Land North of Church Lane, Three Mile Cross

Total Page:16

File Type:pdf, Size:1020Kb

Land North of Church Lane, Three Mile Cross Land North of Church Lane, Three Mile Cross Planning Statement accompanying Reserved Matters Application October 2016 Land North of Church Lane, Three Mile Cross Planning Statement accompanying Reserved Matters Application Prepared on behalf of Taylor Wimpey Project Ref: 24931/P1/A5/NMS Status: FINAL Issue/Rev: P1 Date: 11th October 2016 Prepared by: Nina Sharp Checked by: Nick Paterson-Neild Authorised by: Nick Paterson-Neild The Blade, Abbey Square, Reading Berkshire RG1 3BE Tel: 0118 943 0000 Ref: 24931/P1/A5/NMS/NPN/dw Fax: 0118 943 0001 Email: [email protected] Date: 11th October 2016 COPYRIGHT The contents of this document must not be copied or reproduced in whole or in part without the written consent of the Barton Willmore LLP. All Barton Willmore stationery is produced using recycled or FSC paper and vegetable oil based inks. CONTENTS Page 1. Introduction 1 2. Site Location 3 3. The Development Proposals 4 4. Planning Context 6 5. Conclusions 10 Land North of Church Lane, Three Mile Cross Introduction 1.0 INTRODUCTION 1.1 Barton Willmore LLP is instructed by Taylor Wimpey to prepare and submit the Reserved Matters application for 175 unit residential scheme at Three Mile Cross, Spencers Wood. The proposed development is located within the South of the M4 Strategic Development Location (SDL) as identified within the Wokingham Borough Core Strategy and within an area identified within the South East Plan as be appropriate for the development of around 2,500 houses to serve the needs of Greater Reading. The description of development is as below: Reserved Matters application for 175 dwellings including internal access roads, garages, parking spaces, open space, Allotments, Multi- Use Games Area (MUGA) and Locally Equipped Area of Play (LEAP) 1.2 A Hybrid planning permission for the residential development on land north east of Spencers Wood and east of Three Mile Cross was granted on 22nd July 2014 by Wokingham Borough Council (WBC). The Hybrid Planning permission consisted of an outline consent for up to 900 dwellings, up to a three form of entry primary school, public open space, access and landscape (means of access into the site to be considered) and part in full in respect to Suitable Alternative Natural Greenspace (SANG), following demolition of existing dwelling and ancillary buildings including greenhouses, sheds, stables and garage (214a Hyde End Road) and a full planning application in relation to the first 276 dwellings with associated access, landscaping and open space following demolition of existing dwelling and ancillary buildings (214a Hyde End Road). 1.3 Pre-application meetings were held with Planning Officers from September to December 2015 focussing first on the layout and then the character areas as per the Design Code. 1.4 Land North of Church Lane, Three Mile Cross is considered Phase 2 of the wider approved masterplan for Three Mile Cross and Spencers Wood, part of a collective of strategic development proposals for the south of M4 development area. Structure of Planning Statement 1.5 This brief Planning Statement seeks to explain the proposals contained in the Reserved Matters application 1.6 Section 2.0 of this Statement (Site Location) explains the existing planning permission and the related documents which define the contents of this Reserved Matters application. 24931/P1/A5/NMS/NPN/dw Page 1 October 2016 Land North of Church Lane, Three Mile Cross Introduction 1.7 Section 3.0 of this Statement (Development Proposals) briefly describes the description of the proposal in the wider context of the outline consent 1.8 Section 4.0 of this Statement (Policy Context) provides details of the proposals compliance to national and local planning policy. 1.9 Section 5.0 sets out the conclusions of this Statement. 24931/P1/A5/NMS/NPN/dw Page 2 October 2016 Land North of Church Lane, Three Mile Cross Site Location 2.0 SITE LOCATION 2.1 The location Land North of Church Lane, Three Mile Cross. The application site is bounded by Church Lane to the south in part and existing residential development (which fronts Basingstoke Road), west is predominantly residential with the exception of the Bowling Green. Further south and southeast is May’s Farm SANG and imminently the Ridge SANG. The north abuts the Wokingham/Reading Boroughs administrative boundaries and situated immediately north (but within the Reading Borough Councils boundary) is an implemented permission (Reading Borough Council reference 130359) for a foul water pumping station. This application has recently been amended and approved by Reading Borough Council Planning under application reference 160191. Immediately north is also Junction 11 of the M4. East of the application boundary is the Thatch situated adjacent to Church Lane and further east is Shinfield Court. 24931/P1/A5/NMS/NPN/dw Page 3 October 2016 Land North of Church Lane, Three Mile Cross The Development Proposals 3.0 THE DEVELOPMENT PROPOSALS 3.1 This Statement supports the Reserved Matters application for Land North of Church Lane, Three Mile Cross for 175 dwellings including internal access roads, garages, parking spaces, open space, Allotments, Multi-Use Games Area (MUGA) and Locally Equipped Area of Play (LEAP). 3.2 The housing comprises a range of house types at an overall density for the phase of 38.2 dwellings per hectare (gross residential) a relatively medium density which is appropriate for this parcel which reflect the core principles that are established in the locality including linear nature, consistent building line nature, with detached and semi-detached the predominant typology in a mix of two and two-and-a-half storey and three storey dwellings, providing the following mix: 15 x 1-bedroom flats; 26 x 2-bedroom flats; 2 x 1-bedroom coach house; 7 x 2-bedroom coach house; 17 x 2-bedroom houses; 67 x 3-bedroom houses; 24 x 4 bedroom houses; and, 17 x 5 bedroom houses. 3.3 Included within the scheme are 15 affordable dwellings (6 two bedroom flats; 5 two bedroom dwellings and 4 three bedroom dwellings), consistent with the requirements of the S106 agreement. 3.4 In addition to the Reserved Matters that are two additional applications which relate to access to the proposal from Church Lane. One application seeks to apply for a private driveway vehicular access only off of Church Lane which would serve two plots (plots 277 and 278). The rationale behind this application it that is falls outside the original Outline Permission parameters. The second application relates to a temporary access off Church Lane. The description of the proposal is as detailed below: Proposed vehicular private driveway access off Church Lane to serve residential development on Land North of Church Lane 24931/P1/A5/NMS/NPN/dw Page 4 October 2016 Land North of Church Lane, Three Mile Cross The Development Proposals 3.5 The second application relating to access is for a temporary access that would facilitate the immediate access of the Marketing Suite (upon completion) and to ensure that members of the public are not mixing with construction traffic. This application would be for the duration of three years upon commencement of construction. The description of the development is a detailed below: Proposed temporary vehicular access off Church Lane to provide access to Marketing Suite for a period of three years upon commencement of construction. 3.6 Both access applications are being submitted concurrently with the main Reserved Matters application and all three applications should be determined as a collective. 24931/P1/A5/NMS/NPN/dw Page 5 October 2016 Land North of Church Lane, Three Mile Cross Planning Context 4.0 PLANNING CONTEXT 4.1 Land North of Church Lane, Three Mile Cross forms part of the South of M4 Strategic Development Location, allocated under Policy CP19 of the adopted Wokingham Borough Core Strategy, 2010. The policies of the Core Strategy were subsequently supplemented by the South of M4 Strategic Development Location Supplementary Planning Document, October 2011 (“the SPD”). 4.2 A Hybrid planning permission for the residential development on land north east of Spencers Wood and east of Three Mile Cross on 22nd July 2014 by Wokingham Borough Council (WBC). The Hybrid Planning permission consisted of an outline consent for up to 900 dwellings, up to a three form of entry primary school, public open space, access and landscape (means of access into the site to be considered) and part in full in respect to Suitable Alternative Natural Greenspace (SANG), following demolition of existing dwelling and ancillary buildings including greenhouses, sheds, stables and garage (214a Hyde End Road) and a full planning application in relation to the first 276 dwellings with associated access, landscaping and open space following demolition of existing dwelling and ancillary buildings (214a Hyde End Road). 4.3 The principle of development at Spencers Wood and Three Mile Cross is therefore established as a result of the Core Strategy allocation, the guidance of the SPD and through the grant of planning permission. However, before any building work can take place on each phase it is necessary to secure approval in writing of details of the layout, scale and external appearance of the buildings and the landscaping for each phase of the development. 4.4 An Environmental Impact Assessment Screening Opinion was formally submitted to Wokingham Borough Council in October 2015. Wokingham Borough Council assessed the application in accordance with the Town and Country Planning (Environmental Impact Assessment) Regulations 2011 – the EIA Regulations that the proposal did not constitute as EIA development. The Screening Opinion application reference is 153064 and was determined on 18th November 2015. 4.5 A number of conditions of the outline planning permission seek to ensure certain information and documents are submitted with the planning application.
Recommended publications
  • Email Exchanges Between Wokingham Borough Council And
    From: Sent: 27 March 2020 11:36 To: [email protected] Subject: GE202003362 - ONR resposne to Wokingham Borough Council Local plan Update Follow Up Flag: Follow up Flag Status: Completed Dear Sir/Madam, In response to your emails dated 3 February and 18 March regarding the 2020 Wokingham Borough Local Plan Update consultation, please find below ONR’s response, which is provided in line with our Land Use Planning policy published here http://www.onr.org.uk/land-use-planning.htm. Since ONR responded to the previous draft Local Plan Update consultation on 21 January 2019 (see email below) the proposed development locations included in the draft local plan have significantly changed. Additionally, the Detailed Emergency Planning Zone (DEPZ) for the AWE Burghfield site has been re-determined by West Berkshire District Council under the Radiation (Emergency Preparedness and Public Information) Regulations (REPPIR) 2019 resulting in a larger DEPZ. ONR’s current position remains that we would be likely to object to: • developments within the DEPZ, unless the West Berkshire District Council emergency planner provides adequate assurance to ONR that any adverse impact on the operability and viability of the off-site emergency plan could be mitigated. • large scale developments within the circular 5km Outer Consultation Zone (OCZ), which extends beyond the DEPZ from grid reference SU684680, unless the West Berkshire District Council emergency planner provides adequate assurance to ONR that any adverse impact on the operability and viability of the off-site emergency plan could be mitigated. ONR has previously responded regarding the two development locations below which are included in both the 2018/19 Local Plan Update consultation and the 2020 Local Plan Update consultation: 1.
    [Show full text]
  • Arborfield Cross Relief Road) Compulsory Purchase Order 2018
    WOKINGHAM BOROUGH COUNCIL THE WOKINGHAM BOROUGH COUNCIL (ARBORFIELD CROSS RELIEF ROAD) COMPULSORY PURCHASE ORDER 2018 DRAFT STATEMENT OF REASONS 85 1. Introduction 1.1. On [ ] 2018 Wokingham Borough Council (the “Council” and the “Acquiring Authority”) resolved to make the Wokingham Borough Council (Arborfield Cross Relief Road) Compulsory Purchase Order 2018 (the “Order”) to acquire land and interests over land within the Arborfield area and to enable the delivery of a new relief road known as the Arborfield Cross Relief Road (the “ACRR”). 1.2. The Order is made pursuant to sections 239, 240, 246, 250 and 260 of the Highways Act 1980 (the “1980 Act”) for the acquisition of all interests (except mining interests and others specifically excluded) in the land shown coloured pink (the “Order Land") on the plan attached to the Order (the “Order Plan”), and as described in the Schedule to the Order. The land proposed to be acquired pursuant to the Order is also described in greater detail in section 2 below. Further detail as to the powers under which the Order is made are found in section 3 below. 1.3. The Order Land is split into fields, supporting both arable and pasture farming, interspersed with a number of small woodland blocks. The Order Land is described further in section 2 of this Statement of Reasons. 1.4. The Order is being sought so that the Council can assemble in its ownership the Order Land to facilitate and enable the construction, on schedule, of a new section of highway linking the A327 Reading Road in the north and the A327 Eversley Road in the south east, along with associated necessary works (the “Scheme”).
    [Show full text]
  • How to Get Your Child to Yateley School Students
    HOW TO GET YOUR CHILD TO YATELEY SCHOOL Free travel will be provided for Hampshire children in the following circumstances: • if they attend the nearest catchment school OR one that is nearer to your home, AND • the distance (measured by the shortest available walking route) is more than three miles, OR • Where parents name the designated catchment school as one of their 3 preferences and a place is not available, assistance may be offered to the next closest school, using the three mile distance in the previous paragraph • Children entitled to free school meals or whose parents (with whom they live) are in receipt of the maximum level of working tax credit have enhanced entitlement. If your child does not qualify for travelling expenses, you may apply for him/her to be a 'privilege' passenger on school transport. This will depend on whether there are spare seats and only applies if the vehicle is contracted by Hampshire County Council to transport children. The privilege place can be withdrawn at short notice if it is needed for a child who qualifies for free transport. There is a flat-rate charge for privilege seats which is the same for all children whatever their age, the distance travelled or the number of days used per week. If your child qualifies for free school meals due to low income, the fee may be waived. The coach runs from Hartley Wintney through Eversley to Yateley School. For further details please contact Passenger Transport on 01962 846924 or 845332 or email [email protected] .
    [Show full text]
  • Cultural Heritage Gazetteer
    HIGHWAYS AGENCY – M4 JUNCTIONS 3 TO 12 SMART MOTORWAY APPENDIX 7.1 – CULTURAL HERITAGE GAZETTEER Site HER/Ref Name Description Number number 1 MLO99241 Land South of the M4 and East of Pit Walled Garden Farm, Hillingdon {Neolithic pits} 2 MLO99241 Land South of the M4 and East of Pit Walled Garden Farm, Hillingdon {Neolithic pits} 3 MLO10495 Holloway Lane Enclosure, pit 4 MLO10507 Holloway Lane Quarry 5 MLO11303 The Parkway Enclosure, moated Site 6 MLO84980 Cranford House Stables Wall, stable 7 MLO84981 Walls to north of stables Wall 8 MLO84982 Cranford Park Bridge Road Bridge 9 MLO84986 Church of St. Peter and St. Paul Commemorative monument, effigy, parish church 10 MLO85161 Church of St. Dunstan Church, commemorative monument 11 MLO85162 Curved wall to south of west end Wall, courtyard of stables 12 MLO85164 Walls to north of Church of St. Wall Peter and St. Paul 13 MLO85174 Monument to William and Tombstone Elizabeth Brookes in Churchyard of Church of St. Peter and St. Paul 14 MLO85188 Ha-ha wall to south and south Wall west of Cranford House Stables 15 MLO85190 Cellars of Former Cranford Cellar House 16 MLO85269 Wall to south of east end of Wall stables 17 MLO85270 Garden walls to west of Cranford Garden wall House stables 18 MLO85273 Wall to south of churchyard of Wall Church of St. Peter and St. Paul 20 MLO14464 M4 widening scheme Grubenhaus 21 MLO25606 Longford To Cursus 22 MLO17551 Holloway Lane Findspot 23 MLO17552 Holloway Lane Field System 24 MLO17992 Holloway Lane Trackway ENVIRONMENTAL STATEMENT APPENDICES CULTURAL HERITAGE
    [Show full text]
  • A Century of Bowling in BERKSHIRE 1910 - 2010
    A Century of Bowling IN BERKSHIRE 1910 - 2010 GRAHAM ROGERS ACKNOWLEDGEMENTS he author is very grateful to everyone who assisted in the production of this publication. Particular thanks go to the Secretaries of the Bowling Clubs T affiliated to The Royal County, who provided information about their Club’s histories, and to those members of Clubs, who shared their stories and memories of Clubs they have known both past and present. I am also very indebted to Alan Bartter for the time spent as my “Proof-Reader”, thereby eliminating as many mistakes as possible in the compilation of this publication. Every effort has been made to verify the information herein, but should there be some discrepancies with people’s own recollections, please contact the author through the County. Graham Rogers. 2 FOREWORD BY THE PRESIDENT am very honoured to write this foreword as your President for this our Centenary Year, and also my 42nd year as a playing member with The Royal County of I Berkshire Bowling Association. I have been closely involved with others in the continued development of the Association since 1993, when I was elected to serve as a Selector and in 2005 was elected to the post of Hon. Assistant Secretary, which has bought me into contact with many members over the years. I have been very proud to have played a small part in what has been achieved, and in the friendships I have made. The game has certainly moved on in the last 100 years. Gone are the days of men only Clubs, wooden bowls and men playing in flat caps, ties and ordinary dress shoes.
    [Show full text]
  • 145 Bus Time Schedule & Line Route
    145 bus time schedule & line map 145 Three Mile Cross View In Website Mode The 145 bus line (Three Mile Cross) has 2 routes. For regular weekdays, their operation hours are: (1) Three Mile Cross: 12:00 PM (2) Winnersh: 9:45 AM Use the Moovit App to ƒnd the closest 145 bus station near you and ƒnd out when is the next 145 bus arriving. Direction: Three Mile Cross 145 bus Time Schedule 52 stops Three Mile Cross Route Timetable: VIEW LINE SCHEDULE Sunday Not Operational Monday Not Operational King Street Lane - Allnatt Avenue, Winnersh Tuesday 12:00 PM King Street Lane, Sindlesham Wednesday Not Operational Mole Road - Mayƒelds, Sindlesham Thursday Not Operational Mole Road, Winnersh Civil Parish Friday Not Operational Church Lane, Arborƒeld Cross Mole Road, Arborƒeld And Newland Civil Parish Saturday Not Operational Sindlesham Road North, Arborƒeld Cross Sindlesham Road South, Arborƒeld Cross 145 bus Info The Swan, Arborƒeld Cross Direction: Three Mile Cross Stops: 52 British Legion, Arborƒeld Cross Trip Duration: 65 min Line Summary: King Street Lane - Allnatt Avenue, Ducks Nest Farm, Arborƒeld Cross Winnersh, King Street Lane, Sindlesham, Mole Road - Mayƒelds, Sindlesham, Church Lane, Arborƒeld Cross, Sindlesham Road North, Arborƒeld Cross, Rickman Close, Arborƒeld Garrison Sindlesham Road South, Arborƒeld Cross, The Swan, Arborƒeld Cross, British Legion, Arborƒeld Cross, Langley Common Road North, Langley Common Ducks Nest Farm, Arborƒeld Cross, Rickman Close, Arborƒeld Garrison, Langley Common Road North, The Bull, Barkham Langley Common,
    [Show full text]
  • Deer Leap Park Orchard Rise Travel Pack.Pdf 4 MB
    Welcome Pack Welcome to Deer Leap Park & Orchard Rise February 2020 www.myjourneywokingham.com Welcome to Deer Leap Park & Orchard Rise 16pp A5.indd 1 13/02/2020 14:02:24 1 Welcome About This Booklet My Journey Wokingham Welcome to your new home in Deer Leap Park/ As well as welcoming new residents to the borough, Orchard Rise. This pack has been produced by the My Journey Wokingham provides a series of travel My Journey team to provide you with information related events and training courses. about planning journeys from your new home. For further information about the My Journey My Journey Wokingham promotes travel which Wokingham programme please visit the My Journey helps keep our residents healthy and safe and our Wokingham website. borough cleaner and greener. Additionally, you can follow us on Facebook or Within this pack you will find reference to local Twitter to find out about our latest offers, events walking and cycle routes, information about local and training programmes. bus and rail services, and where to find your nearest electric car charging points. Website: www.myjourneywokingham.com We are also pleased to be able to provide you with information on discounted travel and travel related Facebook: items, some of which are exclusively for new www.facebook.com/MJWokingham residents of Deer Leap Park & Orchard Rise. Twitter: @MJWokingham My Developer Details Feedback We are always looking to improve the information provided in our welcome packs. If you have any comments about the pack or any questions around travel in Wokingham you can contact us. Email: [email protected] 1 Welcome to Deer Leap Park & Orchard Rise Welcome to Deer Leap Park & Orchard Rise 16pp A5.indd 2 13/02/2020 14:02:24 Welcome to Deer Leap Park & Orchard Rise 16pp A5.indd 3 13/02/2020 14:02:24 2 Three Mile Cross to Wokingham, and the route west to Grazeley and By the 1820ʼs the Mortimer.
    [Show full text]
  • Footpath Maps WALK 5 5
    Route and Points of Interest (continued) SHINFIELD PARISH Footpath Maps WALK 5 5. Just after a point where the Lane swings left, turn left Large maps showing all the footpaths across the Parish are displayed Three Mile Cross into the edge of the woods and walk uphill beside a in notice boards situated (a) opposite Grazeley School; (b) on School and Woodcock Lane small stream, following the path as it curves to the right. Green, Shinfield; (c) on Perigee in Shinfield Park; (d) at the entrance to Spring Gardens in Spencers Wood; and (e) by the children’s play area The large white building at the top of the fields on the left is at Three Mile Cross. Maps are also displayed in Shinfield Parish Office, Highlands, which began as an 18th century hunting lodge. The at the Library, and in local schools, surgeries and other places. trees are secondary growth of ash, sycamore and oak, and during the 19th and early 20th centuries bricks were made Footpaths are public rights of way which everyone has a legal right to walk freely. See the Wokingham Borough Council website: from the clay dug out of the ground here. The clay pits now www.wokingham.gov.uk. They are shown on Ordnance Survey maps: form ponds which often dry out in summer. Explorer no. 159 (1:25,000 scale) and Landranger no. 175 (1:50,000 scale). 6. Turn left over a stile onto the open field known as Spencers Wood Common and follow the footpath across This is one of six walk leaflets that are available free from the Shinfield parish office, shops and other outlets.
    [Show full text]
  • Page 2017/306 MINUTES of the EXTRAORDINARY MEETING of SWALLOWFIELD PARISH COUNCIL PLANNING COMMITTEE HELD on TUESDAY 3Rd APRIL 2
    MINUTES OF THE EXTRAORDINARY MEETING OF SWALLOWFIELD PARISH COUNCIL PLANNING COMMITTEE HELD ON TUESDAY 3rd APRIL 2017 IN THE ROSE ROOM, SWALLOWFIELD PARISH HALL, SWALLOWFIELD STREET, SWALLOWFIELD AT 7.30PM Present: Cllr. J. Anderson (Chairman) Cllr. R. McDonald Cllr. P. Sampson In attendance: Liz Halson, Clerk Members of the public: 4 483 APOLOGIES FOR ABSENCE Cllr. G. Collender, Cllr. W. Dance, Cllr. C. Morrissey, Cllr. R. Norris, Cllr. J. Sant, Cllr. J. Wheelwright 484 DECLARATIONS OF INTEREST None 485 QUESTIONS OR COMMENTS FROM MEMBERS OF THE PUBLIC 485.1 16/02989/OUT 485.1.1 Resident – the planning application will be considered by Hart District Council Planning Committee on 12th April 2017. It is important that individuals continue to submit their comments on the inaccuracies of the officer and developers Highways reports, even though the council are writing a letter. Cllr. Anderson – it is also important that residents attend the meeting to show the strength of feeling and to support the individual who will speak in objection. 486 CURRENT APPLICATIONS 486.1 16/02989/OUT - Land at Odiham Road, Riseley, Reading, Berkshire Outline application for the development of up to 83 residential dwellings including 33 ‘social rented’ units, vehicular access from Odiham Road, public open space, ancillary works and associated infrastructure on land off Odiham Road, Riseley. All matters reserved except for access. It was agreed that in Mrs McKeown’s absence, the residents’ nominated speaker, Mr Goldsmith should be asked to register to speak as an objector so that the slot was not lost since this is allocated on a first come, first served basis.
    [Show full text]
  • Eversley Quarry Finchampstead, Wokingham Berkshire
    Eversley Quarry Finchampstead, Wokingham Berkshire Post-Excavation Assessment and Updated Project Design for The Guildhouse Consultancy on behalf of Cemex UK Operations Ltd CA Project: 9095 CA Report: 12300 October 2012 Eversley Quarry Finchampstead, Wokingham Berkshire Post-Excavation Assessment and Updated Project Design CA Project: 9095 CA Report: 12300 Author: Alan Hardy Approved: Martin Watts Signed: ……………………………………………………………. Issue: 01 Date: 16.10.2012 This report is confidential to the client. Cotswold Archaeology accepts no responsibility or liability to any third party to whom this report, or any part of it, is made known. Any such party relies upon this report entirely at their own risk. No part of this report may be reproduced by any means without permission. © Cotswold Archaeology Building 11, Kemble Enterprise Park, Kemble, Cirencester, Gloucestershire, GL7 6BQ t. 01285 771022 f. 01285 771033 e. [email protected] 1 Eversley Quarry, Finchampstead, Wokingham, Berkshire: Post-Excavation Assessment and Updated Project Design © Cotswold Archaeology CONTENTS SUMMARY 5 1 INTRODUCTION 6 Location, topography and geology ...................................................................... 6 Archaeological background ................................................................................ 6 2 AIMS AND OBJECTIVES 7 3 METHODOLOGY 8 4 RESULTS 9 Fieldwork summary ............................................................................................ 9 5 FACTUAL DATA AND STATEMENTS OF POTENTIAL 12 Stratigraphic
    [Show full text]
  • Land North of Church Lane, Spencers Wood, Berkshire
    Land North of Church Lane, Spencers Wood, Berkshire Archaeological Evaluation for CgMs Consulting on behalf of Taylor Wimpey UK CA Project: 770546b CA Report: 17157 April 2017 North of Church Lane, Three Miles Cross, Spencers Wood, Berkshire Archaeological Evaluation CA Project: 770546b CA Report: 17157 Document Control Grid Revision Date Author Checked by Status Reasons for Approved revision by A 26-4-16 Oliver Ray Internal General Edit Richard Good/Adam Kennedy Review Greatorex Howard This report is confidential to the client. Cotswold Archaeology accepts no responsibility or liability to any third party to whom this report, or any part of it, is made known. Any such party relies upon this report entirely at their own risk. No part of this report may be reproduced by any means without permission. © Cotswold Archaeology © Cotswold Archaeology Land north of Croft Road and North of Church Lane, Spencers Wood, Berks: Archaeological Evaluation CONTENTS SUMMARY ...................................................................................................................................................................... 2 1. INTRODUCTION ............................................................................................................................................... 3 2. ARCHAEOLOGICAL BACKGROUND ................................................................................................................... 4 3. AIMS AND OBJECTIVES ...................................................................................................................................
    [Show full text]
  • Participation Version) – June 2011
    General Guidance on making a representation on the Draft Managing Development Delivery Development Plan Document (Participation version) – June 2011 The Managing Development Delivery DPD will amplify the approach in the adopted Core Strategy regarding where development could go within the borough to 2026 and how it will ensure exceptional development is delivered which enhances the area’s character and environment. The Managing Development Delivery DPD when finalised will include policies about where everything from homes, shops, offices, schools and leisure facilities should be developed, including design and landscaping. The Draft version of the document details the various options for planning policies that the Council considers are appropriate for the borough having regard to the framework provided by the Core Strategy together with national policy and previous consultation. Through this consultation, the Council is seeking your views on whether you think these approaches to planning policy are appropriate. You do not have to comment on all the areas listed in the document. Further information on the maps A number of issues are only likely to affect specific parts of the borough i.e. areas close to rivers could be affected by flooding. To help you understand how the Council’s policy approaches could affect you, it has produced maps showing which areas would be covered. Where the approach could affect the whole borough, the Council has produced three maps which between them illustrate how the policies would apply. The three maps and
    [Show full text]