Appendix-1

Section 4 (1) (b) (i)

The Particulars of Functions & Duties in ENGINEERING Division of MMRDA Name of the Office Engineering Division (MMRDA) Address 2nd & 5th Floor, MMRDA New office Building, Bandra-Kurla Complex, Bandra (E), Mumbai- 400 051. Chief Engineer -1 (Chief) Shri D.T.Thube Chief Engineer -2 (Chief) Shri R.B.Gadge Head of the office Mumbai Metropolitan Region Development Authority Parent Govt. Dept. Urban Development Department, Mantralaya, Mumbai-400032. Reporting to which authority Mumbai Metropolitan Region (Which Mantralaya Department) Jurisdiction Geographical / 1)Mumbai District (City & Suburban) 2)Raigad Functional Dist.(Partly) 3) Thane Dist.(Partly) 4) Alibaug Dist.(Partly), ) 5) Palghar Dist.(Partly), Mission Development of SPA Notified Area. Infrastructure works in MMR Appointed by Government of . Vision As above Objectives As above Scope / Functions As above Details of Services provided / Following scheme undertaken by the MMRDA are duties implemented by Engineering Division 1) Extended MUIP – Road Infrastructure in MMR Area are handed over to MCGM 2) Mithi River widening & deepening from (CST Bridge to Mahim) Works are completed. 3) Multi Modal Corridor – 126 km long, Virar Alibaug Multi Modal Corridor. 4) Development of BKC: Truck Terminus, Wadala and ODC as growth Centers 5) Mumbai Trans Harbour Link (MTHL) Sea Link 22 km Connectivity between Sewri in Island /city and Nhava-Sheva in Navi Mumbai. Physical Assets – Statement of -- lands & building Organizations Structural Chart at Telephone No : (022) 2659 4034 / 2659 4048 each level- Give linkage of Office Timings: Monday to Friday, 9.30 AM To 6.00 Jurisdiction & Address, Tel. No. & PM Office Timings, Weekly Holidays & Weekly Holida ys: Saturday, Sunday & Public Specific Service Timings Holidays as per Govt. Notification

E:\4 (1) B 2018 changes final\11-6-2018 English Changes.doc Appendix-2 ORGANIZATIONS STRUCTURAL CHART OF ENGINEERING DIVISION

C. E. (T) C. C. E. (G)G)

ADMIN ACCOUNT S. E. CELL CELL

S. O. Asst. C.A.O. E. E.

Section A. O. Officer D. E.-I

H. G. S. D. E.-II

Asst. Sec. D’Man Officer

L. G. S. Tracer

C. O. cum

Clerk

NAIK

PEON

E:\4 (1) B 2018 changes final\11-6-2018 English Changes.doc

Appendix – 3

Section 4 (1) (b) (ii) Format ‘A’

The powers of officers & Employees in ENGINEERING DIVISION of MMRDA (A)

Sr. Designation Powers -Financial Under which Remark No. Legislation / Rules / Orders / GRs. / Circular 1. Chief 1) Original and Revised Technical Engineer Sanction for Civil works Office Order 2) To accord acceptance of Tender No. Rs.8 Crs. (For tenders at par or ED/Power of below) Delegation/02 3) Payment of R.A. Bills to /03/-16 Contractors Dtd. 4) Power to invite tender by short 14/03/2016 notice up to 50 Lacs 5) Power to approve expenditure on works/supply of various material without budget provision up to 30 Lacs 6) Power to levy of compensation/liquidated damages/penalty on contractor/consultant up to 15 Crores 7) Power to grant extension of time limit to contractor up to 15 Crores 8) Survey/Investigation prior to work designing and estimate up to 25 Lacs 9) Power to sanction 10 % excess over contract cost For original/ Maintenance works 10) Appointment of PMC/Consultant for supervision/execution of works up to 1 Crore

E:\4 (1) B 2018 changes final\11-6-2018 English Changes.doc (B) Sr. Designation Powers -Admini -strative Under Remark No. which Legislation / Rules / Orders / GRs. / Circular 1) Superintending 1) Original and Revised Engineer Technical Sanction for Office Civil works up to 2.5 Crore Order No. 2) To accord acceptance of ED/Power Tender Rs.2.5 Crs ( For of tenders at par or below) Delegation/ 3) Payment of R.A. Bills to 02/03/-16 Contractors up to 2.5 Dtd. crores 14/03/2016 4) Power to levy of compensation/liquidated damages/penalty on contractor/consultant up to 2.5 Crores 5) Power to grant extension of time limit to contractor up to 2.5 Crores 6) Survey/Investigation prior to work designing and estimate up to 5 Lacs 7) Appointment of PMC/Consultant for supervision/execution of works up to 5 Lacs 8) Check Measurment 2% 2) Executive 1) Original and Revised Office Engineer Technical Sanction for Order No. Civil works up to 1 Crore ED/Power 2) To accord acceptance of of Tender Rs.50 Lacs ( For Delegation/ tenders at par or below) 02/03/-16 3) Payment of R.A. Bills to Dtd. Contractors up to 50 Lacs 14/03/2016 4) Survey/Investigation prior to work designing and estimate up to 1Lac

E:\4 (1) B 2018 changes final\11-6-2018 English Changes.doc Sr. Designation Powers -Admini -strative Under Remark No. which Legislation / Rules / Orders / GRs. / Circular 5) Appointment of PMC/Consultant for supervision/execution of works up to 1 Lac 6) Check Measurment 10% 3) Dy. Engineer-I 1) To supervise the work as Office per the instructions of Order No. Executive Engineer and ED/Power submit Technical reports of to Executive Engineer as Delegation/ per contract. 02/03/-16 2) Site Supervision Dtd. 3) Preservation of 14/03/2016 Documents. 4) Checking of bills submit by Project Management Consultants, contractors and recommending it to the Senior Officers for payment. 5) Check Measurment 25% 6) Coordination with SDC for encroachment matters. 7) Availability of information and when required by citizens and people representatives 8) Preparation of Tender and preparation of proposal for approval 4) Dy. Engineer-II To carry out all aforesaid above duties as per the guidance of Dy.Engineer – I

E:\4 (1) B 2018 changes final\11-6-2018 English Changes.doc Sr. Designation Powers -Admini -strative Under Remark No. which Legislation / Rules / Orders / GRs. / Circular 5) Staff Officer 1) All Administrative Works of officers and staff members in Engineering Division & PWD and co-ordination with respective division of MMRDA and other departments respect to Engineering Division 2) Annual work programme / budget and other related work entire to Engineering Divison. 3) Dealing with assembly question / starred and un- starred questions, calling attention, cut motion, Resolution, Assurance etc in Engineering Division 4) Dealing with the cases of RTI application / appeals in respect of Administrative work coordination 5) Coordination and controlling of administration in working of all employee in Engineering Division and housekeeping work 6) Work in respect of preparation of Item Note, minutes etc. of the Authority and Executive Committee Meeting 7) Arrange various meeting of important project in Engineering Division particularly MTHL/dealing with correspondence /Bills/Adjustment of Imprest etc.

E:\4 (1) B 2018 changes final\11-6-2018 English Changes.doc Sr. Designation Powers -Admini -strative Under Remark No. which Legislation / Rules / Orders / GRs. / Circular 6) Asst.CAO 1) scrutiny and Passing of estimate/bills and other accounts items of various contractor and PMC in respect of work being carried out in Engineering Division 2) Recommendation for payment and deposit in respect of bills in Engineering Division 7) Accounts Officer 1) Bills Checking of various contractor of PMC in respect of MUIP / Mithi River works 2) Scrutiny of bills of various contractor & PMC in respect of all works under MUIP, Ext. MUIP, R & R task wise work (BKC) and Mithi River works. 8) Dy. Accountant 1) Bills Checking of various contractor of PMC in respect of MUIP / Mithi River works 2) Scrutiny of bills of various contractor & PMC in respect of all works under MUIP, Ext. MUIP, R & R task wise work (BKC) and Mithi River works. 9) Draftsman 1) Keep in account of measurement book and field book and its distribution. 2) Preparation of drawings for all engineers in Engineering Division. 3) Keeping of all survey / measurement instrument and its distribution. 4) Store Keeping works

E:\4 (1) B 2018 changes final\11-6-2018 English Changes.doc Sr. Designation Powers -Admini -strative Under Remark No. which Legislation / Rules / Orders / GRs. / Circular 10) Section Officer 1) Submission of leave application and issuing orders in respect of various leaves, granted to the officers, granting annual increment also. 2) Entries in service-Book of Class I & II officers in Engineering Division 3) Complaint of audit para in respect of service of employee’s personal file. 4) Scrutiny of T. A. Bills, Medical Bills and its entries in register. 5) The work related to the Executive Committee and Authority Meeting in respect of Engineering Division, arrangement of meetings. 6) The work related to the Assembly in respect of Engineering Division 7) The Annual Work Programme work related to the Engineering Division 8) The work related to the Annual Budget of Engineering Division 9) Filling of confidential report of Engineering Staff 10) Office Orders and Circulars circulate to office staff 11) Election duty work as per Parliament and assembly election work as per Govt Direction

E:\4 (1) B 2018 changes final\11-6-2018 English Changes.doc Sr. Designation Powers -Admini -strative Under Remark No. which Legislation / Rules / Orders / GRs. / Circular 12) Economic Survey of Maharashtra / Information of various projects/ speech of finance minister, Governor & Chief Minister. 11) Higher Grade Personal Assistant of Chief Steno Engineer I & II taking dictation and other works 12) Lower Grade Shorthand & Typing (English Steno & Marathi) SE, EE & DE-I, II & other officers, Maintaining Inward & Outward Register & Daily Correspondence & in time to time to sent the email on internet 13) Asst. Sec 1) Submission of leave Officer application and issuing orders in respect of various leaves, granted to the class III & IV employees, granting annual increment. 2)Entries in service Book of Class III & IV employees in Engineering Division 3)Scrutiny of Class III & IV T.A bills, Medical Bills and entries in register, preparation of office order of Class III & IV regarding leave 4)Office orders and Circulars circulate to office staff 5)Demand and supply of office Stationary to officers / staff 6) Work related to muster roll and leave of staff 7) Work related to training for officers

E:\4 (1) B 2018 changes final\11-6-2018 English Changes.doc Sr. Designation Powers -Admini -strative Under Remark No. which Legislation / Rules / Orders / GRs. / Circular 8) Work related to control room during Monsoon period. 9) Checking of Zerox bill 10) Processing dead stock register. 11) Work related to canteen bill 12) Processing salaries of Contract Basis Staff of Engineering Division 13) Work related with RTI, 2005 Scrutiny of various applications and Appeals received in Engineering Division from various applicant / appellate and bringing to save to the notice concern Engineer within the times. stipulated therein and to arrange hearings of various applicant / appellate, & preparation of Three months report & dispatch all correspondence of RTI 14) Tracer Tracing work 15) Computer All typing work of CE, SE, EE operator-cum- , SO, DE - I, II and other staff, Clerk Inward-Outward work related with Engineering Division 16) Electrician All electrical works of MMRDA office Bldg. / Staff Quarters 17) Plumber All Plumbing work 18) Naik Working at Chief Engineer (I & II) and other officer’s Xerox & Fax work etc.

E:\4 (1) B 2018 changes final\11-6-2018 English Changes.doc Sr. Designation Powers -Admini -strative Under Remark No. which Legislation / Rules / Orders / GRs. / Circular 19) Peon Peon works related with Accounts Cell & cabin works of all officers (Xeroxing, site work, outdoor duty) etc.

(C) Sr. Designation Powers -magisterial Under which Remark No. Legislation / Rules / Orders / GRs. / Circular Nil

(D) Sr. Designation Powers - Under which Remark No. Quasi Legislation / Rules / Judicial Orders / GRs. / Circular Nil

E:\4 (1) B 2018 changes final\11-6-2018 English Changes.doc

Appendix – 4

Section 4 (1) (b) (ii) Format ‘B’

The duties of officers & Employees in Engineering Division of MMRDA (A) Sr. Name and Financial Duties Under which Remark No. Designation act / rules

1) Chief To give technical sanction PWD manual Engineer I to project & Chief Engineer II

(B) Sr. Name and Administrative Duties Under which Remark No Designation act / rules

1) Chief 1) Various references PWD manual Engineer I received from the Govt. & Chief Dept. and to give opinion Engineer II regarding the same. 2) To update all Administrative matter in Engineering Division

(C) Sr. Name and Magisterial Under which act / rules Remark No Designation Duties

NIL

(D) Sr. Name and Quasi Judicial Under which act / rules Remark No. Designation Duties

NIL

E:\4 (1) B 2018 changes final\11-6-2018 English Changes.doc Appendix – 5

Section 4 (1) (b) (iii) Section 4 (1) (b) (ii) Format ‘B’

The procedure followed in the decision making process, including channels of supervision & accountability in Engineering Division of MMRDA

Name of the Department MMRDA, Engineering Division

Name of activity Planning and infrastructure in MMR Region

Related provision MORTH / IRC / IS Codes and provisions

Name of the act(s) As above

Rules As above

GR Issued time to time by Government with respect to above. Circulars As above.

Office orders As above.

Sr. Nature of Work Duration of work Authority Responsible Remark No. for that activity 1) To manage all the projects Continuous Chief Engineer I & II entrusted to Chief Engineers I & process II and to give necessary assistance / direction to the SE’s / EE’s / DE-I & II in Engineering Division. 2) To manage all the project Continuous Superintending entrusted to Superintending process Engineer, Engineers and to give necessary Executive Engineer, assistance / direction to the EE’s Dy. Engineers / DE-I & II in Engineering Division.

E:\4 (1) B 2018 changes final\11-6-2018 English Changes.doc Sr. Nature of Work Duration of work Authority Responsible Remark No. for that activity 3) Construction of Ring Shri A.K.Pahal Road 4) Naigaon Juichandra Bopane SH- Shri V.M.Shewale 41 (Part-Juichandra Phata to Naigaon Railway Station) 5) Naigaon ROB 6) Construction of Flyover Bridges at Andnd Nagar, Thane- Ghoudbunder Road, Kasar- Wadavali & BhaindarPada 7) Diva Vasai Flyover 8) Naigoan ROB 9) Improvement & Widening from Shri A.K.Pahal Shirsat Phata to Washind (Sh 3 to Sh 8) Pkg. I & II 10) R&R maintenance works Shri A.K.Pahal

Shri B.H. Chavan/ Shri S.L. Gundala/ Shri M.P. Singh Shri Chausashte 11) Gorai Creek Bridge Shri A.K.Pahal 12) Virar to Alibaug – Multimodal Corridor Shri M.P. Singh 13) Marve – Manori Creek Bridge Shri A.K.Pahal

Shri N.S.Dabholkar 14) Construction of flyovers at Thane Shri S.S.Varaskar Belapur Road on Savita Chemical Junction, Ghansoli Shri M.V. Jaitpal Junction, Talavali Junction and Vehicular Underpass on Mahape Junction. 15) Mumbai Trans Harbour Link 16) Pkgs. No. - 2(Marine) Shri S.S.Varaskar Description - Ch. 10.38 Km to end of Shivaji nagar Interchange Shri V.A.Jambhale at ch.18.19 Km 17) Pkgs. No. - 3(Land) Shri S.S.Varaskar Description - End of Shivaji nagar Interchange at ch. 18.19 Shri G.G.Deshpande Km up to Chirle Interchange at Ch 21.83 Km

E:\4 (1) B 2018 changes final\11-6-2018 English Changes.doc Sr. Nature of Work Duration of work Authority Responsible Remark No. for that activity 18) General Consultancy Shri S.S.Varaskar Description - General Consultancy for all packages Shri A.R.Bhisikar a) Land acquisition & matters Shri S.S.Varaskar pertaining to Forest Dept. Shri V.A.Jambhale & Shri G.G.Deshpande (Addl.Charge) 19) Improvement of Neral-Dasturi Shri S.S.Varaskar Road 20) Construction of Kalyan Ring Road- Secn. 1, 2 & 3 Shri J.R.Dhane 21) Construction of Kalyan Ring Road- Secn. 4, 5, 6 & 7 22) Construction of Four Lane Creek Bridge on Ulhas creek in Durgadi at Kalyan Bhiwandi National Highway No.222 23) District Planning committee • Mumbai City 24) VIP/VVIP Corrospondence Report • Mumbai City 25) Maintenance work of Bandra Shri S.S.Varaskar Kurla Complex, RCC Box drain works, other Shri V.A.Jambhale development works in BKC 26) • Repairing & Maintenance of old & new office bldg. • Repairing & Maintenance of Namatri Bldg. • Repairing & Maintenance of Residential Building at ‘Jetwan’ 27) Administrative Works Shri S.S.Varaskar

Shri J.R.Dhane

SO (ED) 28) • Dasturi to Matheran Pathway Shri P.S.Nimje • Matheran View Points Shri A.B.Dhabe

E:\4 (1) B 2018 changes final\11-6-2018 English Changes.doc Sr. Nature of Work Duration of work Authority Responsible Remark No. for that activity 29) District Planning Committee Shri P.S.Nimje (DPDC) • Shri M.Y. Patil Shri Vinay Surve 30) VIP/VVIP Corrospondenc e Shri P.S.Nimje Report • Thane District Shri M.Y. Patil Shri Vinay Surve 31) Kalyan Growth Centre Shri P.S.Nimje 32) Road Improvement work of NH 43 passing through Badlapur city. Shri M.N.Ghadge

33) Widening & Strengthening of Shri P.S.Nimje Forest Naka to Badlapur Shri A.V.Patil 34) Construction of 4 Lane Bridge Shri P.S.Nimje and Road on Ulhas creek at Motagaon on Motagaon Shri A.G.Korgaonkar Road 35) Chedda Nagar Flyover Shri P.S.Nimje 36) Construction of Flyover at Minatai Thakre Chowk (TMC Shri V.G.Surve work) 37) Eastern Express Highway Construction of bypass road from Mumbai Agra Road to Ghodbunder Construction bypass road from Mumbai Agra Road to Nashik road 38) Rajnoli Flyover & Mankoli Flyover 39) Widening and improvement of Shri P.S.Nimje Thane Ghodbunder service road (TMC work) Shri V.M.Shewale 40) Thane/Raigad IVDS Schemes Shri P.S.Nimje 41) Grants / Loans / Revolving Funds to various Municipal Corporations Shri N.S. Dabholkar 42) Widening of Road work in Shri P.S.Nimje Ulhasnagar Shri S.S.Lokare

E:\4 (1) B 2018 changes final\11-6-2018 English Changes.doc Sr. Nature of Work Duration of work Authority Responsible Remark No. for that activity 43) SRA & All Rental Housing Shri P.S.Nimje Schemes Independent Unit (As per Order dated 24.11.2016 Shri M.P.Singh approved by AMC (D)) Under supervision of: i) Shri. Sanjay Pawar, Addl.Collector ii) Shri Balasaheb Vakchoure, Dy.Collector iii) Shri. Ravindra Hazare, Dy.Collector Thane Municipal Corporation and SRA 44) Newly sanctioned OARDS Works & Extended MUIP works in - Bhiwnadi, Kalyan, Thane Shri P.S.Nimje

Shri B.H.Chavan - Badlapur, Ambarnath, Shri P.S.Nimje Thane, Raigad Shri S.L.Gundala 45) OARDS Works executed by Shri P.S.Nimje local agencies – Release of Funds Shri S.L.Gundala Shri B.H.Chavan 46) Overall coordination for Shri P.S.Nimje

OARDS Works Shri B.H.Chavan Shri S.L.Gundala 47) Chirle Dispersal Shri P.J.Bhangare

Shri M.Y.Patil 48) Creek bridge at Ghatkopar-Kopar Shri P.J.Bhangare Khairane Shri M.Y.Patil 49) Creek bridge at Revas Karanja Shri P.J.Bhangare

Shri B.H.Chavan 50) Vitawa Skywa lk Shri P.J.Bhangare

Shri A.B.Dhabe

E:\4 (1) B 2018 changes final\11-6-2018 English Changes.doc Sr. Nature of Work Duration of work Authority Responsible Remark No. for that activity 51) Wadala TT Works including Shri P.J.Bhangare Maintenance 52) Chitalsar Manpada office Shri M.V.Jaitpal Building 53) Airoli-Katai Road (phase 1,2) 54) Airoli-Katai Road (phase 3) 55) Other works/issues related to Thane-Belapur Road 56) MSRDC Co-ordination and Shri P.J.Bhangare MSRDC executed works related 57) Kurar Subway / Widening etc. Shri P.D.Jamadar 58) Aakurli subway Shri P.J.Bhangare

Shri P.D.Jamadar 59) District Planning Committee Shri P.J.Bhangare (DPDC) • Thane District Shri M.Y.Patil Shri Vinay Surve 60) VIP/VVIP Corrospondence Shri P.J.Bhangare Report • Thane District Shri M.Y.Patil Shri Vinay Surve • Mumbai Suburban Shri P.J.Bhangare

Shri M.V.Jaitpal Shri S.S.Lokare 61) Work of Railway Flyover at Shri P.J.Bhangare Kopari Shri V.G.Surve 62) Flyover at Mumbra Shri P.J.Bhangare 63) Shil-Kalyan junction road and Flyover at Shilphata Shri M.Y.Patil 64) MUIP related works 65) Wadala office space renovation works (Ground, first & second floor) 66) Construction of four lane flyover Shri P.J.Bhangare near L & T junction on Shilphata Mahape Road and Widening & Strengthening of Shri M.N.Ghadge Service Road 67) Solid Waste Management Project at Taloja

E:\4 (1) B 2018 changes final\11-6-2018 English Changes.doc Sr. Nature of Work Duration of work Authority Responsible Remark No. for that activity 68) Widening and improvement of Shri P.J.Bhangare NH-4 from Takka Colony to Palasape Phata to Khanda Shri N.S.Dabholkar Colony (Work being transferred to MSRDC) 69) Mahim Nature Park Society (MNPS) 70) District planning Committee (DPDC) - Raigad District 71) SRA & All Rental Housing Schemes Independent Unit [(As per Order dated 24.11.2016 approved by AMC (D)] Under supervision of: i) Shri. Sanjay Pawar, Addl.Collector ii) Shri Balasaheb M. Vakchoure, Dy.Collector iii) Shri. Ravindra Hazare, Dy.Collector - Naina and CIDCO Jurisdiction 72) Construction of Building at Cross Shri P.J.Bhangare Maidan for Homguard Shri Shri S.L.Gundla 73) Construction of Flyover at Shri P.J.Bhangare Navade Phata on Old Mumbai Pune Highway No.4 Shri A.S.Titre 74) Flyover on EEH near Ghatkopar Shri A.P.Nagargoje depot junction on AGLR Shri A.R.Bhisikar 75) District Planning Committee Shri A.P.Nagargoje (DPDC) • Mumbai Suburban City Shri S.S.Lokare 76) Work of Dr. Ambedkar Memorial at Indu Mill Area 77) VIP/VVIP Corrospondence Shri A.P.Nagargoje Report • Mumbai Suburban Shri M.V.Jaitpal Shri S.S.Lokare 78) Extension of Coastal Road Shri A.P.Nagargoje

Shri P.D.Jamadar

E:\4 (1) B 2018 changes final\11-6-2018 English Changes.doc Sr. Nature of Work Duration of work Authority Responsible Remark No. for that activity 79) Noise barrier work on Navghar Shri A.P.Nagargoje flyover & Suman nagar flyover on EEH Shri N.S.Dabholkar 80) Noise barrier on WEH Shri A.P.Nagargoje 81) New Buildings for Homeguard in Oshiwara Shri A.G.Korgaonkar 82) Extension of Santacruz-Chembur Link Road 83) Building at Wadala Shri A.P.Nagargoje

Shri C.B.Dhoklepatil 84) Vasai-Bhayander Creek Bridge Shri A.P.Nagargoje Link Road 85) Disaster management & MMRDA Shri A.S.Titre Control Room (for year 2017) 86) Technical Support to Kalamboli Shri A.P.Nagargoje Steel Yard Shri S.L.Gundla 87) Work of Dr.Ambedkar Memorial Shri A.P.Nagargoje at Indu Mill Area 88) Road safety Audit related Shri S.S.Lokare

89) Eastern Express Highway (including mainatenance, advertisement) 90) Construction of Flyover under Jagruti Nagar Metro (balance work) 91) SRA & All Rental Housing Shri A.P.Nagargoje Schemes Independent Unit (As per Order dated 24.11.2016 Shri S.L.Gundla approved by AMC (D)) Under supervision of: i) Shri. Sanjay Pawar, Addl.Collector ii) Shri Balasaheb M Vakchoure, Dy.Collector iii) Shri. Ravindra Hazare, Dy.Collector • Raigad Jurisdiction

E:\4 (1) B 2018 changes final\11-6-2018 English Changes.doc Sr. Nature of Work Duration of work Authority Responsible Remark No. for that activity 92) Construction of Flyover at Late Shri A.P.Nagargoje Rajiv Gandhi Chowk to Saibaba Temple on Kalyan Road in Shri V.G.Surve Bhivandi-Nijampur, Municipal Corporation 93) Western Express Highway– Shri A.P.Nagargoje maintenance & budgeted works of PWD and new sanctioned Shri Pataskar works 94) VIP/VVIP Corrospondence Shri M.S.Narkar Report - Raigad District Shri N.S.Dabholkar 95) Flyover at Kalanagar Junction Shri M.S.Narkar

Shri M.Y.Patil 96) District Planning Committee Shri M.S.Narkar (DPDC) • Palghar District Shri V.M.Shewale 97) VIP/V VIP Corrospondence Report • Palghar District 98) Oshiwara District Centre works 99) a) Quadrupling of the road Shri M.S.Narkar between Murdha gaon (Subhash Chandra Bose ground) and Uttan gaon. Shri V.M.Shewale b) Flyover from Golden Nace Circle to Deepak Hospital c) Flyover from Shivar Garden to SK Stone Signal d) Flyover from Pleasant Park to Silver Park Signal 100) Gaimukh-Fountain Hotel Elevated Bridge 101) Road from Vasai-Virar site Shri M.S.Narkar crossing Bhayandar creek up to Subhash Chandra Bose ground and further joining Mira Road to Shri A.S.Titre Dahisar Link Road on the West of Railways 102) Flyover in Badlapur City Shri M.S.Narkar 103) Badlapur-Belavali Railway ROB

E:\4 (1) B 2018 changes final\11-6-2018 English Changes.doc Sr. Nature of Work Duration of work Authority Responsible Remark No. for that activity 104) Construction of internal roads in Shri M.S.Narkar Bhiwandi under extended MUIP (Pkg-II)-25 Roads Shri M.N.Ghadge 105) Feasibility study of panvel Taloja road 106) Mithi River Maintenance Shri M.S.Narkar Shri A.G.Korgaonkar 107) Primary health Centre At Awas, Shri M.S.Narkar Dist: raigad 108) Construction of Awas sasawane Shri Bhandekar road, Dist: Raigad 109) Construction of internal roads in Bhiwandi under extended MUIP (Pkg-I & III)-27 Roads

110) Alibaug building and road works 111) 1. SRA & All Rental Housing Shri M.S.Narkar Schemes Independent Unit [(As per Order dated 24.11.2016 Shri L.R. Chausashte approved by AMC (D)] Under supervision of: i) Shri. Sanjay Pawar, Addl.Collector ii) Shri Balasaheb M. Vakchoure, Dy.Collector iii) Shri. Ravindra Hazare, Dy.Collector ••• Mira Bhayander Jurisdiction 112) Newly sanctioned OARDS works & Extended MUIP works in • Ulhasnagar Shri M.S.Narkar

Shri A.G.Korgaonkar • Mira Bhayander Shri M.S.Narkar

Shri A.S. Titre • Ambarnath Shri M.S.Narkar

Shri S.S.Lokare 113) Overall coordination for : Shri M.S.Narkar Extended MUIP works Shri A.G.Korgaonkar

E:\4 (1) B 2018 changes final\11-6-2018 English Changes.doc Sr. Nature of Work Duration of work Authority Responsible Remark No. for that activity 114) SRA & All Rental Housing Shri M.S.Narkar Schemes Independent Unit [(As per Order dated 24.11.2016 Shri S.L.Gundala approved by AMC (D)] Under supervision of: i) Shri. Sanjay Pawar, Addl.Collector ii) Shri Balasaheb M.Vakchoure, Dy.Collector iii) Shri. Ravindra Hazare, Dy.Collector • MMRDA, Ulhasnagar and Kalyan Jurisdiction 115) Mumbai Trans Harbour Link Shri Y.E.Sakhalkar Pkgs (1) Marine Sewri interchange at Ch 0.0 Km Shri A.R.Bhisikar upto Ch. 10.38 Km 116) Pkgs (4) ITS Shri Y.E.Sakhalkar Intelligent Transport System (ITS) Shri V.A.Jambhale 117) R & R Land acquisition on Shri Y.E.Sakhalkar Mumbai side Shri A.R. Bhisikar 118) EMP related works Shri Y.E.Sakhalkar

Shri G.G.Deshpande (Addl charge) 119) Mantralaya/Delhi/NGT related Shri Y.E.Sakhalkar 120) GKRK Consulting services of NP Bridging Shri A.R.Bhisikar 121) Sewri-Worli Elevated Project 122) DPR Sewri interchange 123) BKC Connector 124) Workshops / Presentations / Shri A.B.Dhabe (EE) Lectures in MMRDA Office Shri Amit Khopade (DE)

E:\4 (1) B 2018 changes final\11-6-2018 English Changes.doc Appendix – 6

Section 4 (1) (b) (iv) format ‘A’

Norms set for discharge of its functions in Engineering Division of MMRDA:-

ORGANIZATION TARGETS (Annual):-

Sr. Function / Units to be covered Financial Remark No Activity Targets in Rs. . 1) Construction and -- -- These works are planning of continuous process. infrastructure at Mumbai Metropolitan Region

E:\4 (1) B 2018 changes final\11-6-2018 English Changes.doc Appendix – 7

Section 4 (1) (b) (v) format ‘A’

The Rules / Regulation related with functions of Engineering Division

Sr. Subject as indicated in Rule No./ GR.No./EC, Remark if any No. the notification Authority Resolution & its year 1) -- MMRDA Act, 1974 Updating of rules GR, resolution of authority Resolution of Executive Committee in report concern project in related files.

E:\4 (1) B 2018 changes final\11-6-2018 English Changes.doc Appendix – 8

Section 4 (1) (a) (vi)

List of documents available in Engineering Division of MMRDA Name of Division/Cell:- Engineering Division Subject of Document:- Sr. Type of Subject/ topic Person in Charge / Location of the person No. document designation if not situated in the above mentioned office 1) File of Civil Issues related Concerned Work, to Engineering Dy.Engineer Measurement Projects books, Plans, Corresponde nce files, Bill Engineering Division files, Tender 2nd & 5th floor, New copies Office Bldg., 2) Leave, Leave and Smt. V.G.Gavankar, M.M.R.D.A., Increment & salary of all Section Officer Bandra-Kurla Complex, files of staff of on Bandra (E), Mumbai-51. class-I & II deputation & Engineering Division etc.

3) Files in Answer of Shri Y.B.Gaonkar, respected to question Section Officer starred, un- submitted to starred, cut Govt. on motion and variation other matters subject 4) Muster Roll, All Staff - Shri D.S.Ghag, All types of Officers and Asst. Section Officer Bill, Employees Stationary 5) Inward RTI related Smt. M.S.Chavan, /outward letters Asst. Section Officer register

E:\4 (1) B 2018 changes final\11-6-2018 English Changes.doc Sr. Type of Subject/ topic Person in Charge / Location of the person No. document designation if not situated in the above mentioned office 6) Inward/ 1. leave, Smt. P.P.Salvi, Outward Increment files Asst. Section Officer register of class III & IV 2. Files in respected Training, visiting cards, NOC, Circular, C. R. First Aid, Xerox Bills 7) Inward Correspondence Computer Operator - /outward of division Cum-Clerk register

E:\4 (1) B 2018 changes final\11-6-2018 English Changes.doc

Section 4 (1) (a) (vi)

Statement of categories of documents held in (Division/Cell) of MMRDA Name of Division/Cell:- Sr. Subject Type of document file Particulars of Periodicity of No. / Muster / Register / Heading / type in reservation Voucher etc. the document 1) Office Files Register Related files-Staff Class A -Permanent Officer, Related preserved papers Section Officer, Class B- 30 Years Asst. Sec. Officer, preserved papers Related Computer Class C-5 years Operator Cum preserved papers Clerk Class D only 1 years preserved papers and after disposal paper 2) Inward/ Register Computer Class C-5 Years Outward Operator-Cum- preserved papers Register Clerk 3) RTI Register Register Asst. Section Class C-5 Years officer preserved Papers 4) Starred Register Section officer Class D-1 year Question preserved Papers Register 5) Different Register Asst. Section Class D-1 year Types of Bill officer preserved Papers Register 6) Others Register Computer Class C - 5 years division of Operator-Cum- preserved Papers outward Clerk Register 7) Officers of Register Assistant Class C- 5 years Inward preserved Papers Register 8) Medical Bill Register Asst. Section Class D -1 years Register officer preserved Papers 9) Traveling Register Asst. Section Class D -1 year allowances officer preserved Papers Register

E:\4 (1) B 2018 changes final\11-6-2018 English Changes.doc Sr. Subject Type of document file Particulars of Periodicity of No. / Muster / Register / Heading / type in reservation Voucher etc. the document 10) Govt. Letter Register Computer Class C -5 years register Operator-Cum- preserved Papers Clerk 11) Attendance Register Asst. Section Class D- 1 Year sheet officer preserved papers register (Officers and employee) 12) Letter of Register Computer Class C – 5 Years MLA & MP Operator-Cum- preserved papers Register Clerk 13) Engineering Register Work Related Class B – 30 Years Project Dy. Engineers preserved papers related Bills, Work, Measuremen t books, Plans 14) Engineering Register Work Related Class B - 30 Years Project Dy. Engineers preserved papers Tender copies 15) Engineering Register Work Related Class A – project Dy. Engineers Permanent related preserved papers works excluding No.16, other corresponde nce and map

E:\4 (1) B 2018 changes final\11-6-2018 English Changes.doc Appendix – 9

Section 4 (1) (b) (vii)

Particular of any arrangement that exist for consultation with the members of public in relation to the formulation of policy & implementation in Engineering Division of MMRDA

Sr. Consultation for Details of the Under which act Periodicity No mechanism / rules / circular . 1) Suggestion and In the required The orders If required objection of projects, issued time to projects suggestions time by Govt. of and objections , Govt. of are invited vide Maharashtra publishing regarding the notice for a project. specific period. After completion of specified period, received suggestion and objections are considered from viability point of view and then incorporated accordingly in the further scope of project.

E:\4 (1) B 2018 changes final\11-6-2018 English Changes.doc Appendix – 10

Section 4 (1) (b) (viii) Format ‘A’

List of committees to be published under Engineering Division of MMRDA

Sr. Name of Compositio Purpose Frequency Weather Minutes No the n of of the of open to available in committee committee / committee meetings public or the office of / Board/ Board/ / Board/ not Bodies/ Bodies/ Bodies/ Councils Councils Councils Nil

E:\4 (1) B 2018 changes final\11-6-2018 English Changes.doc

Appendix – 11

Section 4 (1) (b) (ix)

Directory of the officers & employees & their monthly remuneration in Engineering Division of MMRDA Sr. Designation Name of the Grade Dt. of Contact Gross No. officer / joining the details Salary Employee post Phone / Fax / Email 1) Superintending Shri S.S. I 15/04/1986 2659 4041 133508 Engineer Varaskar 2) Superintending Shri P.S.Nimje I 28/06/1990 2659 4157 117016 Engineer 3) Superintending Shri I 06/06/1995 2659 4050 102998 Engineer P.J.Bhangare 4) Superintending Shri M.S. I 27/02/1984 2659 5924 114207 Engineer Narkar 5) Executive Shri I 04/04/1983 2659 4047 109951 Engineer N.S.Dabholkar 6) Executive Shri J.R.Dhane I 01/02/1984 2659 5933 108515 Engineer 7) Executive Shri M.Y.Patil I 20/02/1984 2659 4049 112478 Engineer 8) Executive Shri I 28/09/1984 2659 5949 108355 Engineer V.M.Shewale 9) Executive Shri M.V.Jaitpal I 04/02/1985 2659 5941 100136 Engineer 10) Executive Shri A.V.Patil I 18/03/1992 2659 4134 89363 Engineer 11) Executive Shri A.S.Titre I 19/04/1993 2659 5912 88139 Engineer 12) Executive Shri I 26/04/1993 2659 4142 88139 Engineer M.N.Ghadage 13) Executive Shri B.H.Chavan I 17/02/1999 2659 4085 67471 Engineer 14) Executive Shri I 10/01/2005 2659 4075 81037 Engineer C.B.Dhokale- Patil 15) Executive Shri S.S.Lokare I 11/01/2005 2659 5944 83437 Engineer 16) Executive Shri I 13/01/2005 2659 5996 72202 Engineer V.A.Jambhale

E:\4 (1) B 2018 changes final\11-6-2018 English Changes.doc Sr. Designation Name of the Grade Dt. of Contact Gross No. officer / joining the details Salary Employee post Phone / Fax / Email 17) Executive Shri I 01/02/2005 2659 4076 83437 Engineer A.R.Bhishikar 18) Executive Shri I 04/04/2005 2659 4186 83437 Engineer A.G.Korgaonkar 19) Executive Shri A.B.Dhabe I 28/04/2008 2659 4044 83437 Engineer 20) Executive Shri V.G.Surve I 03/11/2008 2659 4051 81064 Engineer 21) Executive Shri I 28/04/2008 2659 5925 81037 Engineer L.R.Chousashte 22) Executive Shri S.L.Gundla I 15/09/2017 2659 5932 70131 Engineer 23) Executive Shri I 01/10/2007 2659 4061 63682 Engineer P.P.Bhandekar 24) Executive Shri S.T.Salve I 07/09/1992 2659 4104 68829 Engineer 25) Executive Shri I 18/09/1992 2659 4139 68429 Engineer (Addl. S.C.Odhekar Charge) 26) Asst. Chief Shri S. B. Thakur I 28/05/1986 2659 4053 94476 Accounts Officer 27) Staff Officer Smt I 16/01/1995 2659 4048 82799 N.S.Nandanwar 28) Dy.Engineer Shri S.V.Gajre I 01/03/2008 2659 5994 86574 (Elect.) 29) Dy. Engineer-I Shri N.M.Kamble I 24/08/1992 2659 5952 70829 30) Dy. Engineer-I Shri I 12/11/2009 2659 4103 97721 H.S.Sonawane 31) Dy. Engineer-I Shri G.D.Rathod I 30/01/1996 2659 4189 73861 32) Dy. Engineer-I Shri I 28/04/2008 2659 5995 63070 S.A.Bhadane 33) Dy. Engineer-I Shri I 28/04/2008 2659 4170 71962 A.A.Khopade 34) Dy. Engineer-I Smt I 16/07/2008 2659 4122 69562 S.Tembhurnikar 35) Dy. Engineer-I Shri I 28/04/2008 2659 4187 71936 P.R.Wakodkar 36) Dy. Engineer-I Shri A.V.Pagare I 28/04/2008 2659 5988 71936 37) Dy. Engineer-I Shri A.P.Jadhav I 28/04/2008 2659 4045 69536

E:\4 (1) B 2018 changes final\11-6-2018 English Changes.doc Sr. Designation Name of the Grade Dt. of Contact Gross No. officer / joining the details Salary Employee post Phone / Fax / Email 38) Dy. Engineer-I Smt. I 28/04/2008 2659 4127 71936 P.T.Tayshetye 39) Dy. Engineer-I Shri I 01/08/1995 2659 4096 88057 R.R.Dhakate 40) Dy. Engineer-I Shri B.V.Biradar I 10/09/2013 2659 4156 67389 41) Dy. Engineer-I Shri J.B.Patil II 10/09/2013 2659 4156 48558 42) Accounts Officer Smt Mansi II 11/01/2005 2659 4195 59475 Khedekar 43) Accounts Officer Shri II 02/02/2009 2659 5986 52639 G.S.Kumbhare 44) Section Officer Shri II 22/09/1980 2659 4052 72711 Y.B.Gaonkar 45) Section Officer Smt II 27/11/1995 2659 4138 53224 V.G.Gavankar 46) Draftsman Shri R.S.Shinde II 02/12/1996 2659 4056 65301 47) Higher Gr. Smt P.V.Dhawral III 28/02/2008 2659 5957 46521 Stenographer 48) Assistant Shri D.S.Ghag III 24/05/1994 2659 4112 39633 Section Officer 49) Assistant Smt.M.S.Chavan III 17/07/2008 2659 4175 38117 Section Officer 50) Assistant Smt.P.P.Salvi III 17/07/2008 2659 4131 36926 Section Officer 51) Lower Gr. Smt A.V.Bhor III 01/12/2010 2659 5900 39553 Stenographer 52) Lower Gr. Miss III 01/12/2010 2659 4175 39553 Stenographer R.M.Waghmare 53) Lower Gr. Smt S.W.Correia III 01/12/2010 2659 4171 38409 Stenographer 54) Lower Gr. Smt R.S.Pawar III 01/12/2010 2659 4081 39393 Stenographer 55) Lower Gr. Smt S.N.Kumtha III 01/12/2010 2659 4125 39393 Stenographer 56) Tracer Shri M. M. Bhore III 02/07/1993 2659 4138 32431

57) Computer Shri III 01/04/2008 2659 4125 20721 Operator cum R.G.Dabholkar Clerk 58) Computer Shri.R.L. III 01/04/2008 2659 4175 23141 Operator cum Bhandare Clerk

E:\4 (1) B 2018 changes final\11-6-2018 English Changes.doc Sr. Designation Name of the Grade Dt. of Contact Gross No. officer / joining the details Salary Employee post Phone / Fax / Email 59) Computer Shri III 08/03/2017 2659 4175 21312 Operator cum S.S.Shiradkar Clerk 60) Plumber Shri V.R.Kharat IV 02/05/1984 -- 26136 61) Naik Shri N.C.Gondke IV 22/09/1980 -- 36489 62) Peon Shri S.P.Jagtap IV 24/05/1994 -- 26785 63) Peon Shri H.S.Jadhav IV 06/06/1994 -- 30085 64) Peon Shri B.D.Mahade IV 06/06/1994 -- 30085 65) Peon Shri V.S.Salvi IV 19/05/1994 -- 30085 66) Peon Smt. IV 24/04/2001 -- 23099 R.R.Goriwale 67) Peon Shri IV 03/01/2007 -- 21392 R.B.Patankar 68) Peon Smt J.D.Kadam IV 30/07/2010 -- 16497 69) Electrician Shri Antosh IV 14/11/2007 -- 24732 Shinde

PWD : Sr. Designation Name of the Grad Dt. of Contact Gross No. officer / e joining the details Salary Employee post Phone / Fax / Email 1) Chief Engineer Shri D.T.Thube I 09/11/2015 2659 4032 126391 2) Chief Engineer Shri R.B.Gadge I 24/08/2017 2659 4037 125635 3) Superintending Shri A.P. I 26/11/2015 2659 4165 119122 Engineer Nagargoje 4) Superintending Shri I 21/06/2011 2659 5936 107584 Engineer (Addl. Y.E.Sakhalkar Charge)/Executiv e Engineer 5) Executive Shri I 04/08/2015 2659 5955 90884 Engineer (Elect.) S.M.Bhasme

6) Executive Shri I 18/08/2011 2659 4076 107770 Engineer (Addl. G.G.Deshpande Charge) / Dy. Engineer-I 7) Dy. Engineer-I Shri I 01/08/2016 2659 7704 106802 G.G.Sonawane

E:\4 (1) B 2018 changes final\11-6-2018 English Changes.doc Sr. Designation Name of the Grad Dt. of Contact Gross No. officer / e joining the details Salary Employee post Phone / Fax / Email 8) Dy. Engineer-I Shri R.D.Mandve I 08/08/2016 2659 7705 96481

9) Dy. Engineer-I Shri P.M. I 18/10/2016 2659 7701 89715 Chacharkar 10) Dy. Engineer-II Shri P.L.Salunke II 01/02/2017 2659 4056 83175 11) Dy. Engineer-II Shri II 24/01/2017 2659 5900 66525 M.M.Sangare 12) Civil Engineering Shri S.M.Ghodke III 18/08/2008 2659 4129 32608 Assistant

Contract Basis:

Sr. Designation Name of the Grade Dt. of Contact Gross No. officer / joining the details Salary Employee post Phone / Fax / Email 1) Executive Shri M.P.Singh I 16/07/2008 2659 4145 52000/- Engineer 2) Dy. Engineer-I Smt. V.C.Keni I 17/11/2008 2659 5948 42000/-

E:\4 (1) B 2018 changes final\11-6-2018 English Changes.doc

Section 4 (1) (b) (x)

Details of remuneration of officers and employees in (Division/Cell) of MMRDA Sr. Cadre & Class Pay Scale Admissible allowances in Rs. No. Regular Occasional Special (Included (Like TA Bill) like in the (Project salary) allowance, like DA training allowance, any others) 1) Chief Engineer I P.B.IV As per rule As per rule As per rule 37400- 67000 Grade pay 8900/- 2) Superintending I P.B.III As per rule As per rule As per rule Engineer 15600- 39100 Grade pay 7600/- 3) Executive I P.B.III As per rule As per rule As per rule Engineer 15600- 39100 Grade pay 6600/- 4) ACAO I P.B.III As per rule As per rule As per rule 15600- 39100 Grade pay 6600 5) Staff Officer I P.B.III As per rule As per rule As per rule 15600- 39100 Grade pay 5700/- 6) Dy. Engineer-I I P.B.III As per rule As per rule As per rule 15600- 39100 Grade pay 5400/- 7) Section Officer II P.B.III 9300- As per rule As per rule As per rule 34800 Grade pay 4800/- 8) Accounts II P.B.III 9300- As per rule As per rule As per rule Officer 34800 Grade pay 4600/-

E:\4 (1) B 2018 changes final\11-6-2018 English Changes.doc Sr. Cadre & Class Pay Scale Admissible allowances in Rs. No. Regular Occasional Special (Included (Like TA Bill) like in the (Project salary) allowance, like DA training allowance, any others) 9) Dy. Engineer-II II P.B.II 9300- As per rule As per rule As per rule 34800 Grade pay 4400/- 10) Higher Grade III P.B.II 9300- As per rule As per rule As per rule Stenographer 34800 Grade pay 4400/- 11) Draftsman III P.B.II 9300- As per rule As per rule As per rule 34800 Grade pay 4400/-

12) Assistant III P.B.II 9300- As per rule As per rule As per rule Section officer 34800 Grade pay 4300/- 13) Lower Grade III P.B.II 9300- As per rule As per rule As per rule Stenographer 34800 Grade pay 4300/- 14) Plumber III P.B.I 5200- As per rule As per rule As per rule 20200 Grade pay 2100/- 15) Tracer III P.B.I 5200- As per rule As per rule As per rule 20200 Grade pay 2000/- 16) Computer III P.B.I 5200- As per rule As per rule As per rule Operator Cum 20200 Grade Clerk pay 1900/- 17) Electrician IV P.B.I 5200- As per rule As per rule As per rule 20200 Grade pay 1900 18) Naik IV P.B.I 5200- As per rule As per rule As per rule 20200 Grade pay 1900 19) Peon IV P.B.I 5200- As per rule As per rule As per rule 20200 Grade pay 1600

E:\4 (1) B 2018 changes final\11-6-2018 English Changes.doc

Section 4 (1) (b) (xi)

Details of allocation of budget and disbursement made in (Division/Cell) of MMRDA for the year ______• Budget (In Rs.) • Grants Issued (In Rs.)

Sr. Budget Grants Planned use If more grants Remarks No head received (give details excepted then description area wise and in Rs. work wise in a separate form) Nil

E:\4 (1) B 2018 changes final\11-6-2018 English Changes.doc Appendix – 12

Section 4 (1) (b) (xii) Format ‘A’

Process of disbursement of Grant/subsidy programme in Engineering Division of MMRDA Name of the programme Eligibility of Beneficiary Pre-requisites for the benefit Procedure to avail the benefits of the programme Criteria for deciding eligibility Detail of the benefits given in the programme (also mention the amount of subsidy/grant or other help given) Procedure for the distribution of the subsidy/grant. Where to apply or whom to contact in the office for applying Application Fee (where applicable) Nil Other fees (where applicable) Application format (where applicable. If the application made on plain paper please mention it along with what the applicant should mention in the application) List of Annexure (Certificates / documents) Format of annexure Where to contact in case of process related complaints Details of the available fund (at various levels like district level, Block level etc) List of beneficiaries in the format given below

E:\4 (1) B 2018 changes final\11-6-2018 English Changes.doc

Appendix – 13

Section 4 (1) (b) (xii) Format ‘B’

Details of beneficiaries of subsidy/grant in Engineering Division of MMRDA

Name of Division/Cell: Engineering

Name of the scheme / programme

Sr. Beneficiary of Amount of Criteria of Remarks No. name and subsidy / selection address concession Nil

E:\4 (1) B 2018 changes final\11-6-2018 English Changes.doc Appendix – 14

Section 4 (1) (b) (xiii)

Particulars of recipients of concession permit or authorization granted in Engineering Division of MMRDA

Type of License / permission / concession

Sr. Name of the Nature Issued Valid General Details of the No licensee on up to Conditions license Nil

E:\4 (1) B 2018 changes final\11-6-2018 English Changes.doc

Appendix – 15

Section 4 (1) (b) (xiv)

Details of information available in electronic form in Engineering Division of MMRDA

Sr. Type of Subject/ In which electronic Mode of Person in charge No. document Topic format it is kept retrieval Nil

E:\4 (1) B 2018 changes final\11-6-2018 English Changes.doc 43

Section 4 (1) (b) (xv)

Particulars of facilities available for citizen to obtaining information in Engineering Division of MMRDA Types of facilities :-

Information about visiting Monday To Friday time (10 to 5) hours. Excluding Public Holiday Information about 24 Hours Website interactive website https://mmrda.maharashtra.gov.in

Information about facilities N.A. for inspection of record Information about facilities N.A. for inspection of works Information about facilities N.A. for providing samples. Information about notice MMRDA Building, Ground floor, Bandra Kurla Complex, boards Bandra (E) Information about library Chief Planning Division / Liberian Planning Division, MMRDA Building, Ground floor, Bandra-Kurla Complex, Bandra (E).

Sr. Type of Timings Procedure Location Person in Grievance redress No. facility charge Nil

E:\4 (1) B 2018 changes final\11-6-2018 English Changes.doc 44 Appendix – 16

Section 4 (1) (b) (xvi)

Details of Public Information Officers / APIOs / Appellate authority in Engineering Division of MMRDA (A) PIOs Sr. Name of PIO Designatio Jurisdiction as PIO Address E-mail id for Appellate No. under RTI / Ph. no. purpose of authority RTI 1. Shri Executive 1. District planning N.S.Dabholkar Engineer Committee (DPDC) - Raigad District 2. VIP/VVIP Corrospondence Report Raigad District 3. Noise barrier work on Navghar flyover & Suman Nagar flyover on EEH 4. Thane/Raigad IVDS Schemes 5. Grants/Loans/Rev olving Funds to various Municipal Corporations 6. Widening and Improvement of NH-4 from Takka Colony to Palaspe Phata to khanda colony (Work being transferred to MSRDC) 7. Mahim Nature Park Society (MNPS) 8. Marve Manori Creek Bridge

E:\4 (1) B 2018 changes final\11-6-2018 English Changes.doc 45 Sr. Name of PIO Designatio Jurisdiction as PIO Address E-mail id for Appellate No. under RTI / Ph. no. purpose of authority RTI 9. SRA & All Rental Housing Schemes Independent Unit • Naina and CIDCO Jurisdiction 2. Shri J.R.Dhane Executive 1. Improvement of Engineer Neral-Dasturi Road 2. Construction of Kalyan Ring Road- Secn. 1, 2 3 3. Construction of Kalyan Ring Road- Secn. 4, 5, 6 & 7 4. Construction of Four Lane Creek Bridge on Ulhas creek in Durgadi at Kalyan Bhiwandi National Highway No.222 5. District Planning Committee (DPDC) • Mumbai City 6. VIP/VVIP Corrospondenc e Report • Mumbai City 7. Administrative Works 8. RTI on issues not related to MMRDA

E:\4 (1) B 2018 changes final\11-6-2018 English Changes.doc 46 Sr. Name of PIO Designatio Jurisdiction as PIO Address E-mail id for Appellate No. under RTI / Ph. no. purpose of authority RTI 3. Shri M.Y.Patil Executive 1. Chirle Dispersal Engineer 2. Creek bridge at Ghatkopar-Kopar khairane (Note: Shri A.R.Bhisikar, EE to continue upto appointment of Consultant for DPR 3. Flyover at Kalanagar junction 4. District Planning Committee (DPDC) ••• Thane District 5. VIP/VVIP Corrospondence Report ••• Thane District 6. Flyover at Mumbra 7. Shil-Kalyan Junction road and flyover at Shilphata 8. MUIP related works 9. Wadala office space renovation works (Ground, First and second floor)

E:\4 (1) B 2018 changes final\11-6-2018 English Changes.doc 47 Sr. Name of PIO Designatio Jurisdiction as PIO Address E-mail id for Appellate No. under RTI / Ph. no. purpose of authority RTI 4. Shri Executive 1. District V.M.Shewale Engineer Planning Committee (DPDC) ••• Palghar District 2. VIP/VVIP Corrospondenc e Report ••• Palghar District 3. Construction of Bhiwandi Ring Road 4. Naigaon Juichandra Bopane SH-41 (Part-Juichandra Phata to Naigaon Railway Station) 5. Construction of Flyover Bridges at Anand Nagar, Thane- Ghodbunder Road, Kasar- Wadavali & Bhaindar Pada

E:\4 (1) B 2018 changes final\11-6-2018 English Changes.doc 48 Sr. Name of PIO Designatio Jurisdiction as PIO Address E-mail id for Appellate No. under RTI / Ph. no. purpose of authority RTI 6. a) Quadrupling of the road between Murdha gaon (Subhash Chandra Bose ground) and Uttan gaon. b) Flyover from Golden Nace Circle to Deepak Hospital c) Flyover from Shivar Garden to SK Stone Signal d) Flyover from Pleasant Park to Silver Park Signal 7. Gaimukh- Fountain Hotel Elevated Bridge 8. Diva Vasai Flyover 9. Widening and improvement of Thane Ghodbunder service road (TMC work) 10. Oshiwara District Centre works 11. Naigaon ROB

E:\4 (1) B 2018 changes final\11-6-2018 English Changes.doc 49 Sr. Name of PIO Designatio Jurisdiction as PIO Address E-mail id for Appellate No. under RTI / Ph. no. purpose of authority RTI 5. Shri Executive 1. Construction of M.V.Jaitpal Engineer flyovers at Thane Belapur Road on Savita Chemical Junction, Ghansoli Junction, Talavali Junction and Vehicular Underpass on Mahape Junction 2. Wadala TT Works including Maintenance 3. Chitalsar Manpada office Building 4. Airoli-Katai Road (phase 1,2) 5. Airoli-Katai Road (phase 3) 6. Other works/issues related to Thane- Belapur Road 7. VIP/VVIP Correspondence Report - Mumbai Suburban 8. Nodal Person & Mosquito breeding Detectors - Wadala TT 6. Shri Executive Electrical works S.M.Bhasme Engineer 7. Shri A.V.Patil Executive Widening & Engineer Strengthening of Forest Naka to Badlapur 8. Shri A.S.Titre Executive 1. Workshops Engineer /presentations /lectures in MMRDA office 2. Mithi River works 3. Vasai-Bhayander Creek Bridge Link Road

E:\4 (1) B 2018 changes final\11-6-2018 English Changes.doc 50 Sr. Name of PIO Designatio Jurisdiction as PIO Address E-mail id for Appellate No. under RTI / Ph. no. purpose of authority RTI 4. Road from Vasai- Virar site crossing Bhayandar creek up to Subhash Chandra Bose ground and further joining Mira Road to Dahisar Link Road on the West of Railways 5. Construction of Flyover at Lokhand bazaar and Navdephata on old Mumbai Pune Express way 6. Disaster management & MMRDA Control Room (for year 2017) 7. Newly sanctioned OARDS works & Extended MUIP works in - Mira Bhayander

E:\4 (1) B 2018 changes final\11-6-2018 English Changes.doc 51 Sr. Name of PIO Designatio Jurisdiction as PIO Address E-mail id for Appellate No. under RTI / Ph. no. purpose of authority RTI 9. Shri Executive 1. Kalyan Growth M.N.Ghadge Engineer Centre 2. Road Improvement work of NH 43 passing through Badlapur city. 3. Construction of four lane flyover near L & T junction on Shilphata Mahape Road and, Widening & Strengthening of Service Road 4. Solid Waste Management Project at Taloja 5. Construction of internal roads in Bhiwandi under extended MUIP (Pkg-II)-25 Roads 6. Feasibility study of Panvel Taloja road 10. Shri Executive 1. Creek bridge at B.H.Chavan Engineer Revas Karanja 2. R & R maintenance works 3. Newly sanctioned OARDS works & Extended MUIP works in - Bhiwandi, Kalyan, Dist.Thane 4. Overall Coordiantion for : - OARDS works

E:\4 (1) B 2018 changes final\11-6-2018 English Changes.doc 52 Sr. Name of PIO Designatio Jurisdiction as PIO Address E-mail id for Appellate No. under RTI / Ph. no. purpose of authority RTI 5. OARDS Works executed by local agencies – Release of Funds 11. Shri Executive 1. MSRDC Co- P.D.Jamadar Engineer ordination and MSRDC executed works related 2. Kurar Subway / Widening etc. 3. Aakurli subway 4. RTI Application Distribution & RTI issue resolving (Administration related) 5. Extension of Coastal Road 12. Shri Executive Building at Wadala C.B.Dhokale- Engineer patil 13. Shri Executive 1. District S.S.Lokare Engineer Planning Committee (DPDC) - Mumbai Suburban city 2. VIP/VVIP Corrospondenc e Report - Mumbai Suburban City 3. Building at Wadala 4. Widening of Road work in Ulhasnagar 5. Road safety audit related

E:\4 (1) B 2018 changes final\11-6-2018 English Changes.doc 53 Sr. Name of PIO Designatio Jurisdiction as PIO Address E-mail id for Appellate No. under RTI / Ph. no. purpose of authority RTI 6. Newly sanctioned OARDS works & Extended MUIP works in - Ambernath 7. Eastern Express Highway (including maintenance, advertisement) 8. Construction of Flyover under Jagruti Nagar Metro (balance work) 9. Work of Dr.Ambedkar Memorial at Indu Mill Area 14. Shri Executive 1. Mumbai Trans V.A.Jambhale Engineer Harbour Link -Pkg 2 (Marine) Ch. 10.38 Km to end of Shivaji Nagar Interchange at 18.19 Km -Pkg 4 (ITS) Intelligent Transport System 2. Land acquisition & matters pertaining to Forest Dept. 3. Maintenance work of Bandra Kurla Complex, RCC Box drain works,Other development works in BKC

E:\4 (1) B 2018 changes final\11-6-2018 English Changes.doc 54 Sr. Name of PIO Designatio Jurisdiction as PIO Address E-mail id for Appellate No. under RTI / Ph. no. purpose of authority RTI 4. Repairing & Maintenance of old & new office bldg. 5. Repairing & Maintenance of Namatri Bldg. 6. Repairing & Maintenance of Residential Building at ‘Jetwan’ 15. Shri Executive 1. Mumbai Trans A.R.Bhisikar Engineer Harbour Link - Pkg 1 (Marine) Sewri interchange at Ch. 0.0 Km up to Ch. 10.38 Km 2. Mumbai Trans Harbour Link - General Consultanc y - General Consultancy for all packages 3. b) R & R Land acquisition on Mumbai side 4. d) Mantralaya/ Delhi/NGT related 5. GKRK Consulting services of NP Bridging 6. Sewri-Worli elevated project

E:\4 (1) B 2018 changes final\11-6-2018 English Changes.doc 55 Sr. Name of PIO Designatio Jurisdiction as PIO Address E-mail id for Appellate No. under RTI / Ph. no. purpose of authority RTI 7. Flyover on EEH near Ghatkopar depot junction on AGLR 8. Creek bridge at Ghatkopar-Kopar Khairane (*Note: Shri A.R.Bhisikar, EE to help upto appointment of Consultant for DPR) 9. BKC Connector 16. Shri Executive 1. Noise barrier on A.G.Korgaonkar Engineer EEH 2. Mithi River Maintenance 3. New Buildings for Homeguard in Oshiwara 4. Extension of Santacruz- Chembur Link Road 5. Construction of 4 Lane Bridge and Road on Ulhas creek at Motagaon on Mankoli Motagaon Road 6. Newly sanctioned OARDS works & Extended MUIP works in - Ulhasnagar 7. Overall coordination for:- Extended MUIP works

E:\4 (1) B 2018 changes final\11-6-2018 English Changes.doc 56 Sr. Name of PIO Designatio Jurisdiction as PIO Address E-mail id for Appellate No. under RTI / Ph. no. purpose of authority RTI 17. Shri A.B.Dhabe Executive 1. a) Dasturi Engineer Matheran Pathway b) Matheran view Points 2. Vitawa Skywalk 18. Shri V.G.Surve Executive 1. District Planning Engineer Committee (DPDC) - Thane District 2. VIP/VVIP Corrospondence Report - Thane District 3. Chedda Nagar Flyover 4. Construction of Flyover at Minatai Thakre Chowk (TMC work) 5. Eastern Express Highway Construction of bypass road from Mumbai Agra Road to Ghodbunder Construction bypass road from Mumbai Agra Road to Nashik road 6. Work of Railway Flyover at Kopari 7. Rajnoli flyover & Mankoli Flyover

E:\4 (1) B 2018 changes final\11-6-2018 English Changes.doc 57 Sr. Name of PIO Designatio Jurisdiction as PIO Address E-mail id for Appellate No. under RTI / Ph. no. purpose of authority RTI 8. Construction of Flyover at Late Rajiv Gandhi Chowk to Saibaba Temple on Kalyan Road in Bhivandi- Nijampur, Municipal Corporation 19. Shri Executive 1. R & R L.R.Chousashte Engineer Maintenance works 2. SRA & All Rental Housing Schemes Independent Unit [(As per Order dated 24.11.2016 approved by AMC (D) ] - Mira Bhayander Jurisdiction 20. Shri Executive 1. R & R S.L.Gundla Engineer Maintenance works 2. SRA & All Rental Housing Schemes Independent Unit - MMRDA Ulhasanagar & Kalyan Jurisdiction - Raigad Jurisdiction

E:\4 (1) B 2018 changes final\11-6-2018 English Changes.doc 58 Sr. Name of PIO Designatio Jurisdiction as PIO Address E-mail id for Appellate No. under RTI / Ph. no. purpose of authority RTI 3. Newly sanctioned OARDS works & Extended MUIP works in - Raigad, Badlapur, Ambarnath, Dist. Thane 4. OARDS Works executed by local agencies - Release of Funds 5. Overall Coordination for OARDS Works 6. Technical support to Kalamboli steel yard. 21. Shri P.P. Executive 1. VIP/VVIP Bhandekar Engineer Correspondence Report - Thane District - Raigad District 2. Morva bypass 3. Alibaug Building and road works. 4. Primary health Centre At Awas, Dist: raigad 5. Construction of Awas Sasawane road, Dist: Raigad 6. Newly sanctioned OARDS Works & Extended MUIP works in:- Ambernath

E:\4 (1) B 2018 changes final\11-6-2018 English Changes.doc 59 Sr. Name of PIO Designatio Jurisdiction as PIO Address E-mail id for Appellate No. under RTI / Ph. no. purpose of authority RTI 7. Primary health centre at Awas, Dist-Raigad 8. Construction of Awas Sasawane road, Dist- Raigad 9. Construction of internal roads in Bhiwandi under extended MUIP (Pkg-I & III)-27 Roads 22. Shri S.T.Salve Executive 1. Airoli-Katai Engineer Road (Phase -3) 2. Construction of four lane flyover near L & T junction on Shilphata Mahape Road and, Widening & Strengthening of Service Road 3. Solid Waste Management Project at Taloja 23. Shri M.P.Singh Executive 1. Gorai Creek Engineer Bridge 2. Virar to Alibaug Multimodal corridor 3. R & R Maintenance works

E:\4 (1) B 2018 changes final\11-6-2018 English Changes.doc 60 Sr. Name of PIO Designatio Jurisdiction as PIO Address E-mail id for Appellate No. under RTI / Ph. no. purpose of authority RTI 4. SRA & All Rental Housing Schemes Independent Unit [(As per Order dated 24.11.2016 approved by AMC (D)] - Thane Municipal Corporation & SRA Work of Rental Housing Scheme carried out by MMRDA - Thane Municipal Corporation Jurisdiction (Supervision ) 24. Shri Executive Work of Vigilance S.C.Odhekar Engineer Cell (Addl. Charge) 25. Shri Executive 1. Pkgs. No. - 3 G.G.Deshpande Engineer (Land) (Addl. Description - Charge) End of Shivaji nagar Interchange at ch. 18.19 Km up to Chirle Interchange at Ch 21.83 Km 2. a) Land acquisition & matters pertaining to Forest Dept 3. c) EMP Related works

E:\4 (1) B 2018 changes final\11-6-2018 English Changes.doc 61 (B) APIOs

Sr. Name of APIO Designation Jurisdiction as APIO Address E-mail id Appellate No. under TRI / Ph.no. for authority purpose of RTI 1. Shri S.V.Gajre D.E. -I Electrical works 2. Shri N.M.Kamble D.E. -I 1. Dasturi to Matheran Pathway 2. Matheran View Points 3. MSRDC Co- ordination and MSRDC executed works related 4. Kurar Subway/Wideni ng etc 5. Akurli Subway 6. VIP/VVIP Corresponden ce Report ••• Mumbai Suburban 7. Nodal Person & Mosquito breeding Detectors ••• Oshiwara District Centre 8. Mithi River Works

E:\4 (1) B 2018 changes final\11-6-2018 English Changes.doc 62 Sr. Name of APIO Designation Jurisdiction as APIO Address E-mail id Appellate No. under TRI / Ph.no. for authority purpose of RTI 9. Road from Vasai-Virar site crossing Bhayandar creek up to Subhash Chandra Bose ground and further joining Mira Road to Dahisar Link Road on the West of Railways 10. Oshiwara District Centre Works 3. Shri G.D.Rathod D.E. -I 1. Construction of flyovers at Thane Belapur Road on Savita Chemical Junction, Ghansoli Junction, Talavali Junction and Vehicular Underpass on Mahape Junction. 2. Airoli-Katai Road (Phase 1,2) 3. Other works / Issues related to Thane- Belapur Road

E:\4 (1) B 2018 changes final\11-6-2018 English Changes.doc 63 Sr. Name of APIO Designation Jurisdiction as APIO Address E-mail id Appellate No. under TRI / Ph.no. for authority purpose of RTI 4. Shri D.E. -I 1. Construction of H.S.Sonavane Bhiwandi Ring Road 2. Naigaon Juichandra Bopane SH-41 (Part Juichandra Phata to Naigaon Railway Station) 3. Construction of Flyover Bridges at Anand Nagar, Thane- hodbunder Road, Kasar- Wadavali & Bhainder Pada. 4. a)Quadrupling of the road between Murdha gaon (Subhash Chandra Bose ground) and Uttan gaon. b) Flyover from Golden Nace Circle to Deepak Hospital c) Flyover from Shivar Garden to SK Stone Signal d) Flyover from Pleasant Park to Silver Park Signal

E:\4 (1) B 2018 changes final\11-6-2018 English Changes.doc 64 Sr. Name of APIO Designation Jurisdiction as APIO Address E-mail id Appellate No. under TRI / Ph.no. for authority purpose of RTI 5. Diva Vasai Flyover 6. Newly sanctioned OARDS Works & Extended MUIP works in : - Mira Bhayander 7. Naigaon ROB 5. Shri D.E. -I 1. Construction of G.G.Deshpande Kalyan Ring Road-Secn. 1,2 & 3 2. Construction of Kalyan Ring Road-Secn. 4,5,6 & 7 3. Construction of Four Lane Creek Bridge on Ulhas creek in Durgadi at Kalyan Bhiwandi National Highway No.222 6. Shri D.E. -I 1. Construction of G.G.Sonavane Flyover at Lokhandbazar and Navdephata on old Mumbai- Pune Express way 2. Flyover at Kalanagar Junction

E:\4 (1) B 2018 changes final\11-6-2018 English Changes.doc 65 Sr. Name of APIO Designation Jurisdiction as APIO Address E-mail id Appellate No. under TRI / Ph.no. for authority purpose of RTI 3. Wadala office space renovation works (Ground, first & second floor) 7. Shri Amit Khopde D.E. -I 1. Vitawa Skywalk 2. R & R maintenance works 3. Nodal Person & Mosquito breeding Detectors for R & R premises /area under MMRDA 4. Construction of Building at Cross Maidan for Homguard 8. Shri S.R.Bhadane DE - I 1. Maintenance work of Bandra Kurla Complex, RCC Box drain works,Other development works in BKC 2. Repairing & Maintenance of old & new office bldg. 3. Repairing & Maintenance of Namatri Bldg. 4. Repairing & Maintenance of Residential Building at ‘Jetwan’ 5. BKC Connector

E:\4 (1) B 2018 changes final\11-6-2018 English Changes.doc 66 Sr. Name of APIO Designation Jurisdiction as APIO Address E-mail id Appellate No. under TRI / Ph.no. for authority purpose of RTI 6. Nodal Person & Mosquito breeding Detectors - For BKC (E,G,GN Blocks) 7. Workshops /presentations /lectures in MMRDA office 9. Smt.S.S. DE - I 1. Flyovers in Tembhurnikar Badlapur City 2. Belapur-Belavali Railway ROB 3. Kalyan Growth Centre 4. Widening and strengthing of Forest Naka to Badlapur 5. Widening of Road work in Ulhasnagar 6. SH-40 Shirgaon Phata to SH-35 Badlapur 7. Newly sanctioned OARDS Works & Extended MUIP works in : - Ulhasnagar

E:\4 (1) B 2018 changes final\11-6-2018 English Changes.doc 67 Sr. Name of APIO Designation Jurisdiction as APIO Address E-mail id Appellate No. under TRI / Ph.no. for authority purpose of RTI 10. Shri A.P.Jadhav DE – I 1. Proposed East- West Elevated Corridor over Sardar Vallabhai Patel Road connection Eastern Freeway (Near P.D’Mello Road Jn.) and proposed Western Coastal Road (Near Girgaon Chowpati) 2. Noise barrier work on Navghar flyover and Suman nagar flyover on EEH 3. Noise barrier on WEH 4. Mithi River Maintenance 5. Extension of Santacruz- Chembur Link Road 6. Construction of 4 Lane Bridge and Road on Ulhas creek at Motagaon on Mankoli Motagaon Road 7. Thane/Raigad IVDS schemes

E:\4 (1) B 2018 changes final\11-6-2018 English Changes.doc 68 Sr. Name of APIO Designation Jurisdiction as APIO Address E-mail id Appellate No. under TRI / Ph.no. for authority purpose of RTI 8. Grants/Loans/ Revolving funds to various Municipal Corporations 9. Mahim Nature Park Society (MNPS) 10. Marve- Manori Creek Bridge 11. Shri A.V.Pagare DE – I 1. Chheda Nagar Flyover 2. Road Improvement work of NH 43 passing through Badlapur city. 3. Work of Railway flyover at Kopri 4. Feasibility study of Panvel Taloja road 5. Rajnoli Flyover & Mankoli Flyover 6. Construction of Flyover at Late Rajiv Gandhi Chowk to Saibaba Temple on Kalyan Road in Bhivandi- Nijampur, Municipal Corporation

E:\4 (1) B 2018 changes final\11-6-2018 English Changes.doc 69 Sr. Name of APIO Designation Jurisdiction as APIO Address E-mail id Appellate No. under TRI / Ph.no. for authority purpose of RTI 12. Shri Prashant DE - I 1. VIP/VVIP Wakodkar Corresponden ce Report ••• Mumbai City 2. Work of Dr. Ambedkar Memorial at Indu Mill Area 3. Newly sanctioned OARDS Works & Extended MUIP works in : - Bhiwandi 13. Smt. Poonam DE - I 1. R & R Tayshete maintenance works 2. Nodal Person & Mosquito breeding Detectors for R & R premises /area under MMRDA 14. Shri R.R.Dhakate DE - I 1. Widening and strengthing of Forest Naka to Badlapur 2. Newly sanctioned OARDS Works & Extended MUIP works in : - Badlapur - Raigad 3. OARDS Works executed by local agencies- Release of Funds

E:\4 (1) B 2018 changes final\11-6-2018 English Changes.doc 70 Sr. Name of APIO Designation Jurisdiction as APIO Address E-mail id Appellate No. under TRI / Ph.no. for authority purpose of RTI 15. Shri B.V.Biradar DE - I 1. New Buildings for Homeguard in Oshiwara 2. Extension of Santacruz- Chembur Link Road 3. Disaster management & MMRDA Control Room (for year 2017 16. Shri R.D.Mandve DE - I 1. Mumbai Trans Harbour Link Pkgs. No. - 1(Marine) Description - Sewri Interchange at Ch 0.0 Km up to Ch. 10.38 Km 2. Pkgs. No. - 4(ITS) Description - Intelligent transport system (ITS) 3. Pkgs. No. - General Consultancy Description - General Consultancy for all packages 4. R & R Land acquisition on Mumbai side 5. Mantralaya/Delh i/NGT related 6. GKRK Consulting services of NP Bridging

E:\4 (1) B 2018 changes final\11-6-2018 English Changes.doc 71 Sr. Name of APIO Designation Jurisdiction as APIO Address E-mail id Appellate No. under TRI / Ph.no. for authority purpose of RTI 7. Sewri-Worli Elevated Project 8. DPR Sewri Interchange 9. RTI on issues not related to MMRDA 17. Shri P.M. 1. Flyover on EEH Chacharkar near Ghatkopar depot junction on AGLR 2. Chirle Dispersal 3. Creek bridge at Ghatkopar- Kopar khairane 4. Creek bridge at Revas Karanja 5. Extension of Coastal Road 6. Vasai- Bhayander Creek Bridge Link Road 7. Flyover at Mumbra 8. Shil-Kalyan junction road and Flyover at Shilphata 9. MUIP related works

E:\4 (1) B 2018 changes final\11-6-2018 English Changes.doc 72 Sr. Name of APIO Designation Jurisdiction as APIO Address E-mail id Appellate No. under TRI / Ph.no. for authority purpose of RTI 18. Shri Mandar Sectional 1. Mumbai Trans Sangare Engineer Harbour Link a) Pkgs. No. – 2 (Marine) Description - Ch. 10.38 Km to end of Shivaji nagar Interchange at ch.18.19 Km b) Pkgs. No. – 3 (Land) Description - End of Shivaji nagar Interchange at ch. 18.19 Km up to Chirle Interchange at Ch 21.83 Km 2. Land acquisition & matters pertaining to Forest Dept. 3. MTHL- EMP related works 4. Improvement of Neral-Dasturi Road 5. Construction of Kalyan Ring Road-Secn. 1,2 & 3 6. Construction of Kalyan Ring Road-Secn. 4,5,6 & 7

E:\4 (1) B 2018 changes final\11-6-2018 English Changes.doc 73 Sr. Name of APIO Designation Jurisdiction as APIO Address E-mail id Appellate No. under TRI / Ph.no. for authority purpose of RTI 19. Shri P.L. Salunkhe Sectional 1. Wadala TT Engineer Works including Maintenance 2. Chitalsar Manpada Office Building 3. Building at Wadala 4. Eastern Express Highway (including maintenance, advertisement) 20. Smt. V.C. Keni D.E. -I 1. Gorai Creek Bridge 2. Virar to Alibaug- Multimodal Corridor 3. R&R maintenance works 4. Work of Rental Housing Scheme carried out by MMRDA - Thane Municipal Corporation Jurisdiction (supervision)

E:\4 (1) B 2018 changes final\11-6-2018 English Changes.doc 74 Sr. Name of APIO Designation Jurisdiction as APIO Address E-mail id Appellate No. under TRI / Ph.no. for authority purpose of RTI 21. Shri J. B. Patil DE - II 1. Construction of Four Lane Creek Bridge on Ulhas creek in Durgadi at Kalyan Bhiwandi National Highway No.222 2. Maintenance work of Bandra Kurla Complex, RCC Box drain works, Other development works in BKC 22. Shri Sumant Asst Civil Naigaon ROB Ghodke Engineer 23. Smt. S.O (ED) Administrative N.S.Nandanwar works

E:\4 (1) B 2018 changes final\11-6-2018 English Changes.doc 75 (C) Appellate Authority

Sr. Name of Designation Jurisdiction as Appellate PIO reporting E-mail i d Admini No. Appellate Authority for strative Authority purpose Officer of RTI 1. Shri Superintending 1. Construction of A.K.Pahal Engineer Bhiwandi Ring Road 2. Naigaon Juichandra Bopane SH-41 (Part- JuichandraPhata to Naigaon Railway Station) 3. Construction of Flyover Bridges at Andnd Nagar, Thane- Ghoudbunder Road, Kasar- Wadavali & BhaindarPada 4. Diva Vasai Flyover 5. Improvement & Widening from Shirsat Phata to Washind (Sh 3 to Sh 8) Pkg. I & II 6. R&R maintenance works 7. Naigaon ROB 8. Gorai Creek Bridge 9. Virar to Alibaug – Multimodal Corridor 10. Marve – Manori Creek Bridge 11. Morva Bypass

E:\4 (1) B 2018 changes final\11-6-2018 English Changes.doc 76 Sr. Name of Designation Jurisdiction as Appellate PIO reporting E-mail i d Admini No. Appellate Authority for strative Authority purpose Officer of RTI 2. Shri S.S. Superintending 1. Construction of Varaskar Engineer flyovers at Thane Belapur Road on Savita Chemical Junction, Ghansoli Junction, Talavali Junction and Vehicular Underpass on Mahape Junction. 2. Mumbai Trans Harbour Link a) Pkgs. No. – 2 (Marine) Description - Ch.10.38 Km to end of Shivaji nagar Interchange at ch.18.19 Km b) Pkgs. No. – 3 (Land) Description - End of Shivaji nagar Interchange at ch. 18.19 Km up to Chirle Interchange at Ch 21.83 Km c) Pkgs. No. - General Consultancy Description - General Consultancy for all packages 3. Land acquisition & matters pertaining to Forest Dept

E:\4 (1) B 2018 changes final\11-6-2018 English Changes.doc 77 Sr. Name of Designation Jurisdiction as Appellate PIO reporting E-mail i d Admini No. Appellate Authority for strative Authority purpose Officer of RTI 4. Improvement of Neral-Dasturi Road 5. Construction of Kalyan Ring Road- Secn. 1, 2 & 3 6. Construction of Kalyan Ring Road- Secn. 4, 5, 6 & 7 7. Construction of Four Lane Creek Bridge on Ulhas creek in Durgadi at Kalyan Bhiwandi National Highway No.222 8. Maintenance work of Bandra Kurla Complex, RCC Box drain works, Other development works in BKC 9. Repairing & Maintenance of old & new office bldg. 10. Repairing & Maintenance of Namatri Bldg. 11. Repairing & Maintenance of Residential Building at ‘Jetwan’ 12. District Planning committee -Mumbai City

E:\4 (1) B 2018 changes final\11-6-2018 English Changes.doc 78 Sr. Name of Designation Jurisdiction as Appellate PIO reporting E-mail i d Admini No. Appellate Authority for strative Authority purpose Officer of RTI 13. VIP/VVIP Correspondence Report - Mumbai City 14. Administrativ e works (Engineering Division) 3. Shri P. S. Superintending 1. Dasturi to Nimje Engineer Matheran Pathway 2. Matheran View Points 3. District Planning Committee (DPDC) - Thane District 4. VIP/VVIP Correspondence Report -Thane district 5. Kalyan Growth Centre 6. Widening & Strengthening of Forest Naka to Badlapur 7. Construction of 4 Lane Bridge and Road on Ulhas creek at Motagaon on Mankoli Motagaon Road 8. Chheda Nagar Flyover 9. Widening & Improvement of Thane Ghodbundar service Road (TMC work)

E:\4 (1) B 2018 changes final\11-6-2018 English Changes.doc 79 Sr. Name of Designation Jurisdiction as Appellate PIO reporting E-mail i d Admini No. Appellate Authority for strative Authority purpose Officer of RTI 10. Construction of Flyover at Minatai Thakre Chowk (TMC work) 11. Thane / Raigad IVDS Schemes 12. Grants / Loans / Revolving Funds to various Municipal Corporations 13. Widening of Road work in Ulhasnagar 14. Road improvement work of NH-43 passing through Badlapur City 15. Eastern Express Highway Construction of bypass road from Mumbai Agra Road to Ghodbunder Construction bypass road from Mumbai Agra Road to Nashik road

E:\4 (1) B 2018 changes final\11-6-2018 English Changes.doc 80 Sr. Name of Designation Jurisdiction as Appellate PIO reporting E-mail i d Admini No. Appellate Authority for strative Authority purpose Officer of RTI 16. SRA & All Rental Housing Schemes Independent Unit [(As per Order dated 24.11.2016 approved by AMC (D)] Under supervision of: i) Shri. Sanjay Pawar, Addl.Collector ii) Shri Balasaheb M. Vakchoure, Dy.Collector iii) Shri. Ravindra Hazare, Dy.Collector - Thane Municipal Corporation and SRA 17. Newly sanctioned OARDS Works & Extended MUIP works in - Bhiwnadi, Badlapur, Raigad, Kalyan, Ambarnath, Dist. Thane 18. OARDS Works executed by local agencies – Release of Funds

E:\4 (1) B 2018 changes final\11-6-2018 English Changes.doc 81 Sr. Name of Designation Jurisdiction as Appellate PIO reporting E-mail i d Admini No. Appellate Authority for strative Authority purpose Officer of RTI 19. Overall coordination for ••• OARDS works 20. Rajnoli Flyover & Mankoli Flyover 21. Work of Rental Housing Scheme carried out by MMRDA - Thane Municipal Corporation Jurisdiction (supervision) 4. Shri Superintending 1. Chirle Dispersal P.J.Bhanga Engineer 2. Creek bridge at re Ghatkopar-Kopar Khairane 3. Creek bridge at Revas Karanja 4. Vitawa Skywalk 5. Wadala TT Works including Maintenance 6. Chitalsar Manpada office Building 7. Airoli-Katai Road (phase 1,2) 8. Airoli-Katai Road (phase 3) 9. Other works / Issues related to Thane-Belapur Road 10. MSRDC Co- ordination and MSRDC executed works related 11. Kurar Subway / Widening etc.

E:\4 (1) B 2018 changes final\11-6-2018 English Changes.doc 82 Sr. Name of Designation Jurisdiction as Appellate PIO reporting E-mail i d Admini No. Appellate Authority for strative Authority purpose Officer of RTI 12. Aakurli subway 13. District Planning Committee (DPDC) - Thane District - Raigad District 14. VIP/VVIP Correspondence Report • Mumbai Suburban • Thane District 15. Work of railway flyover at kopri 16. Flyover at Mumbra 17. Shil-Kalyan junction road and Flyover at Shilphata 18. MUIP related works 19. Construction of four lane flyover near L & T junction on Shilphata Mahape Road and, Widening & Strengthening of Service Road 20. Widening and improvement of NH-4 from Takka Colony to Palaspe phata and to Khanda Colony ( work being transferred to MSRDC)

E:\4 (1) B 2018 changes final\11-6-2018 English Changes.doc 83 Sr. Name of Designation Jurisdiction as Appellate PIO reporting E-mail i d Admini No. Appellate Authority for strative Authority purpose Officer of RTI 21. Mahim Nature Park Society (MNPS) 22. Solid Waste Management Project at Taloja 23. Wadala office space renovation works (Ground, first and second floor) 24. SRA & All Rental Housing Schemes Independent Unit [(As per Order dated 24.11.2016 approved by AMC (D)] Under supervision of : i) Shri. Sanjay Pawar, Addl.Collector ii) Shri Balasaheb M. Vakchoure, Dy.Collector iii) Shri. Ravindra Hazare, Dy.Collector ••• Naina and CIDCO Jurisdiction 25. Construction of Building at Cross Maidan for Homguard 26. Construction of Flyover at Navade Phata on Old Mumbai Pune Highway No.4

E:\4 (1) B 2018 changes final\11-6-2018 English Changes.doc 84 Sr. Name of Designation Jurisdiction as Appellate PIO reporting E-mail i d Admini No. Appellate Authority for strative Authority purpose Officer of RTI 5. Shri A.P. Superintending 1. Flyover on EEH Nagargoje Engineer near Ghatkopar depot junction on AGLR 2. District Planning Committee (DPDC) ••• Mumbai Suburban 3. VIP/VVIP Correspondence Report ••• Mumbai Suburban 4. Extension of Coastal Road 5. Noise barrier work on Navghar flyover & Suman nagar flyover on EEH 6. Noise barrier work on WEH 7. Buildings at Wadala 8. New Buildings for Homeguard in Oshiwara 9. Extension of Santacruz- Chembur Link Road 10. Technical support to Kalamboli steel yard. 11. Work of Dr.Ambedkar Memorial at Indu Mill Area 12. Road safety audit related

E:\4 (1) B 2018 changes final\11-6-2018 English Changes.doc 85 Sr. Name of Designation Jurisdiction as Appellate PIO reporting E-mail i d Admini No. Appellate Authority for strative Authority purpose Officer of RTI 13. SRA & All Rental Housing Schemes Independent Unit [(As per Order dated 24.11.2016 approved by AMC (D)] Under supervision of: 1) Shri. Sanjay Pawar, Addl.Collector 2) Shri Balasaheb M. Vakchoure, Dy.Collector 3) Shri. Ravindra Hazare, Dy.Collector ••• Raigad Jurisdiction 14. Construction of Flyover at Late Rajiv Gandhi Chowk to Saibaba Temple on Kalyan Road in Bhivandi- Nijampur, Municipal Corporation 15. Eastern Express Highway (Including maintenance, advertisement) 16. Western Express Highway – maintenance & budgeted works of PWD and new sanctioned works 17. Construction of Flyover under Jagruti Nagar Metro (balance work) 18. Vasai- Bhayander Creek Bridge Link Road

E:\4 (1) B 2018 changes final\11-6-2018 English Changes.doc 86 Sr. Name of Designation Jurisdiction as Appellate PIO reporting E-mail i d Admini No. Appellate Authority for strative Authority purpose Officer of RTI 19. Construction of Flyover at Lokhand bazaar and Navdephata on old Mumbai Pune Express way 20. Disaster management and MMRDA control Room 6. Shri Superintending 1. Flyover at M.S.Narkar Engineer Kalanagar Junction 2. District Planning Committee (DPDC) ••• Palghar District 3. VIP/VVIP Correspondence Report ••• Palghar District ••• Raigad District a) Quadrupling of the road between Murdha gaon (Subhash Chandra Bose ground) and Uttan gaon. b) Flyover from Golden Nace Circle to Deepak Hospita c) Flyover from Shivar Garden to SK Stone Signal d) Flyover from Pleasant Park to Silver Park Signal

E:\4 (1) B 2018 changes final\11-6-2018 English Changes.doc 87 Sr. Name of Designation Jurisdiction as Appellate PIO reporting E-mail i d Admini No. Appellate Authority for strative Authority purpose Officer of RTI e) Road from Vasai-Virar site crossing Bhayandar creek up to Subhash Chandra Bose ground and further joining Mira Road to Dahisar Link Road on the West of Railways 4. Flyovers in Badlapur City 5. Badlapur-Belavali Railway ROB 6. Gaimukh-Fountain Hotel Elevated Bridge 7. Construction of internal roads in Bhiwandi under extended MUIP (Pkg-I & III)-27 Roads 8. Construction of internal roads in Bhiwandi under extended MUIP (Pkg-II)-25 Roads Alibaug Building and road works 9. Primary health centre At Awas, Sasawane road, Dist: Raigad 10. Construction of Awas Sasawane Road at Dist. Raigadh

E:\4 (1) B 2018 changes final\11-6-2018 English Changes.doc 88 Sr. Name of Designation Jurisdiction as Appellate PIO reporting E-mail i d Admini No. Appellate Authority for strative Authority purpose Officer of RTI 11. SRA & All Rental Housing Schemes Independent Unit [(As per Order dated 24.11.2016 approved by AMC (D)] Under supervision of: i) Shri. Sanjay Pawar, Addl.Collector ii) Shri Balasaheb M. Vakchoure, Dy.Collector iii) Shri. Ravindra Hazare, Dy.Collector ••• MMRDA, ••• Ulhasnagar and Kalyan Jurisdiction ••• Mira Bhayander Jurisdiction 12. Newly sanctioned OARDS Works & Extended MUIP works in ••• Ulhasnagar ••• Mirabhayander ••• Ambarnath 13. Overall coordination for : Extended MUIP works 14. Mithi River Works 15. Mithi River Maintenance 16. Oshiwara District Centre works 17. Feasibility study of panvel Taloja road

E:\4 (1) B 2018 changes final\11-6-2018 English Changes.doc 89 Sr. Name of Designation Jurisdiction as Appellate PIO reporting E-mail i d Admini No. Appellate Authority for strative Authority purpose Officer of RTI 7. Shri Y.E. Superintending 1. Mumbai Trans Sakhalkar Engineer Harbour Link a. Pkgs. No. - 1(Marine) Description - Sewri Interchange at Ch 0.0 Km up to Ch. 10.38 Km b. Pkgs. No. - 4(ITS) Description - Intelligent transport system (ITS) 2. R & R Land acquisition on Mumbai side 3. MTHL- EMP related works 4. Mantralaya / Delhi / NGT related 5. GKRK Consulting services of NP Bridging 6. Sewri-Worli Elevated Project 7. DPR Sewri interchange 8. BKC Connector

E:\4 (1) B 2018 changes final\11-6-2018 English Changes.doc 90

Section 4 (1) (b) (xvii)

Administrative information about Engineering Division in MMRDA Nil.