GSMA London Office

Total Page:16

File Type:pdf, Size:1020Kb

GSMA London Office GSMA London Office The GSMA London office address is: 2nd Floor The Walbrook Building 25 Walbrook London EC4N 8AF 1 Transportation London Underground & Train Stations The nearest London Underground & Train Stations to the GSMA London Office are: London Underground • Cannon Street • Bank (exit 8) • Mansion House • Monument For more information please see Transport for London Train Stations • London Bridge • London Cannon Street • London Blackfriars For more information on rail networks & timetables please see National Rail Taxis London Black Cabs can be easily hailed on the street or booked in advance by phone or via an app or you can use an alternative taxi company. 2 Transportation Cars The GSMA London Office falls within the Congestion Charge Zone. To drive inside the zone, you will be charged a fixed amount per day between 07:00 and 18:00, Monday to Friday. Organise payment in advance online or contact: UK 0343 222 2222 International +44 207 649 9122 Hours: Monday to Friday: 08:00-22:00, Saturday: 09:00-15:00, Sunday: Closed For information on paid carpark locations near the office please see here. Buses For information on Bus Routes & Timetables please visit Transport for London or contact TFL on: 0343 222 1234, 08:00-20:00 seven days a week. Eurostar For travel to France, Belgium and The Netherlands. St Pancras International is served by the Northern, Victoria, Piccadilly, Circle, Hammersmith & City and Metropolitan lines. To plan your journey to St Pancras International by tube, visit Transport for London 3 Transportation Airport Links Can be easily reached by DLR, Bus, Train or Taxis. For information on public City Airport transport to City Airport please see www.londoncityairport.com The Heathrow Express train leaves from Paddington Station. From Cannon Heathrow Street Underground Station, take the Circle Line (yellow) or District Line (green) Airport to Paddington. The Journey from Paddington to Heathrow is 15 minutes. Visit www.heathrowexpress.co.uk The Gatwick Express train leaves from Victoria Station. From Cannon Street Underground Station, take the Circle Line (yellow) or District Line (green) to Gatwick Airport Victoria Station. Journey time from Victoria to Gatwick is 30 minutes. Visit www.gatwickexpress.co.uk The Stansted Express train leaves from Liverpool Street Station. From Bank Stansted Underground Station, take the Central Line (red) to Liverpool Street Station. Airport Journey time from Liverpool Street to Stansted Airport is 50 minutes. Visit www.stanstedexpress.com From Bank Underground Station, take the Northern Line (black) to King’s Cross St. Pancras Underground Station & take the East Midlands Train or Thameslink Luton Airport Train to Luton Airport. Alternatively, Thameslink Trains can also be taken to Luton from Blackfriars Train Station. Visit Transport for London 4.
Recommended publications
  • Rail Accident Report
    Rail Accident Report Penetration and obstruction of a tunnel between Old Street and Essex Road stations, London 8 March 2013 Report 03/2014 February 2014 This investigation was carried out in accordance with: l the Railway Safety Directive 2004/49/EC; l the Railways and Transport Safety Act 2003; and l the Railways (Accident Investigation and Reporting) Regulations 2005. © Crown copyright 2014 You may re-use this document/publication (not including departmental or agency logos) free of charge in any format or medium. You must re-use it accurately and not in a misleading context. The material must be acknowledged as Crown copyright and you must give the title of the source publication. Where we have identified any third party copyright material you will need to obtain permission from the copyright holders concerned. This document/publication is also available at www.raib.gov.uk. Any enquiries about this publication should be sent to: RAIB Email: [email protected] The Wharf Telephone: 01332 253300 Stores Road Fax: 01332 253301 Derby UK Website: www.raib.gov.uk DE21 4BA This report is published by the Rail Accident Investigation Branch, Department for Transport. Penetration and obstruction of a tunnel between Old Street and Essex Road stations, London 8 March 2013 Contents Summary 5 Introduction 6 Preface 6 Key definitions 6 The incident 7 Summary of the incident 7 Context 7 Events preceding the incident 9 Events following the incident 11 Consequences of the incident 11 The investigation 12 Sources of evidence 12 Key facts and analysis
    [Show full text]
  • The Operator's Story Appendix
    Railway and Transport Strategy Centre The Operator’s Story Appendix: London’s Story © World Bank / Imperial College London Property of the World Bank and the RTSC at Imperial College London Community of Metros CoMET The Operator’s Story: Notes from London Case Study Interviews February 2017 Purpose The purpose of this document is to provide a permanent record for the researchers of what was said by people interviewed for ‘The Operator’s Story’ in London. These notes are based upon 14 meetings between 6th-9th October 2015, plus one further meeting in January 2016. This document will ultimately form an appendix to the final report for ‘The Operator’s Story’ piece Although the findings have been arranged and structured by Imperial College London, they remain a collation of thoughts and statements from interviewees, and continue to be the opinions of those interviewed, rather than of Imperial College London. Prefacing the notes is a summary of Imperial College’s key findings based on comments made, which will be drawn out further in the final report for ‘The Operator’s Story’. Method This content is a collation in note form of views expressed in the interviews that were conducted for this study. Comments are not attributed to specific individuals, as agreed with the interviewees and TfL. However, in some cases it is noted that a comment was made by an individual external not employed by TfL (‘external commentator’), where it is appropriate to draw a distinction between views expressed by TfL themselves and those expressed about their organisation.
    [Show full text]
  • Investigation Into Reliability of the Jubilee Line
    Investigation into Reliability: London Underground Jubilee Line An Interactive Qualifying Project submitted to the Faculty of WORCESTER POLYTECHNIC INSTITUTE in partial fulfilment of the requirements for the degree of Bachelor of Science By Jack Arnis Agolli Marianna Bailey Errando Berwin Jayapurna Yiannis Kaparos Date: 26 April 2017 Report Submitted to: Malcolm Dobell CPC Project Services Professors Rosenstock and Hall-Phillips Worcester Polytechnic Institute This report represents work of WPI undergraduate students submitted to the faculty as evidence of a degree requirement. WPI routinely publishes these reports on its web site without editorial or peer review. For more information about the projects program at WPI, see http://www.wpi.edu/Academics/Projects. Abstract Metro systems are often faced with reliability issues; specifically pertaining to safety, accessibility, train punctuality, and stopping accuracy. The project goal was to assess the reliability of the London Underground’s Jubilee Line and the systems implemented during the Jubilee Line extension. The team achieved this by interviewing train drivers and Transport for London employees, surveying passengers, validating the stopping accuracy of the trains, measuring dwell times, observing accessibility and passenger behavior on platforms with Platform Edge Doors, and overall train performance patterns. ii Acknowledgements We would currently like to thank everyone who helped us complete this project. Specifically we would like to thank our sponsor Malcolm Dobell for his encouragement, expert advice, and enthusiasm throughout the course of the project. We would also like to thank our contacts at CPC Project Services, Gareth Davies and Mehmet Narin, for their constant support, advice, and resources provided during the project.
    [Show full text]
  • Uncovering the Underground's Role in the Formation of Modern London, 1855-1945
    University of Kentucky UKnowledge Theses and Dissertations--History History 2016 Minding the Gap: Uncovering the Underground's Role in the Formation of Modern London, 1855-1945 Danielle K. Dodson University of Kentucky, [email protected] Digital Object Identifier: http://dx.doi.org/10.13023/ETD.2016.339 Right click to open a feedback form in a new tab to let us know how this document benefits ou.y Recommended Citation Dodson, Danielle K., "Minding the Gap: Uncovering the Underground's Role in the Formation of Modern London, 1855-1945" (2016). Theses and Dissertations--History. 40. https://uknowledge.uky.edu/history_etds/40 This Doctoral Dissertation is brought to you for free and open access by the History at UKnowledge. It has been accepted for inclusion in Theses and Dissertations--History by an authorized administrator of UKnowledge. For more information, please contact [email protected]. STUDENT AGREEMENT: I represent that my thesis or dissertation and abstract are my original work. Proper attribution has been given to all outside sources. I understand that I am solely responsible for obtaining any needed copyright permissions. I have obtained needed written permission statement(s) from the owner(s) of each third-party copyrighted matter to be included in my work, allowing electronic distribution (if such use is not permitted by the fair use doctrine) which will be submitted to UKnowledge as Additional File. I hereby grant to The University of Kentucky and its agents the irrevocable, non-exclusive, and royalty-free license to archive and make accessible my work in whole or in part in all forms of media, now or hereafter known.
    [Show full text]
  • Standard-Tube-Map.Pdf
    Tube map 123456789 Special fares apply Special fares Check before you travel 978868 7 57Cheshunt Epping apply § Custom House for ExCeL Chesham Watford Junction 9 Station closed until late December 2017. Chalfont & Enfield Town Theydon Bois Latimer Theobalds Grove --------------------------------------------------------------------------- Watford High Street Bush Hill Debden Shenfield § Watford Hounslow West Amersham Cockfosters Park Turkey Street High Barnet Loughton 6 Step-free access for manual wheelchairs only. A Chorleywood Bushey A --------------------------------------------------------------------------- Croxley Totteridge & Whetstone Oakwood Southbury Chingford Buckhurst Hill § Lancaster Gate Rickmansworth Brentwood Carpenders Park Woodside Park Southgate 5 Station closed until August 2017. Edmonton Green Moor Park Roding Grange Valley --------------------------------------------------------------------------- Hatch End Mill Hill East West Finchley Arnos Grove Hill Northwood Silver Street Highams Park § Victoria 4 Harold Wood Chigwell West Ruislip Headstone Lane Edgware Bounds Green Step-free access is via the Cardinal Place White Hart Lane Northwood Hills Stanmore Hainault Gidea Park Finchley Central Woodford entrance. Hillingdon Ruislip Harrow & Wood Green Pinner Wealdstone Burnt Oak Bruce Grove Ruislip Manor Harringay Wood Street Fairlop Romford --------------------------------------------------------------------------- Canons Park Green South Woodford East Finchley Uxbridge Ickenham North Harrow Colindale Turnpike Lane Lanes
    [Show full text]
  • Design of Farringdon Elizabeth Line Station
    Structural engineering for the Elizabeth line Farringdon station thestructuralengineer.org Design of Farringdon Elizabeth line station Ghanshyam Kumar David Sharples NOTATION BEng, MTech, MEng, CEng, MIStructE BSc (Hons), CEng, MICE AOD above ordnance datum TfL Engineering (formerly Structural Technical Director, AECOM, London, UK BIM Building Information Associate, AECOM, London, UK) Modelling CAD computer-aided design Synopsis ETH East Ticket Hall Farringdon is one of eight new underground stations being built in central London LU London Underground for the Elizabeth line and will be one of the key interchange stations on the new mATD meters above tunnel datum (AOD +100m) line. Upon completion, over 140 trains per hour will pass through the Farringdon OSD oversite development interchange, making it one of Britain’s busiest stations. With Thameslink, SCL sprayed concrete lining Elizabeth line and London Underground services, it will be a key link in bringing SH-W1 circular shaft (West passengers from outer London to the business hubs in the City and Canary Wharf. Ticket Hall) SH-W2 rectangular shaft (West The station will also provide direct rail links to three of London’s fi ve airports. Ticket Hall) Farringdon Elizabeth line station comprises two platform tunnels, each 245m SH-W3 escalator shaft (West long, between new ticket halls over 300m apart. Each ticket hall has been Ticket Hall) SH-E3 trapezoidal shaft (East designed to accommodate future oversite developments. Ticket Hall) This paper discusses the structural engineering challenges encountered during TBM tunnel boring machine design and construction of the two ticket halls on constrained sites surrounded by WTH West Ticket Hall existing transport infrastructure, utilities and historic buildings.
    [Show full text]
  • Case Study: Looking After Customers
    Case Study: Looking after customers Focus on the customer Recommendations for future projects to improve the delivery of infrastructure projects to maintain a focus on customers Throughout the Thameslink Programme the top priority was to look after customers through: • maintaining train service capacity wherever possible • understanding the touch points prior to, during and after journeys • identifying the best journey options • providing an excellent communications campaign covering each stage of the programme • highlighting the benefits achieved – ‘This is why… ‘ • providing ticket acceptance on alternative routes and types of transport • recruiting additional staff to assist during the major engineering works • encouraging volunteers from the Train Operating Companies (TOCs), Network Rail and Department for Transport to assist. Maintaining train service capacity where possible For each of the stages of the programme which required changes in train services both during engineering works and post the network changes, the TOCs and Network Rail focused on passenger numbers and journeys with emphasis on the peak hours of travel to develop timetables providing required capacity. Major timetable changes, for example the Charing Cross run-throughs, where trains to Charing Cross did not stop at London Bridge station between January 2015 and August 2016 and the Cannon Street run-throughs, where trains to Cannon Street did not stop at London Bridge station between 29 August 2016 to January 2018 were fully consulted along with the May 2018 timetable changes. A marketing campaign ‘Times are changing’ was run; https://www.southeasternrailway.co.uk/travel-information/live-travel-information/may-timetable This covers details of the Southeastern May 2018 Timetable Consultation Response.
    [Show full text]
  • Impact of the Night Tube on London's
    TfL 90993 – Impact of the Night Tube on London’s Night-Time Economy Report Prepared by Volterra Partners for TfL and London First September 2014 Economic impact of the Night Tube Contents Executive Summary ..................................................................................................................................... 2 1 Introduction ..................................................................................................................................... 8 2 The need for the scheme ............................................................................................................... 9 3 Business Case of the Night Tube ............................................................................................... 18 4 The Wider Case for the Night Tube .......................................................................................... 21 5 Retaining London’s attractiveness .............................................................................................. 28 Appendix 1 – London’s Night-Time Transport Network ................................................................... 33 Appendix 2 – Transport Impact of the Night Tube ............................................................................. 40 Appendix 3 – Supporting Material for Wider Case .............................................................................. 44 1 Economic impact of the Night Tube Executive Summary Key conclusions The new Night Tube service will open up London’s night-time economy to a whole
    [Show full text]
  • Great Northern Route
    Wells-next-the-Sea SERVICES AND FACILITIES Burnham Market Hunstanton This is a general guide to the basic daily services. Not all trains stop at Fakenham all stations on each coloured line, so please check the timetable. Dersingham Routes are shown in different colours to help identify the general pattern. Sandringham King’s Lynn Great Northern LIMITED REGULAR ROUTE Watlington SERVICE SERVICE IDENTITY GN1 King’s Lynn and Cambridge Downham Market Wisbech GN2 Cambridge local to Yorkshire, the North East and Scotland Littleport to Norwich GN3 Peterborough and Ipswich GN4 Hertford Ely GN5 Welwyn Waterbeach Other train operators may provide additional services along some of our routes. Peterborough to Newmarket Cambridge North and Ipswich Other train operators’ routes St. Ives Bus links Huntingdon Cambridge Principal stations to Stansted Airport Foxton and London Interchange with London Underground St. Neots Interchange with London Overground Shepreth Interchange with other operators’ train services Sandy Meldreth Biggleswade Royston Ashwell & Morden ACCESSIBILITY Arlesey Baldock Step-Free access between the street and all platforms Letchworth Garden City Hitchin Some step-free access between the street and platforms Step-free access is available in the direction of the arrow Stevenage Watton-at-Stone No step-free access between the street and platforms Knebworth Notes: Hertford North Platform access points may vary and there may not be be step-free access to Welwyn North or between all station areas or facilities. Access routes may be unsuitable for Welwyn Garden City Bayford unassisted wheelchair users owing to the gradient of ramps or other reasons. St. Albans Hatfield Cuffley We want to be able to offer you the best possible assistance, so we ask you to contact us in advance of your journey if possible.
    [Show full text]
  • London Underground - 150 Years and Beyond
    A London Councils Member briefing January 2014 London Underground - 150 Years and Beyond 2013 saw celebrations of 150 years of an underground railway in London. The underground has changed and shaped the way people live in the capital and this anniversary has provided Transport for London with the opportunity to set out a vision for its future. Overview This briefing summarises Transport for London’s (TfL) vision for the future of the underground (Tube). Gareth Powell, Director of Strategy at London Underground, gave a presentation to the meeting of the Transport and Environment Committee on 12 December 2013. He stated London Underground’s priorities for the future are: • Keeping London Moving- Reliability and safely • Keeping London Growing - Capacity from the current network and from growing the network • Making Life in London Better - Customer service where every journey matters The vision also includes five commitments to Londoners: 1. Introduce a new 24-hour Tube service at weekends 2. Further improve the reliability and capacity of services 3. All Tube stations are controlled and staffed while services operating 4. Make journeys easier for customers – supported by technology 5. Deliver improvements with the best possible value for money Analysis For 150 years the Tube has been constantly evolving to meet the needs of Londoners. Today, the Tube travels 43 million miles and carries over one billion passengers a year. There have been many key milestones since it first opened in 1863, 10 are highlighted below: 1890 First deep level electric Tube railway in the world and access to platforms by hydaulic lift 1905-38 The Tube reshapes suburban London, including the development of ‘Metroland’ 1968-69 First computer-controlled underground railway in the world, with automatic trains and ticket gates 1977 First airport link for the Tube, with Picadilly line extension to Heathrow Central (terminals 1,2 and 3).
    [Show full text]
  • UK Jubilee Line Extension (JLE)
    UK Jubilee Line Extension (JLE) - 1 - This report was compiled by the OMEGA Centre, University College London. Please Note: This Project Profile has been prepared as part of the ongoing OMEGA Centre of Excellence work on Mega Urban Transport Projects. The information presented in the Profile is essentially a 'work in progress' and will be updated/amended as necessary as work proceeds. Readers are therefore advised to periodically check for any updates or revisions. The Centre and its collaborators/partners have obtained data from sources believed to be reliable and have made every reasonable effort to ensure its accuracy. However, the Centre and its collaborators/partners cannot assume responsibility for errors and omissions in the data nor in the documentation accompanying them. - 2 - CONTENTS A INTRODUCTION Type of Project Location Major Associated Developments Current Status B BACKGROUND TO PROJECT Principal Project Objectives Key Enabling Mechanisms and Timeline of Key Decisions Principal Organisations Involved • Central Government Bodies/Departments • Local Government • London Underground Limited • Olympia & York • The coordinating group • Contractors Planning and Environmental Regime • The JLE Planning Regime • The Environmental Statement • Project Environmental Policy & the Environmental Management System (EMS) • Archaeological Impact Assessment • Public Consultation • Ecological Mitigation • Regeneration Land Acquisition C PRINCIPAL PROJECT CHARACTERISTICS Route Description Main Termini and Intermediate Stations • Westminster
    [Show full text]
  • Farringdon Elizabeth Line Station Handed Over to Transport for London
    Farringdon Elizabeth line station handed over to Transport for London March 5, 2021 Farringdon Elizabeth line station has been officially handed over to Transport for London (TfL). It is the first of the central London stations to be transferred over to TfL, who will operate the Elizabeth line. The station is now ready and the extensive testing and commissioning of systems have been finalised in advance of Trial Operations beginning later this year. Trial Operations is the final phase of testing involving trials to ensure the safety and reliability of the railway for public use. This includes real-time testing of evacuations of trains and stations before opening the Elizabeth line. The contractor, Bam Ferrovial and Kier Joint Venture (BFK JV) will continue demobilisation from the site. This is the second of the new Elizabeth line stations to be handed over to TfL and the first to London Underground as infrastructure manager. Custom House was the first Elizabeth line station to be handed over to TfL last year. Crossrail confirmed last month that Tottenham Court Road and Paddington stations have reached the T-12 landmark, which means the stations are now considered to be 12 weeks away from being ready to hand over and will be the next stations to transfer to TfL. Mark Wild, Crossrail Chief Executive, said: “I am delighted that Farringdon station has been handed over to London Underground, this is a huge milestone for Crossrail. “I am proud of everyone who has worked so hard to get this magnificent new railway station over the line and we look forward to more stations reaching this stage in the coming months.” Kim Kapur, London Underground’s Head of Station Integration, said: “This is a great achievement by the both the Crossrail and London Underground teams.
    [Show full text]