Winter 2018 Quabbin Voices Newsletter
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
J. Matthew Bellisle, P.E. Senior Vice President
J. Matthew Bellisle, P.E. Senior Vice President RELEVANT EXPERIENCE Mr. Bellisle possesses more than 20 years of experience working on a variety of geotechnical, foundation, civil, and dam engineering projects. He has acted as principal-in-charge, project manager, and project engineer for assignments involving geotechnical design, site investigations, testing, instrumentation, and construction monitoring. His experience also includes over 500 Phase I inspections and Phase II design services for earthen and concrete dams. REGISTRATIONS AND Relevant project experience includes: CERTIFICATIONS His experience includes value engineering of alternate foundation systems, Professional Engineer – Massachusetts, ground improvement methodologies, and temporary construction support. Mr. Rhode Island, Bellisle has also developed environmental permit applications and presented at New Hampshire, New York public hearings in support of public and private projects. Dam Engineering PROFESSIONAL AFFILIATIONS Natural Resources Conservation Services (NRCS): Principal-in- American Society of Civil Charge/Project Manager for various stability analyses and reports to assess Engineers long-term performance of vegetated emergency spillways. Association of State Dam - Hop Brook Floodwater Retarding Dam – Emergency Spillway Safety Officials Evaluation - George H. Nichols Multipurpose Dam – Conceptual Design of an Armored Spillway EDUCATION - Lester G. Ross Floodwater Retarding Dam – Emergency Spillway University of Rhode Island: Evaluation M.S., Civil Engineering 2001 - Cold Harbor Floodwater Retarding Dam – Emergency Spillway B.S., Civil & Environmental Evaluation Engineering, 1992 - Delaney Complex Dams – Emergency Spillway Evaluation PUBLICATIONS AND Hobbs Pond Dam: Principal-in-Charge/Project Manager for the design PRESENTATIONS and development of construction documents of a new armored auxiliary spillway and new primary spillway to repair a filed embankment and Bellisle, J.M., Chopy, D, increase discharge capacity. -
Quaboag and Quacumqausit
Total Maximum Daily Loads of Total Phosphorus for Quaboag & Quacumquasit Ponds COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF ENVIRONMENTAL AFFAIRS STEPHEN R. PRITCHARD, SECRETARY MASSACHUSETTS DEPARTMENT OF ENVIRONMENTAL PROTECTION ROBERT W. GOLLEDGE Jr., COMMISSIONER BUREAU OF RESOURCE PROTECTION MARY GRIFFIN, ASSISTANT COMMISSIONER DIVISION OF WATERSHED MANAGEMENT GLENN HAAS, DIRECTOR Total Maximum Daily Loads of Total Phosphorus for Quaboag & Quacumquasit Ponds DEP, DWM TMDL Final Report MA36130-2005-1 CN 216.1 May 16, 2006 Location of Quaboag & Quacumquasit Pond within Chicopee Basin in Massachusetts. NOTICE OF AVAILABILITY Limited copies of this report are available at no cost by written request to: Massachusetts Department of Environmental Protection Division of Watershed Management 627 Main Street Worcester, MA 01608 This report is also available from DEP’s home page on the World Wide Web at: http://www.mass.gov/dep/water/resources/tmdls.htm A complete list of reports published since 1963 is updated annually and printed in July. This report, entitled, “Publications of the Massachusetts Division of Watershed Management – Watershed Planning Program, 1963- (current year)”, is also available by writing to the DWM in Worcester. DISCLAIMER References to trade names, commercial products, manufacturers, or distributors in this report constituted neither endorsement nor recommendations by the Division of Watershed Management for use. Front Cover Photograph of the flow gate at Quacumquasit Pond, East Brookfield. Total Maximum Daily Load of Total Phosphorus for Quaboag and Quacumquasit Ponds 2 Executive Summary The Massachusetts Department of Environmental Protection (DEP) is responsible for monitoring the waters of the Commonwealth, identifying those waters that are impaired, and developing a plan to bring them back into compliance with the Massachusetts Surface Water Quality Standards. -
Bird Observer of Eastern Massachusetts
BIRD OBSERVER OF EASTERN MASSACHUSETTS DECEMBER 1983 VOL. 11 NO. 6 BIRD OBSERVER OF EASTERN MASSACHUSETTS DECEMBER, 1983 VOL. 11 NO. 6 President Editorial Board Robert H. Stymeist H. Christian Floyd Treasurer Harriet Hoffman Theodore H. Atkinson Wayne R. Petersen Editor Leif j. Robinson Dorothy R. Arvidson Bruce A. Sorrie Martha Vaughan Production Manager Soheil Zendeh Janet L. Heywood Production Subscription Manager James Bird David E. Lange Denise Braunhardt Records Committee Herman H. D ’Entremont Ruth P. Emery, Statistician Barbara Phillips Richard A. Forster, Consultant Shirley Young George W. Gove Field Studies Committee Robert H. Stymeist John W. Andrews, Chairman Lee E. Taylor Bird Observer of Eastern Massachusetts (USPS 369-850) A bi-monthly publication Volume 11, No. 6 November-December 1983 $8.50 per calendar year, January - December Articles, photographs, letters-to-the-editor and short field notes are welcomed. All material submitted will be reviewed by the editorial board. Correspondence should be sent to: Bird Observer C> 462 Trapelo Road POSTMASTER; Send address changes to: Belmont, M A 02178 All field records for any given month should be sent promptly and not later than the eighth of the following month to Ruth Emery, 225 Belmont Street, VVollaston, M A 02170. Second class postage is paid at Boston, MA. ALL RIGHTS RESERVED. Subscription to BIRD OBSERVER is based on a calendar year, from January to December, at $8.50 per year. Back issues are available at $7.50 per year or $1.25 per issue. Advertising space is available on the following schedule: full page, $50.00; half page, $25.00; quarter page, $12.50. -
Census Tract Outline Map (Census 2000
42.170732N CENSUS TRACT OUTLINE MAP (CENSUS 2000) 42.170732N 72.604842W 72.337413W 8112 Chicopee Rsvr 8102 Three Rivers 69730 8104.12 Palmer ABBREVIATED LEGEND 8104.14 52070 8106.02 SYMBOL NAME STYLE Quaboag River 8101 INTERNATIONAL 8106.01 Minechoag Pond LUDLOW TOWN 37175 Chicopee 8103 River Chicopee° 13660 Chicopee River AIR (FEDERAL) 8104.03 8104.04 Trust Land 8110 PALMER TOWN 52105 OTSA / TDSA Chicopee River AIR (State) 8107 SDAISA 8001 STATE COUNTY 8002.02 MINOR CIVIL DIV.1 Nine 8109.01 Mile 8108 Pond Consolidated City Lake 1 Lorraine Incorporated Place Loon Pond 1 Five Census Designated Place Mile 8136.01 8002.01 Pond 8015.03 Census Tract Abbreviation Reference: AIR = American Indian Reservation; Trust Land = Off−Reservation Trust Land; OTSA = Oklahoma Tribal Statistical Area; 8109.02 TDSA = Tribal Designated Statistical Area; Tribal Subdivision = American Indian Tribal Subdivision; SDAISA = State Designated American Indian Statistical Area 1 A ' * ' following a place name indicates that the place is coextensive with a Wilbraham 79705 MCD. A ' ° ' indicates that the place is also a false MCD. In both cases, the 8003 8015.02 Pulpit Rock Pond MCD name is shown only when it differs from the place name. FEATURES FEATURES 8004 8014.01 8016.03 WILBRAHAM TOWN 79740 River / Lake 8016.02 Glacier 8005 8014.02 8015.01 Military Inset Out Area 8006 8009 8013 Springfield° 67000 8008 8016.01 8136.02 8012 8017 Dan Baker Cove 8018 MONSON TOWN 42145 8011.01 Connecticut River 8137 Watershops Pond 8016.04 8024 8019 8011.02 West8123 Springfield* 77885 -
WSCAC Status of MWRA Water System Dams
Massachusetts Water Resources Authority Presentation to WSCAC Status of MWRA Water System Dams John J. Gregoire, Program Manager, Reservoir Operations May 16, 2017 Dams by location and type Dam Name and Location Year Completed Construction/Type Storage (MG) Quabbin Reservoir Winsor Dam, Belchertown 1939 Earthen Embankment 412,000 Goodnough Dike, Ware 1938 Earthen Embankment Quabbin Spillway 1938 Masonry - Gravity Ware River Lonergan Intake Dam, Barre 1931 Masonry - Arch Run of River Wachusett Reservoir Wachusett Reservoir Dam, Clinton 1905 Masonry - Gravity 65,000 North Dike, Clinton 1905 Earthen Embankment South Dike, Clinton 1905 Earthen Embankment Wachusett Aqueduct Open Channel Lower Dam, Southborough 1880s Masonry – Gravity & 8 Earthen Embankment Wachusett Aqueduct Hultman Intake Dam, Marlborough 1940s Earthen Embankment 8 Sudbury Reservoir Sudbury Dam, Southborough 1898 Earthen Embankment 7,200 Foss Reservoir Foss Reservoir Dam, Framingham 1890s Earthen Embankment 1500 Norumbega Reservoir Dams 1, 2, 3, 4 and East Dike, Weston 1940s Earthen Embankment 163 Schenck’s Pond Schenck’s Pond Dam, Weston 1940s Earthen Embankment 43 Weston Reservoir Weston Reservoir Dam, Weston 1903 Earthen Embankment 360 Spot Pond Dams 1, 4 and 5, Stoneham 1899 Earthen Embankment 2,500 Fells Reservoir Dams 2, 3, 6, 7, and 8, Stoneham 1898 Earthen Embankment 63 Chestnut Hill Reservoir Chestnut Hill Dam, Boston 1870 Earthen Embankment 413 2 Dams locations geographically 3 Oroville Dam and Spillway Crisis 4 Oroville Dam, CA •1 TG volume (>2X Quabbin Reservoir) -
Quaboag River Bridge, Brookfield, MA
Project Number: LDA-1301 Quaboag River Bridge Replacement Design A Major Qualifying Project Report Submitted to the Faculty Of WORCESTER POLYTECHNIC INSTITUTE By Lauren D’Angelo Madison Shugrue Mariah Seaboldt Date: 18 April 2013 Approved: Professor Leonard Albano, Advisor Abstract The Quaboag River Bridge located in Brookfield, MA is to be replaced through the Accelerated Bridge Program. In this Major Qualifying Project, alternative designs for the Quaboag River Bridge were investigated and evaluated based on a set of established criteria. As a result of the evaluation process a prestressed concrete, spread box girder design was created based on AASHTO LRFD Bridge Design Specifications. The proposed design includes a completed superstructure, substructure, 3D model and life-cycle cost analysis. 2 Authorship The Abstract, Authorship, Capstone Design, Introduction, and Background chapters were equally contributed to by Lauren D’Angelo, Madison Shugrue, and Mariah Seaboldt. All other elements of the project were collaborated on, but headed and written individually. The following individuals were responsible for the specific project elements listed below: Evaluation Criteria: Mariah Seaboldt Superstructure: Mariah Seaboldt Deck: Madison Shugrue Substructure: Lauren D’Angelo Cost Analysis: Lauren D’Angelo Editing and Formatting Madison Shugrue 3 Capstone Design In our Major Qualifying Project, alternative designs for a single span bridge were investigated and evaluated based on a set of established criteria. As a result of the evaluation process, we created a prestressed concrete, spread box girder design based on AASHTO LRFD Bridge Design Specifications. This design included a completed superstructure, substructure, 3D model and life-cycle cost analysis. To satisfy the ABET Capstone Design requirements, our project addressed realistic sustainable, environmental, ethical, manufacturability, economic, social, political, and health and safety constraints of the Quaboag River Bridge Replacement project. -
2018 Water System Master Plan
MWRA BOARD OF DIRECTORS Matthew A. Beaton, Chairman John J. Carroll, Vice-Chair Christopher Cook Joseph C. Foti Kevin L. Cotter Paul E. Flanagan Andrew M. Pappastergion, Secretary Brian Peña Henry F. Vitale John J. Walsh Jennifer L. Wolowicz Prepared under the direction of Frederick A. Laskey, Executive Director David W. Coppes, Chief Operating Officer Stephen A. Estes-Smargiassi, Director, Planning and Sustainability Lisa M. Marx, Senior Program Manager, Planning Carl H. Leone, Senior Program Manager, Planning together with the participation of MWRA staff 2018 MWRA Water System Master Plan Table of Contents Executive Summary Chapter 1-Introduction 1.1 Overview of MWRA 1-1 1.2 Purpose of the Water Master Plan 1-1 1.3 Planning Approach, Assumptions and Time Frame 1-2 1.4 Organization of the Master Plan 1-3 1.5 Periodic Updates 1-3 1.6 MWRA Business Plan 1-3 1.7 Project Prioritization 1-4 Chapter 2-Planning Goals and Objectives 2.1 Planning Goals and Objectives Defining MWRA’S Water System Mission 2-1 2.2 Provide Reliable Water Delivery 2-2 2.3 Deliver High Quality Water 2-3 2.4 Assure an Adequate Supply of Water 2-4 2.5 Manage the System Efficiently and Effectively 2-5 Chapter 3-Water System History, Organization and Key Infrastructure 3.1 The Beginning – The Water System 3-1 3.2 The MWRA Water System Today 3-5 3.3 Water Infrastructure Replacement Asset Value 3-8 3.4 The Future Years 3-11 Chapter 4-Supply and Demand 4.1 Overview of the Water Supply System 4-1 4.2 System Capacity 4-4 4.3 Potential Impacts of Climate Change 4-6 4.4 Current -
Town of Barre Massachusetts
Town of Barre Massachusetts Annual Official Reports For the Calendar Year Ending December 31, 2018 Table of Content Animal Inspector 130 Annual Town Election 25 Annual Town Meeting 31 Appointed Officials 11 Barre Common Oversight Committee 139 Board of Assessors 131 Board of Health 133 Cemetery 135 Code Enforcement 137 Conservation Commission 141 Council on Aging 142 Cultural Council 145 Dedication 3 Department of Public Works 146 Dog Licensing Statistics 119 Elected Officials 21 Finance Committee 148 Fire Department 149 Historical Commission 159 Library Director 161 Library Trustees 162 Montachusett Regional Vocational Tech. School District 164 Planning Board 181 Police Department 183 Quabbin Regional School District 187 Recreation Committee 226 South Barre Common Committee 227 Special Town Meeting 85 State Election 75 State Officials 5 State Primary Election 67 Town Accountant 230 Town Administrator 128 Town of Barre Statistics 8 Town Treasurer 244 Town Clerk Issued Licenses and Permits 119 Veteran’s Agent 250 Vital Statistics 119 Voter Registration Statistics 119 Wachusett Greenways 251 Zoning Board of Appeal 253 DEDICATION Marguerite “Margi” W. Williams Maki June 20, 1934 – June 17, 2018 On behalf of the Town of Barre, the Board of Selectmen dedicates the Annual Town Report for 2018 to Marguerite “Margi” Maki. Margi was born and raised in Barre, the daughter of Howard and Ramona Williams, and was a 1952 graduate of the former Barre High School. Margi was possessed of a gentle heart, compassionate spirit, captivating wit and a keen sense of observation and judgment when it came to the human condition. Throughout her adult life, she devoted herself to social work and changed the course of innumerable lives for the better through her dedication, perseverance and steadfast belief in the sanctity of the human spirit. -
The Quaboag River Blue Trail! Access Is Possible at Rt 9 and Near the Spencer Fair Grounds
still a wild interface with surrounding forests. Studies POINTS OF INTEREST have shown an inverse relation between the presence 1 The Seven Mile River offers paddling at adequate flows. of marshbirds to the presence of development around a Welcometo the Quaboag River Blue Trail! Access is possible at Rt 9 and near the Spencer Fair Grounds. marsh, and it is no surprise that the Quaboag still supports Adequate flows at Stevens Rd are generally over 3 cfs as This guide and map will familiarize you with the Quaboag impressive numbers of American bitterns, along with measured at the Seven Mile USGS flow gage. other rare species of marshbirds, while so many other River’s interesting natural and historical features and 2 East Brookfield access on the Seven Mile River is recreational opportunities. marshes in central and eastern Massachusetts have lost their marshbirds to the on Stevens Rd off Cottage St (off Rt 9). At low flows, the first The Quaboag Blue Trail is a community partnership disturbance, pollution hundred yards can be shallow. The East Brookfield River formed to strengthen river stewardship and community and general degradation below Lake Lashaway can be accessed at the end of Connie vitality throughout Central Massachusetts’ Chicopee brought on by marsh-side Mack Dr. In low water, these segments may be best to paddle 4Rivers Watershed, which we refer to as C4R. sprawl. (MassDF&W) up from Quaboag Pond. Be prepared for beaver dams, too. The Upper Quaboag Blue Trail offers a smooth paddle River Etiquette: 3 Quaboag Pond access is on Shore Rd at the state boat through scenic and wildlife-rich areas bordering Mass The upper Quaboag River ramp. -
T Ro U T Sto C K E D Wat E Rs
2021 MASSACHUSETTS TROUT STOCKED WATERS CONNECTICUT VALLEY DISTRICT Daily stocking updates can be viewed at Mass.gov/Trout. All listed waters are stocked in the spring. Bold waters are stocked in spring and fall. AGAWAM: Westfield River GILL: Fall River AMHERST: Adams Brook, Amethyst Brook, GRANBY: Bachelor Brook, Dufresne Farm Pond Cushman Brook, Fort River, Mill River, Puffers Pond GREENFIELD: Fall River, Green River (Factory Hollow Pond) HADLEY: Fort River, Harts Brook, Mill River, USFW BELCHERTOWN: Jabish Brook, Metacomet Lake, Pond Quabbin Reservoir, Scarboro Brook, Swift River HAMPDEN: Scantic River, South Branch Mill River BERNARDSTON: Fall River, Shattuck Brook HATFIELD: Mill River BRIMFIELD: Dean Pond, Foskett Mill Stream,Little Alum Pond, Mill Brook, Quaboag River, Quinebaug HOLLAND: Hamilton Reservoir, Holland Pond, River, Sherman Pond Quinebaug River CHICOPEE: Chicopee Reservoir HOLYOKE: Broad Brook COLRAIN: East Branch North River, Green River, LEVERETT: Doolittle Brook, Roaring Brook, Sawmill North River, West Branch North River River CONWAY: Bear River, Deerfield River, Poland Brook, LEYDEN: Green River, Shattuck Brook South River LUDLOW: Broad Brook, Chapin (Haviland) Pond, DEERFIELD: Deerfield River, Mill River Chicopee River EAST LONGMEADOW: South Branch Mill River MONSON: Chicopee Brook, Chicopee Brook Reservoir, Conant Brook, Quaboag River, Scantic EASTHAMPTON: Broad Brook, Hannum Brook, River Manhan River, Nashawannuck Pond, North Branch Manhan River MONTAGUE: Goddard Brook, Millers River, Sawmill River ERVING: Keyup -
Quabbin Park Information for Schools
Department of Conservation and Recreation Quabbin Interpretive Services Educational Information Packet Points of Interest in Quabbin Park Quabbin Park offers the widest range of features and educational opportunities for school groups. History, biology, chemistry and engineering are just a few of the topics that can be addressed from this location. Here is a description of some of the main stops at the Park, but there are numerous other trails and vistas, a few of which will be listed at the end and for which more information is available. Visitor Center: The Visitor Center is located in the Administration Building which was built in the 1930’s. The building was originally intended to be administrative offices and living quarters for Metropolitan District Commission (MDC, the predecessors to the DCR) employees, as well as MDC police (there is still a jail cell in the basement!). In the 1980’s through the early 2000’s, a series of divisions in the MDC established the Department of Conservation and Recreation, the Massachusetts Water Resource Authority and the Massachusetts State Police, all of which are still here. Today the building houses not only the administration for the Quabbin Reservoir and Watershed, but also engineers, biologists, and many other people whose jobs are vital to the mission of the Quabbin. Exhibits, videos and other resources are located in the Visitor Center. Its hours are: Monday through Friday 8:30 – 4:30 year round Saturday & Sunday 8:30 – 4:30 November through February Saturday & Sunday 9:00 – 5:00 March through October. Winsor Dam: Winsor Dam was named for Frank E. -
Quaboag & Quacumquasit Ponds
Total Maximum Daily Loads of Total Phosphorus for Quaboag & Quacumquasit Ponds COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF ENVIRONMENTAL AFFAIRS STEPHEN R. PRITCHARD, SECRETARY MASSACHUSETTS DEPARTMENT OF ENVIRONMENTAL PROTECTION ROBERT W. GOLLEDGE Jr., COMMISSIONER BUREAU OF RESOURCE PROTECTION MARY GRIFFIN, ASSISTANT COMMISSIONER DIVISION OF WATERSHED MANAGEMENT GLENN HAAS, DIRECTOR Total Maximum Daily Loads of Total Phosphorus for Quaboag & Quacumquasit Ponds DEP, DWM TMDL Final Report MA36130-2005-1 CN 216.1 May 16, 2006 Location of Quaboag & Quacumquasit Pond within Chicopee Basin in Massachusetts. NOTICE OF AVAILABILITY Limited copies of this report are available at no cost by written request to: Massachusetts Department of Environmental Protection Division of Watershed Management 627 Main Street Worcester, MA 01608 This report is also available from DEP’s home page on the World Wide Web at: http://www.mass.gov/dep/water/resources/tmdls.htm A complete list of reports published since 1963 is updated annually and printed in July. This report, entitled, “Publications of the Massachusetts Division of Watershed Management – Watershed Planning Program, 1963- (current year)”, is also available by writing to the DWM in Worcester. DISCLAIMER References to trade names, commercial products, manufacturers, or distributors in this report constituted neither endorsement nor recommendations by the Division of Watershed Management for use. Front Cover Photograph of the flow gate at Quacumquasit Pond, East Brookfield. Total Maximum Daily Load of Total Phosphorus for Quaboag and Quacumquasit Ponds 2 Executive Summary The Massachusetts Department of Environmental Protection (DEP) is responsible for monitoring the waters of the Commonwealth, identifying those waters that are impaired, and developing a plan to bring them back into compliance with the Massachusetts Surface Water Quality Standards.