Table of Contents Power Suite Overview ______9

Total Page:16

File Type:pdf, Size:1020Kb

Table of Contents Power Suite Overview ______9 Power Suite Help Table of Contents Power Suite Overview _________________________________________________________ 9 Application Functionality ______________________________________________________ 10 Explorers ________________________________________________________________________ 10 My Profile - Setting Default Preferences _______________________________________________ 11 Pop-up Menu _____________________________________________________________________ 12 GenSize __________________________________________________________________________ 13 GenSize Overview ________________________________________________________________________ 13 Working with Projects _____________________________________________________________________ 13 GenSize Dashboard _____________________________________________________________________ 13 Import GenSize Project __________________________________________________________________ 14 Create New Project _____________________________________________________________________ 15 Open Project __________________________________________________________________________ 16 Project Parameters _____________________________________________________________________ 18 Project Country ________________________________________________________________________ 18 Transient Dip Limits ____________________________________________________________________ 18 Delete Project _________________________________________________________________________ 19 Copy Project __________________________________________________________________________ 21 Save Project __________________________________________________________________________ 22 Close Project __________________________________________________________________________ 24 Sharing Projects _______________________________________________________________________ 24 Follow these steps to share a project ____________________________________________________ 25 GenSize Link to Library __________________________________________________________________ 27 Size Project ___________________________________________________________________________ 28 Edit Project ___________________________________________________________________________ 33 Default Preferences __________________________________________________________________ 33 Edit Project _________________________________________________________________________ 34 Fuel _______________________________________________________________________________ 38 Emissions __________________________________________________________________________ 38 Frequency __________________________________________________________________________ 38 Generator Set Phase _________________________________________________________________ 38 Generator Sets Running in Parallel ______________________________________________________ 39 Transient Dip Limits __________________________________________________________________ 39 Transient Dip Limits _______________________________________________________________ 39 Maximum Allowable Step Voltage Dip ________________________________________________ 40 Maximum Allowable Step Frequency Dip ______________________________________________ 40 Maximum Allowable Peak Voltage Dip ________________________________________________ 40 Maximum Allowable Peak Frequency Dip ______________________________________________ 41 Peak Voltage Dip Limits Calculation ___________________________________________________ 41 Peak Frequency Dip Limits Calculation ________________________________________________ 41 Minimum Generator set Load Allowed, Percent of Rated Load _______________________________ 41 Maximum Generator set Load Allowed, Percent of Rated Load _______________________________ 41 Table of Contents Page 1 Power Suite Help Site Conditions ______________________________________________________________________ 42 Ambient Temperature ________________________________________________________________ 42 Altitude ___________________________________________________________________________ 42 Maximum Allowable Alternator Temp Rise _______________________________________________ 42 Temperature Rise at Full Rated Load ____________________________________________________ 42 Voltage ____________________________________________________________________________ 43 Generator Set Duty Ratings ___________________________________________________________ 43 Duty ____________________________________________________________________________ 43 Generator Connected Load __________________________________________________________ 43 Generator Nominal Power Rating Definitions ___________________________________________ 43 Generator Rated Load ______________________________________________________________ 44 Standby Rating ___________________________________________________________________ 44 Prime Rating _____________________________________________________________________ 45 Continuous Rating _________________________________________________________________ 45 Working with Loads ____________________________________________________________________ 45 Loads Overview _____________________________________________________________________ 45 Create New Load ____________________________________________________________________ 49 Edit Load ___________________________________________________________________________ 50 Delete Load ________________________________________________________________________ 51 Load Definitions _____________________________________________________________________ 52 Generator Connected Load __________________________________________________________ 52 Generator Rated Load ______________________________________________________________ 52 Harmonic Content (THDI%) __________________________________________________________ 53 Leading Power Factor Load __________________________________________________________ 53 Regenerative Loads ________________________________________________________________ 53 Non-linear Loads __________________________________________________________________ 54 Total Harmonic Voltage Distortion (THDV%, RMS) _______________________________________ 54 Project Voltage Distortion Limit ______________________________________________________ 55 Rectifier Types ____________________________________________________________________ 55 Surge Loads ______________________________________________________________________ 56 Voltage Unbalance ________________________________________________________________ 56 Load Starting and Running Requirements ________________________________________________ 56 Running Amps (RAmps) ____________________________________________________________ 56 Running kVA (RkVA) _______________________________________________________________ 56 Running kW (RkW) ________________________________________________________________ 56 Running Power Factor (RPF) _________________________________________________________ 56 SkVA ____________________________________________________________________________ 57 SkW ____________________________________________________________________________ 57 Starting Power Factor ______________________________________________________________ 57 Non-linear kVA ___________________________________________________________________ 57 Peak kW (PkW) ___________________________________________________________________ 57 Peak kVA (PkVA) __________________________________________________________________ 57 Types of Loads ______________________________________________________________________ 58 Lighting Load _____________________________________________________________________ 58 Entering Lighting Loads___________________________________________________________ 58 Air Conditioning Load ______________________________________________________________ 61 Table of Contents Page 2 Power Suite Help Entering Air Conditioning Loads ____________________________________________________ 61 Air Conditioning Load Efficiency ___________________________________________________ 70 Air Conditioning Load Calculations _________________________________________________ 71 Battery Charger Load ______________________________________________________________ 72 Entering Battery Charger Load _____________________________________________________ 72 Medical Imaging Load ______________________________________________________________ 75 Entering Medical Imaging Load ____________________________________________________ 75 Medical Imaging Voltage Dip Calculations ___________________________________________ 78 Peak Amperes __________________________________________________________________ 78 Peak kW (PkW) _________________________________________________________________ 78 Peak kVA (PkVA) ________________________________________________________________ 78 Motor Load ______________________________________________________________________ 79 Entering Motor Load _____________________________________________________________ 79 Motor Load Calculations _________________________________________________________ 88 Three-Phase Starting Methods ____________________________________________________ 89 High Efficiency NEMA Design B ____________________________________________________ 90 Large Motor Loads (over 50 HP)____________________________________________________ 90 Cyclic Motor Load _______________________________________________________________ 91 Locked Rotor Kilovolt-Amperes Factor (LR-kVA / HP factor) _____________________________ 91 Low/High Inertia Motor Load ______________________________________________________ 91 Motor Starting Voltage Dip _______________________________________________________
Recommended publications
  • Army Tm 9-6115-464-12 Air Force To-35C2-3-445-1 Navy Navfac P-8-624-12
    ARMY TM 9-6115-464-12 AIR FORCE TO-35C2-3-445-1 NAVY NAVFAC P-8-624-12 TECHNICAL MANUAL Operator And Unit Maintenance Manual GENERATOR SET, DIESEL ENGINE DRIVEN, TACTICAL SKID MTD, 15 KW, 3 PHASE, 4 WIRE, 120/208 AND 240/416 VOLTS NSN DOD MODEL CLASS HERTZ MEP-004A UTILITY 50/60 6115-00-118-1241 MEP-103A PRECISE 50/60 6115-00-118-1245 MEP-113A PRECISE 400 6115-00-118-1244 INCLUDING OPTIONAL KITS DOD MODEL NOMENCLATURE NSN MEP-005-AWF WINTERIZATION KIT, FUEL BURNING 6115-00463-9083 MEP-005-AWE WINTERIZATION KIT, ELECTRIC 6115-00-463-9085 MEP-004-ALM LOAD BANK KIT 6115-00-291-9201 MEP-005-AWM WHEEL MOUNTING KIT 6115-00-463-9094 APPLICATIONS KIT 6115-01-096-9015 MEP-015-ASK ACOUSTIC SUPPRESSION KIT 6115-01-233-8274 DISTRIBUTION STATEMENT A: Approved for public release; distribution Is unlimited This manual supersedes TM 5-6115-464-12, 31 January 1975, including all changes. HEADQUARTERS, DEPARTMENTS OF THE ARMY, AIR FORCE AND NAVY 30 July 1993 ARMY TM 9-6115-464-12 AIR FORCE TO 35C2-3-445-1 NAVY NAVFACP-8-624-12 CHANGE HEADQUARTERS, DEPARTMENTS OF THE ARMY, THE AIR FORCE, AND THE NAVY NO. 2 WASHINGTON D.C., 31 MARCH 1997 OPERATOR AND UNIT MAINTENANCE MANUAL GENERATOR SET, DIESEL ENGINE DRIVEN, TACTICAL SKID MTD, 15 KW, 3 PHASE, 4 WIRE, 120/208 AND 240/416 VOLTS DOD MODELS CLASS HERTZ NSN MEP-OO4A UTILITY 50/60 6115-00-118-1241 MEP-103A PRECISE 50/60 6115-00-118-1245 MEP-113A PRECISE 400 6115-00-118-1244 INCLUDING OPTIONAL KITS DOD MODELS NOMENCLATURE NSN MEP-005AWF WINTERIZATION KIT, FUEL BURNING 6115-00-463-9083 MEP-005AWE WINTERIZATION KIT, ELECTRIC 6115-00-463-9065 MEP-004ALM LOAD BANK KIT 6115-00-291-9201 MEP-005AWM WHEEL MOUNTING KIT 6115-00-463-9094 APPLICATIONS KIT 6115-01-096-9015 MEP-015ASK ACOUSTIC SUPPRESSION KIT 6115-01-233-8274 DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited TM 9-6115-464-12/T.O.
    [Show full text]
  • Load Bank Testing White Paper
    Load bank testing white paper Helping to keep the light on Why load banks are a necessity in industry Handling electrical failure What to do when an electrical system fails Why add a fixed load bank? Avoid costly retrofits by adding a fixed load bank Helping to keep the lights on Building and plant managers need to be sure that people will be safe if the electrical supply to their buildings is cut off in an emergency. Almost all the equipment and systems that we depend on when things go wrong need an electrical supply in order to work, including emergency lights, lifts, pumps, computer systems and fire alarms. For this reason, most public buildings, banks, hotels and process industries will have at least one alternative power source that can be called on when primary power from the Grid is cut off for any reason. These alternatives will invariably be one or more diesel generators, sometimes supported by battery-backed uninterruptible power supplies (UPS) to ensure continuity of supply to computer systems and emergency lighting. The challenge for the managers of these systems is how to ensure that they will not fail on the relatively infrequent occasions when they are called on to work. As in any system that spends most of its time unused, relays stick, filters clog up, batteries go flat, pipes burst, fuses and timers fail. Regular ‘real’ testing of Most public buildings have at least one alternative power source that can be called on when primary power is cut off. emergency A UPS battery set is only as strong as systems is a must Load bank models can range from its weakest battery cell.
    [Show full text]
  • ASCO White Paper | Load Bank Testing to Ensure Generator Set
    White Paper Load Bank Testing to Ensure Generator Set Performance Photo courtesy of ASCO Power Technologies Diesel Engine Generator sets (gensets), are one of the main components in Emergency Backup Power Systems. Their failure to perform in an Emergency situation could result in catastrophic conditions. The main goal of load bank testing is to uncover potential genset problems in a controlled situation, rather than during an actual power failure. Load bank testing therefore is a critical part of a genset maintenance program. In the case of a standby diesel genset, a load bank test will indicate: • The engine’s ability to provide the required power • General performance of the whole system, oil and output (kW) fuel pressure • Voltage regulator response time • A load bank test will also help remove fuel deposits • The alternator’s capability to provide required from pistons, engine castings and exhaust voltage, and frequency stability • With data logging software load test results can be • The genset control system under varying recorded and the technician can analyze work conditions of load that needs to be done The Case for Load Bank Testing As detailed below, load bank testing is the best practical 1 Voltage Regulator means to ensure efficient 2 Governor Operation operation of a genset. Be it 3 3 Cooling System just purely resistive or resis- 2 5 tive and inductive any load 4 Fuel System test is far superior then no 5 Control Operation 1 load testing or using un- controllable building loads. Load banks can help test and improve the health of 4 generator and its compo- nents in the following ways: A typical diesel generator arrangement.
    [Show full text]
  • UPS/Generator Maintenance with Load Banks
    UPS/Generator maintenance with load banks #DigitalEvolution #InnovationDay #EcoStruxure Presenter Spilios Rigopoulos National ASCO Business Development Manager, Australia & New Zealand ASCO Power Technologies SCHNEIDER ELECTRIC Spilios Rigopoulos Schneider Electric | Page 2 What is a Load Bank? A Load Bank provides a consistent and repeatable electrical load, that can be accurately controlled, measured and recorded. Intelligent Hand-Held Terminal SIGMA LT & SIGMA 2 Module Sigma Software Control Supply-on-Test ModBus SIGMA. The ASCO load bank control and instrumentation platform. Network multiple load banks. Numerous interfaces and options to meet market & application. Confidential Property of Schneider Electric What is a Load Bank? All industrial load banks utilize a fan and use the corresponding airflow to cool the resistive elements. The air flow can be Vertical or Horizontal discharge Must have rugged and reliable resistive elements. ASCO load bank elements can be either the helically wound “Avtron HelidyneTM or Froment style non finned sheathed elements It must accurate controls to place appropriate load on to the power system. “Accurate load bank step” Confidential Property of Schneider Electric Why Does The World Need Load Banks? “The best way to replicate, prove and verify the real life demands on critical power systems.” • Gen-Set Testing & Compliance: • Commissioning • Verify performance • Prevention of wet stacking • Engine maintenance • Meeting emission standards including Tier 4 • Testing to ISO8528 • AVR (Automatic Voltage Regulator) and governor setup • UPS / DC – Capacity testing An ASCO load bank testing two diesel gen-sets • HVAC Commissioning – data centres / server heat profiling • Power Factor Correction Testing - 0.8 lagging or leading • To Test Infrastructure – Breakers, power distribution Confidential Property of Schneider Electric Load Testing affects all major Genset Components Running the generator at 100% load, ensures all components of the generator are tested.
    [Show full text]
  • ASCO White Paper | Application of Resistive/Reactive Load Banks For
    White Paper Application of Resistive/Reactive Load Banks for kVA Testing Application of Resistive/Reactive Load Banks for kVA Testing Resistive load banks are the most commonly used load banks for the testing of generator sets and power systems. They provide full kW loading to the power source and help evaluate the generator sets engine cooling, exhaust, and fuel systems. However, due to its design a resistive load bank will not load to full nameplate kVA capacity. To achieve full kVA load testing a reactive load bank will be required. Resistive Load Banks The kW of a resistive load bank is “real” power in electrical terms. When a resistive load bank is used to test an engine generator set the engine will produce its full horsepower rating, dissipate engine exhaust gases, and produce thermal energy into the engine cooling system. The resistive load bank in fact, will completely test the engine and its various systems. It is important to understand that the generator or power system will not be loaded to its full kVA rating. Resistive load banks utilize resistors, which only provide kW loading at 1.0 (unity) power factor. Reactive Load Banks Reactive load banks are designed to simulate either an inductive, or a capacitive load depending on the type of load expected on the I (Leading Current: power system. ent (I) Capacitive + Resistive) Curr Reactive/Inductive Load Measured in kVAR (Kilo Volt Amperes Reactive), a reactive/ inductive load converts current into a magnetic field. Inductive Voltage (V) reactance resists the change to current, causing the circuit current to lag voltage.
    [Show full text]
  • Why Is a Permanent Load Bank a Good Idea?
    Technical Brief - Why is a permanently-installed generator load bank a good idea? The main reason is that, when applied to a diesel or gas-fueled engine-generator set, it can often extend the engine’s lifetime and reduce its maintenance costs. A load bank can also serve as a great on-site tool allowing regular and disruption-free exercising and testing of a standby or emergency power system. Many facilities today are designed with emergency power sources capable of handling future loads. As an example, a manufacturing facility may be designed today with an immediate load profile of 400kW, but with consideration to future expansion plans that could double it in size. The design engineer may choose to specify a 1000kW standby generator to allow for the planned expansion and addition of future loads. This could be the most cost- effective design if a future upgrade of the electrical system calculates to be more expensive or difficult to accomplish while the facility is occupied. However, the initial light load on the emergency generator can be detrimental to the engine, as it may cause abnormal wear, inefficient combustion and higher emissions in some cases. The installation of a load bank can remove these negative consequences by automatically applying an artificial load to the generator. For the most efficient design, the load bank control panel can be set to sense the building loads and automatically regulate the load applied to the generator by the load bank. This “active control” can be programmed so that the generator is always loaded to its optimal level, perhaps 80% of the generator's rated output.
    [Show full text]
  • Load Bank Buyers Guide When Rating Load Bank Capacities for Special Applications, Refer to the Wiring 60 Hz Models Diagrams Shown on Right
    Load Bank Specifications LOAD BANK CONNECTIONS Most Avtron load banks are three-wire delta designs. Four wire wye power systems can be easily connected to the standard Avtron load bank by connect ing phases A, B, and C to their respective input terminals. The standard Avtron load bank is a balanced 3-phase load, so the gen- erator’s neutral wire is not required. Load Bank Buyers Guide When rating load bank capacities for special applications, refer to the wiring 60 hz models diagrams shown on right. POWER INFORMATION The KW rating of the engine-generator set is dependent on the horsepower rating of the prime mover and the electrical rating of the generator. The KVA rating of the generator is dependent on the current rating of the generator. ORDERING When ordering or requesting pricing on Avtron load banks, the following inform ation is helpful: 1. Resistive, Reactive, or DC 2. Applied Voltage(s) and Frequency 3. Portable or Permanent Mounting 4. Capacity VOLTAGE DERATING 5. Load Step Resolution Load banks are designed to provide 6. Internal and/or External Control a specific capacity at a rated voltage. Power They cannot be operated at a volt- 7. Blower Voltage Requirements age higher than their rating without 8. Indoor or Outdoor Service risking damage to the load bank. 9. Core Dimensions and Air Flow However, the load bank can be (K711 Duct Mount only) operated at lower voltages. For a prompt quotation, please pro- Load bank derating is calculated as vide a complete specification via Fax: follows: (216) 573-5953, Phone: (216) 573-7600, or e-mail: [email protected].
    [Show full text]
  • Impact of Leading Power Factor on Data Center Generator Systems
    Impact of Leading Power Factor on Data Center Generator Systems White Paper 200 Revision 0 by Neil Rasmussen Executive summary IT devices may exhibit electrical input current with a characteristic called “leading power factor”. This situation may cause back-up generators to become unstable and shut down. Furthermore, a data center that is operating correctly for a long time may sudden- ly develop a problem as the IT load changes over time, or during an unusual event. This means that it is important to understand the margin of safety and correct for this condition before it happens. This paper explains the problem, why and how it occurs, and how to detect and correct it. by Schneider Electric White Papers are now part of the Schneider Electric white paper library produced by Schneider Electric’s Data Center Science Center [email protected] Impact of Leading Power Factor on Data Center Generator Systems Introduction Diesel or gas back-up generators are commonly used to allow data centers to operate for extended periods during a mains power loss or for certain maintenance activities. While these are rugged machines that generally tolerate load steps, overloads, and other conditions well, in the data center application there are recorded cases where the generator trips off line under load conditions that appear to be well within the generator ratings. The situation where this occurs is under conditions where the IT load becomes directly supplied by the generator, bypassing the UPS. This occurs when the UPS is in a bypass mode, or if the system is of a tier 3 or other design where one of the power paths to the IT load does not have UPS protection.
    [Show full text]
  • LD Series Radiator Duct Mounted Resistive Load Banks
    Instruction Manual LD Series Radiator Duct Mounted Resistive Load Banks IMPORTANT: These instructions should be read thoroughly before installation. All warnings and precautions should be observed for personal safety, proper equipment performance and longevity. Failure to follow these instructions could result in equipment failure, serious injury to personnel, and/or property damage. Load Banks contain lethal voltages when connected to the power source. It is very important to remove all sources of power to the load circuits, resistors, blower motor circuits, and control circuits before installing, operating, or servicing this unit. Always allow adequate time after removing power before touching any system components. PROPRIETARY: This document is the property of Load Banks Direct LLC, and shall remain so while in user’s possession. The information is provided for the instruction, operation, maintenance and service of this equipment and not to be used for manufacturing or procurement of equipment from any source other than Load Banks Direct LLC. The technology shown here is strictly proprietary and is not to be disclosed to any 3rd party without prior consent and the express written permission of Load Banks Direct LLC. Proprietary and Confidential Page 1 of 42 © 2013. All Rights Reserved. Do Not Distribute www.LoadBanksDirect.com Table of Contents Safety Points .................................................................................................................. 3 Safety Precautions ......................................................................................................
    [Show full text]
  • White Paper Load Bank Utilization in Data Centers
    White Paper Load Bank Utilization in Data Centers Reliability Engineering Decreasing Constant Increasing Failure Rate Failure Rate Failure Rate Load Bank Utilization in Data Centers Random Failures The data Failures Early center industry is growing exponentially with construction of new facilities increasing every year. Out Failures Wear Power consumption is set to continue growing at an accelerated rate (see figure 1). Power reliability in data centers is crucial. A data center with 99% uptime per year will still have the equivalent of 88 hours of downtime. When you consider some larger data centers can lose thousands of dollars because of an outage, reliable power is vital. Load banks provide a means of testing and validating major electrical components in a modern data center to ensure efficient operation Observedand reduce Failure downtime. Rate Constant Failure Rate USA Data Center Power Consumption 160 140 140 120 100 91 80 60 56 40 Figure 1: USA data center Power Consumption (Billion kWh) Power power consumption. 20 28 (source: www.quotecolo. com/how-to-choose- 0 the-best-green-cloud- 2000 2005 2013 2020 hosting-provider/) When are Load Banks used in Data Centers? There are typically four main applications where load banks will be utilized in data centers. • Commissioning • Expansion • Maintenance/ Periodic Testing • Component Replacements Each application has varied requirements of power, size, type, and technical specification. Ensuring the correct load bank is used is vital in ensuring optimum testing. 2 Photo courtesy of ASCO Power Technologies Commissioning Commissioning is the process of assuring all systems and components of an industrial facility are tested, installed, and operated to the requirements of the end user.
    [Show full text]
  • IMM LOAD BANK ADDITION Houston, Texas
    THE UNIVERSITY of TEXAS HEALTH SCIENCE CENTER AT HOUSTON IMM LOAD BANK ADDITION Houston, Texas ISSUED FOR CONSTRUCTION FEBRUARY 15, 2016 PROJECT SITE Shah Smith & associates, inc. houston/austin/dallas/college station DRAWING LIST Tx. Registation no. F-2113 CS COVER SHEET G-100 GENERAL INFORMATION E N G I N E E R A-112 ROOF PLANS A-540 DOOR AND WINDOW DETAILS E-001 ELECTRICAL LEGEND SYMBOLS AND ABBREVIATIONS E-010 ELECTRICAL ONE-LINE DIAGRAM - IMM LOAD BANK ADDITION E-107 ELECTRICAL 7TH FLOOR PLAN - IMM LOAD BANK ADDITION ) , 9v 9v 2122 3ilcrest, S.ite 5320 Ho.ston, Te as 77082 Ph. 713.710.7263 Fa .713.710.9209 19I1 Te as Registered Engineering Firm F-2113 19I1 % % ) ! ) ") $"$ $"$ 33 33 ! -$7 ! * * ! w) 9 1-$, 1$3 C /,* 9,*- 13) C A 9,, 9,,: 13 t$ 9- I t$ 9$ 93 /*$ /3 * *3 "# , ) ,) ,3 $3 * ,$, $=3 $# - $ $ $ 3# " $* ,$, $ 4 C # t6 b7 8 9 ! ! 3 9* ! ! 3 b0 9 t: 1 % 7 ! )* 33 3 -$,7 I3 3 ;< ! % # $,, 3 -$, 33 & ' / ! ! D D A) 7$,37,) 37 7 /- I* * /: " A * / ;A /< 7 . 9- /: bCt! : 9: II h,,*$,-: /3$ II ! w t 7 a* 33 )- ,)) ) 37 b !7 1 5$) I3 ;15I<: I3 C,- .,* /, 5 I$ ., 9 ;9, !** !: < ! 5 4 5 ) ,,* 3 $D,7 7 1 5$) ., w* ;15.w< 1 !,,"- RED ARC ! 9 3 !,3,* !,: H E ! ! ! T n E. I , y H 7 F /)) 3 !,, I3, h6 ;F/!Ih< S r o T $ $ I h r E ,*, t a C = = 7 bCt! : 9 A, 4 . I 9-) G a n C E T % = = = 9/*$) ;w, "- 15I< !,," !" 1 * 9- D" " C I / !,," 9 !,," 9 .- 1=* R " ,, ,* $ $# ) 3 * * $ %7 C t, ." H /3),: bCt! : 9 7 /- I*0 S # * ) $ 3: T 1 S ! , A 9 2 6 6 A 9 h,: 5$) t E 5$) T X *=* E TE ) t# h,: 5$) t E 5$) OF 7 bCt! C 9 *3 ;w, "- A /< == 7 bCt! ! A 9$# 9-) ;w, "- A./< 7 bCt! : *# h - 9-) /*) 9 a I ! 7 7 bCt! % b 9,, / ;w, "- A./< !7 bCt! % b C !) / ;w, "- A./< 7 bCt! C 5 C 4 ;w, "- A./< 7 bCt! 9 9),- 9"- t 9-) ' 5 ! 5,$9-)" 5 7 bCt! 9 1-$ * /*, ;w, "- bCt! < %7 !9a9 !%7 9- / 9 9, !,*, / t 3 9 $ ,3)# A, C7C7 9.
    [Show full text]
  • LP Series Portable Resistive Load Banks Models LP400, LP500
    Instruction Manual LP Series Portable Resistive Load Banks Models LP400, LP500,LP600 LP700, LP850 and LP1000 IMPORTANT: These instructions should be read thoroughly before installation. All warnings and precautions should be observed for personal safety, proper equipment performance and longevity. Failure to follow these instructions could result in equipment failure, serious injury to personnel, and/or property damage. Load Banks contain lethal voltages when connected to the power source. It is very important to remove all sources of power to the load circuits, resistors, blower motor circuits, and control circuits before installing, operating, or servicing this unit. Always allow adequate time after removing power before touching any system components. PROPRIETARY: This document is the property of Load Banks Direct LLC, and shall remain so while in user’s possession. The information is provided for the instruction, operation, maintenance and service of this equipment and not to be used for manufacturing or procurement of equipment from any source other than Load Banks Direct LLC. The technology shown here is strictly proprietary and is not to be disclosed to any 3rd party without prior consent and the express written permission of Load Banks Direct LLC. Proprietary and Confidential Page 1 of 41 © 2013. All Rights Reserved. Do Not Distribute www.LoadBanksDirect.com Table of Contents Safety Points ....................................................................................................... 3 Safety Precautions ...........................................................................................
    [Show full text]