TRAFFIC ANNOUNCEMENT UPDATES ON TRAFFIC MANAGEMENT PLAN FOR MRT CONSTRUCTION ALONG JALAN KUALA AND PERSIARAN SURIAN 15 MAY 2015

1. CONTINUATION OF LONG-TERM NIGHT LANE CLOSURES ALONG JALAN KUALA SELANGOR (SUBANG-BOUND & KEPONG-BOUND) Date 18 May 2015 – 31 July 2015 Time 10:00pm – 6:00am Duration 79 days Reason To enable the construction of MRT special span crossing Jalan and Jalan Kuala Selangor

There will be 2 long-term road closures implemented from 18 May 2015 - 31 July 2015, intermittently. The two closures are as below: i) Closure at the slip road from Jalan Hospital until the traffic light to Jalan Sungai Buloh (Subang-bound) / Jalan Kuala Selangor (Kepong-bound) ii) Closure along Jalan Kuala Selangor (Kepong-bound) i) Closure at slip road from Jalan Hospital until the traffic light to Jalan Sungai Buloh (Subang-bound) / Jalan Kuala Selangor (Kepong-bound), from 12.30am – 6.00am The following diversions will take place:  Motorists from Jalan Hospital heading towards Kepong Diverted to take the flyover ahead at Jalan Hospital into Jalan Kuala Selangor, and then diverted to make a U-turn at The Store, Bandar Baru Sungai Buloh before going back into Jalan Kuala Selangor to head towards Kepong (as indicated in GREEN in map)  Motorists from Jalan Hospital heading towards Subang Diverted to take the flyover ahead at Jalan Hospital into Jalan Kuala Selangor, and then diverted to make a U-turn at The Store into Jalan Kuala Selangor and another U-turn ahead at Damansara Damai and exit left the slip road to Jalan Sungai Buloh (Subang-bound) as indicated in BLUE in map).

During the closure at Jalan Kuala Selangor, two lanes will be made available for motorists heading to Kepong.

MAP 1A: LONG-TERM ROAD CLOSURE AT SLIP ROAD FROM JALAN HOSPITAL UNTIL THE TRAFFIC LIGHT TO JALAN SUNGAI BULOH (SUBANG-BOUND)/JALAN KUALA SELANGOR (KEPONG-BOUND)

Page 1 of 4 ii) Jalan Kuala Selangor (Kepong-bound) from 10:00pm to 6:00am

During the closure, motorists from Jalan Kuala Selangor heading towards Kepong will be diverted to exit left at the slip road along Jalan Kuala Selangor (as indicated in GREEN in map).

MAP 1B: LONG-TERM ROAD CLOSURE AT JALAN KUALA SELANGOR (KEPONG-BOUND)

Page 2 of 4

2. PERMANENT LANE REALIGNMENT AT PERSIARAN SURIAN (SUNGAI BULOH-BOUND) Date 18 May 2015 onwards Time 12:00midnight Duration Permanent Reason To enable underpass construction

There will be permanent lane realignment at Persiaran Surian near Casa Indah 1 Condo (Sungai Buloh-bound) starting from 16 May 2015.

There will be two (2) lanes available for motorists Sungai Buloh-bound. For Casa Indah 1 Condo residents, there will be a tapper lane for them to enter and exit (please refer to below Map).

MAP 2: PERMANENT LANE REALIGNMENT AT PERSIARAN SURIAN (SUNGAI BULOH-BOUND)

Page 3 of 4

3. TEMPORARY LANE REALIGNMENT AT PERSIARAN SURIAN (LDP-BOUND) Date 20 May 2015 – 21 May 2015 Time 10:00am (20 May 2015) until 6:00am (21 May 2015) Duration 20 hours Reason To enable underpass construction

There will be one day lane realignment at Persiaran Surian in front of Sierra Damansara, Jalan Camar (LDP-bound) starting from 20 May 2015 until 21 May 2015, 10:00am to 6:00am.

There will be no reduction in number of lanes available for LDP-bound motorists.

Please refer to below Map.

MAP 3: TEMPORARY LANE REALIGNMENT AT PERSIARAN SURIAN (LDP-BOUND)

For media enquiries, please contact Diana Daud (Item 1) Tel: +603 6156 0400 [email protected] Juliana Johari Tan Item 2 & 3) Tel: +6019 355 8322 [email protected] Siti Fadzillah Ismail Tel: +603 7493 3965 [email protected]

MMC GAMUDA KVMRT (PDP) SDN BHD (927050-H) Block A, Level 7, Menara Mustapha Kamal, PJ Trade Centre, No 8, Jalan PJU 8/8A, Page 4 of 4 Bandar , 47820 , Selangor, Malaysia T: 603 7494 2200 F: 603 7722 2643 www.kvmrt.com.my