IMCC IT Park
Total Page:16
File Type:pdf, Size:1020Kb
FORM – 1 IMCC IT Park At Plot No.23, 23 (PT.) 24 & 24(PT), TTC Industrial Area, MIDC – Mahape, Dist- Thane, Maharashtra. By M/s. INDUSTRIAL MINERALS & CHEMICAL CO. PVT. LTD. Elphinstone Building, 2nd Floor, 10 Veer Nariman Road, Fort, Mumbai 400 001 APPENDIX - I (See paragraph - 6) FORM 1 (I) Basic Information Sr. Item Details 1. Name of the project/s “IMCC IT Park”, MIDC, Mahape, Navi Mumbai 2. S. No. in the schedule 8 (a) 3. Proposed capacity/area/length/tonnage Total Plot Area: 1,92,320.00 Sq.mt. to be handled/command area/lease Built-up Area as per FSI: 36,965.72 Sq.mt. area/number of wells to be drilled Total Construction Built -up Area: 63,015.11 Sq.mt. Project Proposal: Configuration Details IT Building: Offices Lower Stilt + Stilt + Podium + 4 upper floors 4. New/Expansion/Modernization New 5. Existing Capacity/ Area etc. Not applicable 6. Category of project i.e.’ A’ or ‘B’ B2 7. Does it attract the general condition? If Not Applicable yes, please specify. 8. Does it attract the specific condition? Not Applicable If yes, please specify. 9. Location Mahape Plot/Survey/Khasra No. Plot No.23, 23 (PT.) 24 & 24(PT) Village Mahape Tehsil Navi Mumbai District Navi Mumbai State Maharashtra 10. Nearest railway station Ghansoli Railway station: Within 0.75 Km (Road Distance) Nearest airport Mumbai Chhatrapati Shivaji Airport: Within 24.00 Km (Road Distance) 11. Nearest Town, city, District Maharashtra Industrial Development Corporation (M.I.D.C) headquarters along with distance in kms. 12. Village Panchayats, Zilla Parishad, Maharashtra Industrial Development Corporation (M.I.D.C) Municipal Corporation, Local body (complete postal address with telephone nos. to be given) 13. Name of the applicant M/s. INDUSTRIAL MINERALS & CHEMICAL CO. PVT. LTD. 14. Registered Address Elphinstone Building, 2nd Floor, 10 Veer Nariman Road, Fort, Mumbai 400 001 15. Address for correspondence Elphinstone Building, 2nd Floor, 10 Veer Nariman Road, Fort, Mumbai 400 001 Name Mr. Santosh Mhadgut Designation(Owner/Partner/ CEO) Authorized Signatory Address Elphinstone Building, 2nd Floor, 10 Veer Nariman Road, Fort, Mumbai 400 001 Pin Code 400 001 E-mail [email protected] 1 Form 1 – IMCC IT Park, MIDC, Mahape, Navi Mumbai Mobile number 9769616903 Telephone No. 91–22-66294088 Fax No. -- 16. Details of Alternative Sites examined, Not applicable if any. Location of these sites should be shown on a topo-sheet. 17. Interlinked Projects Not applicable 18. Whether separate application of Not applicable interlinked project has been submitted? 19. If yes, date of submission Not applicable 20. If no, reason Not applicable 21. Whether the proposal involves Not Applicable approval/clearance under: if yes, details of the same and their status to be given. (a) The Forest (Conservation) Act, 1980? Not Applicable (b) The Wildlife (Protection) Act, 1972? Not Applicable as per Draft Notification reg. ESZ of SGNP & Minutes of meeting of 20th Expert Committee meeting for declaration of Eco Sensitive Zone (ESZ) around wildlife sanctuaries/national parks held on 5th July, 2016. (c) The C.R.Z Notification, 1991? Not Applicable 22. Whether there is any Government Not Applicable Order/Policy relevant/ relating to the site? 23. Forest land involved (hectares) Not applicable 24. Whether there is any litigation pending No against the project and/or land in which the project is propose to be set up? (a) Name of the Court (b) Case No. (c) Order /directions of the Court, if any and its relevance with the proposed project. (II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Sr. Information/Checklist Yes / Details thereof (with approximate quantities No. confirmation No /rates, wherever possible) with source of information data 1.1 Permanent or temporary change No Site is open land in land use, land cover or Land use of project site is for IT development. topography including increase Received letter from MIDC for user change. Copy in intensity of land use (with attached as Enclosure. respect to local land use plan) 1.2 Clearance of existing land, Yes Open land vegetation and building? 1.3 Creation of new land uses? Yes Site is open land Land use of project site is for IT development. Received letter from MIDC for user change. Copy attached as Enclosure 1. 2 Form 1 – IMCC IT Park, MIDC, Mahape, Navi Mumbai Sr. Information/Checklist Yes / Details thereof (with approximate quantities No. confirmation No /rates, wherever possible) with source of information data 1.4 Pre-construction investigation Yes Geotechnical Investigation has been carried out. e.g. bore houses, soil testing? Copy attached as Enclosure 2. 1.5 Construction works? Yes This is an IT development. 1.6 Demolition works? No Site is open land 1.7 Temporary sites used for No -- construction works or housing of construction workers? 1.8 Above ground building, No Excavation earth shall be reused for backfilling. structures or earthworks including linear structures, cut Construction waste shall be partly recycled and and fill or excavations remaining shall be disposed to authorized landfill site with permission of MIDC. 1.9 Underground works including No -- mining or Tunneling? 1.10 Reclamation works? No -- 1.11 Dredging? No -- 1.12 Offshore structures? No -- 1.13 Production and manufacturing No -- processes? 1.14 Facilities for storage of goods or Yes Temporary storage facilities to store construction materials? material. 1.15 Facilities for treatment or Yes • STP for treatment of sewage disposal of solid waste or liquid • Segregation of solid waste into non- effluents? biodegradable and biodegradable garbage • Treatment of biodegradable waste in Organic Waste Converter • Non-biodegradable waste shall be handed over to Authorized recyclers • Dried sludge from STP : As manure 1.16 Facilities for long term housing No -- of operational workers? 1.17 New road, rail, or sea traffic No -- during construction or operation? 1.18 New road, rail, air waterborne No -- or other transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing No -- transport routes or infrastructure leading to changes in traffic Movements? 1.20 New or diverted transmission No -- lines or pipelines? 1.21 Impoundment, damming, No -- culverting, realignment or other change to the hydrology of watercourses or aquifers? 1.22 Stream crossings? No -- 3 Form 1 – IMCC IT Park, MIDC, Mahape, Navi Mumbai Sr. Information/Checklist Yes / Details thereof (with approximate quantities No. confirmation No /rates, wherever possible) with source of information data 1.23 Abstraction or transfers of water No -- from ground or surface waters? 1.24 Changes in water bodies or the Yes By considering the runoff prior to development and land surface affecting drainage runoff after development there is some increment in or run-off? runoff of storm water. Incremental Runoff = 3.55 m3/sec 1.25 Transport of personnel or Yes Transport of construction materials. materials for construction, Precautions shall be taken to reduce the impact of operation or decommissioning? the vehicular movement by trying to avoid the vehicular trips during peak hours 1.26 Long-term dismantling or No -- decommissioning or restoration works? 1.27 Ongoing activity during No -- decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in Yes There will be influx of about ~ 5546 persons. either temporarily or (Floating population) permanently? 1.29 Introduction of alien species? No -- 1.30 Loss of native species or genetic No -- diversity? 1.31 Any other actions? No -- 2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): Sr. Information/checklist Yes / Details thereof (with approximate quantities No. confirmation No /rates, wherever possible) with source of information data 2.1 Land especially undeveloped or No The land is in developed infrastructure area. agricultural land (ha) 2.2 Water (expected source & Yes During Construction Phase – competing users) unit : KLD For Workers : From MIDC.: 12 KLD For Construction: From Water tankers: 10 - 20 KLD (Depending upon the activity) During Operational Phase – Fresh water from MIDC: 179 KLD (for Domestic & partly cooling tower make up)) 2.3 Minerals (MT) No -- 2.4 Construction material – stone, Yes Quantity : As per requirement aggregates, and / soil (expected Sources: The material required for construction source – MT) activities shall be procured from company’s authorized / approved vendors/ open market. 2.5 Forests and timber (source – Yes Timber required for doors sourced from local MT) suppliers. 4 Form 1 – IMCC IT Park, MIDC, Mahape, Navi Mumbai Sr. Information/checklist Yes / Details thereof (with approximate quantities No. confirmation No /rates, wherever possible) with source of information data 2.6 Energy including electricity Yes During Constructional Phase- and fuels (source, competing Maharashtra State Electricity Distribution Company users) Unit: fuel (MT), energy Limited (MSEDCL) : 150 KW (MW) D.G. Set: As per requirement During Operational Phase - Source: MSEDCL Connected load 3746 KW Maximum demand 2205 KW D.G sets (For 5 DG sets of capacity emergency backup 750 KVA each during power failure) 2.7 Any other natural resources No -- (use appropriate standard units) 3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health. Sr. Information/Checklist confirmation Yes / Details thereof (with approximate No. No quantities/rates, wherever possible) with source of information data 3.1 Use of substances or materials, which are No --- hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies) 3.2 Changes in occurrence of disease or affect No --- disease vectors (e.g.