile. There are two scenic vistas, Lookout Point at of beloved children’s author Thornton Burgess and the beautiful brook inspired many town. The trail passes by fields, wetlands, and wooded areas. PIONEER VALLEY Location: The trail network can be accessed from the Mass Central Rail Location: Take Enfield Road off Pelham Road; after 2 miles bear left on the east end of the trail and the historic Goat Rock at the west end. of his timeless tales. Location: From the rotary in the center of town travel ¼ mile west on Trail, and from South East St., College St., South Pleasant St., Packardville Road.
    [Show full text]
  • Factsheet: City of Middletown Water Quality and Stormwater Summary
    79 Elm Street • Hartford, CT 06106-5127 www.ct.gov/deep Affirmative Action/Equal Opportunity Employer Factsheet: City of Middletown Water Quality and Stormwater Summary This document was created for each town that has submitted monitoring data under the current Small Municipal Separate Storm Sewer System (MS4) General Permit. What follows is information on how stormwater can affect water quality in streams and rivers and a summary of data submitted by your town. This factsheet is intended to help you interpret your monitoring results and assist you in compliance with the MS4 program. Water Quality in Connecticut Surface waters are important resources that support numerous uses, including water supply, recreation, fishing, shellfishing and sustaining aquatic life. Water quality conditions needed to support these uses are identified within the Connecticut Water Quality Standards (WQS). In order to protect and restore these uses, we need acceptable environmental conditions (physical, chemical and biological) to be present within surface waters. To assess and track water quality conditions, CT DEEP conducts monitoring across the State. The data is synthesized into a biennial state water quality report called the Integrated Water Quality Report. Currently, specific water quality monitoring in the state encompasses about 50% of rivers, 47% of lakes, and 100% of estuary/coastline. In addition, CT DEEP may have information about certain land uses or discharges which could indicate a potential for water quality to be impacted, even if the waterbody has not been fully monitored and assessed. To find more detailed information on water quality in your town, please see the Integrated Water Quality Report (IWQR) on the CT DEEP website at www.ct.gov/deep/iwqr.
    [Show full text]
  • Rehabilitation of the Otis Reservoir Dam: Improving Cost Effectiveness by Including Bridge Placement
    CEP_28_Taylor_Layout 1 2/13/2014 4:02 PM Page 1 Project Considerations Rehabilitation of the Otis Reservoir Dam: Improving Cost Effectiveness by Including Bridge Placement was found to be in “Poor” condition due pri- Combining efforts to address marily to the deteriorating/leaking spillway dam safety issues with access and downstream masonry wall and the erodi- bility of the “emergency spillway” over the and transportation issues main embankment section of the dam. provided a win-win situation To address most of the main dam safety concerns, a reconstructed spillway with a for all of the involved hydraulically actuated crest gate was chosen parties. as the preferred alternative. The crest gate option provided additional hydraulic capacity while also improving the DCR’s ability to MATTHEW A. TAYLOR & JOHN G. DELANO manage the reservoir level, most importantly, he Massachusetts Department of Con - during the annual winter drawdown. ser vation and Recreation (DCR) owns During the planning stages of the project, Tand operates the Otis Reservoir Dam in maintaining access to the west side of the Otis, Massachusetts, for recreational purposes. reservoir during construction was identified In 2006, the 145-year-old, 31.5-foot-tall, earth- as a critical component in the viability of the en embankment dam with downstream project. At the time, the bridge over the spill- masonry wall and stone masonry spillway way was a one and one-half lane, temporary CIVIL ENGINEERING PRACTICE 2013 1 CEP_28_Taylor_Layout 1 2/13/2014 4:02 PM Page 2 “Bailey bridge” installed in 1995. It was sup- ered by about 3 feet to create an “emergency posed to have been replaced with a permanent spillway,” although no erosion protection, bridge in 1998.
    [Show full text]