<<

당진항_링크_1030_영문_1.pdf 2 2014-10-30 오후 4:53:02

C

M

Y

CM

MY

CY

CMY

K PORT We connect OF

Korea with

the world! 당진항_링크_1030_영문_1.pdf 3 2014-10-30 오후 4:53:02

We connect Korea with the world!

From the center of KOREA to that of the world! Dangjin Port, with the dream of an unlimited future toward the sea, shaping today different from yesterday and better tomorrow than today .

DANGJIN + OCEAN + ECONOMY + FUTURE

C

M

Y

CM

MY

CY

CMY

K 당진항_링크_1030_영문_1.pdf 4 2014-10-30 오후 4:53:03

CONTENTS

C

M

Y

CM

MY

CY

CMY Connecting the land with the ocean K 04 Status map 06 Basic situation 07 Port operation support center

Connecting the port with the logistics 08 Advantages and vision 10 Various statistics

Connecting the economy with values 12 Kodae Pier 14 West Pier 16 Songak Pier 17 Dangjin Coal-Fired Power Complex Pier

Connecting the present with the future 18 Development plan 20 Integrated industrial complex 22 Associate institutions and companies

03

당진항_링크_1030_영문_1.pdf 7 2014-10-30 오후 4:53:10

Basic

The center of the Pan- era that boasts the country's largest logistics volume increase rate Dangjin Port

Statutory port name port name: Dangjin· Port (Revision of the Enforcement Decree of Port Act on Dec. 30, 2004

Port type Type 1 designated port (trade port) C

M Route (60 mins) Y Seonggumi, Gagok-ri, Songsan-myeon, Dangjin ~ South of Goon-ri,

CM (70 mins) Woojeong-eup, Hwaseong, Gyeonggi-do (Water area: 97.2㎢) Dangjin MY port Dangjin- Expressway Course CY

Seohaean (West Coast) Distance 30km, Width 0.4~1.0km, Depth 11~18m Expressway CMY (90 mins) Daejeon K Capacity

Type Berth Unloading Note Dangjin·Pyeongtaek 61 86,319,000 Dangjin Coal-Fired Power Port tons Complex is excluded (2 hrs) Dangjin Port 35 61,176,000 Dangjin Coal-Fired Power tons Complex is included ※Dangjin·Pyeongtaek Port excludes Dangjin Coal-Fired Power Complex; however, in the case that only Dangjin Port is excluded, Dangjin Coal-Fired Power Complex is included (2 hrs)

The best geographical situation the heartland of KOREA

The center of Northeast Asia, which is near to the large global markets, such as China, Japan and Russia

(Dalian port 482km, Dandong port 454km, Qingdao port 593km)

06 당진항_링크_1030_영문_1.pdf 8 2014-10-30 오후 4:53:14

Connecting the land with the ocean (Land + Ocean) Port operation support center

Dangjin port operation support center

Location Kodae Industrial Complex 2-gil, Songak-eup, Dangjin (Shoreward side of Kodaeri 342, landward side of the pier) Period 2013. 06 ~ 2014. 08 Size Basement-1 floor~Above Ground − 6 floors / Gross area 4,955㎡, Building area 1,060㎡ Installed facilities

C - C.I.Q institution offices, administrative organization branch offices, etc.

M - Port-related companies : Shipping company, shipping logistics agency, logistics company,

Y loading company, etc.

CM - Work support company : Convenience areas, such as rest area, viewing deck, financial institution

MY Expected effects

CY - Establishing the one-stop processing system for export-import, port management, shipping logistics

CMY - Enhancing the competitiveness by focusing on inspection, customs, logistics intermediary,

K administrative support, etc. - Creating the port logistics foundation centering on Dangjin port by establishing the comprehensive town for the port-related facilities

07 당진항_링크_1030_영문_1.pdf 9 2014-10-30 오후 4:53:16

Advantages and vision

Growing into one of Korea’s five large ports with amazing natural conditions and high growth potential

C

M

Y

CM

MY

CY

CMY

K

2008 2009 2010 2011 2012 2013 2014 20.56 mil ton 22.80mil ton 36.80mil ton 50.18mil ton 52.54mil ton 56.83mil ton 65.79mil ton

increase rate of 23% 당진항_링크_1030_영문_1.pdf 10 2014-10-30 오후 4:53:17

Connecting the port with the logistics (Port + Logistics)

C

M

Y

CM

MY

CY

CMY

K

Proper cargo transportation with the naturally blessed conditions Dangjin Port is located within the gulf, surrounded by land and it is barely affected by typhoons and tsunamis, moreover, the cargo transportation delays due to adverse climate conditions are rare The typhoon days at Dangjin port are average 6.8 days and the mist occurrence days are 26.3 days, which is about half of the records of other ports The access route is excellent and the pier depth is also deep, enabling the huge ships to enter and go out The waiting time for the incoming and outgoing ships is short, reducing the cargo transportation cost and realizing the transportation on time

Providing the advantages to the related industry with the establishment of the steel cluster Making it convenient for the related industry to be located as the local's famous steel companies, such as , Dongbu Steel, , , Seah Steel, Hwanyoung Steel, and Husteel.

Providing a convenient pier to be used by the medium and small cargo owners Dangjin Port operates the two systems for the public pier (one of 50,000 tons, one of 30,000 tons) and one additional system is being constructed With the latest loading facilities, Dangjin Port reduces the loading time and provides customized loading services

09 당진항_링크_1030_영문_1.pdf 11 2014-10-30 오후 4:53:18

Various

With Korea’s No. 1 logistics volume increase, the unlimited development potential for Dangjin Port has been proved

Kodae Pier, Songak Pier, West Pier, Dangjin Coal-Fired Power Complex Pier

Increase rate Type Note volume (1,000 tons) (%) 2009 22,798 11 volume 2010 36,799 60 C 2011 50,177 36 Hyundai Steel commenced Blast furnace 3 65,794 M 52,543 56,832 2012 52,543 5 Bulk cargo transport duration 50,177 Y 36,799 2013 56,832 8 Complete construction of two systems for Songak Pier 22,798 CM 2014 65,794 16 Hyundai Steel commenced operations of Blast furmace 3 MY 2009 2010 2011 2012 2013 2014

CY

CMY

K

10 당진항_링크_1030_영문_1.pdf 12 2014-10-30 오후 4:53:19

Ship entry and exit record Dangjin

Number of Increase rate 7,945 Type Note ships (%) 7,870 7,809 7,060 2009 4,696 4 5,945 2010 5,945 27 Two systems for cement pier 4,696 2011 7,060 19 2012 7,870 11 2013 7,809 -1 Large increase in numbers of incoming and outgoing ships

2014 7,945 2 Large increase in numbers of incoming and outgoing ships Increase conversion 2009 2010 2011 2012 2013 2014

Kodae Pier, Songak Pier, West Pier, Dangjin Coal-Fired Power Complex Pier

Increase rate Processing Type Note 61,176 C (%) capacity (1,000 tons) 35 48,612 M 2000 5 11,923 Hanbo Pier, Dangjin Coal-Fired Power Complex Pier 23 Y 2003 7 13,241 25,251 22,572 CM 2006 9 22,572 Dangjin Coal-Fired Power Complex, Hyundai Steel Pier 14 13,241 9 MY 2008 14 25,251 Development of Songak Pier and Kodae Pier in full phase 11,923 7 5 CY 2010 23 48,612

CMY 2014 35 61,176 Development of West Pier and Songak Pier 2000 2003 2006 2008 2010 2014 K

8.10% 7.31% 7.52% Dangjin· 6.37% 7.10% 4.45% 4.27% 4.27% 2000 2002 2004 2006 2008 4.07% 3.73% 3.73% 4.07% 4.27% 4.27% 4.45% 2010 2011 2012 2013 2014 6.37% 7.31% 7.52% 8.10% 7.10% 2000 2002 2004 2006 2008 2010 2011 2012 2013 2014

11 당진항_링크_1030_영문_2.pdf 1 2014-10-30 오후 4:54:32

Kodae Pier

C

M

Y

CM

MY

CY Dangjin Tank Terminal CMY Pier

K

Management Pier Dongbu Steel Pier Government-Operated Pier (Zone 1 )

Size : Floating pier 2, ships with no more Size : Six systems (One for 5,000 tons, three Size : One for 30,000 tons than 200 tons, and 50 official service ships for 50,000 tons, and two for 30,000 tons) Processing Cargo : Goods Operator : Pyeongtaek Maritime Port Agency, Processing cargo : steel Operator : Dangjin Port Operator Port Logistics Dept. Operator : Dongbu Dangjin Port Operator

12 당진항_링크_1030_영문_2.pdf 2 2014-10-30 오후 4:54:33

Connecting the economy with the values (Economy + Values)

Management Pier

Dongbu Steel Pier

Government-Operated Pier (1 Zone)

Government-Operated Pier (Zone 2)

Dongkuk Steel Pier

C

M

Y

CM

MY

CY

CMY K Supporting the high-value-added industry with the steel cluster support

l Area of Kodae Complex 2-gil, Songak-eup, Dangjin l

Government-Operated Pier (Zone 2) Dongkuk Steel Pier Dangjin Tank Terminal Pier

Size : 1 for 50,000 tons Size : 1 for 50,000 tons Size : One for 50,000 tons Processing Cargo : Goods Processing Cargo : Steel Processing Cargo : Liquid Cargo Operator : Dangjin Port Operator Operator : Dongkuk Steel Operator : Dangjin Tank Terminal

13 당진항_링크_1030_영문_2.pdf 3 2014-10-30 오후 4:54:36

West Pier

Logistics site

Animal feed plant of Cargill Inc. C Management Plant the destination Logistics site M pier

Y

CM

MY

CY Taeyoung Grain CMY Terminal Pier

K

l Area of Dangjin Port in Sinpyeong-myeon, Dangjin l

Management Pier Hanil Cement Pier Youngjin Global Pier

Size : Floating pier 2, ships with no more than Size : One for 30,000 tons Size : One for 30,000 tons 200 tons, and 50 official service ships Processing cargo : Slag and non-powder slag Processing cargo : Slag and non-powder slag Operator : Pyeongtaek Maritime Port Agency, Operator : Hanil Cement Operator : Yongjin Global Port Logistics Dept.

14 당진항_링크_1030_영문_2.pdf 4 2014-10-30 오후 4:54:38

Connecting the economy with the values (Economy + Values)

The base for processing of various cargoes, such as cement, grain, and goods

Tank terminal (Youngjin TNM, West Pyeongtaek) Hanil Cement Youngjin Global Pier HyundaiㆍSampyo Pier Pyeongtaek Dangjin Central Pier Pier

Pyeongtaek Dangjin Pier

ManagementC pier M

Y

CM

MY

CY

CMY

K

Hyundai·Sampyo Pier Pyeongtaek Dangjin Central Pier Size : 1 for 30,000 tons Size : Two for 30,000 tons Processing cargo : Slag and non-powder slag Processing cargo : Goods Operator : Hyundai Cement, Operator : Pyeongtaek Dangjin Central Pier Sampyo Basic Materials

Pyeongtaek Dangjin Pier Taeyoung Grain Terminal Pier

Size : Two for 30,000 tons Size : Two for 50,000 tons Processing cargo : Goods Processing cargo : Grains Operator : Pyeongtaek Dangjin Pier Operator : Taeyoung Grain Terminal

15 당진항_링크_1030_영문_2.pdf 5 2014-10-30 오후 4:54:43

Songak Pier

Hyundai Steel Pier

Public Pier

C

M

Y

CM

MY

CY Hyundai Steel Pier

CMY K Establishing the one-stop Under construction steel cluster, covering ingredient adoption and steel production

l Area of north industrial road, Songak-eup, Dangjin l Public Pier

Size : One for 50,000 tons Processing cargo : Steel Operator :

Hyundai Steel Pier

Size : twelve 30,000 tons ~200,000 tons Processing cargo : Steel, coal, iron ore Operator : Hyundai Steel

16 당진항_링크_1030_영문_2.pdf 6 2014-10-30 오후 4:54:49

Dangjin Coal-Fired Power Complex Pier Dangjin Coal-Fired Power Complex Pier

C

M

Y

CM

MY

CY

CMY

K

l Area of Kyoro-gil, Seokmun-myeon, Dangjin l Dangjin Coal-Fired Power Complex Pier 4 mil. Kw High-efficiency Advanced Power Plant

Dangjin Coal-Fired Power Complex Pier

Size : Three(One for 150,000 tons, One for 170,000 tons, One for 200,000 tons) Processing cargo : Bituminous coal Operator : Korea East-West Power Development

17 당진항_링크_1030_영문_3.pdf 1 2014-10-30 오후 4:56:03

Develop -ment Reducing the distance between West Port and Inner Port with the plan construction of the access road for Sinpyeong- Inner Port 3.7km bridge, 2.2km road (About 300 billion KRW of business expenses) Promoting the joint development of Dangjin and Pyeongtaek Ports by reducing Dangjin Port the logistics cost and supplementing the port functions Expansion of access road to West Port 6.4km from the No.38 National Highway junction to West Port, expanding into four lanes enjoying a resurgence 1st phase is to be constructed in 2015 (34 billion KRW of total construction cost) Creation of the conditions for the new pier construction via the in development as expansion of harbor limit East of Seonggumi port, Songsan-myeon → expansion of Seonggumi port and it grows into a change to Sea gate of Seokmun tide embankment The conditions for the material pier for Hyundai Steel (250,000 tons) and harbor global trade facilities in Songsan Zone (228,000㎡) are expected to be constructed With the docking system, the increasing logistics volume can be processed effectively base port By 2020, 42 berth systems - an increase of 12 - will be established, such as C Hyundai Steel's 250,000 tons pier, Kodae Pier, and West Pier M

Y Considerations for the 3rd National Trade Port Basic Plan

CM Type (berths) Completed In progress Future plan Total (~2014.9) MY Dangjin•Pyeongtaek CY 51 12 16 79 Ports total

CMY Dangjin Port 27 5 7 39 K Pyeongtaek Port 24 7 9 40

Dangjin Coal-Fired 2 - 1 3 Power Complex Port

18 당진항_링크_1030_영문_3.pdf 2 2014-10-30 오후 4:56:04

Current Status of Each pier at Dangjin Port

The size of the Wharf Current status of development Name of Ability of Major Oper ng company Number Length of Minimum Notes pier coming into Host Year and freights of berth the berth depth of water Current status the pier Month 1 5,000 110 6.5 Private management completed Slag 2 3,000 110 6.5 Private management completed tar 3 5,000 120 22.5 Private management 2009.12 completed 4 200,000 390 22.5 Private management 2009.04 completed iron ore private pier of Hyundai Steel Co., Ltd 5 100,000 330 20 Private management completed 6 50,000 280 14 Private management 2006.12 completed coal Songak 7 30,000 240 12 Private management 2007.05 completed steel (Hyundai 8 20,000 220 11 Private management 2012 in progress steel Hyundai Steel Co., Ltd Steel) 9 50,000 240 14 government-owned 1996 completed common use steel pier 10 30,000 240 12 government-owned 1996 completed only for Hyundai Steel Co., Ltd 11 30,000 230 12 government-owned 1996 completed Scrap iron 12 5,000 120 7.5 Private management 2012 in progress steel 13 5,000 120 7.5 Private management 2012 in progress steel 14 5,000 120 Private management 2020 completed private pier of Hyundai Steel Co., Ltd steel 15 5,000 120 Private management 2020 completed 250,000 420 Private management 2020 completed iron ore 1 5,000 120 7 Private management 1996 completed C 2 50,000 280 14 Private management 2009.10 completed M 3 50,000 280 14 Private management 2009.10 completed Dongbu Steel Co., Ltd steel private pier of Dongbu Steel Co. Ltd Y 4 50,000 280 14 Private management 2009.10 completed 5 30,000 240 12 Private management 2011.10 completed CM Kodae pier 6 30,000 240 12 Private management 2011.10 completed MY Dangjin Port Co. 7 30,000 240 12 government-owned 2011.05 completed miscellaneous TOC TOC pier

CY Dong Kuk Steel Co., Ltd 8 50,000 280 14 government-owned 2013.07 in progress miscellaneous TOC TOC pier Consosium CMY Intergis Co. 9 50,000 280 14 Private management 2009.08 completed steel private pier of Dongkuk Steel Co., Ltd

K Dangjin Tank Terminal 10 50,000 280 14 Private management 2013 in progress liquid Hanil Cement Co., Ltd 1 30,000 240 12 Private management 2010.07 completed cement Youngjin Global Co. Ltd 2 30,000 240 12 Private management 2010.09 completed cement exclusive Western Hyundai Cement Co., Ltd 3 30,000 240 12 Private management 2012.04 completed cement Pier at Sampyo Co., Ltd outer 4 30,000 240 12 government-owned 2007.06 completed Pyeongtaek-Dangjin Joongang miscellaneous TOC TOC pier pier pier Corpora n 5 30,000 240 12 government-owned 2007.06 completed 6 30,000 240 13 government-owned 2001.08 completed Pyeongtaek Dangjin Port Co. miscellaneous TOC TOC pier 7 30,000 240 13 government-owned 2001.08 completed 8 50,000 280 14.5 Private management 2011.07 completed Taeyoung Grain Terminal grain exclusive Western 9 50,000 280 14.5 Private management 2011.07 completed Pier at 10 30,000 240 Private management 2020 completed inner 11 30,000 240 Private management 2020 completed miscellaneous TOC The Third Basic Plan for Port in Korea pier 12 30,000 240 Private management 2020 completed 13 30,000 240 Private management 2020 completed

Dangjin 1 150,000 Dolphin 22 Private management 1998 completed bituminous coal Firepower Korea East-West Power Co., Ltd 2 170,000 Dolphin 22 Private management 2006 completed bituminous coal power plant producing 4 million KWs

pier 3 200,000 Dolphin Private management 2014 completed bituminous coal

Current Status of Each pier at Pyeongtaek Port Name of Piers Host The number of berth The size of the pier Major freights Notes Eastern pier Private management 15 50,000*5, 30,000*10 Vehicle, container Dolphin pier Private management 7 20,000~130,000 oil and gas Passenger pier Private management 2 260,000*2 passenger

19 당진항_링크_1030_영문_3.pdf 3 2014-10-30 오후 4:56:08

Integrated industrial complex

Providing the best company establishment conditions with the effective integration between Dangjin Port and the hinterland industrial complex

C

M Seokmun National Industrial Complex Y Location CM Area of Seongsan-ri, Kodae-myeon, Tongjeong-ri, Seokmun-myeon, Dangjin MY Size CY 12,018,189㎡ CMY Period K 1992~2013 Details Industrial complex (industry, logistics, tourism, relaxation, housing, etc.) Industries to be covered automobile and trailer, other equipment and device combination, and chemical products, metal processing products, etc. Conditions - 20km from Songak IC of West Coast Expressway, within one hour from Seoul metropolitan area - The No. 38 National Highway is to be expanded and Seokmun Pier is also to be constructed, thereby facilitating the land and maritime transportation - Industrial complex and housing complex are to be created, facilitating the nearby regional development

20 당진항_링크_1030_영문_3.pdf 4 2014-10-30 오후 4:56:13

Connecting the present with the future (Present + Future)

Songsan General Industrial ComplexⅡ Location Area of Yugok-ri, Donggok-ri, Gagok-ri, Songsan-myeon, Dangjin Size 5,605,395㎡ Period 1992~2013 Industries to be covered 1st metal manufacturing, metal processing, other equipment and device manufacturing, etc. Conditions 10km from Songak IC of West Coast Expressway, within one hour from Seoul metropolitan area

C

M

Y

CM

MY

CY

CMY

K

Hapdeok Industrial Park Location Area of Seokwoori, Hapdeok-eup, Dangjin Size 636,793㎡ Period 2010~2014 Industries to be covered Medical materials and medical product manufacturing, and seven other industries Conditions 13km from Songak IC of West Coast Expressway, within one hour from Seoul metropolitan area

21 당진항_링크_1030_영문_3.pdf 5 2014-10-30 오후 4:56:15

Associate institutions and companies

Improving port competitiveness with the quick administrative service provision for Dangjin port users

Pyeongtaek Maritime Port Agency, Port Logistics Dept. Daesan Maritime Port Agency, Port Logistics Dept. Maritime transportation system operation, port facility security, Maritime transportation system operation, port facility safety and counter-terrorism, ship entry and exit security, safety and counter-terrorism, ship entry and exit TEL 82-31-680-7230 FAX 82-31-680-7239 TEL 82-41-660-7651 FAX 82-41-663-0348

Pyeongtaek Customs, Inspection Dept. Ministry of Justice, Immigration Office, C General export and import work, Pyeongtaek port entry and Pyeongtaek Branch M exit, port and landing site Immigration inspection and ship search at Pyeongtaek and Y TEL 82-31-8054-7220 FAX 82-31-8054-7224 Dangjin ports CM TEL 82-31-683-6938 FAX 82-31-682-1794

MY National Quarantine Station, , Pyeongtaek Branch National Plant Quarantine Service, Jungbu, CY Ship and airplane inspection, anti-epidemic inspection, Pyeongtaek Branch CMY epidemiologic survey, internationally certified vaccination Inspection and testing of import and export plants, inspection K TEL . 82-31-682-5213 FAX 82-31-682-5326 and testing of local plants, research and development TEL 82-31-8053-7701~6 FAX 82-31-8053-7714 National Veterinary Research and Quarantine Service, National Fisheries Products Quality Inspection Jungbu, Pyeongtaek Branch Service, Pyeongtaek Branch Inspection of import animals and livestock products, sanitary Inspection of fisheries for local consumption and import and inspection and safety test export fisheries (ingredients, simple processing products), TEL 82-31-8053-7700 FAX 82-31-8053-7707 quarantine of transported fisheries TEL 82-31-8053-7711~3 FAX 82-31-683-2789

Shipowners Company name T E L F A X Work Hyundai Steel 82-41-680-0114 82-41-680-1199 Manufacturing of steel products Dongbu Steel 82-41-351-8114 82-41-351-8115 2nd phase processing of cold strip and steel Dongkuk Steel 82-41-351-4984 82-41-351-4691 Heavy section processing and sales Hu Steel 82-41-350-8114 82-41-357-4625 Heavy section for broad ship-building purpose, TMCP heavy section production Korea East-West Power Co., Ltd (EWP) Dangjin Coal-Fired Power 82-41-351-0871 82-41-351-1214 Power generation Complex Development Division Basic Material 82-41-357-2541 82-41-357-5229 Slag and non-powder slag logistics Cargill Agri Purina 82-31-669-9024 82-31-668-6458 Livestock feed production

22 당진항_링크_1030_영문_3.pdf 6 2014-10-30 오후 4:56:17

Connecting the present with the future (Present + Future)

Port operators

Company name TEL FAX Work Hyundai Steel 82-41-680-0114 82-41-680-0114 Operation of Songak Pier Dongbu Dangjin Pier Operator 82-41-351-8114 82-41-351-8114 Operation of 1-6 berths of Kodae Pier Dangjin Port 82-41-357-5300 82-41-357-5300 Operation of 7 berth of Kodae Pier Dangjin Kodae Pier Operator 82-41-351-4984 82-41-351-4984 Operation of 8 berth of Kodae Pier Dongkuk Steel 82-41-351-4984 82-41-351-4984 Operation of 9 berth of Kodae Pier Dangjin Tank Terminal 82-41-358-0570 82-41-358-0570 Operation of 10 berth of Kodae Pier Hanil Cement 82-31-683-0460 82-31-683-0460 Operation of 1 berth of West Pier Youngjin Global 82-31-686-6711 82-31-686-6711 Operation of 2 berth of West Pier Hyundai Cement 82-31-681-4526 82-31-681-4526 Operation of 3 berth of West Pier Sampyo Basic Material 82-31-684-9452 82-31-684-9452 Pyeongtaek Dangjin Central Port 82-31-684-9211 82-31-684-9211 Operation of 4-5 berths of West Pier Pyeongtaek Dangjin Port 82-31-680-7421 82-31-680-7421 Operation of 6-7 berths of West Pier Taeyoung Grain Terminal 82-31-684-5564 82-31-684-5564 Operation of 8-9 berths of West Pier Korea East-West Power Co., Ltd (EWP), Dangjin 82-41-351-0871 82-41-351-0871 Operation of Dangjin Coal-Fired Power Complex Pier Coal-Fired Power Complex Development HQ

West Pier Background companies C Company name TEL FAX Work M Seopyeongtaek Tank Terminal 82-31-683-5101 82-31-683-5105 Import, storage and logistics of liquid cargo Y Youngjin TNM 82-31-628-7557 82-31-682-8668

CM Cargill Agri Purina 82-31-669-9024 82-31-668-6458 Animal feed production MY Agencies CY Company name TEL FAX Work CMY Asan Shipping 82-41-357-2220 82-41-357-2224 K Western Shipping 82-41-358-4994 82-41-358-4445 Agency work relating to ship entry and exit Seojin Shipping 82-41-352-3322 82-41-352-2300 SangKorea Shipping 82-41-358-2501 82-41-358-2505 Loading companies Company name TEL FAX Work Dangjin Shipping 82-41-356-8703 82-41-356-8708 Chungcheong Shipping 82-41-358-3132 82-41-357-2369 Daeju Heavy Industries 82-41-354-3875 82-41-354-3880 Port loading (Songak Pier) Korea Express, Chungnam branch 82-41-680-7853 82-41-680-7854 Sebang 82-41-353-3919 82-41-353-3915 Dangjin Pier 82-41-357-5300 82-41-357-5431 Dongbu Express 82-41-359-3300 82-41-359-3306 Port loading (Kodae Pier) Intergis 82-41-351-4961 82-41-359-1565 Port transportation trade unions Company name TEL FAX Work Dangjin Pier transportation trade union 82-41-354-1994 82-41-354-1996 United labor union for Hyundai, Dangjin, Dongbu, Dongkuk, Hyundai Steel transportation trade union 82-41-356-8717 82-41-356-7188 Dangjin Coal-Fired Power Complex transportation trade union 82-41-352-7500 82-41-352-6564 Improving the working conditions for laborers and Dongbu Steel transportation trade union 82-41-357-6670 82-41-357-1574 managing their wages Dongkuk Steel transportation trade union 82-41-359-1579 82-41-359-1574

23 당진항_링크_1030_영문_1.pdf 1 2014-10-30 오후 4:53:02

www.dangjin.go.kr

C

M

Y

CM

MY

CY We connect Korea with the world!

CMY

K

Cityhall 1ro-1 Dangjin, Chungcheongnam-do, Republic of Korea 31773 (1002, Sucheong-dong) T : 82-41-350-4090~3 F : 82-41-350-4619