Application (Form-1, Pre-Feasibility Report)
Total Page:16
File Type:pdf, Size:1020Kb
APPLICATION (FORM-1, PRE-FEASIBILITY REPORT) ENVIRONMENTAL CLEARANCE FOR STONE MINE (MINING LEASE AREA 1.62 Ha) AT Village- Dahigaon, Tehsil- Nandgaon Khandeshwar, District- Amravati, State-Maharashtra Project Proponent: M/s. Aditi stone crusher Prop. Prakash Harikisan Rathi R/O. Toshaniwal Layout Akola, Tehsil : Akola, District : Akola, Maharashtra Environment Consultant Recognized by moef (GOI) as per EPA and valid up to Jan’2019 Accredited by NABL for Chemical & Biological), valid up to 03.10.2014 Accredited under the QCI-NABET Scheme for EIA Consultant Certified by ISO 9001:2008, ISO 14001:2004, ISO 18001:2007 Head Office: 60, Bajiprabhu Nagar, Nagpur-440 033, MS Lab. : FP-34, 35, Food Park, MIDC, Butibori, Nagpur – 441122 Ph. : (0712) 2242077, 9373287475 Fax: (0712) 2242077 Email: [email protected], [email protected] Website: www.anaconlaboratories.com February 2016 Stone (Basalt) Mine, Village- Dahigaon, Tehsil- Nandgaon Khandeshwar, Dist –Amravati of FORM - I M/s. Aditi Stone Crusher, Prop. Prakash Harikisan Rathi (Area: 1.62 Ha) APPENDIX-I FORM-1 (I) Basic Information Sr. No. Item Details 1 Name of the project Stone (Basalt) Mine of M/s. Aditi Stone Crusher, Prop. Prakash Harikisan Rathi 2 Sl. No. in the schedule 1 (a) as per MoEF notification dt. 14.09.2006 as per OM dt. 18.05.2012 3 Proposed capacity/ area/ length/ Production– 1,98,100 TPA Stone, tonnage to be handled/ command area/ Mine Lease Area – 1.62 Ha lease area/ number of wells to be drilled 4 New/Expansion/Modernization New 5 Existing Capacity/ Area etc. Mine Lease Area – 1.62 Ha 6 Category of Project i.e. ‘A’ or ‘B’ B – 2 7 Does it attract the general condition? If No yes, please specify. 8 Does it attract the specific condition? If No yes, please specify. 9 Location The Stone (Basalt) Mine is located in part of Khasra No. 55/1, Village- Dahigaon, Tehsil- Nandgaon Khandeshwar, District- Amravati, Lease Area – 1.62 Ha. The Area falls in Survey of India, Topo-sheet No. 55H/10 The geographical location of the mine with respect to the boundary pillar of lease area are given below :- Sr. Latitude/Northing Longitude/Easting No. 1 20°47'25.52"N 77°38'31.76"E 2 20°47'19.72"N 77°38'32.64"E 3 20°47'21.22"N 77°38'28.47"E 4 20°47'24.89"N 77°38'28.00"E Plot/Survey/Khasra No. Khasra No. 55/1 Village Dahigaon Tehsil Nandgaon Khandeshwar District Amravati State Maharashtra 10 Nearest railway station/airport along with Nearest railway station: Takali~ 4.87 km, NE distance in kms. Nearest Airport: Amravati ~ 8.22 Km, ENE 11 Nearest Town, city, District Nearest village: Dahigaon: 1.50 km, WNW Headquarters along with distance in Nearest Town: Amravati ~ 15.00 Km, NE kms. Nearest City: Amravati ~ 15.00 Km, NE District HQ: Amravati ~ 15.00 Km, NE Anacon Laboratories Pvt. Ltd., Nagpur, Maharashtra Page 1 Stone (Basalt) Mine, Village- Dahigaon, Tehsil- Nandgaon Khandeshwar, Dist –Amravati of FORM - I M/s. Aditi Stone Crusher, Prop. Prakash Harikisan Rathi (Area: 1.62 Ha) Sr. No. Item Details 12 Village Panchayats, ZillaParishad, Village Panchayat: Gram Panchayat – Village: Municipal Corporation, Local body Dahigaon, located in part of Khasra No. 55/1, (complete postal addresses with Village- Dahigaon, Tehsil- Nandgaon Khandeshwar, telephone nos. to be given) District- Amravati, Maharashtra ZilaParishad : C. E. O., Zila Parishad, The office of Collector, Amravati, Dist.- Amravati, Maharashtra Municipal Corporation : Commissionner, Municipal Corporation, Amravati, Maharashtra 13 Name of the applicant M/s. Aditi Stone Crusher, Prop. Prakash Harikisan Rathi 14 Registered Address M/s. Aditi Stone Crusher, Prop. Prakash Harikisan Rathi R/O. Toshaniwal Layout Akola, Tehsil : Akola, District : Akola, Maharashtra 15 Address for correspondence Name M/s. Aditi Stone Crusher, Prop. Prakash Harikisan Rathi Designation Owner/Partner/CEO) Owner Address M/s. Aditi Stone Crusher, Prop. Prakash Harikisan Rathi R/O. Toshaniwal Layout Akola, Tehsil : Akola, District : Akola, Maharashtra Pin Code 444001 E-mail Telephone No. 9158107718 Fax No. 16 Details of Alternative Sites examined, if Not applicable. Mining is site specific project. Mine any. Location of these sites should be lease area is falling in Toposheet No. 55 H/10. shown on a toposheet. 17 Inter-linked Projects No 18 Whether separate application of Not Applicable interlinked project has been submitted 19 It yes, date of submission Not Applicable 20 If no, reason Not Applicable 21 Whether the proposal involves Not Applicable. approval/clearance under: (a) The Forest (Conservation) Act, 1980 No forest land involved. (b) The Wildlife (Protection) Act, 1972 No wildlife sanctuary/National park in 5 km radius. (c) The C.R.Z Notification, 1991 Area does not fall in CRZ. 22 Whether there is any Government No Order/Policy relevant/relating to the site 23 Forest land involved (hectares) None Anacon Laboratories Pvt. Ltd., Nagpur, Maharashtra Page 2 Stone (Basalt) Mine, Village- Dahigaon, Tehsil- Nandgaon Khandeshwar, Dist –Amravati of FORM - I M/s. Aditi Stone Crusher, Prop. Prakash Harikisan Rathi (Area: 1.62 Ha) Sr. No. Item Details 24 Whether there is any litigation pending No litigation is pending in any court of law. against the project and/ or land in which the project is propose to be set up (a) Name of the Court (b) Case No. (c) Orders/ directions of the Court, if any and its relevance with the proposed project. [II] Activity Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Sr. Information/Checklist Yes/ Details thereof (with approximate quantities/ rates, No. Confirmation No wherever possible) with source of information data Permanent or temporary Mining activity will cause permanent change in the change in landuse, land topography and land use of mining area. After cover or topography including completion of mining, the lower part of mined out pit will 1.1 Yes increase in intensity of land be converted into water reservoir and thick plantation will use (with respect to local be developed on the upper benches of mined out area landuse plan) and on the safety zone area. This is proposed new mine hence there is existing vegetation in the form of bushes and shrubs which will Clearance of existing land, 1.2 Yes be cleared before starting the mining activity. vegetation and building? The land is devoid of any other structures, there will not be clearance of any building/structures. After completion of mining, the lower part of mined out pit will be converted into water reservoir and thick 1.3 Creation of new land uses Yes plantation will be developed on the upper benches of mined out area and on the safety zone area. Mineral reserves have been proved during existing Pre-construction mining in the nearby area. Further exploration will be 1.4 investigations e.g. bore Yes carried out during the 5 year period to assess the further houses, soil testing ? reserves Proposed infrastructure will consist of Mine Office, First 1.5 Construction works? Yes Aid Centre, Drinking Facility, Rest Shelter and Approach Road. The mining lease area is devoid any structure as this is a proposed new mine, hence no demolition work is involved during implementation and operation phase of 1.6 Demolition Works ? No the project. Demolition of any structure shall be done at the end of mine life as per the Mine Closure plan. Temporary sites used for construction works or Temporary sheds will be provided with basic facilities of 1.7 Yes housing of construction drinking water, sanitation, etc. for construction workers. workers? Anacon Laboratories Pvt. Ltd., Nagpur, Maharashtra Page 3 Stone (Basalt) Mine, Village- Dahigaon, Tehsil- Nandgaon Khandeshwar, Dist –Amravati of FORM - I M/s. Aditi Stone Crusher, Prop. Prakash Harikisan Rathi (Area: 1.62 Ha) Sr. Information/Checklist Yes/ Details thereof (with approximate quantities/ rates, No. Confirmation No wherever possible) with source of information data Above ground buildings, Proposed infrastructure will consist of Mine office, first structures or earthworks aid centre, drinking water facility, rest shelter and 1.8 Yes including linear structures, approach road will be created during the plan period cut and fill or excavations (2016-17 to 2020-21). There will be no underground mining activity. Underground works including 1.9 No Open cast Manual method of mining will be used for mining or tunneling? mining operation. After completion of mining, the lower part will be 1.10 Reclamation works? Yes converted into water body, with plantation on the upper benches and along the safety zone. 1.11 Dredging? No Not applicable. 1.12 Offshore structures? No Not Applicable It is proposed to produce maximum of 1,98,100 TPA stone during the five year period (2016-17 to 2020-21) Production and 1.13 Yes as per mine plan. The mining will be done by open cast manufacturing Process? Manual method with the help of excavators and tippers and associated equipment’s. The excavated stone will be directly transported to the nearby crusher for sizing and sale. But there will be a Facilities for storage of goods temporary storage yard within lease area for storage of 1.14 Yes or materials? excavated stone for short duration before it is transported. Explosive will be stored in portable explosive magazine. There is 0.5 – 1.0 m thin Soil cover is present in the area. Soil cover will be completely removed during the Plan period of mining and will be spread in the safety zone for plantation purpose. About 39,515 Cum OB/waste will be generated from mining will be dumped and stacked separately within lease area at specific location.