Pāģáðlpā Ļāpáðgā

Total Page:16

File Type:pdf, Size:1020Kb

Pāģáðlpā Ļāpáðgā «±ÉõÀ gÁdå ¥ÀwæPÉ ¨sÁUÀ– III , £ÀA.73 �ೆಂಗಳ�ರು, ಮಂಗಳವಾರ ,3, ಮಾ ರ್ ಚ್ 2020 (¥sÁ®ÄÎt 13, ಶಕವಷ� ೧೯೪೧) Part– III Bengaluru, TUESDAY,3, MARCH,2020( Phalguna 13, ShakaVarsha 1941) No. 73 GOVERNMENT OF KARNATAKA URBAN DEVELOPMENT DEPARTMENT NOTIFICATION No.UDD 53 MLR 2014, Bangalore, Dated: 02.03.2020. In exercise of the powers conferred by the Section 7(2)(A) and 21 of the Karnataka Municipal Corporation Act 1976 and the Guidelines issued vide Government order No. UDD 4 MLR 2014, dated 15.02.2014, the Government of Karnataka hereby publishing draft Delimitation of Wards for Bruhat Bengaluru Mahanagara Palike as per 2011 Census, for the information of all persons likely to be affected thereby as follows 1. The Number of Wards of the Bruhat Bengaluru Mahanagara Palike : 198 (One hundred and ninety eight). 2. The extent of each wards is as indicated in column Number:4 The notification of draft delimitation of the Bruhat Bengaluru Mahanagara Palike hereby published to the information of the Public. Notification will be taken up for final consideration after 15 days published in the official gazette. All the persons, who would like to file any 2 objections/suggestions to this Notification, are hereby required to submit the same with reasons within the stipulated period, in writing to the Deputy Commissioner, Bengaluru Urban District, Bengaluru. By Order and in the name of the Governor of Karnataka (A.Vijayakumar) Under Secretary to Government Urban Development Department ANNEXURE TO NOTIFICATION NO. UDD 53 MLR 2014, Dated 02.03.2020 Sl.n Ward No. & Important localities Schedule o Name 1 2 3 4 1 1-Kempegowda BSF & Airport Area (P), Sai Spring Field North By BBMP Boundary Limit. Ward Colony, Vinayaka Nagar (P), Satyappa East By Existing Ward & AC Boundary Annayappa Kempamma Layout, Vikas Layout, South By Existing Ward & AC Boundary, Venkatappa Layout, Venkatala Layout, Coumpound Wall, Existing Ward & AC Lakeview Residency, ,Yelahanka Lake, Boundary Maruthi Nagar (P), Bhadranna Layout, West By Railway line, Bellary Road, Doddaballapur Shankarena Layout, Kullappa Layout, Road, Jayaprakash Narayan Road, Railway line, Yelahanka, Maheshwari Nagar, Gandhi Nagar, Tank bund Road, Yelahanka Lake South side Neharu Nagar, Jakkur Water Treatment Plant, Boundary, Railway line, Existing Ward Shivanahalli, Basaveshwara Nagar, Surabhi Boundary. Layout, Vidyashilpa Academy. Wheel & Axle plant(P), Gandhinagar (Yelahanka) 3 2 2-Chowdeswari ISRO Layout, Naganahalli, Srinidhi Layout, North By BBMP Boundary Limit. Ward KEB Layout 1st Phase, CRPF Campus, Balaji East By Existing Ward Boundary, Railway line, Layout, Kenchenahalli , Heritage Estate, Yelahanka Lake South Side Boundary. Vinayaka Layout, Puttanahalli, DUO Marvell South By Tank bund Road, Railway line, Jayaprakash Layout, Anantapur, Nisarga Layout, Narayan Road, Doddaballapur Road, Mahalakshmi Layout, Ramanasri Californiya Yeshwanthpura Road, Puttenahalli Road, 4th Garden,Atturu, Muneshwara Layout, Yelahanka Main, 4th Cross Road, Attur Road, Veerasagara th 5 Stage, KSSIDC Industrial Estate, Airforce Main Road. Quarters, Wheel & Axle Plant(P), West By BBMP Boundary Limit. Kamakshamma Layout, Yelahanka Satellite Town (P), Chowdeshwari Layout. 3 3-Bettahalli Yelahanka New Town 4th & 5th Stage, 208 SFS North By Veerasagara Main Road, Atturu Main Road, Colony, Attur Layout, L&T Nagar, Tirumala 4th Cross Road,4th Main. Nagar, Bettahalli, Bettahalli Extension, Sri East By Puttenahalli Road (1st Main). Muneshwara Layout, Chik Bettahalli Village, AMS Layout, Aditya Nagar, MS Palya (P), Hill Side Medows, Jyothi Nagar. South By Yelahanka New Town Road (Major Sandeep Unnikrishnan Road), Existing Ward & AC Boundary, GKVK Road,4th Cross, Vidyaranyapura Main Road, Lattic Network Road, Cross Road, Vidyaranyapura Main Road, Yelahanka New Town Road (Major Sandeep Unnikrishnan Road),Existing Ward & AC Boundary, Singapura Main Road, Main Road, Cross Road, 6th Cross, Main Road, Existing Ward & AC Boundary. West By BBMP Boundary Limit 4 4-Yelahanka Yelahanka Satellite Town(P), Mother Dairy, North By Yelahanka New Town Road (Major Sandeep Satellite Town Udaya Layout, Judicial Colony, Allalasandra, Unnikrishnan Road). Ambedkar Colony, GKVK(P), Yelahanka Slum, East By Doddaballapur Road, Bellary Road, Railway Nehuru Nagara. Line.Bellary Road. South By GKVK Compound Wall ( Existing Ward & AC Boundary). 4 West By GKVK Compound Wall ( Existing Ward & AC Boundary). 5 5-Kogilu Ramanna Garden Layout, Tayamma Layout, North By BBMP Boundary Limit. Baba Nagar, Shrikrishna Garden Layout, East By Existing Ward & AC Boundary. Vinayaka Nagar(P), GL Raju Colony, South By Sanitorini Garden Apts., Southern Katiigenahalli, Tippunagar , Kogilu, Kogilu Compound, 3rd Main 80 feet Road (Thanisandra Layout,Vinayaka Layout, Bali Halli, Sadahalli Main Road), Chokkanahalli Road, Main Road, Gate, Tirumenahalli, Agrahara Layout, 3rd Cross, Sampgehalli Road, Main Road, Storm Maruthinagar (P), Prakruti Layout, KPSC Water Drain, Jakkuru Kere North East Layout, Chamundi Layout, Agrahara (P), Boundary. Chokkanahalli, Noor Nagar. West By Existing Ward & AC Boundary. 6 6-Thanisandra Thanisandra, Jakkuru Aerodrome, Indian North By Sanitorini Garden Apts., Southern Express Layout, Jakkuru, Jakkuru Lake, Compound, Agrahara Part, Arkavathy Layout, East By Existing Ward & AC Boundary. Sampigehalli,RK Hegde Nagar, Balaji Krupa South By Existing Ward & AC Boundary & Storm Layout, Custom & Central Excise Layout, Water Drain, MCECHS Layout, Vidya Layout, Railway West By Manyatha Tech Park Compound Wall, Mens's Layout, Nandanavana Layout, Shiradi Manyatha Residency Western Compound, Sai Rathan Layout, Telecom Layout, Manyatha Embassy Residency Main Road, 9th Srirampura(P), Jingarappa Layout(P), Hoysala Cross Road, Rachenahalli Main Road, St.Anns Layout, L&T Layout, Jakkur Layout(P), Church Road, Storm Water Drain, Cross Talakavery Layout (P). Road, Rachenahalli Main Road, Compound Wall, 1st Main Road, Railway Line, 3rd Cross Road, Main Road, 1st A Cross Road, 1st Main Road, Telecom Layout Road, 8th Cross Road, 6th A Main Road, Existing Ward Boundary, R.K.H 1st Main Road,3rd Cross Road, 3rd Main 80 feet Road (Thanisandra Main Road). 5 7 7-Jakkuru Srirampura (P), Jingarappa Layout(P), North By Jakkuru Kere Boundary, Storm Water Drain, Rachenahalli Lake, Rachenahalli, Dasarahalli, Agrahara Lake Southern part Boundary, NR Maruthi Layout (P), Mestri Palya, Bhagyashree Windgates Road, Chokkanahalli Main Road. Royal Layout, P & T Layout, Thanisandra, East By Manyatha Tech Park Compound Wall, Amarajyothi Layout, Manyata Residensial Manyatha Residency Western Compound, Layout, Manyata Tech Park, Defence Layout, Manyatha Embassy Residency Main Road, 9th Chowdeshwari Layout, Mariyyanna Palya (P), Cross Road, Rachenahalli Main Road, St.Anns MS Ramaiah North City,Nagavara (P), Church Road, Storm Water Drain, Cross Rasoolsab Layout, Vidyasagar Layout, Telecom Road, Rachenahalli Main Road, Compound Layout, Sarayi Palya, Defence colony, Wall, 1st Main Road, Railway Line, 3rd Cross Amruthalli (P), Jakkuru (P). Road, Main Road, 1st A Cross Road, 1st Main Road, Telecom Layout Road, 8th Cross Road, 6th A Main Road, Existing Ward Boundary, R.K.H 1st Main Road,3rd Cross Road, 3rd Main 80 feet Road (Thanisandra Main Road), Nagavara Main Road. South By Nagavara Main Road, RCC Road (Existing Ward Boundary), RCC Road, Dasrahalli Main Road, TCH Collage Road, Existing Ward Boundary, Dasarahalli Main Road, Outer Ring Road. West By K G Main Road St.Anthony Church Road, 10th Main Road, Main Road (Existing Ward Boundary), 3rd Main Road (Pampa Ext Road),Dasrahalli Main Road, 2nd A Cross,Bhuvaneshwari Nagara Main Road, 2nd Cross, SLS Symphony Road,Amruthalli Tank Bund Road, Main Road,SLV Vidyanikethana School Road, Compound Wall,Cross Road, Main Road, Cross Road, Amruthahalli Main Road, Park View Layout Main Road, Dasrahali Main Road, Jakkur Road, Railway Line, Existing Ward Boundary, Jakkur Lake Western Peripheral Limit. 6 8 8- Gundanjaneya Indian Express Layout, UAS teachers Layout, North By Vidya Shilpa Academy School Compound Temple Ward Arkavathi Layout 1st Block, Jakkur Airodrome, Wall, Shobha Apts Compound Wall, Railway MCECH Layut (P), Jakkur Layout (P), Line. Jakkur(P), Talakaveri Layout, L&T Layout East By Jakkuru Main Road, Dasrahalli Main Road, (Amruthalli), Hoysala Layout (Amruthallai (P)). Park-view Layout Main Road. Byatarayanapura, Shabari Nagara, Sahakar South By Amruthahalli Main Road, SLV Vidya Nagar(P), Sanjeevini Nagara, Shanthi Vana Nikethan School Road, Nikethan School Layout, Military Farm Area, Jakkuru (P). Compound Wall. Amruth Nagara Main Road, Amruthalli Main Road,Bellary Road, Hebbal lake Northern Periperal Limit (Existing Ward Boundary) Military Farm Compound. West By 1st Main Road, Military Farm Compound. 5th Cross, Twin Towers Compound, Sterling Apts Compound, Kodigehalli Main Road, 1st Main Road, N Damodharan Road, Railway Line, Bellary Road, Existing Ward Boundary, Vidyashilpa Academy School Compound (Existing Ward Boundary). 9 9-Amrutahalli Sahakar Nagar(P), Kallappa Layout, Hotteppa North By Amruthahalli Main Road, SLV Vidya Layout, M Narayanaswamy Layout Nikethan School Road. (Amruthalli), Amruthalli (P) East By SLV Vidya Nikethan School Road, Bhuvaneshwarinagar(P), Hebbal Kempapura(P), Amruthanagara Main Road, SLS Symphony Vinayaka Layout (H Kempapura), Coffice Road (Storm Water Drain) Board Layout, Mariyanapalya, Arkavathi ExistingWardBoundary), Bhuvaneshwri Nagara Layout (P), Vishwanathanagenahalli (P), 2nd Cross,, Bhuvaneshwari Nagara Main Kariyanna Layout,
Recommended publications
  • Remembering 26/11'S NSG Heroes - India News - Ibnlive
    Remembering 26/11's NSG heroes - India News - IBNLive http://content.ibnlive.in.com/article/02-Jul-2009india/meet-the-pa... Like 1.2m Follow Let's talk cricket SIGN IN Ads by Google Home Politics India World South Movies Football Tech Photos CNN-IBN Video Live TV Sports Business Health Books Blogs News Article Home Search by Keyword | Search by date India | Updated Jul 03, 2009 at 09:47am IST Remembering 26/11's NSG heroes Arunoday Mukharji, CNN-IBN Follow @ArunodayM Recommend 0 Send Staatl. gepr. Techniker Fortbildung für Berufstätige, an 60 Orten bundesweit, 6 Fachrichtungen 0 www.daa-technikum.de ads by Google Tweet Brave NSG commandos were among those risking their lives to flush out terrorists from 0 the Taj, the Oberoi and Nariman House. CNN-IBN met the team that got rid of the last terrorist at the Taj Hotel. Like Hawaldar Azad Singh and Captain Ryan Chakravarty have lived to tell the tale of 26/11. It 0 was their bullets that cornered that last terrorist holed up in the first floor of the hotel. "Suddenly there was a blast of AK-47 fire on top of me. We moved back, thankfully it didn't hit us. We chucked two grenades and kept on pinning him down with fire," recalled Captain Rayan Chakravarty. "Hum log uspe fire karte rahe aur grenade phenkte rahey. Woh ek khirki mein se gir gaya Share aur maine apni jaan ki parwa na kartey hue, uspe fire kiya aur usko maar giraya (We kept firing at them and throwing grenades.
    [Show full text]
  • 26Th May 2016 EIA Presentation
    Proceedings of 165th Meeting of SEAC held on 26th and 27th May 2016 26th May 2016 Members present in the meeting: Shri. N. Naganna - Chairman Prof. D.L. Manjunath - Member Dr. S. Manjappa - Member Dr. B.S. Jaiprakash - Member Shri. B. Chikkappaiah - Member Dr. N. Krishnamurthy - Member Dr. S. Prashanth - Member Dr. K.C. Jayaramu - Member Sri. Srinivasaiah - Member Dr. K.B. Umesh - Member Sri. Subramany.M - Member Sri. Vijaya Kumar - Secretary, SEAC The Chairman, SEAC, Karnataka welcomed the members of the Committee and others present. The following proposals listed in the agenda were appraised in accordance of the provision of EIA Notification 2006. The observation and decision of the Committee are recorded under each of the agenda items. Confirmation of the proceedings of 164th SEAC meeting held on 11th and 12th May 2016. The State Expert Appraisal Committee, Karnataka perused the proceedings of 164th SEAC meeting held on 11th and 12th May 2016 and confirmed the same. EIA Presentation: 165.1 Tank Terminal facility for storage of MEG, Acetic acid, Light Naphtha, LSHS, Diesel at Sy.NO. 46-1(p), 47-2(p), 47-3(p), 47-7(p1), 47-7(p2), 47-8(p), 47-13(p), 47-14(p), 47-15, 47-16(p), 47-3(p), 47-9(p), 47-10(p), 47-7(p3), Thannirbhavi, Mangalore, Dakshina Kannada District of Sri R.S.Negarkar, CEO, M/s Raftaar Terminals Pvt. Ltd., #4/152, Laxman Building, NH-66, Kottara Chowki, Mangalore- 575006 (SEIAA 12 IND 2015) This is a proposal seeking Environment Clearance for Tank Terminal facility for storage of MEG, Acetic acid, Light Naphtha, LSHS, Diesel at Sy.NO.
    [Show full text]
  • Authored by Dr. Rajeev Kishen
    Authored by Dr. Rajeev Kishen. INDIA’S HEROES Anonymous Vocabulary and key words: 1. fidgeted 2. air of thrill and enthusiasm 3. assignment had not been a drudge 4. particular trait or quality 5. wish to emulate 6. crackle of sheets 7. rapt attention 8. perspiration 9. accustomed 10. not have a flair 11. two tenures 12. battalion in counter terrorism 13. insurgency 14. arranged for his evacuation 15. courageous 16. birds chirped 17. cars honked 18. abandon his responsibilities 19. restore the heritage structure 20. welled up 21. selfless 22. class rose as one, applauding and cheering 23. uphold the virtues of peace, tolerance and selflessness The story is narrated from the third person omniscient point of view. 1 INDIA’S HEROES Students Kabir Mrs. Baruah Students fidgeted and When Kabir got up to speak, his hands shook She gave them a few shifted in their seats, slightly and beads of perspiration appeared on seconds to settle and an air of thrill and his forehead. He was not accustomed to facing down, let us begin our enthusiasm prevailed. the entire class and speaking aloud. He knew he lesson for today. Mrs. She addressed an eager did not have a flair for making speeches. Baruah beamed Mrs. class 8 A. All forty However, he had worked hard on his Baruah said hands went up in assignments and written from the depth of his wonderful, you can unison. heart. His assignments were different from the speak on a profession A crackle of sheets was others. It did not focus on one person, profession someone you like and heard as students or quality.
    [Show full text]
  • Plan Bengaluru 2020
    www.•bldebe!IPIUN.In PI an Vffit,})fn\ BENGALURu_i(lj8 {lj Bringing back a Bengaluru of Kempe Gowda's dreams JANUARY 2010 Agenda for Bengaturu With hlnding & support of Infrastructure and Namma Benpluru Foundation Devetopement Task force -.Mmi'I'IIH!enJIIIIUru.ln BENGA~~0 1010 Bringing ba1k a Bengaluru of Kempe Gowda's dreams BE ASTAKEHOLDER OF PLANBENGALURU20201 1. PlanBengaluru2020 marks a significant deliverable for the Abide Task force - following the various reports and recommendations already made. 2. For the first time, there is a comprehensive blueprint and reforms to solve the city's problems and residents' various difficulties. This is a dynamic document that will continuously evolve, since there will be tremendous scope for expansion and improvement, as people read it and contribute to it 3. PlanBengaluru2020 is a powerful enabler for RWAs 1 residents and citizens. It will enable RWAs 1 residents to engage with their elected representatives and administrators on specific solutions and is a real vision for the challenges of the city. 4. The PlanBengaluru2020 suggests governance reforms that will legally ensure involvement of citizens 1 RWAs through Neighbourhood Area Committee and Ward Committee to decide and influence the future/ development of the Neighbourhoods, Wards and City 5. This plan is the basis on which administrators and elected representatives must debate growth, overall and inclusive development and future of Bangalore. 6. The report will be reviewed by an Annual City Report-Card and an Annual State of City Debate/conference where the Plan, its implementation and any new challenges are discussed and reviewed. 7. PlanBengaluru2020 represents the hard work, commitment and suggestions from many volunteers and citizens.
    [Show full text]
  • A1 SYSTEM MAP 2021.Cdr
    TO TO PUNE (PA) LATUR TO Eó®Ò¨ÉxÉMÉ® TO NANDED ROHA 0.000, 191.590(CST) DAUND JN.(DD) PARBHANI JN. ÊxÉVÉɨÉɤÉÉn 267.180(CST) KARIMNAGAR TO ENLARGEMENT AT A C NIZAMABAD MUMBAI ENLARGEMENT AT =º¨ÉÉxÉɤÉÉn HOSAPETE JN. (HPT) 143.261, 0.000(AVC) TORANAGALLU JN. (TNGL) NH 7 BAYALU VODDIGERI OSMANABAD 141.798 (BYO)161.530 175.700, 0.000(RNJP) MARMAGAO HARBOUR TO TO PAPINAYAKANAHALLI (MRH) 111.870 BALLARI CANTT. KURDUWADI JN. (KWV) MIRAJ HUBBALLI JN. (PKL)156.510 DAROJI (BYC) 202.940 376.28(CST) GADIGANURU (DAJ) 181.270 KONKAN RAILWAY MUNIRABAD (MRB) 137.290 (GNR)168.470 BELLARY CANTONMENT (H) VASCO-DA-GAMA 204.100 BARAMATI TO HOSAPETE BYE PASS LINE INDIA (VSG) 108.458 2.510 310.880(CST) KAZIPET JN. BALLARI JN. (BAY) TUNGA BHADRA DAM (TBDM) 5.020 KUDATINI 208.060, 0.000(RDG) KARIGANURU (KDN)188.230 DABOLIM (H) SWR LIMIT XX VERNA (KGW)149.605 174.105 KHED (DBM) 103.384 VYASANAKERI (VYS) 10.300 ºÉiÉÉ®É BIDAR (BIDR) TORANAGALLU 1.658 212.000 SOLAPUR (SUR) ¨ÉänE SWR LIMIT VYASA COLONY JN(VC) NH 9 ¤ÉÒn® 90.780 92.500 BYE PASS LINE TO BHIMA 454.970, 299.440(GDG) 16.218,0.000(SMLI) BALLARI SATARA SANKAVAL GUNTAKAL JN. XX RIVER MEDAK SWR LIMIT MAJORDA JN. (MJO) GUNJI (GNJ) MARIYAMMANAHALLI (H) (MMI) 21.930 BANNIHATTI BYE PASS LINE BIDAR XX (SKVL) 100.391 572.990 ¶ÉÉä±ÉÉ{ÉÖ® XX 109.110 (BNHT) 9.020 HOTGI JN. (HG) 435.730(ROHA/KRCL) HAMPAPATNAM (H) RAMGAD HADDINAGUNDU XX NH 9 470.040, 284.090(GDG) 91.500(LD) (HPM) 33.170 (RMGD) 13.122 (HDD) 214.680 SOLAPUR CANSAULIM TINAIGHAT TO OBALAPURAM CHIPLUN SWR LIMIT SANJUJE- DA- AREYAL (H) 0 (CSM) 95.873 (TGT) 11.640 HUBBALLI YESHWANTH NAGAR (OBM) 15.40 281.900 HUMNABAD XX (SJDA)79.655 SULERJAVALGE (H) (SLGE) 271.520 CASTLEROCK (YTG) 23.992 TPURA XX VALI (H) (SRVX) RANJI RAM (HMBD) 37.207 SURA (CLR) 24.500 HAGARIBOMMANAHALLI SOMALAPU 439.020, 88.210(LD) (RNJP) 23.020 30.860 TADWAL (TVL) 264.180 (HBI) 43.470 (SLM) SOUTH WESTERN RAILWAY Eó±É¤ÉÙ®MÉÒ SECUNDERABAD JN.
    [Show full text]
  • Gangothri Residency - G M Palya, Bangalore Residential Apartments Fully Furnished 3 Bhk Flat with Separate Family Room, Pooja Area, 2 Balconies
    https://www.propertywala.com/gangothri-residency-bangalore Gangothri Residency - G M Palya, Bangalore Residential Apartments Fully furnished 3 bhk flat with separate family room, pooja area, 2 balconies. Flat is on the 4th floor of this 5 storey building. Project ID : J771190387 Builder: Gangothri Properties: Apartments / Flats, Residential Plots / Lands Location: Gangothri Residency, G M Palya, Bangalore (Karnataka) Completion Date: May, 2012 Status: Started Description Gangothri Residency: Fully furnished 3 bhk flat with separate family room, pooja area, 2 balconies. Flat is on the 4th floor of this 5 storey building. It is open from 3 sides and is cool and has a good breeze. Lift facility, stilt parking and security is also available. All rooms have granite flooring. All bedrooms ( 2 bedrooms have double beds with spring matresses while the third bedroom has a sofa cum bed ) are air- conditioned and have wall units for ample storage of clothes. All bedrooms have attached bathrooms. Location Advantages: Airport: 35.0 Kms Railway Station: 13.0 Kms Hospital: 3.0 Kms City Center: 5.0 Kms School: 1.0 Kms ATM: 1.0 Kms Lifestyle Amenities: Power Back-up Security / Fire Alarm Corner Flat / House / Plot Feng Shui / Vaastu Compliant Intercom Facility Lift(s) Reserved Parking Park Security Personnel Water Storage Rain Water Harvesting Features Luxury Features Security Features Power Back-up Lifts Security Guards Electronic Security Intercom Facility Fire Alarm Lot Features Interior Features Balcony Corner Location Feng Shui / Vaastu Compliant
    [Show full text]
  • Trade Marks Journal No: 1771 , 14/11/2016 Class 41
    Trade Marks Journal No: 1771 , 14/11/2016 Class 41 1478864 14/08/2006 DOON PUBLIC SCHOOL trading as ;DOON PUBLIC SCHOOL B-2, PASCHIM VIHAR, N DELHI Address for service in India/Agents address: MR. MANOJ V. GEORGE, MR. ARUN MANI B-23 A, SAGAR APARTMENTS, 6, TILAK MARG NEW DELHI-110001 Used Since :01/04/1978 DELHI SERVICE OF IMPARTING EDUCATION THIS IS CONDITION OF REGISTRATION THAT BOTH/ALL LABELS SHALL BE USED TOGETHER..THIS IS SUBJECT TO FILING OF TM-16 TO AMEND THE GOODS/SERVICES FOR SALE/CONDUCT IN THE STATES OF.DELHI ONLY. 3707 Trade Marks Journal No: 1771 , 14/11/2016 Class 41 1807857 16/04/2009 MEDINEE INSTITUTE OF INFORMATION TECHNOLOGY SANTIPUR,MECHEDA,KOLAGHAT,PURBA MEDINIPUR,PIN 721137,W.B. SERVICE PROVIDER Address for service in India/Agents address: KOLKATA TRADE MARK SERVICE. 71, CANNING STREET (BAGREE MARKET) 5TH FLOOR, ROOM NO. C 524 KOLKATA 700 001,WEST BENGAL. Used Since :10/06/2006 KOLKATA EDUCATION, PROVIDING OF TRAINING, TEACHING, COACHING AND LEARNING OF COMPUTER, SPOKEN ENGLISH, CALL CENTER, PUBLIC SCHOOL. 3708 Trade Marks Journal No: 1771 , 14/11/2016 Class 41 1847931 06/08/2009 UNIVERSITY OF WESTERN SYDNEY GREAT WESTERN HIGHWAY, WERRINGTON, NEW SOUTH WALES, 2747, AUSTRALIA. SERVICE PROVIDERS. AN AUSTRALIAN UNIVERSITY. Address for service in India/Agents address: S. MAJUMDAR & CO. 5, HARISH MUKHERJEE ROAD, KOLKATA - 700 025, INDIA. Proposed to be Used KOLKATA EDUCATIONAL SERVICES, INCLUDING THE PROVISION OF SUCH SERVICES FROM A COMPUTER DATABASE OR THE INTERNET, THE CONDUCT OF EDUCATIONAL COURSES AND LECTURES, AND
    [Show full text]
  • Wetlands: Treasure of Bangalore
    WETLANDS: TREASURE OF BANGALORE [ABUSED, POLLUTED, ENCROACHED & VANISHING] Ramachandra T.V. Asulabha K. S. Sincy V. Sudarshan P Bhat Bharath H. Aithal POLLUTED: 90% ENCROACHED: 98% Extent as per BBMP-11.7 acres VIJNANAPURA LAKE Encroachment- 5.00acres (polygon with red represents encroachments) ENVIS Technical Report: 101 January 2016 Energy & Wetlands Research Group, CES TE 15 Environmental Information System [ENVIS] Centre for Ecological Sciences, Indian Institute of Science, Bangalore - 560012, INDIA Web: http://ces.iisc.ernet.in/energy/, http://ces.iisc.ernet.in/biodiversity Email: [email protected], [email protected] ETR 101, Energy & Wetlands Research Group, CES, IISc WETLANDS: TREASURE OF BANGALORE [ABUSED, POLLUTED, ENCROACHED & VANISHING] Ramachandra T.V. Asulabha K. S. Sincy V. Sudarshan P Bhat Bharath H. Aithal © Energy & Wetlands Research Group, CES TE15 Centre for Ecological Sciences, Indian Institute of Science Bangalore 560012, India Citation: Ramachandra T V, Asulabha K S, Sincy V, Sudarshan Bhat and Bharath H.Aithal, 2015. Wetlands: Treasure of Bangalore, ENVIS Technical Report 101, Energy & Wetlands Research Group, CES, IISc, Bangalore, India ENVIS Technical Report 101 January 2016 Energy & Wetlands Research Group, Centre for Ecological Sciences, TE 15 New Bioscience Building, Third Floor, E Wing Indian Institute of Science Bangalore 560012, India http://ces.iisc.ernet.in/energy, http://ces.iisc.ernet.in/biodiversity Email: [email protected], [email protected] Note: The views expressed in the publication [ETR 101] are of the authors and not necessarily reflect the views of either the publisher, funding agencies or of the employer (Copyright Act, 1957; Copyright Rules, 1958, The Government of India).
    [Show full text]
  • Paper Presentation for Lake Symposium 2014
    Paper Presentation for Lake Symposium 2014 Indian Institute Of Science Presented By: Gnana Jyothi School Team STUDY OF PHYSICO-CHEMICAL AND BIOLOGICAL CHARACTERISTICS OF YELAHANKA AND ALLALASANDRA LAKES Today’s Presentation Introduction Objectives Materials and Methods Result and Discussion Conclusion INTRODUCTION • Wetlands are one of the most productive ecosystems. • Functions of wetlands: . water storage (domestic, agricultural and industrial usage), . protection from storms and floods, . recharge of ground water, . water purification, . storehouse for nutrients, . erosion control . stabilisation of local climate (such as temperature and rainfall), . maintain the ecological balance. • Lakes occupy less than 0.007% of the world’s fresh water. • Water is getting polluted day-by-day due to discharge of domestic and industrial wastes, oil spills , run off from agricultural fields etc. into nearby lakes . • Water quality includes all physical, chemical and biological factors that influence the beneficial use of water. • Water bodies support algae, zooplankton, fish, mollusk, birds etc. The objective of the study were • The objectives of the present study were a) to study the nature of water quality b) to analyse the physico- chemical parameters c) to study and observe the nature of waste water algae. Study Area • Allalasandra Lake is located in Bangalore North at Lal Bahadur Shastri Nagar, Yelahanka. In 2009, the Allalasandra lake bed was dryland. • Restored by the BBMP in 2010-11 fencing the lake area, desilting the lake bed, building a pathway, and installation of benches and lights. • But still untreated sewage inflows can be seen. • Yelahanka Lake is located on northern side of Bangalore (about 200 Acres). • Restoration measures started during 2008 - 2009 included: Construction of bridge, desilting, diversion drain, embankment and pitching.
    [Show full text]
  • Table of Contents INTERNATIONAL NEWS
    www.toprankers.com Table of Contents INTERNATIONAL NEWS ........................................................................................ 3 NATIONAL NEWS .................................................................................................. 11 BANKING AND ECONOMICS ............................................................................... 36 AWARDS AND RECOGNITION ............................................................................. 39 SPORTS ................................................................................................................. 42 APPOINTMENTS AND RESIGNATIONS................................................................ 47 SCIENCE AND TECHNOLOGY ............................................................................. 49 OBITUARY ............................................................................................................ 51 SUMMITS AND MOU‟S ......................................................................................... 52 DAYS ..................................................................................................................... 54 1 www.toprankers.com 2 www.toprankers.com INTERNATIONAL - Hong Kong in recession as protests slam retailers, tourism On Thursday, the government said Hong Kong's economy shrank 3.2% in July-September from the previous quarter, pushing the city into a technical recession. -North Korea conducts new test of „super-large‟ rocket launcher: South Korea‘s military said Thursday that the North had launched two
    [Show full text]
  • The Print Media Coverage of the 26/11 Mumbai Terror Attacks: a Study on the Coverage of Leading Indian Newspapers and Its Impact on People
    Journal Media and Communication Studies Vol. 1(6) pp. 095-105, December, 2009 Available online http://www.academicjournals.org/jmcs ©2009 Academic Journals Full Length Research Paper The print media coverage of the 26/11 Mumbai terror attacks: A study on the coverage of leading Indian newspapers and its impact on people M. Neelamalar*, P. Chitra and Arun Darwin Department of Media Sciences, Anna University Chennai, Tamil Nadu, India. Accepted 23 October, 2009 Since its independence in 1947, India has been facing the problem of terrorism in different parts of the country. This research is an analysis of the media coverage of terrorists’ attack on Mumbai (one of the busy metros of India and the business capital of the country) on 26 November 2008 (now the attack is popularly known as 26/11). The research is carried out to know the people’s opinion about the media coverage, to find out how people responded to the newspaper coverage, whether the coverage was biased or sensationalizing, how people responded to the coverage, whether they gave a fair coverage to the incident and to find out whether they commercialized the issue. Key words: Mumbai, terror attacks, media, coverage, impact. INTRODUCTION Since its independence in 1947, India has been facing as 26/11). the problem of terrorism in different parts of the country. The research is carried out to know the people’s India has faced terrorist movements in Punjab and opinion about the media coverage, to find out how people Jammu and Kashmir, bordering Pakistan and northeast responded to the newspaper coverage, whether the and also in certain states like Andhra Pradesh, Madhya coverage was biased or sensationalizing, how people Pradesh and Orissa.
    [Show full text]
  • Comprehensive Comprehensive Traffic And
    << KARNATAKA URBAN INFRASTRUCTURE DEVELOPMENT AND FINANCE CORPORATION COMPREHENSIVE TRAFFICAND TRANSPORTATION PLAN FOR BANGALORE OCTOBER 2007 RITES Ltd (A Government of India Enterprise) Comprehensive Traffic & Transportation Plan for Bangalore Table of Contents Comprehensive Traffic and Transportation Plan for Bangalore TABLE OF CONTENTS LIST OF TABLES LIST OF FIGURES LIST OF ABBREVIATIONS EXECUTIVE SUMMARY CHAPTER ––– 1 INTRODUCTION 1.1 GENERAL BACKGROUND 1.2 PHYSICAL CHARACTERISTICS 1.3 DEMOGRAPHIC AND SOCIO-ECONOMIC CHARACTERISTICS 1.4 TRANSPORT NETWORK 1.5 GROWTH OF MOTOR VEHICLES 1.6 THE BANGLORE METROPOLITAN REGION 1.7 URBAN LAND USE STRUCTURE FOR BMA 1.8 BANGALORE MYSORE INFRASTRUCTURE CORRIDOR AREA PLANNING AUTHROITY (BMICAPA) 1.9 EARLIER STUDIES 1.10 NEED FOR THE COMPREHENSIVE TRAFIC AND TRANSPORTATION PLAN CHAPTER ––– 2 STUDY OBJECTIVES AND METHODOLOGY 2.1 STUDY GOALS 2.2 OBJECTIVES OF THE STUDY 2.3 SCOPE OF THE STUDY 2.4. STUDY METHODOLOGY CHAPTER ––– 3 EXISTING TRAFFIC AND TRAVEL CHARACTERISTICS 3.1 INTRODUCTION 3.2 PRIMARY TRAFFIC AND TRAVEL SURVEYS 3.3 TRAFFIC ZONE DELINEATION 3.4 ZONAL POPULATION 3.5 TRAFFIC CHARACTERISTICS 3.6 SOCIO-ECONOMIC AND TRAVEL CHARACTERISTICS RITES Ltd. Page 1 of 8 Comprehensive Traffic & Transportation Plan for Bangalore Table of Contents 3.7 PEDESTRIAN TRAFFIC CHARACTERISTICS 3.8 PARKING CHARACTERISTCS 3.9 SPEED & DELAY STUDY 3.10 PUBLIC TRANSPORT SURVEY 3.11 TRAFFIC MANAGEMENT 3.12 ROAD ACCIDENTS 3.13 PROBLEMS AND ISSUES CHAPTER ––– 4 DEVELOPMEDEVELOPMENTNT OF OPERATIONAL TRAVEL DEMAND MODEL
    [Show full text]